STOCK TITAN

Bravada Commences Drill Program at Wind Mountain Gold Project, Nevada

(Moderate)
(Neutral)
Tags

Bravada Gold (TSXV: BVA, OTC: BGAVD) has begun an approximately 2,300m reverse-circulation drill program at its wholly owned Wind Mountain Gold Project in Nevada. The work includes 31 shallow holes testing historic waste dumps and 16 deeper holes targeting resource extensions near the Wind and Breeze pits, with completion expected by the end of Q3 2026.

Bravada has also staked 60 new claims west of the deposit, expanding Wind Mountain from 124 to 184 claims and to about 1,490 hectares (3,600 acres). The updated PEA for Wind Mountain remains on schedule, with results anticipated in the third quarter.

Loading...
Loading translation...

Positive

  • 2,300m drill program targeting dumps and resource extensions at Wind Mountain
  • Wind Mountain land position expanded by 60 claims to 184 claims
  • Project area increased to approximately 1,490 hectares (3,600 acres)
  • Updated Wind Mountain PEA results expected in Q3 2026

Negative

  • None.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Vancouver, British Columbia--(Newsfile Corp. - August 5, 2026) - Bravada Gold Corporation (TSXV: BVA) ("Bravada" or the "Company") is pleased to announce that it has commenced an approximately 2,300 m drill program at its wholly owned Wind Mountain Gold Project in Nevada ("Wind Mountain" or the "Project").

Wind Mountain Drill Program

The drill program is comprised of two targets: historic waste dumps and extensions of the current resources, with many of the possible extensions beneath the dumps. The program includes 31 holes ranging from 7 to 30 m in depth to test historic waste dumps, with the objective of fully converting these dumps into resources. It also includes 16 holes, most of which will be extensions of the dump test holes, ranging from 60 to 210 m in depth to target resource expansion at the Wind and Breeze pits. Drilling will be completed using a single reverse-circulation drill rig utilizing a casing advance technique for the dump portions of the holes and is expected to be finished by the end of the third quarter.

Staking of Additional Claims

The Company has recently completed the staking of 60 new claims west of the deposit. The additional claims expand Wind Mountain's land position by nearly 50%, increasing the Project from 124 claims to 184 claims and bringing the total area to approximately 1,490 hectares (3,600 acres). The new claims strengthen the Project's exploration potential and cover areas being considered for heap-leach infrastructure in the upcoming updated PEA.

Updated PEA

The updated PEA remains on schedule, and results are expected to be announced in the third quarter.

Qualified Person

Joseph Anthony Kizis, Jr. (AIPG CPG-11513), Vice President of Exploration and a Director of Bravada Gold Corporation, is the qualified person responsible for reviewing and preparing the technical data presented in this release and has approved its disclosure.

About Bravada Gold

Bravada Gold Corporation is advancing the past-producing Wind Mountain gold-silver project in Nevada. The project is the Company's primary development focus and is being evaluated for a potential return to production.

A 2022 Preliminary Economic Assessment for Wind Mountain indicated compelling project economics, supporting the Company's continued work to advance the project through the next stages of development.

In addition to Wind Mountain, Bravada maintains significant exploration upside across its Nevada-based property portfolio, including the potential for new discoveries.

On behalf of the Board of Directors

Dr. Paul West-Sells
President, CEO, & Director
Bravada Gold Corporation

For further information, please visit Bravada Gold Corporation's website at bravadagold.com; or contact us at 604.641.2759 or by email info@bravadagold.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements in this news release include conducting a drill program and PEA for the Wind Mountain project. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. These statements are based on a number of assumptions, including, but not limited to, assumptions regarding general economic conditions, interest rates, commodity markets, regulatory and governmental approvals for the company's projects, and the availability of financing for the company's development projects on reasonable terms. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, the timing and receipt of government and regulatory approvals, and continued availability of capital and financing and general economic, market or business conditions.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/307985

FAQ

What drilling program did Bravada Gold (BGAVD) start at Wind Mountain in August 2026?

Bravada Gold began a roughly 2,300m reverse-circulation drill program at Wind Mountain in August 2026. According to Bravada Gold, 31 shallow holes will test historic waste dumps and 16 deeper holes will target resource extensions near the Wind and Breeze pits.

How many drill holes are planned in Bravada Gold’s 2026 Wind Mountain program (BGAVD)?

The 2026 Wind Mountain program includes 47 drill holes in total. According to Bravada Gold, 31 holes from 7–30m will test historic waste dumps and 16 holes from 60–210m will target potential resource expansion at the Wind and Breeze pits.

How much did Bravada Gold (BGAVD) expand the Wind Mountain claim package in 2026?

Bravada Gold added 60 new claims at Wind Mountain in 2026. According to Bravada Gold, the project expanded from 124 to 184 claims, covering about 1,490 hectares (3,600 acres) and nearly increasing the land position by 50%.

When will Bravada Gold’s updated PEA for Wind Mountain (BGAVD) be released?

Bravada Gold expects to release the updated PEA for Wind Mountain in the third quarter. According to Bravada Gold, the study remains on schedule and will incorporate new claims and potential heap-leach infrastructure locations.

What is the purpose of testing historic waste dumps at Bravada Gold’s Wind Mountain project (BGAVD)?

The drill program aims to fully convert historic waste dumps into resources at Wind Mountain. According to Bravada Gold, 31 shallow holes will test these dumps, with many deeper extensions also targeting additional resource potential beneath them.

When is Bravada Gold’s 2026 Wind Mountain drilling expected to finish, and what rig is used?

The 2026 Wind Mountain drilling is expected to be completed by the end of the third quarter. According to Bravada Gold, a single reverse-circulation drill rig using a casing-advance technique will complete both dump and resource-extension holes.