STOCK TITAN

Blackrock Silver Drills 5.03 Metres of 750 g/t AgEq (Including 1.83 Metres of 1,661 g/t AgEq) and Reports Multiple Thick Mineralized Zones in First Assays from Eastern Expansion Drill Program at Tonopah West

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Negative)
Tags

Blackrock Silver (OTCQX: BKRRF) reported partial assays from its Eastern Expansion drill program at Tonopah West on October 27, 2025. Initial results include TXC25-166: 5.03 m @ 750 g/t AgEq (including 1.83 m @ 1,661 g/t AgEq) and TXC25-159: 8.75 m @ 193 g/t AgEq (including 0.82 m @ 1,217 g/t AgEq). Other notable intercepts: TXC25-164 5.67 m @ 263 g/t AgEq and TXC25-160 1.52 m @ 807 g/t AgEq. The Program drilled 6,798 m in 24 holes, with true thickness estimated at 75%–85% of drilled intervals and a 150 g/t AgEq cut-off. Assays remain pending for multiple holes, and results highlight an eastward mineralized trend up to ~1,200 m from DPB South.

Blackrock Silver (OTCQX: BKRRF) ha riferito i risultati parziali delle analisi dal suo programma di trivellazione East Expansion a Tonopah West il 27 ottobre 2025. I risultati iniziali includono TXC25-166: 5,03 m @ 750 g/t AgEq (inclusa 1,83 m @ 1.661 g/t AgEq) e TXC25-159: 8,75 m @ 193 g/t AgEq (inclusa 0,82 m @ 1.217 g/t AgEq). Altri intercetti notabili: TXC25-164 5,67 m @ 263 g/t AgEq e TXC25-160 1,52 m @ 807 g/t AgEq. Il programma ha trivellato 6.798 m in 24 pozzi, con uno spessore reale stimato tra il 75% e l'85% degli intervalli trivellati e una soglia di taglio di 150 g/t AgEq. Le analisi sono ancora in attesa per molte trivellazioni, e i risultati evidenziano una tendenza mineralizzata verso est fino a ~1.200 m dal DPB South.

Blackrock Silver (OTCQX: BKRRF) informó ensayos parciales de su programa de perforación de Expansión Este en Tonopah West el 27 de octubre de 2025. Los resultados iniciales incluyen TXC25-166: 5,03 m a 750 g/t AgEq (incluye 1,83 m a 1.661 g/t AgEq) y TXC25-159: 8,75 m a 193 g/t AgEq (incluye 0,82 m a 1.217 g/t AgEq). Otros contactos notables: TXC25-164 5,67 m a 263 g/t AgEq y TXC25-160 1,52 m a 807 g/t AgEq. El programa perforó 6.798 m en 24 hoyos, con espesor real estimado entre el 75% y el 85% de los intervalos perforados y un corte de 150 g/t AgEq. Las pruebas siguen pendientes para múltiples hoyos, y los resultados destacan una tendencia mineralizada hacia el este de hasta ~1,200 m desde DPB South.

Blackrock Silver (OTCQX: BKRRF)가 Tonopah West의 동부 확장 드릴 프로그램의 부분 분석을 2025년 10월 27일 보고했습니다. 초기 결과로 TXC25-166: 5.03 m @ 750 g/t AgEq(포함 1.83 m @ 1,661 g/t AgEq) 및 TXC25-159: 8.75 m @ 193 g/t AgEq (포함 0.82 m @ 1,217 g/t AgEq) 가 포함됩니다. 다른 주목할 만한 인터섹트: TXC25-164 5.67 m @ 263 g/t AgEq 및 TXC25-160 1.52 m @ 807 g/t AgEq. 이 프로그램은 24개 구멍에서 총 6,798 m를 시추했으며, 실제 두께는 시추 구간의 75%–85%로 추정되고 150 g/t AgEq 컷오프를 사용합니다. 여러 구멍에 대한 분석은 아직 대기 중이며, 결과는 DPB South로부터 동쪽으로 약 1,200 m까지의 광맥 경향을 강조합니다.

Blackrock Silver (OTCQX : BKRRF) a communiqué des essais partiels de son programme de forage d'expansion est à Tonopah West le 27 octobre 2025. Les résultats initiaux incluent TXC25-166 : 5,03 m à 750 g/t AgEq (dont 1,83 m à 1 661 g/t AgEq) et TXC25-159 : 8,75 m à 193 g/t AgEq (dont 0,82 m à 1 217 g/t AgEq). D'autres intersections notables : TXC25-164 5,67 m à 263 g/t AgEq et TXC25-160 1,52 m à 807 g/t AgEq. Le programme a foré 6 798 m sur 24 trous, avec une épaisseur réelle estimée entre 75 % et 85 % des intervalles forés et un seuil de coupure à 150 g/t AgEq. Les analyses restent en attente pour plusieurs trous, et les résultats mettent en évidence une tendance minéralisée vers l'est jusqu'à environ 1 200 m à partir de DPB South.

Blackrock Silver (OTCQX: BKRRF) berichtete partielle Proben aus seinem Eastern Expansion-Bohrprogramm in Tonopah West am 27. Oktober 2025. Erste Ergebnisse umfassen TXC25-166: 5,03 m bei 750 g/t AgEq (einschließlich 1,83 m bei 1.661 g/t AgEq) und TXC25-159: 8,75 m bei 193 g/t AgEq (einschließlich 0,82 m bei 1.217 g/t AgEq). Weitere bemerkenswerte Abschnitte: TXC25-164 5,67 m bei 263 g/t AgEq und TXC25-160 1,52 m bei 807 g/t AgEq. Das Programm umfasste 6.798 m in 24 Bohrungen, mit einer realen Mächtigkeit von geschätzt 75%–85% der gebohrten Abschnitte und einem Cut-off von 150 g/t AgEq. Die Assays stehen noch für mehrere Löcher aus, und die Ergebnisse heben eine östliche mineralisierte Tendenz bis zu ca. 1.200 m vom DPB South hervor.

Blackrock Silver (OTCQX: BKRRF) أبلغت عن اختبارات جزئية من برنامج الحفر في التوسع الشرقي بموقع Tonopah West في 27 أكتوبر 2025. النتائج الأولية تشمل TXC25-166: 5.03 م عند 750 ج/ط AgEq (تشمل 1.83 م عند 1,661 ج/ط AgEq) و TXC25-159: 8.75 م عند 193 ج/ط AgEq (تشمل 0.82 م عند 1,217 ج/ط AgEq). نقاط مميزة أخرى: TXC25-164 5.67 م عند 263 ج/ط AgEq و TXC25-160 1.52 م عند 807 ج/ط AgEq. البرنامج حفر 6,798 م في 24 بئرًا، مع تقدير السماكة الحقيقية بنسبة 75%–85% من الفواصل الحفر واستخدام حد قطع 150 ج/ط AgEq. لا تزال النتائج في انتظار لعدة آبار، وتبرز النتائج اتجاهًا mineralized نحو الشرق حتى نحو ~1,200 م من DPB South.

Blackrock Silver (OTCQX: BKRRF) 于 2025 年 10 月 27 日披露了在 Tonopah West 东扩钻探计划中的部分分析结果。初步结果包括 TXC25-166: 5.03 m @ 750 g/t AgEq(含 1.83 m @ 1,661 g/t AgEq)和 TXC25-159: 8.75 m @ 193 g/t AgEq(含 0.82 m @ 1,217 g/t AgEq)。其他重要段:TXC25-164 5.67 m @ 263 g/t AgEq 以及 TXC25-160 1.52 m @ 807 g/t AgEq。该计划共钻探 6,798 m in 24 holes,实际厚度估计为所钻区间的 75%–85%,截断值为 150 g/t AgEq。多孔洞的分析仍在等待中,结果显示向东延伸的矿化趋势,距 DPB South 大约 1,200 m

Positive
  • TXC25-166: 5.03 m @ 750 g/t AgEq (incl. 1.83 m @ 1,661 g/t AgEq)
  • TXC25-159: 8.75 m @ 193 g/t AgEq (incl. 0.82 m @ 1,217 g/t AgEq)
  • Program drilled 6,798 m across 24 holes
  • Thick mineralized intervals of 5.03–8.75 m encountered
Negative
  • Assays pending for 13 Eastern Expansion holes
  • Holes TXC25-156, -162, -165 returned no significant results
  • Two pre-collar holes were not usable for core tails

The Eastern Expansion Drill Program Is Targeting Prospective Shallow Mineralization Encountered in Scout Drilling Across a 1.2 Kilometre Trend

EASTERN EXPANSION PROGRAM HIGHLIGHTS:

  • TXC25-166 cut 5.03 metres grading 750 grams per tonne (g/t) silver equivalent (AgEq) (306.8 g/t silver (Ag) & 4.06 g/t gold (Au)) from 165.2 metres, including 1.83 metres grading 1,661 g/t AgEq (724 g/t Ag & 8.58 g/t Au);

  • TXC25-159 drilled 8.75 metres grading 193 g/t AgEq (90.3 g/t Ag & 0.94 g/t Au) from 234.1 metres, including 0.82 metres grading 1,217 g/t AgEq (567.7 g/t Ag & 5.95 g/t Au);

  • TXC25-164 intercepted 5.67 metres of 263 g/t AgEq (3.6 g/t Ag & 2.38 g/t Au) from 180.0 metres, including 1.1 metres grading 955 g/t AgEq (9.2 g/t Ag & 8.67 g/t Au);

  • TXC25-160 cut 1.52 metres of 807 g/t AgEq (79.4 g/t Ag & 6.66 g/t Au) from 146.3 metres; and

  • Assays for 13 drillholes under the Eastern Expansion Drill Program remain pending at this time.

Vancouver, British Columbia--(Newsfile Corp. - October 27, 2025) - Blackrock Silver Corp. (TSXV: BRC) (OTCQX: BKRRF) (FSE: AHZ0) ("Blackrock" or the "Company") announces partial assay results from its fully-funded eastern expansion drill program (the "Eastern Expansion Program" or the "Program") at its 100% owned Tonopah West project located in Nye and Esmeralda Counties, Nevada, United States ("Tonopah West").

The Eastern Expansion Program was a follow-up to the Company's scout drill program (the "Scout Program") at Tonopah West completed in February 2025 (see March 31, 2025 news release), which showed significant potential to expand the DPB South resource area 1,200 metres in an easterly direction (the "Eastern Expansion Zone").

The Eastern Expansion Program commenced in July 2025 within the Eastern Expansion Zone, utilizing reverse circulation (RC) drilling to establish initial holes, which were then deepened using diamond core drilling (core tails) for more detailed geological analysis. The Program drilled a total of 6,798 metres (22,896 feet) in twenty-four drillholes, however, only 22 drillholes were completed, as two pre-collar holes were not usable for core tails. Of the 22 completed drillholes, three were core holes completed from surface.

Andrew Pollard, Blackrock's President and Chief Executive Officer, stated: "Initial assays from our Eastern Expansion Program have returned both high-grades and broad zones of shallow silver and gold intercepts potentially extending up to 1,200 metres along trend from the DPB South Resource shell. At the historic Ohio mine area on the eastern margin of Tonopah West, hole TXC25-166 intersected 5.03 metres grading 750 g/t AgEq, offsetting the mineralized structure first identified in RC hole TW25-128, which returned two 1.52 metres zones grading 1,198 g/t Ag and 9.61 g/t Au starting at 292.6 metres and 219 g/t Ag and 1.72 g/t Au starting at 297.2 metres earlier this year. Thick zones of mineralization, spanning between 5.67 to 8.75 metres were encountered in drillholes TXC25-164 and TXC25-159 just east of the existing DPB South resource area, situated in close proximity to our planned exploration decline. As our geologic model continues to advance along the outer ring of the fraction caldera, and with assays pending from an additional 13 drillholes under the Program, this emerging zone represents significant tonnage potential that can meaningfully expand the Tonopah West mineral resource base stemming from the edge of DPB South zone through to the eastern boundary of Tonopah West."

Table 1 summarizes the results of the Eastern Expansion Program using a cut-off grade of 150 g/t AgEq.

Table 1: Eastern Expansion Program Significant Results

Drillhole IDProgramAreaHole TypeFrom (m)To (m)Drillhole Interval (m)Ag g/tAu g/tAgEq g/t
TXC25-158E ExpansionDPB SouthRC/Core146.30147.831.52123.00.852216.0
TXC25-158E ExpansionDPB SouthRC/Core272.83273.861.0417.92.353274.8
Including273.56273.860.3059.87.970930.1
TXC25-159E ExpansionDPB SouthRC/Core234.18242.938.7590.30.943193.3
Including241.65242.470.82567.75.9531217.8
TXC25-160E ExpansionDPB SouthRC/Core146.30147.831.5279.46.660806.6
TXC25-164E ExpansionDPB SouthRC/Core180.44186.115.673.62.379263.4
Including185.01186.111.109.28.670955.9
TXC25-166E ExpansionOhioRC/Core160.17160.780.61114.91.658296.0
TXC25-166E ExpansionOhioRC/Core165.20170.235.03306.84.062750.3
Including166.73168.561.83724.18.5771660.6
AgEq = Ag + Au/(Factor); where Factor = (Ag Price/Au Price)*(Ag Recovery/Au Recovery) or Factor=($27/$2,700)*(87%/95%)=0.009157; True thickness is 75% to 85% of drill interval; NSV=No values above cut off; Cut-off grade is 150 g/t AgEq; RC/Core = RC pre-collar with core tail; Core is core from the surface.

 

Thick intervals were noted in TXC25-159, -164 and -166 which ranged between 5.03 to 8.75 metres. True thickness is estimated to be between 75% and 85% of the drilled interval. The thick mineralized intervals speaks to the potential of the Eastern Expansion Zone.

TXC25-166 and TW25-128 (Scout Program) cut thick, and high-grade intervals along the Pittsburg-Monarch fault system which is oriented north-northwest. This splay of the fault opens additional upside along the eastern margin of the property from TW25-128, which returned 1.52 metres grading 1,198 g/t Ag and 9.61 g/t Au (see March 31, 2025 news) towards TW20-001, which cut 28.96 metres of 435.7 g/t Ag and 5.29 g/t Au, representing a horizontal distance of approximately 1,100 metres.

Drillholes TXC25-157, -161 and -163 were mineralized with TXC25-161 returning 2.4 g/t Ag and 0.92 g/t Au over 1.98 metres, and TXC25-163 yielding 31.7 g/t Ag and 0.78 g/t Au over 0.95 metres. TXC25-157 encountered 0.46 metres grading 60.2 g/t Ag and 0.74 g/t Au. TXC25-156, -162, and -165 did not return significant results.

Assay results for eleven Eastern Expansion holes (TXC25-167 through -170 and TXC25-172 through -177 and TXC25-179 are pending at this time. TXC25-171 and TXC25-178 were completed in the DPB South resource area, and assays are pending for these two holes at this time.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/676/271960_e0ea6e7dc4eb3bef_001.jpg

Figure 1: Drillhole location map for the Eastern Expansion drillholes reported in this news release

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/271960_e0ea6e7dc4eb3bef_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/676/271960_e0ea6e7dc4eb3bef_002.jpg

Figure 2: Tonopah West expansion potential

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/271960_e0ea6e7dc4eb3bef_002full.jpg

Drillhole IDAreaProgramTypeUTM_NAD27 EUTM_NAD27 NElevation (m)Depth (ft)Depth (m)AzimuthDip
TXC25-156OhioE ExpansionRC/Core479073.04213222.01843.41000.0304.8150-60
TXC25-157DPB SouthE ExpansionRC/Core478100.04213400.01785.0888.0270.7180-60
TXC25-158DPB SouthE ExpansionRC/Core478150.04213530.01786.01165.0355.1180-60
TXC25-159DPB SouthE ExpansionRC/Core478200.04213300.01789.0878.0267.6180-55
TXC25-160DPB SouthE ExpansionRC/Core478540.04213310.01800.0953.0290.5180-65
TXC25-161DPB SouthE ExpansionRC/Core478240.04213360.01793.01050.0320.0180-65
TXC25-162OhioE ExpansionRC/Core479073.04213222.01843.4922.0281.0180-60
TXC25-163DPB SouthE ExpansionRC/Core478450.04213040.01805.0932.0284.10-65
TXC25-164DPB SouthE ExpansionRC/Core478375.04213088.01800.01042.0317.60-60
TXC25-165OhioE ExpansionRC/Core478778.04213176.01824.51130.0344.4120-50
TXC25-166OhioE ExpansionRC/Core479073.04213222.01843.41230.0374.940-75

 

Quality Assurance/ Quality Control

All sampling is conducted under the supervision of the Company's project geologists, and a strict chain of custody from the project to the sample preparation facility is implemented and monitored. The RC samples are hauled from the project site to a secure and fenced facility in Tonopah, Nevada, where they are loaded on to American Assay Laboratory's (AAL) flat-bed truck and delivered to AAL's facility in Sparks, Nevada. A sample submittal sheet is delivered to AAL personnel who organize and process the sample intervals pursuant to the Company's instructions.

The RC samples are lined out at the lab and logged into AAL's system. The samples are dried, crushed to 85% passing 10 mesh (2mm) and a 250-gram sub-sample split is collected and pulverized to 200 mesh (74 micron) in a ring and puck pulverizer. Then the pulverized material is digested and analyzed for gold using fire assay fusion and an Induced Coupled Plasma (ICP) finish on a 30-gram assay split (FA-PB30-ICP). Silver is determined using five-acid digestion and ICP analysis (ICP-5AM48). Over limits for gold and silver are determined using a gravimetric finish (GRAVAU30 and GRAVAG30). Data verification of the assay and analytical results are completed to ensure accurate and verifiable results. Blackrock personnel insert a blind prep blank, lab blank or a certified reference material approximately every 15th to 20th sample.

Qualified Persons

Blackrock's exploration activities at Tonopah West are conducted and supervised by Mr. William Howald, Executive Chairman of Blackrock. Mr. William Howald, AIPG Certified Professional Geologist #11041, is a Qualified Person as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects. He has reviewed and approved the contents of this news release.

About Blackrock Silver Corp.

Backed by gold and silver ounces in the ground, Blackrock is a junior precious metal focused exploration and development company driven to add shareholder value. Anchored by a seasoned Board of Directors, the Company is focused on its 100% controlled Nevada portfolio of properties consisting of low-sulphidation, epithermal gold and silver mineralization located along the established Northern Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada.

Additional information on Blackrock Silver Corp. can be found on its website at www.blackrocksilver.com and by reviewing its profile on SEDAR at www.sedarplus.ca.

Cautionary Note Regarding Forward-Looking Statements and Information

This news release contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking statements") within the meaning of Canadian and United States securities legislation, including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, are forward-looking statements. Forward-looking statements in this news release relate to, among other things: the Company's strategic plans; the completion of the Company's Eastern Expansion Program at Tonopah West and the anticipated objectives and results therefrom; material expansion of the Tonopah West mineral resource base; the Company's de-risking initiatives at Tonopah West; estimates of mineral resource quantities and qualities; estimates of mineralization from drilling; geological information projected from sampling results; and the potential quantities and grades of the target zones.

These forward-looking statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; the historical basis for current estimates of potential quantities and grades of target zones; the availability of skilled labour and no labour related disruptions at any of the Company's operations; no unplanned delays or interruptions in scheduled activities; all necessary permits, licenses and regulatory approvals for operations are received in a timely manner; the ability to secure and maintain title and ownership to properties and the surface rights necessary for operations; and the Company's ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

The Company cautions the reader that forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such forward-looking statements contained in this news release and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data; general market and industry conditions; and those factors identified under the caption "Risks Factors" in the Company's most recent Annual Information Form.

Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For Further Information, Contact:

Andrew Pollard
President and Chief Executive Officer
(604) 817-6044
info@blackrocksilver.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/271960

FAQ

What were Blackrock Silver (BKRRF) headline assay results from Tonopah West on October 27, 2025?

Headline assays include TXC25-166: 5.03 m @ 750 g/t AgEq (incl. 1.83 m @ 1,661 g/t AgEq) and TXC25-159: 8.75 m @ 193 g/t AgEq (incl. 0.82 m @ 1,217 g/t AgEq).

How many metres and holes did Blackrock drill in the Eastern Expansion Program at Tonopah West?

The Program drilled a total of 6,798 metres across 24 drillholes, with 22 holes completed for core tails.

How much of the Eastern Expansion assays are still pending for BKRRF?

Assays remain pending for 13 holes from the Eastern Expansion Program at the time of the release.

What true thickness should investors assume for the reported Tonopah West intercepts?

True thickness is estimated at 75%–85% of the drilled interval for the reported intercepts.

Which Eastern Expansion holes returned no significant results in the October 27, 2025 release?

Holes TXC25-156, TXC25-162, and TXC25-165 did not return significant results.

Do the October 2025 assays indicate an eastward resource extension at Tonopah West for BKRRF?

Initial assays highlight mineralized intercepts that potentially extend the DPB South trend up to ~1,200 metres eastward, subject to pending assays and further interpretation.
Blackrock Silver Corp

OTC:BKRRF

BKRRF Rankings

BKRRF Latest News

BKRRF Stock Data

166.71M
262.86M
17.05%
12.68%
Other Precious Metals & Mining
Basic Materials
Link
Canada
Vancouver