STOCK TITAN

CDSG PLANS HIGHLY PROFITABLE GOLD PRODUCTION IN WESTERN TANZANIA

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags
Titan Lithium Inc. (CDSG) plans to profitably produce gold in Western Tanzania by entering a co-production agreement to recover gold from processed tailings. The company is setting up a 200 ton per day Carbon in Pulp (CIP) processing plant with low operating costs of $400-$500 per ounce. The project is located in a region with significant gold deposits, and a successful pilot test program has already been conducted, aiming for positive cash flow generation of over $5 million annually.
Titan Lithium Inc. (CDSG) prevede di produrre oro in modo redditizio nell'ovest della Tanzania stipulando un accordo di coproduzione per recuperare l'oro dai residui lavorati. L'azienda sta allestendo un impianto di lavorazione Carbon in Pulp (CIP) da 200 tonnellate al giorno con costi operativi bassi, tra i 400 e i 500 dollari per oncia. Il progetto si trova in una regione con depositi significativi di oro, e un programma pilota di test riuscito è già stato condotto, con l'obiettivo di generare un flusso di cassa positivo di oltre 5 milioni di dollari all'anno.
Titan Lithium Inc. (CDSG) planea producir oro de manera rentable en el oeste de Tanzania mediante un acuerdo de coproducción para recuperar oro de los residuos procesados. La compañía está estableciendo una planta de procesamiento de Carbon in Pulp (CIP) de 200 toneladas por día con bajos costos operativos de $400-$500 por onza. El proyecto está ubicado en una región con depósitos significativos de oro, y ya se ha llevado a cabo con éxito un programa piloto de prueba, apuntando a la generación de un flujo de caja positivo de más de $5 millones anuales.
타이탄 리튬 주식회사(CDSG)는 서부 탄자니아에서 가공된 꼬리찌에서 금을 회수하기 위해 공동 생산 계약을 체결하여 수익성 있게 금을 생산할 계획입니다. 회사는 하루 200톤 처리량의 카본 인 펄프(CIP) 가공 설비를 설치하고 있으며, 운영 비용은 온스당 400-500달러로 낮습니다. 이 프로젝트는 금 매장량이 풍부한 지역에 위치하고 있으며, 이미 성공적인 파일럿 테스트 프로그램이 실시되었고, 연간 500만 달러 이상의 긍정적인 현금 흐름 창출을 목표로 하고 있습니다.
Titan Lithium Inc. (CDSG) envisage de produire de l'or de manière rentable dans l'ouest de la Tanzanie en concluant un accord de coproduction pour récupérer l'or des résidus traités. La société met en place une usine de traitement Carbon in Pulp (CIP) de 200 tonnes par jour avec des coûts d'exploitation bas de 400 à 500 dollars par once. Le projet est situé dans une région avec d'importants gisements d'or et un programme de test pilote réussi a déjà été mené, visant à générer un flux de trésorerie positif de plus de 5 millions de dollars par an.
Titan Lithium Inc. (CDSG) plant, profitabel Gold im Westen Tansanias zu produzieren, indem es eine Koproduktionsvereinbarung eingeht, um Gold aus verarbeiteten Rückständen zu gewinnen. Das Unternehmen richtet eine Carbon in Pulp (CIP) Verarbeitungsanlage mit einer Leistung von 200 Tonnen pro Tag und niedrigen Betriebskosten von 400-500 Dollar pro Unze ein. Das Projekt befindet sich in einer Region mit bedeutenden Goldvorkommen, und ein erfolgreiches Pilottestprogramm wurde bereits durchgeführt, mit dem Ziel, einen positiven Cashflow von über 5 Millionen Dollar jährlich zu erzeugen.
Positive
  • Entering into a co-production agreement in Tanzania to recover gold from tailings.
  • Planning a 200 ton per day CIP processing plant with low operating costs of $400-$500 per ounce.
  • Located in a region with large gold deposits, including the Geita and Bulyanhulu mines.
  • Successful CIP pilot test program conducted on-site.
  • Predicted annual operating costs of under $2.0 million could generate over $5 million in positive cash flow.
Negative
  • None.

Las Vegas, NV., April 22, 2024 (GLOBE NEWSWIRE) -- Titan Lithium Inc., (OTC Markets: CDSG) (the “Company” or “CDSG”) is pleased to announce CDSG has entered into a co-production agreement with a company based in Tanzania to recover gold from the processed tailings within the heart of the gold region of Tanzania.

The Company is presently planning a 200 ton per day Carbon in Pulp (“CIP”) processing plant that will serve to initially process 20,000 - 30,000 tons of tailings annually. CDSG has begun sourcing out prefabricated CIP plants that are available. Typically, CIP plant costs include all materials, shipping and construction. Operating costs per gold ounce for the CIP plant is anticipated to be extremely low, between $400 - $500 per ounce, which will allow the company to achieve robust profits per ounce.

The processing project is located in the northwest of Tanzania within a world class region containing many large gold deposits including the Geita mine, operated by AngloGold Ashanti, a deposit which has been in operation for over 50 years and still contains 9.9 Moz of gold resources and the Bulyanhulu mine containing gold, silver and copper operated by Barrick Gold.

Recently, a CIP pilot test program at the site proved very effective in recovering gold at the site. CDSG intends to rapidly develop positive cash flow for the company. Predicted annual operating costs of under $2.0 million could generate over $5 million in positive cash flow which could run for 7 to 10 years.

Harp Sangha, Chairman of CDSG states, “This step into gold production is game changer for the company. The market conditions are excellent for low-cost gold production and nearby to the CIP plant our local geologic team has identified at least 7 other gold targets which will allow us to expand our production efforts in the area.”

About the Company: China Dongsheng International Inc. (OTC Markets: CDSG), through its wholly owned subsidiary Titan Lithium, Inc., is a lithium explorer and developer with operations in Nevada, USA and The United Republic of Tanzania.

Contact:

Harp Sangha-Chairman

sanghaharp1964@gmail.com        

+1-702-595-2247

titanlithiuminc.com


Forward-Looking Statements:

This press release may contain "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995, such as statements relating to financial results and plans for future development activities and are thus prospective. Forward-looking statements include all statements that are not statements of historical fact regarding intent, belief or current expectations of the Company, its directors or its officers.  Investors are cautioned that any such forward-looking statements are not guarantees of future performance and involve risks and uncertainties, many of which are beyond the Company's ability to control. Actual results may differ materially from those projected in the forward-looking statements. Among the factors that could cause actual results to differ materially from those indicated in the forward-looking statements are risks and uncertainties associated with the Company's business and finances in general, including the ability to continue and manage its growth, competition, global economic conditions and other factors discussed in detail in the Company's periodic filings with the Securities and Exchange Commission.


FAQ

What is Titan Lithium Inc. (CDSG) planning to produce in Western Tanzania?

Titan Lithium Inc. (CDSG) plans to produce gold by recovering it from processed tailings in Western Tanzania.

What type of processing plant is Titan Lithium Inc. (CDSG) setting up?

Titan Lithium Inc. (CDSG) is setting up a 200 ton per day Carbon in Pulp (CIP) processing plant.

Where is the processing project located?

The processing project is located in the northwest of Tanzania, in a region with significant gold deposits.

What are the predicted operating costs per ounce for the CIP plant?

The operating costs per ounce for the CIP plant are anticipated to be between $400-$500.

How much positive cash flow is predicted to be generated annually?

Predicted annual operating costs of under $2.0 million could generate over $5 million in positive cash flow.

CHINA DONGSHENG INTL INC

OTC:CDSG

CDSG Rankings

CDSG Latest News

CDSG Stock Data

7.89M
138.46M
Pharmaceutical Preparation Manufacturing
Manufacturing
Link
United States of America
Las Vegas