Faraday Copper Closes the Acquisition of the San Manuel Project in Arizona and Mobilizes Drill Rigs
BHP affiliates receive board nomination rights and protections covering certain San Manuel royalty financing transactions and property transfers.
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Rhea-AI Summary
Faraday Copper (CPPKF) completed its acquisition of the San Manuel project from a BHP subsidiary, forming the Redhawk Copper Complex in Arizona. San Manuel and adjacent Copper Creek are now combined under 100% ownership. Faraday issued 131,593,046 common shares as consideration; BHP now holds approximately 32.0% on a non-diluted basis. Shares transferred or issued at closing were valued at an aggregate of $657.9 million.
Drill crews and rigs have mobilized for a planned 24,000-metre program to confirm historical estimates at San Manuel and Kalamazoo. Faraday expects drilling in the coming days, resource estimates for both projects by mid-2027, and a Phase I prefeasibility study in 2028. San Manuel's historical estimates are not current mineral resources. Development pathways remain conceptual and depend on technical studies, permitting and economic evaluation.
How this balance works
Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.
It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.
Rhea-AI Sentiment measures something else, the tone of the wording.
Hollow bars mark forward-looking points. How the balance works
Positive
- Major pointSan Manuel acquisition completed, combining it with Copper Creek into the 100%-owned Redhawk Copper Complex.
- Minor pointApproximately 27,000 acres of private land added, with access to regional road, rail, gas and power infrastructure.
- Minor point. Forward-looking: it has not happened yet and may not happen.24,000 metres of drilling planned; crews and rigs mobilized, with drilling expected in the coming days.
- Minor point. Forward-looking: it has not happened yet and may not happen.Drilling program will evaluate potential silver and gold credits and supply metallurgical samples and geotechnical data.
- Minor point. Forward-looking: it has not happened yet and may not happen.Resource estimates expected by mid-2027 for Copper Creek and San Manuel.
3 minor points
- Minor point. Forward-looking: it has not happened yet and may not happen.Phase I prefeasibility study expected in 2028, focusing on copper cathode and open-pit copper sulphide production.
- Minor point. Forward-looking: it has not happened yet and may not happen.Future Phase II study is expected to address underground production at Kalamazoo, American Eagle and Keel.
- Minor point. Forward-looking: it has not happened yet and may not happen.Existing infrastructure and brownfield sites are planned for future facilities to reduce footprint and improve capital efficiency.
Negative
- Major point131,593,046 common shares issued as acquisition consideration dilute existing shareholders.
- Minor pointDevelopment pathways remain conceptual, subject to technical studies, permitting and economic evaluation.
- Minor pointSan Manuel historical estimates use US$0.80/lb copper, remain unverified and should not support economic evaluation.
- Minor pointBHP affiliates' investor protections include rights of first refusal over certain San Manuel royalty financings and property transfers.
AI-generated analysis. How Rhea-AI works. Not financial advice.
VANCOUVER, BC / ACCESS Newswire / October 15, 2026 / Faraday Copper Corp. (" Faraday ") (TSX:FDY)(OTCQX:CPPKF) is pleased to announce the closing of its previously announced acquisition of the San Manuel project from a wholly owned subsidiary of BHP Group Limited (" BHP "). The San Manuel project and Faraday's Copper Creek project, located in Arizona, USA, are adjacent to each other and together form the Redhawk Copper Complex (" Redhawk Complex ") (Figures 1 and 2).
Paul Harbidge, President and CEO, commented, "The acquisition of the San Manuel project marks a transformational milestone for Faraday. We have brought together two complementary assets, Copper Creek and San Manuel, to create the Redhawk Copper Complex, one of the largest undeveloped copper districts in the United States."
"This is just the beginning of Faraday's next stage of growth, as we embark on delivering key milestones over the coming months and years, aimed to deliver a multi-decade source of domestic copper. With a district-scale copper complex, a team focused on safe and disciplined execution, and the support of our key strategic shareholders we have a strong foundation as we establish a leading copper complex in the USA."
"We are excited to commence drilling at the San Manuel and Kalamazoo deposits. The program is designed to confirm the historical resource estimates and provide modern technical data to support future economic studies."
In connection with closing of the San Manuel project acquisition, Elaina Ware, Vice President Resource Centre of Excellence at BHP, and Dominic Perrottet, Vice President International Affairs and USA at BHP, are appointed to the Board of Directors of Faraday.
Strategic Rationale 1
- Significant resource potential: The two deposits are expected to become a multi-generational copper district delivering made-in-America copper.
- Accelerates pathway to production: Leveraging the private land position of the San Manuel project to facilitate the potential for expedited copper cathode production.
- Flexibility through private land and infrastructure: Adds ~27,000 acres of private land at the San Manuel project suitable for site facilities and access to existing regional infrastructure, including road, rail, gas and power.
- Streamlined infrastructure and reduced environmental footprint: Future facilities, utilizing existing infrastructure and prioritizing use of brownfield sites, to reduce the overall environmental footprint while enhancing capital efficiency.
- Potential for project staging: Prioritization of copper cathode production, followed by open-pit sulphides before development of underground operations.
- BHP becomes a strategic investor: Currently holding an aggregate of 137,993,046 common shares of Faraday (including 131,593,046 common shares issued by Faraday as consideration for the San Manuel project assets), representing approximately
32.0% of Faraday's issued and outstanding common shares (on a non-diluted basis).
Upcoming Milestones
- Drill Program: Initial 24,000 metres of drilling are planned at the San Manuel project (Figure 3), with the main goal of confirming the historical Mineral Resource Estimates 2,3 at the San Manuel and Kalamazoo deposits.
- Drill crews and rigs have been mobilized, and drilling is expected to start in the coming days.
- The program will obtain modern multi-element and mineralogical datasets to evaluate presence of potential credit elements such as silver and gold.
- Samples for metallurgical test work and geotechnical data for future studies will also be provided by this program.
- Mineral Resource Estimates: The Mineral Resource Estimates are expected by mid-2027 for the Copper Creek project and the San Manuel project.
- Prefeasibility Study: A Phase I study, expected in 2028, will focus on copper cathode production and open-pit copper sulphide production.
- A future Phase II study is expected to focus on production from the underground mineralization at the Kalamazoo, American Eagle, and Keel deposits.
- This approach allows for an expedited pathway to first copper cathode production.
Redhawk Copper Complex Overview
The
Copper Creek Project
The property hosts a porphyry copper deposit with high-grade, near-surface, breccia-hosted mineralization. Both mineralization types form the basis of the existing Mineral Resource Estimate (" MRE ") prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum standards. Copper is the primary commodity, with molybdenum, silver and gold present in varying amounts as by-products.
On May 3, 2023, Faraday announced an updated MRE and Preliminary Economic Assessment for the project, with a technical report titled "Copper Creek Project NI 43-101 Technical Report and Preliminary Economic Assessment" filed on SEDAR+ on June 13, 2023.
The project has over 280,000 metres of recent and historical drilling and modest past production. Significant exploration upside remains, with over 320 known breccia occurrences mapped at the surface, of which only 17 are included in the 2023 MRE.
San Manuel Project
The San Manuel project comprises the legacy San Manuel Copper Mine (including the San Manuel and Kalamazoo deposits and land associated with the legacy processing infrastructure), the Black Hills Quarry and the Camp Grant Quarry.
The San Manuel project previously operated as a combined underground block cave and open‑pit mine. The combined operation was one of the largest underground mines in the USA, generating over 4.2 million tonnes (4.65 short tons) of copper between 1955 and 1999 based on publicly available historical production records. Historical copper production was predominantly from underground sulphide material feeding a concentrator, while notable cathode production was achieved later in the mine's life by mining and processing of oxide material, including in-situ recovery (" ISR "). A significant historical resource 2 remained at closure, which is not compliant under the current standards of National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators (" NI 43-101 ") 3 .
The mineralization at San Manuel and Kalamazoo is well-understood. Sulphide mineralization occurs within Laramide porphyry intrusives and the surrounding Oracle granite. Supergene (oxide) mineralization formed later during tectonic extension. The Kalamazoo deposit is the downthrown extension of mineralization which was offset along the San Manuel fault. Significant exploration upside remains at the project, with limited modern exploration conducted.
A technical report on San Manuel titled " Technical Report San Manuel Property Pinal County, Arizona " was prepared by an independent qualified person in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects, which was filed on Faraday's SEDAR+ profile on July 30, 2026 and is available on the Company's website.
Appointments to the Board of Directors
In connection with closing of the San Manuel project acquisition, Elaina Ware, Vice President Resource Centre of Excellence at BHP, and Dominic Perrottet, Vice President International Affairs and USA at BHP, are appointed to the Board of Directors of Faraday.
Elaina Ware
Elaina Ware is a mining executive with over 25 years of industry experience, driving operational excellence and delivering safe, sustainable results. Ms. Ware joined BHP in March 2025 and serves as Vice President, Resource Centre of Excellence. Prior to joining BHP, she held executive leadership roles at Newmont, including SVP Planning & Mining and SVP Operations Excellence. Her career also includes operational leadership positions at Coeur Mining, where she served as Regional General Manager, and at Teck Resources, where she served as General Manager for Steelmaking Coal and Copper operations. Ms. Ware holds an Executive MBA from the Kellogg School of Management at Northwestern University and a Bachelor of Science in Mining Engineering from the University of Missouri - Rolla. She is a licensed Professional Mining Engineer.
Dominic Perrottet
Dominic Perrottet is Vice President, International Affairs and USA at BHP, based in Washington, D.C. In this role, he leads BHP's International Affairs and US Corporate Affairs teams, strengthening the company's engagement with governments, policymakers, partners, and stakeholders globally. Prior to joining BHP, Mr. Perrottet served as the 46th Premier of New South Wales from 2021 to 2023. Over a 13‑year career in the New South Wales Parliament, he held several senior economic portfolios including Treasurer, Minister for Finance, and Minister for Industrial Relations. His ministerial career was marked by a focus on economic reform, fiscal management, and major infrastructure investment. Mr. Perrottet holds degrees in law and commerce from the University of Sydney.
Figure 1: Redhawk Copper Complex Location Map
Figure 2: Regional Location Map
Figure 3: San Manuel-Kalamazoo Mineralized Footprint 3
Qualified Persons
The scientific and technical information contained in this news release has been reviewed and approved by Faraday's Vice President, Geology, Dr. Thomas Bissig, P. Geo., and Vice President, Technical Services, Zach Allwright, P.Eng., each of whom is considered a Qualified Person under NI 43-101.
Notes
1 The potential development pathways and production scenarios described herein are conceptual in nature. There is no certainty that such outcomes will be realized, and they are subject to, among other things, completion of technical studies, permitting, and economic evaluation. Future studies will evaluate the potential integration of certain development scenarios across the projects.
2 For historical resource (based on US
3 While Faraday considers the historical estimates in respect of San Manuel to be relevant to investors as they indicate the presence of copper mineralization, the mineral resource estimates referenced herein were prepared prior to the adoption of NI 43-101 and are provided as historical estimates only. The historical estimates were calculated using a copper price assumption of US
Early Warning Disclosure
Further to the requirements of National Instrument 62-104 Take-Over Bids and Issuer Bids and National Instrument 62-103 The Early Warning System and Related Take-Over Bid and Insider Reporting Issues, an amended early warning report will be filed in connection with the acquisition by subsidiaries of BHP of Faraday common shares ("Common Shares") issued by Faraday as consideration for the acquisition of the San Manuel project (the "Transaction"). Immediately prior to closing of the Transaction, BHP Copper Inc. ("BCI"), a wholly-owned subsidiary of BHP Group Limited, held 6,400,000 Common Shares, representing approximately
About Faraday Copper
Faraday Copper is a development company focused on advancing its flagship copper project in Arizona, the Redhawk Copper Complex. The Complex consists of the Copper Creek project and the adjacent past-producing San Manuel project (recently acquired from a wholly owned subsidiary of BHP Group Limited), which together form one of the largest copper districts in the U.S. Faraday is well-funded to deliver on its key milestones and is supported by its key strategic shareholders, BHP and the Lundin Family. The Company benefits from a management team and board of directors with senior mining company experience and expertise. Faraday trades on the TSX under the symbol "FDY".
For additional information please contact:
Stacey Pavlova, CFA
Vice President, Investor Relations & Communications
Faraday Copper Corp.
E-mail: info@faradaycopper.com
Website: www.faradaycopper.com
To receive news releases by e-mail, please register using the Faraday website at www.faradaycopper.com .
Cautionary Note on Forward Looking Statements
Some of the statements in this news release, other than statements of historical fact, are "forward-looking statements" and are based on the opinions and estimates of management as of the date such statements are made and are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause actual results, level of activity, performance or achievements of Faraday to be materially different from those expressed or implied by such forward-looking statements. Forward‑looking statements in this news release include, without limitation, statements relating to the anticipated strategic, operational and economic benefits of the acquisition of the San Manuel project; the future integration or development of the Copper Creek project and the San Manuel project; anticipated exploration programs, drill plans and study timelines; the timing and completion of future mineral resource estimates; the potential development pathways and production scenarios for the projects; the exploration, development and resource potential of the projects; and other statements that are not historical facts.
Although Faraday believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements should not be in any way construed as guarantees of future performance and actual results or developments may differ materially. Accordingly, readers should not place undue reliance on forward-looking statements or information.
Certain forward-looking statements in this news release relate to potential future development scenarios involving the Copper Creek project and the San Manuel project. Such statements are conceptual in nature and are based on management's current expectations regarding potential future technical studies. There is no certainty that future studies will support the integration of the projects, the development pathways described herein, or the realization of any anticipated operational, economic or strategic benefits.
Factors that could cause actual results to differ materially from those in forward-looking statements include without limitation: the inability to confirm historical data or historical resource estimates; differences between actual results and assumptions used in future technical studies; the possibility that future mineral resource estimates differ materially from expectations; the inability to realize anticipated synergies or benefits from the acquisition of the San Manuel project; and the possibility that future studies do not support the development scenarios contemplated in this news release. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental events and hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and the risk of inadequate insurance or inability to obtain insurance to cover these risks as well as "Risk Factors" included in Faraday's disclosure documents filed on and available at www.sedarplus.ca .
This press release does not constitute an offer to sell or a solicitation of an offer to buy any securities in any jurisdiction to any person to whom it is unlawful to make such an offer or solicitation in such jurisdiction. This press release is not, and under no circumstances is to be construed as, a prospectus, an offering memorandum, an advertisement or a public offering of securities in Faraday in Canada, the United States or any other jurisdiction. No securities commission or similar authority in Canada or in the United States has reviewed or in any way passed upon this press release, and any representation to the contrary is an offence.
SOURCE: Faraday Copper Corp.
View the original press release on ACCESS Newswire
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
What did Faraday Copper issue to acquire the San Manuel project?
Faraday issued 131,593,046 common shares as consideration for San Manuel. BHP's aggregate holding following closing was 137,993,046 shares, representing approximately 32.0% of Faraday's outstanding common shares on a non-diluted basis.
When will Faraday Copper drill San Manuel and publish new resource estimates?
Drilling is expected to begin in the coming days, with resource estimates for San Manuel and Copper Creek expected by mid-2027. Crews and rigs have mobilized for an initial planned 24,000-metre program aimed at confirming historical estimates at San Manuel and Kalamazoo.
What board representation rights do BHP affiliates have at Faraday Copper after the San Manuel acquisition?
The investor rights agreement provides nomination rights for two directors at ownership of 15% or more, or one director at 10% or more, counting affiliated holdings, with observers available instead. Elaina Ware and Dominic Perrottet were appointed at closing. The agreement also provides representation on a joint technical advisory committee and anti-dilution and top-up rights.


