STOCK TITAN

ATERRA Metals Commences Preparation of Maiden Mineral Resource Estimate for the Totora Cu/Au Project

(Very High)
(Neutral)
Tags

ATERRA Metals (CSE: ATC, OTCQB: CSSCF) has begun preparing its maiden independent Mineral Resource Estimate (MRE) for the Totora Cu/Au Project in Chile’s Dos Amigos Mining District. ATERRA has engaged SRK Consulting (Chile) SpA to complete the NI 43-101–compliant estimate, which will define Totora’s initial mineral inventory and support future economic studies.

The MRE will integrate results from ATERRA’s Phase I drilling and historical drilling across the Frontera, Totora and Clinton copper-gold porphyry systems, with release anticipated in September 2026. Phase I highlights include 284 m grading 0.64% CuEq from surface at Frontera and 194 m at 0.41% CuEq from 254 m at Totora. Copper equivalent grades were calculated using prices of US$4.00/lb Cu and US$3,500/oz Au with assumed 85% metallurgical recoveries for both metals. The technical information was reviewed and approved by ATERRA’s Qualified Person, Chief Geologist Francisco Bravo.

Loading...
Loading translation...

Positive

  • Maiden MRE initiated for Totora with SRK as independent consultant
  • NI 43-101–compliant estimate targeting Frontera, Totora and Clinton systems
  • Phase I highlight: 284 m at 0.64% CuEq from surface at Frontera
  • Phase I highlight: 194 m at 0.41% CuEq from 254 m at Totora
  • MRE timing: initial resource targeted for release in September 2026

Negative

  • None.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Toronto, Ontario--(Newsfile Corp. - August 6, 2026) - ATERRA Metals Inc. (CSE: ATC) (OTCQB: CSSCF) ("ATERRA" or the "Company") is pleased to announce that it has commenced preparation of the Company's maiden independent Mineral Resource Estimate ("MRE") for its Totora Cu/Au Project ("Totora" or the "Project"). The maiden MRE will define Totora's initial mineral inventory and establish the technical foundation for future economic studies. ATERRA has engaged SRK Consulting (Chile) SpA ("SRK"), a leading international mining consultancy, to prepare the independent MRE. The Project is located in the Dos Amigos Mining District, 15 kilometres south of Tintina Mines' Domekyo Sulfuros development project (see Figure 1).

The MRE will be prepared in accordance with Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and will incorporate the results from ATERRA's recently completed Phase I drill program together with historical drilling completed on the Project. The estimate will focus on the Company's three principal copper-gold porphyry systems - Frontera, Totora and Clinton - which collectively represent the most advanced exploration targets on the property. It is anticipated that the MRE will be available for release during September 2026.

Carl Hansen, Chief Executive Officer of ATERRA, commented: "Our objective is to establish the first independently verified mineral resource at Totora by integrating the results from a number of historical drill programs with our successful Phase I drilling. A maiden resource will provide investors with the first quantitative assessment of the scale of the Project and guide ATERRA's future exploration and development plans. This work marks an important step toward unlocking the value of the Totora Project."

Mr. Hansen continued: "Recent investments by multiple companies in the Dos Amigos Mining District underscore renewed industry interest in the region's copper-gold potential. We believe this increasing activity highlights the strategic position of the Totora Project within an emerging mining district."

Phase I Totora Drilling Highlights

The Mineral Resource Estimate will incorporate the results of ATERRA's recently completed Phase I drill program at Totora, the highlights of which were previously disclosed in the Company's news release dated July 16, 2026. Selected drill highlights previously reported include:

  • Frontera (AFROD01): 284 metres grading 0.64% CuEq (0.41% Cu & 0.27 g/t Au) from surface, including 180 metres grading 0.71% CuEq (0.48% Cu & 0.28 g/t Au); and

  • Totora (ATOD01): 194 metres grading 0.41% CuEq (0.35% Cu & 0.11 g/t Au) from 254 metres downhole.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7721/308363_edb6003db41d1bf3_001.jpg

Figure 1 - Dos Amigos Mining District - Location of ATERRA Totora Cu/Au Project Properties

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7721/308363_edb6003db41d1bf3_001full.jpg

NI 43-101 Disclosure

Qualified Person: As defined by NI 43-101 of the Canadian Securities Administrators, the "Qualified Person" for ATERRA Metals Inc. is Francisco Bravo, a resident of Santiago, Chile. As ATERRA's Chief Geologist, Mr. Bravo is considered "not independent" as the term is defined by NI 43-101. Mr. Bravo, a Public Registered Person for Reserves and Resources in Chile (N° 515) and registered with the Colegio de Geólogos de Chile (N° 725), has reviewed and approved the technical information contained in this press release.

Copper Equivalent Estimation: Copper equivalent ("CuEq") grades were estimated using a copper price of US$4.00 per pound and a gold price of US$3,500 per ounce (US$112.53 per gram). CuEq grades are estimated using the following formula: CuEq% = (((Au grade * 0.85 * 112.53) / 4.00 / 2,204.6) * 100) + (Cu grade * 0.85).

NOTE: Regulatory requirements for disclosure of CuEq grade estimates require an estimation of metallurgical recoveries in the situation where no metallurgical testwork has been completed. ATERRA estimates copper recoveries of 85% and gold recoveries of 85%. It is important to note that actual recoveries will likely vary from those used in the estimation of the CuEq grades.

About ATERRA Metals Inc.

ATERRA Metals Inc. is a mineral exploration company focused on advancing high-quality copper and gold assets in the Americas. The Company's flagship Totora Cu/Au Project is located within Chile's highly prospective Dos Amigos Mining District and hosts multiple copper-gold porphyry systems with significant exploration and development potential.

On behalf of ATERRA Metals Inc.,

Carl Hansen, CEO
Phone: 416-953-0258
For additional information, please contact us at: info@aterrametals.com

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This news release contains forward-looking statements, including predictions, projections and forecasts. Forward-looking statements include, but are not limited to: plans for the evaluation of exploration properties; the success of evaluation plans; the success of exploration activities; mine development prospects; and, potential for future metals production. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or "does not expect", "focus is to", "continues", "scheduled", "estimates", "forecasts", "objectives", "intends", "potential", "anticipates", "does not anticipate", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", or "will" be taken, occur or be achieved.

Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: timing of the release of the MRE; changes in economic parameters and assumptions; all aspects related to the timing of exploration activities and receipt of exploration results including assays; the interpretation and actual results of current exploration activities; changes in project or exploration parameters as plans continue to be refined; the results of regulatory and permitting processes; future metals prices; possible variations in grade or recovery rates; variations in the recovery rates used in the calculation of equivalent grades; failure of equipment or processes to operate as anticipated; labour disputes and other risks of the mining industry; the results of economic and technical studies; delays in obtaining governmental approvals or financing or in the completion of exploration; as well as those factors disclosed in ATERRA's publicly filed documents.

Although ATERRA has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepts responsibility for the adequacy or accuracy of the content of this news release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/308363

FAQ

What did ATERRA Metals (CSSCF) announce about the Totora Cu/Au Project on August 6, 2026?

ATERRA Metals announced it has started preparing a maiden independent Mineral Resource Estimate for the Totora Cu/Au Project. According to ATERRA Metals, this NI 43-101–compliant MRE will define Totora’s initial mineral inventory and underpin future economic studies for the Chilean copper-gold property.

Who is preparing the maiden Mineral Resource Estimate for ATERRA Metals’ Totora project (CSSCF)?

The maiden Mineral Resource Estimate for Totora is being prepared by SRK Consulting (Chile) SpA. According to ATERRA Metals, SRK is an independent international mining consultancy engaged to complete a NI 43-101–compliant estimate for the Frontera, Totora and Clinton porphyry systems.

When is ATERRA Metals expecting to release the Totora maiden Mineral Resource Estimate for CSSCF shareholders?

ATERRA Metals anticipates releasing the Totora maiden Mineral Resource Estimate in September 2026. According to ATERRA Metals, the estimate will incorporate Phase I drilling and historical drilling to provide the first quantitative assessment of the project’s copper-gold mineral inventory.

What are the key drilling highlights supporting ATERRA Metals’ Totora MRE for CSSCF?

The MRE will include Phase I highlights such as 284 m grading 0.64% CuEq from surface at Frontera and 194 m grading 0.41% CuEq from 254 m at Totora. According to ATERRA Metals, these intercepts come from copper-gold porphyry systems on the property.

How did ATERRA Metals calculate copper equivalent (CuEq) grades for the Totora project (CSSCF)?

CuEq grades were calculated using US$4.00/lb copper and US$3,500/oz gold with 85% recoveries for both metals. According to ATERRA Metals, the CuEq formula combines gold and copper grades to express results as copper equivalent, noting actual recoveries may differ.

Who is the Qualified Person for ATERRA Metals’ Totora Cu/Au Project disclosure (CSSCF)?

The Qualified Person is Francisco Bravo, ATERRA Metals’ Chief Geologist based in Santiago, Chile. According to ATERRA Metals, he is a Public Registered Person for Reserves and Resources in Chile and has reviewed and approved the technical information related to the Totora project.

Why is the maiden Mineral Resource Estimate important for ATERRA Metals and CSSCF investors?

The maiden MRE will provide the first independent mineral resource for Totora, giving a quantitative view of project scale. According to ATERRA Metals, this resource will guide future exploration, development planning and economic studies, informing investors about the copper-gold potential.