Contango Announces Results for the Quarter Ended September 30, 2026
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Rhea-AI Summary
Contango Silver & Gold (CTGO) reported a $23.0 million net loss for the quarter ended September 30, 2026, primarily reflecting exploration spending. Operating results swung to a $24.2 million loss from $25.0 million income a year earlier; exploration expenses rose to $26.9 million from $2.1 million. Cash was $56.6 million versus $64.8 million at December 31, 2025.
Contango's share of Manh Choh production was 7,657 gold-equivalent ounces. Rain and mill downtime reduced output below budget. The company expects fourth-campaign production of 13,000–15,000 gold-equivalent ounces and production toward the lower end of 2026 guidance of 40,000 ounces. It received a $6 million joint-venture distribution on October 7 and expects another $16 million in the fourth quarter. Kitsault Valley and Lucky Shot resource updates are planned for the first half of 2027; Johnson Tract's access road and portal laydown area were completed.
How this balance works
Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.
It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.
Rhea-AI Sentiment measures something else, the tone of the wording.
Hollow bars mark forward-looking points. How the balance works
Positive
- Moderate point$6 million distribution received October 7 brought 2026 Peak Gold JV distributions to $24 million. 1.4% of market cap
- Moderate point. Forward-looking: it has not happened yet and may not happen.$16 million final distribution expected in the fourth quarter, bringing expected 2026 distributions to $40 million. 3.7% of market cap
- Moderate point. Forward-looking: it has not happened yet and may not happen.Fourth campaign expected to produce 13,000–15,000 gold-equivalent ounces, scheduled to commence in mid-November.
- Moderate pointKitsault Valley indicated resources contain 58.70 million silver ounces and 394.70 thousand gold ounces in 7.66 million tonnes.
- Moderate pointJohnson Tract's Section 404 permit remains in place following final judgment favoring JT Mining on September 15.
- Moderate point15,000 ounces of 2027 hedge obligations eliminated through the credit-facility amendment.
- Moderate pointLucky Shot mineral claims and underlying royalty acquisition closed July 1 for $16,074,000. 3.7% of market cap
16 minor points
- Minor pointManh Choh gold recovery improved to 86.5% in Q3 from 80.4% in Q2.
- Minor pointManh Choh ore mined increased approximately 16% from Q2 to approximately 304,000 tons.
- Minor point. Forward-looking: it has not happened yet and may not happen.Additional mining equipment addressed reduced availability; mill improvements were completed, with further upgrades planned.
- Minor pointKitsault Valley completed 56,000 meters of drilling, roughly 40% above plan while remaining on budget.
- Minor pointKitsault Valley inferred resources contain 22.80 million silver ounces and 620.82 thousand gold ounces in approximately 6.31 million tonnes.
- Minor pointKitsault Valley drilling included 13.90 meters at 506 g/t silver equivalent and 4.96 meters at 807 g/t.
- Minor point. Forward-looking: it has not happened yet and may not happen.Kitsault Valley plans a first-half 2027 resource update and targets an initial mine-development assessment in late 2027.
- Minor pointLucky Shot completed over 11,000 meters of drilling and 536 meters of underground tunnel development.
- Minor pointLucky Shot drilling included 2.45 meters at 86.05 g/t gold, 0.63 meters at 140.23 g/t, and 3.65 meters at 18.16 g/t.
- Minor point. Forward-looking: it has not happened yet and may not happen.Lucky Shot's next drilling and tunnel-development phase is expected to finish by February 2027.
- Minor point. Forward-looking: it has not happened yet and may not happen.Lucky Shot plans a first-half 2027 resource update and targets a feasibility study in late 2027.
- Minor point. Forward-looking: it has not happened yet and may not happen.Lucky Shot targets a direct-shipping ore operation producing 40,000–50,000 gold ounces annually, subject to stated conditions.
- Minor pointJohnson Tract completed its 2.6-mile access road and portal laydown area, and expanded its camp footprint.
- Minor point. Forward-looking: it has not happened yet and may not happen.Johnson Tract underground exploration tunnel construction remains scheduled for 2027.
- Minor point$1.0 million credit-facility repayment reduced outstanding principal to $45.3 million in Q3.
- Minor point15,000 ounces of put options carry a $3,100-per-ounce strike and mature in March and June 2027.
Negative
- Moderate point$23.0 million net loss reported for Q3, primarily related to expensed exploration across projects.
- Moderate pointPeak Gold JV income declined to $6.9 million from $29.5 million in Q3-2025.
- Moderate pointCash declined to $56.6 million at September 30 from $64.8 million at December 31, 2025.
- Moderate pointContango's gold production fell to 7,595 ounces in Q3 from 8,885 ounces in Q2.
- Moderate pointContango's gold sales fell to $31,349,035 from $36,444,202 in Q2.
- Moderate point. Forward-looking: it has not happened yet and may not happen.2026 production is guided toward the lower end of 40,000 gold-equivalent ounces.
- Moderate point. Forward-looking: it has not happened yet and may not happen.2026 cash costs and all-in sustaining costs are guided at $2,700 and $2,900 per gold ounce sold, respectively.
- Moderate pointHedge elimination required a $33,732,426 increase in secured credit-facility debt and purchase of put options. 7.7% of market cap
- Moderate point. Forward-looking: it has not happened yet and may not happen.Credit-facility repayments due are $1.0 million December 2026, $15.5 million March 2027 and $28.8 million June 2027.
12 minor points
- Minor pointOperating results fell to a $24.2 million loss from $25.0 million income in Q3-2025.
- Minor pointExploration expenditures rose to $26.9 million from $2.1 million in Q3-2025.
- Minor pointContango's silver sales fell to $334,646 from $1,055,011 in Q2.
- Minor pointBelow-budget Q3 gold production reflected rain-related curtailment, mine sequencing and mill maintenance; remaining planned ounces were deferred.
- Minor pointQ3 cash costs rose to $2,699 per ounce sold from $2,641 in Q2.
- Minor pointQ3 all-in sustaining costs rose to $2,909 per ounce sold from $2,877 in Q2.
- Minor pointHigher pre-stripping, diesel, reagent and consumable costs accompanied the south-pit transition and changed ore characteristics.
- Minor point. Forward-looking: it has not happened yet and may not happen.Lucky Shot's production target depends on technical results, permitting and a future production decision.
- Minor pointKitsault Valley's possible Torbrit–North Star connection has unestablished grade continuity; assays were pending.
- Minor pointJohnson Tract continues through the FAST-41 permitting timetable.
- Minor point. Forward-looking: it has not happened yet and may not happen.A remaining 7,000-ounce carry trade matures December 31, 2026.
- Minor pointLucky Shot acquisition includes a $10 million secured note at 5%, compounded monthly, payable annually, maturing four years after closing.
News Explained
The hedge change removed 15,000 ounces of deliveries in exchange for added secured borrowing and put options, while a separate 7,000-ounce carry trade remained outstanding.
Contango says it filed its Form 10-Q for the quarter ended
A
As of
The company lists principal repayments of
Sources and calculations
- Contango Announces Results for the Quarter Ended September 30, 2026 (2026-11-13)
- Contango Q3 2026 fundamentals (2026Q3)
- Available liquidity against the last reported quarterly operating outflow, in days at that rate ($56,643,971 + $4,764,069) / ($58,805,791 / 92) = 96.1 days
Key Figures
- Loss from operations
- $24.2 M
- Q3-2026, compared with income from operations of $25.0 M in Q3-2025
- Net loss
- $23.0 M
- Q3-2026, compared with $5.4 M in Q3-2025
- Adjusted net loss
- $20.9 M
- Q3-2026, compared with adjusted net income of $24.9 M in Q3-2025
- Exploration expenditures
- $26.9 M
- Q3-2026, compared with $2.1 M in Q3-2025
- Net cash used in operating activities
- $109.1 M
- YTD-2026, compared with $60.2 M provided by operating activities in YTD-2025
- Gold equivalent ounces sold
- decreased by 56%
- Q3-2026 compared with Q3-2025
- Fourth campaign production
- 13,000 to 15,000 ounces of gold equivalent
- Expected for the fourth and final 2026 campaign
- 2026 production guidance
- 40,000 gold equivalent ounces
- Company guiding toward the lower end
Historical Context
-
Rain ended Manh Choh's third campaign early; company guided to the lower end of 2026 output.
24h Move is the share-price change in the day after each event; other market factors may also have contributed.
Key Terms
aisc financial
net smelter return royalty financial
put option contracts financial
AI-generated analysis. How Rhea-AI works. Not financial advice.
Fairbanks, Alaska--(Newsfile Corp. - November 13, 2026) - Contango Silver & Gold Inc. (NYSE American: CTGO) (TSX: CTGO) ("Contango" or the "Company") announced today that it filed with the Securities and Exchange Commission its Form 10-Q for the quarter ended September 30, 2026 ("Q3-2026").
Rick Van Nieuwenhuyse, the Company's Chief Executive Officer said, "The focus for the third quarter was to continue to advance and de-risk our portfolio of advanced-stage exploration projects. On the mining front at Manh Choh, the Peak Gold JV completed the transition from the north pit to the south pit while significant improvements were also made to the milling facility to accommodate the higher copper and total sulfur content of the high-grade sulfide ore. Operational enhancements continue to be made ahead of our fourth 2026 campaign, scheduled to commence in mid-November with anticipated production of 13,000 to 15,000 gold equivalent ounces net to Contango, keeping us on track to meet the lower end of 2026 production guidance of 40,000 gold equivalent ounces. The Company expects to provide 2027 production and cost guidance later in December."
Mr. Van Nieuwenhuyse continued, "At Kitsault Valley we have now completed 56,000 meters of drilling, roughly
Q3-2026 Results
In Q3-2026, Contango's share of production sold from the Manh Choh mine, jointly held by Kinross and Contango, totaled 7,333 ounces of gold and 5,349 ounces of silver. Contango received a cash distribution of
Manh Choh Production Results
| Peak Gold JV (on a | Q1-2026 | Q2-2026 | Q3-2026 | YTD 2026 | |
| Total tons mined | 1.96 | 2.73 | 3.85 | 8.54 | M tons |
| Ore tons mined | 220,878 | 261,941 | 304,102 | 786,921 | tons |
| Gold oz mined | 38,415 | 45,341 | 45,369 | 129,125 | oz |
| Ore tons processed | 187,479 | 253,494 | 203,720 | 644,693 | tons |
| Gold grade processed | 0.131 | 0.145 | 0.145 | 0.142 | oz/t |
| Gold recovery | 88.6 | 80.4 | 86.5 | 84.6 | % |
| Gold oz produced | 26,890 | 29,618 | 25,315 | 81,823 | oz |
| Gold oz sold | 26,710 | 28,758 | 24,444 | 79,912 | oz |
| Silver oz sold | 50,142 | 34,397 | 17,830 | 102,369 | oz |
| Contango's Share (on a | |||||
| Gold oz produced | 8,067 | 8,885 | 7,595 | 24,547 | oz |
| Gold oz sold | 8,013 | 8,627 | 7,333 | 23,973 | oz |
| Total gold equivalent oz produced2 | 8,244 | 9,007 | 7,657 | 24,908 | oz |
| Silver oz sold | 15,042 | 10,319 | 5,349 | 30,710 | oz |
| Total gold sales | |||||
| Total silver sales | |||||
| Cash costs on a by-product basis, per oz sold3 | per oz sold | ||||
| AISC on a by-product basis, per oz sold3 | per oz sold | ||||
| Average realized spot gold price | per oz sold | ||||
| Cash distributions received from Peak Gold JV4 | $nil |
Notes:
- Certain numbers have been rounded for presentation purposes.
- Gold equivalent oz calculated using a factor of 85.1 to 1 for conversion of silver oz.
- See non-GAAP measures disclosed in the Company's 10-Q for the period ended September 30, 2026.
- On October 7, 2026 Contango received a cash distribution of
$6 million . Distributions received in 2026 total$24 million .
Manh Choh Mine:
On October 7, 2026, Peak Gold JV delivered a
Gold production for the quarter came in below budget due to several factors including:
- The third milling campaign of 2026 ended earlier than planned due to persistent above average rainy conditions in September, resulting in fewer gold ounces being processed during the quarter - the remaining planned ounces being deferred until the fourth campaign of 2026
- Tons processed at the Fort Knox mill were additionally reduced in Q3 due to mine sequencing and changes in ore characteristics at Manh Choh which resulted in increased downtime for mill maintenance and modifications to handle the higher copper and sulfide content
In Q3-2026 gold recovery at the mill was
Ore transportation from the Manh Choh mine to the Fort Knox milling facility continues to outperform and is expected to exceed our planned budget for 2026.
The cash costs and AISC for Q3-2026 were
The fourth and final campaign for 2026 is expected to produce 13,000 to 15,000 ounces of gold equivalent ounces at cash costs and AISC of
Lucky Shot Project:
Underground Drilling & Development: The initial underground drilling phase comprised 65 HQ diamond holes totaling approximately 6,020 meters. Further surface drilling, underground access and KM vein drilling are intended to support an updated resource estimate targeted for the first half of 2027, followed by feasibility evaluation in late 2027. Underground exploration-access work has resumed with contractor on site. The Company remains focused on advancing a high-grade Direct Shipping Ore (DSO) operation targeting 40,000 to 50,000 gold ounces per year, subject to technical results, permitting and a future production decision.
Surface Drilling Completed: The surface program comprised approximately 5,800 meters in 27 holes from five pads and was completed on August 31, 2026. Results announced on September 2, 2026 included LSS26016 with 2.45 meters grading 86.05 g/t Au. Subsequent to quarter end, results announced on October 6, 2026 included LSS26018 with 0.63 meters grading 140.23 g/t Au and LSS26021 with 3.65 meters grading 18.16 g/t Au. These are selected downhole intervals and true widths have not been established. Additional assays remain pending.
KM Vein Drilling: KM vein drilling began on September 16, 2026. As of the October 6, 2026 project update, the program comprised approximately 1,140 meters in 17 planned holes from five stations, with ten holes completed from the first two stations. The program is evaluating the geometry of the KM vein and its interpreted structural relationship to the Lucky Shot Fault and vein system. Assays are expected in the fourth quarter of 2026.
Kitsault Valley Project:
Expanded Drill Campaign: The 2026 drilling program was expanded from 40,000 meters to more than 56,000 meters. Results announced on September 15, 2026 included DV26-480 with 13.90 meters grading 506 g/t AgEq and DV26-494 with 4.96 meters grading 807 g/t AgEq. Intervening holes showed mineralization consistent with a possible geological connection between Torbrit and North Star; assays were pending and continuity of grade has not been established. Intervals are downhole lengths and true widths require further validation. Silver equivalent grades are calculated using the metal prices and recovery assumptions set out in the Company's September 15, 2026 news release.
Updated Mineral Resource Estimate: On September 11, 2026, the Company reported an updated MRE for the Kitsault Valley Project comprising 7.66 million tonnes of indicated resources containing 58.70 million ounces of silver and 394.70 thousand ounces of gold (89.55 million ounces AgEq), and approximately 6.31 million tonnes of inferred resources containing 22.80 million ounces of silver and 620.82 thousand ounces of gold (64.92 million ounces AgEq). The MRE is based on drilling completed through 2025 and excludes 2026 drilling. The MRE is supported by a technical report summary filed with the Company's Form 8-K on September 22, 2026. In H1-2027 the Company is planning to update the MRE with the drilling completed in 2026, which will form the basis of the IA targeted for release in late 2027.
Johnson Tract Project:
Road & Portal Access: During the third quarter, the Company completed construction of the 2.6-mile access road connecting the existing camp to the proposed portal site, along with the portal laydown area. This work supports construction of the underground exploration drift, which is scheduled to begin in 2027.
Permitting & Site Preparation: Environmental and cultural surveys within the Johnson Tract and project easements were largely completed during the season and the baseline program is substantially advanced. Geotechnical investigations within the foreshore have been completed and investigations along the proposed coastal road are substantially complete. The project continues to advance under the FAST-41 permitting timetable and remains on schedule for underground exploration tunnel construction to begin in 2027.
Section 404 Permit Upheld: On September 14, 2026, the U.S. District Court for the District of Alaska ruled in favor of JT Mining in the lawsuit challenging the Johnson Tract Section 404 permit. Final judgment in favor of JT Mining was entered on September 15, 2026, and the permit remains in place.
Repayments of Debt, Elimination of Hedge Contracts and Financing:
- The Company's cash and cash equivalents position as of September 30, 2026 was
$56.6 M .
- In Q3-2026, Contango repaid
$1.0 M on the amended credit facility, reducing the outstanding principal balance to$45.3 M .
- In Q3-2026, the Company delivered 4,000 gold ounces into its carry trade hedge contracts and cash settled the remaining 15,000 ounces of hedge contracts maturing in March and June 2027 as part of the credit facility amendment (see Corporate Development Activities), eliminating all remaining hedge delivery obligations, with the exception of the 7,000 ounces of carry trade noted below. For the first nine months of 2026, the Company delivered and cash settled a total of 43,000 gold ounces under the hedge contracts.
- As of September 30, 2026, the Company had a carry trade outstanding for 7,000 ounces maturing on December 31, 2026, and put options for 15,000 ounces with a strike price of
$3,100 per ounce maturing in March and June 2027.
Corporate Development Activities:
Amendment to the Credit Facility:
On July 1, 2026, the Company amended its Credit Agreement pursuant to which the delivery of a total of 15,000 ounces of hedge contracts maturing in March and June 2027 were eliminated in exchange for (i) an increase of
Remaining principal repayments of the secured credit facility are as follows:
- December 31, 2026:
$1.0 million ; - March 31, 2027:
$15.5 million ; and - June 30, 2027:
$28.8 million .
Purchase of Underlying Lease and NSR for Lucky Shot Project:
On May 4, 2026, the Company entered into a purchase agreement (the "LSA Purchase Agreement") with Alaska Hardrock Inc. for the purchase of mineral claims, including a
Statement of Operations for Q3-2026 compared to Q3-2025:
The Company reported a loss from operations of
The Company reported a net loss of
Gold equivalent ounces produced and sold in the third quarter of 2026, both decreased by
Statement of Cash Flows for YTD-2026 compared to YTD-2025:
Net cash used in operating activities was
Gold equivalent ounces produced and sold in the first nine months of 2026 both decreased by
Adjusted Net Income/(Loss) (Non-GAAP)
Management uses Adjusted Net Income/(Loss) to evaluate the Company's operating performance, and to plan and forecast operations. The Company believes the use of Adjusted Net Income/(Loss) reflects the underlying operating performance of our core mining business and allows investors and analysts to compare results of the Company to similar results of other mining companies. Management's determination of the components of Adjusted Net Income/(Loss) is evaluated periodically and is based, in part, on a review of non-GAAP financial measures used by mining industry analysts. Net income/(loss) (GAAP) is reconciled to Adjusted net income/(loss) (Non-GAAP) adjusted for (gain)/loss on derivative contracts in the following table:
| Q3-2026 ($) | Q3-2025 ($) | YTD-2026 ($) | YTD-2025 ($) | |
| Net income/(loss) | (22,958,311) | (5,392,948) | (32,476,914) | (12,016,408) |
| (Gain)/loss on derivative contracts | 2,028,760 | 30,335,871 | 10,746,157 | 83,656,330 |
| Adjusted net income/(loss) | (20,929,551) | 24,942,923 | (21,730,757) | 71,639,922 |
Conference Call and Webcast
Contango will host a conference call and webcast to discuss the third quarter results on Monday, November 16, 2026, at 12:00pm EST / 10:00am PCT. Please note the updated time zone for BC residents. Participants may join the webcast using the following call-in details: Contango Silver & Gold: Q3 Financials.
At the Market Equity Program
On November 13, 2026, Contango entered into a Controlled Equity Offering^SM^ Sales Agreement with Cantor Fitzgerald & Co. ("Cantor"), Canaccord Genuity LLC, National Bank Financial Inc., ATB Capital Markets Inc., Haywood Securities Inc., BTIG, LLC, Maxim Group LLC, Research Capital USA Inc., and Prime Executions, Inc., doing business as Freedom Capital Markets, pursuant to which the Company may, from time to time and at its option, offer and sell shares of its common stock having an aggregate sales price of up to
The shares will be offered pursuant to the Company's effective automatic shelf registration statement on Form S-3 (File No. 333-297038) filed with the Securities and Exchange Commission on June 25, 2026 and the related prospectus supplement dated November 13, 2026.
In connection with the establishment of the new ATM Program, the Company terminated its prior Controlled Equity Offering^SM^ Sales Agreement with Cantor, dated June 8, 2023.
The Company intends to use the net proceeds from any sales under the ATM Program, if any, for general corporate purposes.
This press release shall not constitute an offer to sell or the solicitation of an offer to buy any securities, nor shall there be any sale of securities in any jurisdiction in which such offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of such jurisdiction.
ABOUT CONTANGO
Contango is an NYSE American and TSX-listed mining company that engages in the exploration for and development of silver, gold, and associated minerals with a growth strategy focused on district-scale silver and gold exploration in British Columbia's Golden Triangle funded by high-grade gold production in Alaska. The Company's flagship Canadian asset comprises approximately 247,000 acres (100,000 hectares) of prospective silver-gold mineral tenures in and around the Kitsault Valley, the southern cornerstone of the Golden Triangle. In Alaska, Contango holds a
Additional information can be found on our web page at www.contangoore.com.
FORWARD-LOOKING STATEMENTS
This press release contains forward-looking information and forward-looking statements within the meaning of applicable securities laws ("Forward-looking Statements"). These include statements regarding Contango's plans and expectations for its properties and operations, the content within future annual filings, operations in respect of Contango mineral properties and any benefits of investment in Contango. The Forward-looking Statements regarding Contango are intended to be covered by the safe harbor for "forward-looking statements" provided by the Private Securities Litigation Reform Act of 1995, based on Contango's current expectations and includes statements regarding future results of operations, quality and nature of the asset base, the assumptions upon which estimates are based and other expectations, beliefs, plans, objectives, assumptions, strategies or statements about future events or performance (often, but not always, using words such as "expects", "projects", "anticipates", "plans", "estimates", "intends", "believes", "ensures", "forecasts", "predicts", "proposes", "contemplates", "aims", "seeks", "continues", "potential", "positioned", "strategy", "outlook", "future", "going forward", "designed to", and similar expressions or other words of similar meaning, and the negatives thereof, or stating that certain actions, events or results "may", "might", "will", "should", "would", or "could" be taken, or that they are "possible", "probable", or "likely" to occur or be achieved). However, the absence of these words does not mean that the statements are not forward-looking. Forward-looking Statements are based on current expectations, estimates and projections that involve a number of risks and uncertainties, which could cause actual results to differ materially from those reflected in the statements. These risks include, but are not limited to: the risks of the exploration and the mining industry (for example, operational risks in exploring for and developing mineral reserves); risks and uncertainties involving geology; the speculative nature of the mining industry; the uncertainty of estimates and projections relating to future production, costs and expenses; the volatility of natural resources prices, including prices of gold and associated minerals; the existence and extent of commercially exploitable minerals in properties acquired by Contango or the Peak Gold JV; ability to realize the anticipated benefits of the Peak Gold JV; potential delays or changes in plans with respect to exploration or development projects or capital expenditures; the interpretation of exploration results and the estimation of mineral resources; the loss of key employees or consultants; health, safety and environmental risks; risks related to weather and other natural disasters; uncertainties as to the availability and cost of financing; risks relating to the Company's indebtedness under the amended credit facility, including its ability to service or repay that debt on or ahead of schedule and the effect of changes in interest rates; the Company's unhedged exposure to gold prices and the effectiveness of its price protection strategy; and the Company's ability to achieve anticipated production and grades at Manh Choh, which depends in part on the operator of the Peak Gold JV; Contango's inability to retain or maintain its relative ownership interest in the Peak Gold JV; inability to realize expected value from acquisitions; inability of our management team to execute its plans to meet its goals; the extent of disruptions caused by an outbreak of disease, such as the COVID-19 pandemic; and the possibility that government policies may change, political developments may occur or governmental approvals may be delayed or withheld, including as a result of presidential and congressional elections in the U.S. or the inability to obtain mining permits. Additional information on these and other factors which could affect Contango's operations or financial results are included in Contango's other reports on file with the U.S. Securities and Exchange Commission. Investors are cautioned that any Forward-looking Statements are not guarantees of future performance and actual results or developments may differ materially from the projections in the Forward-looking Statements. Forward-looking Statements are based on the estimates and opinions of management at the time the statements are made. Contango does not assume any obligation to update Forward-looking Statements should circumstances or management's estimates or opinions change.
CONTACTS:
Contango Silver & Gold Inc.
Rick Van Nieuwenhuyse
(907) 388-7770
www.contangoore.com
1 See non-GAAP measures in the Adjusted Net Income/(Loss) (Non-GAAP) section of this press release for calculation of Adjusted Net Income
2 See non-GAAP measures disclosed in the Company's 10-Q for the period ended September 30, 2026.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/323875
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
What were Contango CTGO's financial results for the third quarter of 2026?
Contango reported a $23.0 million net loss and a $24.2 million operating loss for Q3-2026. Exploration expenditures were $26.9 million, compared with $2.1 million in Q3-2025, while income from the Peak Gold JV declined to $6.9 million from $29.5 million.
What is Contango CTGO's 2026 gold production outlook?
Contango is guiding toward the lower end of 40,000 gold-equivalent ounces attributable to its 30% Peak Gold JV interest. The fourth campaign is expected to produce 13,000 to 15,000 gold-equivalent ounces. Full-year cash costs and all-in sustaining costs are guided at $2,700 and $2,900 per ounce of gold sold, respectively.
When are Contango CTGO's remaining secured credit-facility repayments due?
Remaining repayments are $1.0 million on December 31, 2026, $15.5 million on March 31, 2027, and $28.8 million on June 30, 2027. Outstanding principal was $45.3 million after a $1.0 million repayment during Q3-2026.
Does Contango's Kitsault Valley resource estimate include 2026 drilling?
The Kitsault Valley resource estimate reported September 11, 2026, excludes 2026 drilling and uses drilling completed through 2025. Contango expects all assays from the expanded campaign to be received and quality-checked by January 2027.