STOCK TITAN

Fluor-Built Pharmaceutical Facility in California is First Industrial Manufacturing Facility in Western United States to Achieve LEED v4 Platinum Certification

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Very Positive)
Tags

Facility also named 2025 ISPE Facility of the Year Winner for Social Impact - Unmet Medical Needs

IRVING, Texas--(BUSINESS WIRE)-- Fluor Corporation (NYSE: FLR) announced today that Bayer’s Cell Therapy Launch Facility in Berkeley, California, has been designated the first industrial manufacturing facility in the Western United States to achieve Leadership in Energy and Environmental Design (LEED) v4 Platinum Certification. The project was also named the 2025 Facility of the Year for Social Impact - Unmet Medical Needs by the International Society for Pharmaceutical Engineering (ISPE).

Bayer's Cell Therapy Launch Facility in Berkeley, California.

Bayer's Cell Therapy Launch Facility in Berkeley, California.

LEED v4 Platinum certification is the highest level of recognition for sustainable building practices and indicates that a building meets the highest standards for sustainability.

Fluor’s scope of work included the engineering, procurement, construction management, commissioning, qualification and validation for the 144,000-square-foot, state-of-the-art facility. It features 30,000 square feet of cleanroom space dedicated to advancing cell therapy production for neurological degenerative disorders, cardiovascular disease and other unmet medical needs.

"Fluor and Bayer collaborated to deliver Bayer's first fully electric pharmaceutical manufacturing plant, and we met an aggressive schedule to support client and patient needs," said Richard Meserole, President of Fluor’s Advanced Technologies & Life Sciences business. “Fluor secured LEED v4 Platinum Certification and ISPE Facility of the Year designation through effective collaboration with our trade partners, lean construction methods, and dedication to quality.”

Sustainability benefits for the facility include 52.6% energy cost savings via LED, high-efficiency lighting, heat pump and rooftop solar installation. The facility boasts 100% process water reduction, 98% onsite management of rainfall high efficiency plumbing fixtures, 65% recycled content installation, high use of sustainable materials, land use maximization and various innovation credits.

This is the second new facility built by Fluor on Bayer’s Biotech campus in Berkeley. Previously, Fluor completed construction of Bayer’s state-of-the-art Single Use Technology biopharmaceutical manufacturing Cell Culture Technology Center in 2021.

About Fluor Corporation:

Fluor Corporation (NYSE: FLR) is building a better world by applying world-class expertise to solve its clients’ greatest challenges. Fluor’s nearly 27,000 employees provide professional and technical solutions that deliver safe, well-executed, capital-efficient projects to clients around the world. Fluor had revenue of $16.3 billion in 2024 and is ranked 265 among the Fortune 500 companies. With headquarters in Irving, Texas, Fluor has provided engineering, procurement and construction services for more than a century. For more information, please visit www.fluor.com or follow Fluor on Facebook, Instagram, LinkedIn, X and YouTube.

#atls

Brett Turner

Media Relations

864.281.6976



Jason Landkamer

Investor Relations

469.398.7222

Source: Fluor Corporation

Fluor Corp

NYSE:FLR

FLR Rankings

FLR Latest News

FLR Stock Data

6.18B
161.49M
1.75%
95.7%
4.4%
Engineering & Construction
Heavy Construction Other Than Bldg Const - Contractors
Link
United States
IRVING