STOCK TITAN

GreenPower Signs Contract for More Than $5 Million with State of New Mexico for All-Electric School Bus Pilot Program

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Neutral)
Tags

GreenPower Motor Company (NASDAQ: GP) has secured a contract worth over $5 million with the state of New Mexico for an all-electric school bus pilot program. The two-year project will deploy three Type A Nano BEAST Access buses in 2025-26 and three Type D BEAST and Mega BEAST buses in 2026-27.

The program includes comprehensive testing of charging infrastructure, with both Level 2 and Level 3 DC fast chargers. The flagship Mega BEAST offers an industry-leading 300-mile range with a 387 kWh battery pack and will be used for vehicle-to-grid (V2G) evaluation. GreenPower is partnering with Highland Electric Fleets for charging infrastructure implementation, with buses rotating through five pilot rounds, each lasting six weeks.

Loading...
Loading translation...

Positive

  • Secured significant $5+ million contract with New Mexico state government
  • Mega BEAST offers industry-leading 300-mile range with 387 kWh battery capacity
  • Strategic partnership with Highland Electric Fleets for charging infrastructure
  • Manufacturing of first three Nano BEAST Access buses already substantially complete

Negative

  • Extended two-year pilot period before potential full implementation
  • Significant infrastructure investment required for charging systems

News Market Reaction

+35.02% 550.0x vol
53 alerts
+35.02% News Effect
+78.1% Peak in 4 hr 10 min
+$5M Valuation Impact
$19M Market Cap
550.0x Rel. Volume

On the day this news was published, GP gained 35.02%, reflecting a significant positive market reaction. Argus tracked a peak move of +78.1% during that session. Our momentum scanner triggered 53 alerts that day, indicating high trading interest and price volatility. This price movement added approximately $5M to the company's valuation, bringing the market cap to $19M at that time. Trading volume was exceptionally heavy at 550.0x the daily average, suggesting very strong buying interest.

Data tracked by StockTitan Argus on the day of publication.

SANTA FE, N.M., Aug. 4, 2025 /PRNewswire/ -- GreenPower Motor Company Inc. (Nasdaq: GP) (TSXV: GPV) ("GreenPower"), a leading manufacturer and distributor of all-electric, purpose-built, zero-emission medium and heavy-duty vehicles serving the cargo and delivery market, shuttle and transit space and school bus sector, today announced it has signed a contract with the state of New Mexico to implement an all-electric school bus pilot project. The contract is the result of an award made by the state under an RFP published in May.

The two-year pilot project will deploy three GreenPower Type A all-electric, purpose-built, zero-emission Nano BEAST Access school buses in the first school year (2025-26), and three GreenPower Type D all-electric, purpose-built, zero-emission BEAST and Mega BEAST school buses in the second school year (2026-27). The school buses will rotate around the state in five pilot rounds each school year with each round lasting six weeks. GreenPower will install charging systems, provide training for the drivers, mechanics and the community's first responder and help ensure a seamless testing period.

The contract between GreenPower and the state of New Mexico provides more than $5 million for the purchase of vehicles, cost of charging infrastructure and overall management of the pilot. GreenPower will support the implementation of the project from a location to be established in New Mexico. Based on voluntary requests to participate, school districts are currently being selected by the state to participate in the pilot. The manufacturing of the three Nano BEAST Access school buses is substantially complete and they will be ready for deployment for Round 1 the week of September 15.

"The New Mexico pilot project provides an opportunity to expand the reach of GreenPower's zero-emission school bus product and gives parents, kids and school districts in the state the opportunity to evaluate the transition to all-electric, purpose-built school buses," said GreenPower President Brendan Riley. "The project is leveraging the successful pilot that GreenPower conducted in West Virginia, but also has a concentration on evaluating charging options and infrastructure."

The pilot will include both Level 3 DC fast chargers and Level 2 slow chargers for the Nano BEAST Access school buses, and will evaluate Level 3 DC fast charging in the second year with the BEAST school buses. A part of the second year will be a vehicle-to-grid (V2G) evaluation using the GreenPower Mega BEAST. The Mega BEAST is a 40-foot Type D all-electric, purpose-built, zero-emission school bus that delivers a class-leading range of up to 300 miles on a single charge because of its massive 387 kWh battery pack. The range of the Mega BEAST is greater than any electric school bus in its class. It has more uphill climbing power and the most compelling and cost effective V2G capability for a more stable electric grid and community sustainability in areas where it is deployed.

"We are particularly interested in evaluating charging as a part of the pilot project," said Mark Roper, Director of the Economic Development Division within the New Mexico Economic Development Department. "Range, charging rates and grid resiliency are critical components of switching to all-electric, zero-emission vehicles."

GreenPower is partnering with Highland Electric Fleets to install and implement the charging infrastructure necessary for the pilot. In a letter to the state, Highland's Chief Commercial Officer Brian Buccella shared the company's commitment to supporting GreenPower in assessing charging infrastructure and creating a reliable EV pilot project in New Mexico. "Our experience delivering and operating electric school buses at scale positions us well to assist in the successful execution of this pilot program. This initiative presents an opportunity to reduce transportation-related emissions in New Mexico communities, protect student health and modernize school transportation," Buccella said.

For further information contact:

Brendan Riley, President
510) 910-3377

Fraser Atkinson, CEO
(604) 220-8048

Mark Nestlen, Business Development & Strategy
(405) 850-9571

About GreenPower Motor Company Inc.
GreenPower designs, builds and distributes a full suite of high-floor and low-floor all-electric medium and heavy-duty vehicles, including transit buses, school buses, shuttles, cargo van and a cab and chassis. GreenPower employs a clean-sheet design to manufacture all-electric vehicles that are purpose built to be battery powered with zero emissions while integrating global suppliers for key components. This OEM platform allows GreenPower to meet the specifications of various operators while providing standard parts for ease of maintenance and accessibility for warranty requirements. GreenPower was founded in Vancouver, Canada with primary operational facilities in southern California. Listed on the Toronto exchange since November 2015, GreenPower completed its U.S. IPO and NASDAQ listing in August 2020. For further information go to www.greenpowermotor.com

Forward-Looking Statements
This document contains forward-looking statements relating to, among other things, GreenPower's business and operations and the environment in which it operates, which are based on GreenPower's operations, estimates, forecasts and projections. Forward-looking statements are not based on historical facts, but rather on current expectations and projections about future events, and are therefore subject to risks and uncertainties which could cause actual results to differ materially from the future results expressed or implied by the forward-looking statements. These statements generally can be identified by the use of forward-looking words such as "upon", "may", "should", "will", "could", "intend", "estimate", "plan", "anticipate", "expect", "believe" or "continue", or the negative thereof or similar variations. These statements are not guarantees of future performance and involve risks and uncertainties that are difficult to predict. A number of important factors including those set forth in other public filings (filed under the Company's profile on www.sedar.com) could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Consequently, readers should not place any undue reliance on such forward-looking statements. In addition, these forward-looking statements relate to the date on which they are made. GreenPower disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. All amounts in U.S. dollars. ©2025 GreenPower Motor Company Inc. All rights reserved.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/greenpower-signs-contract-for-more-than-5-million-with-state-of-new-mexico-for-all-electric-school-bus-pilot-program-302520454.html

SOURCE GreenPower Motor Company

FAQ

What is the value of GreenPower's (GP) contract with New Mexico for electric school buses?

GreenPower secured a contract worth more than $5 million with New Mexico for an all-electric school bus pilot program, including vehicle purchases, charging infrastructure, and project management.

How many electric school buses will GreenPower (GP) deploy in New Mexico?

GreenPower will deploy six buses total: three Type A Nano BEAST Access buses in 2025-26 and three Type D BEAST and Mega BEAST buses in 2026-27.

What is the range of GreenPower's Mega BEAST electric school bus?

The Mega BEAST offers a class-leading range of up to 300 miles on a single charge, powered by a massive 387 kWh battery pack.

When will GreenPower (GP) begin the New Mexico school bus pilot program?

The first round of the pilot program will begin the week of September 15, 2025, with the Nano BEAST Access buses already substantially complete.

How long will each school district test GreenPower's electric buses?

Each school district will test the buses for six weeks as part of five pilot rounds each school year over the two-year program.
GreenPower Mtr Co Inc

NASDAQ:GP

GP Rankings

GP Latest News

GP Latest SEC Filings

GP Stock Data

6.39M
3.08M
Farm & Heavy Construction Machinery
Industrials
Link
Canada
Vancouver