STOCK TITAN

HIVE's BUZZ HPC Announces 320 MW Sovereign AI Infrastructure in Greater Toronto Area

(Neutral)
(Positive)
Tags
AI

HIVE (TSX: HIVE, NASDAQ: HIVE), via BUZZ HPC, plans a 320 MW sovereign AI infrastructure “gigafactory” in the Greater Toronto Area, targeting over 100,000 GPUs at full build-out.

The project includes ~CAD $3.5 billion capital investment, 25-acre land purchase, and target online date in the second half of 2027.

Loading...
Loading translation...

Positive

  • Planned 320 MW AI gigafactory in GTA with over 100,000 GPUs capacity
  • Capital investment of approximately CAD $3.5 billion in Canadian AI infrastructure
  • Acquisition of ~25 acres of land with 320 MW power allocation in Ontario
  • HIVE reports over 850 MW of global power capacity, including 450 MW operating data centers
  • Pipeline to support approximately 130,000 GPUs across HIVE and BUZZ infrastructure
  • Project expected to create 800+ construction jobs and hundreds of permanent high-skill roles

Negative

  • Project requires significant capital commitment of approximately CAD $3.5 billion
  • AI gigafactory is only targeted to be online in the second half of 2027

News Market Reaction – HIVE

+28.62%
52 alerts
+28.62% Session close to close
+39.6% Peak in 3 hr 20 min
$876.27M Market Cap
1.3x Rel. Volume

In the May 18 session, HIVE gained 28.62%, reflecting a significant positive market reaction. Argus tracked a peak move of +39.6% during that session. Our momentum scanner triggered 52 alerts that day, indicating high trading interest and price volatility.

Data tracked by StockTitan Argus on the day of publication.

Market Context

The stock surged +28.6% in the session following this news. A strong positive reaction aligns with H...
Analysis

The stock surged +28.6% in the session following this news. A strong positive reaction aligns with HIVE’s ongoing pivot into large-scale AI infrastructure. Prior AI-tagged announcements averaged moves of about 1.57%, mainly on smaller capacity expansions and partnerships. A bigger gain on this GTA project would reflect its scale – 320 MW capacity and CAD $3.5 billion capex. Investors would still need to watch funding structures, execution timelines into 2027, and how returns compare with earlier AI projects.

Key Figures

GTA AI capacity: 320 MW Capital investment: CAD $3.5 billion Main Parcel land cost: $46 million +5 more
8 metrics
GTA AI capacity 320 MW Planned AI gigafactory utility capacity in Greater Toronto Area
Capital investment CAD $3.5 billion Estimated total investment for GTA AI infrastructure project
Main Parcel land cost $46 million Purchase price for ~21-acre Main Parcel in Ontario
Additional Parcel cost $12 million Purchase price for ~4-acre Additional Parcel in Ontario
Global power capacity 850 MW HIVE total global power, including operating and pipeline
Operating data centers 450 MW Current operating data center power globally
Development pipeline 400 MW Additional power capacity expected online in 2027
Planned GPU scale 130,000 GPUs Infrastructure pipeline capacity across New Brunswick and GTA sites

Previous AI Reports

5 past events · Latest: May 08 (Positive)
Same Type Pattern 5 events
Date Event Sentiment 24h Move Catalyst
May 08 AI fibre upgrade Positive -1.7% Fibre overbuild to support 50 MW Tier III+ AI factory in New Brunswick.
May 08 AI fibre upgrade Positive -1.7% Capital plan of $3.1M over five years for Grand Falls AI data center.
Mar 16 AI capacity expansion Positive +4.5% 4x increase in Canadian liquid-cooled AI capacity to 16.6 MW total load.
Mar 16 AI capacity expansion Positive +4.5% Added 5 MW in BC with 7.6 MW option and GPU ramp targets.
Mar 13 AI cloud partnership Positive +2.4% Collaboration with AMC Robotics using BUZZ GPU AI Cloud for robotics workloads.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Pattern Detected

Recent AI-related announcements have mostly seen modest positive reactions, but two New Brunswick fibre/AI factory updates triggered small negative moves, indicating occasional sell-the-news behavior.

Recent Company History

Over the last few months HIVE has steadily repositioned toward AI infrastructure. BUZZ’s AI-tagged news flow includes GPU cloud collaborations, a fourfold liquid-cooled capacity expansion to 16.6 MW in Canada, and fibre upgrades to convert Grand Falls into a 50 MW Tier III+ AI factory funded by a $115 million exchangeable note. Average AI-news moves around 1.57%, so today’s large GTA gigafactory announcement builds on this expansion trajectory but comes against a weaker pre-news share trend.

Key Terms

ai gigafactory, gpu, closed-loop cooling systems, low-latency
4 terms
ai gigafactory technical
"anchored by a planned new industrial-scale AI infrastructure facility, also known as an AI gigafactory, in the Greater Toronto Area"
An AI gigafactory is a very large, purpose-built facility that produces the physical infrastructure needed for artificial intelligence—such as specialized chips, servers or the massive computing capacity used to train AI models—and may combine manufacturing, assembly and data-center operations under one roof. Investors care because these sites can sharply lower per-unit costs, speed product rollouts and create scale advantages that drive revenue growth, capital needs and long-term competitiveness, much like a car plant does for an automaker.
gpu technical
"designed to support fully vertically integrated AI supercomputers and host more than 100,000 GPUs at full build-out"
A GPU (graphics processing unit) is a specialized computer chip designed to handle many calculations at once, originally for rendering images and video but now widely used for tasks like artificial intelligence, data analysis and high-performance computing. Investors watch GPU demand and prices because strong sales often signal growth for chip makers and their customers, affect profit margins and capital spending, and can forecast wider trends in gaming, AI adoption and cloud services.
closed-loop cooling systems technical
"Powered by Ontario's Clean Grid: Designed for high efficiency AI compute using closed-loop cooling systems with no-water use approach"
A closed-loop cooling system is a self-contained setup that circulates the same coolant through equipment to remove heat, rather than releasing or drawing in new water or air from the environment. Think of it like a reusable thermos that keeps liquid moving around to carry heat away; for investors, it matters because these systems often cut energy and water costs, reduce regulatory risk, and improve equipment reliability—affecting operating expenses and long-term capital needs.
low-latency technical
"This places the facility at the intersection of research excellence, enterprise demand, and low-latency global network connectivity"
Low-latency describes a system or process that responds very quickly to information or changes, often within milliseconds. For investors, it means receiving and acting on market data almost instantly, which can provide a competitive edge in fast-moving trading environments. Think of it like a quick reflex in a game—being faster can make a difference in making timely decisions.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

BUZZ is building industrial-scale infrastructure designed to help Canada scale compute capacity, accelerate domestic AI adoption, and support the next generation of enterprise, research and public sector AI applications.

Toronto, Ontario--(Newsfile Corp. - May 18, 2026) - HIVE Digital Technologies Ltd. (TSX: HIVE) (NASDAQ: HIVE) (FSE: YO0), through its wholly owned subsidiary BUZZ High Performance Computing Inc. ("BUZZ HPC" or "BUZZ"), today announced that BUZZ is advancing a major infrastructure investment in Ontario, anchored by a planned new industrial-scale AI infrastructure facility, also known as an AI gigafactory, in the Greater Toronto Area ("GTA") with approximately 320 megawatts ("MW") of utility capacity. The project is expected to become one of Canada's largest AI gigafactories, designed to support fully vertically integrated AI supercomputers and host more than 100,000 GPUs at full build-out. An AI gigafactory is the industrial infrastructure of the intelligence economy: a facility that converts compute into intelligence, helping make Canadian businesses more competitive.

Canada Invented Modern AI. Now It Is Building the Factories That Will Own It.

BUZZ High Performance Computing Inc. acquired land comprising approximately 21 acres (the "Main Parcel") for a purchase price of $46 million, as well as an additional parcel of land adjacent to the Main Parcel, measuring approximately 4 acres (the "Additional Parcel"), for a purchase price of $12 million. The Main Parcel and the Additional Parcel collectively comprise a contiguous site benefiting from a 320 MW power allocation. BUZZ has secured major milestones along the project's 320 MW power pathway to develop sovereign AI infrastructure in the Toronto-Waterloo innovation corridor. The project is designed to place massive industrial-scale compute directly inside Canada's largest metropolitan economy and one of North America's most important hubs for technology, financial services, and artificial intelligence.

The vision of sovereign AI infrastructure is to provide the physical backbone for Canada's intelligence economy. Compute is the new sovereignty. Countries that own the machines will write the future. Countries that rent compute from data centers abroad will not contain sensitive data within their borders.

Located within one of the most important 100-kilometre corridors in global AI, the project is positioned between Geoffrey Hinton's legacy, the University of Toronto and the Vector Institute to the east, and Waterloo's world-leading systems and engineering talent to the west. This places the facility at the intersection of research excellence, enterprise demand, and low-latency global network connectivity.

Key Highlights:

  • Target Online: Second half of 2027.
  • Capital Investment: ~CAD $3.5 billion.
  • Jobs: 800+ construction, hundreds of permanent high-skill roles.
  • Powered by Ontario's Clean Grid: Designed for high efficiency AI compute using closed-loop cooling systems with no-water use approach consistent with BUZZ HPC's broader sustainability strategy.
  • Community First Approach: Focused on responsible development, local economic participation and long-term alignment with national priorities.

Frank Holmes, Executive Chairman of HIVE and BUZZ:

"AI is the new industrial base and compute is the factory floor. Canada produced the Godfathers of deep learning but kept renting the factories. That era is over. Between Toronto and Waterloo, BUZZ is building the sovereign AI infrastructure that turns Canadian intelligence into Canadian dominance. At full build-out, this intelligence factory will deploy over 100,000 GPUs, creating one of North America's largest domestically controlled AI clusters. Low-latency inference, AI agents, financial platforms, healthcare breakthroughs, scientific discovery, and national priority workloads will finally run on Canadian iron, under Canadian control. Our vision is to build AI infrastructure that will serve humanity, with the potential to improve quality of life for millions of Canadians."

Aydin Kilic, President & CEO of HIVE Digital Technologies:

"We have been strategically land-banking by regional substations, and we are very pleased to announce this expansion. HIVE now has over 850 MW of power globally; this includes our 450 MW of operating data centers plus a pipeline of 400 MW of capacity, which we expect to bring online in 2027. Globally diversified growth, this includes our 100 MW of operating data centers in Canada, now with a pipeline of 320 MW for 2027. BUZZ has done a phenomenal job expanding our footprint in Canada. With 5,500 GPUs online today doing AI compute, along with our 70 MW New Brunswick Grand Falls site, and now our 320 MW GTA site, we have the land and power to develop a pipeline of infrastructure to support approximately 130,000 GPUs. This puts HIVE and BUZZ at a global scale, with the largest AI native clouds."

Craig Tavares, President & COO of BUZZ HPC:

"This investment is nationally important to Canada's efforts to build the infrastructure required for the next generation of AI innovation. Compute is the new engine of the AI economy. If Canada wants to lead in AI, we need to build the factories that produce intelligence here at home. Canada has the clean energy, network connectivity and research ecosystem to lead AI innovation around the world. BUZZ is building the infrastructure layer that turns Canada's AI ambition into reality. This gigafactory is the engine Canada needs to lead the intelligence economy. This facility anchors BUZZ's national AI platform spanning British Columbia, Manitoba, Ontario, Quebec, and New Brunswick. It is being built as a fully vertically integrated, Canadian-governed supercomputing platform for the age of inference and enterprise AI. Being a Greater Toronto Area resident, it is an honor to build Canada's first AI gigafactory in our community. I believe the jobs and economic development this project will offer, will provide tremendous value to the community."

About HIVE Digital Technologies Ltd.

Founded in 2017, HIVE Digital Technologies Ltd. was among the first publicly listed companies to prioritize mining digital assets powered by green energy. Today, HIVE builds and operates next-generation Tier-I and Tier-III data centers across Canada, Sweden, and Paraguay, serving both Bitcoin and high-performance computing clients. HIVE's twin-turbo engine infrastructure-driven by hashrate services and GPU-accelerated AI computing delivers scalable, environmentally responsible solutions for the digital economy.

For more information, visit hivedigitaltech.com, or connect with us on:

X: https://x.com/HIVEDigitalTech
YouTube: https://www.youtube.com/@HIVEDigitalTech
Instagram: https://www.instagram.com/hivedigitaltechnologies/
LinkedIn: https://linkedin.com/company/hiveblockchain

On Behalf of HIVE Digital Technologies Ltd.

"Frank Holmes"
Executive Chairman

For further information, please contact:

Nathan Fast, Director of Marketing and Branding
Frank Holmes
, Executive Chairman
Aydin Kilic
, President & CEO

Tel: (604) 664-1078

About BUZZ

BUZZ High Performance Computing ("BUZZ"), a wholly owned subsidiary of HIVE Digital Technologies Ltd. (TSX: HIVE) and an NVIDIA Cloud Partner, delivers enterprise-grade cloud services and large-scale GPU clusters in vertically integrated data centres. Proudly Canadian, BUZZ is building sovereign AI factories while operating across 9 time zones and 3 continents. The platform supports a suite of managed services, including Kubernetes, Slurm, virtual machines, and bare-metal deployments optimized for AI, machine learning, and scientific workloads.

Headquartered in Canada with a global reach, BUZZ is one of the first and few Canadian sovereign AI platforms operating at scale. Since 2017, it has deployed supercomputing environments across Canada and the Nordics. Its AI Factories are powered entirely by renewable energy and engineered with ultra-low Power Usage Effectiveness (PUE) below 1.3, hosting thousands of industrial-grade GPUs across North America, South America, and Europe used for AI model training, fine-tuning, and inference.

Through its Green GPU initiative, BUZZ combines AI innovation with sustainability, offering localized expertise and global infrastructure.

Learn more at buzzhpc.ai.

For further information, please contact:

Craig Tavares, BUZZ President and COO

Tel: (604) 664-1078

Neither the TSX, Nasdaq, or any other securities exchange or regulatory authority accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Forward-looking information is based on current management expectations, estimates, and assumptions, including that infrastructure will be deployed on expected timelines and within budget, that demand for AI computing will continue to grow, and that the Company will be able to execute on its Canadian AI infrastructure growth strategy. Known and unknown risks - including changes to deployment timelines, cost overruns, lower-than-anticipated demand, GPU procurement or network buildout delays, and the risk factors described in the Company's continuous disclosure documents available on SEDAR+ and EDGAR - may cause actual results to differ materially. Readers are cautioned not to place undue reliance on forward-looking information. The Company disclaims any obligation to update or revise such information except as required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/297771

FAQ

What AI infrastructure project did HIVE (HIVE) announce in May 2026?

HIVE announced a 320 MW AI gigafactory in the Greater Toronto Area. According to HIVE, the facility is designed to host over 100,000 GPUs and provide vertically integrated AI supercomputing for enterprise, research, and public sector applications across Canada.

How much will HIVE's BUZZ HPC invest in the 320 MW GTA AI gigafactory?

HIVE plans a capital investment of about CAD $3.5 billion for the GTA AI gigafactory. According to HIVE, the project includes purchasing roughly 25 acres of land and building large-scale infrastructure to support sovereign AI compute in Canada.

When is HIVE's 320 MW AI gigafactory in the Greater Toronto Area expected to come online?

The 320 MW AI gigafactory is targeted to be online in the second half of 2027. According to HIVE, the development is part of a 400 MW capacity pipeline they expect to bring online globally during 2027, expanding their AI infrastructure footprint.

How many GPUs will HIVE's BUZZ HPC support with its new GTA AI facility?

The GTA AI gigafactory is designed to host more than 100,000 GPUs at full build-out. According to HIVE, combined with existing sites, their infrastructure pipeline is expected to support approximately 130,000 GPUs for AI compute workloads.

What land purchases did HIVE's BUZZ HPC make for the 320 MW AI gigafactory?

BUZZ HPC acquired a 21-acre main parcel for $46 million and a 4-acre adjacent parcel for $12 million. According to HIVE, the combined 25-acre site benefits from a 320 MW power allocation critical for the planned AI gigafactory.

How does HIVE's new AI gigafactory align with its global power and data center capacity?

HIVE reports over 850 MW of global power capacity, including 450 MW of operating data centers and 400 MW in pipeline. According to HIVE, the 320 MW GTA project and other sites support scaling AI-native cloud infrastructure across multiple Canadian provinces.