Nicola Mining Receives Multi-Year Area Based Exploration Permit for Its Mine-Permitted Treasure Mountain Silver Project
- Received multi-year area-based exploration permit allowing extensive exploration activities
- Recently obtained ten-year mining lease extension valid through April 2032
- Historical high-grade silver samples of up to 9,221g/t Ag with additional Cu, Pb, and Zn content
- Previous exploration identified a significant 2km soil anomaly coinciding with vein system
- No exploration conducted on the property for over a decade
- Project appears to have been overlooked by investors according to CEO's comments
Vancouver, British Columbia--(Newsfile Corp. - June 9, 2025) - Nicola Mining Inc. (TSX: NIM) (OTCQB: HUSIF) (FSE: HLIA) (the "Company" or "Nicola") is pleased to announce that it has received a multi-year area-based exploration permit, Permit Number MX-15-121 (the "MYAB Permit") on June 4th, 2025. The MYAB Permit allows Nicola to conduct extensive exploration on its wholly owned Treasure Mountain Silver Project1 (the "Treasure Mountain"), a fully permitted silver mine (Permit 239) located 30 km northeast of Hope and about a 3-hour drive from Vancouver, British Columbia (Fig. 1).
Figure 1. Treasure Mountain location
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4873/254869_f589e05a049e09e2_001full.jpg
Receipt of the MYAB Permit, follows the Company's August 30th, 2024, announcement that it had received a ten-year mining lease extension (the "Extension") for Treasure Mountain2 under its M-239 permit. The Extension is valid through April 26, 2032, and receipt of the MYAB Permit positions the Company to leverage both mining and exploration options.
Treasure Mountain consists of an historic underground silver mine with a resource estimate in accordance with CIM definition standards3 and exploration upside to the north and west of the historic mine. The MB Zone is approximately 800 m northwest of the current mine workings on undrilled northern flank of the mountain. The Cal Vein was discovered at this location in 2010 and return a surface sample grading as high as 9,221g/t Ag,
The MYAB Permit allows the Company to carry out the following exploration activities over the next five years in the areas shown below (Fig. 2):
|
|
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4873/254869_f589e05a049e09e2_003full.jpg
Figure 2. Site map with MYAB Permit boundaries
Peter Espig, CEO of Nicola Mining Inc., commented, "Receipt of the MYAB under Permit Number MX-15-121 coupled with our recently received ten-year mine life extension under Permit M-239, puts Nicola into an envious position as the confluence of mine and exploration potential brings forth a project that most investors have forgotten. Bolstered by solid silver prices and with permits in hand, we are very excited about its potential and look forward to exploring our Treasure Mountain Project for the first time in over a decade"
Qualified Person
William Whitty, P. Geo., the Company's VP Exploration, is the Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects and supervised the preparation of, and has reviewed and approved the technical information in this release.
About Nicola Mining
Nicola Mining Inc. is a junior mining company listed on the TSX-V Exchange and Frankfurt Exchange that maintains a
The Company owns
On behalf of the Board of Directors
"Peter Espig"
Peter Espig
CEO & Director
For additional information
Contact: Peter Espig
Phone: (778) 385-1213
Email: info@nicolamining.com
URL: www.nicolamining.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
1 Treasure Mountain Silver Project / Mine: Link
2 August 30, 2024, News: Link
3 Ostensoe, E. A., Giroux, G. H. and Beaton, A. J., 2009, Technical Report, Resource Estimation, Mining and Reclamation Plan and Economic Evaluation, Treasure Mountain Property, Tulameen River Area, B. C., Canada.
4 August 25, 2010, News: Link
5 October 7, 2013, News: Link
6 Assessment Report for 2021 Exploration
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/254869