STOCK TITAN

Notifications

Limited Time Offer! Get Platinum at the Gold price until January 31, 2026!

Sign up now and unlock all premium features at an incredible discount.

Read more on the Pricing page

Liberty Gold Reports Q3 2025 Financial and Operating Results

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

Liberty Gold (OTCQX: LGDTF) reported Q3 2025 results and operational updates on November 10, 2025. Key corporate actions include a C$28.01M private placement with Centerra acquiring 9.9% of shares and receipt of a US$2.21M staged payment from the sale of TV Tower. Technical work at Black Pine delivered Phase 5A/5B column leach recoveries of ~80–82%, sonic drill assays showing residual heap grades of 0.06–1.18 g/t Au, and expanded Rangefront/Discovery drill intercepts including 1.53 g/t Au over 85.3 m. Financials show cash and short-term investments of $32.46M and shareholders’ equity of $45.23M as at September 30, 2025, with a nine-month loss from continuing operations of $13.21M.

Liberty Gold (OTCQX: LGDTF) ha riportato i risultati del terzo trimestre 2025 e aggiornamenti operativi il 10 novembre 2025. Le azioni corporate chiave includono una private placement da C$28,01 milioni con Centerra che acquisisce il 9,9% delle azioni e la ricezione di un pagamento scaglionato di US$2,21 milioni dalla vendita di TV Tower. Il lavoro tecnico a Black Pine ha fornito recuperi della colonna in fasi 5A/5B di circa 80–82%, saggi del foro sonico che mostrano gradi residui della pila di 0,06–1,18 g/t Au, ed estensioni dei sondaggi Rangefront/Discovery inclusi 1,53 g/t Au su 85,3 m. I dati finanziari mostrano liquidità e investimenti a breve termine di $32.46M e patrimonio netto degli azionisti di $45.23M al 30 settembre 2025, con una perdita di $13.21M dai nove mesi dalle attività continuative.

Liberty Gold (OTCQX: LGDTF) informó resultados del tercer trimestre de 2025 y actualizaciones operativas el 10 de noviembre de 2025. Las acciones corporativas clave incluyen una colocación privada de C$28,01 millones con Centerra que adquiere el 9,9% de las acciones y la recepción de un pago escalonado de US$2,21 millones por la venta de TV Tower. El trabajo técnico en Black Pine entregó recuperaciones de columna de fase 5A/5B de aproximadamente 80–82%, ensayos de perforación sónica que muestran calificaciones residuales de la pila de 0,06–1,18 g/t Au, y interceptaciones ampliadas de Rangefront/Discovery incluyendo 1,53 g/t Au sobre 85,3 m. Los resultados financieros muestran efectivo e inversiones a corto plazo de $32.46M y patrimonio de los accionistas de $45.23M al 30 de septiembre de 2025, con una pérdida de nueve meses desde operaciones continuas de $13.21M.

Liberty Gold (OTCQX: LGDTF)은 2025년 11월 10일 2025년 3분기 실적 및 운영 업데이트를 발표했다. 주요 기업 조치로는 Centerra가 주식의 9.9%를 취득하는 C$28.01M 비공개 배정과 TV Tower 매각으로부터의 US$2.21M 단계적 지급의 수령이 있다. Black Pine의 기술 작업은 Phase 5A/5B 컬럼 회수율을 대략 80–82%로 제시했고, 소닉 드릴 어세이에서 잔류 골재 등급은 0.06–1.18 g/t Au로 나타났으며, Rangefront/Discovery 드릴 인터셉트가 확장되어 1.53 g/t Au over 85.3 m를 포함했다. 재무상으로는 2025년 9월 30일 기준 현금 및 단기 투자 $32.46M과 주주 자본 $45.23M, 지속 운영으로 인한 9개월 손실 $13.21M을 보여준다.

Liberty Gold (OTCQX: LGDTF) a publié les résultats du troisième trimestre 2025 et des mises à jour opérationnelles le 10 novembre 2025. Les principales actions corporatives comprennent une placement privé de 28,01 M$ CAD avec Centerra qui acquiert 9,9% des actions et la réception d'un paiement échelonné de 2,21 M$ US provenant de la vente de TV Tower. Les travaux techniques à Black Pine ont donné des taux de récupération de colonne des phases 5A/5B d'environ 80–82%, des essais par forage sonic qui montrent des grades résiduels de pile de 0,06–1,18 g/t Au, et des intercepts élargis Rangefront/Discovery incluant 1,53 g/t Au sur 85,3 m. Les résultats financiers montrent une trésorerie et des investissements à court terme de $32.46M et des capitaux propres des actionnaires de $45.23M au 30 septembre 2025, avec une perte de neuf mois issus des opérations en cours de $13.21M.

Liberty Gold (OTCQX: LGDTF) berichtete am 10. November 2025 über die Ergebnisse des Q3 2025 und operative Updates. Zu den wichtigsten unternehmerischen Maßnahmen gehören eine private Platzierung in Höhe von C$28,01 Mio. mit Centerra, die 9,9% der Aktien erwirbt, und der Erhalt einer gestaffelten Zahlung von US$2,21 Mio. aus dem Verkauf von TV Tower. Die technischen Arbeiten bei Black Pine lieferten Phase-5A/5B-Spaltenrückgewinnungen von ca. 80–82%, Sonic-Drill-Proben zeigten verbleibende Pile-Grade von 0,06–1,18 g/t Au, und erweiterte Rangefront/Discovery-Bohrabschnitte einschließlich 1,53 g/t Au über 85,3 m. Die Finanzen zeigen Bargeld und kurzfristige Investitionen von $32.46M und Eigenkapital der Anteilseigner von $45.23M zum 30. September 2025, mit einem Neun-Monats-Verlust aus fortgeführten Operationen von $13.21M.

Liberty Gold (OTCQX: LGDTF) أصدرت نتائج الربع الثالث من 2025 وتحديثات تشغيلية في 10 نوفمبر 2025. تشمل الإجراءات المؤسسية الرئيسية مكانة خاصة بقيمة C$28.01 مليون مع Centerra لاكتساب 9.9% من الأسهم وتلقي دفعة مجدولة من US$2.21 مليون من بيع TV Tower. الأعمال التقنية في Black Pine قدمت استردادات عمود المرحلة 5A/5B بنحو 80–82%، اختبارات الحفر الصوتي أظهرت درجات تكدس متبقية من التراكم 0.06–1.18 g/t Au، وتوسعت اعتراضات Rangefront/Discovery بما في ذلك 1.53 g/t Au على مدى 85.3 م. تُظهر البيانات المالية نقداً واستثمارات قصيرة الأجل بقيمة $32.46M ورأس مال المساهمين بقيمة $45.23M حتى 30 سبتمبر 2025، مع خسارة لمدة تسعة أشهر من العمليات المستمرة قدرها $13.21M.

Positive
  • C$28.01M Centerra private placement (9.9% ownership)
  • Cash and short-term investments of $32.46M at Sept 30, 2025
  • Phase 5B weighted column leach recovery of 81.9%
  • Expanded Rangefront/Discovery drill intercepts including 1.53 g/t Au over 85.3 m
  • Sonic drilling found legacy heap residual gold up to 1.18 g/t Au
  • Shareholders’ equity increased to $45.23M
Negative
  • Nine-month loss from continuing operations of $13.21M
  • Individual Phase 5B composites ranged as low as 52% recovery

VANCOUVER, British Columbia, Nov. 10, 2025 (GLOBE NEWSWIRE) -- Liberty Gold Corp. (TSX: LGD; OTCQX: LGDTF) ("Liberty Gold" or the “Company”), is pleased to announce its financial and operating results for the three and nine months ended September 30, 2025. All amounts are presented in United States dollars unless otherwise stated.

THIRD QUARTER OF 2025 AND RECENT HIGHLIGHTS

  • On September 30, 20251, we announced the closure of a subscription agreement with Centerra Gold Inc. (“Centerra”), whereby Centerra acquired 9.9% of the issued and outstanding common shares of the Company. Centerra purchased, by way of private placement, 50,025,230 Common Shares at a 10% premium to 5-day VWAP of C$0.56 per share, for gross proceeds of C$28.01 million.
  • On October 2, 20252, we announced the receipt of the first staged payment of US$2.21 million related to the previously announced sale of our interest in the TV Tower copper-gold project.
  • On October 20, 20253, we announced the appointment of Brad Ralph as Senior Vice President, Corporate Development.
  • On August 12, 20254, we announced the appointment of Lauren Roberts to the Board of Directors.
  • On July 22, 20255, we announced the appointment of four highly experienced mining/permitting professionals to our project development team:
    • Vice President, Project Development, Tyler Cole, accountable for delivery of the Black Pine Feasibility Study and all associated basic and detailed engineering activities leading to a construction decision.
    • Senior Director, Mining and Metallurgy, Richard Zaggle, who will lead the development of the Black Pine processing flowsheet, oversee metallurgical and geo-metallurgical integration, and support mine design and feasibility planning in coordination with the broader technical team.
    • Director, Technical Services, Owen Nicholls, responsible for the completion of the feasibility-level resource estimate, short-term grade control models, geo-metallurgical modeling, and integration of geotechnical and hydrogeological programs to support permitting and operational readiness at Black Pine.
    • Senior Environmental and Permitting Specialist, Charles Mumford, will lead critical aspects of the Black Pine permitting program, including site environmental compliance, NEPA and state permitting, and coordination with regulatory bodies and community partners.

________________________
1 See news release dated September 8 and September 30, 2025
2 See news release dated October 2, 2025
3 See news release dated October 20, 2025
4 See news release dated August 12, 2025
5 See news release dated July 22, 2025


At the Black Pine project (“Black Pine”),

  • On August 19, 20256, we reported Phase 5A Column Leach Metallurgical results. Key results include:
    • Consistent Gold Extractions and Leach Performance: Weighted average column leach gold extraction of 80.6%, with individual composites reaching up to 90.8%, demonstrating metallurgical continuity across multiple mineralized zones; all of the Phase 5A composites tested exhibit the typical Black Pine leach result of greater than 80% of the eventual gold extraction achieved in under 10 days.
    • Corroborated Bottle Roll Data: Gold and silver extractions from coarse crush bottle roll tests strongly correlate with column leach results, 78.9% vs 80.6%, respectively, in line with previous metallurgical results.
    • De-risking Project Development: Phase 5A column tests reinforce the suitability of ROM heap leach processing and provide key inputs into the ongoing feasibility study metallurgical model.
    • Expanded Metallurgical Coverage: Phase 5A testing included composites from Back Range and J Zone, areas not previously tested and variability composites infilling previous sampling in the M Zone, Tallman and F zones.
  • On August 27, 20257, we announced that sonic drill hole assays confirm the presence of residual, cyanide-soluble gold in the 30 million tonne legacy heap on site at Black Pine.
    • Assay data further indicates residual gold grades supportive of potential economic reprocessing, with individual samples ranging from 0.06 to 1.18 grams per tonne (“g/t”) gold (“Au”), with the highest gold grades occurring near the surface of the heap.
    • Recognizing the potential to remove the legacy heap and process that material economically on the new heap opens significant exploration potential for resource and reserve expansion in the Rangefront Zone, located directly adjacent to the legacy heap.
  • On September 4, 20258, we reported report initial reverse circulation assay results from the Rangefront Zone. Key results include:
    • Multiple stacked zones of higher-grade oxide gold mineralization have been confirmed beyond the current Rangefront Resource Pit. Grades and widths are consistent with previous drilling.
    • The near surface high grade zone in the western Rangefront area remains open for expansion, with strong continuity to the northwest toward the heap leach pad and to the east. This is an area previously categorized as waste.
    • New drill results bolstered confidence in converting over 250,000 ounces of gold in mineral resources to mineral reserves currently locked by proximity to the legacy heap leach pad, building on previously released sonic drilling that indicated reprocessing legacy heap material could unlock Reserve Pit design potential.
    • Legacy heap leach pad reprocessing could unlock ~1 square kilometer of new exploration potential and connect Rangefront mineralization to the main Discovery Area.
    • Rangefront remains open in multiple directions and is emerging as a strategic starter pit for future mining operations.
  • On September 24, 2025,9 we reported Phase 5B metallurgical program results. Key results include:
    • Consistent Gold Extractions and Leach Performance: Weighted average column leach gold extraction of 81.9% at an average head grade of 0.65 parts per million gold, with individual composites ranging from 52% to 94.5%. Phase 5B composites exhibit the typical Black Pine leach result of greater than 80% of the eventual gold extraction achieved in under 10 days.
    • Corroborated Bottle Roll Data: Gold extractions from direct leach coarse crush bottle rolls (P80 of 1.68 millimeters) are aligned with column leach results (P80 of 16.9 millimeters) at 78.4% vs 81.9%, respectively.
    • Confirmed gold recoveries in Primary Mining Phases: Phase 5B testing focused on infill sampling within the primary mining phases of Rangefront and Discovery Zones.
  • On October 15, 202510 we announced the latest drilling results confirming that the Rangefront Zone at Black Pine continues to expand, with near-surface oxide gold mineralization now exceeding 150 meters wide (north-south) and 200 meters wide (east-west), introducing significant potential changes to mining economics and sequencing strategy. Highlights include:
    • Near-surface, higher-grade mineralization in western Rangefront continues to grow in size to the south, east and northwest, extending toward the historic heap leach pad area.
      • 0.41 grams g/t Au over 41.1 meters in LBP1145 at 45 m below surface
    • Infill and conversion drilling continues to expand mineralization at Rangefront, with strong oxide gold grades and widths consistent with and extending the prior results.
      • East Rangefront: 0.28 g/t Au over 125 meters in hole LBP1136
      • West Rangefront: 0.20 g/t Au over 53.3 meters and 0.92 g/t Au over 35.1 meters in hole LBP1141
      • North Rangefront: 0.37 g/t Au over 71.6 meters in hole LBP1144
  • On October 29, 202511 we announced new high-grade oxide gold drill intercepts at the Discovery Zone. This series of holes in Discovery were planned to increase confidence in the mineralization and metallurgical models in an area previously defined largely by historic drilling. The upper portion of this intercept has confirmed the extension of a previously mined high-grade shoot in the historic B Pit area. Notable intercepts include:
    • 1.53 g/t Au over 85.3 meters, including 5.19 g/t Au over 9.1 meters in LBP1171
    • 1.17 g/t Au over 59.4 meters, including 3.44 g/t Au over 15.2 meters in LBP1155

________________________
6 See news release dated August 19, 2025
7 See news release dated August 27, 2025
8 See news release dated September 4, 2025
9 See news release dated September 24, 2025
10 See news release dated October 15, 2025
11 See news release dated October 29, 2025


SELECTED FINANCIAL DATA

The following selected financial data are derived from our unaudited condensed interim consolidated financial statements and related notes thereto (the “Interim Financial Statements”) for the three and nine months ended September 30, 2025, as prepared in accordance with IFRS Accounting Standards – IAS 34: Interim Financial Statements.

A copy of the Interim Financial Statements is available on the Company’s website at libertygold.ca or on SEDAR+ at www.sedarplus.ca.

The information in the tables below is presented in $’000s, except ‘per share’ data:

 Three months ended
September 30,
Nine months ended
September 30,
  2025  2024  2025  2024 
Attributable to shareholders:    
Loss for the period from continuing operations$(6,249)$(5,597)$(13,212)$(12,057)
Loss and comprehensive loss for the period from continuing operations$(6,536)$(5,522)$(13,041)$(12,307)
Basic and diluted loss per share from continuing operations$(0.01)$(0.01)$(0.03)$(0.03)


 As at September 30, As at December 31, 
  2025  2024 
Cash and short-term investments$32,459 $6,967 
Working capital12$31,569 $7,345 
Total assets$50,449 $24,436 
Current liabilities$3,902 $2,061 
Non-current liabilities$1,314 $1,216 
Shareholders’ equity$45,233 $21,159 

________________________
12 These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosures for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found in the Company's September 30, 2025 MD&A.


ABOUT LIBERTY GOLD

Liberty Gold is focused on developing open pit oxide deposits in the Great Basin of the United States, home to large-scale gold projects that are ideal for open-pit mining. This region is one of the most prolific gold-producing regions in the world and stretches across Nevada and into Idaho and Utah. The Company is advancing the Black Pine Project in southeastern Idaho, a past-producing, Carlin-style gold system with a large, growing resource and strong economic potential. We know the Great Basin and are driven to advance big gold deposits that can be mined profitably in open-pit scenarios and in an environmentally responsible manner.

For more information, visit libertygold.ca or contact:

Susie Bell, Manager, Investor Relations
Phone: 604-632-4677 or Toll Free 1-877-632-4677
info@libertygold.ca

Peter Shabestari, P.Geo., Vice-President Exploration, Liberty Gold, is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and validated that the information contained in the release is accurate.

Quality Assurance – Quality Control
Drill composites were calculated using a cut-off of 0.15 g/t Au. Drill intersections are reported as drilled thicknesses. True widths of the mineralized intervals vary between 30% and 100% of the reported lengths due to varying drill hole orientations but are typically in the range of 50% to 90% of true width. Drill samples were assayed by ALS Limited in Reno, Nevada for gold by Fire Assay of a 30 gram (1 assay ton) charge with an AA finish, or if over 5.0 g/t Au were re-assayed and completed with a gravimetric finish. For these samples, the gravimetric data were utilized in calculating gold intersections. For any samples assaying over 0.10 parts per million an additional cyanide leach analysis is done where the sample is treated with a 0.25% NaCN solution and rolled for an hour. An aliquot of the final leach solution is then centrifuged and analyzed by Atomic Absorption Spectroscopy. QA/QC for all drill samples consists of the insertion and continual monitoring of numerous standards and blanks into the sample stream, and the collection of duplicate samples at random intervals within each batch. All holes are also analyzed for a 51 multi-element geochemical suite by ICP-MS. ALS Geochemistry-Reno is ISO 17025:2005 Accredited, with the Elko and Twin Falls prep lab listed on the scope of accreditation.

This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable securities laws, including statements or information concerning, future financial or operating performance of Liberty Gold and its business, operations, properties and condition; planned de-risking activities at Liberty Gold’s mineral properties; the potential quantity, recoverability and/or grade of minerals; the potential size of a mineralized zone or potential expansion of mineralization; proposed exploration and development of Liberty Gold’s exploration property interests; the results of mineral resource estimates or mineral reserve estimates and preliminary feasibility studies; and the Company’s anticipated expenditures.

Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold, and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, timely receipt of governmental or regulatory approvals, including any stock exchange approvals; receipt of shareholder approval and court approval for the spin-out transaction; receipt of a financing on time, obtaining renewals for existing licenses and permits and obtaining required licenses and permits, labour stability, stability in market conditions, availability of equipment, results of any mineral resources, mineral reserves, or pre-feasibility study, the availability of drill rigs, the timing of receipt of future staged payments from the sale of TV Tower, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Liberty Gold and there is no assurance they will prove to be correct.

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to the interpretation of results and/or the reliance on technical information provided by third parties as related to the Company’s mineral property interests; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities generally; the timing or results of the publication of any mineral resources, mineral reserves or pre-feasibility studies; delays in permitting; possible claims against the Company; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing, timing of receipt of staged payments on the sale of TV Tower or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated March 25, 2025, in the section entitled "Risk Factors", under Liberty Gold’s SEDAR+ profile at www.sedarplus.ca.

Although Liberty Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results, and future events could differ materially from those anticipated in such statements. Liberty Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except for material differences between actual results and previously disclosed material forward-looking information, or as otherwise required by law.

Except for statements of historical fact, information contained herein or incorporated by reference herein constitutes forward-looking statements and forward-looking information. Readers should not place undue reliance on forward-looking information. All forward-looking statements and forward-looking information attributable to us is expressly qualified by these cautionary statements.

Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources

The information in this MD&A, including any information incorporated by reference, and disclosure documents of Liberty Gold that are filed with Canadian securities regulatory authorities concerning mineral properties have been prepared in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of United States securities laws.

Without limiting the foregoing, these documents use the terms “measured resources”, “indicated resources”, “inferred resources” and “mineral reserves”. These terms are Canadian mining terms as defined in, and required to be disclosed in accordance with, NI 43-101, which references the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards, adopted by the CIM Council, as amended. However, these standards differ significantly from the mineral property disclosure requirements of the United States Securities and Exchange Commission (the “SEC”) in Regulation S-K Subpart 1300 (the “SEC Modernization Rules”) under the United States Securities Act of 1934, as amended. The Company does not file reports with the SEC and is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and will continue to provide disclosure under NI 43-101 and the CIM Definition Standards.


FAQ

What did Liberty Gold (LGDTF) disclose about the Centerra private placement on November 10, 2025?

Centerra purchased 50,025,230 common shares (9.9%) at C$0.56 per share for gross proceeds of C$28.01M.

How much cash did Liberty Gold (LGDTF) report as of September 30, 2025?

Liberty Gold reported $32.46M in cash and short-term investments as at September 30, 2025.

What Black Pine metallurgical recoveries did Liberty Gold (LGDTF) report in Q3 2025?

Phase 5A/5B column leach programs reported weighted average gold extractions of about 80–81.9%.

Did Liberty Gold (LGDTF) report material drill results at Black Pine in 2025?

Yes. Notable intercepts include 1.53 g/t Au over 85.3 m at Discovery and multiple expanded Rangefront intercepts.

What cash inflows beyond the Centerra financing did Liberty Gold (LGDTF) report in Q3 2025?

The company received the first staged payment of US$2.21M from the sale of its interest in the TV Tower project.

What were Liberty Gold's losses for the nine months ended September 30, 2025?

Loss from continuing operations for the nine months was $13.21M.
Liberty Gold

OTC:LGDTF

LGDTF Rankings

LGDTF Latest News

LGDTF Stock Data

202.00M
450.59M
2.63%
28.15%
Gold
Basic Materials
Link
Canada
Vancouver