LAKE VICTORIA GOLD IDENTIFIES PREFERRED PROCESSING ROUTE FOR IMWELO NEAR-SURFACE MINERALIZATION
The measured gains apply to treated material; whole-ore performance awaits a mass and gold balance across desliming.
Rhea-AI Summary
Lake Victoria Gold (LVGLF) identified attrition scrubbing followed by desliming as the preferred pretreatment for shallow Area C mineralization at Imwelo.
In tests designed to simulate plant conditions, 24-hour gold extraction rose from 49.99% on as-received material to 84.54% after pretreatment. Bottle-roll recovery at 48 hours was 88.15% for the pretreated fraction, versus 70.76% as received. Average gravity recovery increased from 12.78% to 21.25%, while settling time fell from 220 to 130 seconds. The program used 38 whole-core samples weighing 120.34 kg.
Recoveries measured on pretreated fractions do not yet represent overall whole-ore plant recovery. The next phase will establish the mass and gold balance across desliming. Nesch Mintech recommended advancing the treatment for further process optimization.
Positive
- 24-hour gold extraction rose from 49.99% to 84.54% after pretreatment
- 48-hour bottle-roll recovery reached 88.15% on the pretreated fraction
- Average gravity recovery rose from 12.78% to 21.25%
- Settling time fell from 220 to 130 seconds
Negative
- None.
AI-generated analysis. How Rhea-AI works. Not financial advice.
Pretreatment lifts 24-hour gold extraction from
The program identifies attrition scrubbing followed by desliming as the preferred pretreatment option for further optimization of the clay-rich material expected to form an important component of initial Area C feed. In mechanically agitated leach testing designed to simulate plant conditions, 24-hour gold extraction increased from
The work was completed by Nesch Mintech Tanzania Limited ("Nesch Mintech"), a laboratory based in Mwanza,
Key Highlights
- Preferred pretreatment route lifts 24-hour gold extraction to
84.54% . Attrition scrubbing followed by desliming produced the strongest overall metallurgical response, increasing extraction from49.99% on as-received material to84.54% while materially improving slurry handling. - Bottle-roll recovery of up to
88.15% . The attrition-scrubbed and deslimed fraction returned88.15% recovery at 48 hours, compared with70.76% on as-received material and76.84% following desliming alone. - Coarse and gravity-recoverable gold confirmed. Approximately
26% of the gold reported to the +300 µm size fraction, while average gravity recovery increased from12.78% as received to21.25% following attrition scrubbing and desliming, supporting further evaluation of gravity recovery ahead of cyanidation. - Pretreatment materially improves slurry handling. Settling time decreased from 220 seconds to 130 seconds, while bed compaction increased from
50.56% as received to65.09% following attrition scrubbing and desliming. - Extends the metallurgical framework across the planned mining sequence. The weathered-ore results complement the Company's March 18, 2026 program on transitional and fresh mineralization, which demonstrated recoveries of up to approximately 96–
97% using conventional gravity concentration and cyanide leaching.
Management Commentary
Marc Cernovitch, President & CEO of Lake Victoria Gold, commented: "We designed this program to answer a practical engineering question: how should we treat the clay-rich material expected early in the Area C mining sequence? The results give us a clear preferred processing direction, with scrubbing and desliming materially improving gold extraction and slurry handling. Combined with the strong recovery profile already established for the deeper transitional and fresh material, we now have a much stronger metallurgical basis for advancing Imwelo's process design. This is another important step in moving the Project from engineering into execution."
Strong Near-Surface Results from Area C
The metallurgical program follows LVG's August 27, 2026 announcement of strong, near-surface drill results from Area C, including 28.71 g/t Au over 2.75 metres from 21.00 metres in IMWDR029 and 12.20 g/t Au over 4.50 metres from 32.00 metres in IMWDR028. The intervals included higher-grade sections of 59.77 g/t Au over 1.30 metres and 27.94 g/t Au over 1.90 metres, respectively, with individual quartz-vein samples returning up to 142.90 g/t Au and 124.83 g/t Au. The drilling was designed specifically to intersect the shallow, highly weathered mineralization and provide whole-core material for metallurgical testing ahead of detailed mine planning and process design.
Previous geotechnical work identified the weathered zone as extending locally to approximately 40–60 metres depth. As this material is expected to be encountered early in the Area C mining sequence, the Company initiated dedicated metallurgical work to establish how the clay-rich mineralization responds to processing and to determine the preferred treatment approach for the front end of the plant.
Taken together, the strong near-surface drill results and the metallurgical response provide important additional inputs for mine planning and process design at Area C. The identification of a preferred treatment route for this weathered material further advances the Company's understanding of the mineralization expected early in the mining sequence.
Metallurgical Testwork Program
A total of 38 HQ whole-core samples weighing 120.34 kg were submitted to Nesch Mintech for metallurgical testing. The calculated head grade from the individual samples was 3.92 g/t Au, while the average composite head grade was 3.80 g/t Au.
The composite material was evaluated under three treatment conditions: as received, deslimed, and attrition scrubbed followed by desliming. The program evaluated cyanide leaching, gravity recovery, grind characteristics and slurry settling, with certified reference materials returning results within the laboratory's stated acceptance ranges.
Summary of Principal Results
|
Test |
As Received |
Deslimed |
Attrition Scrubbed + Deslimed |
|
Composite head grade (g/t Au) |
3.80 |
2.72 |
2.87 |
|
Agitated leach – 24 h extraction |
49.99 % |
62.10 % |
84.54 % |
|
Bottle roll – 48 h recovery |
70.76 % |
76.84 % |
88.15 % |
|
CIL – 25 g/L carbon |
43.64 % |
61.77 % |
85.02 % |
|
Bottle roll – P80 75 µm |
41.26 % |
56.99 % |
83.97 % |
|
Average gravity-recoverable gold |
12.78 % |
16.48 % |
21.25 % |
|
Settling time |
220 sec |
130 sec |
130 sec |
|
Bed compaction |
50.56 % |
64.55 % |
65.09 % |
Recoveries for the deslimed and attrition-scrubbed/deslimed samples relate to the respective pretreated fractions and do not yet represent overall whole-ore plant recovery. The next phase of work will establish the mass and gold balance across the desliming circuit.
The results demonstrate a consistent improvement following pretreatment. Nesch concluded that attrition scrubbing and desliming produced the strongest overall response and recommended that the treatment be advanced for further evaluation.
Grind testing also demonstrated improved gold extraction at finer grind sizes, but with increased generation of fines. Nesch therefore recommends optimizing the grind within the P80 75–106 µm range rather than selecting the finest grind at this stage.
Advancing Imwelo Process Design
The current program builds on LVG's previously announced metallurgical work on deeper transitional and fresh mineralization at Area C, which returned recoveries of up to approximately 96–
Cautionary Note on Production Decision
Although Imwelo has been the subject of JORC-compliant PEA, PFS and updated PFS work, these foreign-code studies are not current under NI 43-101. The Company has not completed a feasibility study on Imwelo that establishes mineral reserves demonstrating economic and technical viability and is not treating the JORC-based estimates or analyses as current under CIM Definition Standards. Any decision to commence production is not based on a feasibility study of mineral reserves and therefore involves increased uncertainty and a higher risk of economic and technical failure. There is no certainty that the planned low-capex open-pit operation will be economically viable or that production will occur as anticipated. Risks include, without limitation, variations in grade and recovery, unexpected geotechnical or metallurgical challenges, cost overruns, funding availability, and operational, regulatory, or permitting risks.
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved by David Scott, Pr. Sci. Nat., a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Scott is a Director and Officer of the Company.
Quality Control
Testwork was completed by Nesch Mintech Tanzania Limited, Mwanza, which is independent of the Company. Head grades were determined by 50 g fire assay with AAS finish on duplicate pulps. Certified reference materials and a blank were inserted with the samples and returned results within acceptable limits.
About Lake Victoria Gold
Lake Victoria Gold is a rapidly growing gold exploration and development company listed on the TSX Venture Exchange under the symbol LVG. Leveraging our unique position and experience, the Company is principally focused on growth and consolidation in the highly prolific and prospective Lake Victoria Goldfield in Tanzania.
The Company has a
LVG has assembled a highly experienced team with a track record of developing, financing, and operating mining projects in Africa with management, directors and partners owning more than
Taifa Group (a diverse group of companies with interests in amongst others, Mining, Telecoms, Oil & Gas, Agri Business, Pharmaceuticals and Leather) has entered into an agreement with the Company to obtain an equity stake in the Company and through its wholly owned subsidiary Taifa Mining (a wholly Tanzanian owned company), or other nominees. Taifa Mining will also conduct all the contract mining and civil works for the Imwelo project. Taifa Mining is Tanzania's largest mining contractor with over 30 years mining related experience. Taifa have been the contractor of choice to most mines in Tanzania and have maintained long and successful relationships with companies such as Petra, De Beers, Barrick, and AngloGold Ashanti. In addition, Taifa also owns the largest fleet of mining equipment in Tanzania. As a company, Taifa is committed to adopting and adhering to the latest internationally recognized standards throughout all aspects of its business.
On Behalf of the Board of Directors of the Company,
Simon Benstead
Executive Chairman & CFO
Phone: +1 604-685-9316
Email: sbenstead@lakevictoriagold.com
For more information please contact:
Simon Benstead
Executive Chairman & CFO
Phone:+ 1 604-685-9316
Email: sbenstead@lakevictoriagold.com
Marc Cernovitch
CEO & Director
Phone: +1 604-685-9316
Email: mcernovitch@lakevictoriagold.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
This news release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian securities legislation (collectively, "forward-looking statements"). Forward-looking statements in this news release include, but are not limited to, statements regarding: the expected processing characteristics of near-surface mineralized material at Area C; the advancement of attrition scrubbing and desliming as the preferred pretreatment option for further evaluation; additional gravity recovery, grind optimization, mass-balance, bulk and/or locked-cycle metallurgical testwork; the establishment of reproducible overall gold recovery parameters; the incorporation of metallurgical results into process and plant design; the expected sequencing and treatment of material from Area C; and the continued advancement of the Imwelo Gold Project toward development, construction and potential production.
Forward-looking statements are based on the opinions, assumptions and estimates of management as of the date such statements are made, including assumptions regarding the representativeness of the samples tested; the ability of future metallurgical testwork to confirm or improve upon the results reported herein; the applicability of laboratory-scale results to future plant-scale operations; the characteristics, grade and continuity of mineralization encountered during mining; the availability of financing, equipment, contractors and personnel; the receipt and maintenance of required regulatory and governmental approvals; and the Company's ability to advance engineering, construction and development activities as currently contemplated.
Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to differ materially from those expressed or implied by such statements. These risks include, without limitation: the risk that further metallurgical testwork does not reproduce the recoveries reported herein; the risk that gold reporting to the slimes fraction or other process losses results in overall whole-ore recovery below the recoveries reported for the pretreated fractions; variability in mineralization, grade, recovery, geotechnical conditions and metallurgical response; changes to the planned mining sequence or process flowsheet; delays or cost increases in engineering, procurement, construction or commissioning; the availability and terms of financing; commodity-price and foreign-exchange fluctuations; regulatory, permitting and governmental risks; contractor and supply-chain risks; and the risks associated with making a production decision in the absence of a feasibility study of mineral reserves demonstrating economic and technical viability.
Although the Company believes that the expectations reflected in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct. Readers are cautioned not to place undue reliance on forward-looking statements. The forward-looking statements contained in this news release are made as of the date hereof, and the Company disclaims any obligation to update or revise such statements to reflect new events or circumstances, except as required by applicable securities laws.
View original content to download multimedia:https://www.prnewswire.com/news-releases/lake-victoria-gold-identifies-preferred-processing-route-for-imwelo-near-surface-mineralization-302889142.html
SOURCE Lake Victoria Gold Ltd.
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
What did Lake Victoria Gold's Imwelo pretreatment tests show?
Attrition scrubbing followed by desliming raised 24-hour gold extraction from 49.99% on as-received material to 84.54% in tests designed to simulate plant conditions. The measured result applies to the tested material, not an established overall whole-ore plant recovery.
What grind size is recommended for Lake Victoria Gold's Imwelo process work?
Nesch Mintech recommends optimizing grinding within a P80 range of 75–106 µm rather than selecting the finest grind at this stage. Finer grinding improved gold extraction but also generated more fine particles.