Modern Mining Plans Its First Commercial-Scale E-Waste Gold Plant, With Capacity for About 40,000 Gold Equivalent Ounces a Year; Files Third Quarter 2026 Financial Statements
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Modern Mining has proven it can recover and sell metal concentrate from electronic waste. Its
“We approach electronic waste with the mindset of a mining company, as an above-ground resource rather than simply a waste stream,” said Jeet Basi, President and CEO of Modern Mining. “Building our first commercial-scale plant is the step that turns that resource into a new source of supply for the U.S. market. We designed our model so that each pre-concentration plant we add can feed the same purification hub, giving us a clear path to growth.”
Electronic waste is a large and growing source of valuable metals. The world generated a record 62 million tonnes of e-waste in 2022, up
From Build-Out to Revenue: The 18-Month Plan
The Company’s development targets, measured from completion of the IPO, are:
- First 6 to 9 months: Complete build-out of a pre-concentration plant and an aqueous purification plant in
North Carolina , convert e-waste supply arrangements into binding contracts, and train operating teams. The pre-concentration plant’s target design processing capacity is up to one tonne of waste printed circuit boards per hour. - Months 9 to 12: Complete commissioning and demonstrate ramp-up toward the pre-concentration plant’s target design capacity, addressing process bottlenecks as needed.
- Months 12 to 18: Grow commercial production and revenue.
- In parallel, months 6 to 18: Seek R2 (Responsible Recycling) Standard certification and add e-waste supply contracts to support operation at target design capacity.
Modern Mining plans to secure supply contracts with recyclers, e-waste aggregators, IT asset disposition providers, manufacturers, and OEMs. The demonstration facility will continue to support process development and operator training.
Built to Scale: One Purification Hub, Up to Five Regional Plants
The planned purification plant will be designed to process concentrate from up to five pre-concentration plants. Modern Mining’s growth strategy is a two-step model: regional pre-concentration plants near electronic waste suppliers, feeding centralized purification in
Beyond the anticipated commissioning of the first plant, the Company plans to develop its expansion roadmap and begin research to improve recovery rates, reduce costs and evaluate additional metals and feedstocks.
Files Third Quarter 2026 Financial Statements
The Company is pleased to announce the filing of its interim condensed consolidated financial statements for the three and nine months ended September 30, 2026.
The financial statements are available under the Company’s profile on SEDAR+ at www.sedarplus.ca and have been furnished to the
About Modern Mining Technology Corp.
Modern Mining Technology Corp. is a resource recovery company focused on recovering valuable metals from electronic waste. The Company uses its proprietary aqueous-based processing technologies to extract, recover and produce precious and commodity metals, including gold, palladium, silver and copper, and potentially 30 other metals. By processing end-of-life electronics, Modern Mining provides an alternative to traditional mining for sourcing valuable metals.
For more information about Modern Mining, visit https://modernmining.com/.
FORWARD-LOOKING STATEMENTS:
This release contains forward-looking statements and information under applicable United States and Canadian securities laws, including statements about the use of IPO proceeds; development costs and timing; site selection, plant build-out, commissioning, ramp-up and commercial production; design capacity; feedstock contracts; staffing; certification; research; and expansion. These statements reflect management’s expectations as of the date of this release and assume access to facilities, equipment, personnel, feedstock and capital, receipt of permits and approvals, and the ability to scale demonstration results and sell products on acceptable terms.
We have based these forward-looking statements on information currently available to the Company, assumptions the Company believes are reasonable and our current expectations about future events or performance. While we believe these expectations are reasonable, such forward-looking statements are inherently subject to risks and uncertainties, many of which are beyond our control. Actual results may differ materially due to engineering, procurement, construction or commissioning delays; cost increases; permitting requirements; changes in feedstock availability, composition or cost; supplier or customer performance; failure to achieve design capacity, recoveries, product specifications or economic production; metal prices and market demand; changes in laws and regulations; or financing constraints. Supplier letters of intent do not guarantee deliveries of feedstock. Schedules and budgets are estimates, additional capital may be required, and there is no assurance that development milestones or commercial production will be achieved.
Readers should review the risk factors in the Company’s Regulation A offering circular, Canadian prospectus and other filings with the U.S. Securities and Exchange Commission, available at www.sec.gov, and with the applicable Canadian securities regulators, available at www.sedarplus.ca, and should not place undue reliance on forward-looking statements contained in this news release and in any document referred to in this news release. The forward-looking statements contained in this news release are made only as of the date hereof. The Company undertakes no obligation to update or supplement any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law. This release does not constitute an offer to sell or a solicitation of an offer to buy the Company’s securities.
View source version on businesswire.com: https://www.businesswire.com/news/home/20261118102576/en/
Investors
info@modernmining.com
(984) 235-6778
Media
mdrn@gateway-grp.com
(949) 574-3860
Source: Modern Mining Technology Corp.