STOCK TITAN

Metallium Announces Contracts for 50% of Stage-1 Printed Circuit Board Feedstock Target

(Neutral)
Tags

Metallium (OTCQX: MTLMY) announced binding contracts that now cover 50% (4,000 tpa) of its 8,000 ton per annum Stage‑1 PCB feedstock target, including a binding supply agreement with Glencore for up to 2,400 tpa. The company is commissioning its Texas Technology Campus with multi‑reactor Flash Joule Heating installation and testing.

Management said it targets a contracted base of ~70% of Stage‑1 while retaining ~30% spot exposure to benchmark pricing and maintain sourcing flexibility as operations scale.

Loading...
Loading translation...

Positive

  • Contracts cover 50% of Stage‑1 8,000 tpa target (4,000 tpa)
  • Glencore supply agreement for up to 2,400 tpa of e‑scrap/feedstock
  • Commissioning progress at Texas Technology Campus with multi‑reactor FHJ installation and testing
  • Targeted contracted base ~70% planned to underpin stable operations

Negative

  • Retains ~30% exposure to spot market procurement for Stage‑1 feedstock
  • Currently contracted volume (50%) is below stated 70% target for a fully underpinned Stage‑1

News Market Reaction – MTMCF

+0.24%
+0.24% Session close to close

In the May 6 session, MTMCF gained 0.24%, reflecting a mild positive market reaction.

Data tracked by StockTitan Argus on the day of publication.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

HOUSTON, May 6, 2026 /PRNewswire/ -- Metallium Limited (ASX: MTM; OTCQX: MT. MCF and MTLMY-ADRs) announced binding contracts that cover half of its 8,000 ton per annum Stage 1 throughput target of printed circuit board (PCB) feedstock for its operations in the U.S.

This builds on the Company's previously announced binding supply agreement with Glencore Ltd. for up to 2,400 tpa of e-scrap and feedstock including additional agreements with other established industry participants as the company continues to ramp up commissioning of its Texas Technology Campus in the Houston area. "We are targeting a contracted base of approximately 70% of Stage 1, which will provide sufficient volume to underpin stable operations, while retaining 30% exposure to spot market procurement," said Michael Walshe, Managing Director and CEO of Metallium. He added that this ratio enables Metallium to continuously benchmark and validate prevailing market pricing; maintain flexibility across feedstock grades and suppliers; and optimize margins through opportunistic purchasing. Additional details are available here https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-03087005-6A1324254&v=undefined.

Walsh said, "We are building a diversified and high-quality supply base beyond our cornerstone agreement with Glencore, while deliberately retaining exposure to the spot market, ensuring we maintain real-time visibility on pricing to optimize commercial outcomes as we scale."

Metallium is progressing the commissioning at its Texas Technology Campus, including multi-reactor FHJ installation and testing, as well as ongoing studies into upstream pre-processing and downstream recovery pathways. "Securing increasing volumes of contracted feedstocks enables the company to maintain predictable reactor utilization, execute extended processing campaigns across multiple PCB streams and generate data to support the planned multi-line scale up," he added.

Global e-waste is rapidly expanding with recycling rates materially lagging growth, increasing a structure supply gap in high-value secondary materials. PCBs sit at the center of this opportunity, offering materially higher grades of gold, silver, palladium and copper than most primary ores. The growth of data centers, AI, telecoms and electrification is driving sustained increases in PCB scrap volumes, yet the US remains reliant on offshore processing, with limited domestic capacity and the extra costs involved in exporting and sub-optimal recovery systems.

Metallium Ltd. (https://www.metalluminc.com) is pioneering a low-carbon, high-efficiency approach to recovering critical and precious metals from mineral concentrates and high-grade waste streams. The company's patented Flash Joule Heating (FJH) technology enables the extraction of high-value materials, including gallium, germanium, antimony, rare earth elements, and gold, from feedstocks such as refinery scrap, e-waste and monazite. The company's secured its first commercial site in Texas via its wholly owned US subsidiary, Flash Metals USA.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/metallium-announces-contracts-for-50-of-stage-1-printed-circuit-board-feedstock-target-302763775.html

SOURCE Metallium Ltd.

FAQ

How much of Metallium's Stage‑1 PCB feedstock target is contracted under MTLMY announcements?

Metallium has secured binding contracts for 50% (4,000 tpa) of its 8,000 tpa Stage‑1 target. According to the company, this includes a Glencore agreement for up to 2,400 tpa and other supplier contracts to build supply diversity.

What does the Glencore agreement mean for MTLMY supply stability and volume?

The Glencore deal provides up to 2,400 tpa of e‑scrap/feedstock. According to the company, this forms a cornerstone of contracted supply while Metallium adds other suppliers to diversify and scale reactor utilization.

What commissioning milestones did Metallium report for its Texas Technology Campus (MTLMY)?

Metallium reported multi‑reactor Flash Joule Heating installation and testing underway. According to the company, commissioning progress includes FHJ installation and studies into upstream pre‑processing and downstream recovery pathways.

Why is Metallium retaining spot market exposure for feedstock procurement (MTLMY)?

Metallium retains ~30% spot exposure to benchmark and validate prevailing market pricing. According to the company, this approach preserves sourcing flexibility across feedstock grades and supports opportunistic margin optimization.

What is Metallium's contracted target for Stage‑1 feedstock and its current gap (MTLMY)?

The company targets a contracted base of approximately 70% of Stage‑1 but has currently contracted 50%. According to the company, the remaining volume will be filled via additional contracts and spot procurement as commissioning continues.