Q3 2025 Operational & Financial Results and Progress Report on Key Developments to Double Production by 2030

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

McEwen (NYSE/TSX: MUX) reported Q3 2025 results and released a plan to double consolidated production to 250,000–300,000 GEOs by 2030 through advances at Fox Complex, Gold Bar Complex and El Gallo. Q3 revenue fell to $50.5M on sales of 14,968 GEOs, while adjusted EBITDA rose 12% to $11.8M. Management cut 2025 full‑year production guidance to 112,000–123,000 GEOs and raised full‑year cash cost guidance for 100% assets to $2,028–$2,128/oz and AISC to $2,356–$2,456/oz. Key developments: Stock Mine mid‑2026 start, El Gallo Phase 1 targeted mid‑2027, Grey Fox resource update in Q4 2025, Los Azules feasibility and RIGI benefits secured. Cash was $51.2M and debt principal $130.0M at Sept 30, 2025.

McEwen (NYSE/TSX: MUX) ha riportato i risultati del terzo trimestre 2025 e ha pubblicato un piano per raddoppiare la produzione consolidata a 250.000–300.000 GEO entro il 2030 attraverso i progressi al Fox Complex, al Gold Bar Complex e all'El Gallo. Il fatturato del Q3 è sceso a $50,5 milioni dalle vendite di 14.968 GEO, mentre l' EBITDA rettificato è salito del 12% a $11,8 milioni. La direzione ha tagliato le previsioni di produzione per l'intero 2025 a 112.000–123.000 GEO e ha aumentato le previsioni dei costi in contanti per il 100% degli asset a $2.028–$2.128/oz e l'AISC a $2.356–$2.456/oz. Sviluppi chiave: avvio previsto della miniera Stock a metà‑2026, la Fase 1 di El Gallo mirata a metà‑2027, aggiornamento delle risorse Grey Fox nel quarto trimestre 2025, fattibilità di Los Azules e benefici RIGI assicurati. La liquidità ammontava a $51,2 milioni e il debito in principale a $130,0 milioni al 30 settembre 2025.

McEwen (NYSE/TSX: MUX) informó resultados del 3T 2025 y presentó un plan para duplicar la producción consolidada a 250,000–300,000 GEOs para 2030 mediante avances en Fox Complex, Gold Bar Complex y El Gallo. Los ingresos del tercer trimestre cayeron a $50.5M por ventas de 14,968 GEOs, mientras que el EBITDA ajustado subió un 12% a $11.8M. La gerencia redujo la guía de producción para todo el año 2025 a 112,000–123,000 GEOs y elevó la guía de costos en efectivo para 100% de los activos a $2,028–$2,128/oz y el AISC a $2,356–$2,456/oz. Desarrollos clave: inicio en mitad de 2026 de la Mina Stock, Fase 1 de El Gallo prevista para mediados de 2027, actualización de recursos Grey Fox en el Q4 2025, factibilidad de Los Azules y beneficios de RIGI asegurados. La liquidez fue de $51.2M y la deuda principal de $130.0M al 30 de septiembre de 2025.

McEwen (NYSE/TSX: MUX)는 2025년 3분기 실적을 발표하고 2030년까지 연결 생산을 25만~30만 GEO로 두 배로 늘리겠다는 계획을 밝히며 Fox Complex, Gold Bar Complex, El Gallo의 진전을 언급했습니다. 3분기 매출은 $50.5M으로 감소했고 판매량은 14,968 GEO였습니다. 또한 조정 EBITDA는 12% 상승하여 $11.8M이 되었습니다. 경영진은 2025년 연간 생산 가이던스를 112,000–123,000 GEO로 하향 조정하고 100% 자산의 현금비용 가이던스를 $2,028–$2,128/oz와 AISC를 $2,356–$2,456/oz로 상향했습니다. 주요 개발: Stock 광산 2026년 중반 시작, El Gallo 1단계 목표를 2027년 중반으로 설정, Grey Fox 자원 업데이트를 2025년 4분기에 발표, Los Azules 타당성 및 RIGI 혜택 확보. 현금은 $51.2M, 부채 원금은 $130.0M으로 2025년 9월 30일 기준.

McEwen (NYSE/TSX: MUX) a publié les résultats du T3 2025 et dévoilé un plan visant à démultiplier la production consolidée à 250 000–300 000 GEOs d'ici 2030 grâce aux progrès du Fox Complex, du Gold Bar Complex et d'El Gallo. Le chiffre d'affaires du T3 a reculé à $50,5M sur des ventes de 14 968 GEO, tandis que l'EBITDA ajusté a augmenté de 12% pour atteindre $11,8M. La direction a revu à la baisse les prévisions de production pour l'ensemble de 2025 à 112 000–123 000 GEO et a relevé les prévisions de coûts en espèces pour 100% des actifs à $2 028–$2 128/oz et l'AISC à $2 356–$2 456/oz. Développements clés : démarrage prévu de la mine Stock à la mi‑2026, la Phase 1 d'El Gallo visée à la mi‑2027, mise à jour des ressources Grey Fox au T4 2025, faisabilité de Los Azules et avantages RIGI sécurisés. La trésorerie s'élevait à $51,2M et la dette principale à $130,0M au 30 septembre 2025.

McEwen (NYSE/TSX: MUX) berichtete über die Ergebnisse des Q3 2025 und legte einen Plan vor, die konsolidierte Produktion bis 2030 auf 250.000–300.000 GEOs zu verdoppeln, durch Fortschritte beim Fox Complex, Gold Bar Complex und El Gallo. Der Umsatz im Q3 fiel auf $50,5M bei Verkäufen von 14.968 GEO, während das bereinigte EBITDA um 12% auf $11,8M stieg. Das Management senkte die Jahresprognose für 2025 auf 112.000–123.000 GEOs und hob die Bar-Kostenprognose für 100% der Vermögenswerte auf $2.028–$2.128/oz und das AISC auf $2.356–$2.456/oz an. Wesentliche Entwicklungen: Start der Stock-Mine Mitte 2026, Phase 1 von El Gallo auf Mitte 2027 zielen, Grey Fox Ressourcen-Update im Q4 2025, Machbarkeit von Los Azules und RIGI-Vorteile gesichert. Die Liquidität betrug $51,2M und die Schuldenhöhe $130,0M zum 30. September 2025.

مايكوين (NYSE/TSX: MUX) أبلغت عن نتائج الربع الثالث لعام 2025 وكشفت عن خطة مضاعفة الإنتاج المجمّع إلى 250,000–300,000 GEOs بحلول 2030 من خلال التقدّم في Fox Complex وGold Bar Complex وEl Gallo. انخفضت الإيرادات في الربع الثالث إلى $50.5M من مبيعات 14,968 GEO، بينما ارتفع EBITDA المعدّل بنسبة 12% ليصل إلى $11.8M. قللت الإدارة من توجيهات الإنتاج للسنة الكاملة 2025 إلى 112,000–123,000 GEOs ورفعت توجيهات التكلفة النقدية لـ 100% من الأصول إلى $2,028–$2,128/oz وAISC إلى $2,356–$2,456/oz. التطورات الرئيسية: بدء تشغيل منجم Stock في منتصف 2026، هدف المرحلة 1 من El Gallo في منتصف 2027، تحديث الموارد Grey Fox في الربع الرابع من 2025، دراسة جدوى Los Azules وفوائد RIGI مضمونة. النقدية بلغت $51.2M والدين رئيسي $130.0M حتى 30 سبتمبر 2025.

Positive
  • Adjusted EBITDA +12% to $11.8M in Q3 2025
  • Cash increased to $51.2M at Sept 30, 2025
  • Stock Mine expected to start mid‑2026 with lower cost production
  • Los Azules Feasibility Study published and RIGI benefits approved (30 years tax stability)
  • Strong exploration hits: 2.43 gpt over 74.7 m at Windfall
Negative
  • Full‑year 2025 production guidance reduced to 112,000–123,000 GEOs
  • Full‑year cash cost guidance increased to $2,028–$2,128/oz
  • Gold Bar 2025 guidance cut to 32,000–35,000 GEOs with cash costs now $2,050–$2,150/oz
  • Debt principal rose to $130.0M (convertible notes $110M + term loan $20M)

Insights

Operational shortfalls in 2025 weigh near-term performance, but multiple development projects materially increase medium‑term production optionality.

Production at the Gold Bar and Fox complexes fell short of initial targets, prompting upward revisions to unit cost guidance and a lowered full‑year output range to 112,000123,000 GEOs. The company identifies concrete operational causes (mine model updates, waste stripping and contractor costs) and lists corrective actions and timelines, with expectations of improvements in Q4 2025 and new lower‑cost production from Stock starting mid‑2026.

Key dependencies and risks hinge on timely ramp‑up at Stock and Froome West, permit approval and mill construction at El Gallo for mid‑2027 Phase‑1 production, and resource/PFS milestones at Grey Fox (Updated Resource in Q4 2025; PFS in H1 2026). Monitor delivery of Stock production by mid‑2026, El Gallo permits and mill construction start in H1 2026, and the Grey Fox PFS in H1 2026 for validation of the stated production ramp to the 2030 target.

Near‑term financials show higher costs and lower volumes, but liquidity and marketable securities improved materially by Q3 2025.

Revenue fell slightly to 50.5M due to a 33% decline in GEOs sold, partially offset by a higher realized price of 3,477 per GEO. Gross profit narrowed and the company reported a small net loss, while adjusted EBITDA rose to 11.8M. Cash and equivalents increased to 51.2M and working capital turned positive at 62.6M, despite debt principal rising to 130.0M.

Financial upside depends on achieving lower unit costs as new lower‑royalty, higher‑throughput sources (Stock, Froome West, El Gallo Phase 1) come online and on the close of the Canadian Gold acquisition expected in January 2026. Watch cashflow generation in Q4 2025, the timing of El Gallo permits and construction starts in H1 2026, and how higher debt and convertible notes affect flexibility; these items will clarify whether liquidity gains offset elevated operating costs.

TORONTO, Nov. 06, 2025 (GLOBE NEWSWIRE) -- McEwen Inc. (NYSE/TSX: MUX) today announced its third quarter (Q3) and year-to-date (9M) results for the period ended September 30, 2025, and reported on its plan to double production by 2030, lower costs, and extend mine life across all operations. Management believes these initiatives provide an achievable path toward our goal of 250,000 to 300,000 GEOs Consolidated Annual Production by 2030.

McEwen is advancing the following projects: The Fox Complex (Stock and Grey Fox) is expected to contribute approximately 50% of the total production goal. This will be followed by the Gold Bar Mine Complex (Gold Bar Mine, Windfall and Lookout Mountain) at 30%, and El Gallo (Phases 1 and 2) at 20%. The acquisition of Canadian Gold Corp's Tartan mine is excluded from this forecast.

  • Stock Mine (Fox Complex) is expected to begin production by mid-2026, resulting in lower-cost gold production at the Fox Complex compared to the Froome mine, due to a lower royalty burden, shorter ore haulage to the mill, and cost benefits from processing softer material. Underground ramp development is on schedule and within budget. Based on our current mineral resource estimates, McEwen projects a six-year life at the Stock Mine, which is expected to increase once underground exploration drilling commences next year.

  • El Gallo (Mexico) is targeting mid-2027 for Phase 1 production (previously described as Project Fenix), based on an optimized production plan to maximize cash flow and metal recoveries. We now expect to operate a ball mill initially at 3,200 tonnes per day (tpd), which will result in lower initial capital costs. Engineering is underway, with construction of the mill expected to begin in H1 2026, pending final permit approval. Phase 1 is expected to operate for 10 years, producing up to 20,000 GEOs annually once commercial production is achieved. Permit approval of Phase 2 (El Gallo Silver) would materially extend the mine life.

  • Grey Fox (Fox Complex) is scheduled to release an Updated Resource Estimate in Q4 2025 and a Pre-feasibility Study (“PFS”) during H1 2026. At full production, Grey Fox is anticipated to be McEwen’s largest producing mine.

  • Windfall and Lookout Mountain (Gold Bar Mine Complex) update: Encouraging results from the drilling at the Windfall and Lookout Mountain areas (details below) will be reflected in the resource update expected in H1 2026. Permitting activities continue to bring the Windfall and Lookout Mountain areas into the Gold Bar Complex production plan.

  • Canadian Gold Corp. entered a definitive agreement to be acquired by McEwen. Following the expected closing in January 2026, McEwen will complete a resource estimate for the Tartan Mine, advance engineering designs and apply for potential permit modifications to support future production.

  • Los Azules' detailed engineering is set to commence, with construction targeted for early 2027, subject to project financing. Based on the recently released Feasibility Study, Los Azules is expected to have a 21-year mine life, with potential to extend it by an additional 30 years through the use of Nuton® leaching technology or a Conventional Concentrator.

“We encountered operational challenges that led to production below guidance and higher-than-expected costs. We have identified the root causes at our Nevada and Timmins operations and are implementing decisive corrective measures. We expect these actions to begin delivering positive results in the fourth quarter.

At the same time, we achieved significant strategic progress. We advanced all sites toward our 2030 goal of 250,000–300,000 ounces of annual gold production, published the Feasibility Study for Los Azules, and secured approval for RIGI benefits—providing 30 years of tax and foreign exchange stability, a substantially lower tax burden, and immediate VAT recovery. These major de-risking milestones bring this world-class copper asset closer to construction and production,” said Rob McEwen, CEO and Chief Owner.

Highlights of Q3 2025

Abbreviations used are defined in the Glossary at the end of this press release.

Gold Bar Performance8,191 GEOs were produced from the Pick deposit, which was lower than expected. The Company completed additional drilling during Q3 and reinterpreted historic drill holes, resulting in an updated geological model. In October, we observed significant improvements in mine compliance with the updated model, which strengthened our confidence in near-term mine planning.

As a result, the revised annual production guidance range for the year has been reduced to 32,000 to 35,000 GEOs, from 40,000 to 45,000 GEOs.

Costs per GEO sold were $2,540 cash costs and $2,852 AISC due to lower GEO production, resulting from fewer ore tonnes as described above, as well as increased costs from the related waste tonnes. During Q4 2025, costs per ounce are expected to be lower as we resolve and optimize short-term mine planning described above.

Revised annual cost per ounce guidance ranges for the year have been increased to $2,050 to $2,150 cash costs, from $1,500 to $1,700, and to $2,400 to $2,500 AISC, from $1,700 to $1,900.
  
Fox Complex Performance6,386 GEOs were produced primarily from the Froome Mine, including early production from development activities at Froome West.

Annual production guidance for 2025 has been lowered to 25,000 to 28,000 GEOs, from 30,000 to 35,000 GEOs. While Q3 results met internal production targets, we expect to continue increasing production in Q4, both at Froome and Froome West. However, Q4 production is not expected to offset the production shortfall experienced in Q1 2025.

Costs per GEO sold were $2,132 cash costs and $2,352AISC. Our cost base increased due to higher contractor labor costs and development at Froome West and is expected to remain elevated through 2025. As we reach targeted production levels at Froome West, we expect costs to decrease as we process higher-grade gold-bearing material.

Revised annual cost per ounce guidance for the year is $2,000 to $2,100 cash costs and $2,300 to $2,400 AISC.
  
RevenueDecreased by 3% to $50.5M from the sale of 14,968 GEOs, vs revenue of $52.3M from the sale of 21,350 GEOs produced at our two 100%-owned operations, Fox Complex and Gold Bar Mine Complex. In Q3, the average realized gold sale price was $3,477 per GEO, 39% higher than the average realized gold sale price of $2,499 per GEO in Q3 2024, offsetting the decline in GEOs sold of 33%.
  
ProfitabilityGross profit $7.8M vs $13.8M in Q3 2024. In addition to the revenue impacts above, gross margins were primarily impacted by higher waste stripping costs at our Gold Bar operation.

Net loss to $0.5M or $0.01 per share, vs net loss of $2.1M or $0.04 per share in Q3 2024.
  
Adjusted EBITDAAdjusted EBITDA increased 12% to $11.8M or $0.22 per share vs $10.5M or $0.20 per share in Q3 2024.

Adjusted EBITDA is calculated by adding back our portion of McEwen Copper's Q3 results to our consolidated income or loss before income and mining taxes. We use adjusted EBITDA to evaluate our operating performance and ability to generate cash flow from our gold operations in production, including the San José mine.
  
Liquidity & Capital Resources at September 30, 2025

Cash and equivalents increased to $51.2M vs $13.7M at December 31, 2024.

The value of marketable securities increased to $24.2M vs $1.6M at December 31, 2024, driven by net additions of $8.0M and unrealized gains of $14.6M during 2025.

Working capital increased to $62.6M vs negative $6.5M at December 31, 2024.

Debt principal outstanding increased to $130.0M ($110.0M in convertible notes due 2030 and $20.0M under our term loan facility), vs $40.0M debt at December 31, 2024.

The reported total debt of $126.0M reflects the debt principal of $130.0M, less debt issuance costs of $4.0M, which are amortized over the life of the debt, in accordance with US GAAP.

The most recent financing of McEwen Copper at $30 per share implies a market value of $984M. Based on this number, McEwen’s 46.4% ownership of McEwen Copper has an implied market value of $456M or $8.43 per MUX share.

McEwen had 54,106,415 shares outstanding on September 30, 2025, compared to 52,924,821 shares on September 30, 2024.
  
Exploration & Development$6.8M was invested during the quarter in exploration programs at Grey Fox, Gold Bar, Lookout Mountain, and Windfall properties, compared to $5.3M in Q3 2024.

Fox Complex is advancing the Froome West discovery to production while continuing development of the Stock ramp.

$4.3M was invested by McEwen Copper in the Los Azules copper project in Q3, representing our 46.4% share of costs to operate the project and complete the Feasibility Study, compared with $1.9M in Q3 2024. As a Mineral Reserve statement with an effective date of September 3, 2025 was published, subsequent eligible development costs will be capitalized and will no longer be included in McEwen Copper’s income statement under US GAAP.
  
SafetyZero lost-time incidents across our 100%-owned operations.
  
2025 Production & Unit Costs OutlookFull-year production guidance range lowered to 112,000-123,000 GEOs, from 120,000–140,000 GEOs, including our attributable production from our 49%-owned San José mine.

Cost per ounce guidance ranges for our 100% owned operations increased to $2,028 to $2,128 per ounce cash costs, and to $2,356 to $2,456 per ounce AISC, compared to our initial guidance ranges of $1,543 to $1,743 per ounce cash costs and $1,700 to $1,900 per ounce AISC.
  
  

Individual Asset Performance – Production & Costs, Project Updates

(See Table 1 for Q3 2025 and 9M 2025 production and costs, 2024 comparatives and 2025 revised guidance)

Gold Bar Mine Complex, Nevada (100% owned)

Exploration

There are currently four drills active at the Gold Bar Mine Complex. During the quarter, we invested $2.5 million in exploration. The focus was on extending the mine life near the current open pits, as well as infill drilling at Lookout Mountain and exploration drilling at Windfall to produce an updated resource estimate for these areas.

Recent expansion drilling at Windfall has produced wide intersections of oxide mineralization at above average grades that are expected to increase the overall resource size. Recent near-surface oxide results include:

  • 2.43 gpt gold over 74.7 meters (m)
  • 4.57 gpt gold over 12.2 m
  • 1.70 gpt gold over 64.0 m
  • 1.01 gpt gold over 89.9 m and
  • 0.77 gpt gold over 36.6 m.

Incorporating the Windfall 2024-2025 drill results into the resource estimate is expected to add to the Lookout Mountain resource. The current resource estimate for Lookout Mountain contains 423,000 ounces gold from 23.4M tonnes grading 0.56 gpt gold in the Measured and Indicated categories, and 84,000 ounces gold from 6.6M tonnes grading 0.39 gpt gold in the Inferred category (2023 Timberline Resources S-K 1300 Report).

Development

The gold mineralization at Windfall and Lookout Mountain is near-surface and oxidized, which means it may be possible to be processed by heap leach recovery, the same process currently used at the Gold Bar Mine. Windfall is located on private land, which may allow for faster production permitting. Metallurgical testing to advance the deposits towards a production decision is nearing completion.

Fox Complex Mine, Ontario (100% owned)

Exploration

No changes were made to the Mineral Resource statements for the Fox Complex when we recently refiled the Technical Report, which had previously omitted some required information on supporting technical data (see PR dated October 28, 2025).

Exploration drilling adjacent to the Froome Mine led to the expansion of a higher-grade zone, known as “Froome West”, located 200 meters (650 feet) to the West. Drilling results from Q3 indicate that Froome West extends both closer to surface and at greater depth.

Highlights from this drilling included:

  • 36.0 gpt gold over 10.0 m (TW) in drillhole 25PR-G424
  • 9.3 gpt gold over 7.8 m (TW) also in drillhole 25PR-G424
  • 11.7 gpt gold over 2.4 m (TW) in drillhole 25PR-G390

The potential for the Froome West zone to expand appears promising, as highlighted by recent assays, which are the deepest results received to date. These results, extending the mineralized zone from 250m to 315m vertically, include:

  • 6.1 gpt gold over 5.7 m (TW) in drillhole 25PR-G478 and
  • 7.7 gpt gold over 10.5 m (TW) in drillhole 25PR-G467 (1)

There are currently four surface drills operating in the Froome area. A significant amount of underground development at Froome West has been completed this year, enabling production to commence from this new area this quarter.

At Grey Fox, approximately $2.9 million has been invested primarily at the Gibson Zone to complete 20,600 m (67,500 ft) of drilling during Q3. The results have attractive gold grades, demonstrating good continuity across key zones, such as:

  • 10.1 gpt gold over 5.8 m (TW) in drillhole 25GF-1597 in the NW Gibson expansion zone and
  • 10.4 gpt gold over 5.6 m (TW) in drillhole 25GF-1564 close to the historical Gibson ramp.

For the Grey Fox deposit, an updated resource estimate that considers a combined open pit and underground mining scenario is expected to be released in Q4 2025. This updated resource will be used in the pre-feasibility study (“PFS”) for the Grey Fox project that will be published in H1 2026. The Grey Fox PFS will be an important milestone for the Company’s ambitious growth plans, which envision a larger gold resource base, higher gold production with a longer mine life and improved operating margins.

Adjacent to Grey Fox, at the recently acquired Stroud property, the Company has been completing a verification drill program. Stroud contains an historical resource estimate of 483,500 tonnes at a grade of 6.61 gpt Au for 103,000 ounces gold in the Indicated category and 367,700 tonnes at a grade of 5.90 gpt Au for 70,000 ounces gold in the Inferred category. This NI 43-101 resource was publicly disclosed in 2004 but is now considered historical in nature and should not be considered as current. Follow-up work in 2021 performed by the previous operator updated the geological data and outlined an Exploration Target with a range of 2 to 4 million tonnes at grades of 3 to 5 gpt Au, which now forms the basis for our exploration and verification drill programs. The Company intends to complete the drill programs and data review in order to include Stroud’s mineralization in future Grey Fox resource updates.

Development

The Stock ramp development is proceeding on time and within budget, with $5.7 million invested during Q3. The ramp will connect the West and the East zones to the existing historical underground mine. Starting mid-2026, Stock is expected to generate revenue by producing more gold at a lower costs per ounce than is currently produced from the Froome Mine. The advantages of mining at Stock compared to Froome include 1) significantly reduced royalty burden, 2) softer material, leading to higher mill throughput, and 3) lower hauling cost due to its proximity to the mill. Additional upside is being evaluated in the historically mined Stock Main zone as development continues through this area in late 2025.

San José Mine, Argentina (49% owned)

Production and Costs

  • Attributable production during Q3 was 14,986 GEOs.
  • Costs per GEO sold were $2,196 cash costs and $2,771 AISC, impacted by high inflation outpacing the devaluation of the Argentine peso and increased use of contractors.
  • Despite higher costs, working capital at the San José mine remains strong, reaching $105.7 million (100% basis) as of September 30, 2025.
  • Annual production guidance tightened to 55,000–60,000 GEOs from 50,000-60,000 GEOs.
  • Annual unit costs guidance increased to $1,900 to $2,050 for cash costs and $2,200 to $2,350 for AISC.

El Gallo, Mexico

We have reached a construction decision for the Phase 1 gold reprocessing project contemplated in our Feasibility Study (previously described as the Fenix project). The Company is waiting for the extension of its Environmental Impact Assessment (Manifestación de Impacto Ambiental) from the Mexican government. McEwen is proceeding with the final detailed engineering plan for the mill, which has been purchased and is onsite. Assuming the extension of the Environmental Impact Assessment is approved, we anticipate beginning construction mid-2026, with production commencing mid-2027. 

Phase 1 is expected to produce for 10 years, producing approximately 20,000 GEOs annually once commercial production is achieved. Production will come from the reprocessing of the material currently on the leach pad, through a ball mill and recovery circuit with an operating plan optimized for cash flow. Remaining capital costs to complete construction are estimated at $25 million. Since the material to be processed has been previously leached, no significant development or exploration costs are anticipated. 

The Company has also started work on Fenix Phase 2, which will primarily involve production from the project’s in-situ silver deposits. This would extend the life of Fenix well beyond the initial 10 years contemplated under Phase 1. 

For El Gallo and district satellite deposits, McEwen has previously reported Measured and Indicated silver resource estimates of 13Mt at 77 gpt Ag for 32.3Moz Ag (2018 PEA Technical Report). These estimates are historical in nature and should not be considered as current.

McEwen Copper – Los Azules Copper Project, Argentina (46.4% ownership and 1.25% NSR)

Project Update

  • RIGI (Large Investment Incentive Regime) application approved, securing significant tax and regulatory benefits in Argentina.

    The approval of the RIGI application marks a major milestone for Los Azules, granting significant tax, legal, and regulatory benefits in Argentina.

    Through the RIGI, Los Azules benefits from 30 years of legal, fiscal, and customs stability, providing a predictable framework and strong protection against future regulatory changes. Key incentives include a reduced corporate income tax rate of 25% (down from 35%), a 50% reduction in dividend withholding tax, accelerated depreciation for new investments, release of VAT payments during construction, and exemption from export duties at the time of starting exports.

  • Feasibility Study completed. Summary results published on October 7, 2025 indicate robust project economics from production designed for low environmental impact:
    • Leach + SX/EW process will produce 99.99% copper cathode (LME Grade A)
    • $2.9 billion (B) NPV(8%)
    • 19.8% IRR
    • 3.9 years payback
    • $3.2 B initial capex
    • $1.71/lb C1 cash cost
    • $2.11/lb AISC
      Copper price assumption used in the financial model is $4.35/lb. The National Instrument 43-101 technical report will be published in November 2025.

      International Finance Corporation (“IFC”), a member of the World Bank Group, and McEwen Copper signed a collaboration agreement to align the Los Azules project with IFC’s environmental, social and governance standards for future potential debt and equity financing. The agreement also provides IFC with customary rights for IFC to act, at its sole discretion, as lender and/or arranger for prospective project debt financing. These rights are non-exclusive and do not constitute a commitment to provide financing; any IFC financing would remain subject to satisfactory due diligence, internal approvals and execution of definitive documentation.

      United Nations Global Compact*: In August 2024, Los Azules formally joined the United Nations Global Compact through its Argentine Network, reinforcing its commitment to sustainability, human rights, fair labor practices, environmental stewardship, and corporate transparency.

      This affiliation marks a significant milestone in the project’s responsible development strategy, as it strengthens the integration of environmental, social, and governance principles, aligning the company’s actions with the United Nations' 2030 Agenda and its Sustainable Development Goals.

      *Launched by the United Nations in 2000, it is a voluntary framework that encourages businesses and organizations worldwide to align their strategies and operations with ten universally accepted principles in the areas of human rights, labor, environment, and anti-corruption. (See: https://unglobalcompact.org/)

Further Corporate Developments

  • On October 14, 2025, the Company signed a definitive agreement to acquire Canadian Gold Corp., a strategic move to increase our resource base and future production. Its Tartan Mine is a former producing mine located in the province of Manitoba, a mining friendly jurisdiction in Canada. The transaction is expected to close in early January 2026, subject to required approvals. Following completion of the acquisition, the next steps will be to prepare an updated resource estimate, follow with a preliminary economic assessment (PEA) and advance engineering designs and apply for potential permit modifications to support future production at the Tartan Mine.

  • On November 3, 2025, McEwen acquired 31% of Paragon Geochemical Laboratories Inc., a provider of PhotonAssay™ services to the mining industry. PhotonAssay™ is a disruptive technology that provides a rapid, accurate, and non-destructive method for assaying gold, silver, and base metals, transforming industry standards. McEwen acquired this strategic investment by purchasing 874,288 shares of Paragon at a deemed price of CDN$17.50 per Paragon share and payable in shares of McEwen, representing a total investment of CDN$15.3 million.

Management Conference Call

Management will discuss our Q3 2025 financial results and project developments and follow with a question-and-answer session. Questions can be asked directly by participants over the phone during the webcast.

Thursday
November 6, 2025
at 11:00 AM EST
Toll Free Dial-In North America:(888) 210-3454
Toll Dial-In:(646) 960-0130
Dial-In Other Countries:https://events.q4irportal.com/custom/access/2324/
Conference ID Number:3232920
Webcast Link:https://events.q4inc.com/attendee/798525651/guest


An archived replay of the webcast will be available approximately 2 hours after the conclusion of the live event. Access the replay on the Company’s media page at https://www.mcewenmining.com/media.

Table 1. Q3 and 9M 2025 Production and Costs, Comparatives from Q3 and 9M 2024 and 2025 Annual Revised Guidance

 Q39MFull Year 2025
Revised Guidance

2024202520242025
Consolidated Production     
GEOs(2) (3)35,18029,662103,44581,346112,000–123,000
Gold Bar Mine Complex, Nevada     
GEOs13,6398,19037,64924,28132,000–35,000
Cash Costs/GEO1,2812,5401,3021,805$2,050$2,150
AISC/GEO1,8222,8521,5482,286$2,400$2,500
Fox Complex, Canada     
GEOs7,8456,37723,59717,31125,000–28,000
Cash Costs/GEO1,5722,1321,5722,138$2,000$2,100
AISC/GEO2,0172,3521,9312,473$2,300$2,400
San José Mine, Argentina (49%)(4)     
GEOs13,68414,98641,29039,62855,000–60,000
Cash Costs/GEO2,1732,1961,7882,335$1,900$2,050
AISC/GEO2,6752,7712,1942,881$2,200$2,350

Notes to Table 1:

  1. Cash gross profit, cash costs per ounce, and all-in sustaining costs (AISC) per ounce, adjusted earnings before interest, taxes, depreciation, and amortization (adjusted EBITDA) and adjusted EBITDA per share are non-GAAP financial performance measures with no standardized definition under U.S. GAAP. For definitions of these non-GAAP measures, refer to the “Non-GAAP Financial Measures” section in this press release. For reconciliations to the closest U.S. GAAP measures, see the Management Discussion and Analysis for the quarter ended September 30, 2025, filed on EDGAR and SEDAR Plus.
  2. Gold Equivalent Ounces (GEOs) are calculated using gold-to-silver price ratios: 88:1 for Q3 2025, 85:1 for Q3 2024, 92:1 for 9M 2025, 85:1 for 9M 2024, and 85:1 for 2025 production guidance.
  3. El Gallo contributed 902 GEOs of production in 9M 2024 and 99 GEOs of production in 9M 2025.
  4. San José Mine figures represent the portion attributable to McEwen from its 49% interest in the San José Mine.

Glossary of Terms and Abbreviations

Au
AISC
B
CW
ft
GEO
gpt
H1
H2
LOI
– gold
– all-in sustaining costs
– billion
– core width
– foot
– gold equivalent ounce
– grams per tonne
– first half (January 1 - June 30)
– second half (July 1 - December 31)
– Letter of Intent
M
M
PFS
Q1
Q2
Q3
Q4
SX/EW TW
– million
– meter
– Pre-feasibility Study
– first quarter (January 1 - March 31)
– second quarter (April 1 - June 30)
– third quarter (July 1 - September 30)
– fourth quarter (October 1 - December 31)
– Solvent Extraction / Electrowinning
– true width
    
    

CAUTIONARY NOTE REGARDING NON-GAAP MEASURES

We have included in this report certain non-GAAP performance measures as detailed below. In the gold mining industry, these are common performance measures but do not have any standardized meaning and are considered non-GAAP measures. We use these measures to evaluate our business on an ongoing basis and believe that, in addition to conventional measures prepared in accordance with GAAP, certain investors use such non-GAAP measures to evaluate our performance and ability to generate cash flow. We also report these measures to provide investors and analysts with useful information about our underlying costs of operations and clarity over our ability to finance operations. Accordingly, they are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. There are limitations associated with the use of such non-GAAP measures. We compensate for these limitations by relying primarily on our US GAAP results and using the non-GAAP measures supplementally.

The non-GAAP measures are presented for our wholly owned mines and our interest in the San José mine. The amounts in the reconciliation tables labeled “49% basis” were derived by applying to each financial statement line item the ownership percentage interest used to arrive at our share of net income or loss during the period when applying the equity method of accounting. We do not control the interest in or operations of MSC and the presentations of assets and liabilities and revenues and expenses of MSC do not represent our legal claim to such items. The amount of cash we receive is based upon specific provisions of the Option and Joint Venture Agreement (“OJVA”) and varies depending on factors including the profitability of the operations.

The presentation of these measures, including the minority interest in the San José, has limitations as an analytical tool. Some of these limitations include:

  • The amounts shown on the individual line items were derived by applying our overall economic ownership interest percentage determined when applying the equity method of accounting and do not represent our legal claim to the assets and liabilities, or the revenues and expenses; and

  • Other companies in our industry may calculate their cash costs, cash cost per ounce, all-in sustaining costs, all-in sustaining costs per ounce, adjusted EBITDA, and average realized price per ounce differently than we do, limiting the usefulness as a comparative measure.

Cash Costs and All-In Sustaining Costs

The terms cash costs, cash cost per ounce, all-in sustaining costs (“AISC”), and all-in sustaining cost per ounce used in this report are non-GAAP financial measures. We report these measures to provide additional information regarding operational efficiencies on an individual mine basis, and believe these measures provide investors and analysts with useful information about our underlying costs of operations.

Cash costs consist of mining, processing, on-site general and administrative expenses, community and permitting costs related to current operations, royalty costs, refining and treatment charges (for both doré and concentrate products), sales costs, export taxes and operational stripping costs, but exclude depreciation and amortization (non-cash items). The sum of these costs is divided by the corresponding gold equivalent ounces sold to determine a per ounce amount.

All-in sustaining costs consist of cash costs (as described above), plus accretion of retirement obligations and amortization of the asset retirement costs related to operating sites, environmental rehabilitation costs for mines with no reserves, sustaining exploration and development costs, sustaining capital expenditures and sustaining lease payments. Our all-in sustaining costs exclude the allocation of corporate general and administrative costs. The following is additional information regarding our all-in sustaining costs:

  • Sustaining operating costs represent expenditures incurred at current operations that are considered necessary to maintain current annual production at the mine site and include mine development costs and ongoing replacement of mine equipment and other capital facilities. Sustaining capital costs do not include costs of expanding the project that would result in improved productivity of the existing asset, increased existing capacity or extended useful life.

  • Sustaining exploration and development costs include expenditures incurred to sustain current operations and to replace reserves and/or resources extracted as part of the ongoing production. Exploration activities performed near-mine (brownfield) or new exploration projects (greenfield) are classified as non-sustaining.

The sum of all-in sustaining costs is divided by the corresponding gold equivalent ounces sold to determine a per ounce amount. Costs excluded from cash costs and all-in sustaining costs, in addition to depreciation and depletion, are income and mining tax expenses, all corporate financing charges, costs related to business combinations, asset acquisitions and asset disposal, and any items that are deducted for the purpose of normalizing items.

The following tables reconcile these non-GAAP measures to the most directly comparable GAAP measure, production costs applicable to sales.

                  
 Three months ended
September 30, 2025
 Nine months ended
September 30, 2025
 Gold Bar Fox Complex Total Gold Bar Fox Complex Total
 (in thousands, except per ounce) (in thousands, except per ounce)
Production costs applicable to sales
(100% owned)
$21,701 $13,485 $35,186 $44,815 $37,709 $82,524
In‑mine exploration 94    94  212    212
Capitalized mine development (sustaining)   1,248  1,248  7,597  5,725  13,322
Capital expenditures on plant and equipment (sustaining) 2,557    2,557  4,092    4,092
Sustaining leases 11  146  157  33  181  214
Allin sustaining costs$24,363 $14,879 $39,242 $56,749 $43,615 $100,364
Ounces sold, including stream (GEO) 8,543  6,325  14,869  24,828  17,636  42,464
Cash cost per ounce sold ($/GEO)$2,540 $2,132 $2,366 $1,805 $2,138 $1,942
AISC per ounce sold ($/GEO)$2,852 $2,352 $2,639 $2,286 $2,473 $2,364
                  


 Three months ended
September 30, 2024
 Nine months ended
September 30, 2024
 Gold Bar Fox Complex Total Gold Bar Fox Complex Total
 (in thousands, except per ounce) (in thousands, except per ounce)
Production costs applicable to sales
(100% owned)
$17,078 $12,604 $29,682 $49,515 $37,343 $86,858
In‑mine exploration 165    165  647    647
Capitalized underground mine development (sustaining) 5,246  3,383  8,629  5,246  7,788  13,034
Capital expenditures on plant and equipment (sustaining) 1,459    1,459  2,438    2,438
Sustaining leases and other 345  186  531  1,014  723  1,737
All‑in sustaining costs$24,293 $16,173 $40,466 $58,860 $45,854 $104,714
Ounces sold, including stream (GEO) 13,333  8,017  21,350  38,033  23,750  61,783
Cash cost per ounce sold ($/GEO)$1,281 $1,572 $1,390 $1,302 $1,572 $1,406
AISC per ounce sold ($/GEO)$1,822 $2,017 $1,895 $1,548 $1,931 $1,695
             


 Three months ended
September 30,
 Nine months ended
September 30,
 2025  2024  2025  2024 
San José mine cash costs
(100% basis)
(in thousands, except per ounce)
Production costs applicable to sales$50,053  $58,031  $170,244  $154,136 
Mine site reclamation, accretion and amortization 68   338   204   1,003 
Site exploration expenses 1,854   1,605   5,009   4,926 
Capitalized underground mine development (sustaining) 8,186   7,045   26,033   21,425 
Less: Depreciation (638)  (616)  (1,991)  (2,036)
Capital expenditures (sustaining) 3,623   5,031   8,797   9,674 
Allin sustaining costs$63,146  $71,434  $208,296  $189,128 
Ounces sold (GEO) 22,788   26,705   72,295   86,207 
Cash cost per ounce sold ($/GEO)$2,196  $2,173  $2,355  $1,788 
AISC per ounce sold ($/GEO)$2,771  $2,675  $2,881  $2,194 
                
                

Adjusted EBITDA and adjusted EBITDA per share
Adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”) is a non-GAAP financial measure and does not have any standardized meaning. We use adjusted EBITDA to evaluate our operating performance and ability to generate cash flow from our gold operations in production, including the San José mine; we believe this measure provides valuable assistance to investors and analysts in evaluating our ability to finance our precious metal operations and capital activities separately from our copper exploration operations. The most directly comparable measure prepared in accordance with GAAP is net loss before income and mining taxes. Adjusted EBITDA is calculated by adding back McEwen Copper's income or loss impacts on our consolidated income or loss before income and mining taxes.

The following tables present a reconciliation of adjusted EBITDA:

 Three months ended
September 30,
 Nine months ended
September 30,
 2025  2024  2025  2024 
 (in thousands) (in thousands)
Income (loss) before income and mining taxes$(1,731) $(1,267) $(7,151) $(39,578)
Less:           
Depreciation and depletion 7,643   8,921   20,667   24,009 
Loss from investment in McEwen Copper Inc. (Note 9) 4,275   1,852   19,831   36,680 
Interest expense 1,628   983   4,660   2,928 
Adjusted EBITDA$11,815  $10,489  $38,007  $24,039 
Weighted average shares outstanding (thousands) 54,170   51,953   53,808   50,380 
Adjusted EBITDA per share$0.22  $0.20  $0.71  $0.48 
                
                

Technical Information

The technical content of this news release related to financial results, mining and development projects has been reviewed and approved by William (Bill) Shaver, P.Eng., COO of McEwen Inc. and a Qualified Person as defined by SEC S-K 1300 and the Canadian Securities Administrators National Instrument 43-101 "Standards of Disclosure for Mineral Projects."

Technical information pertaining to the Fox Complex exploration contained in this press release has been prepared under the supervision of Sean Farrell, P.Geo., McEwen Ontario’s Exploration Manager, who is a Qualified Person as defined by SEC S-K 1300 and Canadian Securities Administrators National Instrument 43-101 "Standards of Disclosure for Mineral Projects."

(1) New analyses reported herein were submitted as full core samples and assayed by the Photon Assay method at the ISO 17025:2017 accredited laboratory Paragon Geochemical, Hamilton, Ontario for exploration holes and at the Fox Complex assay lab by the Fire Assay method for definition holes. McEwen recently signed an agreement to acquire 31% of Paragon Geochemical Laboratories.

(2) NI43-101 Technical Report on the Preliminary Economic Assessment for the Fenix Project, Sinaloa, Mexico, June 2018

Technical information related to resource estimates in this press release has been reviewed and approved by Luke Willis, P.Geo., McEwen’s Director of Resource Modelling and a Qualified Person as defined by SEC S-K 1300 and Canadian Securities Administrators National Instrument 43-101 "Standards of Disclosure for Mineral Projects."

Reliability of Information Regarding San José

The Company accounts for its investment in Minera Santa Cruz S.A., the owner of the San José Mine, using the equity method. The Company relies on the management of MSC to provide accurate financial information prepared in accordance with GAAP. While the Company is not aware of any errors or possible misstatements of the financial information provided by MSC, MSC is responsible for and has supplied to the Company all reported results from the San José Mine, and such results are unaudited as of the date of this release. McEwen’s joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates other than MSC do not accept responsibility for the use of project data or the adequacy or accuracy of this release.

ABOUT MCEWEN

McEwen shares trade on both the NYSE and TSX under the ticker MUX.

McEwen provides its shareholders with exposure to a growing base of gold and silver production in addition to a very large copper development project, all in the Americas. The gold and silver mines are in prolific mineral-rich regions of the world: the Cortez Trend in Nevada, USA, the Timmins district of Ontario, Canada, and the Deseado Massif in Santa Cruz province, Argentina. McEwen is also considering reactivating a gold and silver mine in Mexico.

The Company has a 46.4% interest in McEwen Copper, which owns the large, long-life, advanced-stage Los Azules copper development project in San Juan province, Argentina – a region that hosts some of the country’s largest copper deposits. According to the last financing for McEwen Copper, the implied value of McEwen’s ownership interest is US$456 million.

The Los Azules copper project is designed to be one of the world’s first regenerative copper mines, with a commitment to achieving carbon neutrality by 2038. Its Feasibility Study results were announced in the press release dated October 7, 2025.

Chairman and Chief Owner Rob McEwen has personally invested over US$200 million and takes a salary of $1 per year, aligning his interests with shareholders. He is a recipient of the Order of Canada, a member of the Canadian Mining Hall of Fame and a winner of the EY Entrepreneur of the Year (Energy) award. His objective is to build MUX’s profitability, share value and eventually implement a dividend policy, as he did while building Goldcorp Inc.

CAUTION CONCERNING FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, the ability of the Company to receive or receive in a timely manner permits or other approvals required in connection with operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves, foreign exchange volatility, foreign exchange controls, foreign currency risk, and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Inc.'s Annual Report on Form 10-K for the fiscal year ended December 31, 2024, and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by the management of McEwen.

Want News Fast?
Subscribe to our email list by clicking here:
https://www.mcewenmining.com/contact-us/#section=followUs
and receive news as it happens!!

      
 WEBSITESOCIAL MEDIA   
 www.mcewenmining.comMcEwen
Facebook:facebook.com/mceweninc 
  LinkedIn:linkedin.com/company/mceweninc 
 CONTACT INFORMATIONX:X.com/mceweninc 
 150 King Street WestInstagram:instagram.com/mceweninc 
 Suite 2800, PO Box 24    
 Toronto, ON, CanadaMcEwenCopper
Facebook:facebook.com/ mcewencopper 
 M5H 1J9LinkedIn:linkedin.com/company/mcewencopper 
  X:X.com/mcewencopper 
 Relationship with Investors:Instagram:instagram.com/mcewencopper 
 (866)-441-0690 - Toll free line    
 (647)-258-0395Rob McEwen
Facebook:facebook.com/mcewenrob 
 Mihaela Iancu ext. 320LinkedIn:linkedin.com/in/robert-mcewen-646ab24 
 info@mcewenmining.comX:X.com/robmcewenmux 
      

FAQ

What did McEwen (MUX) report for Q3 2025 revenue and adjusted EBITDA?

Q3 2025 revenue was $50.5M and adjusted EBITDA was $11.8M (a 12% increase year‑over‑year).

Why did McEwen lower its 2025 production guidance for MUX?

Production guidance was lowered due to operational challenges and lower GEOs at Gold Bar and Fox, reducing full‑year guidance to 112,000–123,000 GEOs.

When will the Stock Mine contribute to McEwen (MUX) production and why is it cheaper?

Stock is expected to begin production mid‑2026 and is forecast to have lower costs due to a smaller royalty burden, softer material and shorter haulage to the mill.

What are McEwen’s updated 2025 cost guidance ranges for MUX 100% owned operations?

Revised 2025 guidance for 100% owned operations is $2,028–$2,128/oz cash costs and $2,356–$2,456/oz AISC.

What timeline did McEwen give for El Gallo Phase 1 production (MUX)?

El Gallo Phase 1 is targeted to reach production by mid‑2027, operating initially at a 3,200 tpd ball mill and expected to produce up to 20,000 GEOs annually once commercial.

How did McEwen’s liquidity and debt position (MUX) change by Sept 30, 2025?

Cash and equivalents rose to $51.2M, marketable securities to $24.2M, while debt principal increased to $130.0M as of Sept 30, 2025.
McEwen Inc

NYSE:MUX

MUX Rankings

MUX Latest News

MUX Latest SEC Filings

MUX Stock Data

853.16M
45.95M
15.7%
43.85%
8.71%
Other Precious Metals & Mining
Gold and Silver Ores
Link
Canada
TORONTO