STOCK TITAN

Notifications

Limited Time Offer! Get Platinum at the Gold price until January 31, 2026!

Sign up now and unlock all premium features at an incredible discount.

Read more on the Pricing page

North Bay Resources Announces 2nd Gold Concentrate Shipment, Bishop Gold Mill, California

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags

North Bay Resources (OTC: NBRI) has completed its second test shipment of 240 pounds of gold concentrate from approximately 10 tons of ore processed at its Bishop Gold Mill in California. The concentrate was shipped to Just Refiners and ALS Geochemical in Reno, NV.

The company has implemented significant mill improvements, including an additional water holding tank and a new recirculation pump, which will increase processing capacity from 10-20 tons to nearly 96 tons per day. The water recirculation system is expected to handle over 80% of water use, eliminating the previous 8-hour recharge requirement.

At the Fran Gold Project, NBRI is planning to extract 10,000 tons of near-surface material from the main zone, which has shown consistent grades of 0.5 ounces per ton across 100-foot-wide trenches. The property spans 34,360 acres and features a gold deposit extending 3,700 feet in length, up to 120 feet in width, and over 700 feet in depth, with gold grades reaching up to 2.6 troy ounces per ton.

Loading...
Loading translation...

Positive

  • Significant mill capacity increase from 10-20 to 96 tons per day
  • High-grade gold deposit with veins up to 2.6 troy ounces per ton
  • 5,000 tons of stockpiled material ready for shipment
  • Successful completion of gravity circuit and implementation of flotation circuit for increased gold recovery

Negative

  • Mill operations were previously to 4 hours of continuous operation
  • Current water system still requires top-up despite recirculation improvements

News Market Reaction 1 Alert

+12.50% News Effect

On the day this news was published, NBRI gained 12.50%, reflecting a significant positive market reaction.

Data tracked by StockTitan Argus on the day of publication.

BISHOP, Calif., March 21, 2025 (GLOBE NEWSWIRE) -- North Bay Resources, Inc. (the “Company” or “North Bay”) (OTC: NBRI) is pleased to announce a 2nd test shipment of 240 pounds of gold concentrate from approximately 10 tons of ore processed at the Company’s Bishop Gold Mill. The gold concentrate was shipped to Just Refiners, Reno, NV, with sample splits to ALS Geochemical, Reno, NV. A prior concentrate shipment is currently in process at the Refinery (see Press Release dated March 4, 2024). The new shipment was comprised of centrifuge concentrate and centrifuge reconcentrated Deister Shaker Table scavenger recovery. The Company continues Mill optimization and processing of ore from the Company’s Fran Gold Project with the stockpiling of gold concentrate for bulk shipment to the Refinery.

The Company has added an additional water holding tank and is installing a new pump that will allow for recirculation of water from the tailings pond allowing for an increase to near capacity of 96 tons per day. The water tower currently requires up to 8 hours to recharge but will now only be required for top up as recirculation is expected to handle greater than 80% of water use. Prior to the recirculation pump installation the Mill was limited to 4 hours of continuous operation with a capacity of 10-20 tons per day. In addition to the water storage tank and recirculation pump, upgrades and repairs to the classifier and Deister Shaker Table now allow for continuous milling operations.

Video - Continuous Gold Concentrate Production at Bishop Gold Mill

With successful and stable operation of the gravity circuit completed, and upgrading of water availability, the Company has begun implementation of the flotation circuit. Based on prior metallurgical studies, gold recovery by flotation is expected to significantly increase recovery of very fine (less than minus 200 mesh) gold and overall physical concentrate production. The Company has begun mobilization and logistics coordination for additional shipments from the Company’s Fran Gold Project to provide additional feedstock to the Mill.

Fran Gold Project

Planning for near term extraction of 10,000 tons of near surface material has commenced. The development focus remains the main zone where consistent grade of 0.5 ounces per ton has been identified in trenches 100 feet in width and is further supported by drill hole data. The Property is 34,360 acres and is located 20 miles from Centerra Gold’s 60,000 tonne per day / $15B in situ resource Mt. Milligan Copper, Gold Mine (299Mt @ 0.22% Cu, .45 g/t Au). To date there has been in excess of 50,000 feet of diamond drilling in 104 holes at Fran, primarily at the Bullion Alley Zone. A gold deposit, 3700 feet in length, with width of up to 120 feet, and depth of over 700 feet has been delineated. The deposit contains 3 to 4 well defined parallel gold veins grading up to 2.6 troy ounces of gold per ton as well as wide sections of low and mid-grade gold in veins and disseminated in veinlets throughout the deposit. Surface trenching has identified a near surface sub-zone where the gold bearing veins swell and are accessible from surface. There is approximately 5,000 tons of stockpiled material currently available for shipment.

On behalf of the Board of Directors of

NORTH BAY RESOURCES INC.

Jared Lazerson
CEO

info@northbay-resources.com

northbay-resources.com

X: @NorthBayRes

YouTube: North Bay Resources - YouTube

LinkedIn: North Bay Resources Inc | LinkedIn

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws.


FAQ

What is the new processing capacity of North Bay Resources' Bishop Gold Mill after recent upgrades?

After installing a new water recirculation system, the Bishop Gold Mill's capacity has increased from 10-20 tons to nearly 96 tons per day.

How much gold concentrate did NBRI ship in its second test shipment?

NBRI shipped 240 pounds of gold concentrate from approximately 10 tons of processed ore.

What are the dimensions and grades of the gold deposit at NBRI's Fran Gold Project?

The deposit is 3,700 feet long, up to 120 feet wide, and over 700 feet deep, containing veins grading up to 2.6 troy ounces of gold per ton.

What is NBRI's near-term extraction plan for the Fran Gold Project?

NBRI plans to extract 10,000 tons of near-surface material from the main zone, which shows consistent grades of 0.5 ounces per ton across 100-foot-wide trenches.
North Bay Resour

OTC:NBRI

NBRI Rankings

NBRI Latest News

NBRI Stock Data

3.54M
Other Precious Metals & Mining
Basic Materials
Link
United States
Skippack