STOCK TITAN

Notifications

Limited Time Offer! Get Platinum at the Gold price until January 31, 2026!

Sign up now and unlock all premium features at an incredible discount.

Read more on the Pricing page

North Bay Resources Announces Assays >2.9 Ounces per Ton Gold, Fran Gold Project, British Columbia

Rhea-AI Impact
(High)
Rhea-AI Sentiment
(Neutral)
Tags

North Bay Resources (OTC: NBRI) reported gold assays from the Fran Gold Project, British Columbia, ranging from 0.41 to >2.92 ounces per ton from four samples taken during a 20‑ton test shipment.

Samples (~5 lbs each) were assayed by ALS Global, North Vancouver using fire assay Au-AA25; sample 25FRTB-5 exceeded the testing limit (>100 g/t) and is undergoing overlimit analysis. Multi‑element assays (including copper and silver) are pending. Approximately 20 tons of ore were shipped to the company’s Bishop Gold Mill. Prior June 2025 surface discovery returned 0.5 oz/ton, and trenches B+C previously showed grades up to 2.3 oz/ton.

Loading...
Loading translation...

Positive

  • Assays reported at 0.41–>2.92 oz/ton gold
  • Sample 25FRTB-5 exceeded 100 g/t (overlimit)
  • 20 tons of ore shipped to Bishop Gold Mill
  • Prior trenches B and C confirmed up to 2.3 oz/ton gold

Negative

  • Only four assay samples reported from a 20‑ton test shipment
  • Multi‑element (Cu, Ag) results are pending
  • Overlimit sample requires additional analyses before full assay confirmation

News Market Reaction 1 Alert

-25.00% News Effect

On the day this news was published, NBRI declined 25.00%, reflecting a significant negative market reaction.

Data tracked by StockTitan Argus on the day of publication.

BISHOP, Calif., Oct. 27, 2025 (GLOBE NEWSWIRE) -- North Bay Resources, Inc. (the “Company” or “North Bay”) (OTC: NBRI) is pleased to announce assays of 0.4 to >2.9 ounces per ton gold, Fran Gold Project, British Columbia. Four samples of ~5lbs each were taken from alternating supersacks, as part of a 20 ton test shipment, and assayed by ALS Global, North Vancouver, BC using fire assay method Au-AA25:

Sample numberWeight lbs.Weight kg.Au Ounces per TonAu Grams per Tonne
25FRTB-14.42.00.4114.0
25FRTB-47.83.52.6490.5
25FRTB-57.53.4>2.92>100
25FRTB-65.02.32.3078.7


Sample of 25FRTB-5 reached the limit of testing (>100 Au gpt) and is now undergoing overlimit analyses. Multi-element analyses is ongoing, inclusive of copper and silver, with results pending.

Development was undertaken in the area of a recent discovery (June 2025) of massive sulphide surface outcrop with gold assay of 0.5 ounces per ton. The massive sulphide surface zone is between trenches of prior known high grade gold mineralization in Trench B and Trench C, to the West and East respectively, with grade increasing at depth. The ore is heavily mineralized containing gold, copper, and silver mineralization primarily in the form of chalcopyrite, marcasite, and spherulite/galena. The massive sulphide ore is grey in color, blocky when broken with visual mineralization, veinlets, and sheeting. Grade has been confirmed in the above reported assay as well as previous assays in Trenches B + C up to 2.3 ounces per ton gold. Approximately 20 tons of ore has been extracted, packed into supersacks, loaded and shipped to the Company’s Bishop Gold Mill.

Fran Gold Project

The Fran Property is underlain by Takla Group sedimentary and volcaniclastic rocks intruded by dykes and small stocks of monzonite, monzodiorite and diorite. Previous work, including 55,000 ft. (18,000m) of diamond drilling, has outlined gold-bearing structures featuring broad zones of gold mineralization.

On behalf of the Board of Directors of

NORTH BAY RESOURCES INC.

Jared Lazerson
CEO

info@northbay-resources.com

northbay-resources.com

X: @NorthBayRes

YouTube: North Bay Resources - YouTube

LinkedIn: North Bay Resources Inc | LinkedIn

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws.


FAQ

What gold grades did North Bay Resources (NBRI) report from the Fran Gold Project on October 27, 2025?

North Bay reported gold assays ranging from 0.41 to >2.92 ounces per ton, with one sample >100 g/t undergoing overlimit analysis.

How many samples and what shipment size produced NBRI's reported Fran Gold assay results?

Four samples of ~5 lbs each were taken from alternating supersacks as part of a 20‑ton test shipment.

Which lab performed the Fran Gold assays for North Bay Resources (NBRI)?

Assays were completed by ALS Global, North Vancouver using the fire assay method Au‑AA25.

Is there additional testing planned for North Bay Resources' Fran Gold results (NBRI)?

Yes; overlimit analysis is underway for the >100 g/t sample and multi‑element (copper, silver) analyses are pending.

Did North Bay Resources (NBRI) ship any ore from the Fran Gold Project to mill facilities?

Approximately 20 tons of ore were extracted, packed into supersacks, and shipped to the company’s Bishop Gold Mill.

What prior high‑grade results at Fran Gold did North Bay reference in the October 27, 2025 release?

The company referenced a June 2025 surface discovery at 0.5 oz/ton and trenches B+C with grades up to 2.3 oz/ton.
North Bay Resour

OTC:NBRI

NBRI Rankings

NBRI Latest News

NBRI Stock Data

3.54M
Other Precious Metals & Mining
Basic Materials
Link
United States
Skippack