North Bay Resources Announces Production of 8.5 Ounces Per Ton Gold Concentrate, Bishop Gold Mill, California
Rhea-AI Summary
North Bay Resources Inc. (OTC: NBRI) has announced successful production of high-grade gold concentrate at its Bishop Gold Mill in California. The concentrate yielded 8.52 ounces per ton gold, aligning with recent metallurgical studies that produced 8.54 ounces per ton using gravity separation.
The company's Fran Gold Project spans 34,360 acres and is situated 20 miles from Centerra Gold's Mt. Milligan Mine. The project features a gold deposit extending 3,700 feet in length, up to 120 feet in width, and over 700 feet in depth. The deposit contains 3-4 parallel gold veins grading up to 2.6 troy ounces of gold per ton, with additional copper content up to 1.68% and silver up to 5.1 troy ounces per ton. The company reports approximately 5,000 tons of surface material ready for shipment.
Positive
- Production of high-grade gold concentrate at 8.52 oz/ton, confirming previous metallurgical studies
- Substantial gold deposit with 3-4 parallel veins grading up to 2.6 oz/ton gold
- Additional valuable minerals present (up to 1.68% copper and 5.1 oz/ton silver)
- 5,000 tons of surface material ready for shipment
- Strategic location near major mining operation (Centerra Gold's Mt. Milligan Mine)
Negative
- None.
News Market Reaction 1 Alert
On the day this news was published, NBRI gained 22.22%, reflecting a significant positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
BISHOP, Calif., Feb. 19, 2025 (GLOBE NEWSWIRE) -- North Bay Resources Inc. (the “Company” or “North Bay”) (OTC: NBRI) is pleased to announce production of concentrate grading 8.52 ounces per ton gold. The concentrate was produced utilizing the gravity circuit at the Company’s Bishop Gold Mill with ore from its Fran Gold Project. The results are in-line with recent metallurgical studies that produced 8.54 ounces per ton gold concentrate utilizing gravity separation (see Press Release dated December 16, 2024). The Company continues to process ore and optimize the mill in coordination with its refinery partner.
Multi-element analyses and fire assay with gravity finish were conducted by ALS Geochemistry Reno, Nevada, utilizing ALS Analytical Procedure ME-ICP41 and Au-GRA22.
Fran Gold Project
The Property is 34,360 acres and is located 20 miles from Centerra Gold’s 60,000 ton per day Mt. Milligan Copper, Gold Mine (299Mt @
On behalf of the Board of Directors of
NORTH BAY RESOURCES INC.
Jared Lazerson
CEO
info@northbay-resources.com
northbay-resources.com
X: @NorthBayRes
YouTube: North Bay Resources - YouTube
Facebook: North Bay Resources Inc | Facebook
LinkedIn: North Bay Resources Inc | LinkedIn
This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws.