STOCK TITAN

NexMetals Intersects 11.15 Metres of Massive Sulphide Mineralization at Selebi Main in Drill Hole SMD-26-212-W1, Expanding the Flexure Zone

(Positive)
Tags

NexMetals (TSXV/NASDAQ:NEXM) reported new visual drilling results from the Selebi Main Flexure Zone in Botswana. Key hole SMD-26-212-W1 intersected 11.15 metres of massive sulphides in the Main Zone plus additional sulphide zones. Holes SMD-26-210 and SMD-26-213 also intersected massive and disseminated sulphides in Main and Lower Zones. A total of 23,965 metres of surface drilling has been completed toward a 30,000 metre program. Assays are pending for all highlighted intervals, with an updated Mineral Resource Estimate targeted for the second half of 2026.

Loading...
Loading translation...

Positive

  • SMD-26-212-W1 intersects 11.15 m massive sulphides in Main Zone
  • SMD-26-213 cuts 20.80 m mineralized Lower Zone interval
  • Three new holes extend sulphide mineralization outside 2024 Selebi Main MRE
  • Flexure Zone drill spacing around 200 m indicates large mineralized footprint
  • Surface program totals 23,965 m drilled toward 30,000 m target

Negative

  • All copper, nickel and cobalt assays for new holes are still pending
  • Some true widths cannot yet be estimated due to limited drill density

News Market Reaction – NEXM

-0.70%
-0.70% Session close to close

In the Jun 1 session, NEXM declined 0.70%, reflecting a mild negative market reaction.

Data tracked by StockTitan Argus on the day of publication.

Market Context

This announcement details continued drilling success at the Selebi Main Flexure Zone, including a th...
Analysis

This announcement details continued drilling success at the Selebi Main Flexure Zone, including a thick 11.15 metre massive sulphide interval and broad additional mineralization, all ahead of an updated Mineral Resource Estimate expected in the second half of 2026. Recent history shows consistent positive responses to Selebi drilling and metallurgical news. Investors may watch for pending assays, upcoming MRE updates, and further step-out results to gauge the emerging scale and continuity of the system.

Key Figures

Surface drilling program: 30,000 metres Massive sulphide interval: 11.15 metres High-grade intercept: 10.40 m @ 6.82% CuEq +5 more
8 metrics
Surface drilling program 30,000 metres Ongoing Selebi Main Flexure Zone surface drilling campaign
Massive sulphide interval 11.15 metres Massive sulphides in SMD-26-212-W1 Main Zone
High-grade intercept 10.40 m @ 6.82% CuEq SMD-26-209 referenced from May 7, 2026 news
High-grade intercept 11.05 m @ 7.31% CuEq SMD-25-205 referenced from Feb 26, 2026 news
Flexure Zone spacing 200 metres Nominal drill spacing defining the Flexure Zone
Program drilled to date 23,965 metres Total metres completed in surface drilling program to date
Lower Zone interval 20.80 metres Mineralized Lower Zone in SMD-26-213
Hole depth SMD-26-210 1,716.6 metres Completed depth of drill hole SMD-26-210

Historical Context

5 past events · Latest: May 27 (Neutral)
Pattern 5 events
Date Event Sentiment 24h Move Catalyst
May 27 AGM results Neutral +1.8% Shareholders approved all AGM resolutions and DSU grants to directors.
May 7 Selebi drilling update Positive +9.5% Reported 10.40 m of 6.82% CuEq at Selebi Main beyond 2024 MRE.
Apr 27 Metallurgical results Positive +7.2% Locked‑cycle tests showed saleable Cu and Ni concentrates with improved recoveries.
Apr 9 Board changes Neutral +0.8% New director nominee and option grants ahead of the May 27 AGM.
Apr 1 Selebi North drilling Positive +4.1% Final 2025 underground assays confirmed high‑grade continuity and footprint growth.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Pattern Detected

Recent Selebi/Selkirk technical updates and drilling news have generally been followed by positive price reactions, indicating the market has rewarded resource growth and metallurgical derisking announcements.

Recent Company History

Over the last few months, NexMetals has steadily advanced its Botswana assets. On Apr 1, 2026, high‑grade Selebi North underground results expanded the South Limb footprint. Metallurgical work at Selkirk on Apr 27, 2026 confirmed saleable Cu and Ni concentrates with improved recoveries. Subsequent Selebi Main surface drilling on May 7, 2026 extended mineralization beyond the 2024 MRE. Governance items on May 27, 2026 maintained board continuity. Today’s Flexure Zone drill results continue that Selebi Main expansion narrative.

Key Terms

massive sulphides, borehole electromagnetic, CuEq, ICP-AES, +3 more
7 terms
massive sulphides technical
"Drill hole SMD-26-212-W1 intersected a 11.15 metre interval of massive sulphides."
Massive sulphides are dense bodies of rock made mostly of sulphide minerals, which are compounds of sulfur and metals such as copper, zinc, lead, nickel or gold. Think of them as rich “clumps” of metal-containing material within host rock, like chunks of chocolate in a cookie; their size, concentration and depth determine whether they could be mined economically. For investors, they signal the potential for high-grade metal resources, but also carry exploration, processing and permitting risks.
borehole electromagnetic technical
"The Flexure Zone is associated with the highest-amplitude borehole electromagnetic ("BHEM") anomalies"
A borehole electromagnetic test is a geophysical technique that sends and measures electromagnetic signals from equipment placed in a drilled hole to map the electrical properties of the surrounding rock and fluids. For investors, it provides non‑destructive clues about where minerals, water or hydrocarbons might be located and how concentrated they are, reducing the guesswork and cost of further drilling much like an MRI gives a clearer picture before surgery.
CuEq technical
"SMD-26-209 (10.4 Metres of 6.82% CuEq (3.09%Cu, 1.83%Ni)"
CuEq (copper equivalent) converts the value of multiple metals in a mineral deposit into the amount of copper that would have the same value, producing a single, comparable grade number. For investors it acts like converting different currencies into one money — simplifying comparison of deposits and potential revenue, but its accuracy depends on the metal prices, recovery rates and cost assumptions used to make the conversion, so detailed reports are still needed.
ICP-AES technical
"peroxide fusion preparation and ICP-AES finish (ME-ICP81)."
ICP-AES (Inductively Coupled Plasma–Atomic Emission Spectroscopy) is a laboratory technique that identifies and measures the amounts of metals and other elements in a sample by turning the sample into a hot glowing gas and reading the light colors it emits—like using a prism to tell which ingredients are present and how much. Investors care because it provides reliable, quantitative proof of metal content, contamination levels or product purity, which affects resource valuation, regulatory compliance and product quality across mining, manufacturing and environmental contexts.
fire assay technical
"Analyses for Pt, Pd, and Au are by fire assay (30 grams nominal sample weight)"
Fire assay is a laboratory process used to accurately measure the amount of precious metals, like gold or silver, in a sample of ore or material. It involves heating the sample intensely to separate the metals from other substances, much like melting and purifying metal to determine its purity. This method is important to investors because it provides precise data on the metal content, helping to assess the value of mining operations or mineral deposits.
NI 43-101 regulatory
"Inferred Resource reference in Figure 1 is presented in accordance with NI 43-101"
A Canadian regulatory standard that sets the rules for how mining and exploration companies must report mineral resources and reserves, requiring technical reports prepared or signed off by an independent, certified expert. It matters to investors because it creates a consistent, transparent “inspection report” for mining projects, making it easier to compare prospects, judge the reliability of claims, and assess geological and financial risk before investing.
Regulation S-K regulatory
"Subpart 1300 of Regulation S-K and is available in the Company's Annual Report"
A set of U.S. Securities and Exchange Commission rules that tell public companies which narrative and qualitative details must be disclosed in filings, such as risk factors, management discussion, executive pay, legal proceedings and business description. Think of it as a standardized checklist or blueprint that ensures investors get the same types of background information from every company so they can compare risks, management quality and strategy before making investment decisions.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Vancouver, British Columbia--(Newsfile Corp. - June 1, 2026) - NexMetals Mining Corp. (TSXV: NEXM) (NASDAQ: NEXM) ("NEXM" or the "Company") is pleased to report visual results from drill holes SMD-26-210, 212-W1 and 213, part of its ongoing 30,000 metre surface drilling program targeting the emerging Flexure Zone ("Flexure Zone") at the Selebi Main deposit in Botswana (see Figure 1). The Flexure Zone is associated with the highest-amplitude borehole electromagnetic ("BHEM") anomalies identified to date at Selebi Main. Drill core photos from holes SMD-26-210, 212-W1, and 213 are presented in Figure 2. Drilling continues to intersect strong zones of sulphide mineralization outside of the 2024 Mineral Resource Estimate ("2024 MRE"), further supporting the scale, continuity, and expansion potential of the Selebi system.

Highlights:

What You Need to Know: Three New Intersections and Strong Visual Intercept from SMD-26-212-W1

  • All three holes intersected wide intervals of mineralization, including intervals of massive sulphides.
  • Drill hole SMD-26-212-W1 intersected a 11.15 metre interval of massive sulphides.
  • Holes that define the Flexure zone have a nominal spacing of 200 metres, demonstrating the size of this new zone.
  • Assays are pending and will be reported once received and validated.

What Does This Mean?

  • Visual results from SMD-26-212-W1 are consistent with SMD-26-209 (10.4 Metres of 6.82% CuEq (3.09%Cu, 1.83%Ni), see news release dated May 7, 2026) and SMD-25-205 (11.05 metres of 7.31% CuEq (3.00% Cu, 2.09% Ni) see news release dated February 26, 2026), demonstrating expansion potential within the Flexure Zone, extending down-dip and down-plunge from Selebi Main.
  • The presence of thick, continuous massive sulphide intervals in holes spaced more than 300 meters apart supports the Company's interpretation of a robust and laterally extensive mineralized system at Selebi Main.
  • The combination of massive, semi-massive, net-textured and disseminated sulphides highlights the scale and continuity of the mineralized system and, when combined with BHEM targeting, suggests strong potential for further extensions.

Sean Whiteford, CEO and Director of the Company, commented: "We are encouraged by the visual results from these latest drill holes as we continue advancing the program ahead of the updated Mineral Resource Estimate expected to be completed in the second half of 2026. The consistency of thick massive sulphide intersections across broad drill spacing, together with previously reported high-grade assay results, continues to support our view that the Flexure Zone represents a significant growth opportunity beyond the current Selebi Main resource. These intersections also continue to correlate with the strongest BHEM conductors identified to date at Selebi Main, highlighting the effectiveness of our targeting approach and the potential scale of the system."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/299572_bab003e364548a35_002.jpg

Figure 1: Long section of Selebi Mines highlighting drill holes SMD-26-210, 212-W1 and 213 locations relative to the 2024 MRE and the expansion of the Flexure Zone. The Inferred Resource reference in Figure 1 is presented in accordance with NI 43-101, which may not be identical to Inferred Resource references under SK-1300.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/299572_bab003e364548a35_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/299572_nexmetals_550.jpg

Figure 2: SMD-26-210, SMD-26-212-W1 and SMD-26-213 Core photos.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/299572_nexmetals.jpg

Detailed Drilling and BHEM Information

SMD-26-210 was completed to 1716.6 metres and intersected 4.85 metres of mineralization from 1,681.50 to 1686.35 metres corresponding to the Main Zone. The zone includes a total of 3.65 metres of massive sulphides in two intervals including a 2.90 metre interval. This hole is a 225-metre northward step-out from SMD-25-205 and is located 190 metres down dip of historic drill hole sd123 and 300 metres up dip of SMD-26-213.

SMD-26-212-W1 was completed to 1,636.2 metres and intersected two zones of mineralization starting at 1520.10 metres downhole, including a significant 11.15 metre interval of massive sulphides corresponding to the Main Zone. Separated by 7.3 metres of gneiss, is a second zone comprising a 4.45 metre interval of semi-massive, net-textured and disseminated sulphides, followed by 18.3 metres of disseminated sulphides, indicating a broad sulphide system. SMD-26-212-W1 is located 160 metres down-dip of SMD-22-007a, 180 metres up dip of SMD-26-208, and 185 metres along strike from SMD-022-008a.

SMD-26-213 was completed to 1,989.3 metres and intersected several 2 to 2.5 metre intervals of massive sulphides alternating with thick intervals of disseminated sulphides, including a 1.75 metre interval of massive sulphides corresponding to the Main Zone and a 20.80 metre zone corresponding to the Lower Zone. SMD-26-213 is located 155 metres down-dip of SMD-25-201 and 150 metres up-dip of SMD-25-203.

Details of the most significant mineralized intervals are shown in Table 1 and details of drillholes are provided in Table 2.

To date, a total of 23,965 metres in 11 completed holes, 1 hole extension, 4 abandoned holes and 2 in-progress holes have been completed as part of the surface drilling program. Drill results are reported below in Table 1 and drill hole collar details are provided in Table 2.

Table 1: 2025 Surface Drilling Results

Hole-IDFrom
(m)
To
(m)
Length
(m)
Est. True
Thickness1
Vertical Depth5
(m)
Cu
(%)
Ni
(%)
Co
(%)2
ZoneCuEq
(%)3
SMD-26-2101681.501686.354.854.801602Ap4Ap4Ap4Main ZoneAp4
including1681.501684.402.902.851602Ap4Ap4Ap4Main ZoneAp4
SMD-26-212-W11520.101531.2511.1511.151417Ap4Ap4Ap4Main ZoneAp4
SMD-26-212-W11539.001556.0017.0017.001430Ap4Ap4Ap4Lower ZoneAp4
SMD-26-2131888.851890.601.751.651821Ap4Ap4Ap4Main ZoneAp4
SMD-26-2131919.101939.9020.8019.851849Ap4Ap4Ap4Lower ZoneAp4
including1921.551928.106.556.251851Ap4Ap4Ap4Lower ZoneAp4

 

1Length refers to drillhole length and not true width. True widths are estimated where density of drilling is sufficient for an estimation. Some true widths cannot be estimated due to insufficient drill density.
2Co is not included in the MRE as cobalt analyses are not consistently available throughout the deposit.
3CuEq was calculated using the formula CuEq=Cu+2.06*Ni assuming long-term prices of US$10.50/lb Ni and US$4.75/lb Cu, and nickel and copper recoveries of 72.0% and 92.4%, respectively, derived from metallurgical studies which consider a conceptual bulk concentrate scenario.
4Assays pending.
5Vertical depth measured from surface to the top of the interval.

Table 2: Surface Drilling Collar Information

HOLE IDUTM EastUTM NorthElevationDipTrue North AzimuthHole LengthComment
SMD-26-210582807.47563850.3901.2-74.4115.21,717.6Surveyed collar
SMD-26-212-W1582754.97563356.4903.5-72.1120.91,636.2Surveyed collar
SMD-26-2135825207563780907-76.4110.71,989.3Planned coordinate

 

Qualified Person

All scientific and technical information in this news release has been reviewed and approved by Sharon Taylor, V.P. Exploration of the Company, MSc, P.Geo, and a "qualified person" for the purposes of National Instrument 43-101 and Subpart 1300 of Regulation S-K.

Quality Control

The program is being executed using three company-owned underground Zinex U5 drills which were converted into surface A5 drills, and two Marcotte HTM2500 drills purchased by the Company capable of drilling to depths of 2,550 metres (NQ core).

Drill core samples are either NQ (47.75 mm diameter) or BQ (36.40 mm diameter). All samples are ½ core samples cut by a diamond saw on site and the remaining half of the core is retained for reference purposes. Samples are generally 1.0 to 1.5 metre intervals or less at the discretion of the site geologists. Sample preparation and lab analysis was completed at ALS Geochemistry in Johannesburg, South Africa. Commercially prepared Blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81). Analyses for Pt, Pd, and Au are by fire assay (30 grams nominal sample weight) with an ICP-AES finish (PGM-ICP23).

Holes are numbered as follows: SMD (Selebi Main Deposit) + year + hole number starting at 201.

BHEM Surveys

The BHEM surveys at Selebi utilize the Crone PEM system operated by local Botswana staff. Survey data is collected using a 3-component fluxgate probe collecting full waveform data. Surveys have been collected using timebases between 50 and 1000ms (0.25 Hz to 5 Hz). The data has been processed to a calculated residual step response to better quantify the conductive sources. This added processing has proven to be highly valuable because of the size of the highly conductive mineralized system.

Technical Report

The 2024 MRE on the Selebi Mines is supported by the technical report entitled "Technical Report, Selebi Mines, Central District, Republic of Botswana" dated September 20, 2024 (with an effective date of June 30, 2024) (the "Selebi Technical Report"), and the technical report summary entitled "S-K 1300 Technical Report Summary Selebi Mines, Central District, Republic of Botswana, Premium Resources Ltd." dated December 17, 2024 (with an effective date of June 30, 2024) (the "Selebi Technical Report Summary"), each prepared by SLR Consulting (Canada) Ltd. for NEXM. Reference should be made to the full text of the Selebi Technical Report, which was prepared in accordance with NI 43-101 and is available on SEDAR+ (www.sedarplus.ca) and the Selebi Technical Report Summary, which was prepared in accordance with Subpart 1300 of Regulation S-K and is available in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2025 filed with the U.S. Securities and Exchange Commission on EDGAR (www.sec.gov), in each case, under NEXM's issuer profile.

About NexMetals Mining Corp.

NexMetals Mining Corp. is a TSX.V and NASDAQ listed mineral exploration and development company focused on redeveloping the past-producing Selebi and Selkirk copper-nickel-cobalt-platinum group element mines in Botswana. NexMetals has confirmed the scale of mineralization is larger than historical estimates, supported by NI 43-101- and Regulation S-K 1300-compliant resource estimates, with ongoing down-hole geophysics, drilling, and metallurgical programs aimed at expanding resources and supporting future economic studies. The Company is led by an experienced management and technical team with a proven track record in global mineral projects, emphasizing disciplined execution, transparent governance, and long-term stakeholder value creation.

For further information about NexMetals Mining Corp., please contact:

Sean Whiteford
CEO
info@nexmetalsmining.com
1-866-794-NEXM(6396)

Neither the TSX Venture Exchange and its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Stock Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Follow Us
X: https://x.com/NexMetalsCorp
LinkedIn: https://www.linkedin.com/company/NexMetalsMiningCorp
Facebook: https://www.facebook.com/NexMetalsMiningCorp

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the United States federal securities laws and "forward-looking information" within the meaning of applicable Canadian securities legislation (collectively, "forward-looking information") based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward looking information includes, but is not limited to, the implementation of the objectives, goals and future plans of the Company, including the potential for a laterally extensive mineralized system at Selebi Main and the scale and continuity thereof; the expansion potential within the Flexure Zone; the receipt of pending assay results and the timing and results thereof; and the Company's belief that the combination of massive, semi-massive and disseminated sulphides indicates a strong sulphide system with potential for scale, particularly when integrated with ongoing BHEM targeting. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of drilling and metallurgical test results; the ability of exploration results to predict mineralization; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; prefeasibility or the feasibility of mine production; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company's filings with the SEC on EDGAR (www.sec.gov) and public disclosure record on SEDAR+ (www.sedarplus.ca), in each case, under NEXM's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/299572

FAQ

What did NexMetals (NEXM) announce on June 1, 2026 about Selebi Main drilling?

NexMetals announced new visual drill results from the Selebi Main Flexure Zone, including a key 11.15 metre massive sulphide interval. According to NexMetals, holes SMD-26-210, 212-W1 and 213 all intersected mineralization outside the 2024 Mineral Resource Estimate, with assays still pending.

Why is the 11.15 metre massive sulphide interval in hole SMD-26-212-W1 important for NEXM investors?

The 11.15 metre massive sulphide interval suggests a thick, continuous Main Zone sulphide body within the Flexure Zone. According to NexMetals, this hole, together with widely spaced similar intersections, supports a robust, laterally extensive mineralized system and expansion potential beyond the current Selebi Main resource.

How much drilling has NexMetals completed in the Selebi Main Flexure Zone program?

NexMetals has completed 23,965 metres of surface drilling toward its 30,000 metre Flexure Zone program. According to NexMetals, this total includes 11 completed holes, one hole extension, four abandoned holes and two in-progress holes, using company-owned and Marcotte HTM2500 drills.

Are assay results available for NexMetals NEXM drill holes SMD-26-210, 212-W1 and 213?

Assay results are not yet available for these highlighted holes; only visual mineralization is reported. According to NexMetals, copper, nickel, cobalt and CuEq values in Table 1 are marked as assays pending, with results to be released once received and validated.

How do the new NexMetals drill holes impact the Flexure Zone around Selebi Main?

The new holes expand mineralization within the Flexure Zone, demonstrating thick sulphides across broad step-outs. According to NexMetals, holes defining the Flexure Zone are spaced about 200 metres, and massive sulphide intervals over 300 metres apart suggest a large, continuous mineralized system.

When is NexMetals expected to complete the updated Selebi Main mineral resource estimate?

An updated Selebi Main Mineral Resource Estimate is targeted for completion in the second half of 2026. According to NexMetals, ongoing Flexure Zone drilling and pending assays will feed into this 2024 MRE update for the Selebi Mines project in Botswana.