NEVADA KING DOUBLES PHASE 4 DRILL PROGRAM TO 40,000 METRES, PROVIDES ASSAY RESULTS FROM SILVER PARK, AND A PROJECT WIDE PERMITTING UPDATE
Rhea-AI Summary
Nevada King (OTCQB: NKGFF) doubled its Phase 4 RC drill program to 40,000 metres, reports assay results from Silver Park East and advances project-wide permitting.
Key items: BLM approved an NOI for 33 Western Rim RC sites; PoO Mod 5 is being advanced to permit 78 RC and 404 RAB sites; Silver Park drill highlights include 0.30 g/t Au over 39.6m and 0.14 g/t Au over 158.5m.
Positive
- Phase 4 RC drilling expanded to 40,000 metres
- BLM approved NOI for 33 Western Rim RC drill sites
- Silver Park highlights: 0.30 g/t Au over 39.6m and 0.14 g/t Au over 158.5m
- Advancing PoO Mod 5 to permit 78 RC and 404 RAB drill sites
Negative
- Plan of Operations Modification 5 remains subject to BLM approval
- Many drill composites are low-grade or NSI, limiting immediate resource upgrade
News Market Reaction – NKGFF
On the day this news was published, NKGFF gained 1.83%, reflecting a mild positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
Overview:
- Drill program expanded by
100% : The planned Phase 4 exploration program has been increased from 20,000 metres to 40,000 metres of reverse circulation ("RC") drilling to aggressively test district-scale targets. - Positive BLM permitting decision: Approval received from the Bureau of Land Management ("BLM") for the Western Rim Notice of Intent ("NOI") allowing for immediate drilling from 33 RC sites where the Company recently sampled 20.8 g/t Au at surface, the highest ever recorded rock chip sample at
Atlanta . - Silver Park East drill results: Assay results from 18 new holes continues to define a large, mineralized footprint, including 0.30 g/t Au over 39.6m (Hole AT26SP-61) and 0.14 g/t Au over 158.5m (Hole AT26-SP-62) both starting near surface.
- Strategic permitting progress: The Company is advancing its fifth and most extensive modification to its Plan of Operations ("PoO Mod 5") covering 78 additional RC drill sites and 404 RAB drill locations, which will allow follow up on key mineralized targets.
Expanded 2026 Drilling Program
Since releasing the updated mineral resource estimate for the Atlanta Resource Zone ("ARZ"), which included drilling completed during Phase 1 and 2 drilling, the Company has shifted its exploration focus toward testing the full district scale potential of its 130km2 land package which encompasses the entire Atlanta Caldera. The location of the current resource along the caldera margin, coupled with bonanza grade mineralization, suggests a robust mineralizing system with significant potential for discovery along the largely untested caldera rim, including additional high-grade zones elsewhere along the caldera margin.
During 2025,
The expanded Phase 4 drill program will test both the main mineralized zone at SPE and the 350m step out to the south, the SPE Extension, to potentially advance to a resource stage. Further, the expanded program will allow the Company to fully assess the mineralized potential of Western Rim, vector towards higher grade areas at Atlanta South, and look to fill in the gap at Atlanta North. This 40,000 metre total excludes ongoing Rotary Air Blast ("RAB") drilling, which remains a primary tool for rapid target generation.
Plan of Operations Modification 5
The Company is advancing PoO Mod 5, its most ambitious permitting expansion to date. Upon BLM approval, this will permit an additional 78 RC and 404 RAB drill sites plus associated access routes. Permitted drill areas include Western Rim, Atlanta South, Silver Park, and Atlanta North (see Figure 1 below). This large-scale Plan of Operations covering 45km2, provides a long-term exploration runway and maintains the Company's ability to remain nimble in follow-up drilling.
Continuing to Expand the Mineralized Footprint at SPE
Drilling at the main SPE area has previously demonstrated mineralization over a large footprint spanning 300 metres by 500 metres, with potential to connect to the SPE Extension, the step out area located ~350 metres to the southwest, which itself now covers approximately 450 metres by 300 metres.
The current objective at Silver Park is to expand and upgrade the mineralization encountered to date by vectoring toward higher grade zones where cross-cutting structures may have focused mineralizing fluids, thus following the same strategy the Company used for expanding and upgrading the ARZ with its Phase 1 and 2 drilling programs. Knowing that lower grade, blanket-like mineralization at the northern end of the ARZ formed from gold-bearing fluids that migrated northward from very high-grade structural intersections or hydrothermal flues, the Company's Phase 4 program is currently using the same method to track mineralization toward potential higher grade flue zones at Silver Park.
Today, the Company is reporting assay results from 18 new holes from the Silver Park area, of which 11 intersected mineralization above the current cut-off grade applied to the ARZ which is based on a gold and silver price assumption of
These results include both infill drilling at the main SPE zone and step out drilling in the SPE Extension zone. The drilling continues to demonstrate consistent, near-surface oxide mineralization above current cut off grades, with step out results extending mineralization to greater depths than previously tested. See Table 1 for a full list of assay results.
Silver Park East Drill Highlights:
- 0.30 g/t Au over 39.6m starting at 10.7m depth in hole AT26SP-61 including:
- 0.62 g/t Au over 13.7m starting at 10.7m depth
- 0.14 g/t Au over 158.5m starting at 13.7m depth in hole AT26SP-62 including:
- 0.37 g/t Au over 16.8m starting at 13.7m depth, and
- 0.58 g/t over 6.1m starting at 44m depth
Both highlighted drill holes encountered oxide mineralization, above the cut off grade of the ARZ, and are located in the SPE Extension zone. These results validate previously reported RAB drilling data from February 3, 2026, which identified strong near-surface oxide grades but were limited to approximately 30 metres depth due to constraints of the RAB drill. Furthermore, the drilling extended above cut-off grade mineralization to true vertical depths of 172 metres in angled hole AT26SP-62, enhancing confidence in the continuity of this step-out zone. These holes are located near the historical Solo Joker mine shaft along with multiple small prospect pits positioned atop a large rhyolitic flow dome. This intrusive feature is in structural contact with strongly altered dolomite basement rock and has been largely unexplored with modern techniques with only two historical drill holes in the area. All indications of a structurally complex area with deep plumbing features seen at surface as well as in geophysical data indicate a prime prospective area for extending mineralization starting from surface.
Drill holes AT26SP-58 and AT26SP-63 to the southwest of holes AT26SP-61 and AT26SP-62 both intersected the same oxide mineralization slightly deeper, in both dolomitic basement rock and mineralized intrusives with abundant quartz veining. This suggests strong hydrothermal activity and favourable structure an additional 300 metres southwest, resulting in a largely unexplored footprint 650 metres southwest of the main SPE area, beneath post-mineral cover.
The continuation of the Phase 4 drilling campaign will focus, in part, on targeted infill drilling to assess the extent of mineralization, pinpointing favourable structure and important host rocks along the unconformity. The progression in drilling will also clarify the potential link of the newly drilled mineralization with the footprint of the SPE to the northeast.
Justin Daley, VP Exploration of
"Combined with the recent approval of the Notice of Intent at Western Rim and the anticipated property‑wide PoO Mod 5, these results support our decision to expand the Phase 4 drill program and advance multiple new and exciting targets across the project in 2026."
Western Rim Target Receives Positive Permitting Decision from BLM
RC Drill Rig Mobilized to Atlanta South
The Company has mobilized the RC drill rig to Atlanta South for the first drilling from the Phase 4 program. It remains a highly prospective target with above cut-off grade gold mineralization encountered in Pogonip Limestone, a common host rock for large gold deposits in
Hole No. | From (m) | To (m) | Interval (m) | Au (g/t) | Ag (g/t) | AuEq* (g/t) |
AT25SP-46 | 32.0 | 35.1 | 3.1 | 0.032 | 0.25 | 0.04 |
AT25SP-47^ | NSI | NSI | NSI | NSI | NSI | NSI |
AT26SP-48^ | 132.6 | 134.1 | 1.5 | 1.31 | 0.25 | 1.31 |
AT26SP-49^ | NSI | NSI | NSI | NSI | NSI | NSI |
AT26SP-50^ | 38.1 | 79.2 | 41.1 | 0.11 | 5.38 | 0.11 |
Includes | 38.1 | 48.8 | 10.7 | 0.17 | 0.25 | 0.17 |
Includes | 74.7 | 79.2 | 4.6 | 0.25 | 44.3 | 0.28 |
And | 128.0 | 129.5 | 1.5 | 0.18 | 2.5 | 0.18 |
And | 138.7 | 140.2 | 1.5 | 0.11 | 15.4 | 0.12 |
AT26SP-51^ | 121.9 | 141.7 | 19.8 | 0.14 | 7.30 | 0.22 |
Includes | 121.9 | 131.1 | 9.2 | 0.24 | 12.93 | 0.25 |
AT26SP-52^ | NSI | NSI | NSI | NSI | NSI | NSI |
AT26SP-53^ | 77.7 | 80.8 | 3.1 | 0.75 | 0.30 | 0.75 |
AT26SP-54^ | 132.6 | 155.4 | 22.8 | 0.06 | 2.7 | 0.06 |
AT26SP-55^ | 129.5 | 131.1 | 1.5 | 0.13 | 15.6 | 0.14 |
And | 150.9 | 152.4 | 1.5 | 0.10 | 0.7 | 0.10 |
AT26SP-56^ | 25.9 | 35.1 | 9.1 | 0.14 | 0.25 | 0.14 |
And | 175.3 | 193.5 | 18.3 | 0.2 | 20.0 | 0.21 |
And | 214.9 | 216..4 | 1.5 | 0.61 | 29.7 | 0.63 |
AT26SP-57^ | NSI | NSI | NSI | NSI | NSI | NSI |
AT26SP-58 | 79.2 | 99.1 | 19.8 | 0.27 | 7.32 | 0.27 |
AT26SP-59^ | NSI | NSI | NSI | NSI | NSI | NSI |
AT26SP-60^ | 198.1 | 199.6 | 1.5 | 0.21 | 9.8 | 0.22 |
And | 210.3 | 214.9 | 4.6 | 0.061 | 17 | 0.07 |
AT26SP-61 | 10.7 | 50.3 | 39.6 | 0.3 | 6.05 | 0.30 |
Includes | 10.7 | 24.4 | 13.7 | 0.62 | 11.5 | 0.63 |
And | 71.6 | 73.2 | 1.5 | 0.15 | 1.5 | 0.15 |
AT26SP-62*^ | 13.7 | 172.2 | 158.5 | 0.14 | 4.0 | 0.14 |
Includes | 13.7 | 30.5 | 16.8 | 0.37 | 15.9 | 0.38 |
Includes | 44.2 | 50.3 | 6.1 | 0.58 | 8.0 | 0.59 |
Includes | 73.2 | 76.2 | 3.0 | 0.49 | 16.8 | 0.50 |
Includes | 88.4 | 114.3 | 25.9 | 0.16 | 2.64 | 0.16 |
Includes+ | 126.5 | 134.1 | 7.6 | 0.28 | 4.95 | 0.28 |
Includes | 166.1 | 172.2 | 6.1 | 0.15 | 1.88 | 0.15 |
AT26SP-63 | 68.6 | 76.2 | 7.6 | 0.35 | 1.13 | 0.35 |
Table 1. Drill holes released today at the Silver Park East Target and the SPE Extension. *AuEq based on |
QA/QC Protocols
All RC and RAB samples from the Atlanta Project are split at the drill site and placed in cloth and plastic bags utilizing a nominal 2kg sample weight. CRF standards, blanks, and duplicates are inserted into the sample stream on-site on a one-in-twenty sample basis, meaning all three inserts are included in each 20-sample group. Samples are shipped by a local contractor in large sample shipping crates directly to American Assay Lab in
Qualified Person
The scientific and technical information in this news release has been reviewed and approved by
About Nevada King Gold Corp.
NI 43-101 Mineral Resources at the Atlanta Mine by RESPEC 2025
Tonnes | Au g/t | Au oz | Ag g/t | Ag oz | AuEq g/t | AuEq oz | |
Measured | 3,430,100 | 1.55 | 170,800 | 16.96 | 1,870,200 | 1.65 | 182,000 |
Indicated | 24,280,200 | 1.09 | 848,800 | 8.73 | 6,817,200 | 1.14 | 887,700 |
M&I | 27,710,300 | 1.14 | 1,019,600 | 9.75 | 8,687,400 | 1.20 | 1,069,700 |
Inferred | 3,638,400 | 0.84 | 98,500 | 2.56 | 299,500 | 0.85 | 99,800 |
Please see the Company's website at www.nevadaking.ca.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statements Regarding Forward Looking Information
This news release contains certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable securities legislation. All statements, other than statements of historical fact, included herein, without limitation, statements relating to the future operations and activities of
View original content to download multimedia:https://www.prnewswire.com/news-releases/nevada-king-doubles-phase-4-drill-program-to-40-000-metres-provides-assay-results-from-silver-park-and-a-project-wide-permitting-update-302755174.html
SOURCE Nevada King Gold Corp.




