STOCK TITAN

First Phosphate Files NI 43-101 Technical Report for Updated Mineral Resource Estimate for Bégin-Lamarche Igneous Phosphate Deposit

(Moderate)
(Neutral)
Tags

First Phosphate (NASDAQ: PHOS) has filed an NI 43-101 Technical Report for its updated Mineral Resource Estimate at the Bégin-Lamarche igneous phosphate deposit, 50 km northwest of Saguenay, Quebec. The report, effective May 1, 2026, was prepared by P&E Mining Consultants.

MRE highlights include a 378% increase in Indicated Mineral Resources versus the initial September 9, 2024 estimate, with 6.2 Mt Measured at 7.70% P2O5, 198.5 Mt Indicated at 6.00% P2O5, and 89.5 Mt Inferred at 6.16% P2O5. Metallurgical work indicates a 40.4% P2O5 concentrate at 88% recovery and 91.1% conversion to battery-grade phosphoric acid for LFP batteries.

The deposit remains open at depth, is close to road and hydroelectric infrastructure and 70 km from the Port of Saguenay, and benefits from a definitive, long-term, partially prepaid offtake agreement with a creditworthy partner.

Loading...
Loading translation...

Positive

  • Indicated Mineral Resources +378% versus initial September 9, 2024 MRE
  • Measured resource 6.2 Mt at 7.70% P2O5, pit-constrained
  • Indicated resource 198.5 Mt at 6.00% P2O5, pit-constrained
  • Inferred resource 89.5 Mt at 6.16% P2O5, pit-constrained
  • Metallurgy 40.4% P2O5 concentrate at 88% recovery, 91.1% LFP acid conversion
  • Infrastructure near road, hydro, and 70 km from Port of Saguenay
  • Offtake definitive, long-term, partially prepaid agreement with creditworthy partner

Negative

  • None.

Market reaction after updated mineral resource estimate: PHOS -7.62% in the Aug 24 session

-7.62%
18 alerts
-7.62% Session close to close
-13.6% Trough in 3 hr 14 min
$367.89M Market Cap
1.1x Rel. Volume

In the Aug 24 session, PHOS declined 7.62%, reflecting a notable negative market reaction. Argus tracked a trough of -13.6% from its starting point during tracking. Our momentum scanner triggered 18 alerts that day, indicating notable trading interest and price volatility.

Data tracked by StockTitan Argus on the day of publication.

Market Context

The stock moved -7.6% in the session following this news. The prior 24-hour reaction to news_id 1347...
Analysis

The stock moved -7.6% in the session following this news. The prior 24-hour reaction to news_id 1347241 was 24.64%. A negative scenario would diverge from that historical response; current short positioning was classified as low, and no recent insider activity was reported.

Key Figures

Indicated Resource Increase: 378% Measured Resource: 6.2 Mt @ 7.70% P2O5 Indicated Resource: 198.5 Mt @ 6.00% P2O5 +5 more
8 metrics
Indicated Resource Increase 378% Updated MRE versus initial MRE dated September 9, 2024
Measured Resource 6.2 Mt @ 7.70% P2O5 Pit-constrained mineral resource
Indicated Resource 198.5 Mt @ 6.00% P2O5 Pit-constrained mineral resource
Inferred Resource 89.5 Mt @ 6.16% P2O5 Pit-constrained mineral resource
Apatite Concentrate Grade 40.4% P2O5 Anticipated metallurgical test work result
Process Recovery 88% Anticipated metallurgical process recovery rate
Conversion Ratio 91.1% Qualified conversion to battery-grade phosphoric acid for LFP battery
Port Distance 70 km Driving distance from the deep-sea Port of Saguenay

Historical Context

3 past events · Latest: Aug 17 (Positive)
Pattern 3 events
Date Event Sentiment 24h Move Catalyst
Aug 17 research report Positive +1.8% Flash report reiterated rating and price target after Nasdaq Global Market uplisting.
Aug 13 Nasdaq bell ceremony Positive +24.6% Board and management rang Nasdaq Opening Bell following recent company listing.
Aug 10 ADR uplisting Positive +13249900.0% ADR uplisting to Nasdaq Global Market became effective without new shares or capital raised.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Pattern Detected

The three listed prior news events each had positive 24-hour price reactions, with all three classified as aligned.

Key Terms

ni 43-101, mineral resource estimate, pit-constrained mineral resource, apatite concentrate, +1 more
5 terms
ni 43-101 regulatory
"accordance with National Instrument 43-101 Standards of Disclosure"
A Canadian regulatory standard that sets the rules for how mining and exploration companies must report mineral resources and reserves, requiring technical reports prepared or signed off by an independent, certified expert. It matters to investors because it creates a consistent, transparent “inspection report” for mining projects, making it easier to compare prospects, judge the reliability of claims, and assess geological and financial risk before investing.
mineral resource estimate technical
"filed its updated Mineral Resource Estimate (MRE) Technical Report"
A mineral resource estimate is a calculated approximation of how much metal or mineral material likely exists in a particular deposit and where it sits underground, similar to estimating how many cookies are in a jar by peeking at the layers. It matters to investors because it provides a data-based starting point for judging a project's potential value, future production and risks, while not guaranteeing recoverable or profitable amounts.
pit-constrained mineral resource technical
"Measured pit-constrained Mineral Resource: 6.2 Mt"
A pit-constrained mineral resource is the portion of a mineral deposit that lies inside a hypothetical open-pit mining shell generated using realistic economic and technical assumptions (like metal prices, mining costs, recovery rates, and pit slope angles). It shows the material that could be economically extracted by surface mining under those assumptions, and matters to investors because it gives a more practical, finance-focused estimate of what could be mined than a raw geological resource.
apatite concentrate technical
"anticipated apatite concentrate grade of 40.4% P2O5"
Apatite concentrate is the processed rock product in which the naturally occurring phosphate-bearing mineral group called apatite has been upgraded and separated from waste material, producing a higher-grade, saleable phosphate mineral. It matters to investors because this concentrate is the marketable raw material used by fertilizer makers and other industries; its grade, quantity and production cost directly affect a mining operation’s potential revenue and the commodity price exposure of the producer, like turning raw ore into a refined ingredient.
offtake financial
"benefits from definitive, long-term, partially prepaid offtake"
An offtake is a contract where a buyer commits in advance to purchase a company’s future output—such as raw materials, energy or finished goods—often at agreed volumes and prices. For investors, an offtake provides predictable revenue and lowers the risk that production will go unsold, similar to a long-term subscription or pre-order that helps a factory or mine secure funding and plan operations with greater confidence.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Saguenay, Quebec--(Newsfile Corp. - August 24, 2026) - First Phosphate Corp (NASDAQ: PHOS) (CSE: PHOS) (OTCQX: FRSPF) (FSE: KD0) ("First Phosphate" or the "Company") is pleased to announce that the Company has filed its updated Mineral Resource Estimate ("MRE") Technical Report for the Bégin-Lamarche project located 50 km northwest of the City of Saguenay, Quebec, Canada (the "Deposit").

The Technical Report titled "Technical Report and Updated Mineral Resource Estimate of The Bégin-Lamarche Phosphate Property, Saguenay - Lac Saint-Jean Region, Northern Quėbec" dated August 24, 2026, with an effective date of May 1, 2026, was prepared by P&E Mining Consultants Inc. in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects and supports the disclosures made by the Company in its news release dated May 26, 2026. A full copy of the Report is available on the First Phosphate website at https://firstphosphate.com/projects/begin-lamarche-3 and can be found at SEDAR+ (www.sedarplus.ca) under the Company's issuer profile.

MRE Highlights include:

  • The updated MRE includes a 378% increase in Indicated Mineral Resources over the Company's Initial MRE dated September 9, 2024.

  • Measured pit-constrained Mineral Resource: 6.2 Mt @ 7.70% P2O5 (phosphate).

  • Indicated pit-constrained Mineral Resource: 198.5 Mt @ 6.00% P2O5.

  • Inferred pit-constrained Mineral Resource: 89.5 Mt @ 6.16% P2O5.

  • The Deposit remains open at depth.

  • Metallurgical test work indicates an anticipated apatite concentrate grade of 40.4% P2O5 at an 88% process recovery rate, with very low levels of potentially deleterious elements, and has been qualified for production of battery-grade phosphoric acid for lithium iron phosphate ("LFP") battery with a conversion ratio of 91.1%.

  • The Deposit is located next to existing road and hydroelectric infrastructure and at only 70 km driving distance from the deep-sea Port of Saguenay.

  • The Deposit benefits from definitive, long-term, partially prepaid offtake from an existing, creditworthy partner.

  • Apatite (phosphorus, phosphate) is listed on the critical minerals lists of Québec, Canada, the United States and the European Union.

The Bégin-Lamarche Deposit Updated Optimized Pit Shell

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8917/310970_b02b19dc749f6976_001.jpg

Video available at: https://www.youtube.com/watch?v=4TV4WoC_Jhc&feature=youtu.be

Qualified Person

The Qualified Person, independent of the issuer, responsible for estimating the Mineral Resources of the Begin-Lamarche Property, within the meaning of NI 43-101, is Mr. Antoine Yassa, P.Geo., of the firm P&E Mining Consultants Inc. Mr. Yassa has read this press release and confirms that the scientific and technical information in this press release for accuracy and compliance with NI 43-101.

The scientific and technical disclosure for First Phosphate included in this News Release have been reviewed and approved by Steeve Lavoie, P.Geo. Mr. Lavoie is Chief Geologist of the Company and a Qualified Person under National Instrument 43-101 Standards of Disclosure of Mineral Projects ("NI 43-101").

About First Phosphate Corp

First Phosphate (NASDAQ: PHOS) (CSE: PHOS) (OTCQX: FRSPF) (FSE: KD0) is a mineral exploration and development and clean technology company dedicated to building and reshoring a vertically integrated mine-to-market supply chain for the production of LFP batteries in North America. Target markets include energy storage, data centers, robotics, mobility, and national security. First Phosphate's flagship Bégin-Lamarche property, located in Saguenay-Lac-Saint-Jean, Québec, Canada, represents a rare North American igneous phosphate resource producing high-purity phosphate characterized by very low levels of impurities.

-30-

For additional information, please contact:

Steeve Lavoie
Chief Geologist
Tel: +1 (418) 815-5416

Investor Relations: https://firstphosphate.com/investors
General Inquiries: https://firstphosphate.com/contact
Website: www.FirstPhosphate.com

Follow First Phosphate:

X: https://twitter.com/FirstPhosphate
LinkedIn: https://www.linkedin.com/company/first-phosphate/

Forward-Looking Information and Cautionary Statements

This news release contains certain statements and information that may be considered "forward-looking statements" and "forward looking information" within the meaning of applicable securities laws. In some cases, but not necessarily in all cases, forward-looking statements and forward-looking information can be identified by the use of forward-looking terminology such as "plans", "targets", "expects" or "does not expect", "is expected", "an opportunity exists", "is positioned", "estimates", "intends", "assumes", "anticipates" or "does not anticipate" or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might", "will" or "will be taken", "occur" or "be achieved" and other similar expressions. In addition, statements in this news release that are not historical facts are forward looking statements, including, among other things: the Company's planned exploration and production activities; the properties and composition of any extracted phosphate; and the calculation of mineral resources at the project and the possibility of eventual economic extraction of minerals from the project. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include development and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. These statements are based on a number of assumptions including, among other things: that engineering and construction timetables and capital costs for the Company's, exploration, development and expansion projects are correctly estimated and not affected by unforeseen circumstances; the ability to obtain financing for its proposed operations on acceptable terms; no material deterioration in general business and economic conditions; no material delays in obtaining permits and other approvals; no significant disruptions affecting the activities of the Company or its ability to access required project equipment and services, and operating supplies in sufficient quantities and on a timely basis; inflation and prices for Company project inputs being approximately consistent with anticipated levels; the ability to complete the exploration and development programs consistent with the Company's expectations; commodity price expectations including assumptions for P2O5; the Company's relationship with local municipalities and First Nations remaining consistent with the Company's expectations; the Company's relationship with other third-party partners and suppliers remaining consistent with the Company's expectations; and government relations and actions being consistent with Company expectations. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Accordingly, readers should not place undue reliance on the forward-looking information contained in this press release. The Company does not assume any obligation to update or revise its forward-looking statements, whether because of new information, future events or otherwise, except as required by applicable law. All forward-looking information contained in this release is qualified by these cautionary statements.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/310970

FAQ

What did First Phosphate (PHOS) announce about the Bégin-Lamarche NI 43-101 report on August 24, 2026?

First Phosphate announced filing of its NI 43-101 Technical Report for the updated Mineral Resource Estimate at the Bégin-Lamarche phosphate deposit. According to First Phosphate, the report is dated August 24, 2026 with an effective date of May 1, 2026 and prepared by P&E Mining Consultants.

How much phosphate resource does First Phosphate (PHOS) report at Bégin-Lamarche?

First Phosphate reports 6.2 Mt Measured at 7.70% P2O5, 198.5 Mt Indicated at 6.00% P2O5, and 89.5 Mt Inferred at 6.16% P2O5. According to First Phosphate, these are pit-constrained Mineral Resources in the updated NI 43-101 Technical Report for Bégin-Lamarche.

What is the reported 378% increase in Indicated Mineral Resources for First Phosphate’s (PHOS) Bégin-Lamarche deposit?

According to First Phosphate, the updated Mineral Resource Estimate includes a 378% increase in Indicated Mineral Resources compared with the company’s initial MRE dated September 9, 2024. This increase relates specifically to the Indicated category for the Bégin-Lamarche igneous phosphate deposit in Quebec.

What metallurgical results did First Phosphate (PHOS) disclose for the Bégin-Lamarche phosphate project?

Metallurgical test work indicates an anticipated apatite concentrate grade of 40.4% P2O5 at an 88% process recovery rate. According to First Phosphate, this concentrate has very low deleterious elements and is qualified for battery-grade phosphoric acid with a 91.1% conversion ratio for LFP batteries.

Where is the Bégin-Lamarche phosphate deposit located and what infrastructure advantages does PHOS report?

The Bégin-Lamarche deposit lies 50 km northwest of Saguenay in Quebec’s Saguenay–Lac-Saint-Jean region. According to First Phosphate, it is adjacent to existing road and hydroelectric infrastructure and about 70 km by road from the deep-sea Port of Saguenay, supporting logistics.

Does First Phosphate (PHOS) have an offtake agreement for the Bégin-Lamarche phosphate production?

Yes. According to First Phosphate, the Bégin-Lamarche deposit benefits from definitive, long-term, partially prepaid offtake from an existing, creditworthy partner. This agreement is highlighted as a feature of the project alongside its resource size and infrastructure access.

Why is the Bégin-Lamarche igneous phosphate deposit important for First Phosphate’s LFP battery strategy?

The Bégin-Lamarche deposit supplies high-purity igneous phosphate suitable for LFP battery materials. According to First Phosphate, metallurgical testing supports production of battery-grade phosphoric acid and the company aims to build a vertically integrated mine-to-market LFP supply chain in North America using this resource.