STOCK TITAN

Kicking Horse Canyon Wins Global Best Project of the Year Award

Rhea-AI Impact
(No impact)
Rhea-AI Sentiment
(Neutral)
Tags

Parsons (NYSE: PSN) announced that the Kicking Horse Canyon Phase 4 (KHCP4) project in British Columbia has won the 2024 Global Best Project Award in the Road/Highway category from Engineering News-Record. The $600M project, delivered by a joint venture between Aecon Constructors, Parsons, and Emil Anderson Construction, transformed 4.8 km of the Trans-Canada Highway 1 into a four-lane divided highway.

The project features innovative design elements including accelerated bridge construction and viaducts, addressing challenges in steep terrain prone to rockfall, avalanches, and debris flows. Opening in November 2023, KHCP4 improved safety, stability, and operational efficiency with a 100 km/h design speed and enhanced geohazard mitigation.

Loading...
Loading translation...

Positive

  • None.

Negative

  • None.

News Market Reaction 1 Alert

+0.93% News Effect

On the day this news was published, PSN gained 0.93%, reflecting a mild positive market reaction.

Data tracked by StockTitan Argus on the day of publication.

 CHANTILLY, Va., Nov. 19, 2024 (GLOBE NEWSWIRE) -- Parsons Corporation (NYSE: PSN) announced today that Kicking Horse Canyon Phase 4 (KHCP4), a transformative infrastructure initiative in British Columbia (BC), Canada, has been awarded the prestigious 2024 Global Best Project Award in the Road/Highway category by Engineering News-Record (ENR). Led by Kicking Horse Canyon Constructors – a joint venture between Aecon Constructors, Parsons Corporation, and Emil Anderson Construction – the project was delivered in partnership with the Transportation Investment Corporation and the BC Ministry of Transportation and Infrastructure.

Parsons, a joint venture partner, also served as lead design engineer for the $600M major highway improvement project. KHCP4 is a Design-Build initiative that includes the design and construction of improvements to 4.8 km (3 miles) of the existing Trans-Canada Highway 1 to provide a four-lane divided standard with a 100 km/h (60mph) design speed and geohazard mitigation. The project’s design incorporated state-of-the-art technologies and used innovative methods such as accelerated bridge construction and viaducts to navigate difficult conditions, ensuring minimal disruption and efficient progress despite identified challenges. This award recognizes the project’s outstanding engineering, innovative design, and exceptional teamwork.

"The successful completion of Kicking Horse Canyon Phase 4 was not only a significant engineering achievement but also an example of how collaboration and cutting-edge technology can address complex environmental and geotechnical challenges,” said Mark Fialkowski, president, Infrastructure North America for Parsons. “Through collaborative teamwork, we’ve helped enhance safety, reliability, and resilience on one of Canada’s most critical transportation corridors. We are proud to have contributed to the long-term prosperity of the region and the safety of the thousands of travelers who rely on this highway every day."

The project, which opened in November 2023, is celebrated for its extraordinary efforts to upgrade and stabilize a vital highway segment. This section of the Trans-Canada Highway 1 runs through steep terrain in a canyon prone to rockfall, avalanches, and debris flows, making it a high-risk area for both road users and infrastructure. The project was undertaken to improve safety, stability, and operational efficiency and to enhance the highway's resilience against increasingly severe weather events and geotechnical hazards.

Parsons has decades of experience designing, delivering, and protecting the infrastructure that connects our communities around the world, including roads and highways; bridges; passenger and freight rail; public transit; airports; and ports and waterways. Our experience includes more than 10,000 miles of roadways, 4,500 bridges, and more than 50 advanced traffic management system deployments that help cities and states improve safety and travel efficiency while also reducing emissions and energy costs to enhance the quality of life in the communities we serve.

To learn more about Parsons’ road and highway expertise, visit www.Parsons.com/road-highway/.

About Parsons
Parsons (NYSE: PSN) is a leading disruptive technology provider in the national security and global infrastructure markets, with capabilities across cyber and intelligence, space and missile defense, transportation, environmental remediation, urban development, and critical infrastructure protection. Please visit parsons.com and follow us on LinkedIn and Facebook to learn how we're making an impact.

Media Contact:
Lexus K. White
+1 470.510.6690
Lexus.White@parsons.com

Investor Relations Contact:
Dave Spille
+ 1 571.655.8264
Dave.Spille@parsons.us


FAQ

What award did Parsons (PSN) win for the Kicking Horse Canyon project in 2024?

Parsons (PSN) won the 2024 Global Best Project Award in the Road/Highway category from Engineering News-Record for the Kicking Horse Canyon Phase 4 project.

How long is the Kicking Horse Canyon Phase 4 highway improvement project?

The Kicking Horse Canyon Phase 4 project improved 4.8 kilometers (3 miles) of the Trans-Canada Highway 1.

What was the cost of the Kicking Horse Canyon Phase 4 project by Parsons (PSN)?

The Kicking Horse Canyon Phase 4 project was a $600 million major highway improvement project.

When did the Parsons (PSN) Kicking Horse Canyon Phase 4 project open?

The Kicking Horse Canyon Phase 4 project opened in November 2023.
Parsons

NYSE:PSN

PSN Rankings

PSN Latest News

PSN Latest SEC Filings

PSN Stock Data

7.26B
105.17M
1.1%
106.25%
5.71%
Information Technology Services
Services-computer Integrated Systems Design
Link
United States
CENTREVILLE