Sitka Continues to Expand High-Grade Gold Mineralization at the Blackjack Deposit, Drilling 94.5 Metres of 1.62 g/t Gold, Including 2.0 Metres of 11.85 g/t Gold, and an Additional Interval of 197.0 Metres of 1.06 g/t Gold, Including 2.0 Metres of 9.95 g/t Gold, in Hole 125 at Its RC Gold Project, Yukon
Rhea-AI Summary
Sitka Gold (OTCQX:SITKF) reported new 2026 drill results from its 100%-owned RC Gold Project in Yukon. Hole DDRCCC-26-125 cut 94.5 m of 1.62 g/t gold and 197.0 m of 1.06 g/t. Additional holes returned long mineralized intervals above 1.0 g/t.
Over 18,000 m of expansion drilling across 40 holes have been completed at the Blackjack deposit since the January 2025 resource estimate, effectively doubling prior meterage. A fully funded 60,000 m 2026 drill program is underway, with about 17,600 m completed in 30 holes and six rigs operating.
Positive
- DDRCCC-26-125 intersected 94.5 m of 1.62 g/t Au and 197.0 m of 1.06 g/t Au
- DDRCCC-26-123 returned 214.5 m of 0.97 g/t Au, including 2.0 m of 15.45 g/t Au
- DDRCCC-26-126 returned 153.1 m of 1.33 g/t Au, including 110.0 m of 1.63 g/t Au
- More than 18,000 m of expansion drilling completed at Blackjack since January 2025 resource estimate
- Current resource cited as 1.29 Moz indicated at 1.01 g/t Au and 1.04 Moz inferred at 0.94 g/t Au
- Fully funded 60,000 m 2026 drill program with approximately 17,600 m already drilled and six rigs active
Negative
- None.
News Market Reaction – SITKF
In the Jun 23 session, SITKF declined 0.96%, reflecting a mild negative market reaction.
Data tracked by StockTitan Argus on the day of publication.
AI-generated analysis. How Rhea-AI works. Not financial advice.
Sitka reports results for six additional diamond drill holes; continues to intercept significant intervals of high-grade gold mineralization in step out drilling at the Blackjack deposit
Drillhole DDRCCC-26-125 returned 94.5 m of 1.62 g/t Au including 2.0 m of 11.85 g/t Au, and a separate interval of 197.0 m of 1.06 g/t Au including 2.0 m of 9.95 g/t Au
Drillhole DDRCCC-26-123 returned 214.5 m of 0.97 g/t Au, including 106.9 m of 1.36 g/t Au and 2.0 m of 15.45 g/t Au
Drillhole DDRCCC-26-126 returned 153.1 m of 1.33 g/t Au, including 110.0 m of 1.63 g/t Au including 2.0 m of 12.35 g/t Au
Over 18,000 m of expansion drilling completed at the Blackjack deposit across 40 holes since the last MRE for Blackjack was published in January 2025; effectively doubling the meterage completed since the last resource estimate was calculated
Six drill rigs are currently turning on the Project at Blackjack, Rhosgobel and Saddle
Approximately 17,600 m of diamond drilling have been completed to date this year in 30 drill holes across the Blackjack and Rhosgobel deposits as part of the ongoing 60,000 m drill program planned for 2026
Vancouver, British Columbia--(Newsfile Corp. - June 23, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company") is pleased to announce assay results from six drill holes completed during its 2026 exploration campaign and to provide an update on the 60,000 metre diamond drilling program currently underway at its
Currently, six drills are turning across the project with the goal of expanding on known gold mineralization and defining new mineralization. So far this year a total of approximately 17,600 metres have been completed in 30 drill holes at the Blackjack and Rhosgobel deposits as part of the fully-funded 60,000 metres drill program planned for 2026. Assays are pending for all remaining holes.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_001full.jpg
"These results continue to demonstrate the impressive scale, continuity and high-grade nature of the Blackjack gold deposit and further strengthen our confidence in the overall growth potential of the RC Gold Project," said Cor Coe, Director and CEO of Sitka Gold Corp. "The first holes completed this year at Blackjack have returned several broad, high-grade gold intercepts that highlight the robust nature of the mineralization and continue to expand the known limits of this wide-open deposit. Furthermore, we have now completed more than 18,000 metres of additional drilling at Blackjack since the most recent resource estimate was published in early 2025. For perspective, the current resource estimate of 1.29 million ounces of indicated gold grading 1.01 g/t gold and 1.04 million ounces of inferred gold grading 0.94 g/t gold* was based on 18,800 metres of drilling, meaning we have now effectively doubled the amount of drilling completed since that estimate was calculated. With six drills currently operating and only a portion of our fully funded 60,000 metre drill program completed, we expect a steady flow of results from Blackjack, Rhosgobel and several additional targets as we continue advancing one of Yukon's largest and fastest-growing gold systems."
*see Table A in the About the RC Gold Project section below

Figure 1: Plan map of drilling completed at the Blackjack deposit, highlighting results from drill holes reported in this news release. Over 18,000 metres of drilling across 40 drill holes has been completed in expansion drilling at Blackjack since the last MRE was published in January 2025.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_002full.jpg

Figure 2: Cross section of DDRCCC-26-123 and DDRCCC-26-126 showing broad high-grade gold intervals intercepted in the latest drilling at Blackjack.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_003full.jpg

Figure 3: Cross section of DDRCCC-26-125 showing broad high-grade gold intervals intercepted in the latest drilling at Blackjack.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_004full.jpg

Figure 4: Examples of visible gold observed in DDRCCC-26-122 (564.83m), DDRCCC-26-123 (243.75m), DDRCCC-26-125 (557.13m), and DDRCCC-26-126 (266.53m). Observations of visible gold are common in the drill core across the Clear Creek Intrusive Complex.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_005full.jpg
The 2026 drill program continues to successfully intersect broad zones of Reduced Intrusion-Related Gold mineralization at the Blackjack and Rhosgobel deposits and continues to expand and define the known gold mineralization at each area. Visible gold* has been observed associated with the RIRGS mineralization in all but one drill hole at both targets. The program will continue to define and expand these broad zones of mineralization as well as target new zones of previously defined mineralization such as the Pukelman/Contact zones, Saddle zone and Bear Paw Breccia zone.
* While visible gold observations are very encouraging and confirm the presence of gold mineralization, they are not intended to imply potential gold grades. Gold assays will be published after they are received from the lab for mineralized intervals in which visible gold particles were noted.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_006full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_007full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_008full.jpg

Figure 5: Longitudinal section showing locations of several of the intrusion targets and the current gold resources within the Clear Creek Intrusive Complex. A 60,000 metres diamond drilling program planned for 2026 will focus on further expansion of the 2 km long Blackjack-Eiger area with 15,000 metres of drilling. An additional 30,000 metres of drilling is planned at Rhosgobel to follow up on the initial diamond drilling conducted by Sitka in 2025. 10,000 metres of drilling has been allocated for the Pukelman-Contact zone and 5,000 metres of drilling will follow up on initial drilling results from Bear Paw and test other high-priority targets.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_009full.jpg

Figure 6*: A plan map of the Clear Creek Intrusive Complex (CCIC) showing the updated resource areas at Blackjack and Eiger, and the six additional areas that have drill targets indicated by the mauve hatched areas. The map highlights the numerous drill targets that Sitka has outlined within the CCIC which all are connected by the road network on the project and occur in an area measuring five (5) km north-south and twelve (12) km east-west. Additional areas highlighted by strong gold in soil anomalies are being advanced to the drill ready stage with additional geological work planned in 2026.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_010full.jpg
* References for Figure 6 drilling intervals:
Rhosgobel Intervals: Sitka Gold News Release dated November 25, 2024
Pukelman Intervals: Sitka Gold News Release dated January 7, 2025
Contact Intervals: O'Brien, 2010; Assessment Report, 2010 Diamond Drilling Program, Clear Creek Property (Assessment report 095539)
Shutty, 2011; Assessment Report, 2011 Exploration Program, Clear Creek Property (Assessment Report 095984)
Bear Paw Intervals: Shutty, 2011; Assessment Report, 2011 Exploration Program, Clear Creek Property (Assessment Report 095984)
About the RC Gold Project
Sitka's
The RC Project hosts an indicated MRE of 1,291,000 ounces of gold and an inferred MRE of 3,829,000 ounces of gold (see Table A below) hosted within three at surface, road-accessible pit constrained deposits. In addition to gold resources, the Rhosgobel deposit also hosts 2,926,000 ounces of silver and 51,345 tonnes of tungsten trioxide (see Table B below). The 60,000 metre drill program planned for 2026 is focused on expanding all three known deposits in addition to testing other high potential targets in close proximity to the current resources.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_011full.jpg
* Notes for Blackjack Resources:
Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of January 21, 2025.
Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with NI 43-101.
Mineral resources are not mineral reserves and do not have demonstrated economic viability.
Mineral resources are constrained by an optimized pit shell using the following assumptions: US
$200 0/oz Au price; a 45° pit slope; assumed metallurgical recovery of85% ; mining costs of US$2.00 per tonne; processing costs of US$10.00 per tonne; G&A of US$4.00 /t.The base case cut-off of 0.3 g/t Au is believed to provide a reasonable margin over operating and sustaining costs for open-pit mining and processing.
Totals may not sum due to rounding.
** Notes for Rhosgobel and Eiger Resources:
Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of February 25, 2026
Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with NI 43-101.
Mineral resources are not mineral reserves and do not have demonstrated economic viability.
Mineral resources are constrained by an optimized pit shell using the following assumptions: US
$300 0/oz Au price; a 45° pit slope; assumed metallurgical recovery of85% ; mining costs of US$2.50 per tonne; processing costs of US$14.00 per tonne; G&A of US$4.00 /t.The base case cut-off of 0.3 g/t Au is based on a gold price of US
$250 0/oz and believed to provide a reasonable margin over operating and sustaining costs for open-pit mining and processingTotals may not sum due to rounding.
All of these deposits begin at surface and are potentially open pit minable. Initial bottle roll metallurgical testing confirmed the non-refractory characteristics of the gold mineralization and returned gold extraction rates averaging around

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6144/302502_1a5c3325e4a44aca_012full.jpg
Notes:
Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of May 11, 2026.
Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with NI 43-101.
Mineral resources are not mineral reserves and do not have demonstrated economic viability.
Mineral resources are constrained by an optimized pit shell using the following assumptions: US
$300 0/oz Au price; a 45° pit slope; assumed metallurgical recovery of85% ; mining costs of US$2.50 per tonne; processing costs of US$14.00 per tonne; G&A of US$4.00 /t.The base case cut-off of 0.3 g/t Au is based on a gold price of
$250 0/oz and believed to provide a reasonable margin over operating and sustaining costs for open-pit mining and processingTotals may not sum due to rounding.
For the purposes of the current resource model, it is assumed that a likely mill flowsheet would consist of a gravimetric, flotation, and cyanidation circuit.
Upcoming Events
Sitka Gold will be attending and/or presenting at the following events*:
TAKESTOCK Investor Series Stampede Special, Calgary, AB: June 30, 2026
Yukon Mining Alliance - Property Tours and Conference, Dawson City, Yukon: July 12-15, 2026
Diggers and Dealers: Kalgoorlie, Western Australia: August 3 - 5, 2026
*All events are subject to change.
About Sitka Gold Corp.
Sitka Gold Corp. is a well-funded mineral exploration company headquartered in Canada. The Company is managed by a team of experienced industry professionals and is focused on exploring for economically viable mineral deposits with its primary emphasis on gold, silver and copper mineral properties of merit. Sitka is currently advancing its
A 60,000-metre diamond drilling program planned for 2026 is currently underway at the Company's flagship RC Gold Project, located in Yukon Canada, where six diamond drill rigs are currently operating.
*For more detailed information on the Company's properties please visit our website at www.sitkagoldcorp.com.
Quality Assurance/Quality Control
On receipt from the drill site, the HTW/NTW-sized drill core was systematically logged for geological attributes, photographed and sampled at Sitka's core logging facility. Sample lengths as small as 0.3 m were used to isolate features of interest, otherwise a default 2 m downhole sample length was used. Each sample is identified by a unique sample tag number which is placed in the bag containing the core to be assayed. Core was cut in half lengthwise along a predetermined line, with one-half (same half, consistently) collected for analysis and one-half stored as a record. Standard reference materials, blanks and duplicate samples were inserted by Sitka personnel at regular intervals into the sample stream. Bagged samples were placed in secure bins to ensure integrity during transport. They were delivered by Sitka personnel or a contract expeditor to ALS Laboratories' preparatory facility in Whitehorse, Yukon, with analyses completed in North Vancouver.
ALS is accredited to ISO 17025:2005 UKAS ref. 4028 for its laboratory analysis. Samples were crushed by ALS to over 70 per cent passing below two millimetres and split using a riffle splitter. One-thousand-gram splits were pulverized to over 85 per cent passing below 75 microns. Gold determinations are by fire assay with an inductively coupled plasma atomic emission spectroscopy (ICP-AES) finish on 50 g subsamples of the prepared pulp (ALS code: Au-ICP-22). Any sample returning over 10 g/t gold was re-analyzed by fire assay with a gravimetric finish on a 50 g subsample (ALS code: Au-GRA21). In addition, a 51-element analysis was performed on a 0.5 g subsample of the prepared pulps by an aqua regia digestion followed by an inductively coupled plasma mass spectroscopy (ICP-MS) finish (ALS code: ME-MS41). Select intervals at the Rhosgobel Deposit were selected for additional XRF analysis on a lithium borate fusion (ALS code: XRF-15b) for WO3.
All other scientific and technical content of this news release has been reviewed and approved by Gilles Dessureau, P.Geo., V.P. Exploration of the Company, and a Qualified Person (QP) as defined by National Instrument 43-101.
ON BEHALF OF THE BOARD OF DIRECTORS OF
SITKA GOLD CORP.
"Cor Coe"
CEO and Director
For more information, please contact:
Sitka Gold Corp.
+1-604-979-0509
info@sitkagoldcorp.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary and Forward-Looking Statements
This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions and the Company's anticipated work programs.
These forward‐looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things, market uncertainty and the results of the Company's anticipated work programs.
Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial outlook that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/302502