Spanish Mountain Gold Expands Higher Grade Near Surface Mineralization Starting at 16 M Down the Hole Intersecting 40.7 M of 1.26 g/t Gold and Files Updated Preliminary Economic Assessment
A royalty buyback agreement accompanies drilling results and a potential larger-scale development option.
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Figure 1: Drill Collar Location Map. The figure illustrates the collar locations for drill holes reported in this news release. Section lines correspond to cross-sections presented in Figures 2 to 6. Collar coordinates are summarized in Table 2. (Drilling planned and currently underway for condemnation and at
Approximately 47,011 metres of a planned 60,000 metres 2026 Feasibility Drill Program have been completed to date. The Company is continuing to advance the Project turning its focus now towards the completion of the 60 km drill program and a potential MRE update by year end 2026, advancing the feasibility study to completion in H1, 2028 and a subsequent build decision. This news release presents assay results from holes 26-DH-1419 to 26-DH-1436, 26-DH-1438, 26-DH-1439 and 26-DH-1441, and commentary on the potential expanded production scale scenario outlined in Section 24 of the 2026 PEA. Results are pending for 49 drilled holes.
Drilling Highlights:
- 26-DH-1421 intersected 138.55 m of 0.50 g/t gold from 14.85 m, including 40.7 m of 1.26 g/t gold from 16.0 m.
- 26-DH-1429 intersected 174.0 m of 0.29 g/t gold from 51.0 m, including 43.0 m of 0.93 g/t gold from 51.0 m and 7.55m of 0.38 g/t gold from 138.3 m.
- 26-DH-1432 intersected 219.20 m of 0.29 g/t gold from 44.0 m, including 28.0 m of 0.96 g/t gold from 44.0 m.
- 26-DH-1434 intersected 241.0 m of 0.30 g/t gold from 44.0 m, including 68.0 m of 0.52 g/t gold from 44.0 m and 93.0m of 0.36 g/t gold from 192.0 m.
- 26-DH-1422, returned 155.0 m of 0.34 g/t gold from 161.0 m, including 86.07 m of 0.43 g/t gold from 170.0 m.
- 26-DH-1435 intersected 258.20 m of 0.29 g/t gold from 51.3 m, including 147.5 m of 0.41 g/t gold from 162.0 m.
Mike
These drill holes are part of the 2026 Feasibility Drill Program, initiated in March 2026 targeting infill drilling and resource expansion at the Main Deposit. Other drill programs to provide information on condemnation, geotechnical, metallurgy, geochemistry and groundwater will be used to support the Feasibility Study which is targeted for completion in H1 2028.
2026 PEA – Alternate Project Development Plan
The 2026 PEA update presents the potential for a larger scale pit with moderate conceptual footprint impacts that would contain approximately 348 Mt of mineralized mill feed at a grade of 0.39 g/t or 4.4 Moz from measured, indicated and inferred mineral resources. As the company works to complete its 60 km 2026 Exploration Drill Program and continues to optimize its mill flowsheet utilizing coarse particle flotation and associated mill throughput enhancements, it expects to assess this alternate case as part of the feasibility study underway (as filed on SEDAR+, November 6, 2026).
Peter Mah, President, CEO and Director commented, “We are very encouraged with the ongoing positive drill results reported in recent news releases. We see the potential for an even larger scale gold operation in a region of
Drill Results (Table 1)
Hole |
From (m) |
To (m) |
Length (m)* |
Gold Grade (g/t Au) |
26-DH-1419 |
28.07 |
75.00 |
46.93 |
0.30 |
Including |
45.90 |
75.00 |
29.10 |
0.43 |
26-DH-1420 |
No significant intercepts |
|||
26-DH-1421 |
14.85 |
153.40 |
138.55 |
0.50 |
Including |
16.00 |
56.70 |
40.70 |
1.26 |
26-DH-1422 |
47.40 |
51.83 |
4.43 |
0.77 |
26-DH-1422 |
161.00 |
316.00 |
155.00 |
0.34 |
Including |
170.00 |
256.07 |
86.07 |
0.43 |
26-DH-1423 |
36.00 |
48.00 |
12.00 |
0.30 |
26-DH-1424 |
167.00 |
176.00 |
9.00 |
0.36 |
Including |
167.00 |
168.35 |
1.35 |
1.90 |
26-DH-1425 |
5.50 |
21.00 |
15.50 |
0.33 |
26-DH-1425 |
52.00 |
109.00 |
57.00 |
0.25 |
26-DH-1425 |
152.40 |
222.30 |
69.90 |
0.24 |
Including |
152.40 |
161.00 |
8.60 |
0.46 |
Including |
210.50 |
222.30 |
11.80 |
0.92 |
26-DH-1426 |
43.00 |
150.60 |
107.60 |
0.21 |
Including |
88.00 |
91.20 |
3.20 |
0.70 |
Including |
145.40 |
150.60 |
5.20 |
0.64 |
26-DH-1427 |
5.50 |
49.00 |
43.50 |
0.45 |
Including |
23.90 |
36.00 |
12.10 |
1.01 |
26-DH-1427 |
198.30 |
204.00 |
5.70 |
0.64 |
26-DH-1428 |
173.46 |
176.20 |
2.74 |
0.98 |
26-DH-1428 |
280.58 |
288.18 |
7.60 |
0.69 |
26-DH-1429 |
51.00 |
225.00 |
174.00 |
0.29 |
Including |
51.00 |
94.00 |
43.00 |
0.93 |
Including |
138.30 |
145.85 |
7.55 |
0.38 |
26-DH-1430 |
108.00 |
121.65 |
13.65 |
0.38 |
26-DH-1430 |
212.00 |
222.00 |
10.00 |
0.98 |
26-DH-1431 |
68.00 |
103.35 |
35.35 |
0.37 |
Including |
68.00 |
72.65 |
4.65 |
0.82 |
Including |
92.00 |
103.35 |
11.35 |
0.69 |
26-DH-1432 |
44.00 |
263.20 |
219.20 |
0.29 |
Including |
44.00 |
72.00 |
28.00 |
0.96 |
Including |
126.00 |
130.00 |
4.00 |
1.16 |
Hole |
From (m) |
To (m) |
Length (m)* |
Gold Grade (g/t Au) |
26-DH-1433 |
283.00 |
287.00 |
4.00 |
0.41 |
26-DH-1433 |
416.00 |
418.00 |
6.67 |
3.34 |
26-DH-1434 |
44.00 |
285.00 |
241.00 |
0.30 |
Including |
44.00 |
112.00 |
68.00 |
0.52 |
Including |
192.00 |
285.00 |
93.00 |
0.36 |
26-DH-1435 |
51.30 |
309.50 |
258.20 |
0.29 |
Including |
162.00 |
309.50 |
147.50 |
0.41 |
26-DH-1436 |
78.00 |
82.00 |
4.00 |
2.62 |
26-DH-1436 |
194.00 |
256.00 |
62.00 |
0.19 |
26-DH-1438 |
44.00 |
239.00 |
195.00 |
0.27 |
including |
75.00 |
162.00 |
87.00 |
0.39 |
26-DH-1439 |
16.60 |
28.45 |
11.85 |
0.70 |
Including |
118.00 |
160.00 |
42.00 |
0.64 |
26-DH-1441 |
58.00 |
157.86 |
99.86 |
0.33 |
Including |
102.00 |
106.00 |
4.00 |
1.39 |
Including |
139.90 |
154.00 |
14.10 |
0.80 |
*Length is core length: True thickness is not determined. |
||||
Abbreviations: m = meters, g/t = grams per tonne, Au = gold |
||||
Table 2: Drill Collar Information
Hole ID |
Easting (mE) |
Northing (mN) |
Elev (m) |
Azimuth (°) |
Inclination (°) |
Depth (m) |
Core Size |
26-DH-1419 |
604,717 |
5,827,703 |
1,138 |
120.1 |
60.0 |
153 |
HQ3 |
26-DH-1420 |
603,808 |
5,827,749 |
1,171 |
109.8 |
60.0 |
314 |
HQ3 |
26-DH-1421 |
604,622 |
5,827,548 |
1,189 |
123.3 |
59.4 |
231 |
HQ3 |
26-DH-1422 |
604,099 |
5,827,747 |
1,199 |
119.9 |
64.9 |
357 |
HQ3 |
26-DH-1423 |
604,725 |
5,827,673 |
1,139 |
120.2 |
59.9 |
114 |
HQ3 |
26-DH-1424 |
603,808 |
5,827,749 |
1,171 |
110.1 |
50.1 |
375 |
HQ3 |
26-DH-1425 |
604,137 |
5,827,604 |
1,223 |
120.2 |
70.1 |
315 |
HQ3 |
26-DH-1426 |
604,649 |
5,827,819 |
1,119 |
120.1 |
59.9 |
201 |
HQ3 |
26-DH-1427 |
604,088 |
5,827,619 |
1,215 |
119.8 |
69.9 |
282 |
HQ3 |
26-DH-1428 |
603,805 |
5,827,751 |
1,179 |
50.0 |
55.0 |
371 |
HQ3 |
26-DH-1429 |
604,603 |
5,827,840 |
1,124 |
120.2 |
60.0 |
228 |
HQ3 |
26-DH-1430 |
604,053 |
5,827,631 |
1,209 |
119.9 |
70.0 |
273 |
HQ3 |
26-DH-1431 |
604,578 |
5,827,866 |
1,120 |
121.6 |
59.9 |
240 |
HQ3 |
26-DH-1432 |
604,406 |
5,827,508 |
1,232 |
123.3 |
64.9 |
282 |
HQ3 |
26-DH-1433 |
603,737 |
5,827,735 |
1,169 |
113.2 |
64.9 |
449 |
HQ3 |
26-DH-1434 |
604,619 |
5,827,764 |
1,135 |
128.2 |
61 |
200 |
HQ3 |
26-DH-1435 |
604,445 |
5,827,464 |
1,249 |
117.6 |
64.3 |
369 |
HQ3 |
26-DH-1436 |
604,417 |
5,827,467 |
1,249 |
120.1 |
61.1 |
264 |
HQ3 |
26-DH-1438 |
604,524 |
5,827,720 |
1,159 |
120.1 |
60.0 |
240 |
HQ3 |
26-DH-1439 |
604,435 |
5,827,450 |
1,253 |
120.1 |
61.0 |
300 |
HQ3 |
26-DH-1441 |
604,551 |
5,827,709 |
1,159 |
119.9 |
60.0 |
255 |
HQ3 |
Collar coordinates and hole depths to be confirmed upon final survey data entry. Abbreviations: metres = m, Collar coordinates Datum: UTM NAD83 Zone 10N
Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC)
Drill core is received daily from the rigs and logged for recovery, RQD, lithology, alteration, mineralization and vein style and intensity before samples are marked for cutting, with core photography being done to capture the marked sample intervals. The entire holes are sampled, with core sawn in half and samples labeled and bagged. The remaining half core is stored on-site. Numbered security tags are applied to sample shipments to ensure chain of custody compliance. The Company inserts quality control (QC) samples at regular intervals to monitor laboratory performance, including blanks, certified reference materials and duplicates. Standards, blanks, preparation and field duplicates account for a minimum of
The data verification process involves a multi-step approach to ensure accuracy and integrity. This includes a detailed quality control (QC) analysis of the data, which is performed using both internal and external platforms, such as the MxDeposit™ software. The QC checks involve monitoring the results of analyses of certified reference materials (CRMs), blanks, and duplicates to confirm the reliability of the assay results. In addition, inspection of the specific drill intervals mentioned in this release has been conducted to directly observe the geological features and verify the nature of the results presented.
Drill core samples were submitted to MSALABS's analytical facility in
PhotonAssay™
The PhotonAssay™ method utilizes gamma ray analysis for gold detection using the Chrysos PhotonAssay™ instrument (PA1408X). This non-destructive, fully automated technique offers high accuracy for analyzing ores and pulps. Sample preparation begins with drying and crushing up to 1 kg of material to achieve at least
Spanish Mountain Gold implemented Photon assaying after conducting two QAQC methodologies to validate the accuracy of PhotonAssay™ results, both demonstrating good comparability: 1) comparative analysis of diverse mineralization styles using Total Au screen metallic methods with both MSA code FAS-415 (gravimetric finish) and FAS-211 (AAS finish), and 2) comprehensive testing of both sample aliquots and rejects using FAS-211 (AAS finish).
Multi-Elemental Analysis
For the 2026 drilling campaign, Spanish Mountain Gold routinely obtains multi-element determinations using a four-acid digestion followed by ICP-OES and ICP-MS analysis (MSA code IMS-230).
NSR Buy Back
The Company is also pleased to report that it has entered into an agreement (“Buy Back Agreement”) to buy back a portion of the net smelter interest that was originally granted to Robert Mickle (the “Mickle NSR”). The Mickle NSR is a
The first closing is expected to occur on November 10, 2026. Following the purchase of the additional interest from the vendor in the second closing, the Company will have the right to buydown the remaining Mickle NSR royalty to .
Qualified Person
Michael
About Spanish Mountain Gold Ltd.
Spanish Mountain Gold Ltd. is focused on advancing its
The Company is seeking new ways to achieve optimal financial outcomes that are safer, minimize environmental impact and create meaningful sustainability for communities, which the Company terms “The Relentless Pursuit of Better Gold”. For more information on Spanish Mountain Gold, please visit the Company's website: www.spanishmountaingold.com or the Company’s profile on www.sedarplus.ca.
On Behalf of the Board,
“Peter Mah”
President, Chief Executive Officer and Director
Spanish Mountain Gold Ltd.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
FORWARD-LOOKING INFORMATION:
Certain of the statements and information in this press release constitute "forward-looking information". Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and includes but is not limited to information with respect to exploration drilling extending gold mineralization, the potential to reduce waste stripping requirements and support enhancements to the 10-year mine plan, the potential production scale upside, the receipt of the two remaining instalments from the sale of the
View source version on businesswire.com: https://www.businesswire.com/news/home/20261109457634/en/
For more information, contact:
Peter Mah
(604) 601-3651
info@spanishmountaingold.com
Source: Spanish Mountain Gold Ltd.