Spanish Mountain Gold Expands Near Surface Mineralization Intersecting 295.50 Metres of 0.54 G/T Gold Including a Higher Grade Interval of 107.00 Meters of 0.93 G/T Gold as Part of Its Feasibility Study Drill Program
The highlighted gold intersections begin at drill depths ranging from 8.85 metres to 41.00 metres.
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Figure 1: Drill Collar Location Map. The figure illustrates the collar locations for 28 drill holes reported in this news release. Section lines correspond to cross-sections presented in Figures 2 to 4. Collar coordinates are summarized in Table 2.
Approximately 33,353 metres of a planned 60,000 m 2026 Feasibility Drill Program has been completed to date. This news release presents assay results from holes 26-DH-1391 to 26-DH-1418. Results are pending for 25 additional drill holes.
Highlights:
- 26-DH-1414 intersected 295.5 m of 0.54 g/t gold from 41.0 m, including 107.0 m of 0.93 g/t gold from 170.0 m.
- 26-DH-1408 intersected 152.65 m of 0.52 g/t gold from 8.85 m, including 47.93 m of 1.03 g/t gold from 35.0 m.
- 26-DH-1399 intersected 118.0 m of 0.55 g/t gold from 18.0 m, including a higher-grade interval of 25.0 m of 1.35 g/t gold from 68.0 m.
- 26-DH-1391, returned 340.00 m of 0.36 g/t gold from 14.00 m, including 48.0 m of 0.64 g/t gold from 14.00 m and 146.0 m of 0.54 g/t gold from 174.0 m.
These drill holes are part of the 2026 Feasibility Drill Program, initiated in March 2026 targeting infill drilling and resource expansion at the Main Deposit. Other drill programs to provide information on condemnation, geotechnical, metallurgy, geochemistry and ground water will be used to support the Feasibility Study which is targeted for completion in H1 2028.
Drill Results (Table 1)
Hole |
From (m) |
To (m) |
Length (m)* |
Gold Grade (g/t Au) |
26-DH-1391 |
14.00 |
354.00 |
340.00 |
0.36 |
including |
14.00 |
62.00 |
48.00 |
0.64 |
including |
119.35 |
127.00 |
7.65 |
0.41 |
including |
174.00 |
320.00 |
146.00 |
0.54 |
26-DH-1392 |
31.80 |
38.75 |
6.95 |
0.31 |
and |
56.20 |
84.00 |
27.80 |
0.50 |
including |
75.00 |
84.00 |
9.00 |
1.20 |
26-DH-1393 |
61.27 |
113.00 |
51.73 |
0.20 |
including |
79.97 |
113.00 |
33.03 |
0.24 |
26-DH-1394 |
150.00 |
284.00 |
134.00 |
0.22 |
including |
236.00 |
284.00 |
48.00 |
0.44 |
26-DH-1395 |
38.00 |
154.10 |
116.10 |
0.32 |
including |
38.00 |
55.00 |
17.00 |
0.98 |
26-DH-1396 |
31.55 |
78.50 |
46.95 |
0.48 |
including |
31.55 |
41.85 |
10.30 |
1.06 |
including |
59.00 |
78.50 |
19.50 |
0.53 |
26-DH-1397 |
46.00 |
117.00 |
71.00 |
0.32 |
including |
55.10 |
57.00 |
1.90 |
1.00 |
including |
84.30 |
93.00 |
8.70 |
1.21 |
26-DH-1398 |
36.40 |
114.95 |
78.55 |
0.50 |
including |
36.40 |
44.50 |
8.10 |
1.42 |
including |
67.00 |
96.95 |
29.95 |
0.82 |
26-DH-1399 |
18.00 |
136.00 |
118.00 |
0.55 |
including |
68.00 |
93.00 |
25.00 |
1.35 |
including |
135.00 |
136.00 |
1.00 |
7.48 |
26-DH-1400 |
24.00 |
159.00 |
135.00 |
0.32 |
including |
24.00 |
39.00 |
15.00 |
1.61 |
26-DH-1401 |
30.85 |
50.80 |
19.95 |
0.24 |
including |
30.85 |
36.00 |
5.15 |
0.64 |
26-DH-1402 |
43.70 |
47.80 |
4.10 |
0.45 |
26-DH-1403 |
7.00 |
102.75 |
95.75 |
0.33 |
including |
54.00 |
57.30 |
3.30 |
2.30 |
including |
72.70 |
102.75 |
30.05 |
0.53 |
26-DH-1404 |
58.00 |
66.00 |
8.00 |
0.37 |
26-DH-1405 |
34.00 |
114.00 |
80.00 |
0.23 |
including |
80.65 |
114.00 |
33.35 |
0.42 |
including |
82.00 |
91.00 |
9.00 |
0.80 |
Hole |
From (m) |
To (m) |
Length (m)* |
Gold Grade (g/t Au) |
26-DH-1406 |
32.25 |
142.65 |
110.40 |
0.38 |
including |
76.50 |
135.00 |
58.50 |
0.61 |
including |
133.50 |
135.00 |
1.50 |
3.06 |
26-DH-1407 |
52.00 |
144.05 |
92.05 |
0.34 |
including |
73.00 |
112.00 |
39.00 |
0.55 |
26-DH-1408 |
8.85 |
161.50 |
152.65 |
0.52 |
including |
8.85 |
108.12 |
99.27 |
0.73 |
26-DH-1409 |
19.00 |
111.65 |
92.65 |
0.32 |
including |
64.00 |
111.65 |
47.65 |
0.47 |
26-DH-1410 |
90.00 |
100.55 |
10.55 |
0.83 |
including |
91.30 |
96.80 |
5.50 |
1.40 |
26-DH-1411 |
36.00 |
120.00 |
81.00 |
0.47 |
including |
36.00 |
88.40 |
52.40 |
0.65 |
26-DH-1412 |
4.50 |
191.65 |
187.15 |
0.28 |
including |
118.00 |
160.00 |
42.00 |
0.64 |
26-DH-1413 |
53.50 |
70.00 |
16.50 |
0.71 |
and |
150.80 |
158.00 |
7.20 |
0.26 |
and |
182.00 |
211.60 |
29.60 |
0.33 |
26-DH-1414 |
41.00 |
336.50 |
295.50 |
0.54 |
including |
170.00 |
277.00 |
107.00 |
0.93 |
including |
308.75 |
316.60 |
7.85 |
1.18 |
26-DH-1415 |
102.00 |
110.00 |
8.00 |
0.44 |
and |
141.50 |
172.00 |
30.50 |
0.45 |
and |
248.00 |
344.00 |
96.00 |
0.39 |
26-DH-1416 |
28.05 |
32.80 |
4.75 |
0.62 |
and |
45.60 |
48.00 |
2.40 |
0.36 |
and |
90.10 |
127.00 |
36.90 |
0.41 |
26-DH-1417 |
34.00 |
69.00 |
35.00 |
0.26 |
including |
38.20 |
61.70 |
23.50 |
0.31 |
26-DH-1418 |
21.80 |
57.50 |
35.70 |
0.40 |
including |
21.80 |
42.75 |
20.95 |
0.56 |
and |
114.00 |
117.00 |
3.00 |
0.46 |
and |
138.00 |
156.00 |
18.00 |
0.30 |
and |
222.20 |
334.00 |
111.80 |
0.34 |
including |
222.20 |
245.30 |
21.80 |
0.92 |
including |
228.00 |
244.00 |
16.00 |
1.16 |
including |
263.20 |
272.00 |
8.80 |
0.73 |
*True thickness is not determined.
Abbreviations: m = meters, g/t = grams per tonne, Au = gold
Table 2: Drill Collar Information
Hole ID |
East |
North |
Elev (m) |
Azimuth (°) |
Inclination (°) |
Depth (m) |
Bit Size |
26-DH-1391 |
604181 |
5827705 |
1214 |
120.0 |
60.1 |
360 |
HQ |
26-DH-1392 |
604219 |
5827598 |
1229 |
121.8 |
65.9 |
300 |
HQ |
26-DH-1393 |
604594 |
5827751 |
1145 |
119.8 |
60.2 |
225 |
HQ |
26-DH-1394 |
604084 |
5827671 |
1212 |
120.0 |
60.0 |
297 |
HQ |
26-DH-1395 |
604559 |
5827778 |
1142 |
119.8 |
59.9 |
243 |
HQ |
26-DH-1396 |
604691 |
5827597 |
1167 |
119.9 |
65.1 |
168 |
HQ |
26-DH-1397 |
604672 |
5827636 |
1159 |
120.1 |
59.9 |
246 |
HQ |
26-DH-1398 |
604661 |
5827613 |
1168 |
119.9 |
65.1 |
170 |
HQ |
26-DH-1399 |
604639 |
5827631 |
1169 |
119.9 |
65.0 |
193 |
HQ |
26-DH-1400 |
604652 |
5827594 |
1175 |
119.8 |
65.0 |
201 |
HQ |
26-DH-1401 |
604743 |
5827627 |
1150 |
119.9 |
59.9 |
123 |
HQ |
26-DH-1402 |
604708 |
5827641 |
1151 |
120.0 |
60.1 |
150 |
HQ |
26-DH-1403 |
604618 |
5827701 |
1152 |
120.0 |
60.2 |
210 |
HQ |
26-DH-1404 |
603948 |
5827700 |
1190 |
120.0 |
65.0 |
236 |
HQ |
26-DH-1405 |
605645 |
5287696 |
1151 |
120.1 |
59.9 |
195 |
HQ |
26-DH-1406 |
604659 |
5827517 |
1190 |
119.9 |
64.9 |
178 |
HQ |
26-DH-1407 |
604583 |
5827680 |
1160 |
120.0 |
59.9 |
198 |
HQ |
26-DH-1408 |
604611 |
5827523 |
1199 |
120.1 |
65.1 |
222 |
HQ |
26-DH-1409 |
604627 |
5827658 |
1161 |
119.9 |
60.0 |
192 |
HQ |
26-DH-1410 |
603950 |
5827703 |
1190 |
74.8 |
37.3 |
357 |
HQ |
26-DH-1411 |
604625 |
5827581 |
1180 |
120.0 |
60.1 |
201 |
HQ |
26-DH-1412 |
604525 |
5827698 |
1172 |
119.8 |
65.1 |
213 |
HQ |
26-DH-1413 |
603964 |
5827724 |
1188 |
156.1 |
67.0 |
263 |
HQ |
26-DH-1414 |
604250 |
5827714 |
1191 |
119.9 |
60.1 |
366 |
HQ |
26-DH-1415 |
604093 |
5827925 |
1135 |
120.0 |
65.0 |
345 |
HQ |
26-DH-1416 |
604022 |
5827618 |
1219 |
109.8 |
59.8 |
305 |
HQ |
26-DH-1417 |
604719 |
5827703 |
1134 |
119.2 |
60.3 |
150 |
HQ |
26-DH-1418 |
604183 |
5827870 |
1147 |
120.0 |
65.1 |
386 |
HQ |
Collar coordinates and hole depths to be confirmed upon final survey data entry. Abbreviations: metres = m, Collar coordinates Datum: UTM NAD83 Zone 10N
Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC)
Drill core is received daily from the rigs and logged for recovery, RQD, lithology, alteration, mineralization and vein style and intensity before samples are marked for cutting, with core photography being done to capture the marked sample intervals. The entire holes are sampled, with core sawn in half and samples labeled and bagged. The remaining half core is securely stored on-site. Numbered security tags are applied to sample shipments to ensure chain of custody compliance. The Company inserts quality control (QC) samples at regular intervals, including blanks and certified reference materials and duplicates, to monitor laboratory performance. Standards, blanks, preparation and field duplicates account for a minimum of
The data verification process involves a multi-step approach to ensure accuracy and integrity. This includes a detailed quality control (QC) analysis of the data, which is performed using both internal and external platforms, such as the MxDeposit™ software. The QC checks involve monitoring the results of analyses of certified reference materials (CRMs), blanks, and duplicates to confirm the reliability of the assay results. In addition, a field inspection of the specific drill intervals mentioned in this release has been conducted to directly observe the geological features and verify the nature of the results presented.
Drill core samples were submitted to MSALABS's analytical facility in
PhotonAssay™
The PhotonAssay™ method utilizes gamma ray analysis for gold detection using the Chrysos PhotonAssay™ instrument (PA1408X). This non-destructive, fully automated technique offers high accuracy for analyzing ores and pulps. Sample preparation begins with drying and crushing up to 1 kg of material to achieve at least
Spanish Mountain Gold implemented two QAQC methodologies to validate the accuracy of PhotonAssay™ results, both demonstrating good comparability: 1) comparative analysis of diverse mineralization styles using Total Au screen metallic methods with both MSA code FAS-415 (gravimetric finish) and FAS-211 (AAS finish), and 2) comprehensive testing of both sample aliquots and rejects using FAS-211 (AAS finish).
Multi-Elemental Analysis
For the 2026 drilling campaign, Spanish Mountain Gold used the MSA code IMS-230 method to provide multi-element determination using a four-acid digestion followed by ICP-OES and ICP-MS analysis.
Qualified Person
Dr. Mathew Ball, Ph.D., P.Geo., Mine Exploration Manger for Spanish Mountain Gold, is the Qualified Person as defined under National Instrument 43-101 who has reviewed the technical information in this news release and has approved the content for dissemination.
About Spanish Mountain Gold Ltd.
Spanish Mountain Gold Ltd. is focused on advancing its
The Company is seeking new ways to achieve optimal financial outcomes that are safer, minimize environmental impact and create meaningful sustainability for communities, which the Company terms “The Relentless Pursuit of Better Gold”. For more information on Spanish Mountain Gold, please visit the Company's website: www.spanishmountaingold.com or the Company’s profile on www.sedarplus.ca.
On Behalf of the Board,
"Peter Mah"
President, Chief Executive Officer and Director
Spanish Mountain Gold Ltd.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
FORWARD-LOOKING INFORMATION:
Certain of the statements and information in this press release constitute "forward-looking information". Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and includes but is not limited to information with respect to exploration drilling extending gold mineralization relating to the potential to enhance the proposed life-of-mine, the receipt of the two remaining instalments from the sale of the
View source version on businesswire.com: https://www.businesswire.com/news/home/20261008547299/en/
For more information, contact:
Peter Mah
(604) 601-3651
info@spanishmountaingold.com
Source: Spanish Mountain Gold Ltd.