STOCK TITAN

STLLR Gold Intersects 12.46 g/t Au over 16.17 m and 18.62 g/t Au over 5.30 m at the Jonpol Deposit of the Tower Gold Project and Provides Exploration Plans for the Remainder of 2026

(Neutral)
(Neutral)
Tags

STLLR Gold (OTCQX: STLRF) reported final 2026 drilling assays from the Jonpol Deposit at the Garrison Property, part of the Tower Gold Project in Ontario. Highlight intercepts include 12.46 g/t Au (cut 12.10 g/t) over 16.17 m and 18.62 g/t Au (cut 15.14 g/t) over 5.30 m, with reported true thicknesses of 7.99 m and 3.44 m, respectively.

The company also released detailed intercept and collar data for holes MGA26-278 to MGA26-285 and outlined plans to complete approximately 15,000 m of additional drilling in 2026 at the Jonpol, 903, and Garrcon deposits, targeting resource conversion and potential inclusion in an updated Tower Mineral Resource Estimate.

Loading...
Loading translation...

Positive

  • Jonpol highlight intercept: 12.46 g/t Au (12.10 g/t cut) over 16.17 m (7.99 m TT)
  • Second highlight intercept: 18.62 g/t Au (15.14 g/t cut) over 5.30 m (3.44 m TT)
  • Multiple additional Jonpol intercepts up to 14.82 g/t Au over 3.39 m
  • Planned 15,000 m of additional 2026 drilling at Jonpol, 903 and Garrcon
  • Intercepts calculated with 0.30 g/t Au cut-off and 25 g/t Au cap
  • Use of ISO 17025 accredited ALS and independent QA/QC supports data reliability

Negative

  • None.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Toronto, Ontario--(Newsfile Corp. - August 10, 2026) - STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) ("STLLR" or the "Company") reports final assay results at the Jonpol Deposit ("Jonpol") at the Garrison Property and exploration plans at the Tower Gold Project ("Tower" or the "Project") in the Timmins Mining Camp in Ontario, Canada for the remainder of 2026.

Table 1: 2026 Jonpol Deposit Drilling Highlights:

ZoneHole IDAssay Result
JonpolMGA26-28112.46 g/t Au (12.10 g/t Au, cut) over 16.17 m (7.99 m TT)
JonpolMGA26-28218.62 g/t Au (15.14 g/t Au, cut) over 5.30 m (3.44 m TT)

 

"g/t Au" = grams per tonne gold; "m" = metres; "TT" = True Thickness

"We concluded first-half 2026 drilling at Jonpol with high-grade gold intersections and robust metal factors, potentially expanding the known mineralization and increasing confidence in the block model," said Keyvan Salehi, P.Eng., MBA, President, CEO, and Director of STLLR Gold. "Based on these strong results, we plan to continue drilling Jonpol alongside the 903 and Garrcon deposits at the Garrison Property of Tower for the remainder of the year."

Jonpol Deposit Drilling (See Figures 1-4 for Diagrams; See Tables 1-3 for Assays and Drill Details)

The Jonpol Deposit is situated in the Garrison Property at the eastern end of Tower (see Figure 1) along the Munro Fault, a splay from the regional Destor-Porcupine Fault Zone ("DPFZ"). Mineralization is hosted in structurally controlled alteration zones within mafic to ultramafic rocks and gold mineralization is closely associated with felsic intrusive rocks.

Tower Exploration Plans for Rest of 2026

The Company plans to complete approximately 15,000 m of drilling during the remainder of 2026, targeting the Jonpol, 903, and Garrcon deposits at Tower's Garrison Property. The drill program is focused on converting estimated inferred mineral resources to higher confidence categories and expand the higher-grade gold mineralization for potential incorporation into an updated Tower Mineral Resource Estimate ("Tower MRE").1

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4852/308814_e063a111a4a5ca00_001.jpg

Figure 1: Tower Gold Project - Drill Location Map

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4852/308814_e063a111a4a5ca00_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4852/308814_e063a111a4a5ca00_002.jpg

Figure 2: Jonpol Deposit - Drilling Results Map

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4852/308814_e063a111a4a5ca00_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4852/308814_e063a111a4a5ca00_003.jpg

Figure 3: Jonpol Deposit - Drilling Cross Section "A-B" Looking Northeast

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4852/308814_e063a111a4a5ca00_003full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4852/308814_e063a111a4a5ca00_004.jpg

Figure 4: Jonpol Deposit - Drilling Cross Section "C-D" Looking Northeast

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4852/308814_e063a111a4a5ca00_004full.jpg

Table 2: Drilling Intercepts

TargetHole IDFrom (m)To (m)Interval (m)TT (m)Grade
(g/t Au)
Metal Factor
(g/t Au x m)
JonpolMGA26-27890.2096.005.802.629.1452.99
Jonpolincl.90.2093.593.391.5314.8250.23
Jonpoland121.76128.536.773.060.805.43
JonpolMGA26-27951.2552.861.611.031.372.21
Jonpoland63.1670.357.194.605.5740.05
Jonpolincl.66.6769.703.031.9411.4434.67
JonpolMGA26-28015.8216.550.730.573.112.27
Jonpoland26.2028.702.501.960.952.38
Jonpoland34.5046.0411.549.060.849.66
Jonpoland51.5053.632.131.681.002.12
JonpolMGA26-281222.20238.3716.177.9912.10195.60
Jonpoluncut222.20238.3716.177.9912.46201.50
Jonpoland260.42265.404.982.452.9014.42
Jonpolincl.262.33264.562.231.105.4312.11
Jonpoland286.12288.722.601.290.391.02
JonpolMGA26-282247.00252.305.303.4415.1480.24
Jonpoluncut247.00252.305.303.4418.6298.67
JonpolMGA26-283144.60152.007.404.152.2416.58
Jonpolincl.144.60146.001.400.788.8612.41
Jonpoland157.10159.001.901.074.528.59
Jonpoland179.00182.003.001.720.611.82
Jonpoland241.00242.001.000.591.291.29
JonpolMGA26-284164.00166.002.001.211.152.30
Jonpoland204.45205.250.800.484.373.50
Jonpoland246.00250.004.002.470.301.19
JonpolMGA26-285222.28226.934.652.631.215.62
Jonpolincl.225.46226.160.700.405.003.50

 

Table 3: Drill Hole Details

ZoneHole IDEastingNorthingElevationAzimuthInclin.Depth (m)
JonpolMGA26-278577321.435374011.65300.11335.13-70.08206.49
JonpolMGA26-279577321.255374011.89300.24334.87-56.99171.00
JonpolMGA26-280577310.995374015.78300.85340.02-45.04150.00
JonpolMGA26-281A577281.625374179.94302.75146.05-56.1269.00
JonpolMGA26-281577281.715374180.32303.31145.99-59.06300.00
JonpolMGA26-282577338.765374263.35298.10163.09-47.18312.00
JonpolMGA26-283577397.655374223.43293.75145.25-52.10274.00
JonpolMGA26-284577383.865374250.79294.82150.06-49.96327.00
JonpolMGA26-285577384.225374251.27294.84148.20-54.90372.00

 

Quality Control Procedures

NQ drill core is oriented and cut with half sent to ALS Laboratories Inc. (ALS) for drying and crushing to -2 mm, with a 1.00 kg split pulverized to -75 µm (200#). ALS is an ISO 17025 accredited laboratory. A 50 g charge is Fire Assayed and analyzed using an AAS finish for Gold. Samples above 10.00 g/t Au are analyzed by Fire Assay with a gravimetric finish and selected samples with visible gold or high-grade mineralization are assayed by Metallic Screen Fire Assay on a 1.00 kg sample. STLLR inserts independent certified reference material and blanks with the samples and assays routine pulp repeats, as well as completing routine third-party check assays.

True thickness ("TT") was calculated in Leapfrog Geo, perpendicular to the interpreted plane of mineralization using the dip and dip azimuth of the mineralized zones. All intercepts are calculated using a 0.30 g/t Au cut-off, a maximum of 5 m internal dilution and 25 g/t Au cap applied.

Qualified Person

John McBride, MSc., P.Geo., Vice President of Exploration for STLLR, who is the "Qualified Person" as defined by NI 43-101 for this Project, has reviewed and approved of the technical disclosure contained in this news release.

About STLLR Gold

STLLR Gold Inc. is a Canadian gold development company actively advancing high-potential gold projects in Canada: The Tower Gold Project and the Hollinger Tailings Project in the Timmins Mining Camp in Ontario and the Colomac Gold Project located north of Yellowknife, Northwest Territories. Tower and Colomac have the potential to become large-scale, long-life operations and are surrounded by exploration land with favourable upside potential. Hollinger has the potential for near-term value creation. STLLR's experienced management team, with a track record of successfully advancing projects and operating mines, is working towards rapidly advancing these projects.

Contact Us

STLLR Gold Investor Relations
+1 (416) 863-2105 | investors@stllrgold.com | www.STLLRgold.com

Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to the large-scale, long-life potential advancement of Tower and Colomac, the value potential of Hollinger, and economic opportunities that are derived from future exploration at the Tower Gold Project, the expansion and conversion of mineral resources (including higher than average resource grades), the increase in confidence in the block model of the Tower MRE, and the completion of 15,000 m of drilling during the remainder of 2026. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "accelerate", "add" or "additional", "advancing", "anticipates" or "does not anticipate", "appears", "believes", "can be", "conceptual", "confidence", "continue", "convert" or "conversion", "deliver", "demonstrating", "estimates", "encouraging", "expand" or "expanding" or "expansion", "expect" or "expectations", "fast-track", "forecasts", "forward", "goal", "improves", "increase", "intends", "justification", "leading", "plans", "potential" or "potentially", "pro-forma", "promise", "prospective", "prioritize", "reflects", "re-rating", "robust", "scheduled", "stronger", "suggesting" or "suggests", "support", "updating", "upside", "will be" or "will consider", "work towards", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", or "will be taken", "occur", or "be achieved".

Forward-looking information is based on the opinions and estimates of management at the date the information is made, and is based on a number of assumptions and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of STLLR to be materially different from those expressed or implied by such forward-looking information, including risks associated with required regulatory approvals, the exploration, development and mining such as economic factors as they effect exploration, future commodity prices, changes in foreign exchange and interest rates, global inflationary pressures, actual results of current exploration activities, government regulation, political or economic developments, the ongoing wars and their effect on supply chains, tariffs, environmental risks, pandemic risks, permitting timelines, capex, operating or technical difficulties in connection with development activities, employee relations, the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of reserves, contests over title to properties, and changes in project parameters as plans continue to be refined as well as those risk factors discussed in the Company's Annual Information Form for the year ended December 31, 2025, available on www.sedarplus.ca. Although STLLR has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. STLLR does not undertake to update any forward-looking information, except in accordance with applicable securities laws.


1  For more information on the Tower PEA and Tower MRE, please review the NI 43-101 Technical Report with an issue date of June 30, 2025 titled "Preliminary Economic Assessment NI 43-101 Technical Report Tower Gold Project Ontario, Canada" on SEDAR+ www.sedarplus.ca or the Company website at www.stllrgold.com.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/308814

FAQ

What drilling results did STLLR Gold (STLRF) report from the Jonpol Deposit on August 10, 2026?

STLLR Gold reported highlight intercepts of 12.46 g/t Au over 16.17 m and 18.62 g/t Au over 5.30 m at Jonpol. According to STLLR Gold, these intervals have true thicknesses of 7.99 m and 3.44 m and include both cut and uncut assay values.

How many metres will STLLR Gold drill at the Tower Gold Project in the rest of 2026?

STLLR Gold plans approximately 15,000 m of additional drilling at the Tower Gold Project for the remainder of 2026. According to STLLR Gold, drilling will target the Jonpol, 903 and Garrcon deposits to convert inferred resources and expand higher-grade mineralization.

What is the significance of the 12.46 g/t Au over 16.17 m intercept for STLLR Gold (STLRF) investors?

The intercept of 12.46 g/t Au over 16.17 m provides a high-grade interval with a metal factor above 200 g/t x m uncut. According to STLLR Gold, this result may help expand known mineralization and increase confidence in the Jonpol block model.

Which drill holes delivered the best gold grades at Jonpol in STLLR Gold’s 2026 program?

Holes MGA26-281 and MGA26-282 returned the strongest headline results, including 12.46 g/t Au over 16.17 m and 18.62 g/t Au over 5.30 m. According to STLLR Gold, several other holes reported grades above 9 g/t Au over shorter intervals.

What are STLLR Gold’s exploration objectives at the Jonpol, 903 and Garrcon deposits in 2026?

STLLR Gold aims to convert inferred mineral resources to higher-confidence categories and expand higher-grade mineralization at Jonpol, 903 and Garrcon. According to STLLR Gold, the 15,000 m drill program is intended to support a potential updated Tower Mineral Resource Estimate.

How does STLLR Gold ensure assay quality and QA/QC for the Tower Gold Project drilling?

Assays are completed by ISO 17025 accredited ALS using fire assay with AAS or gravimetric finishes. According to STLLR Gold, the company inserts certified reference materials, blanks, pulp repeats and third-party check assays, and applies cut-offs, dilution limits and capping when calculating intercepts.