Skyharbour Completes Majority Earn-In and Forms Joint-Venture with Rio Tinto at Russell Lake Uranium Project in the Athabasca Basin
Rhea-AI Summary
Skyharbour Resources has completed its earn-in requirements to acquire a 51% interest in the Russell Lake Uranium Project in Northern Saskatchewan, forming a joint venture with Rio Tinto. The company achieved this by paying CAD $508,200, issuing 3,584,014 common shares, and incurring $5,717,250 in exploration expenditures over 3 years.
The Russell Lake Project spans 73,294 hectares and is strategically located between key uranium projects. Recent drilling success includes a notable discovery at the Fork Target area, with hole RSL24-02 returning 0.721% U3O8 over 2.5 metres. Skyharbour is planning a fall drill program of 4,000-5,000m to follow up on recent discoveries.
Positive
- Completed 51% ownership acquisition in Russell Lake Uranium Project
- Strategic location between major uranium projects with existing infrastructure
- Significant uranium discovery with hole RSL24-02 yielding 0.721% U3O8 over 2.5m
- Fully funded for upcoming 4,000-5,000m fall drill program
Negative
- None.
News Market Reaction – SYHBF
On the day this news was published, SYHBF declined 4.83%, reflecting a moderate negative market reaction.
Data tracked by StockTitan Argus on the day of publication.
Vancouver, BC, Oct. 23, 2024 (GLOBE NEWSWIRE) -- Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt: SC1P) (the “Company”) is pleased to announce that it has completed its earn-in requirements to earn a
Russell Lake Project Location Map:
http://www.skyharbourltd.com/_resources/images/SKY-RussellLake-20220325-Inset.jpg
Formation of the JV:
Pursuant to the Agreement, Skyharbour has now earned a
Russell Lake Uranium Project Overview:
The Russell Lake Project is a large, advanced-stage uranium exploration property totalling 73,294 hectares strategically located between Cameco’s Key Lake and McArthur River Projects and adjoining Denison’s Wheeler River Project to the west and Skyharbour’s Moore Uranium Project to the east. The northern extension of Highway 914 between Key Lake and McArthur River runs through the western extent of the Property and greatly enhances accessibility, while a high-voltage powerline is situated alongside this road and the western edge of the property south of Key Lake. Skyharbour’s acquisition of a majority interest in Russell Lake creates a large, nearly contiguous block of highly prospective uranium claims totalling 108,999 hectares between the Russell Lake and the Moore uranium projects. Skyharbour now has a
There has been historical exploration carried out at Russell Lake, however most of it was conducted before 2010 prior to the discovery of several major deposits in/around the Athabasca Basin. In 2023, Skyharbour’s inaugural diamond drilling program tested several Fox Lake Trail targets and the Grayling Zone. Significant uranium mineralization was intersected in the majority of holes at the Grayling Zone over a strike length exceeding one kilometre. Drill hole RSL23-01 intersected one of the better drill results from the project, returning a 5.9 metre wide intercept of
More recently, Skyharbour completed 5,152 metres of drilling in a 2024 winter drill program earlier this year, making a new discovery at the newly identified Fork Target area. Hole RSL24-02 marks the best intercept of uranium mineralization historically at the project, returning a 2.5 metre wide intercept of
Several notable exploration targets exist on the property including the Grayling Zone, the M-Zone Extension target, the Little Man Lake target, the Christie Lake target, the Fox Lake Trail target and the newly identified Fork Zone target. More than 35 kilometres of largely untested prospective conductors in areas of low magnetic intensity also exist on the Property.
Qualified Person:
The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by David Billard, P.Geo., a Consulting Geologist for Skyharbour as well as a Qualified Person. Mr. Billard has verified the data disclosed, which includes a review of the sampling, analytical and test data underlying the information and opinions contained herein.
About Skyharbour Resources Ltd.:
Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with twenty-nine projects, ten of which are drill-ready, covering over 580,000 hectares (over 1.4 million acres) of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a
Skyharbour also has joint-ventures with industry-leader Orano Canada Inc., Azincourt Energy and Thunderbird Resources (previously Valor) at the Preston, East Preston and Hook Lake Projects, respectively. The Company also has several active earn-in option partners including: CSE-listed Basin Uranium Corp. at the Mann Lake Uranium Project; CSE-listed Medaro Mining Corp. at the Yurchison Project; TSX-V listed North Shore Uranium at the Falcon Project; UraEx Resources at the South Dufferin and Bolt Projects; and TSX-V listed Terra Clean Energy (previously Tisdale) at the South Falcon East Project which is host to the Fraser Lakes Zone B uranium and thorium deposit. In aggregate, Skyharbour has now signed earn-in option agreements with partners that total to over
Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.
Skyharbour’s Uranium Project Map in the Athabasca Basin:
https://www.skyharbourltd.com/_resources/images/SKY_SaskProject_Locator_2024-02-14_V2.jpg
To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company’s website at www.skyharbourltd.com.
SKYHARBOUR RESOURCES LTD.
“Jordan Trimble”
__________________________
Jordan Trimble
President and CEO
For further information contact myself or:
Nicholas Coltura
Investor Relations Manager
Skyharbour Resources Ltd.
Telephone: 604-558-5847
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
Forward-Looking Information
This news release contains “forward‐looking information or statements” within the meaning of applicable securities laws, which may include, without limitation, completing ongoing and planned work on its projects including drilling and the expected timing of such work programs, other statements relating to the technical, financial and business prospects of the Company, its projects and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of uranium, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses, and those filed under the Company’s profile on SEDAR+ at www.sedarplus.ca. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather or climate conditions, failure to obtain or maintain all necessary government permits, approvals and authorizations, failure to obtain or maintain community acceptance (including First Nations), decrease in the price of uranium and other metals, increase in costs, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.
FAQ
What ownership percentage did Skyharbour Resources (SYHBF) acquire in the Russell Lake Project?
What were the terms of Skyharbour's (SYHBF) earn-in agreement for Russell Lake?
What was the best drilling result from Skyharbour's (SYHBF) 2024 winter program at Russell Lake?