STOCK TITAN

Tartisan Nickel Corp. Acquires Nickel-Copper Claims, Outlines 2026 Work Program at Turtle Pond, Northwestern Ontario

(Neutral)

Tartisan Nickel (OTCQX:TTSRF) acquired four additional nickel-copper claims at the Turtle Pond Area in northwestern Ontario, expanding the wholly owned property to 170 claim units covering 3,564 ha.

The project hosts the historical Glatz, Double E and Night Danger showings and a 2026 work program of access trails, mapping, sampling and potential diamond drilling.

Loading...
Loading translation...

Positive

  • Acquisition of 4 additional claims, expanding Turtle Pond to 170 units and 3,564 ha
  • Property located about 70 km east of Kenbridge Nickel-Copper Deposit with good infrastructure
  • Historical Glatz showing grab samples reported up to 1.95% nickel
  • Double E drilling included 2 m grading 1.35% Ni and 0.81% Cu
  • Night Danger hole ND-10-1 intersected 4.53% Ni over 0.7 m
  • Planned 2026 Turtle Pond program with access work, mapping, sampling and potential drilling

Negative

  • None.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Toronto, Ontario--(Newsfile Corp. - June 23, 2026) - Tartisan Nickel Corp. (CSE: TN) (OTCQX: TTSRF) (FSE: 8TA) ("Tartisan", or the "Company") is pleased to announce that the Company has acquired four additional claims in the Turtle Pond Area, Northwestern Ontario, approximately 40 km south of Dryden, Ontario. The property size now consists of 170 staked units covering 3,564 ha. which is wholly owned by Tartisan Nickel Corp.

The claims are located approximately 70 kms east of the Company's flagship Kenbridge Nickel-Copper Deposit. The property is situated in an area of excellent infrastructure and consists of 170 claim units and hosts the historical Glatz, Double E and Night Danger nickel-copper showings.

Previous exploration efforts identified nickel-copper sulphide mineralization in twelve trenches along a 700 metre trend at the Glatz nickel copper showing. The zone, discovered in 1965 by local prospector A. Glatz, is up to 40 metres wide and is open along strike and at depth. Historical grab samples were reported to contain up to 1.95% Ni. In 2007, Canadian Arrow Mines Limited, conducted a surface grab sampling program which produced the following results: 1.28% Ni, 0.26% Cu re Glatz Trench 2; 0.99% Ni, 0.18% Cu re Glatz Trench 3; 0.39% Ni, 4.06% Cu re Trench 4. The mineralization varies from disseminated sulphides to narrow semi-massive sulphide bands. Six short drill holes were completed at that time with hole GZ-09- 02 encountering 0.34% Ni, 0.16% Cu and 0.02% Co over 5.9 m from 45.0-50.9 m.

A nickel-copper-PGE discovery on the Double E airborne VTEM anomaly was identified in 2008. The drilling intersected two separate upper and lower mineralized zones in 2 drill holes. Hole EE-09-02 intersected 4.2 metres of 0.81% Ni, 0.52% Cu, 0.20gpt Pt, 0.16gpt P and 0.20gpt Au at a depth of 25.5 metres. This included 2 metres of 1.35% Ni, 0.81% Cu, 0.36gpt Pt, 0.27gpt Pd and 0.31gpt Au. A second zone was intersected at a depth of 135.1 metres containing 8.2m of 0.55% Ni and 0.38% Cu. Hole EE-l0-04 intersected 1.9 metres of 0.51% Ni, 0.24% Cu at a depth of 21.4 metres and a second narrow intersection of 1.9 metres of 0.52% Ni, 0.28% Cu at a depth of 28 metres.

Exploration diamond drilling work completed in 2009 and 2010 on the Night Danger nickel-copper intercepts and reported a nine-metre-wide section of stringers and blebs of sulphide which assayed 0.57% Ni and 0.45% Cu at a drill depth of 79m in hole ND-09-1. Two sections within this interval assayed greater than 1% nickel. Drill hole ND-10-1 intersected 4.53% Ni over 0.7m at a drill depth of 57.5m (Source; MNDM assessment files and Canadian Arrow Mines Limited news release dated June 1, 2010, SEDAR).

From November 28th to December 21st, 2024, a TDEM Geophysical survey was performed on the Turtle Pond Lake Property and was undertaken by Expert Geophysics Limited. Tartisan Nickel Corp. requested this survey for the purpose of determining drill targets and potential future exploration work on The Property.

Mark Appleby, President and CEO of Tartisan stated: "The Glatz, Double E and Night Danger nickel-copper showings display similar nickel and copper tenors as what we find near surface at our Kenbridge Nickel-Copper Deposit. Acquisition of these claims will complement the company's larger objective of developing the Kenbridge Project into an area play. The Company has formulated a 2026 Turtle Pond exploration program consisting of trail and access work, geological mapping and surface sampling, with potentially diamond drilling in 2026-27. We will have boots on the ground this summer."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1492/302503_b53dcbc604448844_002.jpg

Figure 1: Location and Regional Geology of the Turtle Pond Project and Kenbridge Ni-Cu Deposit

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1492/302503_b53dcbc604448844_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1492/302503_b53dcbc604448844_003.jpg

Figure 2. Turtle Pond: Night Danger, Glatz, Double E property outline and Historical Mineral Showings.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1492/302503_b53dcbc604448844_003full.jpg

Qualified Person

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in NI 43-101 and reviewed and approved by Dean MacEachern, P. Geo., an Independent Consultant to the Company and a Qualified Person as defined by NI 43-101.

About Tartisan Nickel Corp. Tartisan Nickel Corp. is a Canadian-based critical minerals exploration and development company which owns, the Kenbridge Nickel-Copper Project near Sioux Narrows, Northwestern Ontario, the Sill Lake Silver Project near Sault Ste. Marie, Ontario as well as the Night Danger, Glatz Turtle Pond Project near Dryden, Ontario.

Tartisan Nickel Corp. common shares are listed on the Canadian Securities Exchange (CSE: TN) (OTCQX: TTSRF) (FSE: 8TA). Currently, there are 158,195,904 shares issued and outstanding (162,616,961 fully diluted).

For further information, please contact Mark Appleby, President & CEO, and a Director of the Company, at 416-804-0280 (info@tartisannickel.com). Additional information about Tartisan Nickel Corp. can be found at the Company's website at www.tartisannickel.com or on SEDAR at www.sedarplus.ca.

This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

The Canadian Securities Exchange (operated by CNSX Markets Inc.) has neither approved nor disapproved of the contents of this press release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/302503

FAQ

What new nickel-copper claims did Tartisan Nickel (OTCQX:TTSRF) acquire at Turtle Pond in June 2026?

Tartisan Nickel acquired four additional claims in the Turtle Pond Area of northwestern Ontario. According to Tartisan Nickel, the wholly owned property now totals 170 staked units covering 3,564 hectares, located about 40 km south of Dryden and 70 km east of Kenbridge.

How large is Tartisan Nickel's Turtle Pond property and where is it located?

The Turtle Pond property covers 170 claim units totaling 3,564 hectares. According to Tartisan Nickel, it lies approximately 40 km south of Dryden, Ontario and about 70 km east of the company’s flagship Kenbridge Nickel-Copper Deposit, in an area described as having excellent infrastructure.

What historical nickel-copper results are reported for the Glatz showing at Turtle Pond?

Historical work at the Glatz showing reported grab samples up to 1.95% nickel. According to Tartisan Nickel, Canadian Arrow’s 2007 sampling included values such as 1.28% Ni and 0.26% Cu, while drilling intersected 0.34% Ni, 0.16% Cu and 0.02% Co over 5.9 metres.

What drilling results were reported from the Double E nickel-copper-PGE discovery near Turtle Pond?

Double E drilling intersected two mineralized zones with nickel, copper and PGEs. According to Tartisan Nickel, hole EE-09-02 returned 4.2 m of 0.81% Ni and 0.52% Cu near 25.5 m depth, plus 2 m of 1.35% Ni and 0.81% Cu within that interval, and deeper 8.2 m of 0.55% Ni.

What 2026 Turtle Pond exploration program did Tartisan Nickel (TTSRF) outline for investors?

Tartisan Nickel outlined a 2026 Turtle Pond program of trail and access work, geological mapping and surface sampling. According to Tartisan Nickel, the plan also includes potentially conducting diamond drilling in 2026–27, with field work beginning in the summer described as having “boots on the ground.”

What historical nickel intercepts are reported from the Night Danger showing at Turtle Pond?

Night Danger drilling reported nickel-copper mineralization over several metres. According to Tartisan Nickel, hole ND-09-1 returned a nine-metre interval averaging 0.57% Ni and 0.45% Cu, with two sections above 1% Ni, while hole ND-10-1 intersected 4.53% Ni over 0.7 metres at 57.5 m.

Who is the qualified person for Tartisan Nickel's Turtle Pond technical information?

The qualified person is geologist Dean MacEachern, P.Geo. According to Tartisan Nickel, the technical information for Turtle Pond was prepared in accordance with NI 43-101 and reviewed and approved by MacEachern, described as an independent consultant and Qualified Person under Canadian securities regulations.