STOCK TITAN

Nine Mile Metals Announces Drill Hole WD-24-04 Certified Assay Results of 1.33% Copper Equivalent (Cu-Eq) over 37.10m Including 3.08% Cu-Eq over 10.24m

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Positive)
Tags

Vancouver, British Columbia--(Newsfile Corp. - April 24, 2024) - NINE MILE METALS LTD. (CSE: NINE) (OTCQB: VMSXF) (FSE: KQ9) (the "Company" or "Nine Mile") is pleased to announce it has received certified assays for drill hole WD-24-04 at the Wedge VMS Drill Target situated in the renowned Bathurst Mining Camp, New Brunswick (BMC).

WD-24-01 HIGHLIGHTS:

  • Drill hole WD-24-04 Location: Collared on the northeastern flank of the Wedge deposit, positioned approximately 40 meters east of drill hole WD-24-02.
  • Orientation and Depth: Drilled at a 160-degree azimuth and a dip of -50 degrees, reaching a total depth of 167m
  • The drill hole successfully intersected three (3) Zones of visual sulphide mineralization at depths of:
    • Zone 1: (55.00 - 78.00m) Zone 2: (110.00 - 132.20m) Zone 3: (136.00 - 147.10m).
    • Note: the lower two zones define the main copper mineralization.
  • The main copper zone intersected a 37.10m section (110.00 - 147.10 m), assaying 0.81% Cu, 0.25% Pb, 1.00% Zn, 8.5 g/t Ag and 0.13 g/t Au (Copper Equivalent: 1.33% Cu).
  • Sub-zones within this section demonstrated higher yields, including:
    • 10.24 meters of pyritic VMS (Volcanogenic Massive Sulfide) assaying 1.57% Cu, 0.74% Pb, 2.99% Zn, 26.61 g/t Ag, and 0.31 g/t Au (Cu Equivalent: 3.08%).
    • 7.52 meters of pyritic VMS assaying 1.86% Cu, 1.00% Pb, 1.17% Zn, 35.50 g/t Ag, and 0.42 g/t Au (Copper Equivalent: 3.07%).
  • Notable gold and silver mineralization are present alongside the lead and zinc within the VMS deposits.

Table 1: Drill Hole Summary, WD-24-04

WD -24-04FromToWidth (m)Cu %Pb %Zn %Au g/tAg g/tCu Eq %
  
Zone 155.0078.0023.000.170.000.050.020.050.20
  
Zone 2110.00130.2020.200.691.910.320.081.911.29
Includes115.00127.2612.260.830.100.370.092.161.05
  
Zone 3136.86147.1010.241.570.742.990.3126.613.08
Includes139.58147.107.521.861.001.170.4235.503.07
  
Summary
Main Zone (2 & 3)110.00147.1037.100.810.251.000.138.51.33

 

Copper Equivalent (Cu Eq) for drill intersections is calculated based on April 23, 2024, pricing. US$ 4.42/ lb. Cu, US$ 0.99 / lb. Pb., S$ 1.27 lb. Zn, $ 27.98 /oz Ag and US$ 2,334/oz Au with 80% metallurgical recoveries assumed for all metals (Since it's unclear what metals will be the principal products, assuming different recoveries is premature at this stage. As such, an 80% recovery rate is justified at this point in time).

In the northeastern section of the Wedge, the geology comprises a blend of volcanic materials and sedimentary deposits. The mineralization is primarily located at the contact point between the felsic volcanic rocks and the underlying graphitic argillite, similar to what was observed in DDH-24-02 to the west. The most significant lead and zinc mineralization has been consistently found at the base of the geological section, adjacent to the graphitic sediment layer.

Table 2: Zone 2 - Certified Assays (110.00 - 130.20 m) - 20.20m Intersection

Sample #From (m)To (686m)Width (m)Cu (%)Pb (%)Zn (%)(Pb + Zn) (%)Ag (g/t)Au (g/t)
  
686009110.00111.001.000.340.090.180.2720.049
686011112.00112.001.000.730.040.540.5810.036
686012112.00113.001.000.550.020.300.3210.036
686013113.00114.001.000.550.050.240.2910.022
686014114.00115.001.000.620.010.380.3910.045
686015115.00116.001.001.290.031.361.3910.084
686016116.00116.600.600.150.000.300.30<10.018
686017116.60117.450.850.900.020.840.8610.05
686018117.45118.451.000.960.010.570.5810.042
686019118.45119.451.001.980.030.850.8830.107
686020119.45120.451.000.270.020.050.0710.034
686021120.45121.451.000.480.020.130.1520.063
686022121.45122.451.000.400.180.130.3130.061
686023122.45123.451.000.430.360.100.4640.279
686024123.45124.461.010.490.130.090.2230.084
686025124.46125.330.871.330.110.090.2030.119
686026125.33126.331.000.440.090.150.2410.1
686027126.33127.260.931.570.100.130.2340.144
686028127.26128.261.000.620.050.030.0830.224
686029128.26129.000.740.090.010.070.0830.046
686031129.00130.201.200.170.060.190.2520.143
  
TotalAve.20.20.690.070.320.391.910.08

 

"Drill Hole WD-24-04 was collared in the northeastern portion of the Wedge 40 meters east of drill hole WD-24-02. Drilled parallel to WD-24-02, the results show the continuity of the mineralization with three (3) Zones of high copper mineralization intersected, the base of the main zone again highlighted by lead, zinc, and silver mineralization. The mineralization consists of fine-grained massive copper bearing pyritic VMS (95% + sulphides) with visible bands of sphalerite and galena as seen in drill hole WD-24-02. The continuity is encouraging, and we look forward to compiling all of the assays and incorporating them into our upcoming 3D model," commented Gary Lohman, P.Geo., VP Exploration & Director.

Patrick J. Cruickshank, MBA, CEO & Director, stated, "The results from our Wedge extension program in Target Area 1, located on the east side of the deposit, have been very encouraging. We are successfully expanding the footprint of the unmined deposit area at the Wedge. The copper assays have been consistently impressive, and the significant widths observed in the drill holes thus far are outstanding. We are determined to fulfill our objectives by increasing the tonnage at the Wedge."

Table 3: Zone 3 - Certified Assays (136.86 - 147.10 m) - 10.24m Intersection

Sample #From (m)To (m)Width (m)Cu %Pb (%)Zn (%)(Pb + Zn) %Ag (g/t)Au (g/t)
  
686039136.86137.861.001.860.030.190.2240.029
686040137.86138.750.890.120.010.110.1210.016
686041138.75139.580.830.130.030.130.1610.034
686042139.58140.581.001.600.330.791.12100.146
686043140.58141.581.004.230.11
Nine Mile Metals Ltd

OTC:VMSXF

VMSXF Rankings

VMSXF Latest News

VMSXF Stock Data

754.63k
86.97M
10.19%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Vancouver