STOCK TITAN

Nine Mile Metals Provides Exploration Program Update

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Neutral)
Tags

Nine Mile Metals (CSE: NINE, OTCQB: VMSXF) has provided an update on its Western Portfolio Advanced Geophysical Summer 2024 Exploration Program in the Bathurst Mining Camp, New Brunswick. Key highlights include:

1. Completion of three Bore Hole Electromagnetic (BHEM) surveys at the Wedge Project and one at California Lake.
2. Initiation of ground-based Time Domain Electromagnetic (TDEM) surveys at Wedge and California Lake.
3. Progress on a 1,400-line kilometer UAV drone magnetic survey, with 72% completion.
4. Preliminary results indicating moderate to strong conductors in several drill holes.
5. Les Forages Chapais drill rig on-site, awaiting final drill target processing.

The company is now awaiting final results, interpretation, and 3D modeling to identify and prioritize drill targets for the upcoming Phase 2 Drill Program.

Loading...
Loading translation...

Positive

  • Completion of multiple geophysical surveys (BHEM, TDEM, UAV magnetic) to refine exploration targets
  • Preliminary results show moderate to strong conductors in several drill holes, indicating potential mineralization
  • 72% completion of a large-scale UAV drone magnetic survey covering 1,400 line kilometers
  • Drill rig on-site, ready for immediate deployment once targets are finalized

Negative

  • Final results, interpretation, and 3D modeling still pending, potentially delaying the start of drilling
  • No concrete assay results or resource estimates provided in this update

News Market Reaction

-28.03%
1 alert
-28.03% News Effect

On the day this news was published, VMSXF declined 28.03%, reflecting a significant negative market reaction.

Data tracked by StockTitan Argus on the day of publication.

Vancouver, British Columbia--(Newsfile Corp. - August 15, 2024) - NINE MILE METALS LTD. (CSE: NINE) (OTCQB: VMSXF) (FSE: KQ9) (the "Company" or "Nine Mile") is pleased to provide an update and report on the Nine Mile's Western Portfolio Advanced Geophysical Summer 2024 Exploration Program situated in the renowned Bathurst Mining Camp, New Brunswick (BMC).

EXPLORATION HIGHLIGHTS:

  • (3) Wedge BHEM Surveys Completed (Holes WD-24-01, WD-24-05, and WD-24-06)
    Awaiting Final Results processing, Interpretation and 3D Modeling
  • (1) California Lake BHEM Surveys Completed (Hole CL-23-10-01)
    Awaiting Final Results processing, Interpretation and 3D Modeling
  • EEX - UAV Drone 3D Survey 1400 Line Kms - 72% Completed
  • EEX - Ground Based TDEM Survey at California Lake Trend 10 (South) - initiated
  • EEX - Ground Based TDEM Survey at Wedge Targets 3-4-6-7 - after California Lake #10
  • Les Forages Chapais Drill Rig Onsite and awaiting Final Drill Target Processing from EEX

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7335/220033_7f6c5b8d74e0fbe8_002.jpg

Figure 1: Nine Mile Metals Western Portfolio High Priority Target Trends Exploration Roadmap

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7335/220033_7f6c5b8d74e0fbe8_002full.jpg

At the Wedge Project, (3) Bore Hole Electromagnetic (BHEM) surveys were completed by EarthEx Geophysical Solutions Inc. ("EarthEx" or "EEX"), one to the south (WD-24-01) collared in the footwall sediments targeting the deposit at depth and (2) holes drilled from the north (WD-24-05, WD-24-06) into the "New" unmined, eastern extension area.

Preliminary results from WD-24-01 BHEM survey indicate a moderate to strong anomaly with initial modeling reflecting the mineralized intersections that included 11.10 meters assaying 1.37% Cu, 0.21% Pb, 0.29% Zn, 19.02 g/t Ag and 0.36 g/t Au (refer news release April 3, 2024). EarthEx has been provided with the historic drilling and further modeling is being conducted to determine the anomaly size and scale.

Drill holes WD-24-05 and WD-24-06 were collared in the north and drilled to the southeast targeting the unmined eastern portion of the deposit. Results from WD-24-05 have near hole responses in areas of elevated assay values as expected in addition to a larger size, moderate to strong conductor. WD-24-05 uncovered VMS Mineralization in (4) Zones between 18.00 and 119.00 meters. Assay values from WD-24-05 included an 18-meter intersection assaying 0.72% Cu, 0.33% Zn, 2.2 g/t Ag and 0.03 g/t Au (refer news release June 24, 2024). A moderate to strong conductor is also seen in WD-24-06 and due to the proximity to WD-24-05, the response likely reflects the same source, the drill hole having a 10-meter intersection assaying 1.53% Cu, 0.81% Zn, 7.0 g/t Ag and 0.08 g/t Au (refer news release June 24, 2024). Additional modeling is being conducted to better constrain the anomaly and improve accuracy for drilling.

The preliminary results from the California Lake CL-23-10-01 BHEM survey, indicated a weak to moderate conductor at depth.

While we await the final results of the BHEM surveys, interpretation and 3D modeling, EarthEx has initiated high priority ground-based Time Domain Electromagnetic (TDEM) surveying over previously identified priority conductors at the Wedge including targets 3, 4, 6 and 7, to further define the respective anomalies (Figure 2). Located in the western Wedge trend, the TDEM survey over the clustered anomalies provides the opportunity to validate the trend with high priority drill targets. Several lines are also planned over Target 6 which is along the southern extension of the California Lake East VMS trend that was successfully drilled in 2022.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7335/220033_7f6c5b8d74e0fbe8_003.jpg

Figure 2: EEX TDEM Ground Based Grids & Loop covering Wedge Targets 3-4-6-7

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7335/220033_7f6c5b8d74e0fbe8_003full.jpg

At California Lake, Target Areas 10 and 11 were previously defined by EarthEX, the reprocessed MegaTEM data identifying numerous strong, late time conductive trends crudely forming a fold nose as seen in red in Figure 1 and highlighted by the red polylines that define the conductive axis. With a moderate conductor identified in CL-23-10-01 at a depth of 230.00 meters and adjacent, unresolved conductors, a ground-based Time Domain Electromagnetic (TDEM) survey will be undertaken, the grid location shown in Figure 3, the southern corner of the grid proximal to the South Branch Forty Mile Brook Cu, Zn mineral occurrence identified by the yellow circle.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7335/220033_7f6c5b8d74e0fbe8_004.jpg

Figure 3: California Lake Trend 10 South TDEM Grid Location (White) covering EEX Priority Strong Red Conductor

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7335/220033_7f6c5b8d74e0fbe8_004full.jpg

In conjunction with the TDEM program, EarthEx is also conducting a large, 1,400-line kilometer, close spaced UAV (Drone) magnetic survey over the California Lake project areas including target areas 1 through 10. The drone survey is underway in addition to linecutting to facilitate the ground based TDEM surveys (Figure 4).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7335/220033_7f6c5b8d74e0fbe8_005.jpg

Figure 4: EEX - UAV Advanced Drone Survey Completion Update (Green - 943.5 Line Kms 72% Completed)

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7335/220033_7f6c5b8d74e0fbe8_005full.jpg

Gary Lohman, P.Geo., VP Exploration, stated, "The entire Team at Nine Mile Metals, EarthEX, Line Cutters and Drillers, have been working for the past 2 months at the Wedge and California Lake Projects, propelling this important Exploration Program forward at an expedited rate. With all 3 surveys complete, the team will have a complete picture of the geophysical characteristics of the targets allowing us to move swiftly into our Phase 2 Drill Program. We look forward to our next update with all our results, findings, interpretation and 3D Modeling with distinct High Priority Drill targets."

NEXT STEPS:

  • Maxwell plate modeling of the TDEM survey data.
  • 3 D modeling of the magnetics to refine lithological boundaries and identify controlling structures.
  • Data integration of all 3 geophysical surveys with the historic and 2024 drill data.
  • Identification and Prioritization of drill targets.
  • Diamond drilling.

The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and reviewed and approved by Gary Lohman, B.Sc., PGO., VP Exploration and Director who acts as the Company's Qualified Person and is not independent of the Company.

About Nine Mile Metals Ltd.:

Nine Mile Metals Ltd. is a Canadian public mineral exploration Company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the renowned Bathurst Mining Camp (BMC), located in New Brunswick, Canada. The Company's primary business objective is to explore its four VMS Projects: Nine Mile Brook VMS Project, California Lake VMS Project, the Canoe Landing Lake (East - West) VMS Project, and the Wedge VMS Project. The Company is focused on Critical Minerals Exploration, positioning itself for the boom in EV and green technologies requiring Copper, Silver, Lead and Zinc with a hedge on Gold.

ON BEHALF OF NINE MILE METALS LTD.

"Patrick J. Cruickshank, MBA"
CEO and Director
T: 506-804-6117
E: patrick@ninemilemetals.com

Forward-Looking Information:

This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of Nine Mile. Forward-looking information is based on certain key expectations and assumptions made by the management of Nine Mile. In some cases, you can identify forward-looking statements by the use of words such as "will," "may," "would," "expect," "intend," "plan," "seek," "anticipate," "believe," "estimate," "predict," "potential," "continue," "likely," "could" and variations of these terms and similar expressions, or the negative of these terms or similar expressions. Forward-looking statements in this press release include that (a) with all 3 surveys complete, the team will have a complete picture of the geophysical characteristics of the targets allowing us to move swiftly into our Phase 2 Drill Program, (b) several lines are also planned over Target 6 which is along the southern extension of the California Lake East VMS trend that was successfully drilled in 2022, (c) a moderate to strong conductor is also seen in WD-24-06 and due to the proximity to WD-24-05, the response likely reflects the same source, and (d) we look forward to our next update with all our results, findings, interpretation and 3D Modeling with distinct High Priority Drill targets. Although Nine Mile believes that the expectations and assumptions on which such forward-looking information is based are reasonable, undue reliance should not be placed on the forward-looking information because Nine Mile can give no assurance that they will prove to be correct.

The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/220033

FAQ

What geophysical surveys has Nine Mile Metals (VMSXF) completed in its 2024 exploration program?

Nine Mile Metals has completed three Bore Hole Electromagnetic (BHEM) surveys at the Wedge Project, one BHEM survey at California Lake, initiated ground-based Time Domain Electromagnetic (TDEM) surveys at both Wedge and California Lake, and is 72% through a 1,400-line kilometer UAV drone magnetic survey.

What are the preliminary results from Nine Mile Metals' (VMSXF) BHEM surveys at the Wedge Project?

Preliminary results from the Wedge Project BHEM surveys indicate moderate to strong conductors in several drill holes, including WD-24-01, WD-24-05, and WD-24-06, suggesting potential mineralization in these areas.

When will Nine Mile Metals (VMSXF) begin its Phase 2 Drill Program in the Bathurst Mining Camp?

The exact start date for the Phase 2 Drill Program is not specified. Nine Mile Metals is currently awaiting final results, interpretation, and 3D modeling of the geophysical surveys to identify and prioritize drill targets before commencing the drilling phase.

What are the next steps in Nine Mile Metals' (VMSXF) exploration program for 2024?

The next steps include Maxwell plate modeling of TDEM survey data, 3D modeling of magnetics, data integration of all geophysical surveys with historic and 2024 drill data, identification and prioritization of drill targets, and finally, diamond drilling.
Nine Mile Metals Ltd

OTC:VMSXF

VMSXF Rankings

VMSXF Latest News

VMSXF Stock Data

706.99k
137.92M
10.65%
4.72%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Vancouver