Nine Mile Metals Ltd. reports mineral exploration developments for volcanogenic massive sulphide, or VMS, targets in the Bathurst Mining Camp of New Brunswick, Canada. The company focuses on copper, lead, zinc, silver and gold mineralization across the Wedge VMS Project, Nine Mile Brook VMS Project, California Lake VMS Project and Canoe Landing Lake East-West VMS Project.
Company news commonly covers drill program summaries, certified assay results, copper-equivalent mineralization intervals, geological modeling, borehole electromagnetic surveying and metallurgical or bulk-sample work. Technical releases reference Canadian NI 43-101 mineral project disclosure standards and describe exploration activity tied to critical minerals used in electric-vehicle and green-technology supply chains.
Nine Mile Metals announced the certified assay results for drill hole WD-24-08 at The Wedge VMS drill target in Bathurst Mining Camp, New Brunswick.
The highlights include a copper equivalent (Cu-Eq) of 1.34% over 44.00m, with notable sections like 3.73% Cu-Eq over 12.00m and 4.57% Cu-Eq over 9.00m.
The drill hole intersected significant mineralization, including copper, lead, zinc, gold, and silver.
The drill hole results are expected to support the expansion of The Wedge Deposit's footprint and its re-evaluation.
CEO Patrick J Cruickshank stated that the results will help plan phase 2 of the high-priority project in 2024.
Upcoming targets include California Lake Hole #10 and the Tri Bag trend.
Nine Mile Metals has released the certified assay results for drill hole WD-24-07 at the Wedge VMS Drill Target in the Bathurst Mining Camp, New Brunswick. The drill hole intersected significant base metal mineralization over 40.32 meters, showing a Copper Equivalent (Cu-Eq) of 1.65%. Notably, two zones stood out: an upper zone (15.50m) with 1.98% Cu-Eq and a lower zone (13.12m) with 2.29% Cu-Eq. The lower zone includes a 5.50m section with a Cu-Eq of 3.25%. These results indicate continued high-grade copper mineralization. The company plans to proceed with 3D modeling to better define the structural and geological controls on the mineralization.
Nine Mile Metals has engaged EarthEx Geophysical Solutions Inc. to conduct BHEM surveys at California Lake and the Wedge drill holes. The surveys aim to detect the electrical conductivity of rocks, providing valuable data for future drilling. The Company is utilizing cutting-edge technology to explore potential VMS targets and mineralization. The positive outcomes of the surveys will guide additional drilling and further exploration efforts, enhancing the Company's understanding of the geological landscape and potential resource deposits.
Nine Mile Metals has completed the exercise and acquisition of 100% of California Lake, Canoe Landing Lake East, and Nine Mile Brook East mineral projects, owning 12 mineral claims totaling 38.94 km2. The Company issued common shares and converted cash payment into shares, subject to a hold period.
Summary not available.
Summary not available.
Summary not available.
Summary not available.
Summary not available.
Summary not available.