STOCK TITAN

XTI Aerospace Announces Key Q2 2025 Product and Engineering Milestones

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

XTI Aerospace (NASDAQ: XTIA) has announced key Q2 2025 product and engineering milestones for its TriFan 600 xVTOL aircraft development program. The company plans to complete several important objectives, including:

  • Engine and drivetrain supplier selection
  • External noise assessment with Continuum Dynamics
  • FAA technical familiarization briefings
  • First flight of 'Sparrow' - a 1:15 scale unmanned model

The company will also launch its 'Kestrel' subscale model later in 2025 to evaluate aerodynamics and flight controls. XTI plans to reopen TriFan 600 pre-sales later in 2025, targeting fleet operators, business owners, and EMS operators. The development roadmap includes preliminary design, critical design, first flight, and type certification phases.

Loading...
Loading translation...

Positive

  • Development program meeting all key objectives and timelines
  • Progress in FAA certification process with scheduled technical briefings
  • Advanced testing through two subscale models (Sparrow and Kestrel)
  • Planned reopening of pre-sales indicating confidence in product development

Negative

  • No immediate revenue generation as product is still in development phase
  • Multiple development phases still required before commercialization
  • Dependent on successful supplier selection and partnerships
  • Complex certification process with FAA ahead

News Market Reaction

+4.35%
1 alert
+4.35% News Effect

On the day this news was published, XTIA gained 4.35%, reflecting a moderate positive market reaction.

Data tracked by StockTitan Argus on the day of publication.

TriFan 600 development continues to gain momentum as XTI Engineering Team meets all key Q1 objectives and announces Q2 2025 milestones

ENGLEWOOD, Colo., April 23, 2025 /PRNewswire/ -- XTI Aerospace, Inc. (NASDAQ: XTIA) ("XTI"), a pioneer in xVTOL and powered-lift aircraft solutions, today released its key product and engineering milestones for Q2 2025. The milestones will set the stage for the reopening of pre-sales for the TriFan 600 later this year.

XTI remains on track in its development efforts which seek to redefine regional air travel through novel point-to-point flight solutions, with the TriFan 600 serving as its flagship xVTOL airplane. One of XTI's Q2 milestones is the planned first flight of the next subscale model, code-named "Sparrow." This unmanned 1:15 scale aircraft builds on the previous subscale model developed in 2023 and will continue validating vertical and transitional flight dynamics with its rotating ducted fans.

Q2 2025 Milestones

XTI aims to complete the following key product and engineering achievements in Q2 2025:

  • Engine Supplier Selection – XTI expects to formalize its engine selection and announce its choice of engine supplier, particularly focusing on the twin turboshaft engines, one of the key aspects crucial to the aircraft's performance.
  • Drivetrain Supplier Selection – XTI will announce its lead supplier of the drivetrain, one of the most complex systems of the TriFan 600's design.
  • External Noise Phase I Assessment – In partnership with Continuum Dynamics, Inc., XTI will begin a detailed noise assessment of the TriFan 600, focusing on understanding and minimizing the environmental noise impact of the aircraft's three ducted fans.
  • FAA Technical Familiarization Briefings – As XTI continues the certification process with the FAA, the engineering team will support three more scheduled TriFan 600 technical familiarization meetings with FAA subject matter experts.
  • Sparrow First Flight – The Sparrow 1:15 scale flying model will perform hover and transition maneuvers to assess and validate the latest aerodynamic configuration as compared to results of the "digital twin's" computational fluid dynamics (CFD) analysis.

"This quarter's engineering milestones highlight a clear path toward a mature aerodynamic design and performance that can provide game-changing aviation capabilities," said Dave Ambrose, VP of Engineering at XTI. "We believe our subscale testing, supplier alignment, and FAA engagement are strengthening technical validation and compressing time to market."

In addition to these technical milestones, XTI is preparing to launch its next subscale model, code-named "Kestrel," later in 2025. That model will focus on further evaluating aerodynamics, flight controls, and performance characteristics, with an emphasis on flight control laws.

Looking Ahead: Pre-Sales and Future Deliveries

XTI plans to reintroduce aircraft pre-sales later in 2025, allowing fleet operators, business owners, EMS operators, and other prospective customers the opportunity to secure their place in line for future TriFan 600 deliveries.

Future Design Phases Leading to the TriFan 600's Commercial Release:

  1. Preliminary Design– During this phase, XTI will evaluate the overall design approach, ensuring that the top-level requirements are satisfied and that the project can move to detailed design and testing.
  2. Critical Design – During this phase, XTI will work closely with suppliers to finalize the airplane's detailed design and ensure requirements are met before proceeding to manufacturing, integration, and testing.
  3. First Flight – The "first flight" marks the culmination of comprehensive ground testing of structures, systems and subsystems to a confidence level sufficient for the first crewed airborne flight test.
  4. Type Certification –Upon successful completion of the FAA's rigorous type certification process, which will include extensive ground and airborne testing, the FAA will issue XTI a type certificate for the TriFan 600's design.

Scott Pomeroy, Chairman and CEO of XTI Aerospace, said, "By consistently delivering on our technical and programmatic commitments, we're reducing risk, accelerating time to market, and positioning XTI to deliver real impact for our customers and to generate long-term value for our shareholders."

About XTI Aerospace, Inc. 

XTI Aerospace (XTIAerospace.com) (Nasdaq: XTIA) is the parent company of XTI Aircraft Company, an aviation business based near Denver, Colorado, currently developing the TriFan 600, a fixed-wing business aircraft designed to have the vertical takeoff and landing (VTOL) capability of a helicopter, maximum cruising speeds of 311 mph and a range of 985 miles, creating an entirely new category – the xVTOL. Additionally, the Inpixon (inpixon.com) business unit of XTI Aerospace is a leader in real-time location systems (RTLS) technology with customers around the world who use the Company's location intelligence solutions in factories and other industrial facilities to help optimize operations, increase productivity, and enhance safety. For more information about XTI, please visit XTIAerospace.com and follow the company on LinkedIn, Instagram, X, and YouTube.

Cautionary Statement Regarding Forward-Looking Statements

This press release contains certain "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act, and Section 21E of the Exchange Act. All statements other than statements of historical fact contained in this press release, including without limitation, statements about XTI's ability to achieve anticipated milestones in the timeframes currently anticipated or at all, the products under development by XTI, the advantages of XTI's technology, and XTI's customers, plans and strategies are forward-looking statements.

Some of these forward-looking statements can be identified by the use of forward-looking words, including "believe," "continue," "could," "would," "will," "estimate," "expect," "intend," "plan," "target," "projects," or the negatives of these terms or variations of them or similar expressions. All forward-looking statements are subject to risks, uncertainties, and other factors which could cause actual results to differ materially from those expressed or implied by such forward-looking statements. All forward-looking statements are based upon estimates, forecasts, and assumptions that, while considered reasonable by XTI and its management, are inherently uncertain, and many factors may cause the actual results to differ materially from current expectations. XTI undertakes no obligation to revise any forward-looking statements in order to reflect events or circumstances that might subsequently arise. Readers are urged to carefully review and consider the risk factors discussed from time to time in XTI's filings with the SEC, including those factors discussed under the caption "Risk Factors" in its most recent annual report on Form 10-K, filed with the SEC on April 15, 2025, and in subsequent reports filed with or furnished to the SEC.

Contacts

General inquiries:
Email: contact@xtiaerospace.com 
Web: https://xtiaerospace.com/contact/ 

Investor Relations:
Dave Gentry, CEO
RedChip Companies, Inc.
Phone: 1-407-644-4256
Email: XTIA@redchip.com 

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/xti-aerospace-announces-key-q2-2025-product-and-engineering-milestones-302435244.html

SOURCE XTI Aerospace, Inc.

FAQ

What are the key Q2 2025 milestones for XTI Aerospace (XTIA)?

XTI Aerospace's Q2 2025 milestones include engine and drivetrain supplier selection, external noise assessment, FAA technical briefings, and the first flight of the 'Sparrow' 1:15 scale model.

When will XTI Aerospace (XTIA) reopen TriFan 600 pre-sales?

XTI Aerospace plans to reopen TriFan 600 pre-sales later in 2025 for fleet operators, business owners, and EMS operators.

What is the Sparrow project announced by XTI Aerospace (XTIA)?

Sparrow is XTI's 1:15 scale unmanned aircraft model designed to validate vertical and transitional flight dynamics with rotating ducted fans.

What are the future design phases for XTI Aerospace's (XTIA) TriFan 600?

The TriFan 600's future phases include preliminary design, critical design, first flight testing, and FAA type certification.
XTI Aerospace

NASDAQ:XTIA

XTIA Rankings

XTIA Latest News

XTIA Latest SEC Filings

XTIA Stock Data

64.88M
34.41M
0.52%
7.08%
8.63%
Aerospace & Defense
Services-computer Programming Services
Link
United States
ENGLEWOOD