STOCK TITAN

One and One Green Technologies Procures More Than 2,000 Tons of Raw Materials for New Metals Recovery Line

Production from the new metals recovery line is expected to start before end-2026, boosting One and One’s capacity for copper and nickel recovery.

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Tags

One and One Green Technologies (YDDL) has procured more than 2,000 tons of raw materials for its new electronic, copper, and nickel sludge metals recovery line in Metro Manila, Philippines.

Smelting equipment installation is underway, and the company expects to begin production before the end of 2026. The new line is designed to process industrial hazardous waste and recover high-value metals such as copper, nickel, gold, and silver. This project expands One and One’s existing recycling operations into additional industrial waste categories and uses its hazardous waste-handling license, local raw-material sourcing, and in-house chemical testing capabilities. Management states that procuring feedstock in parallel with installation is intended to support a faster ramp-up and position the line as a new source of growth.

Loading...
Loading translation...

Positive

  • Procurement of more than 2,000 tons of raw materials for new line
  • New production line targets recovery of copper, nickel, gold, and silver
  • Expected production start before year-end 2026 adds future capacity
  • Project expands hazardous waste recycling into additional industrial waste categories

Negative

  • None.
Argus Sep 2 session 9 alerts
-2.19% close to close 0.1x rel. volume Open Argus
Details

News Market Reaction – YDDL

-5.7% Trough in 3 hr 15 min
$122.19M Mkt Cap at Peak Alert

On Sep 2, the day this news came out, YDDL closed 2.19% below the previous close. Argus tracked a trough of -5.7% from its starting point during tracking. Our momentum scanner recorded 9 alerts for this stock that day.

Data tracked by StockTitan Argus for the Sep 2 session.

Key Figures

Raw materials procured: More than 2,000 tons Production target: Before year-end 2026
Raw materials procured
More than 2,000 tons
New metals recovery line
Production target
Before year-end 2026
New recovery line

Historical Context

5 past events · Latest: Jun 30
5 events
  1. Jun 30

    Environmental conference

    24h Move
    -1.5%

    Company presented at provincial waste-management conference and received proposed partnership follow-ups.

  2. Jun 24

    Lock-up extension

    24h Move
    -3.2%

    Major shareholders extended restrictions covering approximately 67.7% of outstanding shares.

  3. Jun 01

    Laboratory construction

    24h Move
    -0.9%

    Company advanced construction of an in-house chemical testing laboratory.

  4. May 19

    Equipment contract

    24h Move
    -2.4%

    Company signed a smelting-equipment contract for new sludge recovery lines.

  5. Apr 28

    2025 earnings

    24h Move
    +1.2%

    Revenue and net income increased, while gross margin expanded during fiscal 2025.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Key Terms

hazardous waste, smelting equipment, commissioning
3 terms
hazardous waste regulatory
"holding a government-issued license to import and process hazardous waste"
Hazardous waste is material—liquid, solid or gas—that is dangerous to people or the environment because it is flammable, corrosive, toxic or chemically unstable, like a household chemical that would need special disposal instead of the trash. For investors it matters because companies that generate, store or clean up such waste face legal rules, cleanup costs, fines and reputational damage that can reduce profits, trigger unexpected liabilities and affect a company’s valuation, much like a hidden repair bill for a property.
smelting equipment technical
"Installation of the line’s smelting equipment is underway"
Smelting equipment are the furnaces, converters, crucibles and associated machinery used to extract and refine metals from ore or recycled material by applying heat and chemical processes. For investors, this gear represents the physical heart of a metals producer: it determines how much metal a plant can make, how much energy and cost are required, and what regulatory or environmental liabilities may arise — like a factory’s ovens that turn raw ingredients into a sellable product.
commissioning technical
"as installation and commissioning are completed"
Commissioning is the process of officially starting or activating a new project, system, or facility after it has been built or prepared. It involves testing and checking that everything functions correctly and safely before it begins full operation. For investors, commissioning signals that a project or asset is moving closer to generating value or revenue, which can impact its potential profitability and timing of returns.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Equipment Installation Underway; Company Expects to Begin Production Before Year-End 2026

SAN RAFAEL, BULACAN, PHILIPPINES, Sept. 02, 2026 (GLOBE NEWSWIRE) -- One and One Green Technologies, Inc. (Nasdaq: YDDL) ("One and One" or the "Company"), a Philippines-based recycler holding a government-issued license to import and process hazardous waste, today announced that it has procured more than 2,000 tons of raw materials for its new electronic sludge, copper sludge, and nickel sludge recovery line in Metro Manila, Philippines. Installation of the line’s smelting equipment is underway, and the Company expects to commence production before the end of 2026.

The announcement marks the next phase of a project first disclosed in May 2026, when One and One announced the purchase of smelting equipment for the new production line. The Company is procuring raw materials concurrently with equipment installation, positioning it to have feedstock available as installation and commissioning are completed.

As previously announced, the new production line is designed to process industrial hazardous waste, including electronic sludge, copper sludge, and nickel sludge, and to recover high-value metals, including copper, nickel, gold, and silver. The project extends the Company’s existing recycling operations into additional categories of industrial waste and leverages its hazardous waste-handling qualifications, local raw-material procurement capabilities, and in-house chemical testing infrastructure.

"Our priority is to ensure that once equipment installation and commissioning are completed, we are positioned to ramp up production as quickly as possible," said Ms. Tina Yan, Chairman and Chief Executive Officer of One and One Green Technologies. "By procuring raw materials in parallel with equipment installation, we are preparing the operation to move toward full production without unnecessary delay. We believe this approach will help accelerate the contribution of the new production line and establish it as a new source of growth for the Company."

About One and One Green Technologies, Inc.

One and One Green Technologies, Inc. (Nasdaq: YDDL) is a licensed hazardous waste importer and a licensed recycler of non-ferrous metals and industrial materials in the Philippines. The Company transforms electronic waste, scrap metal, and other raw materials into high-value products, including copper alloy ingots and aluminum materials. With a significant permitted annual capacity and advanced processing capabilities, One and One provides economical, flexible, and environmentally responsible recycling solutions to manufacturers and industrial clients across domestic and international markets.

For more information, please visit www.onepgti.com.

Forward-Looking Statements

This press release contains forward-looking statements. Forward-looking statements include statements concerning plans, objectives, goals, strategies, future events or performance, and underlying assumptions and other statements that are other than statements of historical facts. When the Company uses words such as "may," "will," "intend," "should," "believe," "expect," "anticipate," "project," "estimate," or similar expressions that do not relate solely to historical matters, it is making forward-looking statements. Forward-looking statements are not guarantees of future performance and involve risks and uncertainties that may cause actual results to differ materially from the Company’s expectations discussed in the forward-looking statements. These statements are subject to uncertainties and risks, including, but not limited to, the Company’s ability to complete installation and commissioning of the new production line on the anticipated schedule, its ability to secure raw materials on commercially acceptable terms, the availability and pricing of recovered metals, changes in environmental and hazardous waste regulations in the Philippines and in the jurisdictions from which raw materials are sourced, and other factors discussed in the "Risk Factors" section of the Company’s Annual Report on Form 20-F and other filings with the SEC. For these reasons, among others, investors are cautioned not to place undue reliance upon any forward-looking statements in this press release. Additional factors are discussed in the Company’s filings with the SEC, which are available for review at www.sec.gov. The Company undertakes no obligation to publicly revise these forward-looking statements to reflect events or circumstances that arise after the date hereof.

Investor Relations Contact:

Matthew Abenante, IRC
President
Strategic Investor Relations, LLC
Tel: 347-947-2093
Email: matthew@strategic-ir.com


FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What did One and One Green Technologies (YDDL) announce about raw material procurement?

One and One Green Technologies announced that it has procured more than 2,000 tons of raw materials for its new electronic sludge, copper sludge, and nickel sludge recovery line in Metro Manila, Philippines, as part of preparations to start the line.

When does One and One Green Technologies (YDDL) expect the new metals recovery line to begin production?

The company expects the new metals recovery line to commence production before the end of 2026, following completion of smelting equipment installation and commissioning.

What types of waste will the new YDDL production line process?

The new production line is designed to process industrial hazardous waste, including electronic sludge, copper sludge, and nickel sludge, extending One and One Green Technologies’ existing recycling operations into additional industrial waste categories.

Which metals will One and One Green Technologies (YDDL) recover from the new line?

The new line is designed to recover high-value metals, including copper, nickel, gold, and silver, from processed industrial hazardous waste such as electronic, copper, and nickel sludge.

How is One and One Green Technologies (YDDL) preparing to ramp up the new metals recovery operation?

The company is procuring raw materials in parallel with smelting equipment installation so feedstock is available when commissioning finishes. Management states this is intended to enable a quicker ramp-up to full production and support growth from the new line.

Keep reading