Company Description
TriStar Gold Inc. (TSGZF) is a precious metals exploration and development company whose shares trade on the OTCQB under the symbol TSGZF and on the TSX Venture Exchange under the symbol TSG. According to company disclosures, TriStar Gold focuses on gold properties in the Americas that have the potential to become producing mines, with a particular emphasis on advancing projects through technical studies and permitting.
The company identifies its flagship asset as the Castelo de Sonhos gold project in Pará State, Brazil. TriStar describes Castelo de Sonhos as a gold project that has been the subject of a pre-feasibility study and subsequent prefeasibility study update. The project is planned as an open pit gold mine with processing facilities based on whole-ore agitation leaching, designed for a nominal milling rate of 10,000 tonnes per day. The process flowsheet includes crushing, grinding, hybrid cyanidation and carbon-in-leach, carbon acid wash, pressure stripping, thermal regeneration, and electrowinning and smelting of doré bars for shipment to third-party refiners.
TriStar reports that mining at Castelo de Sonhos is planned to use conventional open pit methods (drill-blast-load-haul), which it states are suited to the project’s orebody and local site conditions. Power for the project is described as being supplied by a 138 kV transmission line from a substation near the town of Castelo de Sonhos. The company’s technical disclosures state that closure plans include removal of buildings, rehabilitation of disturbed lands, and returning the property to functional use in line with future approved reclamation plans.
Project studies and technical work
TriStar has announced the completion of a pre-feasibility study (PFS) for Castelo de Sonhos and later a “Pre-Feasibility Study Update 2025” prepared by GE21 Consultoria Mineral Ltda of Belo Horizonte, Brazil, which is described as independent of TriStar. The update focused on revising capital and operating cost estimates and incorporating changes to gold price assumptions and exchange rates, while keeping mineral resources and reserves unchanged from earlier work. The company has filed a technical report titled “Castelo de Sonhos Project, Pre-Feasibility Study Update 2025” under its profile on the Canadian regulatory system SEDAR+ and on its own website.
TriStar’s disclosures include detailed mineral resource and reserve estimates for the project, with Indicated and Inferred mineral resources and Probable mineral reserves reported for regions referred to as Esperança South, Esperança East, and Esperança Center. The company notes that these estimates follow Canadian Institute of Mining (CIM) standards and National Instrument 43-101 guidelines, and that mineral resources do not have demonstrated economic viability. The mineral reserves are described as a subset of Indicated mineral resources and are based on the PFS life-of-mine plan.
The company has also summarized economic analyses for Castelo de Sonhos, including net present value (NPV), internal rate of return (IRR), all-in sustaining costs (AISC), and life-of-mine production metrics, under various gold price assumptions. These metrics are presented as outputs of the prefeasibility study and are accompanied by sensitivity analyses to gold price changes. TriStar emphasizes that these figures are subject to the usual risks and uncertainties associated with forward-looking statements and mining project development.
Permitting and regulatory context
TriStar states that the Preliminary License (Licença Prévia or LP) for Castelo de Sonhos in Pará State is a critical permitting milestone. The company reports that this LP permit was received and that it remains valid and in good standing, with no restrictions that would prevent the project from moving forward. The LP is described as confirming locational feasibility but not authorizing construction or operations, which would be addressed at later licensing stages such as the Construction License (LI) and Operating License (LO).
The company has disclosed that the environmental licensing process and the LP for Castelo de Sonhos have been the subject of scrutiny by Brazil’s Federal Prosecutor’s Office (MPF), including a civil public action seeking to suspend the environmental licence and to require additional studies and Indigenous consultation. TriStar and the State Environmental Secretariat of Pará (SEMAS), identified as the primary regulator, have filed responses defending the licensing process and the adequacy of the Environmental Impact Assessment (EIA/RIMA). According to TriStar’s summaries, SEMAS and other regulators have provided technical defenses of the permitting process and the LP approval.
TriStar has also reported receiving an independent legal opinion regarding the MPF’s inquiries and recommendations. The company states that this opinion supports its position that the Castelo de Sonhos project does not have the potential to interfere with specified Indigenous lands and that additional Indigenous component studies or consultation processes are not justified under the applicable framework. The legal opinion is said to highlight the completeness and adequacy of the project’s EIA and to note that MPF recommendations are non-binding and were not accepted by SEMAS.
Indigenous lands and environmental studies
In its public communications, TriStar describes technical and legal arguments related to potential impacts on Indigenous territories. The company notes that the Baú and Menkragnoti Indigenous Lands are located beyond the distance thresholds established in Interministerial Ordinance No. 60/2015 from the project’s Directly Affected Area, and that hydrological, ecological, and socioeconomic studies do not indicate links that would justify Indigenous consultation at the LP stage. TriStar and SEMAS have both referenced hydrological and socioeconomic analyses, tailings facility design, water and air impact assessments, and cultural and archaeological surveys as part of the licensing documentation.
TriStar’s communications state that the tailings storage facility is designed using a downstream method and that emergency and residue management plans are scheduled for later licensing phases. Hydrological studies are described as indicating local and minor effects, with no mercury use and treatment systems planned to manage water quality. Cultural and archaeological work reportedly identified pre-colonial remains within the project site, which are to be managed under the oversight of Brazil’s heritage authority (IPHAN). The company emphasizes that these technical studies and regulatory reviews underpin its position in ongoing legal and administrative processes.
Corporate strategy and financing
TriStar characterizes itself as focusing on advancing Castelo de Sonhos from the prefeasibility stage toward a feasibility study and, ultimately, a potential construction decision. The company has indicated that further drilling, feasibility work, and optimization studies are part of its plans for project advancement. In its communications, TriStar has also referenced evaluating financing options to fund exploration, development, and general working capital needs.
As part of this strategy, TriStar announced a best efforts private placement financing of units consisting of common shares and share purchase warrants, with Paradigm Capital Inc. acting as lead agent and sole bookrunner on behalf of a syndicate of agents. The company outlined the structure of the units, the agents’ option to increase the offering size, compensation arrangements for the agents, and intended use of proceeds, which include exploration and development expenditures and working capital. The offering is described as being conducted under private placement exemptions in Canada, in the United States under an exemption from registration, and in other agreed jurisdictions, subject to regulatory approvals and listing conditions.
Legal proceedings and project status
TriStar’s disclosures highlight that the civil public action filed by the MPF seeks to suspend the environmental licensing process for Castelo de Sonhos until additional studies and Indigenous consultation are carried out. The company reports that a Federal Judge initially declined to grant an immediate injunction, citing the length of the MPF’s prior investigations and the absence of urgency, and allowed time for SEMAS, TriStar’s subsidiary Mineração Castelo dos Sonhos S.A., and the National Indigenous Foundation (FUNAI) to respond. Subsequent updates from TriStar describe the judge’s decision to move the case forward along a typical litigation path, with phases for evidence production involving the MPF, FUNAI, the State of Pará, and the company.
Throughout these proceedings, TriStar has consistently stated that the LP for Castelo de Sonhos remains effective and in force, without restrictions. The company’s communications frame the ongoing legal process as a forum in which technical, environmental, and legal arguments are being evaluated, while the underlying permit continues to be recognized by the primary regulatory authority. TriStar emphasizes its confidence in the robustness of its environmental and technical studies and in the defenses presented by both the company and the State of Pará.
Management and governance developments
TriStar has reported several governance and leadership updates related to its board and executive team. The company announced the appointment of a new director with experience in technical and managerial roles at large-scale paleoplacer gold mines, including positions at operations in Ghana. This director previously served as TriStar’s Chief Operating Officer before transitioning to the board. TriStar has also recognized the contributions of a founding figure who has been named Chairman Emeritus in acknowledgment of his role in establishing the company and his ongoing involvement.
In addition, TriStar has disclosed a temporary change in executive leadership due to a medical leave, during which a director served as interim CEO. The company later confirmed the return of its President and CEO from leave, with the interim CEO continuing as a director. These governance updates are presented by TriStar as part of its efforts to maintain continuity and to draw on technical, operational, and financial expertise as it advances the Castelo de Sonhos project.
Position within the gold mining value chain
Based on its public statements, TriStar Gold operates in the gold exploration and development segment of the mining industry rather than as a producing mining company. Its primary activities center on geological evaluation, resource and reserve estimation, engineering and economic studies, environmental and social impact assessments, and permitting. The company’s communications repeatedly reference the potential for its projects to become producing mines, indicating a focus on advancing assets to stages where construction and production decisions may be considered.
TriStar’s emphasis on detailed technical studies, regulatory engagement, and legal processes reflects the typical progression of a gold project from exploration through development. For investors and observers, the company’s disclosures provide insight into how it is addressing permitting requirements, environmental and social considerations, and project economics in a specific jurisdiction, namely Pará State in Brazil.
Key points for TSGZF stock watchers
- TriStar Gold is an exploration and development company focused on precious metals properties in the Americas.
- The company’s flagship asset is the Castelo de Sonhos gold project in Pará State, Brazil.
- Castelo de Sonhos has a completed pre-feasibility study and a 2025 prefeasibility study update prepared by an independent engineering firm.
- The project is planned as an open pit gold mine with a 10,000 tpd processing plant using whole-ore agitation leaching and related processes.
- The project holds a Preliminary License (Licença Prévia) that TriStar states is valid and in good standing, with no restrictions.
- The environmental licensing process and LP are subject to a civil public action by the Federal Prosecutor’s Office, with ongoing legal proceedings.
- TriStar and the State of Pará have filed defenses supporting the licensing process and the adequacy of environmental and Indigenous impact studies.
- The company is evaluating financing options and has announced a best efforts private placement to fund exploration, development, and working capital.
- Governance updates include board changes, the appointment of a Chairman Emeritus, and temporary adjustments to executive roles.
Frequently Asked Questions (FAQ)
Q: What does TriStar Gold Inc. do?
A: TriStar Gold Inc. describes itself as an exploration and development company focused on precious metals properties in the Americas that have the potential to become producing mines. Its main activities involve advancing gold projects through technical studies, permitting, and related development work.
Q: What is TriStar Gold’s main project?
A: The company identifies its flagship project as the Castelo de Sonhos gold project in Pará State, Brazil. This project has been the subject of a pre-feasibility study and a subsequent prefeasibility study update and is planned as an open pit gold mine with associated processing facilities.
Q: On which exchanges does TriStar Gold trade?
A: According to company disclosures, TriStar Gold’s shares trade on the TSX Venture Exchange under the symbol TSG and on the OTCQB market under the symbol TSGZF.
Q: What stage is the Castelo de Sonhos project at?
A: TriStar reports that it has completed a pre-feasibility study and a 2025 prefeasibility study update for Castelo de Sonhos. The company states that it is working to advance the project toward a feasibility study while evaluating optimization options and considering financing to support drilling and further technical work.
Q: What is the status of the environmental permit for Castelo de Sonhos?
A: TriStar states that the project holds a Preliminary License (Licença Prévia or LP) in Pará State, which it describes as a critical permitting milestone confirming locational feasibility. The company reports that this LP remains valid, in good standing, and without restrictions that would prevent the project from progressing to subsequent licensing stages.
Q: What legal challenges is TriStar facing regarding Castelo de Sonhos?
A: The Federal Prosecutor’s Office (MPF) in Brazil has filed a civil public action seeking to suspend the environmental licensing process for Castelo de Sonhos and to require additional environmental and Indigenous studies and consultation. TriStar and the State of Pará have filed defenses supporting the licensing process and the adequacy of existing studies. A Federal Judge has moved the case forward along a standard litigation path, with phases for evidence production involving the MPF, FUNAI, the State of Pará, and the company.
Q: How does TriStar describe potential impacts on Indigenous lands?
A: TriStar’s disclosures state that technical and legal analyses indicate that the Castelo de Sonhos project does not have the potential to interfere with specified Indigenous lands. The company notes that these lands lie beyond the distance thresholds defined in Interministerial Ordinance No. 60/2015 from the project’s Directly Affected Area and that hydrological and socioeconomic studies do not show links that would justify Indigenous consultation at the LP stage. An independent legal opinion cited by TriStar supports this view.
Q: How is TriStar Gold funding its activities?
A: TriStar has announced a best efforts private placement financing of units consisting of common shares and share purchase warrants, with Paradigm Capital Inc. as lead agent and sole bookrunner on behalf of a syndicate of agents. The company states that net proceeds are intended for exploration and development of its projects, including Castelo de Sonhos, and for general working capital purposes.
Q: Is TriStar Gold currently a producing mining company?
A: Based on its public statements, TriStar Gold operates as an exploration and development company. Its flagship project, Castelo de Sonhos, is at the prefeasibility and permitting stage, and the company has not described itself as operating producing mines in its recent disclosures.
Q: What role do technical reports play in TriStar’s strategy?
A: TriStar emphasizes the importance of National Instrument 43-101 compliant technical reports and prefeasibility studies in defining mineral resources and reserves, evaluating project economics, and supporting permitting and financing efforts. The company has filed a technical report for the Castelo de Sonhos prefeasibility study update and highlights the involvement of independent qualified persons in preparing these documents.