STOCK TITAN

Vast Renewables (VSTTF) Stock Price, News & Analysis

VSTTF OTC
Published by Stock Titan Data refreshed

Price Move History

Daily moves over 5%
84 160 sessions, November 6, 2025 to November 6, 2026
Largest daily move
+3233.3% close of October 5, 2026
1-year change
-62.5% closing prices, November 6, 2025 to November 6, 2026
1-month change
+0% closing prices, October 6, 2026 to November 6, 2026

Company Description

Vast Renewables Ltd (VSTTF), referred to as "Vast", is described as an Australian on-demand renewable energy and clean fuels platform. According to company disclosures, Vast focuses on delivering carbon-free heat and power at utility scale, with an emphasis on enabling decarbonisation of the electricity grid, supporting green fuels production, and serving hard-to-abate industrial sectors.

The company highlights its proprietary concentrating solar thermal power ("CSP") technology as a core part of its platform. Vast characterises this technology as differentiated and designed to provide 24/7 carbon-free heat and power. By combining CSP generation with long-duration thermal energy storage, Vast aims to provide dispatchable renewable energy rather than only intermittent output.

Port Augusta Green Energy Hub and VS1

A central project for Vast is the Port Augusta Green Energy Hub in South Australia. Within this hub, the company is developing its flagship utility-scale long duration energy storage project known as Vast Solar 1 ("VS1"). VS1 is described as a 30MW CSP plant located in Port Augusta, South Australia, using Vast’s modular tower CSP v3.0 technology. The project is intended to generate clean, low-cost, dispatchable power with 10 hours of thermal energy storage.

Vast reports that VS1 has secured conditional support from the Australian Government, including a grant from the Australian Renewable Energy Agency ("ARENA"). The company positions VS1 as a key step in demonstrating its next generation CSP solution at utility scale, and as part of a broader effort to accelerate Australia’s energy transition.

The Port Augusta Green Energy Hub also includes a 140MW, 2-hour lithium-ion battery project. Vast states that this battery is being developed in partnership with clean energy storage technology company 1414 Degrees. According to the company, this battery project is intended to provide storage capacity and support grid stability alongside the CSP facility.

Business Focus and Technology

Vast describes itself as a platform for on-demand renewable energy and clean fuels, built around proprietary CSP technology. The company emphasises that its technology is designed to deliver carbon-free heat and power around the clock at utility scale. This focus on dispatchable renewable energy is presented as a way to support grid reliability and to enable applications that require continuous or process heat, such as green fuels production and industrial uses.

By pairing CSP generation with thermal energy storage, Vast aims to address the challenge of matching renewable generation with demand. The company’s description of its activities indicates a focus on large-scale projects and long-duration storage, rather than only short-duration or small-scale systems.

Capital Raising and Investor Support

Vast has announced the placement of convertible notes with two of its largest and longest-standing investors, Nabors Industries and Canberra Airport Group. The company states that the proceeds from these convertible notes are intended to support the delivery of the Port Augusta Green Energy Hub, including VS1, and to advance its international project pipeline. Vast refers to this funding as part of a broader capital raise involving institutional and strategic investors.

According to the company, this investment reflects investor confidence in its CSP technology and its readiness to progress major projects such as VS1. Vast also notes that it is actively engaging with long-term investors and strategic partners to secure additional financial support for its project portfolio.

Role in Energy Transition

In its own description, Vast links its activities to the broader energy transition, particularly in Australia. The company presents its CSP-based platform and associated projects as tools to accelerate the shift to carbon-free energy by providing dispatchable renewable power and heat. It also highlights the potential application of its technology in green fuels production and in sectors that are more difficult to decarbonise using conventional renewable generation alone.

Through projects like VS1 and the Port Augusta Green Energy Hub, Vast positions itself as working at the intersection of renewable generation, energy storage, and clean fuels. Its disclosures emphasise long-duration storage, utility-scale deployment, and the use of proprietary CSP technology as defining features of its business.

Corporate and Shareholder Information

Vast Renewables Ltd trades under the symbol VSTTF on the over-the-counter (OTC) market. The company has indicated that it holds annual general meetings (AGMs) for shareholders and publishes annual financial statements for its financial year. These materials are used to provide updates on project progress, financial performance, and the outlook for its CSP solutions and project pipeline.

While detailed segment reporting or geographic breakdowns are not provided in the available information, the company’s descriptions focus on its Australian base, its CSP technology platform, and its pipeline of utility-scale renewable and storage projects.

Key Themes for Investors and Observers

  • Focus on on-demand renewable energy and clean fuels.
  • Use of proprietary concentrating solar thermal power technology.
  • Development of utility-scale projects with long-duration thermal energy storage.
  • Flagship VS1 CSP plant within the Port Augusta Green Energy Hub in South Australia.
  • Integration of CSP with battery storage in partnership projects.
  • Capital raising through instruments such as convertible notes to fund project development.

These elements summarise how Vast Renewables Ltd presents its business model and strategic focus based on the available company statements.

Stock Performance

$0.0006
-
-
Last updated: November 6, 2026 at 16:00
-62.5%
Performance 1 year
$18.0K

Vast Renewables (VSTTF) closed at $0.0006 on November 6, 2026. Over the past 12 months, the price has lost 62.5%.

See what a $1,000 investment in VSTTF would be worth today

Average down calculator for VSTTF

VSTTF Metrics & Rankings

Price returns through November 6, 2026. Month and year figures include the first trading day. Ranking links may use different dates.

Latest News

Vast Renewables has 1 recent news article. Of the recent coverage, 1 article coincided with positive price movement and 0 with negative movement. View all VSTTF news →

SEC Filings

Vast Renewables has filed 1 recent SEC filing, including 1 Form SCHEDULE 13G/A. The most recent filing was submitted on . SEC filings provide transparency into a company's financial condition, material events, and regulatory compliance. View all VSTTF SEC filings →

Financial Highlights

Vast Renewables generated $342K in revenue in FY2024. Diluted earnings per share stood at -$17.50. The company generated -$40.3M in operating cash flow. The current ratio was 1.35, measuring current assets divided by current liabilities.

$342K
Revenue (FY2024)
-$40.3M
Operating Cash Flow
—
Net Income (FY2024)

Upcoming Events

No upcoming events scheduled for VSTTF.

Short Interest History

Last 12 Months

Short interest in Vast Renewables (VSTTF) currently stands at 109.2 thousand shares, representing 0.5% of the float.

Days to Cover History

Last 12 Months

Days to cover for Vast Renewables (VSTTF) currently stands at 1.4 days, down 98% from the previous period. The ratio is the reported short interest divided by the average daily trading volume. Since November 2025, the figure has decreased by 79.5%. Across the settlements charted above, it has ranged from 1.0 to 147.4 days.

VSTTF Company Profile & Sector Positioning

Vast Renewables (VSTTF) operates in the Solar industry within the broader Technology sector and is listed on the OTC.

Investors comparing VSTTF often look at related companies in the same sector, including SinglePoint Inc (SING), TGI Solar Power Group Inc (TSPG), Aurora Solar Technologies (AACTF), Principal Solar Inc (PSWW), and SunHydrogen Inc. (HYSR). Comparing financial metrics, valuation ratios, and stock performance across these peers can help investors evaluate VSTTF's relative position within its industry.

Frequently Asked Questions

The current stock price of Vast Renewables (VSTTF) is $0.0006 as of November 6, 2026.

The market cap of Vast Renewables (VSTTF) is approximately $18.0K. Learn more about what market capitalization means .

The FY2024 revenue of Vast Renewables (VSTTF) is $342K, from its most recent completed fiscal year.

The diluted earnings per share (EPS) of Vast Renewables (VSTTF) is -$17.50 for FY2024, its most recent completed fiscal year. Learn more about EPS .

The operating cash flow of Vast Renewables (VSTTF) is -$40.3M for FY2024, its most recent completed fiscal year. Learn about cash flow.

The current ratio of Vast Renewables (VSTTF), current assets divided by current liabilities, was 1.35 at the end of FY2024, its most recent completed fiscal year. Learn about liquidity ratios.

Vast Renewables Ltd describes itself as an Australian on-demand renewable energy and clean fuels platform. The company focuses on delivering 24/7 carbon-free heat and power at utility scale, using proprietary concentrating solar thermal power technology to support grid decarbonisation, green fuels production, and hard-to-abate industries.

Vast Solar 1 (VS1) is Vast’s flagship utility-scale long duration energy storage project within the Port Augusta Green Energy Hub in South Australia. It is a 30MW concentrating solar thermal power plant that uses Vast’s modular tower CSP v3.0 technology to generate clean, low-cost, dispatchable power with 10 hours of thermal energy storage.

The Port Augusta Green Energy Hub is a project in South Australia that includes Vast’s VS1 concentrating solar thermal power plant and a 140MW, 2-hour lithium-ion battery. Vast describes this hub as a key site for delivering long-duration renewable energy storage and grid stability, with the battery developed in partnership with clean energy storage technology company 1414 Degrees.

Vast states that it uses proprietary concentrating solar thermal power (CSP) technology, implemented as modular tower CSP v3.0 at VS1. This approach is designed to generate carbon-free heat and power and to store energy thermally for up to 10 hours, allowing the company to provide dispatchable renewable energy rather than only intermittent generation.

Vast has announced the placement of convertible notes with investors including Nabors Industries and Canberra Airport Group. The company indicates that proceeds from these notes support the delivery of the Port Augusta Green Energy Hub, including VS1, and the development of its international project pipeline, as part of a broader capital raise involving institutional and strategic investors.

Vast reports that VS1 has secured conditional support from the Australian Government, including a grant from the Australian Renewable Energy Agency (ARENA). This support is described as contributing to the financing of the 30MW CSP plant and its long-duration thermal energy storage capability.

At the Port Augusta Green Energy Hub, Vast notes that a 140MW, 2-hour lithium-ion battery is being developed in partnership with 1414 Degrees. According to the company, this battery project is intended to provide additional storage capacity and grid stability alongside the VS1 concentrating solar thermal power plant.