Agnico Eagle (NYSE: AEM) lifts H1 income, expands Finland and Hope Bay
Agnico Eagle Mines Limited reported higher profitability for the second quarter and first half of 2026, mainly from stronger realized gold prices and wider operating margins. Q2 net income was $1,600.5 million, adjusted net income was $1,540.7 million, and gold production was 855,816 ounces at an average realized gold price of $4,483 per ounce.
The company expanded its footprint in Finland by acquiring properties in the Central Lapland Greenstone Belt, consolidating a 2,492 km² land package including the Ikkari project. It also approved redevelopment of the Hope Bay project, which is expected to produce 400,000–435,000 ounces of gold annually over an initial 11-year mine life.
A rock mass movement at the Barnat pit is expected to reduce Canadian Malartic production by 60,000–80,000 ounces in the second half of 2026 and by up to 150,000 ounces in each of 2027 and 2028. Even so, full-year 2026 payable gold production is expected at the low end of 3.3–3.5 million ounces, with total cash costs of $1,020–$1,120 per ounce and all-in sustaining costs of $1,400–$1,550 per ounce. Net cash increased to $3,267.1 million, and Fitch Ratings upgraded the credit rating to A- with a Stable Outlook.
Positive
- Q2 2026 net income of $1,600.5M on stronger margins and prices.
- First-half operating cash flow of $3,490.0M lifts net cash to $3,267.1M.
- Full-year 2026 gold output guidance kept at low end of 3.3–3.5M oz.
- Fitch credit rating upgraded to A- with a Stable Outlook.
Negative
- Barnat rock movement cuts Canadian Malartic 2026 H2 output by 60k–80k oz.
- Canadian Malartic 2027–2028 production reduced by up to 150k oz annually.
- 2026 capital expenditure guidance raised to $2.6–$2.8B from $2.2–$2.4B.
- Total cash costs per ounce up to $1,073 in the first half.
Filing Explained
The completed Rupert acquisition issued Agnico shares, while buybacks cancelled shares, leaving both ownership-changing mechanics disclosed.
This Form 6-K is Agnico Eagle’s interim second-quarter report, and it records the Central Lapland acquisitions as completed by
Under the Rupert arrangement, each Rupert share was exchanged for
The contingent value right is therefore a conditional maximum, not a stated payment already made. Separately, during the second quarter Agnico repurchased
The bid permits purchases of up to
Key Figures
Key Terms
all-in sustaining costs per ounce financial
normal course issuer bid financial
contingent value right financial
preliminary economic assessment technical
effective tax rate financial
net cash (debt) financial
AI-generated analysis. How Rhea-AI works. Not financial advice.
FAQ
What were Agnico Eagle (AEM) earnings in Q2 2026?
How much gold did AEM produce and at what price in Q2 2026?
How does the Barnat rock mass movement affect AEM’s production guidance?
What are Agnico Eagle’s 2026 cost and capital spending guidance figures?
What growth projects and acquisitions is AEM pursuing in 2026?
How strong is Agnico Eagle’s (AEM) balance sheet and shareholder return profile?
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO
RULE 13a-16 OR 15d-16 UNDER THE
SECURITIES EXCHANGE ACT OF 1934
For the month of July, 2026
Commission File Number 001-13422
AGNICO EAGLE MINES LIMITED
(Translation of registrant’s name into English)
145 King Street East, Suite 400, Toronto, Ontario M5C 2Y7
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F. Form 20-F ¨ Form 40-F x
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101 (b)( 1): ¨
Note: Regulation S-T Rule 101 (b)( 1) only permits the submission in paper of a Form 6-K if submitted solely to provide an attached annual report to security holders.
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101 (b)(7): ¨
Note: Regulation S-T Rule 101(b)(7) only permits the submission in paper of a Form 6-K if submitted to furnish a report or other document that the registrant foreign private issuer must furnish and make public under the laws of the jurisdiction in which the registrant is incorporated, domiciled or legally organized (the registrant’s “home country”), or under the rules of the home country exchange on which the registrant’s securities are traded, as long as the report or other document is not a press release, is not required to be and has not been distributed to the registrant’s security holders, and, if discussing a material event, has already been the subject of a Form 6-K submission or other Commission filing on EDGAR.
Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934. Yes ¨ No x
If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82- .
EXHIBITS
| Exhibit No. | Exhibit Description |
| 99.1 | Second Quarter Report |
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| AGNICO EAGLE MINES LIMITED | |
| (Registrant) |
| Date: 07/29/2026 | By: | /s/ Chris Vollmershausen |
| Chris Vollmershausen | ||
| Executive Vice-President, Legal, General Counsel & Corporate Secretary |
Exhibit Number 99.1 submitted with this Form 6-K is hereby incorporated by reference into Agnico Eagle Mines Limited’s Registration Statements on Form F-10 (Reg. No. 333-234778), Form F-3D (Reg. No. 333-249203) and Form S-8 (Reg. Nos. 333-130339 and 333-152004)
2
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
|
(millions of United States dollars)
|
| |
Three Months Ended
June 30, 2026 vs. Three Months Ended June 30, 2025 |
| |
Six Months Ended
June 30, 2026 vs. Six Months Ended June 30, 2025 |
| ||||||
|
Increase in revenues from mining operations
|
| | | $ | 986.7 | | | | | $ | 2,618.1 | | |
|
Increase in production costs due to effects of foreign currencies
|
| | | | (8.4) | | | | | | (43.6) | | |
|
Increase in production costs
|
| | | | (156.2) | | | | | | (308.8) | | |
|
Increase in amortization of property, plant and mine development
|
| | | | (46.3) | | | | | | (49.8) | | |
|
Increase in exploration and corporate development expenses
|
| | | | (9.4) | | | | | | (20.2) | | |
|
Increase in general and administrative expenses
|
| | | | (0.1) | | | | | | (17.2) | | |
|
Decrease in finance costs
|
| | | | 11.4 | | | | | | 18.1 | | |
|
Change in derivative financial instruments
|
| | | | (206.6) | | | | | | (270.8) | | |
|
Change in non-cash foreign exchange translation
|
| | | | (31.7) | | | | | | (31.0) | | |
|
Decrease (increase) in care and maintenance
|
| | | | 0.4 | | | | | | (8.3) | | |
|
Change in gain on sale of investments
|
| | | | 155.3 | | | | | | 155.3 | | |
|
Decrease in other income and expenses
|
| | | | 11.1 | | | | | | 29.5 | | |
|
Increase in income and mining taxes
|
| | | | (174.5) | | | | | | (658.8) | | |
|
Total net income variance
|
| | | $ | 531.7 | | | | | $ | 1,412.5 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
LaRonde — Operating Statistics*
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 713 | | | | | | 674 | | | | | | 1,489 | | | | | | 1,349 | | |
|
Tonnes of ore milled per day
|
| | | | 7,835 | | | | | | 7,407 | | | | | | 8,227 | | | | | | 7,453 | | |
|
Gold grade (g/t)
|
| | | | 3.80 | | | | | | 4.47 | | | | | | 3.67 | | | | | | 4.50 | | |
|
Gold production (ounces)
|
| | |
|
81,261
|
| | | |
|
91,252
|
| | | |
|
162,857
|
| | | |
|
182,743
|
| |
|
Production costs per tonne (C$)
|
| | | C$ | 219 | | | | | C$ | 172 | | | | | C$ | 186 | | | | | C$ | 178 | | |
|
Minesite costs per tonne (C$)
|
| | | C$ | 183 | | | | | C$ | 166 | | | | | C$ | 179 | | | | | C$ | 166 | | |
|
Production costs per ounce
|
| | | $ | 1,390 | | | | | $ | 918 | | | | | $ | 1,234 | | | | | $ | 932 | | |
|
Total cash costs per ounce
|
| | | $ | 953 | | | | | $ | 807 | | | | | $ | 990 | | | | | $ | 776 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Canadian Malartic — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 4,387 | | | | | | 4,963 | | | | | | 9,094 | | | | | | 9,828 | | |
|
Tonnes of ore milled per day
|
| | | | 48,209 | | | | | | 54,538 | | | | | | 50,243 | | | | | | 54,298 | | |
|
Gold grade (g/t)
|
| | | | 1.06 | | | | | | 1.17 | | | | | | 1.13 | | | | | | 1.14 | | |
|
Gold production (ounces)
|
| | |
|
135,243
|
| | | |
|
172,531
|
| | | |
|
301,459
|
| | | |
|
332,304
|
| |
|
Production costs per tonne (C$)
|
| | | C$ | 40 | | | | | C$ | 32 | | | | | C$ | 39 | | | | | C$ | 33 | | |
|
Minesite costs per tonne (C$)
|
| | | C$ | 52 | | | | | C$ | 42 | | | | | C$ | 51 | | | | | C$ | 43 | | |
|
Production costs per ounce
|
| | | $ | 933 | | | | | $ | 669 | | | | | $ | 850 | | | | | $ | 706 | | |
|
Total cash costs per ounce
|
| | | $ | 1,185 | | | | | $ | 876 | | | | | $ | 1,082 | | | | | $ | 900 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Goldex — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 817 | | | | | | 819 | | | | | | 1,630 | | | | | | 1,611 | | |
|
Tonnes of ore milled per day
|
| | | | 8,978 | | | | | | 9,000 | | | | | | 9,006 | | | | | | 8,901 | | |
|
Gold grade (g/t)
|
| | | | 1.35 | | | | | | 1.47 | | | | | | 1.35 | | | | | | 1.44 | | |
|
Gold production (ounces)
|
| | |
|
29,277
|
| | | |
|
33,118
|
| | | |
|
58,649
|
| | | |
|
63,134
|
| |
|
Production costs per tonne (C$)
|
| | | C$ | 69 | | | | | C$ | 64 | | | | | C$ | 69 | | | | | C$ | 63 | | |
|
Minesite costs per tonne (C$)
|
| | | C$ | 71 | | | | | C$ | 63 | | | | | C$ | 68 | | | | | C$ | 63 | | |
|
Production costs per ounce
|
| | | $ | 1,394 | | | | | $ | 1,138 | | | | | $ | 1,378 | | | | | $ | 1,146 | | |
|
Total cash costs per ounce
|
| | | $ | 1,081 | | | | | $ | 962 | | | | | $ | 998 | | | | | $ | 961 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Detour Lake — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 7,305 | | | | | | 6,836 | | | | | | 14,053 | | | | | | 13,466 | | |
|
Tonnes of ore milled per day
|
| | | | 80,275 | | | | | | 75,121 | | | | | | 77,641 | | | | | | 74,398 | | |
|
Gold grade (g/t)
|
| | | | 0.97 | | | | | | 0.85 | | | | | | 0.93 | | | | | | 0.83 | | |
|
Gold production (ounces)
|
| | |
|
207,279
|
| | | |
|
168,272
|
| | | |
|
384,298
|
| | | |
|
321,110
|
| |
|
Production costs per tonne (C$)
|
| | | C$ | 29 | | | | | C$ | 29 | | | | | C$ | 32 | | | | | C$ | 29 | | |
|
Minesite costs per tonne (C$)
|
| | | C$ | 33 | | | | | C$ | 31 | | | | | C$ | 34 | | | | | C$ | 31 | | |
|
Production costs per ounce
|
| | | $ | 741 | | | | | $ | 840 | | | | | $ | 838 | | | | | $ | 860 | | |
|
Total cash costs per ounce
|
| | | $ | 825 | | | | | $ | 914 | | | | | $ | 894 | | | | | $ | 929 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Macassa — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 236 | | | | | | 143 | | | | | | 385 | | | | | | 291 | | |
|
Tonnes of ore milled per day
|
| | | | 2,593 | | | | | | 1,571 | | | | | | 2,127 | | | | | | 1,608 | | |
|
Gold grade (g/t)
|
| | | | 10.96 | | | | | | 19.50 | | | | | | 11.33 | | | | | | 18.99 | | |
|
Gold production (ounces)
|
| | |
|
80,143
|
| | | |
|
87,364
|
| | | |
|
135,736
|
| | | |
|
173,392
|
| |
|
Production costs per tonne (C$)
|
| | | C$ | 413 | | | | | C$ | 462 | | | | | C$ | 512 | | | | | C$ | 472 | | |
|
Minesite costs per tonne (C$)
|
| | | C$ | 492 | | | | | C$ | 529 | | | | | C$ | 557 | | | | | C$ | 531 | | |
|
Production costs per ounce
|
| | | $ | 877 | | | | | $ | 552 | | | | | $ | 1,052 | | | | | $ | 566 | | |
|
Total cash costs per ounce
|
| | | $ | 1,041 | | | | | $ | 626 | | | | | $ | 1,129 | | | | | $ | 636 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Meliadine — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 648 | | | | | | 545 | | | | | | 1,206 | | | | | | 1,103 | | |
|
Tonnes of ore milled per day
|
| | | | 7,121 | | | | | | 5,989 | | | | | | 6,663 | | | | | | 6,094 | | |
|
Gold grade (g/t)
|
| | | | 4.77 | | | | | | 5.32 | | | | | | 5.10 | | | | | | 5.50 | | |
|
Gold production (ounces)
|
| | |
|
97,516
|
| | | |
|
90,263
|
| | | |
|
191,347
|
| | | |
|
188,775
|
| |
|
Production costs per tonne (C$)
|
| | | C$ | 260 | | | | | C$ | 290 | | | | | C$ | 247 | | | | | C$ | 251 | | |
|
Minesite costs per tonne (C$)
|
| | | C$ | 215 | | | | | C$ | 254 | | | | | C$ | 241 | | | | | C$ | 241 | | |
|
Production costs per ounce
|
| | | $ | 1,255 | | | | | $ | 1,253 | | | | | $ | 1,128 | | | | | $ | 1,043 | | |
|
Total cash costs per ounce
|
| | | $ | 1,033 | | | | | $ | 1,112 | | | | | $ | 1,096 | | | | | $ | 1,012 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Meadowbank — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 1,013 | | | | | | 692 | | | | | | 2,112 | | | | | | 1,729 | | |
|
Tonnes of ore milled per day(i)
|
| | | | 11,132 | | | | | | 10,813 | | | | | | 11,669 | | | | | | 11,227 | | |
|
Gold grade (g/t)
|
| | | | 3.41 | | | | | | 5.00 | | | | | | 3.49 | | | | | | 4.78 | | |
|
Gold production (ounces)
|
| | |
|
100,165
|
| | | |
|
101,935
|
| | | |
|
214,027
|
| | | |
|
242,061
|
| |
|
Production costs per tonne (C$)
|
| | | C$ | 204 | | | | | C$ | 211 | | | | | C$ | 218 | | | | | C$ | 188 | | |
|
Minesite costs per tonne (C$)
|
| | | C$ | 167 | | | | | C$ | 194 | | | | | C$ | 162 | | | | | C$ | 174 | | |
|
Production costs per ounce
|
| | | $ | 1,494 | | | | | $ | 1,040 | | | | | $ | 1,557 | | | | | $ | 963 | | |
|
Total cash costs per ounce
|
| | | $ | 1,206 | | | | | $ | 955 | | | | | $ | 1,139 | | | | | $ | 891 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Fosterville — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 204 | | | | | | 188 | | | | | | 420 | | | | | | 351 | | |
|
Tonnes of ore milled per day
|
| | | | 2,242 | | | | | | 2,066 | | | | | | 2,320 | | | | | | 1,939 | | |
|
Gold grade (g/t)
|
| | | | 6.68 | | | | | | 8.52 | | | | | | 6.49 | | | | | | 8.57 | | |
|
Gold production (ounces)
|
| | |
|
42,012
|
| | | |
|
49,574
|
| | | |
|
83,455
|
| | | |
|
93,189
|
| |
|
Production costs per tonne (A$)
|
| | | A$ | 365 | | | | | A$ | 309 | | | | | A$ | 336 | | | | | A$ | 314 | | |
|
Minesite costs per tonne (A$)
|
| | | A$ | 341 | | | | | A$ | 315 | | | | | A$ | 328 | | | | | A$ | 329 | | |
|
Production costs per ounce
|
| | | $ | 1,230 | | | | | $ | 767 | | | | | $ | 1,165 | | | | | $ | 763 | | |
|
Total cash costs per ounce
|
| | | $ | 1,114 | | | | | $ | 783 | | | | | $ | 1,118 | | | | | $ | 797 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Kittila — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 583 | | | | | | 482 | | | | | | 1,031 | | | | | | 1,004 | | |
|
Tonnes of ore milled per day
|
| | | | 6,407 | | | | | | 5,297 | | | | | | 5,696 | | | | | | 5,547 | | |
|
Gold grade (g/t)
|
| | | | 4.07 | | | | | | 3.96 | | | | | | 4.12 | | | | | | 3.92 | | |
|
Gold production (ounces)
|
| | |
|
61,969
|
| | | |
|
50,357
|
| | | |
|
110,496
|
| | | |
|
104,461
|
| |
|
Production costs per tonne (€)
|
| | | € | 100 | | | | | € | 100 | | | | | € | 113 | | | | | € | 101 | | |
|
Minesite costs per tonne (€)
|
| | | € | 104 | | | | | € | 104 | | | | | € | 112 | | | | | € | 102 | | |
|
Production costs per ounce
|
| | | $ | 1,091 | | | | | $ | 1,093 | | | | | $ | 1,227 | | | | | $ | 1,062 | | |
|
Total cash costs per ounce
|
| | | $ | 1,133 | | | | | $ | 1,134 | | | | | $ | 1,212 | | | | | $ | 1,071 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
Pinos Altos — Operating Statistics
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Tonnes of ore milled (thousands of tonnes)
|
| | | | 442 | | | | | | 441 | | | | | | 869 | | | | | | 822 | | |
|
Tonnes of ore milled per day
|
| | | | 4,857 | | | | | | 4,846 | | | | | | 4,801 | | | | | | 4,541 | | |
|
Gold grade (g/t)
|
| | | | 1.54 | | | | | | 1.58 | | | | | | 1.45 | | | | | | 1.53 | | |
|
Gold production (ounces)
|
| | |
|
20,951
|
| | | |
|
21,363
|
| | | |
|
38,601
|
| | | |
|
38,654
|
| |
|
Production costs per tonne
|
| | | $ | 133 | | | | | $ | 115 | | | | | $ | 143 | | | | | $ | 113 | | |
|
Minesite costs per tonne
|
| | | $ | 132 | | | | | $ | 118 | | | | | $ | 134 | | | | | $ | 118 | | |
|
Production costs per ounce
|
| | | $ | 2,796 | | | | | $ | 2,367 | | | | | $ | 3,231 | | | | | $ | 2,413 | | |
|
Total cash costs per ounce
|
| | | $ | 1,873 | | | | | $ | 2,002 | | | | | $ | 2,073 | | | | | $ | 2,077 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
|
(thousands of United States dollars)
|
| |
As at June 30,
2026 |
| |
As at December 31,
2025 |
| ||||||
|
Current assets
|
| | | $ | 5,523,582 | | | | | $ | 4,993,942 | | |
|
Non-current assets
|
| | | | 32,271,461 | | | | | | 29,477,349 | | |
|
Total assets
|
| | | $ | 37,795,043 | | | | | $ | 34,471,291 | | |
|
Current liabilities
|
| | | $ | 1,932,612 | | | | | $ | 2,472,206 | | |
|
Non-current liabilities
|
| | | | 7,258,701 | | | | | | 7,256,621 | | |
|
Total liabilities
|
| | | $ | 9,191,313 | | | | | $ | 9,728,827 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended June 30,
|
| |
Six Months Ended June 30,
|
| ||||||||||||||||||
|
(thousands of United States dollars)
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Net income for the period
|
| | | $ | 1,600,453 | | | | | $ | 1,068,711 | | | | | $ | 3,295,914 | | | | | $ | 1,883,442 | | |
|
Dilutive impact of cash settling LTIP
|
| | | | (4,539) | | | | | | 2,939 | | | | | | 671 | | | | | | — | | |
|
Net income for the period — diluted
|
| | | $ | 1,595,914 | | | | | $ | 1,071,650 | | | | | $ | 3,296,585 | | | | | $ | 1,883,442 | | |
|
Foreign exchange translation
|
| | | | 20,128 | | | | | | (11,571) | | | | | | 19,395 | | | | | | (11,631) | | |
|
Loss (gain) on derivative financial instruments
|
| | | | 81,404 | | | | | | (125,264) | | | | | | 76,704 | | | | | | (194,123) | | |
|
Environmental remediation
|
| | | | 9,104 | | | | | | 14,234 | | | | | | 23,074 | | | | | | 21,965 | | |
|
Net loss on disposal of property, plant and equipment
|
| | | | 6,597 | | | | | | 6,459 | | | | | | 16,836 | | | | | | 12,105 | | |
|
Purchase price allocation to inventory(i)
|
| | | | (5,785) | | | | | | 1,466 | | | | | | (9,426) | | | | | | 2,534 | | |
|
Debt extinguishment costs
|
| | | | — | | | | | | 5,407 | | | | | | — | | | | | | 5,407 | | |
|
Impairment loss(ii)
|
| | | | — | | | | | | — | | | | | | — | | | | | | 10,554 | | |
|
Gain on sale of investments
|
| | | | (155,319) | | | | | | — | | | | | | (155,319) | | | | | | — | | |
|
Multi-year donations
|
| | | | 19,369 | | | | | | — | | | | | | 19,369 | | | | | | — | | |
|
Other(iii)
|
| | | | — | | | | | | 2,077 | | | | | | — | | | | | | 2,077 | | |
|
Income and mining taxes adjustments(iv)
|
| | | | (35,289) | | | | | | 14,261 | | | | | | (40,129) | | | | | | 13,558 | | |
|
Adjusted net income for the period
|
| | | $ | 1,540,662 | | | | | $ | 975,780 | | | | | $ | 3,246,418 | | | | | $ | 1,745,888 | | |
|
Adjusted net income for the period — diluted
|
| | | $ | 1,536,123 | | | | | $ | 978,719 | | | | | $ | 3,247,089 | | | | | $ | 1,745,888 | | |
|
Net income per share — basic
|
| | | $ | 3.19 | | | | | $ | 2.13 | | | | | $ | 6.58 | | | | | $ | 3.75 | | |
|
Net income per share — diluted
|
| | | $ | 3.17 | | | | | $ | 2.12 | | | | | $ | 6.56 | | | | | $ | 3.74 | | |
|
Adjusted net income per share — basic
|
| | | $ | 3.07 | | | | | $ | 1.94 | | | | | $ | 6.48 | | | | | $ | 3.47 | | |
|
Adjusted net income per share — diluted
|
| | | $ | 3.05 | | | | | $ | 1.94 | | | | | $ | 6.46 | | | | | $ | 3.46 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended June 30,
|
| |
Six Months Ended June 30,
|
| ||||||||||||||||||
|
(thousands of United States dollars)
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Net income for the period
|
| | | $ | 1,600,453 | | | | | $ | 1,068,711 | | | | | $ | 3,295,914 | | | | | $ | 1,883,442 | | |
|
Finance costs
|
| | | | 16,039 | | | | | | 27,429 | | | | | | 31,795 | | | | | | 49,873 | | |
|
Amortization of property, plant and mine development
|
| | | | 423,256 | | | | | | 376,956 | | | | | | 843,522 | | | | | | 793,756 | | |
|
Income and mining tax expense
|
| | | | 722,402 | | | | | | 547,908 | | | | | | 1,586,565 | | | | | | 927,748 | | |
|
EBITDA
|
| | | | 2,762,150 | | | | | | 2,021,004 | | | | | | 5,757,796 | | | | | | 3,654,819 | | |
|
Foreign exchange translation
|
| | | | 20,128 | | | | | | (11,571) | | | | | | 19,395 | | | | | | (11,631) | | |
|
Loss (gain) on derivative financial instruments
|
| | | | 81,404 | | | | | | (125,264) | | | | | | 76,704 | | | | | | (194,123) | | |
|
Environmental remediation
|
| | | | 9,104 | | | | | | 14,234 | | | | | | 23,074 | | | | | | 21,965 | | |
|
Net loss on disposal of property, plant and equipment
|
| | | | 6,597 | | | | | | 6,459 | | | | | | 16,836 | | | | | | 12,105 | | |
|
Purchase price allocation to inventory(i)
|
| | | | (5,785) | | | | | | 1,466 | | | | | | (9,426) | | | | | | 2,534 | | |
|
Debt extinguishment costs
|
| | | | — | | | | | | 5,407 | | | | | | — | | | | | | 5,407 | | |
|
Impairment loss(ii)
|
| | | | — | | | | | | — | | | | | | — | | | | | | 10,554 | | |
|
Gain on sale of investments
|
| | | | (155,319) | | | | | | — | | | | | | (155,319) | | | | | | — | | |
|
Multi-year donations
|
| | | | 19,369 | | | | | | — | | | | | | 19,369 | | | | | | — | | |
|
Other(iii)
|
| | | | — | | | | | | 2,077 | | | | | | — | | | | | | 2,077 | | |
|
Adjusted EBITDA
|
| | | $ | 2,737,648 | | | | | $ | 1,913,812 | | | | | $ | 5,748,429 | | | | | $ | 3,503,707 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
(thousands of United States dollars)
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Cash provided by operating activities
|
| | | $ | 2,144,120 | | | | | $ | 1,845,488 | | | | | $ | 3,489,988 | | | | | $ | 2,889,734 | | |
|
Additions to property, plant and mine development
|
| | | | (809,255) | | | | | | (540,476) | | | | | | (1,423,004) | | | | | | (990,600) | | |
|
Free cash flow
|
| | | | 1,334,865 | | | | | | 1,305,012 | | | | | | 2,066,984 | | | | | | 1,899,134 | | |
|
Changes in income taxes
|
| | | | 13,390 | | | | | | (478,106) | | | | | | 1,002,470 | | | | | | (301,367) | | |
|
Changes in inventory
|
| | | | 42,494 | | | | | | 53,061 | | | | | | 5,694 | | | | | | 22,144 | | |
|
Changes in other current assets
|
| | | | 18,741 | | | | | | 38,152 | | | | | | 29,755 | | | | | | 6,762 | | |
|
Changes in accounts payable and accrued liabilities
|
| | | | (106,541) | | | | | | (126,509) | | | | | | (184,341) | | | | | | (75,797) | | |
|
Free cash flow before changes in non-cash components
of working capital |
| | | $ | 1,302,949 | | | | | $ | 791,610 | | | | | $ | 2,920,562 | | | | | $ | 1,550,876 | | |
|
(thousands of United States dollars)
|
| |
As at
June 30, 2026 |
| |
As at
December 31, 2025 |
| ||||||
|
Long-term debt
|
| | | $ | (196,825) | | | | | $ | (196,271) | | |
|
Cash and cash equivalents
|
| | | | 3,463,957 | | | | | | 2,866,053 | | |
|
Net cash
|
| | | $ | 3,267,132 | | | | | $ | 2,669,782 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
(thousands of United States dollars)
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
LaRonde
|
| | | $ | 112,940 | | | | | $ | 83,734 | | | | | $ | 200,948 | | | | | $ | 170,378 | | |
|
Canadian Malartic
|
| | | | 126,188 | | | | | | 115,383 | | | | | | 256,134 | | | | | | 234,672 | | |
|
Goldex
|
| | | | 40,826 | | | | | | 37,690 | | | | | | 80,825 | | | | | | 72,346 | | |
| Quebec | | | | | 279,954 | | | | | | 236,807 | | | | | | 537,907 | | | | | | 477,396 | | |
|
Detour Lake
|
| | | | 153,621 | | | | | | 141,330 | | | | | | 322,000 | | | | | | 276,276 | | |
|
Macassa
|
| | | | 70,266 | | | | | | 48,266 | | | | | | 142,731 | | | | | | 98,092 | | |
| Ontario | | | | | 223,887 | | | | | | 189,596 | | | | | | 464,731 | | | | | | 374,368 | | |
|
Meliadine
|
| | | | 122,373 | | | | | | 113,093 | | | | | | 215,932 | | | | | | 196,915 | | |
|
Meadowbank
|
| | | | 149,641 | | | | | | 106,039 | | | | | | 333,256 | | | | | | 233,006 | | |
| Nunavut | | | | | 272,014 | | | | | | 219,132 | | | | | | 549,188 | | | | | | 429,921 | | |
|
Fosterville
|
| | | | 51,693 | | | | | | 38,018 | | | | | | 97,186 | | | | | | 71,058 | | |
| Australia | | | | | 51,693 | | | | | | 38,018 | | | | | | 97,186 | | | | | | 71,058 | | |
|
Kittila
|
| | | | 67,623 | | | | | | 55,064 | | | | | | 135,632 | | | | | | 110,897 | | |
| Finland | | | | | 67,623 | | | | | | 55,064 | | | | | | 135,632 | | | | | | 110,897 | | |
|
Pinos Altos
|
| | | | 58,587 | | | | | | 50,570 | | | | | | 124,701 | | | | | | 93,280 | | |
| Mexico | | | | | 58,587 | | | | | | 50,570 | | | | | | 124,701 | | | | | | 93,280 | | |
|
Production costs per the Second Quarter Financial Statements
|
| | | $ | 953,758 | | | | | $ | 789,187 | | | | | $ | 1,909,345 | | | | | $ | 1,556,920 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
(thousands of United States dollars, except as noted)
|
Mine
|
| |
Payable
gold production (ounces)(i) |
| |
Production
costs ($) |
| |
Production
costs per ounce ($) |
| |
Inventory
adjustments ($)(ii) |
| |
Realized
(gains) and losses on hedges ($) |
| |
In-kind
royalty and NTI Payment ($)(iii) |
| |
Smelting,
refining and marketing charges ($) |
| |
Total cash
costs per ounce (co-product basis) ($) |
| |
Impact of
by-product metals ($) |
| |
Total cash
costs per ounce (by-product basis) ($) |
| ||||||||||||||||||||||||||||||
|
LaRonde
|
| | | | 81,261 | | | | | | 112,940 | | | | | | 1,390 | | | | | | (12,495) | | | | | | (29) | | | | | | — | | | | | | 1,026 | | | | |
|
1,248
|
| | | | | (23,990) | | | | |
|
953
|
| |
|
Canadian Malartic
|
| | | | 135,243 | | | | | | 126,188 | | | | | | 933 | | | | | | 7,881 | | | | | | (459) | | | | | | 30,977 | | | | | | 418 | | | | |
|
1,220
|
| | | | | (4,770) | | | | |
|
1,185
|
| |
|
Goldex
|
| | | | 29,277 | | | | | | 40,826 | | | | | | 1,394 | | | | | | 1,154 | | | | | | (10) | | | | | | — | | | | | | 1,362 | | | | |
|
1,480
|
| | | | | (11,671) | | | | |
|
1,081
|
| |
| Quebec | | | | | 245,781 | | | | | | 279,954 | | | | | | 1,139 | | | | | | (3,460) | | | | | | (498) | | | | | | 30,977 | | | | | | 2,806 | | | | | | 1,260 | | | | | | (40,431) | | | | | | 1,096 | | |
|
Detour Lake
|
| | | | 207,279 | | | | | | 153,621 | | | | | | 741 | | | | | | 2,004 | | | | | | (1,098) | | | | | | 17,949 | | | | | | 1,226 | | | | |
|
838
|
| | | | | (2,685) | | | | |
|
825
|
| |
|
Macassa
|
| | | | 80,143 | | | | | | 70,266 | | | | | | 877 | | | | | | 10,262 | | | | | | (26) | | | | | | 2,909 | | | | | | 50 | | | | |
|
1,041
|
| | | | | (7) | | | | |
|
1,041
|
| |
| Ontario | | | | | 287,422 | | | | | | 223,887 | | | | | | 779 | | | | | | 12,266 | | | | | | (1,124) | | | | | | 20,858 | | | | | | 1,276 | | | | | | 895 | | | | | | (2,692) | | | | | | 885 | | |
|
Meliadine
|
| | | | 97,516 | | | | | | 122,373 | | | | | | 1,255 | | | | | | (21,670) | | | | | | (32) | | | | | | — | | | | | | 83 | | | | |
|
1,033
|
| | | | | — | | | | |
|
1,033
|
| |
|
Meadowbank
|
| | | | 100,165 | | | | | | 149,641 | | | | | | 1,494 | | | | | | 3,670 | | | | | | (40) | | | | | | (31,406) | | | | | | 107 | | | | |
|
1,218
|
| | | | | (1,167) | | | | |
|
1,206
|
| |
| Nunavut | | | | | 197,681 | | | | | | 272,014 | | | | | | 1,376 | | | | | | (18,000) | | | | | | (72) | | | | | | (31,406) | | | | | | 190 | | | | | | 1,127 | | | | | | (1,167) | | | | | | 1,121 | | |
|
Fosterville
|
| | | | 42,012 | | | | | | 51,693 | | | | | | 1,230 | | | | | | (3,251) | | | | | | (1,208) | | | | | | — | | | | | | 44 | | | | |
|
1,125
|
| | | | | (466) | | | | |
|
1,114
|
| |
| Australia | | | | | 42,012 | | | | | | 51,693 | | | | | | 1,230 | | | | | | (3,251) | | | | | | (1,208) | | | | | | — | | | | | | 44 | | | | | | 1,125 | | | | | | (466) | | | | | | 1,114 | | |
|
Kittila
|
| | | | 61,969 | | | | | | 67,623 | | | | | | 1,091 | | | | | | 2,794 | | | | | | (1) | | | | | | — | | | | | | (41) | | | | |
|
1,136
|
| | | | | (157) | | | | |
|
1,133
|
| |
| Finland | | | | | 61,969 | | | | | | 67,623 | | | | | | 1,091 | | | | | | 2,794 | | | | | | (1) | | | | | | — | | | | | | (41) | | | | | | 1,136 | | | | | | (157) | | | | | | 1,133 | | |
|
Pinos Altos
|
| | | | 20,951 | | | | | | 58,587 | | | | | | 2,796 | | | | | | 406 | | | | | | (869) | | | | | | — | | | | | | 497 | | | | |
|
2,798
|
| | | | | (19,384) | | | | |
|
1,873
|
| |
| Mexico | | | | | 20,951 | | | | | | 58,587 | | | | | | 2,796 | | | | | | 406 | | | | | | (869) | | | | | | — | | | | | | 497 | | | | | | 2,798 | | | | | | (19,384) | | | | | | 1,873 | | |
| Consolidated | | | | | 855,816 | | | | | | 953,758 | | | | | | 1,114 | | | | | | (9,245) | | | | | | (3,772) | | | | | | 20,429 | | | | | | 4,772 | | | | | | 1,129 | | | | | | (64,297) | | | | | | 1,054 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
(thousands of United States dollars, except as noted)
|
Mine
|
| |
Payable
gold production (ounces)(i) |
| |
Production
costs ($) |
| |
Production
costs per ounce ($) |
| |
Inventory
adjustments ($)(ii) |
| |
Realized
(gains) and losses on hedges ($) |
| |
In-kind
royalty and NTI Payment ($)(iii) |
| |
Smelting,
refining and marketing charges ($) |
| |
Total cash
costs per ounce (co-product basis) ($) |
| |
Impact of
by-product metals ($) |
| |
Total cash
costs per ounce (by-product basis) ($) |
| ||||||||||||||||||||||||||||||
|
LaRonde
|
| | | | 91,252 | | | | | | 83,734 | | | | | | 918 | | | | | | 2,459 | | | | | | 76 | | | | | | — | | | | | | 3,751 | | | | |
|
986
|
| | | | | (16,359) | | | | |
|
807
|
| |
|
Canadian Malartic
|
| | | | 172,531 | | | | | | 115,383 | | | | | | 669 | | | | | | 10,841 | | | | | | 158 | | | | | | 27,132 | | | | | | 567 | | | | |
|
893
|
| | | | | (2,940) | | | | |
|
876
|
| |
|
Goldex
|
| | | | 33,118 | | | | | | 37,690 | | | | | | 1,138 | | | | | | (422) | | | | | | 31 | | | | | | — | | | | | | 1,154 | | | | |
|
1,161
|
| | | | | (6,593) | | | | |
|
962
|
| |
| Quebec | | | | | 296,901 | | | | | | 236,807 | | | | | | 798 | | | | | | 12,878 | | | | | | 265 | | | | | | 27,132 | | | | | | 5,472 | | | | | | 952 | | | | | | (25,892) | | | | | | 864 | | |
|
Detour Lake
|
| | | | 168,272 | | | | | | 141,330 | | | | | | 840 | | | | | | 2,429 | | | | | | 199 | | | | | | 9,383 | | | | | | 1,697 | | | | |
|
921
|
| | | | | (1,231) | | | | |
|
914
|
| |
|
Macassa
|
| | | | 87,364 | | | | | | 48,266 | | | | | | 552 | | | | | | 2,911 | | | | | | 75 | | | | | | 4,076 | | | | | | 74 | | | | |
|
634
|
| | | | | (674) | | | | |
|
626
|
| |
| Ontario | | | | | 255,636 | | | | | | 189,596 | | | | | | 742 | | | | | | 5,340 | | | | | | 274 | | | | | | 13,459 | | | | | | 1,771 | | | | | | 823 | | | | | | (1,905) | | | | | | 816 | | |
|
Meliadine
|
| | | | 90,263 | | | | | | 113,093 | | | | | | 1,253 | | | | | | (12,255) | | | | | | 106 | | | | | | — | | | | | | 144 | | | | |
|
1,120
|
| | | | | (697) | | | | |
|
1,112
|
| |
|
Meadowbank
|
| | | | 101,935 | | | | | | 106,039 | | | | | | 1,040 | | | | | | (1,348) | | | | | | 146 | | | | | | (6,377) | | | | | | 264 | | | | |
|
968
|
| | | | | (1,382) | | | | |
|
955
|
| |
| Nunavut | | | | | 192,198 | | | | | | 219,132 | | | | | | 1,140 | | | | | | (13,603) | | | | | | 252 | | | | | | (6,377) | | | | | | 408 | | | | | | 1,040 | | | | | | (2,079) | | | | | | 1,029 | | |
|
Fosterville
|
| | | | 49,574 | | | | | | 38,018 | | | | | | 767 | | | | | | 901 | | | | | | — | | | | | | — | | | | | | 37 | | | | |
|
786
|
| | | | | (156) | | | | |
|
783
|
| |
| Australia | | | | | 49,574 | | | | | | 38,018 | | | | | | 767 | | | | | | 901 | | | | | | — | | | | | | — | | | | | | 37 | | | | | | 786 | | | | | | (156) | | | | | | 783 | | |
|
Kittila
|
| | | | 50,357 | | | | | | 55,064 | | | | | | 1,093 | | | | | | 2,909 | | | | | | (605) | | | | | | — | | | | | | (63) | | | | |
|
1,138
|
| | | | | (181) | | | | |
|
1,134
|
| |
| Finland | | | | | 50,357 | | | | | | 55,064 | | | | | | 1,093 | | | | | | 2,909 | | | | | | (605) | | | | | | — | | | | | | (63) | | | | | | 1,138 | | | | | | (181) | | | | | | 1,134 | | |
|
Pinos Altos
|
| | | | 21,363 | | | | | | 50,570 | | | | | | 2,367 | | | | | | 1,323 | | | | | | (85) | | | | | | — | | | | | | 309 | | | | |
|
2,440
|
| | | | | (9,361) | | | | |
|
2,002
|
| |
| Mexico | | | | | 21,363 | | | | | | 50,570 | | | | | | 2,367 | | | | | | 1,323 | | | | | | (85) | | | | | | — | | | | | | 309 | | | | | | 2,440 | | | | | | (9,361) | | | | | | 2,002 | | |
| Consolidated | | | | | 866,029 | | | | | | 789,187 | | | | | | 911 | | | | | | 9,748 | | | | | | 101 | | | | | | 34,214 | | | | | | 7,934 | | | | | | 971 | | | | | | (39,574) | | | | | | 925 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
(thousands of United States dollars, except as noted)
|
Mine
|
| |
Payable
gold production (ounces)(i) |
| |
Production
costs ($) |
| |
Production
costs per ounce ($) |
| |
Inventory
adjustments ($)(ii) |
| |
Realized
(gains) and losses on hedges ($) |
| |
In-kind
royalty and NTI Payment ($)(iii) |
| |
Smelting,
refining and marketing charges ($) |
| |
Total cash
costs per ounce (co-product basis) ($) |
| |
Impact of
by-product metals ($) |
| |
Total cash
costs per ounce (by-product basis) ($) |
| ||||||||||||||||||||||||||||||
|
LaRonde
|
| | | | 162,857 | | | | | | 200,948 | | | | | | 1,234 | | | | | | 4,669 | | | | | | (350) | | | | | | — | | | | | | 4,314 | | | | |
|
1,287
|
| | | | | (48,291) | | | | |
|
990
|
| |
|
Canadian Malartic
|
| | | | 301,459 | | | | | | 256,134 | | | | | | 850 | | | | | | 12,659 | | | | | | (1,164) | | | | | | 68,286 | | | | | | 1,373 | | | | |
|
1,119
|
| | | | | (11,232) | | | | |
|
1,082
|
| |
|
Goldex
|
| | | | 58,649 | | | | | | 80,825 | | | | | | 1,378 | | | | | | (699) | | | | | | (129) | | | | | | — | | | | | | 2,423 | | | | |
|
1,405
|
| | | | | (23,888) | | | | |
|
998
|
| |
| Quebec | | | | | 522,965 | | | | | | 537,907 | | | | | | 1,029 | | | | | | 16,629 | | | | | | (1,643) | | | | | | 68,286 | | | | | | 8,110 | | | | | | 1,203 | | | | | | (83,411) | | | | | | 1,044 | | |
|
Detour Lake
|
| | | | 384,298 | | | | | | 322,000 | | | | | | 838 | | | | | | (7,659) | | | | | | (2,130) | | | | | | 35,318 | | | | | | 2,148 | | | | |
|
910
|
| | | | | (6,218) | | | | |
|
894
|
| |
|
Macassa
|
| | | | 135,736 | | | | | | 142,731 | | | | | | 1,052 | | | | | | 3,192 | | | | | | (329) | | | | | | 8,836 | | | | | | 107 | | | | |
|
1,139
|
| | | | | (1,270) | | | | |
|
1,129
|
| |
| Ontario | | | | | 520,034 | | | | | | 464,731 | | | | | | 894 | | | | | | (4,467) | | | | | | (2,459) | | | | | | 44,154 | | | | | | 2,255 | | | | | | 970 | | | | | | (7,488) | | | | | | 955 | | |
|
Meliadine
|
| | | | 191,347 | | | | | | 215,932 | | | | | | 1,128 | | | | | | (5,337) | | | | | | (402) | | | | | | — | | | | | | 222 | | | | |
|
1,100
|
| | | | | (631) | | | | |
|
1,096
|
| |
|
Meadowbank
|
| | | | 214,027 | | | | | | 333,256 | | | | | | 1,557 | | | | | | (2,401) | | | | | | (500) | | | | | | (82,689) | | | | | | 272 | | | | |
|
1,158
|
| | | | | (4,189) | | | | |
|
1,139
|
| |
| Nunavut | | | | | 405,374 | | | | | | 549,188 | | | | | | 1,355 | | | | | | (7,738) | | | | | | (902) | | | | | | (82,689) | | | | | | 494 | | | | | | 1,131 | | | | | | (4,820) | | | | | | 1,119 | | |
|
Fosterville
|
| | | | 83,455 | | | | | | 97,186 | | | | | | 1,165 | | | | | | (1,469) | | | | | | (2,022) | | | | | | — | | | | | | 113 | | | | |
|
1,124
|
| | | | | (466) | | | | |
|
1,118
|
| |
| Australia | | | | | 83,455 | | | | | | 97,186 | | | | | | 1,165 | | | | | | (1,469) | | | | | | (2,022) | | | | | | — | | | | | | 113 | | | | | | 1,124 | | | | | | (466) | | | | | | 1,118 | | |
|
Kittila
|
| | | | 110,496 | | | | | | 135,632 | | | | | | 1,227 | | | | | | (1,260) | | | | | | (10) | | | | | | — | | | | | | (69) | | | | |
|
1,215
|
| | | | | (343) | | | | |
|
1,212
|
| |
| Finland | | | | | 110,496 | | | | | | 135,632 | | | | | | 1,227 | | | | | | (1,260) | | | | | | (10) | | | | | | — | | | | | | (69) | | | | | | 1,215 | | | | | | (343) | | | | | | 1,212 | | |
|
Pinos Altos
|
| | | | 38,601 | | | | | | 124,701 | | | | | | 3,231 | | | | | | (6,838) | | | | | | (1,745) | | | | | | — | | | | | | 1,598 | | | | |
|
3,050
|
| | | | | (37,697) | | | | |
|
2,073
|
| |
| Mexico | | | | | 38,601 | | | | | | 124,701 | | | | | | 3,231 | | | | | | (6,838) | | | | | | (1,745) | | | | | | — | | | | | | 1,598 | | | | | | 3,050 | | | | | | (37,697) | | | | | | 2,073 | | |
| Consolidated | | | | | 1,680,925 | | | | | | 1,909,345 | | | | | | 1,136 | | | | | | (5,143) | | | | | | (8,781) | | | | | | 29,751 | | | | | | 12,501 | | | | | | 1,153 | | | | | | (134,225) | | | | | | 1,073 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
(thousands of United States dollars, except as noted)
|
Mine
|
| |
Payable
gold production (ounces)(i) |
| |
Production
costs ($) |
| |
Production
costs per ounce ($) |
| |
Inventory
adjustments ($)(ii) |
| |
Realized
(gains) and losses on hedges ($) |
| |
In-kind
royalty and NTI Payment ($)(iii) |
| |
Smelting,
refining and marketing charges ($) |
| |
Total cash
costs per ounce (co-product basis) ($) |
| |
Impact of
by-product metals ($) |
| |
Total cash
costs per ounce (by-product basis) ($) |
| ||||||||||||||||||||||||||||||
|
LaRonde
|
| | | | 182,743 | | | | | | 170,378 | | | | | | 932 | | | | | | (2,289) | | | | | | 789 | | | | | | — | | | | | | 6,530 | | | | |
|
960
|
| | | | | (33,581) | | | | |
|
776
|
| |
|
Canadian Malartic
|
| | | | 332,304 | | | | | | 234,672 | | | | | | 706 | | | | | | 16,236 | | | | | | 1,294 | | | | | | 51,720 | | | | | | 837 | | | | |
|
917
|
| | | | | (5,529) | | | | |
|
900
|
| |
|
Goldex
|
| | | | 63,134 | | | | | | 72,346 | | | | | | 1,146 | | | | | | (314) | | | | | | 332 | | | | | | — | | | | | | 2,121 | | | | |
|
1,180
|
| | | | | (13,842) | | | | |
|
961
|
| |
| Quebec | | | | | 578,181 | | | | | | 477,396 | | | | | | 826 | | | | | | 13,633 | | | | | | 2,415 | | | | | | 51,720 | | | | | | 9,488 | | | | | | 959 | | | | | | (52,952) | | | | | | 868 | | |
|
Detour Lake
|
| | | | 321,110 | | | | | | 276,276 | | | | | | 860 | | | | | | 2,065 | | | | | | 1,077 | | | | | | 18,083 | | | | | | 3,000 | | | | |
|
936
|
| | | | | (2,119) | | | | |
|
929
|
| |
|
Macassa
|
| | | | 173,392 | | | | | | 98,092 | | | | | | 566 | | | | | | 4,775 | | | | | | 794 | | | | | | 7,610 | | | | | | 161 | | | | |
|
643
|
| | | | | (1,175) | | | | |
|
636
|
| |
| Ontario | | | | | 494,502 | | | | | | 374,368 | | | | | | 757 | | | | | | 6,840 | | | | | | 1,871 | | | | | | 25,693 | | | | | | 3,161 | | | | | | 833 | | | | | | (3,294) | | | | | | 826 | | |
|
Meliadine
|
| | | | 188,775 | | | | | | 196,915 | | | | | | 1,043 | | | | | | (6,396) | | | | | | 998 | | | | | | — | | | | | | 228 | | | | |
|
1,016
|
| | | | | (697) | | | | |
|
1,012
|
| |
|
Meadowbank
|
| | | | 242,061 | | | | | | 233,006 | | | | | | 963 | | | | | | (3,011) | | | | | | 1,304 | | | | | | (13,795) | | | | | | 299 | | | | |
|
900
|
| | | | | (2,132) | | | | |
|
891
|
| |
| Nunavut | | | | | 430,836 | | | | | | 429,921 | | | | | | 998 | | | | | | (9,407) | | | | | | 2,302 | | | | | | (13,795) | | | | | | 527 | | | | | | 951 | | | | | | (2,829) | | | | | | 944 | | |
|
Fosterville
|
| | | | 93,189 | | | | | | 71,058 | | | | | | 763 | | | | | | 3,421 | | | | | | — | | | | | | — | | | | | | 53 | | | | |
|
800
|
| | | | | (270) | | | | |
|
797
|
| |
| Australia | | | | | 93,189 | | | | | | 71,058 | | | | | | 763 | | | | | | 3,421 | | | | | | — | | | | | | — | | | | | | 53 | | | | | | 800 | | | | | | (270) | | | | | | 797 | | |
|
Kittila
|
| | | | 104,461 | | | | | | 110,897 | | | | | | 1,062 | | | | | | 1,803 | | | | | | (431) | | | | | | — | | | | | | (119) | | | | |
|
1,074
|
| | | | | (294) | | | | |
|
1,071
|
| |
| Finland | | | | | 104,461 | | | | | | 110,897 | | | | | | 1,062 | | | | | | 1,803 | | | | | | (431) | | | | | | — | | | | | | (119) | | | | | | 1,074 | | | | | | (294) | | | | | | 1,071 | | |
|
Pinos Altos
|
| | | | 38,654 | | | | | | 93,280 | | | | | | 2,413 | | | | | | 3,523 | | | | | | 29 | | | | | | — | | | | | | 568 | | | | |
|
2,520
|
| | | | | (17,123) | | | | |
|
2,077
|
| |
| Mexico | | | | | 38,654 | | | | | | 93,280 | | | | | | 2,413 | | | | | | 3,523 | | | | | | 29 | | | | | | — | | | | | | 568 | | | | | | 2,520 | | | | | | (17,123) | | | | | | 2,077 | | |
| Consolidated | | | | | 1,739,823 | | | | | | 1,556,920 | | | | | | 895 | | | | | | 19,813 | | | | | | 6,186 | | | | | | 63,618 | | | | | | 13,678 | | | | | | 954 | | | | | | (76,762) | | | | | | 910 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
(thousands of United States dollars, except as noted)
|
Mine
|
| |
Tonnes of
ore milled (thousands) |
| |
Production
costs ($) |
| |
Production
costs in local currency |
| |
Local
currency production costs per tonne |
| |
Inventory
adjustments in local currency(i) |
| |
In-kind
royalty and NTI Payment in local currency(ii) |
| |
Smelting,
refining and marketing charges in local currency |
| |
Local
currency minesite costs per tonne |
| ||||||||||||||||||||||||||||||||
|
LaRonde
|
| | | | 713 | | | | | | | 112,940 | | | | | | C$ | 156,211 | | | | | | C$ | 219 | | | | | | C$ | (16,492) | | | | | | C$ | — | | | | | | C$ | (9,237) | | | | | |
C$
|
183
|
| | |
|
Canadian Malartic
|
| | | | 4,387 | | | | | | | 126,188 | | | | | | C$ | 173,987 | | | | | | C$ | 40 | | | | | | C$ | 53,982 | | | | | | C$ | (1) | | | | | | C$ | — | | | | | |
C$
|
52
|
| | |
|
Goldex
|
| | | | 817 | | | | | | | 40,826 | | | | | | C$ | 56,582 | | | | | | C$ | 69 | | | | | | C$ | 1,711 | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
71
|
| | |
| Quebec | | | | | 5,917 | | | | | | | 279,954 | | | | | | C$ | 386,780 | | | | | | C$ | 65 | | | | | | C$ | 39,201 | | | | | | C$ | (1) | | | | | | C$ | (9,237) | | | | | | C$ | 70 | | | |
|
Detour Lake
|
| | | | 7,305 | | | | | | | 153,621 | | | | | | C$ | 212,621 | | | | | | C$ | 29 | | | | | | C$ | 2,968 | | | | | | C$ | 24,995 | | | | | | C$ | — | | | | | |
C$
|
33
|
| | |
|
Macassa
|
| | | | 236 | | | | | | | 70,266 | | | | | | C$ | 97,364 | | | | | | C$ | 413 | | | | | | C$ | 14,563 | | | | | | C$ | 4,192 | | | | | | C$ | — | | | | | |
C$
|
492
|
| | |
| Ontario | | | | | 7,541 | | | | | | | 223,887 | | | | | | C$ | 309,985 | | | | | | C$ | 41 | | | | | | C$ | 17,531 | | | | | | C$ | 29,187 | | | | | | C$ | — | | | | | | C$ | 47 | | | |
|
Meliadine
|
| | | | 648 | | | | | | | 122,373 | | | | | | C$ | 168,774 | | | | | | C$ | 260 | | | | | | C$ | (29,326) | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
215
|
| | |
|
Meadowbank
|
| | | | 1,013 | | | | | | | 149,641 | | | | | | C$ | 206,735 | | | | | | C$ | 204 | | | | | | C$ | 5,440 | | | | | | C$ | (42,776) | | | | | | C$ | — | | | | | |
C$
|
167
|
| | |
| Nunavut | | | | | 1,661 | | | | | | | 272,014 | | | | | | C$ | 375,509 | | | | | | C$ | 226 | | | | | | C$ | (23,886) | | | | | | C$ | (42,776) | | | | | | C$ | — | | | | | | C$ | 186 | | | |
|
Fosterville
|
| | | | 204 | | | | | | | 51,693 | | | | | | A$ | 74,457 | | | | | | A$ | 365 | | | | | | A$ | (4,976) | | | | | | A$ | — | | | | | | A$ | — | | | | | |
A$
|
341
|
| | |
| Australia | | | | | 204 | | | | | | | 51,693 | | | | | | A$ | 74,457 | | | | | | A$ | 365 | | | | | | A$ | (4,976) | | | | | | A$ | — | | | | | | A$ | — | | | | | | A$ | 333 | | | |
|
Kittila
|
| | | | 583 | | | | | | | 67,623 | | | | | | € | 58,195 | | | | | | € | 100 | | | | | | € | 2,474 | | | | | | € | — | | | | | | € | — | | | | | |
€
|
104
|
| | |
| Finland | | | | | 583 | | | | | | | 67,623 | | | | | | € | 58,195 | | | | | | € | 100 | | | | | | € | 2,474 | | | | | | € | — | | | | | | € | — | | | | | | € | 104 | | | |
|
Pinos Altos
|
| | | | 442 | | | | | | | 58,587 | | | | | | $ | 58,587 | | | | | | $ | 133 | | | | | | $ | (462) | | | | | | $ | — | | | | | | $ | — | | | | | |
$
|
132
|
| | |
| Mexico | | | | | 442 | | | | | | | 58,587 | | | | | | $ | 58,587 | | | | | | $ | 133 | | | | | | $ | (462) | | | | | | $ | — | | | | | | $ | — | | | | | | $ | 132 | | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
(thousands of United States dollars, except as noted)
|
Mine
|
| |
Tonnes of
ore milled (thousands) |
| |
Production
costs ($) |
| |
Production
costs in local currency |
| |
Local
currency production costs per tonne |
| |
Inventory
adjustments in local currency(i) |
| |
In-kind
royalty and NTI Payment in local currency(ii) |
| |
Smelting,
refining and marketing charges in local currency |
| |
Local
currency minesite costs per tonne |
| ||||||||||||||||||||||||||||||||
|
LaRonde
|
| | | | 674 | | | | | | | 83,734 | | | | | | C$ | 116,035 | | | | | | C$ | 172 | | | | | | C$ | 2,966 | | | | | | C$ | — | | | | | | C$ | (7,056) | | | | | |
C$
|
166
|
| | |
|
Canadian Malartic
|
| | | | 4,963 | | | | | | | 115,383 | | | | | | C$ | 159,348 | | | | | | C$ | 32 | | | | | | C$ | 14,254 | | | | | | C$ | 37,270 | | | | | | C$ | — | | | | | |
C$
|
42
|
| | |
|
Goldex
|
| | | | 819 | | | | | | | 37,690 | | | | | | C$ | 52,257 | | | | | | C$ | 64 | | | | | | C$ | (895) | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
63
|
| | |
| Quebec | | | | | 6,456 | | | | | | | 236,807 | | | | | | C$ | 327,640 | | | | | | C$ | 51 | | | | | | C$ | 16,325 | | | | | | C$ | 37,270 | | | | | | C$ | (7,056) | | | | | | C$ | 58 | | | |
|
Detour Lake
|
| | | | 6,836 | | | | | | | 141,330 | | | | | | C$ | 196,403 | | | | | | C$ | 29 | | | | | | C$ | 2,328 | | | | | | C$ | 12,887 | | | | | | C$ | — | | | | | |
C$
|
31
|
| | |
|
Macassa
|
| | | | 143 | | | | | | | 48,266 | | | | | | C$ | 66,005 | | | | | | C$ | 462 | | | | | | C$ | 3,954 | | | | | | C$ | 5,584 | | | | | | C$ | — | | | | | |
C$
|
529
|
| | |
| Ontario | | | | | 6,979 | | | | | | | 189,596 | | | | | | C$ | 262,408 | | | | | | C$ | 38 | | | | | | C$ | 6,282 | | | | | | C$ | 18,471 | | | | | | C$ | — | | | | | | C$ | 41 | | | |
|
Meliadine
|
| | | | 545 | | | | | | | 113,093 | | | | | | C$ | 158,074 | | | | | | C$ | 290 | | | | | | C$ | (19,587) | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
254
|
| | |
|
Meadowbank
|
| | | | 692 | | | | | | | 106,039 | | | | | | C$ | 145,678 | | | | | | C$ | 211 | | | | | | C$ | (2,682) | | | | | | C$ | (8,533) | | | | | | C$ | — | | | | | |
C$
|
194
|
| | |
| Nunavut | | | | | 1,237 | | | | | | | 219,132 | | | | | | C$ | 303,752 | | | | | | C$ | 246 | | | | | | C$ | (22,269) | | | | | | C$ | (8,533) | | | | | | C$ | — | | | | | | C$ | 221 | | | |
|
Fosterville
|
| | | | 188 | | | | | | | 38,018 | | | | | | A$ | 58,194 | | | | | | A$ | 309 | | | | | | A$ | 1,135 | | | | | | A$ | — | | | | | | A$ | — | | | | | |
A$
|
315
|
| | |
| Australia | | | | | 188 | | | | | | | 38,018 | | | | | | A$ | 58,194 | | | | | | A$ | 309 | | | | | | A$ | 1,135 | | | | | | A$ | — | | | | | | A$ | — | | | | | | A$ | 315 | | | |
|
Kittila
|
| | | | 482 | | | | | | | 55,064 | | | | | | € | 48,363 | | | | | | € | 100 | | | | | | € | 1,996 | | | | | | € | — | | | | | | € | — | | | | | |
€
|
104
|
| | |
| Finland | | | | | 482 | | | | | | | 55,064 | | | | | | € | 48,363 | | | | | | € | 100 | | | | | | € | 1,996 | | | | | | € | — | | | | | | € | — | | | | | | € | 104 | | | |
|
Pinos Altos
|
| | | | 441 | | | | | | | 50,570 | | | | | | $ | 50,570 | | | | | | $ | 115 | | | | | | $ | 1,238 | | | | | | $ | — | | | | | | $ | — | | | | | |
$
|
118
|
| | |
| Mexico | | | | | 441 | | | | | | | 50,570 | | | | | | $ | 50,570 | | | | | | $ | 115 | | | | | | $ | 1,238 | | | | | | $ | — | | | | | | $ | — | | | | | | $ | 118 | | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
(thousands of United States dollars, except as noted)
|
Mine
|
| |
Tonnes of
ore milled (thousands) |
| |
Production
costs ($) |
| |
Production
costs in local currency |
| |
Local
currency production costs per tonne |
| |
Inventory
adjustments in local currency(i) |
| |
In-kind
royalty and NTI Payment in local currency(ii) |
| |
Smelting,
refining and marketing charges in local currency |
| |
Local
currency minesite costs per tonne |
| ||||||||||||||||||||||||||||||||
|
LaRonde
|
| | | | 1,489 | | | | | | | 200,948 | | | | | | C$ | 277,238 | | | | | | C$ | 186 | | | | | | C$ | 7,141 | | | | | | C$ | — | | | | | | C$ | (18,461) | | | | | |
C$
|
179
|
| | |
|
Canadian Malartic
|
| | | | 9,094 | | | | | | | 256,134 | | | | | | C$ | 352,809 | | | | | | C$ | 39 | | | | | | C$ | 111,635 | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
51
|
| | |
|
Goldex
|
| | | | 1,630 | | | | | | | 80,825 | | | | | | C$ | 111,634 | | | | | | C$ | 69 | | | | | | C$ | (943) | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
68
|
| | |
| Quebec | | | | | 12,213 | | | | | | | 537,907 | | | | | | C$ | 741,681 | | | | | | C$ | 61 | | | | | | C$ | 117,833 | | | | | | C$ | — | | | | | | C$ | (18,461) | | | | | | C$ | 69 | | | |
|
Detour Lake
|
| | | | 14,053 | | | | | | | 322,000 | | | | | | C$ | 443,686 | | | | | | C$ | 32 | | | | | | C$ | (10,358) | | | | | | C$ | 48,829 | | | | | | C$ | — | | | | | |
C$
|
34
|
| | |
|
Macassa
|
| | | | 385 | | | | | | | 142,731 | | | | | | C$ | 197,137 | | | | | | C$ | 512 | | | | | | C$ | 4,879 | | | | | | C$ | 12,400 | | | | | | C$ | — | | | | | |
C$
|
557
|
| | |
| Ontario | | | | | 14,438 | | | | | | | 464,731 | | | | | | C$ | 640,823 | | | | | | C$ | 44 | | | | | | C$ | (5,479) | | | | | | C$ | 61,229 | | | | | | C$ | — | | | | | | C$ | 48 | | | |
|
Meliadine
|
| | | | 1,206 | | | | | | | 215,932 | | | | | | C$ | 297,484 | | | | | | C$ | 247 | | | | | | C$ | (7,152) | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
241
|
| | |
|
Meadowbank
|
| | | | 2,112 | | | | | | | 333,256 | | | | | | C$ | 459,496 | | | | | | C$ | 218 | | | | | | C$ | (2,927) | | | | | | C$ | (113,592) | | | | | | C$ | — | | | | | |
C$
|
162
|
| | |
| Nunavut | | | | | 3,318 | | | | | | | 549,188 | | | | | | C$ | 756,980 | | | | | | C$ | 228 | | | | | | C$ | (10,079) | | | | | | C$ | (113,592) | | | | | | C$ | — | | | | | | C$ | 191 | | | |
|
Fosterville
|
| | | | 420 | | | | | | | 97,186 | | | | | | A$ | 140,927 | | | | | | A$ | 336 | | | | | | A$ | (3,106) | | | | | | A$ | — | | | | | | A$ | — | | | | | |
A$
|
328
|
| | |
| Australia | | | | | 420 | | | | | | | 97,186 | | | | | | A$ | 140,927 | | | | | | A$ | 336 | | | | | | A$ | (3,106) | | | | | | A$ | — | | | | | | A$ | — | | | | | | A$ | 328 | | | |
|
Kittila
|
| | | | 1,031 | | | | | | | 135,632 | | | | | | € | 116,176 | | | | | | € | 113 | | | | | | € | (888) | | | | | | € | — | | | | | | € | — | | | | | |
€
|
112
|
| | |
| Finland | | | | | 1,031 | | | | | | | 135,632 | | | | | | € | 116,176 | | | | | | € | 113 | | | | | | € | (888) | | | | | | € | — | | | | | | € | — | | | | | | € | 112 | | | |
|
Pinos Altos
|
| | | | 869 | | | | | | | 124,701 | | | | | | $ | 124,701 | | | | | | $ | 143 | | | | | | $ | (8,583) | | | | | | $ | — | | | | | | $ | — | | | | | |
$
|
134
|
| | |
| Mexico | | | | | 869 | | | | | | | 124,701 | | | | | | $ | 124,701 | | | | | | $ | 143 | | | | | | $ | (8,583) | | | | | | $ | — | | | | | | $ | — | | | | | | $ | 134 | | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
(thousands of United States dollars, except as noted)
|
Mine
|
| |
Tonnes of
ore milled (thousands) |
| |
Production
costs ($) |
| |
Production
costs in local currency |
| |
Local
currency production costs per tonne |
| |
Inventory
adjustments in local currency(i) |
| |
In-kind
royalty and NTI Payment in local currency(ii) |
| |
Smelting,
refining and marketing charges in local currency |
| |
Local
currency minesite costs per tonne |
| ||||||||||||||||||||||||||||||||
|
LaRonde
|
| | | | 1,349 | | | | | | | 170,378 | | | | | | C$ | 239,794 | | | | | | C$ | 178 | | | | | | C$ | (3,185) | | | | | | C$ | — | | | | | | C$ | (13,203) | | | | | |
C$
|
166
|
| | |
|
Canadian Malartic
|
| | | | 9,828 | | | | | | | 234,672 | | | | | | C$ | 328,611 | | | | | | C$ | 33 | | | | | | C$ | 22,204 | | | | | | C$ | 72,670 | | | | | | C$ | — | | | | | |
C$
|
43
|
| | |
|
Goldex
|
| | | | 1,611 | | | | | | | 72,346 | | | | | | C$ | 101,756 | | | | | | C$ | 63 | | | | | | C$ | (565) | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
63
|
| | |
| Quebec | | | | | 12,788 | | | | | | | 477,396 | | | | | | C$ | 670,161 | | | | | | C$ | 52 | | | | | | C$ | 18,454 | | | | | | C$ | 72,670 | | | | | | C$ | (13,203) | | | | | | C$ | 59 | | | |
|
Detour Lake
|
| | | | 13,466 | | | | | | | 276,276 | | | | | | C$ | 388,036 | | | | | | C$ | 29 | | | | | | C$ | 2,341 | | | | | | C$ | 25,442 | | | | | | C$ | — | | | | | |
C$
|
31
|
| | |
|
Macassa
|
| | | | 291 | | | | | | | 98,092 | | | | | | C$ | 137,464 | | | | | | C$ | 472 | | | | | | C$ | 6,646 | | | | | | C$ | 10,692 | | | | | | C$ | — | | | | | |
C$
|
531
|
| | |
| Ontario | | | | | 13,757 | | | | | | | 374,368 | | | | | | C$ | 525,500 | | | | | | C$ | 38 | | | | | | C$ | 8,987 | | | | | | C$ | 36,134 | | | | | | C$ | — | | | | | | C$ | 41 | | | |
|
Meliadine
|
| | | | 1,103 | | | | | | | 196,915 | | | | | | C$ | 276,854 | | | | | | C$ | 251 | | | | | | C$ | (10,860) | | | | | | C$ | — | | | | | | C$ | — | | | | | |
C$
|
241
|
| | |
|
Meadowbank
|
| | | | 1,729 | | | | | | | 233,006 | | | | | | C$ | 325,614 | | | | | | C$ | 188 | | | | | | C$ | (5,107) | | | | | | C$ | (19,230) | | | | | | C$ | — | | | | | |
C$
|
174
|
| | |
| Nunavut | | | | | 2,832 | | | | | | | 429,921 | | | | | | C$ | 602,468 | | | | | | C$ | 213 | | | | | | C$ | (15,967) | | | | | | C$ | (19,230) | | | | | | C$ | — | | | | | | C$ | 200 | | | |
|
Fosterville
|
| | | | 351 | | | | | | | 71,058 | | | | | | A$ | 110,167 | | | | | | A$ | 314 | | | | | | A$ | 5,316 | | | | | | A$ | — | | | | | | A$ | — | | | | | |
A$
|
329
|
| | |
| Australia | | | | | 351 | | | | | | | 71,058 | | | | | | A$ | 110,167 | | | | | | A$ | 314 | | | | | | A$ | 5,316 | | | | | | A$ | — | | | | | | A$ | — | | | | | | A$ | 329 | | | |
|
Kittila
|
| | | | 1,004 | | | | | | | 110,897 | | | | | | € | 101,506 | | | | | | € | 101 | | | | | | € | 634 | | | | | | € | — | | | | | | € | — | | | | | |
€
|
102
|
| | |
| Finland | | | | | 1,004 | | | | | | | 110,897 | | | | | | € | 101,506 | | | | | | € | 101 | | | | | | € | 634 | | | | | | € | — | | | | | | € | — | | | | | | € | 102 | | | |
|
Pinos Altos
|
| | | | 822 | | | | | | | 93,280 | | | | | | $ | 93,280 | | | | | | $ | 113 | | | | | | $ | 3,552 | | | | | | $ | — | | | | | | $ | — | | | | | |
$
|
118
|
| | |
| Mexico | | | | | 822 | | | | | | | 93,280 | | | | | | $ | 93,280 | | | | | | $ | 113 | | | | | | $ | 3,552 | | | | | | $ | — | | | | | | $ | — | | | | | | $ | 118 | | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
(United States dollars per ounce, except where noted)
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Production costs per the Second Quarter Financial Statements (thousands of United States dollars)
|
| | | $ | 953,758 | | | | | $ | 789,187 | | | | | $ | 1,909,345 | | | | | $ | 1,556,920 | | |
|
Gold production (ounces)(i)
|
| | | | 855,816 | | | | | | 866,029 | | | | | | 1,680,925 | | | | | | 1,739,823 | | |
|
Production costs per ounce
|
| | | $ | 1,114 | | | | | $ | 911 | | | | | $ | 1,136 | | | | | $ | 895 | | |
| Adjustments: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Inventory adjustments(ii)
|
| | | | (11) | | | | | | 12 | | | | | | (3) | | | | | | 11 | | |
|
In-kind royalty and NTI Payments(iii)
|
| | | | 24 | | | | | | 39 | | | | | | 18 | | | | | | 36 | | |
|
Realized gains and losses on hedges of production costs
|
| | | | (4) | | | | | | — | | | | | | (5) | | | | | | 4 | | |
|
Smelting, refining and marketing charges
|
| | | | 6 | | | | | | 9 | | | | | | 7 | | | | | | 8 | | |
|
Total cash costs per ounce (co-product basis)
|
| | | $ | 1,129 | | | | | $ | 971 | | | | | $ | 1,153 | | | | | $ | 954 | | |
|
Impact of by-product metals
|
| | | | (75) | | | | | | (46) | | | | | | (80) | | | | | | (44) | | |
|
Total cash costs per ounce (by-product basis)
|
| | | $ | 1,054 | | | | | $ | 925 | | | | | $ | 1,073 | | | | | $ | 910 | | |
| Adjustments: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Sustaining capital expenditures (including capitalized exploration)
|
| | | | 286 | | | | | | 273 | | | | | | 265 | | | | | | 234 | | |
|
General and administrative expenses (including stock option expense)
|
| | | | 68 | | | | | | 67 | | | | | | 81 | | | | | | 68 | | |
|
Non-cash reclamation provision and sustaining leases(iv)
|
| | | | 51 | | | | | | 16 | | | | | | 52 | | | | | | 15 | | |
|
All-in sustaining costs per ounce (by-product basis)
|
| | | $ | 1,459 | | | | | $ | 1,281 | | | | | $ | 1,471 | | | | | $ | 1,227 | | |
|
Impact of by-product metals
|
| | | | 75 | | | | | | 46 | | | | | | 80 | | | | | | 44 | | |
|
All-in sustaining costs per ounce (co-product basis)
|
| | | $ | 1,534 | | | | | $ | 1,327 | | | | | $ | 1,551 | | | | | $ | 1,271 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
(thousands of United States dollars)
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Sustaining capital expenditures
|
| | | $ | 236,950 | | | | | $ | 233,600 | | | | | $ | 433,542 | | | | | $ | 401,676 | | |
|
Sustaining capitalized exploration
|
| | | | 8,843 | | | | | | 5,514 | | | | | | 14,230 | | | | | | 9,962 | | |
|
Development capital expenditures
|
| | | | 462,274 | | | | | | 226,646 | | | | | | 754,564 | | | | | | 412,870 | | |
|
Development capitalized exploration
|
| | | | 92,853 | | | | | | 72,175 | | | | | | 172,194 | | | | | | 132,679 | | |
|
Total Capital Expenditures
|
| | | $ | 800,920 | | | | | $ | 537,935 | | | | | $ | 1,374,530 | | | | | $ | 957,187 | | |
|
Working capital adjustments
|
| | | | 8,335 | | | | | | 2,541 | | | | | | 48,474 | | | | | | 33,413 | | |
|
Additions to property, plant and mine development per the Second Quarter Financial Statements
|
| | | $ | 809,255 | | | | | $ | 540,476 | | | | | $ | 1,423,004 | | | | | $ | 990,600 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended June 30,
|
| |
Six Months Ended June 30,
|
| ||||||||||||||||||
|
(thousands of United States dollars)
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
LaRonde
|
| | | $ | 20,550 | | | | | $ | 21,507 | | | | | $ | 37,443 | | | | | $ | 39,904 | | |
|
Canadian Malartic
|
| | | | 23,663 | | | | | | 29,189 | | | | | | 47,411 | | | | | | 54,350 | | |
|
Goldex
|
| | | | 9,957 | | | | | | 13,199 | | | | | | 20,262 | | | | | | 27,432 | | |
| Quebec | | | | | 54,170 | | | | | | 63,895 | | | | | | 105,116 | | | | | | 121,686 | | |
|
Detour Lake
|
| | | | 74,496 | | | | | | 63,741 | | | | | | 117,027 | | | | | | 99,599 | | |
|
Macassa
|
| | | | 12,854 | | | | | | 10,530 | | | | | | 33,226 | | | | | | 19,477 | | |
| Ontario | | | | | 87,350 | | | | | | 74,271 | | | | | | 150,253 | | | | | | 119,076 | | |
|
Meliadine
|
| | | | 20,431 | | | | | | 17,253 | | | | | | 38,166 | | | | | | 32,502 | | |
|
Meadowbank
|
| | | | 23,738 | | | | | | 34,160 | | | | | | 46,893 | | | | | | 57,528 | | |
| Nunavut | | | | | 44,169 | | | | | | 51,413 | | | | | | 85,059 | | | | | | 90,030 | | |
|
Fosterville
|
| | | | 25,404 | | | | | | 15,985 | | | | | | 48,440 | | | | | | 28,615 | | |
| Australia | | | | | 25,404 | | | | | | 15,985 | | | | | | 48,440 | | | | | | 28,615 | | |
|
Kittila
|
| | | | 21,592 | | | | | | 20,452 | | | | | | 35,741 | | | | | | 30,608 | | |
| Finland | | | | | 21,592 | | | | | | 20,452 | | | | | | 35,741 | | | | | | 30,608 | | |
|
Pinos Altos
|
| | | | 12,613 | | | | | | 10,546 | | | | | | 21,580 | | | | | | 17,196 | | |
| Mexico | | | | | 12,613 | | | | | | 10,546 | | | | | | 21,580 | | | | | | 17,196 | | |
| Other(i) | | | | | 495 | | | | | | 2,552 | | | | | | 1,583 | | | | | | 4,427 | | |
|
Sustaining capital expenditures
|
| | | $ | 245,793 | | | | | $ | 239,114 | | | | | $ | 447,772 | | | | | $ | 411,638 | | |
|
LaRonde
|
| | | $ | 21,636 | | | | | $ | 18,150 | | | | | $ | 42,033 | | | | | $ | 35,093 | | |
|
Canadian Malartic
|
| | | | 123,092 | | | | | | 75,063 | | | | | | 215,703 | | | | | | 131,767 | | |
|
Goldex
|
| | | | 10,251 | | | | | | 4,228 | | | | | | 18,328 | | | | | | 6,706 | | |
| Quebec | | | | | 154,979 | | | | | | 97,441 | | | | | | 276,064 | | | | | | 173,566 | | |
|
Detour Lake
|
| | | | 85,195 | | | | | | 67,362 | | | | | | 165,260 | | | | | | 130,062 | | |
|
Macassa
|
| | | | 49,001 | | | | | | 28,627 | | | | | | 82,330 | | | | | | 60,918 | | |
| Ontario | | | | | 134,196 | | | | | | 95,989 | | | | | | 247,590 | | | | | | 190,980 | | |
|
Meliadine
|
| | | | 24,419 | | | | | | 19,514 | | | | | | 46,974 | | | | | | 35,605 | | |
|
Meadowbank
|
| | | | 10,366 | | | | | | 1,356 | | | | | | 19,562 | | | | | | 2,681 | | |
|
Hope Bay
|
| | | | 142,927 | | | | | | 35,695 | | | | | | 188,525 | | | | | | 52,470 | | |
| Nunavut | | | | | 177,712 | | | | | | 56,565 | | | | | | 255,061 | | | | | | 90,756 | | |
|
Fosterville
|
| | | | 11,454 | | | | | | 10,328 | | | | | | 19,245 | | | | | | 20,173 | | |
| Australia | | | | | 11,454 | | | | | | 10,328 | | | | | | 19,245 | | | | | | 20,173 | | |
|
Kittila
|
| | | | 3,757 | | | | | | 814 | | | | | | 7,303 | | | | | | 2,946 | | |
| Finland | | | | | 3,757 | | | | | | 814 | | | | | | 7,303 | | | | | | 2,946 | | |
|
Pinos Altos
|
| | | | 3,844 | | | | | | 16 | | | | | | 5,676 | | | | | | 2,939 | | |
|
San Nicolás
|
| | | | 4,479 | | | | | | 1,962 | | | | | | 7,196 | | | | | | 4,047 | | |
| Mexico | | | | | 8,323 | | | | | | 1,978 | | | | | | 12,872 | | | | | | 6,986 | | |
| Other(i) | | | | | 64,706 | | | | | | 35,706 | | | | | | 108,623 | | | | | | 60,142 | | |
|
Development capital expenditures
|
| | | $ | 555,127 | | | | | $ | 298,821 | | | | | $ | 926,758 | | | | | $ | 545,549 | | |
|
Total capital expenditures
|
| | | $ | 800,920 | | | | | $ | 537,935 | | | | | $ | 1,374,530 | | | | | $ | 957,187 | | |
|
Working capital adjustments
|
| | | | 8,335 | | | | | | 2,541 | | | | | | 48,474 | | | | | | 33,413 | | |
|
Additions to property, plant and mine development per the Second Quarter Financial Statements
|
| | | $ | 809,255 | | | | | $ | 540,476 | | | | | $ | 1,423,004 | | | | | $ | 990,600 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
|
(thousands of United States dollars, except where noted)
|
| |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
| Net income — key line items: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Revenue from mining operations
|
| | | | | | | | | | | | | | | | | | | | | | | | |
|
LaRonde
|
| | | $ | 373,589 | | | | | $ | 311,077 | | | | | $ | 775,516 | | | | | $ | 590,160 | | |
|
Canadian Malartic
|
| | | | 597,767 | | | | | | 497,217 | | | | | | 1,352,620 | | | | | | 919,264 | | |
|
Goldex
|
| | | | 138,937 | | | | | | 115,280 | | | | | | 305,473 | | | | | | 211,249 | | |
|
Quebec
|
| | | | 1,110,293 | | | | | | 923,574 | | | | | | 2,433,609 | | | | | | 1,720,673 | | |
|
Detour Lake
|
| | | | 872,436 | | | | | | 545,174 | | | | | | 1,816,666 | | | | | | 989,060 | | |
|
Macassa
|
| | | | 294,473 | | | | | | 260,231 | | | | | | 600,917 | | | | | | 495,893 | | |
|
Ontario
|
| | | | 1,166,909 | | | | | | 805,405 | | | | | | 2,417,583 | | | | | | 1,484,953 | | |
|
Meliadine
|
| | | | 517,888 | | | | | | 354,517 | | | | | | 894,482 | | | | | | 612,806 | | |
|
Meadowbank
|
| | | | 427,534 | | | | | | 334,715 | | | | | | 1,021,960 | | | | | | 739,800 | | |
|
Nunavut
|
| | | | 945,422 | | | | | | 689,232 | | | | | | 1,916,442 | | | | | | 1,352,606 | | |
|
Fosterville
|
| | | | 207,651 | | | | | | 153,845 | | | | | | 388,327 | | | | | | 263,674 | | |
|
Australia
|
| | | | 207,651 | | | | | | 153,845 | | | | | | 388,327 | | | | | | 263,674 | | |
|
Kittila
|
| | | | 263,792 | | | | | | 167,942 | | | | | | 515,690 | | | | | | 329,030 | | |
|
Finland
|
| | | | 263,792 | | | | | | 167,942 | | | | | | 515,690 | | | | | | 329,030 | | |
|
Pinos Altos
|
| | | | 108,760 | | | | | | 76,103 | | | | | | 231,032 | | | | | | 133,413 | | |
|
Mexico
|
| | | | 108,760 | | | | | | 76,103 | | | | | | 231,032 | | | | | | 133,413 | | |
|
Corporate and Other
|
| | | | (9) | | | | | | — | | | | | | (276) | | | | | | — | | |
|
Revenues from mining operations
|
| | | | 3,802,818 | | | | | | 2,816,101 | | | | | | 7,902,407 | | | | | | 5,284,349 | | |
|
Production costs
|
| | | | 953,758 | | | | | | 789,187 | | | | | | 1,909,345 | | | | | | 1,556,920 | | |
|
Amortization of property, plant and mine development
|
| | | | 423,256 | | | | | | 376,956 | | | | | | 843,522 | | | | | | 793,756 | | |
|
Gross profit
|
| | | | 2,425,804 | | | | | | 1,649,958 | | | | | | 5,149,540 | | | | | | 2,933,673 | | |
|
Exploration, corporate and other
|
| | | | 102,949 | | | | | | 33,339 | | | | | | 267,061 | | | | | | 122,483 | | |
|
Income before income and mining taxes
|
| | | | 2,322,855 | | | | | | 1,616,619 | | | | | | 4,882,479 | | | | | | 2,811,190 | | |
|
Income and mining taxes expense
|
| | | | 722,402 | | | | | | 547,908 | | | | | | 1,586,565 | | | | | | 927,748 | | |
|
Net income for the period
|
| | | $ | 1,600,453 | | | | | $ | 1,068,711 | | | | | $ | 3,295,914 | | | | | $ | 1,883,442 | | |
|
Net income per share — basic
|
| | | $ | 3.19 | | | | | $ | 2.13 | | | | | $ | 6.58 | | | | | $ | 3.75 | | |
|
Net income per share — diluted
|
| | | $ | 3.17 | | | | | $ | 2.12 | | | | | $ | 6.56 | | | | | $ | 3.74 | | |
| Cash flows: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Cash provided by operating activities
|
| | | $ | 2,144,120 | | | | | $ | 1,845,488 | | | | | $ | 3,489,988 | | | | | $ | 2,889,734 | | |
|
Cash used in investing activities
|
| | | $ | (1,189,583) | | | | | $ | (610,936) | | | | | $ | (1,954,442) | | | | | $ | (1,260,876) | | |
|
Cash used in financing activities
|
| | | $ | (600,715) | | | | | $ | (819,155) | | | | | $ | (935,367) | | | | | $ | (1,002,121) | | |
| Realized prices: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Gold (per ounce)
|
| | | $ | 4,483 | | | | | $ | 3,288 | | | | | $ | 4,672 | | | | | $ | 3,090 | | |
|
Silver (per ounce)
|
| | | $ | 64.98 | | | | | $ | 35.72 | | | | | $ | 74.82 | | | | | $ | 34.45 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
| Payable production(i): | | | | | | | | | | | | | | | | | | | | | | | | | |
| Gold (ounces): | | | | | | | | | | | | | | | | | | | | | | | | | |
|
LaRonde
|
| | | | 81,261 | | | | | | 91,252 | | | | | | 162,857 | | | | | | 182,743 | | |
|
Canadian Malartic
|
| | | | 135,243 | | | | | | 172,531 | | | | | | 301,459 | | | | | | 332,304 | | |
|
Goldex
|
| | | | 29,277 | | | | | | 33,118 | | | | | | 58,649 | | | | | | 63,134 | | |
|
Quebec
|
| | | | 245,781 | | | | | | 296,901 | | | | | | 522,965 | | | | | | 578,181 | | |
|
Detour Lake
|
| | | | 207,279 | | | | | | 168,272 | | | | | | 384,298 | | | | | | 321,110 | | |
|
Macassa
|
| | | | 80,143 | | | | | | 87,364 | | | | | | 135,736 | | | | | | 173,392 | | |
|
Ontario
|
| | | | 287,422 | | | | | | 255,636 | | | | | | 520,034 | | | | | | 494,502 | | |
|
Meliadine
|
| | | | 97,516 | | | | | | 90,263 | | | | | | 191,347 | | | | | | 188,775 | | |
|
Meadowbank
|
| | | | 100,165 | | | | | | 101,935 | | | | | | 214,027 | | | | | | 242,061 | | |
|
Nunavut
|
| | | | 197,681 | | | | | | 192,198 | | | | | | 405,374 | | | | | | 430,836 | | |
|
Fosterville
|
| | | | 42,012 | | | | | | 49,574 | | | | | | 83,455 | | | | | | 93,189 | | |
|
Australia
|
| | | | 42,012 | | | | | | 49,574 | | | | | | 83,455 | | | | | | 93,189 | | |
|
Kittila
|
| | | | 61,969 | | | | | | 50,357 | | | | | | 110,496 | | | | | | 104,461 | | |
|
Finland
|
| | | | 61,969 | | | | | | 50,357 | | | | | | 110,496 | | | | | | 104,461 | | |
|
Pinos Altos
|
| | | | 20,951 | | | | | | 21,363 | | | | | | 38,601 | | | | | | 38,654 | | |
|
Mexico
|
| | | | 20,951 | | | | | | 21,363 | | | | | | 38,601 | | | | | | 38,654 | | |
|
Total gold (ounces)
|
| | | | 855,816 | | | | | | 866,029 | | | | | | 1,680,925 | | | | | | 1,739,823 | | |
|
Silver (thousands of ounces)
|
| | | | 653 | | | | | | 611 | | | | | | 1,252 | | | | | | 1,213 | | |
|
Zinc (tonnes)
|
| | | | 1,101 | | | | | | 2,384 | | | | | | 2,120 | | | | | | 4,126 | | |
|
Copper (tonnes)
|
| | | | 1,581 | | | | | | 1,161 | | | | | | 3,060 | | | | | | 2,545 | | |
| Payable metal sold(ii): | | | | | | | | | | | | | | | | | | | | | | | | | |
| Gold (ounces): | | | | | | | | | | | | | | | | | | | | | | | | | |
|
LaRonde
|
| | | | 81,092 | | | | | | 88,908 | | | | | | 159,539 | | | | | | 179,417 | | |
|
Canadian Malartic
|
| | | | 130,634 | | | | | | 150,830 | | | | | | 285,931 | | | | | | 295,493 | | |
|
Goldex
|
| | | | 29,087 | | | | | | 33,167 | | | | | | 60,843 | | | | | | 63,860 | | |
|
Quebec
|
| | | | 240,813 | | | | | | 272,905 | | | | | | 506,313 | | | | | | 538,770 | | |
|
Detour Lake
|
| | | | 195,070 | | | | | | 166,034 | | | | | | 386,419 | | | | | | 321,514 | | |
|
Macassa
|
| | | | 65,482 | | | | | | 79,145 | | | | | | 127,516 | | | | | | 160,145 | | |
|
Ontario
|
| | | | 260,552 | | | | | | 245,179 | | | | | | 513,935 | | | | | | 481,659 | | |
|
Meliadine
|
| | | | 114,094 | | | | | | 108,188 | | | | | | 191,344 | | | | | | 197,458 | | |
|
Meadowbank
|
| | | | 95,700 | | | | | | 102,224 | | | | | | 217,461 | | | | | | 242,574 | | |
|
Nunavut
|
| | | | 209,794 | | | | | | 210,412 | | | | | | 408,805 | | | | | | 440,032 | | |
|
Fosterville
|
| | | | 46,000 | | | | | | 46,500 | | | | | | 84,000 | | | | | | 84,500 | | |
|
Australia
|
| | | | 46,000 | | | | | | 46,500 | | | | | | 84,000 | | | | | | 84,500 | | |
|
Kittila
|
| | | | 58,300 | | | | | | 51,000 | | | | | | 110,900 | | | | | | 107,000 | | |
|
Finland
|
| | | | 58,300 | | | | | | 51,000 | | | | | | 110,900 | | | | | | 107,000 | | |
|
Pinos Altos
|
| | | | 20,429 | | | | | | 20,839 | | | | | | 41,586 | | | | | | 37,839 | | |
|
Mexico
|
| | | | 20,429 | | | | | | 20,839 | | | | | | 41,586 | | | | | | 37,839 | | |
|
Total gold (ounces)
|
| | | | 835,505 | | | | | | 846,835 | | | | | | 1,665,156 | | | | | | 1,689,800 | | |
|
Silver (thousands of ounces)
|
| | | | 570 | | | | | | 574 | | | | | | 1,187 | | | | | | 1,101 | | |
|
Zinc (tonnes)
|
| | | | 1,153 | | | | | | 2,391 | | | | | | 2,337 | | | | | | 4,203 | | |
|
Copper (tonnes)
|
| | | | 1,589 | | | | | | 1,162 | | | | | | 3,098 | | | | | | 2,560 | | |
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the Three and Six Months Ended June 30, 2026
| | | |
Three months ended
|
| |||||||||||||||||||||||||||||||||||||||||||||
|
(thousands of United States
dollars, except where noted) |
| |
September 30,
2024 |
| |
December 31,
2024 |
| |
March 31,
2025 |
| |
June 30,
2025 |
| |
September 30,
2025 |
| |
December 31,
2025 |
| |
March 31,
2026 |
| |
June 30,
2026 |
| ||||||||||||||||||||||||
|
Revenues from mining operations
|
| | | $ | 2,155,609 | | | | | $ | 2,223,700 | | | | | $ | 2,468,248 | | | | | $ | 2,816,101 | | | | | $ | 3,059,529 | | | | | $ | 3,563,973 | | | | | $ | 4,099,589 | | | | | $ | 3,802,818 | | |
|
Production costs
|
| | | | 783,653 | | | | | | 746,858 | | | | | | 767,733 | | | | | | 789,187 | | | | | | 839,321 | | | | | | 944,443 | | | | | | 955,587 | | | | | | 953,758 | | |
|
Amortization of property, plant and mine development
|
| | | | 390,245 | | | | | | 388,217 | | | | | | 416,800 | | | | | | 376,956 | | | | | | 429,947 | | | | | | 421,594 | | | | | | 420,266 | | | | | | 423,256 | | |
|
Gross profit
|
| | | | 981,711 | | | | | | 1,088,625 | | | | | | 1,283,715 | | | | | | 1,649,958 | | | | | | 1,790,261 | | | | | | 2,197,936 | | | | | | 2,723,736 | | | | | | 2,425,804 | | |
|
Impairment reversal
|
| | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | (229,000) | | | | | | — | | | | | | — | | |
|
Exploration, corporate and
other |
| | | | 141,921 | | | | | | 306,114 | | | | | | 89,144 | | | | | | 33,339 | | | | | | 214,693 | | | | | | 109,783 | | | | | | 164,112 | | | | | | 102,949 | | |
|
Income before income and mining taxes
|
| | | | 839,790 | | | | | | 782,511 | | | | | | 1,194,571 | | | | | | 1,616,619 | | | | | | 1,575,568 | | | | | | 2,317,153 | | | | | | 2,559,624 | | | | | | 2,322,855 | | |
|
Income and mining taxes expense
|
| | | | 272,672 | | | | | | 273,256 | | | | | | 379,840 | | | | | | 547,908 | | | | | | 520,610 | | | | | | 794,092 | | | | | | 864,163 | | | | | | 722,402 | | |
|
Net income for the
period |
| | | $ | 567,118 | | | | | $ | 509,255 | | | | | $ | 814,731 | | | | | $ | 1,068,711 | | | | | $ | 1,054,958 | | | | | $ | 1,523,061 | | | | | $ | 1,695,461 | | | | | $ | 1,600,453 | | |
|
Net income per share — basic
|
| | | $ | 1.13 | | | | | $ | 1.02 | | | | | $ | 1.62 | | | | | $ | 2.13 | | | | | $ | 2.10 | | | | | $ | 3.04 | | | | | $ | 3.39 | | | | | $ | 3.19 | | |
|
Net income per share — diluted
|
| | | $ | 1.13 | | | | | $ | 1.01 | | | | | $ | 1.62 | | | | | $ | 2.12 | | | | | $ | 2.10 | | | | | $ | 3.04 | | | | | $ | 3.38 | | | | | $ | 3.17 | | |
| Cash flows: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Cash provided by operating
activities |
| | | $ | 1,084,532 | | | | | $ | 1,131,849 | | | | | $ | 1,044,246 | | | | | $ | 1,845,488 | | | | | $ | 1,815,875 | | | | | $ | 2,111,504 | | | | | $ | 1,345,868 | | | | | $ | 2,144,120 | | |
CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS
(thousands of United States dollars, except share amounts)
(Unaudited)
| | | |
As at
June 30, 2026 |
| |
As at
December 31, 2025 |
| ||||||
| ASSETS | | | | | | | | | | | | | |
| Current assets: | | | | | | | | | | | | | |
|
Cash and cash equivalents
|
| | |
$
|
3,463,957
|
| | | | $ | 2,866,053 | | |
|
Inventories
|
| | |
|
1,623,497
|
| | | | | 1,698,830 | | |
|
Fair value of derivative financial instruments (Notes 6 and 15)
|
| | |
|
3,525
|
| | | | | 34,428 | | |
|
Other current assets (Note 7A)
|
| | |
|
432,603
|
| | | | | 394,631 | | |
|
Total current assets
|
| | |
|
5,523,582
|
| | | | | 4,993,942 | | |
| Non-current assets: | | | | | | | | | | | | | |
|
Goodwill
|
| | |
|
4,157,672
|
| | | | | 4,157,672 | | |
|
Property, plant and mine development (Note 8)
|
| | |
|
25,735,534
|
| | | | | 22,850,540 | | |
|
Investments (Notes 6, 9 and 15)
|
| | |
|
1,161,559
|
| | | | | 1,508,252 | | |
|
Other assets (Note 7B)
|
| | |
|
1,216,696
|
| | | | | 960,885 | | |
|
Total assets
|
| | |
$
|
37,795,043
|
| | | | $ | 34,471,291 | | |
| LIABILITIES | | | | | | | | | | | | | |
| Current liabilities: | | | | | | | | | | | | | |
|
Accounts payable and accrued liabilities
|
| | |
$
|
1,278,680
|
| | | | $ | 1,033,444 | | |
|
Share based liabilities
|
| | |
|
30,365
|
| | | | | 31,722 | | |
|
Income taxes payable
|
| | |
|
278,144
|
| | | | | 1,226,347 | | |
|
Reclamation provision
|
| | |
|
222,016
|
| | | | | 144,537 | | |
|
Lease obligations
|
| | |
|
34,306
|
| | | | | 30,480 | | |
|
Fair value of derivative financial instruments (Notes 6 and 15)
|
| | |
|
89,101
|
| | | | | 5,676 | | |
|
Total current liabilities
|
| | |
|
1,932,612
|
| | | | | 2,472,206 | | |
| Non-current liabilities: | | | | | | | | | | | | | |
|
Long-term debt (Note 10)
|
| | |
|
196,825
|
| | | | | 196,271 | | |
|
Reclamation provision
|
| | |
|
1,286,556
|
| | | | | 1,318,476 | | |
|
Lease obligations
|
| | |
|
89,219
|
| | | | | 94,719 | | |
|
Share based liabilities
|
| | |
|
12,785
|
| | | | | 23,921 | | |
|
Deferred income and mining tax liabilities
|
| | |
|
5,489,781
|
| | | | | 5,373,013 | | |
|
Other liabilities
|
| | |
|
183,535
|
| | | | | 250,221 | | |
|
Total liabilities
|
| | |
|
9,191,313
|
| | | | | 9,728,827 | | |
| EQUITY | | | | | | | | | | | | | |
|
Common shares (Note 11):
|
| | | | | | | | | | | | |
|
Outstanding — 506,899,374 common shares issued, less 534,510 shares held in trust
|
| | |
|
20,147,781
|
| | | | | 18,699,862 | | |
|
Stock options (Notes 11 and 12)
|
| | |
|
166,303
|
| | | | | 166,775 | | |
|
Retained earnings
|
| | |
|
8,130,478
|
| | | | | 5,463,906 | | |
|
Other reserves (Note 13)
|
| | |
|
159,168
|
| | | | | 411,921 | | |
|
Total equity
|
| | |
|
28,603,730
|
| | | | | 24,742,464 | | |
|
Total liabilities and equity
|
| | |
$
|
37,795,043
|
| | | | $ | 34,471,291 | | |
| Commitments and contingencies (Note 18) | | | | | | | | | | | | | |
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF INCOME
(thousands of United States dollars, except per share amounts)
(Unaudited)
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
| REVENUES | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Revenues from mining operations (Note 14)
|
| | |
$
|
3,802,818
|
| | | | $ | 2,816,101 | | | | |
$
|
7,902,407
|
| | | | $ | 5,284,349 | | |
| COST OF SALES | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Production costs
|
| | |
|
953,758
|
| | | | | 789,187 | | | | |
|
1,909,345
|
| | | | | 1,556,920 | | |
|
Amortization of property, plant and mine development
|
| | |
|
423,256
|
| | | | | 376,956 | | | | |
|
843,522
|
| | | | | 793,756 | | |
|
Gross profit
|
| | |
|
2,425,804
|
| | | | | 1,649,958 | | | | |
|
5,149,540
|
| | | | | 2,933,673 | | |
| EXPENSES (INCOME) | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Exploration and corporate development
|
| | |
|
61,531
|
| | | | | 52,100 | | | | |
|
114,087
|
| | | | | 93,905 | | |
|
General and administrative
|
| | |
|
57,948
|
| | | | | 57,890 | | | | |
|
135,798
|
| | | | | 118,599 | | |
|
Finance costs
|
| | |
|
16,039
|
| | | | | 27,429 | | | | |
|
31,795
|
| | | | | 49,873 | | |
|
Loss (gain) on derivative financial instruments (Note 15)
|
| | |
|
81,404
|
| | | | | (125,264) | | | | |
|
76,704
|
| | | | | (194,123) | | |
|
Foreign exchange translation
|
| | |
|
20,128
|
| | | | | (11,571) | | | | |
|
19,395
|
| | | | | (11,631) | | |
|
Care and maintenance
|
| | |
|
15,275
|
| | | | | 15,682 | | | | |
|
37,871
|
| | | | | 29,583 | | |
|
Gain on sale of investments (Note 16)
|
| | |
|
(155,319)
|
| | | | | — | | | | |
|
(155,319)
|
| | | | | — | | |
|
Other income and expenses (Note 16)
|
| | |
|
5,943
|
| | | | | 17,073 | | | | |
|
6,730
|
| | | | | 36,277 | | |
|
Income before income and mining taxes
|
| | |
|
2,322,855
|
| | | | | 1,616,619 | | | | |
|
4,882,479
|
| | | | | 2,811,190 | | |
|
Income and mining taxes expense
|
| | |
|
722,402
|
| | | | | 547,908 | | | | |
|
1,586,565
|
| | | | | 927,748 | | |
|
Net income for the period
|
| | |
$
|
1,600,453
|
| | | | $ | 1,068,711 | | | | |
$
|
3,295,914
|
| | | | $ | 1,883,442 | | |
|
Net income per share — basic (Note 11)
|
| | |
$
|
3.19
|
| | | | $ | 2.13 | | | | |
$
|
6.58
|
| | | | $ | 3.75 | | |
|
Net income per share — diluted (Note 11)
|
| | |
$
|
3.17
|
| | | | $ | 2.12 | | | | |
$
|
6.56
|
| | | | $ | 3.74 | | |
|
Cash dividends declared per common share
|
| | |
$
|
0.45
|
| | | | $ | 0.40 | | | | |
$
|
0.90
|
| | | | $ | 0.80 | | |
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
(thousands of United States dollars)
(Unaudited)
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Net income for the period
|
| | |
$
|
1,600,453
|
| | | | $ | 1,068,711 | | | | |
$
|
3,295,914
|
| | | | $ | 1,883,442 | | |
| Other comprehensive income: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Items that may be subsequently reclassified to net income:
|
| | | | | | | | | | | | | | | | | | | | | | | | |
|
Derivative financial instruments (Note 13):
|
| | | | | | | | | | | | | | | | | | | | | | | | |
|
Reclassified from the cash flow hedge reserve to
net income |
| | |
|
294
|
| | | | | 294 | | | | |
|
588
|
| | | | | 588 | | |
| | | | |
|
294
|
| | | | | 294 | | | | |
|
588
|
| | | | | 588 | | |
|
Items that will not be subsequently reclassified to net
income: |
| | | | | | | | | | | | | | | | | | | | | | | | |
|
Pension benefit obligations:
|
| | | | | | | | | | | | | | | | | | | | | | | | |
|
Remeasurement loss on pension benefit obligations
|
| | |
|
(42)
|
| | | | | (44) | | | | |
|
(84)
|
| | | | | (86) | | |
|
Income tax impact
|
| | |
|
11
|
| | | | | 11 | | | | |
|
22
|
| | | | | 22 | | |
|
Equity securities (Note 13):
|
| | | | | | | | | | | | | | | | | | | | | | | | |
|
Net change in fair value of equity securities
|
| | |
|
(173,414)
|
| | | | | 88,840 | | | | |
|
(31,059)
|
| | | | | 248,876 | | |
|
Income tax impact
|
| | |
|
51,451
|
| | | | | (12,068) | | | | |
|
33,287
|
| | | | | (31,754) | | |
| | | | |
|
(121,994)
|
| | | | | 76,739 | | | | |
|
2,166
|
| | | | | 217,058 | | |
|
Other comprehensive (loss) income for the period
|
| | | | (121,700) | | | | |
|
77,033
|
| | | | | 2,754 | | | | |
|
217,646
|
| |
|
Comprehensive income for the period
|
| | |
$
|
1,478,753
|
| | | | $ | 1,145,744 | | | | |
$
|
3,298,668
|
| | | | $ | 2,101,088 | | |
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF EQUITY
(thousands of United States dollars, except share and per share amounts)
(Unaudited)
| | | |
Common Shares
Outstanding |
| |
Stock
Options |
| |
Retained
Earnings |
| |
Other
Reserves |
| |
Total
Equity |
| |||||||||||||||||||||
| | | |
Shares
|
| |
Amount
|
| ||||||||||||||||||||||||||||||
|
Balance at December 31, 2024
|
| | | | 501,729,505 | | | | | $ | 18,675,660 | | | | | $ | 172,145 | | | | | $ | 2,026,242 | | | | | $ | (41,147) | | | | | $ | 20,832,900 | | |
|
Net income
|
| | | | — | | | | | | — | | | | | | — | | | | | | 1,883,442 | | | | | | — | | | | | | 1,883,442 | | |
|
Other comprehensive (loss) income:
|
| | | | — | | | | | | — | | | | | | — | | | | | | (64) | | | | | | 217,710 | | | | | | 217,646 | | |
|
Total comprehensive income
|
| | | | — | | | | | | — | | | | | | — | | | | | | 1,883,378 | | | | | | 217,710 | | | | | | 2,101,088 | | |
| Transactions with owners: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Shares issued under employee stock option plan (Notes 11 and 12)
|
| | | | 1,123,933 | | | | | | 74,582 | | | | | | (12,736) | | | | | | — | | | | | | — | | | | | | 61,846 | | |
|
Stock options (Notes 11 and 12)
|
| | | | — | | | | | | — | | | | | | 6,259 | | | | | | — | | | | | | — | | | | | | 6,259 | | |
|
Shares issued under incentive share purchase plan
|
| | | | 274,680 | | | | | | 31,049 | | | | | | — | | | | | | — | | | | | | — | | | | | | 31,049 | | |
|
Shares issued under dividend reinvestment plan
|
| | | | 422,617 | | | | | | 45,180 | | | | | | — | | | | | | — | | | | | | — | | | | | | 45,180 | | |
|
Share cancellations (Note 11)
|
| | | | (1,324,535) | | | | | | (49,553) | | | | | | — | | | | | | (100,381) | | | | | | — | | | | | | (149,934) | | |
|
Dividends declared ($0.80 per share)
|
| | | | — | | | | | | — | | | | | | — | | | | | | (401,509) | | | | | | — | | | | | | (401,509) | | |
|
Restricted Share Unit plan (“RSU”),
Performance Share Unit plan (“PSU”) and Long Term Incentive Plan (“LTIP”) (Notes 11 and 12) |
| | | | 115,770 | | | | | | 15,607 | | | | | | — | | | | | | — | | | | | | — | | | | | | 15,607 | | |
|
Balance at June 30, 2025
|
| | | | 502,341,970 | | | | | $ | 18,792,525 | | | | | $ | 165,668 | | | | | $ | 3,407,730 | | | | | $ | 176,563 | | | | | $ | 22,542,486 | | |
|
Balance at December 31, 2025
|
| | | | 500,046,600 | | | | | $ | 18,699,862 | | | | | $ | 166,775 | | | | | $ | 5,463,906 | | | | | $ | 411,921 | | | | | $ | 24,742,464 | | |
|
Net income
|
| | | | — | | | | | | — | | | | | | — | | | | | | 3,295,914 | | | | | | — | | | | | | 3,295,914 | | |
|
Other comprehensive (loss) income
|
| | | | — | | | | | | — | | | | | | — | | | | | | (62) | | | | | | 2,816 | | | | | | 2,754 | | |
|
Total comprehensive income
|
| | | | — | | | | | | — | | | | | | — | | | | | | 3,295,852 | | | | | | 2,816 | | | | | | 3,298,668 | | |
|
Transfer of gain on disposal of equity
securities to retained earnings, net of tax (Notes 9 and 13) |
| | | | — | | | | | | — | | | | | | — | | | | | | 255,569 | | | | | | (255,569) | | | | | | — | | |
| Transactions with owners: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Shares issued under employee stock option plan (Notes 11 and 12)
|
| | | | 504,503 | | | | | | 39,192 | | | | | | (6,210) | | | | | | — | | | | | | — | | | | | | 32,982 | | |
|
Stock options (Notes 11 and 12)
|
| | | | — | | | | | | — | | | | | | 5,738 | | | | | | — | | | | | | — | | | | | | 5,738 | | |
|
Shares issued on acquisition of Rupert Resources Ltd. (Note 5)
|
| | | | 8,224,116 | | | | | | 1,434,367 | | | | | | — | | | | | | — | | | | | | — | | | | | | 1,434,367 | | |
|
Shares issued under incentive share purchase plan
|
| | | | 221,563 | | | | | | 37,798 | | | | | | — | | | | | | — | | | | | | — | | | | | | 37,798 | | |
|
Shares issued under dividend reinvestment plan
|
| | | | 212,921 | | | | | | 39,353 | | | | | | — | | | | | | — | | | | | | — | | | | | | 39,353 | | |
|
Share cancellations (Note 11)
|
| | | | (3,032,129) | | | | | | (122,865) | | | | | | — | | | | | | (435,494) | | | | | | — | | | | | | (558,359) | | |
|
Dividends declared ($0.90 per share)
|
| | | | — | | | | | | — | | | | | | — | | | | | | (449,355) | | | | | | — | | | | | | (449,355) | | |
|
RSU, PSU and LTIP (Notes 11
and 12) |
| | | | 187,290 | | | | | | 20,074 | | | | | | — | | | | | | — | | | | | | — | | | | | | 20,074 | | |
|
Balance at June 30, 2026
|
| | | | 506,364,864 | | | | | $ | 20,147,781 | | | | | $ | 166,303 | | | | | $ | 8,130,478 | | | | | $ | 159,168 | | | | | $ | 28,603,730 | | |
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS
(thousands of United States dollars)
(Unaudited)
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
| OPERATING ACTIVITIES | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Net income for the period
|
| | |
$
|
1,600,453
|
| | | | $ | 1,068,711 | | | | |
$
|
3,295,914
|
| | | | $ | 1,883,442 | | |
| Add (deduct) adjusting items: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Amortization of property, plant and mine development
|
| | |
|
423,256
|
| | | | | 376,956 | | | | |
|
843,522
|
| | | | | 793,756 | | |
|
Deferred income and mining taxes
|
| | |
|
99,283
|
| | | | | (8,766) | | | | |
|
158,820
|
| | | | | 9,725 | | |
|
Unrealized loss (gain) on currency and commodity derivatives (Note 15)
|
| | |
|
92,988
|
| | | | | (118,678) | | | | |
|
117,042
|
| | | | | (149,798) | | |
|
Unrealized loss (gain) on warrants (Note 15)
|
| | |
|
12,296
|
| | | | | (7,263) | | | | |
|
(6,693)
|
| | | | | (61,431) | | |
|
Stock-based compensation (Note 12)
|
| | |
|
11,695
|
| | | | | 21,389 | | | | |
|
46,626
|
| | | | | 48,782 | | |
|
Foreign exchange translation
|
| | |
|
20,128
|
| | | | | (11,571) | | | | |
|
19,395
|
| | | | | (11,631) | | |
|
Gain on sale of investments (Note 16)
|
| | |
|
(155,319)
|
| | | | | — | | | | |
|
(155,319)
|
| | | | | — | | |
|
Other
|
| | |
|
7,424
|
| | | | | 11,308 | | | | |
|
24,259
|
| | | | | 28,631 | | |
| Changes in non-cash working capital balances: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Income taxes
|
| | |
|
(13,390)
|
| | | | | 478,106 | | | | |
|
(1,002,470)
|
| | | | | 301,367 | | |
|
Inventories
|
| | |
|
(42,494)
|
| | | | | (53,061) | | | | |
|
(5,694)
|
| | | | | (22,144) | | |
|
Other current assets
|
| | |
|
(18,741)
|
| | | | | (38,152) | | | | |
|
(29,755)
|
| | | | | (6,762) | | |
|
Accounts payable and accrued liabilities
|
| | |
|
106,541
|
| | | | | 126,509 | | | | |
|
184,341
|
| | | | | 75,797 | | |
|
Cash provided by operating activities
|
| | |
|
2,144,120
|
| | | | | 1,845,488 | | | | |
|
3,489,988
|
| | | | | 2,889,734 | | |
| INVESTING ACTIVITIES | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Additions to property, plant and mine development (Note 8)
|
| | |
|
(809,255)
|
| | | | | (540,476) | | | | |
|
(1,423,004)
|
| | | | | (990,600) | | |
|
Purchase of O3 Mining, net of cash and cash equivalents acquired
|
| | |
|
—
|
| | | | | — | | | | |
|
—
|
| | | | | (121,960) | | |
|
Purchase of Central Lapland properties, net of cash and cash equivalents acquired (Note 5)
|
| | |
|
(578,408)
|
| | | | | — | | | | |
|
(578,408)
|
| | | | | — | | |
|
Contributions for acquisition of mineral assets
|
| | |
|
(6,354)
|
| | | | | (4,575) | | | | |
|
(11,634)
|
| | | | | (8,400) | | |
|
Purchase of equity securities and other investments
|
| | |
|
(73,389)
|
| | | | | (70,304) | | | | |
|
(218,091)
|
| | | | | (138,361) | | |
|
Proceeds from sale of equity securities and other investments
|
| | |
|
260,646
|
| | | | | — | | | | |
|
260,646
|
| | | | | — | | |
|
Other investing activities
|
| | |
|
17,177
|
| | | | | 4,419 | | | | |
|
16,049
|
| | | | | (1,555) | | |
|
Cash used in investing activities
|
| | |
|
(1,189,583)
|
| | | | | (610,936) | | | | |
|
(1,954,442)
|
| | | | | (1,260,876) | | |
| FINANCING ACTIVITIES | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Repayment of Senior Notes
|
| | |
|
—
|
| | | | | (550,000) | | | | |
|
—
|
| | | | | (550,000) | | |
|
Repayment of lease obligations
|
| | |
|
(8,531)
|
| | | | | (9,172) | | | | |
|
(15,769)
|
| | | | | (18,350) | | |
|
Dividends paid
|
| | |
|
(206,854)
|
| | | | | (180,778) | | | | |
|
(410,019)
|
| | | | | (356,345) | | |
|
Repurchase of common shares (Notes 11 and 12)
|
| | |
|
(399,942)
|
| | | | | (99,938) | | | | |
|
(567,775)
|
| | | | | (159,988) | | |
|
Proceeds from exercise of stock options (Note 12)
|
| | |
|
1,548
|
| | | | | 9,820 | | | | |
|
32,982
|
| | | | | 61,846 | | |
|
Common shares issued
|
| | |
|
13,064
|
| | | | | 10,913 | | | | |
|
25,214
|
| | | | | 20,716 | | |
|
Cash used in financing activities
|
| | |
|
(600,715)
|
| | | | | (819,155) | | | | |
|
(935,367)
|
| | | | | (1,002,121) | | |
|
Effect of exchange rate changes on cash and cash equivalents
|
| | |
|
(1,734)
|
| | | | | 3,856 | | | | |
|
(2,275)
|
| | | | | 4,397 | | |
|
Net increase in cash and cash equivalents during the period
|
| | |
|
352,088
|
| | | | | 419,253 | | | | |
|
597,904
|
| | | | | 631,134 | | |
|
Cash and cash equivalents, beginning of period
|
| | |
|
3,111,869
|
| | | | | 1,138,312 | | | | |
|
2,866,053
|
| | | | | 926,431 | | |
|
Cash and cash equivalents, end of period
|
| | |
$
|
3,463,957
|
| | | | $ | 1,557,565 | | | | |
$
|
3,463,957
|
| | | | $ | 1,557,565 | | |
| SUPPLEMENTAL CASH FLOW INFORMATION | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Interest paid
|
| | |
$
|
2,776
|
| | | | $ | 37,233 | | | | |
$
|
3,339
|
| | | | $ | 38,418 | | |
|
Income and mining taxes paid
|
| | |
$
|
623,176
|
| | | | $ | 79,703 | | | | |
$
|
2,411,498
|
| | | | $ | 616,305 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| |
Cash
|
| | | $ | 325,000 | | |
| |
Total purchase consideration
|
| | | $ | 325,000 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| |
Cash and cash equivalents
|
| | | $ | 462 | | |
| |
Other current assets
|
| | | | 269 | | |
| |
Property, plant and mine development
|
| | | | 463,694 | | |
| |
Accounts payable and accrued liabilities
|
| | | | (139) | | |
| |
Non-controlling interest
|
| | | | (139,286) | | |
| |
Total assets acquired, net of liabilities assumed
|
| | | $ | 325,000 | | |
| |
Cash
|
| | | $ | 308,543 | | |
| |
Fair value of previously held equity interest
|
| | | | 30,720 | | |
| |
Total purchase consideration
|
| | | $ | 339,263 | | |
| |
Cash and cash equivalents
|
| | | $ | 23,331 | | |
| |
Other current assets
|
| | | | 722 | | |
| |
Property, plant and mine development
|
| | | | 195,668 | | |
| |
Investment in FinGold
|
| | | | 139,286 | | |
| |
Other non-current assets
|
| | | | 742 | | |
| |
Accounts payable and accrued liabilities
|
| | | | (20,486) | | |
| |
Total assets acquired, net of liabilities assumed
|
| | | $ | 339,263 | | |
| |
Fair value of common shares issued
|
| | | $ | 1,434,367 | | |
| |
Fair value of previously held equity interest
|
| | | | 235,399 | | |
| |
Cash
|
| | | | 17,670 | | |
| |
Total purchase consideration
|
| | | $ | 1,687,436 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| |
Cash and cash equivalents
|
| | | $ | 31,361 | | |
| |
Other current assets
|
| | | | 12,732 | | |
| |
Property, plant and mine development
|
| | | | 1,654,512 | | |
| |
Other non-current assets
|
| | | | 14 | | |
| |
Accounts payable and accrued liabilities
|
| | | | (3,126) | | |
| |
Reclamation provision
|
| | | | (8,057) | | |
| |
Total assets acquired, net of liabilities assumed
|
| | | $ | 1,687,436 | | |
| | | |
Level 1
|
| |
Level 2
|
| |
Level 3
|
| |
Total
|
| ||||||||||||
| Financial assets: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Trade receivables (Note 7A)
|
| | | $ | — | | | | | $ | 20,149 | | | | | $ | — | | | | | $ | 20,149 | | |
|
Equity securities (FVOCI) (Note 9)
|
| | | | 1,001,001 | | | | | | 91,885 | | | | | | — | | | | | | 1,092,886 | | |
|
Share purchase warrants (FVPL) (Note 9)
|
| | | | — | | | | | | 68,673 | | | | | | — | | | | | | 68,673 | | |
|
Fair value of derivative financial instruments (Note 15)
|
| | | | — | | | | | | 3,525 | | | | | | — | | | | | | 3,525 | | |
|
Total financial assets
|
| | | $ | 1,001,001 | | | | | $ | 184,232 | | | | | $ | — | | | | | $ | 1,185,233 | | |
| Financial liabilities: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Fair value of derivative financial instruments (Note 15)
|
| | | | — | | | | | | 89,101 | | | | | | — | | | | | | 89,101 | | |
|
Total financial liabilities
|
| | | $ | — | | | | | $ | 89,101 | | | | | $ | — | | | | | $ | 89,101 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
As at June 30,
2026 |
| |
As at December 31,
2025 |
| ||||||
|
Federal, provincial and other sales taxes receivable
|
| | | $ | 165,966 | | | | | $ | 178,685 | | |
|
Prepaid expenses
|
| | | | 157,310 | | | | | | 140,040 | | |
|
Trade receivables
|
| | | | 20,149 | | | | | | 18,690 | | |
|
Short term investments
|
| | | | 13,958 | | | | | | 8,856 | | |
|
Other
|
| | | | 75,220 | | | | | | 48,360 | | |
|
Total other current assets
|
| | | $ | 432,603 | | | | | $ | 394,631 | | |
| | | |
As at June 30,
2026 |
| |
As at December 31,
2025 |
| ||||||
|
Non-current ore in stockpiles and on leach pads
|
| | | $ | 942,551 | | | | | $ | 871,803 | | |
|
Non-current prepaid expenses
|
| | | | 40,338 | | | | | | 43,346 | | |
|
Deferred income and mining tax asset
|
| | | | 18,992 | | | | | | 17,821 | | |
|
Non-current loans receivable
|
| | | | 9,203 | | | | | | 9,203 | | |
|
Investment in associate
|
| | | | 189,878 | | | | | | 7,086 | | |
|
Other
|
| | | | 15,734 | | | | | | 11,626 | | |
|
Total other assets
|
| | | $ | 1,216,696 | | | | | $ | 960,885 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
As at June 30,
2026 |
| |
As at
December 31, 2025 |
| ||||||
|
Equity securities
|
| | | $ | 1,092,886 | | | | | $ | 1,423,499 | | |
|
Share purchase warrants
|
| | | | 68,673 | | | | | | 84,753 | | |
|
Total investments
|
| | | $ | 1,161,559 | | | | | $ | 1,508,252 | | |
| | | | | | |
As at June 30, 2026
|
| |
As at December 31, 2025
|
| ||||||||||||||||||||||||||||||
| | | |
Interest Rates
|
| |
Principal
Amount |
| |
Deferred
Financing Costs |
| |
Carrying
Amount |
| |
Fair Value
|
| |
Carrying
Amount |
| |
Fair Value
|
| ||||||||||||||||||
|
Senior Notes
|
| |
2.78% – 2.88%
|
| | | $ | 200,000 | | | | | $ | (687) | | | | | $ | 199,313 | | | | | $ | 181,477 | | | | | $ | 199,239 | | | | | $ | 182,924 | | |
|
Credit Facility
|
| |
Variable
|
| | | | — | | | | | | (2,488) | | | | | | (2,488) | | | | | | (2,488) | | | | | | (2,968) | | | | | | (2,968) | | |
|
Total long-term debt
|
| | | | | | $ | 200,000 | | | | | $ | (3,175) | | | | | $ | 196,825 | | | | | $ | 178,989 | | | | | $ | 196,271 | | | | | $ | 179,956 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Net income for the period
|
| | | $ | 1,600,453 | | | | | $ | 1,068,711 | | | | | $ | 3,295,914 | | | | | $ | 1,883,442 | | |
|
Add: Dilutive impact of cash settling LTIP
|
| | | | (4,539) | | | | | | 2,939 | | | | | | 671 | | | | | | — | | |
|
Net income for the period — diluted
|
| | | | 1,595,914 | | | | | | 1,071,650 | | | | | | 3,296,585 | | | | | | 1,883,442 | | |
|
Weighted average number of common shares outstanding — basic (in thousands)
|
| | | | 501,659 | | | | | | 502,579 | | | | | | 500,950 | | | | | | 502,489 | | |
|
Add: Dilutive impact of common shares related to the RSU plan, PSU plan and LTIP
|
| | | | 576 | | | | | | 1,026 | | | | | | 622 | | | | | | 677 | | |
|
Add: Dilutive impact of employee stock options
|
| | | | 671 | | | | | | 755 | | | | | | 789 | | | | | | 719 | | |
|
Weighted average number of common shares outstanding — diluted (in thousands)
|
| | | | 502,906 | | | | | | 504,360 | | | | | | 502,361 | | | | | | 503,885 | | |
|
Net income per share — basic
|
| | | $ | 3.19 | | | | | $ | 2.13 | | | | | $ | 6.58 | | | | | $ | 3.75 | | |
|
Net income per share — diluted
|
| | | $ | 3.17 | | | | | $ | 2.12 | | | | | $ | 6.56 | | | | | $ | 3.74 | | |
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Number of common shares repurchased
|
| | | | 2,235,947 | | | | | | 836,488 | | | | | | 2,957,158 | | | | | | 1,324,535 | | |
|
Cost of common shares repurchased
|
| | | $ | 399,942 | | | | | $ | 99,938 | | | | | $ | 549,723 | | | | | $ | 149,933 | | |
|
Number of common shares cancelled
|
| | | | 2,235,947 | | | | | | 928,475 | | | | | | 2,957,158 | | | | | | 1,324,535 | | |
|
Book value of cancelled shares
|
| | | $ | 84,258 | | | | | $ | 34,757 | | | | | $ | 111,378 | | | | | $ | 49,553 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
Six Months Ended
June 30, 2026 |
| |
Six Months Ended
June 30, 2025 |
| ||||||||||||||||||
| | | |
Number of
Stock Options |
| |
Weighted
Average Exercise Price |
| |
Number of
Stock Options |
| |
Weighted
Average Exercise Price |
| ||||||||||||
|
Outstanding, beginning of period
|
| | | | 1,559,812 | | | | | C$ | 89.13 | | | | | | 2,125,773 | | | | | C$ | 72.37 | | |
|
Granted
|
| | | | 347,595 | | | | | | 232.76 | | | | | | 873,464 | | | | | | 112.46 | | |
|
Exercised
|
| | | | (504,503) | | | | | | 89.95 | | | | | | (1,123,933) | | | | | | 77.76 | | |
|
Forfeited
|
| | | | (21,142) | | | | | | 131.91 | | | | | | (34,553) | | | | | | 91.18 | | |
|
Expired
|
| | | | — | | | | | | — | | | | | | (4,725) | | | | | | 73.23 | | |
|
Outstanding, end of period
|
| | | | 1,381,762 | | | | | C$ | 124.31 | | | | | | 1,836,026 | | | | | C$ | 87.79 | | |
|
Options exercisable, end of period
|
| | | | 495,094 | | | | | C$ | 102.00 | | | | | | 521,253 | | | | | C$ | 77.99 | | |
| | | |
Six Months Ended
June 30, |
| |||||||||
| | | |
2026
|
| |
2025
|
| ||||||
|
Risk-free interest rate
|
| | | | 2.46% | | | | | | 2.75% | | |
|
Expected life of stock options (in years)
|
| | | | 1.8 | | | | | | 2.1 | | |
|
Expected volatility of Agnico Eagle’s share price
|
| | | | 33.0% | | | | | | 29.0% | | |
|
Expected dividend yield
|
| | | | 0.9% | | | | | | 2.1% | | |
| | | |
Equity
securities reserve |
| |
Cash flow
hedge reserve |
| |
Total
|
| |||||||||
|
Balance at December 31, 2024
|
| | | $ | (35,011) | | | | | $ | (6,136) | | | | | $ | (41,147) | | |
|
Net change in cash flow hedge reserve
|
| | | | — | | | | | | 588 | | | | | | 588 | | |
|
Net change in fair value of equity securities
|
| | | | 217,122 | | | | | | — | | | | | | 217,122 | | |
|
Balance at June 30, 2025
|
| | | $ | 182,111 | | | | | $ | (5,548) | | | | | $ | 176,563 | | |
|
Balance at December 31, 2025
|
| | | $ | 416,881 | | | | | $ | (4,960) | | | | | $ | 411,921 | | |
|
Net change in cash flow hedge reserve
|
| | | | — | | | | | | 588 | | | | | | 588 | | |
|
Transfer of gain on equity securities to retained earnings, net of tax (Note 9)
|
| | | | (255,569) | | | | | | — | | | | | | (255,569) | | |
|
Net change in fair value of equity securities
|
| | | | 2,228 | | | | | | — | | | | | | 2,228 | | |
|
Balance at June 30, 2026
|
| | | $ | 163,540 | | | | | $ | (4,372) | | | | | $ | 159,168 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Revenues from contracts with customers
|
| | | $ | 3,799,842 | | | | | $ | 2,812,391 | | | | | $ | 7,900,048 | | | | | $ | 5,278,846 | | |
|
Provisional pricing adjustments on concentrate sales
|
| | | | 2,976 | | | | | | 3,710 | | | | | | 2,359 | | | | | | 5,503 | | |
|
Total revenues from mining operations
|
| | | $ | 3,802,818 | | | | | $ | 2,816,101 | | | | | $ | 7,902,407 | | | | | $ | 5,284,349 | | |
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
| Revenues from contracts with customers: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Gold
|
| | | $ | 3,741,473 | | | | | $ | 2,780,517 | | | | | $ | 7,772,101 | | | | | $ | 5,215,096 | | |
|
Silver
|
| | | | 36,861 | | | | | | 20,101 | | | | | | 85,851 | | | | | | 37,462 | | |
|
Zinc
|
| | | | 874 | | | | | | 1,707 | | | | | | 1,405 | | | | | | 3,998 | | |
|
Copper
|
| | | | 20,634 | | | | | | 10,066 | | | | | | 40,691 | | | | | | 22,290 | | |
|
Total revenues from contracts with customers
|
| | | $ | 3,799,842 | | | | | $ | 2,812,391 | | | | | $ | 7,900,048 | | | | | $ | 5,278,846 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Premiums realized on written foreign exchange call options
|
| | | $ | (184) | | | | | $ | (23) | | | | | $ | (1,133) | | | | | $ | (854) | | |
|
Unrealized loss (gain) on warrants
|
| | | | 12,296 | | | | | | (7,263) | | | | | | (6,693) | | | | | | (61,431) | | |
|
Realized (gain) loss on currency and commodity derivatives
|
| | | | (23,696) | | | | | | 700 | | | | | | (32,512) | | | | | | 17,960 | | |
|
Unrealized loss (gain) on currency and commodity derivatives
|
| | | | 92,988 | | | | | | (118,678) | | | | | | 117,042 | | | | | | (149,798) | | |
|
Loss (gain) on derivative financial instruments
|
| | | $ | 81,404 | | | | | $ | (125,264) | | | | | $ | 76,704 | | | | | $ | (194,123) | | |
| | | |
Three Months Ended
June 30, |
| |
Six Months Ended
June 30, |
| ||||||||||||||||||
| | | |
2026
|
| |
2025
|
| |
2026
|
| |
2025
|
| ||||||||||||
|
Loss on disposal of property, plant and mine development (Note 8)
|
| | | $ | 6,597 | | | | | $ | 6,459 | | | | | $ | 16,836 | | | | | $ | 12,105 | | |
|
Interest income
|
| | | | (24,727) | | | | | | (11,003) | | | | | | (48,331) | | | | | | (18,383) | | |
|
Environmental remediation
|
| | | | 9,104 | | | | | | 14,234 | | | | | | 23,074 | | | | | | 21,964 | | |
|
Other
|
| | | | 14,969 | | | | | | 7,383 | | | | | | 15,151 | | | | | | 20,591 | | |
|
Total other income and expenses
|
| | | $ | 5,943 | | | | | $ | 17,073 | | | | | $ | 6,730 | | | | | $ | 36,277 | | |
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
Six Months Ended June 30, 2026
|
| |||||||||||||||||||||
| | | |
Revenues from
Mining Operations |
| |
Production
Costs |
| |
Exploration and
Corporate Development |
| |
Segment
Income (Loss) |
| ||||||||||||
|
LaRonde
|
| | | $ | 775,516 | | | | | $ | (200,948) | | | | | $ | — | | | | | $ | 574,568 | | |
|
Canadian Malartic
|
| | | | 1,352,620 | | | | | | (256,134) | | | | | | — | | | | | | 1,096,486 | | |
|
Goldex
|
| | | | 305,473 | | | | | | (80,825) | | | | | | — | | | | | | 224,648 | | |
|
Meliadine
|
| | | | 894,482 | | | | | | (215,932) | | | | | | — | | | | | | 678,550 | | |
|
Meadowbank
|
| | | | 1,021,960 | | | | | | (333,256) | | | | | | — | | | | | | 688,704 | | |
|
Kittila
|
| | | | 515,690 | | | | | | (135,632) | | | | | | — | | | | | | 380,058 | | |
|
Detour Lake
|
| | | | 1,816,666 | | | | | | (322,000) | | | | | | — | | | | | | 1,494,666 | | |
|
Macassa
|
| | | | 600,917 | | | | | | (142,731) | | | | | | — | | | | | | 458,186 | | |
|
Fosterville
|
| | | | 388,327 | | | | | | (97,186) | | | | | | — | | | | | | 291,141 | | |
|
Pinos Altos
|
| | | | 231,032 | | | | | | (124,701) | | | | | | — | | | | | | 106,331 | | |
|
Corporate and other(i)
|
| | | | (276) | | | | | | — | | | | | | — | | | | | | (276) | | |
|
Exploration
|
| | | | — | | | | | | — | | | | | | (114,087) | | | | | | (114,087) | | |
|
Segment totals
|
| | | $ | 7,902,407 | | | | | $ | (1,909,345) | | | | | $ | (114,087) | | | | | $ | 5,878,975 | | |
|
Total segments income
|
| | | | | | | | | | | | | | | | | | | | | $ | 5,878,975 | | |
| Corporate and other: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Amortization of property, plant and mine development
|
| | | | (843,522) | | | ||||||||||||||||||
|
General and administrative
|
| | | | (135,798) | | | ||||||||||||||||||
|
Finance costs
|
| | | | (31,795) | | | ||||||||||||||||||
|
Loss on derivative financial instruments
|
| | | | (76,704) | | | ||||||||||||||||||
|
Foreign exchange translation
|
| | | | (19,395) | | | ||||||||||||||||||
|
Care and maintenance
|
| | | | (37,871) | | | ||||||||||||||||||
|
Gain on sale of investments
|
| | | | 155,319 | | | ||||||||||||||||||
|
Other income and expenses
|
| | | | (6,730) | | | ||||||||||||||||||
| Income before income and mining taxes | | | | $ | 4,882,479 | | | ||||||||||||||||||
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
Six Months Ended June 30, 2025
|
| |||||||||||||||||||||
| | | |
Revenues from
Mining Operations |
| |
Production
Costs |
| |
Exploration and
Corporate Development |
| |
Segment
Income (Loss) |
| ||||||||||||
|
LaRonde
|
| | | $ | 590,160 | | | | | $ | (170,378) | | | | | $ | — | | | | | $ | 419,782 | | |
|
Canadian Malartic
|
| | | | 919,264 | | | | | | (234,672) | | | | | | — | | | | | | 684,592 | | |
|
Goldex
|
| | | | 211,249 | | | | | | (72,346) | | | | | | — | | | | | | 138,903 | | |
|
Meliadine
|
| | | | 612,806 | | | | | | (196,915) | | | | | | — | | | | | | 415,891 | | |
|
Meadowbank
|
| | | | 739,800 | | | | | | (233,006) | | | | | | — | | | | | | 506,794 | | |
|
Kittila
|
| | | | 329,030 | | | | | | (110,897) | | | | | | — | | | | | | 218,133 | | |
|
Detour Lake
|
| | | | 989,060 | | | | | | (276,276) | | | | | | — | | | | | | 712,784 | | |
|
Macassa
|
| | | | 495,893 | | | | | | (98,092) | | | | | | — | | | | | | 397,801 | | |
|
Fosterville
|
| | | | 263,674 | | | | | | (71,058) | | | | | | — | | | | | | 192,616 | | |
|
Pinos Altos
|
| | | | 133,413 | | | | | | (93,280) | | | | | | — | | | | | | 40,133 | | |
|
Exploration
|
| | | | — | | | | | | — | | | | | | (93,905) | | | | | | (93,905) | | |
|
Segment totals
|
| | | $ | 5,284,349 | | | | | $ | (1,556,920) | | | | | $ | (93,905) | | | | | $ | 3,633,524 | | |
|
Total segments income
|
| | | | | | | | | | | | | | | | | | | | | $ | 3,633,524 | | |
| Corporate and other: | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Amortization of property, plant and mine development
|
| | | | (793,756) | | | ||||||||||||||||||
|
General and administrative
|
| | | | (118,599) | | | ||||||||||||||||||
|
Finance costs
|
| | | | (49,873) | | | ||||||||||||||||||
|
Gain on derivative financial instruments
|
| | | | 194,123 | | | ||||||||||||||||||
|
Foreign exchange translation
|
| | | | 11,631 | | | ||||||||||||||||||
|
Care and maintenance
|
| | | | (29,583) | | | ||||||||||||||||||
|
Other income and expenses
|
| | | | (36,277) | | | ||||||||||||||||||
| Income before income and mining taxes | | | | $ | 2,811,190 | | | ||||||||||||||||||
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(thousands of United States dollars, except share and per share amounts, unless otherwise indicated)
(Unaudited)
June 30, 2026
| | | |
Total Assets as at
|
| |||||||||
| | | |
June 30,
2026 |
| |
December 31,
2025 |
| ||||||
|
LaRonde
|
| | | $ | 1,305,689 | | | | | $ | 1,265,895 | | |
|
Canadian Malartic
|
| | | | 7,085,748 | | | | | | 7,025,277 | | |
|
Goldex
|
| | | | 491,082 | | | | | | 468,050 | | |
|
Meliadine
|
| | | | 2,216,490 | | | | | | 2,276,714 | | |
|
Meadowbank
|
| | | | 1,539,491 | | | | | | 1,567,865 | | |
|
Kittila
|
| | | | 2,038,885 | | | | | | 1,545,658 | | |
|
Detour Lake
|
| | | | 10,430,075 | | | | | | 10,201,708 | | |
|
Macassa
|
| | | | 1,953,618 | | | | | | 1,896,086 | | |
|
Fosterville
|
| | | | 1,183,308 | | | | | | 1,236,700 | | |
|
Pinos Altos
|
| | | | 484,377 | | | | | | 436,744 | | |
|
La India
|
| | | | 71,644 | | | | | | 85,100 | | |
|
Exploration
|
| | | | 4,745,185 | | | | | | 1,968,494 | | |
|
Corporate and other
|
| | | | 4,249,451 | | | | | | 4,497,000 | | |
|
Total assets
|
| | | $ | 37,795,043 | | | | | $ | 34,471,291 | | |