UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of November, 2026
Commission File Number: 001-40086
Alpha Compute Corp
(Translation of registrant’s name into English)
Clarence Thomas Building, P.O. Box 4649, Road Town, Tortola, British
Virgin Islands, VG1110
(Address of principal executive office)
| Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F. |
| |
| Form 20-F [ X ] |
Form 40-F [ ] |
INCORPORATION BY REFERENCE
This report on Form 6-K (including any exhibits attached hereto) shall be deemed to be incorporated
by reference into the registration statements on Form S-8 (File Nos. 333-275842 and 333-289199) and Form F-3 (File Nos. 333-286961, 333-290827,
333-291341 and 333-291921) of Alpha Compute Corp (including any prospectuses forming a part of such registration statements) and to be
a part thereof from the date on which this report is filed, to the extent not superseded by documents or reports subsequently filed or
furnished.
On November 19, 2026, Alpha Compute Corp (the “Company”) issued a press release
announcing that, through two wholly owned subsidiaries, it has closed the acquisition of assets that form the Alpha Energy 02 Campus in
Wilcox, Elk County, Pennsylvania. The transaction was first announced on September 22, 2026, at a total purchase price of $5.5 million.
The assets described in the press release include 321 surface acres, 87 shallow oil and natural
gas wells, undeveloped natural gas and mineral rights, and related equipment, facilities and gathering infrastructure. The Company plans
to develop on-site power generation and data center facilities in phases.
A copy of the press release is furnished as Exhibit 99.1 to this Report on Form 6-K.
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly
caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Date: November 19, 2026
ALPHA COMPUTE CORP
| By: |
/s/ Brittany Kaiser |
|
| |
Brittany Kaiser |
|
| |
Chief Executive Officer |
|
| |
|
|
Exhibit 99.1
Alpha Compute Completes Asset Acquisitions
for Alpha Energy 02 Campus in Western Pennsylvania, Securing 430MW of Natural Gas Power
Elk County campus adds shallow oil and natural gas wells, contingent natural
gas resources, plus access to a major natural gas pipeline underneath the property for expansion behind the meter.
WILCOX, Pa., November 19, 2026 (GLOBE NEWSWIRE) — Alpha Compute Corp. (Nasdaq:
ALP) (“Alpha Compute” or the “Company”) today announced that, through two wholly owned subsidiaries, it has closed
the acquisition of assets that form the Alpha Energy 02 Campus in Wilcox, Elk County, Pennsylvania. The transaction was first announced
on September 22, 2026, at a total purchase price of $5.5 million, and the Company provided a due diligence update on September 29, 2026.

Left to Right: Terry Brawand, Brittany Kaiser, Enzo Villani and Sam Brawand.
The campus includes 321 surface acres, 87 shallow oil and natural gas wells, together with
undeveloped natural gas and mineral rights beneath the property, including Marcellus and Utica shale formations. The assets also include
the pump jack inventory, maintenance facilities, heavy equipment and gathering infrastructure. To learn more,
visit https://alphacompute.at/alpha-energy-02.
Independent Assessment Results
Netherland, Sewell & Associates, Inc. (NSAI), an independent petroleum consulting
firm, has completed its assessment of the gas resources beneath the acquired Elk County lease. NSAI's best estimate of the total gross
(100%) contingent gas resources in the Marcellus and Utica formations is 22.5 BCF (billion cubic feet at standard temperature and pressure
bases), with a low estimate of 14.6 BCF and a high estimate of 34.6 BCF. These contingent resources have been estimated using probabilistic
methods, and totals provided are the arithmetic sums of independent probability distributions by formation. Additional gas currently being
produced and sold from shallow formations was excluded from the evaluation.
“Alpha Compute is established upon the strategic trifecta of real estate, energy resources,
and computational infrastructure. The integration of these core assets establishes a diversified revenue base that operates independently
of hourly GPU market fluctuations. Compute serves as the integrating layer of our platform rather than its sole foundation. The Alpha
Energy 02 Campus directly embeds this foundational operational model in Elk County,” stated Brittany Kaiser, Chief Executive Officer
of Alpha Compute.

Revenue that begins near term. Oil production and sales are expected to start once the
Pennsylvania Department of Environmental Protection approves the Company as the operator. Once the first data center designs are final,
Alpha Compute expects to offer future data center capacity and power purchase agreements.
Power and campus. Alpha Energy 02 plans to use the campus's
natural gas as fuel for its own on-site power, in phases: an LNG microgrid first, moving to natural gas produced on site as development
proceeds, using the same generation equipment. The first 10 megawatts would be immediately online within nine months, with a build-out
toward 200 megawatts within 18 months or less. Alpha Compute’s plans call for two barn-style Tier III data center halls of approximately
25,000 square feet each, designed to reflect the character and heritage of the site. The campus would be secured and also open to employees
and their families. Alpha Compute is working with local oil and gas workers, LNG, construction, environmental and community partners
home to Pennsylvania and active in Elk County.
Elk County. The land has produced energy for generations,
and pump jacks dating to the 1930s are located on the property. Alpha Compute plans to hire locally, work with local suppliers and contractors,
and put its commitments to the community in writing through a community agreement, including education and training opportunities on
campus. Alpha Compute will pay property taxes, sign a community engagement agreement, fund local community projects and develop additional
services such as a health clinic and regenerative farming for employees, their families and the community. For more information on partnering
with Alpha Compute please visit our website and contact us at careers@alphacompute.ai
“Elk County has helped power America for generations, and
we're grateful to be part of what comes next here. We will be a good neighbor: hiring locally, paying our share and being open about
what we build.” said Enzo Villani, Executive Chairman and President of Alpha Compute.
“This land has been producing energy since the 1930s, and
some of those original pump jacks are still on the property. We're bringing the field into full production and building on it, with power
made right here on site.” said Cody Kemp, EVP and General Manager, Energy, Alpha Compute.
About Alpha Compute
Alpha Compute (Nasdaq: ALP) builds sovereign
AI infrastructure from the ground up, bringing together land, energy, and data centers servicing neo-clouds, enterprise, government agencies
and the military. Visit alphacompute.ai for more information.
Forward-looking statements. This release contains forward-looking
statements about resuming oil production and sales, recovering and using natural gas, deploying the LNG microgrid, meeting power capacity
and timing targets, developing the data center campus, securing power purchase agreements and customers, and pursuing local hiring and
community initiatives. These statements include illustrative estimates of gas value.
As of November 6, 2026, NSAI has classified the volumes described in this release as contingent resources under the Petroleum Resources
Management System. Contingent resources are not reserves. They are discovered volumes that are not currently considered commercially
recoverable because of one or more unresolved contingencies. The contingencies include, among others, the requirement that the transfer
of the wells remain subject to required regulatory approvals. There is no assurance that the contingencies will be resolved or resolved
on terms or within a specified timeframe.
Estimates of contingent resources are inherently uncertain and have not been adjusted for the risk of commercial development. There is
no assurance that any portion of the volumes will be developed or become commercially producible, and actual recoveries, if any, may
differ materially from the estimates.
Additionally, actual results may differ materially based on regulatory
approvals, mineral and pipeline access rights, well performance and fuel supply, the availability of financing and equipment, construction
costs and delays, commodity and electricity prices, and customer demand, pricing and utilization. Additional risks are described in Item
3.D, “Risk Factors,” of the Company’s Annual Report on Form 20-F for the fiscal year ended March 31, 2026, as amended,
and in subsequent SEC reports. These statements speak as of the date of this release. The Company undertakes no obligation to update
them except as required by law.
Contacts.
Investor relations: ir@alphacompute.ai