AngloGold Ashanti (NYSE: AU) outlines ESG, tailings and Colombia risks in 20-F
AngloGold Ashanti plc files its annual Form 20‑F, outlining its group structure after the 2023 redomiciling to the UK, IFRS-based reporting as a foreign private issuer, and listings on the NYSE, JSE, A2X and GSE.
The report explains extensive use of Non‑GAAP measures such as total cash costs, all‑in sustaining costs and free cash flow, including reconciliations to IFRS figures and inclusion of non‑managed joint ventures on an attributable basis. It also sets out detailed risk factors, highlighting regulatory and permitting challenges in Colombia, stricter global tailings and environmental requirements, recent fines and production interruptions from TSF and wastewater incidents in Ghana and Brazil, and broader political, social, ESG and market risks affecting its gold mining operations.
Positive
- None.
Negative
- None.
Insights
Form 20‑F emphasises mounting regulatory, environmental and project‑specific risks.
The filing underscores that AngloGold Ashanti operates in a tightening regulatory and ESG environment. It details extensive Non‑GAAP cost metrics, but the most consequential disclosures are around permitting, environmental compliance and tailings management across multiple jurisdictions.
Colombian projects face overlapping protected‑area designations, licensing setbacks and force‑majeure disputes, creating real uncertainty over future development. The text describes suspended activities, archived licence applications and ongoing legal challenges, signalling elevated sovereign and permitting risk for that growth pipeline.
Operationally, the company reports TSF and water‑management incidents in Ghana and Brazil that triggered fines, plant shutdowns and enhanced scrutiny. Increasingly stringent tailings and closure rules, plus possible requirements for additional security and rehabilitation spending, may pressure future cash flows. Investors will need subsequent filings for quantified production and cost impacts.
UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 |
REGISTRATION STATEMENT PURSUANT TO SECTION 12(B) OR 12(G) OF THE SECURITIES EXCHANGE ACT OF 1934 | |
OR | |
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934 OR | |
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934 OR | |
SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934 |
E-mail: (Name, Telephone, E-mail and/or Facsimile number and Address of Company Contact Person) |
Title of each class | Trading Symbols | Name of each exchange on which registered |
Ordinary Shares of $1.00 each |
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. | ||
If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934. | Yes ☐ | |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. | ||
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). | ||
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or an emerging growth company. See definition of “large accelerated filer”, “accelerated filer,” and “emerging growth company” in Rule 12b-2 of the Exchange Act. | ||
Check one: | Accelerated filer ☐ | Non-accelerated filer ☐ | Emerging growth company | |||||
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. | |
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). |
Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing: | U.S. GAAP ☐ |
If “Other” has been checked in response to the previous question, indicate by check mark which financial statement item the registrant has elected to follow. | Item 17 ☐ Item 18 ☐ | |
If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). | Yes ☐ |
TABLE OF CONTENTS | |||
Page | |||
Presentation of information | 6 | ||
Certain forward-looking statements | 8 | ||
Glossary of selected terms | |||
Financial terms | 9 | ||
Currencies | 10 | ||
Mining terms | 11 | ||
Abbreviations | 15 | ||
Part I: | |||
Item 1: | Identity of directors, senior management and advisors | 21 | |
Item 2: | Offer statistics and expected timetable | 21 | |
Item 3: | Key information | 21 | |
3A. | [Reserved] | 21 | |
3B. | Capitalisation and indebtedness | 21 | |
3C. | Reasons for the offer and use of proceeds | 21 | |
3D. | Risk factors | 21 | |
Item 4: | Information on the company | 46 | |
4A. | History and development of the company | 46 | |
4B. | Business overview | 48 | |
4C. | Organisational structure | 93 | |
4D. | Property, plants and equipment | 94 | |
Item 4A: | Unresolved staff comments | 145 | |
Item 5: | Operating and financial review and prospects | 145 | |
5A. | Operating results | 147 | |
5B. | Liquidity and capital resources | 172 | |
5C. | Research and development, patents and licences, etc. | 179 | |
5D. | Trend information | 179 | |
5E. | Critical accounting estimates | 179 | |
Item 6: | Directors, senior management and employees | 179 | |
6A. | Directors and senior management | 179 | |
6B. | Compensation | 186 | |
6C. | Board practices | 191 | |
6D. | Employees | 196 | |
6E. | Share ownership | 197 | |
6F. | Disclosure of a registrant's action to recover erroneously awarded compensation | 208 | |
Item 7: | Major shareholders and related party transactions | 209 | |
7A. | Major shareholders | 209 | |
7B. | Related party transactions | 209 | |
7C. | Interests of experts and counsel | 210 | |
Item 8: | Financial information | 210 | |
8A. | Consolidated financial statements and other financial information | 210 | |
Legal proceedings | 210 | ||
Dividends | 213 | ||
8B. | Significant changes | 213 | |
Item 9: | The offer and listing | 213 | |||
9A. | Offer and listing details | 213 | |||
9B. | Plan of distribution | 213 | |||
9C. | Markets | 213 | |||
9D. | Selling shareholders | 214 | |||
9E. | Dilution | 214 | |||
9F. | Expenses of the issue | 214 | |||
Item 10: | Additional information | 214 | |||
10A. | Share capital | 214 | |||
10B. | Articles of association | 214 | |||
10C. | Material contracts | 234 | |||
10D. | Exchange controls | 237 | |||
10E. | Taxation | 237 | |||
10F. | Dividends and paying agents | 242 | |||
10G. | Statement by experts | 242 | |||
10H. | Documents on display | 242 | |||
10I. | Subsidiary information | 242 | |||
10J. | Annual report to security holders | 242 | |||
Item 11: | Quantitative and qualitative disclosures about market risk | 242 | |||
Item 12: | Description of securities other than equity securities | 244 | |||
12A. | Debt securities | 244 | |||
12B. | Warrants and rights | 244 | |||
12C. | Other securities | 244 | |||
12D. | American Depositary Shares | 244 | |||
Part II: | |||||
Item 13: | Defaults, dividend arrearages and delinquencies | 245 | |||
Item 14: | Material modifications to the rights of security holders and use of proceeds | 245 | |||
Item 15: | Controls and procedures | 245 | |||
Item 16A: | Audit committee financial expert | 247 | |||
Item 16B: | Code of ethics | 247 | |||
Item 16C: | Principal accountant fees and services | 248 | |||
Item 16D: | Exemptions from the listing standards for audit committees | 248 | |||
Item 16E: | Purchases of equity securities by the issuer and affiliated purchasers | 248 | |||
Item 16F: | Change in registrant’s certifying accountant | 248 | |||
Item 16G: | Corporate governance | 249 | |||
Item 16H: | Mine safety disclosure | 249 | |||
Item 16I: | Disclosure regarding foreign jurisdictions that prevent inspections | 249 | |||
Item 16J: | Insider trading policies | 249 | |||
Item 16K: | Cybersecurity | 249 | |||
Part III: | |||||
Item 17: | Financial statements | 252 | |||
Item 18: | Financial statements | F-1 | |||
Item 19: | Exhibits | E-1 | |||
2028 notes: The $750 million aggregate principal amount of 3.375% notes due 2028 issued by AngloGold Ashanti Holdings plc and fully and unconditionally guaranteed by AngloGold Ashanti plc. |
2030 notes: The $700 million aggregate principal amount of 3.750% notes due 2030 issued by AngloGold Ashanti Holdings plc and fully and unconditionally guaranteed by AngloGold Ashanti plc. |
2040 notes: The $300 million aggregate principal amount of 6.50% notes due 2040 issued by AngloGold Ashanti Holdings plc and fully and unconditionally guaranteed by AngloGold Ashanti plc. |
Adjusted EBITDA: “Adjusted EBITDA” is a Non-GAAP measure and, as calculated and reported by AngloGold Ashanti, includes profit (loss) before taxation, amortisation of tangible, intangible and right of use assets, retrenchment costs at the operations, finance income, other gains (losses), care and maintenance costs, finance costs and unwinding of obligations, impairment and derecognition of assets, impairment of investments, profit (loss) on disposal of assets and investments, gain (loss) on early settlement of hedge contracts, fair value adjustments, repurchase premium and costs on settlement of issued bonds and the share of associates’ EBITDA. The Adjusted EBITDA calculation is based on the formula included in AngloGold Ashanti’s Revolving Credit Facility Agreements for compliance with the debt covenant formula. |
Adjusted net debt (cash): “Adjusted net debt (cash)” is a Non-GAAP measure and, as calculated and reported by AngloGold Ashanti, includes total borrowings adjusted for the unamortised portion of borrowing costs and IFRS 16 lease adjustments; less cash restricted for use and cash and cash equivalents (net of bank overdraft). The Adjusted net debt (cash) calculation is based on the formula included in AngloGold Ashanti’s Revolving Credit Facility Agreements for compliance with the debt covenant formula. |
All-in sustaining costs (AISC): “All-in sustaining costs” is a Non-GAAP measure which is an extension of the existing “total cash costs” metric and incorporates all costs related to sustaining production and in particular, recognises sustaining capital expenditures associated with developing and maintaining gold mines. In addition, this metric includes the cost associated with Corporate Office structures that support these operations, the community and environmental rehabilitation costs attendant with responsible mining and any exploration and evaluation cost associated with sustaining current operations. “All-in sustaining costs per ounce - managed operations” ($/oz) is calculated by dividing the consolidated US dollar value of this cost metric by the consolidated ounces of gold sold. “All-in sustaining costs per ounce - non-managed joint ventures” ($/oz) is calculated by dividing the attributable US dollar value of this cost metric by the attributable ounces of gold sold. |
Attributable: Share of gold ounces, gold income, capital expenditure, Mineral Resource and Mineral Reserve and other items, as applicable, based on ownership interest. |
Average gold price received per ounce ($/oz): “Average gold price received per ounce” is a Non-GAAP measure which gives an indication of revenue earned per ounce of gold sold and serves as a benchmark of performance against the market spot gold price. “Average gold price received per ounce - managed operations” is calculated by dividing the consolidated US dollar value of this revenue metric by the consolidated ounces of gold sold. “Average gold price received per ounce - non-managed joint ventures” is calculated by dividing the attributable US dollar value of this revenue metric by the attributable ounces of gold sold. |
Average number of employees: The monthly average number of production and non-production employees and contractors employed during the year, where contractors are defined as individuals who have entered into a fixed-term contract of employment with a group company or subsidiary. Employee numbers of joint ventures represent the Group’s attributable share. |
Capital or total capital expenditure: Total capital expenditure on tangible assets. |
Effective tax rate: Current and deferred taxation charge for the year as a percentage of profit before taxation. |
Free cash flow: “Free cash flow” is a Non-GAAP measure and, as calculated and reported by AngloGold Ashanti, includes operating cash flow less capital expenditure. Operating cash flow is defined as net cash flow from operating activities, plus repayment of loans advanced to joint ventures, less distributions to non-controlling interests (i.e., distributions to non-controlling interests in Sukari (50%), Siguiri (15%) and Cerro Vanguardia (7.5%)). |
Managed operations: The term “managed operations” refers to subsidiaries managed by AngloGold Ashanti and included in its consolidated reporting. Managed operations are reported on a consolidated basis. |
Market spot gold price: The price of gold traded at any given moment on the Over-The-Counter (OTC) wholesale market of which the transaction will be settled in two business days’ time. |
Non-managed joint ventures: The term “non-managed joint ventures” refers to equity-accounted joint ventures that are reported based on AngloGold Ashanti’s share of attributable earnings and are not managed by AngloGold Ashanti. Non- managed joint ventures are reported on an attributable basis. |
Non-sustaining capital expenditure: “Non-sustaining capital expenditure” is a Non-GAAP measure comprising capital expenditure incurred at new operations and capital expenditure related to ‘major projects’ at existing operations where these projects will materially increase production. |
Ounces of gold produced: The consolidated number of gold ounces produced by managed and joint operations. The attributable number of gold ounces produced by non-managed joint ventures. |
Ounces of gold sold: The consolidated number of gold ounces sold by managed and joint operations. The attributable number of gold ounces sold by non-managed joint ventures. |
Rated bonds: Collectively, the 2028 notes, the 2030 notes and the 2040 notes. |
Region: Defines the operational management divisions within AngloGold Ashanti, namely Africa (DRC, Egypt, Ghana, Guinea and Tanzania), Australia and the Americas (Argentina and Brazil and projects in the United States and Colombia). |
Related party: Parties are considered related if one party has the ability to control the other party or exercise significant influence over the other party in making financial and operating decisions or if such parties are under common control. |
Significant influence: The ability, directly or indirectly, to participate in, but not exercise control over, the financial and operating policy decision of an entity so as to obtain economic benefit from its activities. |
Sustaining capital expenditure: “Sustaining capital expenditure” is a Non-GAAP measure comprising capital expenditure incurred to sustain and maintain existing assets at their current productive capacity in order to achieve constant planned levels of productive output and capital expenditure to extend useful lives of existing production assets. This includes replacement of vehicles, plant and machinery, Mineral Reserve development, deferred stripping and capital expenditure related to financial benefit initiatives, safety, health and the environment. |
Tier One asset: A Tier One asset is generally defined by AngloGold Ashanti as a large, long-life, low-cost operation or project, located in a stable and supportive jurisdiction, capable of generating strong free cash flow through commodity cycles and delivering sustained value to shareholders and host countries. |
Total cash costs: “Total cash costs” is a Non-GAAP measure and, as calculated and reported by AngloGold Ashanti, include costs for all mining, processing, onsite administration costs, royalties and production taxes, as well as contributions from by- products, but exclude amortisation of tangible, intangible and right of use assets, rehabilitation costs and other non-cash costs, retrenchment costs, corporate administration, marketing and related costs, capital costs and exploration costs. “Total cash costs per ounce - managed operations” ($/oz) is calculated by dividing the consolidated US dollar value of this cost metric by the consolidated ounces of gold produced. “Total cash costs per ounce - non-managed joint ventures” ($/oz) is calculated by dividing the attributable US dollar value of this cost metric by the attributable ounces of gold produced. |
Weighted average number of ordinary shares: The number of ordinary shares in issue at the beginning of the year, increased by shares issued during the year, weighted on a time basis for the period during which they have participated in the income of the Group, and increased by share options that are virtually certain to be exercised. |
$, US$, USD, US dollar or dollar | United States dollar |
ARS or Argentinean peso | Argentinean peso |
A$, AUD or Australian dollar | Australian dollar |
BRL or Brazilian real | Brazilian real |
£, GBP or British pound | British pound |
C$, CAD or Canadian dollar | Canadian dollar |
COP or Colombian peso | Colombian peso |
CDF or Congolese franc | Congolese franc |
E£, EGP or Egyptian pound | Egyptian pound |
€, EUR or Euro | European euro |
Gh¢, GHS, Ghanaian cedi or cedi | Ghanaian cedi |
TZS or Tanzanian shilling | Tanzanian shilling |
ZAR, R, South African rand or rand | South African rand |
Banded iron formation (BIF): A chemical sediment, typically thin-bedded or laminated with greater than 15% iron of sedimentary origin. |
Bogging: Removing broken rock, ore or waste material with a bogging machine which is an underground loader. Also known as load haul dump machines. |
By-products: Any potentially economic or saleable products that emanate from the core process of producing gold or copper, including silver, molybdenum and sulphuric acid. |
Carbon-in-leach (CIL): Gold is leached from a slurry of ore where cyanide and carbon granules are added to the same agitated tanks. The gold loaded carbon granules are separated from the slurry and treated in an elution circuit to remove the gold. |
Carbon-in-pulp (CIP): Gold is leached conventionally from a slurry of ore with cyanide in agitated tanks. The leached slurry then passes into the CIP circuit where activated carbon granules are mixed with the slurry and gold is adsorbed on to the activated carbon. The gold-loaded carbon is separated from the slurry and treated in an elution circuit to remove the gold. |
Comminution: Comminution is the crushing and grinding of ore to make gold available for physical or chemical separation (see also “Milling”). |
Contained gold or contained copper: The total gold or copper content (tonnes multiplied by grade) of the material being described. |
Cut-off grade: Cut-off grade is the grade (i.e., the concentration of metal or mineral in rock) that determines the destination of the material during mining. For purposes of establishing “prospects of economic extraction”, the cut-off grade is the grade that distinguishes material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing facility). Other terms used in similar fashion as cut-off grade include net smelter return, pay limit, and break-even stripping ratio. |
Depletion: The decrease in the quantity of ore in a deposit or property resulting from extraction or production. |
Development: The process of accessing an orebody through shafts and/or tunnelling in underground mining operations. |
Development stage property: A development stage property is a property that has Mineral Reserve disclosed, but no material extraction. |
Diamond drilling (DD): A form of core drilling which uses a rotary drill with a diamond drill bit attached in order to create precisely measured drill holes. |
Diorite: An igneous rock formed by the solidification of molten material (magma). |
Doré: Impure alloy of gold and silver produced at a mine to be refined to a higher purity. |
Economically viable: Economically viable, when used in the context of Mineral Reserve determination, means that the Qualified Person has determined, using a discounted cash flow analysis, or has otherwise analytically determined, that extraction of the Mineral Reserve is economically viable under reasonable investment and market assumptions. |
Electrowinning: A process of recovering gold from solution by means of electrolytic chemical reaction into a form that can be smelted easily into gold bars. |
Elution: Recovery of the gold from the activated carbon into solution before zinc precipitation or electrowinning. |
Exploration results: Exploration results are data and information generated by mineral exploration programmes (i.e., programmes consisting of sampling, drilling, trenching, analytical testing, assaying, and other similar activities undertaken to locate, investigate, define or delineate a mineral prospect or mineral deposit) that are not part of a disclosure of Mineral Resource or Mineral Reserve. A registrant must not use exploration results alone to derive estimates of tonnage, grade, and production rates, or in an assessment of economic viability. |
Exploration stage property: An exploration stage property is a property that has no Mineral Reserve disclosed. |
Exploration target: An exploration target is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the statement or estimate, quoted as a range of tonnage and a range of grade (or quality), relates to mineralisation for which there has been insufficient exploration to estimate a Mineral Resource. |
Feasibility study: A feasibility study is a comprehensive technical and economic study of the selected development option for a mineral project, which includes detailed assessments of all applicable modifying factors, as defined by this section, together with any other relevant operational factors, and detailed financial analyses that are necessary to demonstrate, at the time of reporting, that extraction is economically viable. The results of the study may serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. A feasibility study is more comprehensive, and with a higher degree of accuracy, than a pre-feasibility study. It must contain mining, infrastructure, and process designs completed with sufficient rigour to serve as the basis for an investment decision or to support project financing. The confidence level in the results of a feasibility study is higher than the confidence level in the results of a pre-feasibility study. Terms such as full, final, comprehensive, bankable, or definitive feasibility study are equivalent to a feasibility study. |
Flotation: Concentration of gold and gold-hosting minerals into a small mass by various techniques (e.g. collectors, frothers, agitation, air-flow) that collectively enhance the buoyancy of the target minerals, relative to unwanted gangue, for recovery into an over-flowing froth phase. |
Gold produced or gold production: Refined gold in a saleable form derived from the mining process. |
Grade: The quantity of ore contained within a unit weight of mineralised material generally expressed in grams per metric tonne (g/t) or ounce per short tonne for gold- and silver-bearing material or a percentage (%) for sulphur- and copper-bearing material or parts per million (ppm) for molybdenum-bearing material. |
Greenschist: A schistose metamorphic rock whose green colour is due to the presence of chlorite, epidote or actinolite. |
Indicated Mineral Resource: An Indicated Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an Indicated Mineral Resource is sufficient to allow a Qualified Person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an Indicated Mineral Resource has a lower level of confidence than the level of confidence of a Measured Mineral Resource, an Indicated Mineral Resource may only be converted to a Probable Mineral Reserve. |
Inferred Mineral Resource: An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an Inferred Mineral Resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an Inferred Mineral Resource has the lowest level of geological confidence of all Mineral Resource, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an Inferred Mineral Resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a Mineral Reserve. |
Initial assessment (also known as concept study, scoping study, conceptual study and preliminary economic assessment): An initial assessment is a preliminary technical and economic study of the economic potential of all or parts of mineralisation to support the disclosure of Mineral Resource. The initial assessment must be prepared by a Qualified Person and must include appropriate assessments of reasonably assumed technical and economic factors, together with any other relevant operational factors, that are necessary to demonstrate at the time of reporting that there are reasonable prospects for economic extraction. An initial assessment is required for disclosure of Mineral Resource but cannot be used as the basis for disclosure of Mineral Reserve. |
Leaching: Dissolution of gold from crushed or milled material, including reclaimed slime, prior to adsorption on to activated carbon or direct zinc precipitation. |
Life-of-mine (LOM): Number of years for which an operation is planning to mine and treat ore, and is taken from the current mine plan. |
Localised uniform conditioning (LUC): A technique developed to spatially locate selective mining unit grades that have been derived using uniformed conditioning. |
Long hole open stoping (LHOS): A form of sub-level open stoping which involves excavating ore in a series of horizontal or sub-horizontal levels, known as stopes. This method is used in both hard rock and soft rock mining operations and is ideal for mining steeply dipping ore bodies, where it is more challenging to drill parallel drifts and cross cuts. |
Longitudinal retreat stoping (LRS): A mining method used for continuous extraction along the length of narrow veins and can be mechanised to some extent. |
Measured Mineral Resource: A Measured Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a Measured Mineral Resource is sufficient to allow a Qualified Person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a Measured Mineral Resource has a higher level of confidence than the level of confidence of either an Indicated Mineral Resource or an Inferred Mineral Resource, a Measured Mineral Resource may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve. |
Metallurgical plant / gold plant / plant: A processing plant constructed to treat ore and extract gold or copper in the case of Quebradona (and, in some cases, valuable by-products). |
Metallurgical recovery factor (MetRF): A measure of the efficiency in extracting gold, silver or copper from the ore. |
Milling: A process of reducing broken ore to a size at which concentrating or leaching can be undertaken (see also “Comminution”). |
Mine call factor (MCF): The ratio, expressed as a percentage, of the total quantity of recovered and unrecovered mineral product after processing with the amount estimated in the ore based on sampling. The ratio of contained gold delivered to the metallurgical plant divided by the estimated contained gold of ore mined based on sampling. |
Mineable shape optimiser (MSO): A widely recognised industry-standard software tool used to generate the optimal size, shape and location of stopes for underground mine design. |
Mineralisation: The process or processes by which a mineral or minerals are introduced into rock, resulting in a potentially valuable deposit. |
Mineral deposit: A mineral deposit is a concentration (or occurrence) of material of possible economic interest in or on the earth’s crust. |
Mineral Reserve: A Mineral Reserve is an estimate of tonnage and grade or quality of Indicated and Measured Mineral Resource that, in the opinion of the Qualified Person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a Measured or Indicated Mineral Resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. Mineral Reserve is subdivided in order of increasing confidence into Probable Mineral Reserve and Proven Mineral Reserve. Mineral Reserve is aggregated from the Proven and Probable Mineral Reserve categories. A Measured Mineral Resource may be converted to either a Proven Mineral Reserve or a Probable Mineral Reserve depending on uncertainties associated with modifying factors that are taken into account in the conversion from Mineral Resource to Mineral Reserve. The Mineral Reserve tonnages and grades are estimated and reported as delivered to plant (i.e., the point where material is delivered to the processing facility) according to tonnage, mean grade(s) and contained metal inclusive of mining dilution and mining ore-losses and excludes losses during metallurgical treatment. |
Mineral Resource: A Mineral Resource is a concentration or occurrence of material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A Mineral Resource is a reasonable estimate of mineralisation, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralisation drilled or sampled. Mineral Resource is subdivided and must be so reported, in order of increasing confidence in respect of geoscientific evidence, into Inferred, Indicated or Measured categories. The Mineral Resource tonnages and grades are reported in situ and stockpiled material is reported as broken material. |
Mining recovery factor (MRF): This factor reflects a mining efficiency factor relating to the recovery of material during the mining process and is the variance between the tonnes called for in the mining design and what the plant receives. It is expressed in both a grade and tonnage number. |
Modifying factors: Modifying factors are the factors that a Qualified Person must apply to Indicated and Measured Mineral Resource and then evaluate in order to establish the economic viability of Mineral Reserve. A Qualified Person must apply and evaluate modifying factors to convert Measured and Indicated Mineral Resource to Proven and Probable Mineral Reserve. These factors include, but are not restricted to: mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project. |
Open pit mining: An excavation made at the surface of the ground for the purpose of extracting minerals, inorganic and organic, from their natural deposits, which excavation is open to the surface. |
Ounce (oz) (troy): Used in imperial statistics for the standard measurement of mass. A kilogram is equal to 32.1507 ounces. A troy ounce is equal to 31.1035 grams. |
Pay limit: The grade of a unit of ore at which the revenue from the recovered mineral content of the ore is equal to the sum of total cash costs, closure costs, Mineral Reserve development and sustaining capital. This grade is expressed as an in-situ value in grams per tonne or ounces per short ton (before dilution and mineral losses). |
Precipitate: The solid product formed when a change in solution chemical conditions results in conversion of some pre- dissolved ions into solid state. |
Pre-feasibility study (Preliminary feasibility study): A pre-feasibility study is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a Qualified Person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product. A pre-feasibility study includes a financial analysis based on reasonable assumptions, based on appropriate testing, about the modifying factors and the evaluation of any other relevant factors that are sufficient for a Qualified Person to determine if all or part of the Indicated and Measured Mineral Resource may be converted to Mineral Reserve at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of reporting, that extraction is economically viable. A pre-feasibility study is less comprehensive and results in a lower confidence level than a feasibility study. A pre-feasibility study is more comprehensive and results in a higher confidence level than an initial assessment. |
Probable Mineral Reserve: A Probable Mineral Reserve is the economically mineable part of an Indicated and, in some cases, a Measured Mineral Resource. The confidence in the modifying factors applying to a Probable Mineral Reserve is lower than that applying to a Proven Mineral Reserve. The degree of assurance, although lower than that for Proven Mineral Reserve, is high enough to assume continuity between points of observation. |
Production stage property: A production stage property is a property with material extraction of Mineral Reserve. |
Productivity: An expression of labour productivity based on the ratio of ounces of gold produced per month to the total number of employees in mining operations. |
Project capital expenditure: Capital expenditure to either bring a new operation into production; to materially increase production capacity; or to materially extend the productive life of an asset. |
Proven Mineral Reserve: A Proven Mineral Reserve is the economically mineable part of a Measured Mineral Resource and can only result from conversion of a Measured Mineral Resource. A Proven Mineral Reserve implies a high degree of confidence in the modifying factors. |
Qualified Person: A Qualified Person is an individual who is (1) a mineral industry professional with at least five years of relevant experience in the type of mineralisation and type of deposit under consideration and in the specific type of activity that person is undertaking on behalf of the registrant; and (2) an eligible member or licensee in good standing of a recognised professional organisation at the time the technical report is prepared. Regulation S-K 1300 details further recognised professional organisations and also relevant experience. |
Quartz: A hard mineral consisting of silica dioxide found widely in all rocks. |
Recovered grade: The recovered mineral content per unit of ore treated. |
Reef: A gold-bearing horizon, sometimes a conglomerate band, that may contain economic levels of gold. Reef can also be any significant or thick gold bearing quartz vein. |
Refining: The final purification process of a metal or mineral. |
Regulation S-K 1300: Subpart 1300 of Regulation S-K (17 CFR § 229.1300) which contains the SEC’s mining property disclosure requirements for mining registrants. |
Rehabilitation: The process of reclaiming land disturbed by mining to allow an appropriate post-mining use. Rehabilitation standards are defined by country-specific laws, including but not limited to the US Bureau of Land Management, the US Forest Service, and the relevant Australian mining authorities, and address among other issues, ground and surface water, topsoil, final slope gradient, waste handling and re-vegetation issues. |
Resource modification factor (RMF): This factor is applied when there is an historic reconciliation discrepancy in the Mineral Resource model (e.g. between the Mineral Resource model tonnage and the grade control model tonnage). It is expressed in both a grade and tonnage number. |
Reverse circulation (RC) drilling: A form of percussion drilling that uses compressed air to flush material cuttings out of the drill hole. |
Run-of-mine (ROM): The unprocessed mined material which consists of the soil and rock of overburden, minerals, middlings, contamination and impurities. |
Scats: Within the metallurgical plants, scats is a term used to describe ejected ore or other uncrushable / grinding media arising from the milling process. This, typically oversize material (ore), is ejected from the mill and stockpiled or re-crushed via a scats retreatment circuit. Retreatment of scats is aimed at fracturing the material such that it can be returned to the mills and processed as with the other ores to recover the gold locked up within this oversize material. |
Seismic event: A sudden inelastic deformation within a given volume of rock that radiates detectable seismic energy. |
Selective mining unit (SMU): This concept comes out of geostatistical estimation and relates to the smallest unit that can be mined selectively. This will vary with the style of the mineralisation, the mining method and equipment size. The concept is to select the smallest regular cell size that can be practically mined by appropriately sized mining equipment. |
Shaft: A vertical or subvertical excavation used for accessing an underground mine; for transporting personnel, equipment and supplies; for hoisting ore and waste; for ventilation and utilities; and/or as an auxiliary exit. |
Smelting: A pyro-metallurgical operation in which gold precipitate from electro-winning or zinc precipitation is further separated from impurities. |
Stope: An underground excavation where ore is extracted. |
Stoping: The process of excavating ore underground. |
Stripping ratio: The ratio of waste tonnes to ore tonnes mined calculated as total tonnes mined less ore tonnes mined divided by ore tonnes mined. |
Sub-level open stoping (SLOS): This method is a variation of open stoping that involves dividing the ore body into horizontal slices or sub-levels. Each sub-level is mined progressively, starting from the bottom, with drilled holes for blasting and ore removal. The method allows for selective ore mining and can be adapted to varying vein widths. |
Tailings: Finely ground rock of low residual value from which valuable minerals have been extracted. |
Tailings storage facility/facilities (TSF): Facility/facilities designed to store discarded tailings. |
Tonnage: Quantity of material measured in tonnes. |
Tonne: Used in metric statistics. Equal to 1,000 kilograms. |
Tonnes treated: This is the volume of gold-bearing ore processed and treated at our on-site gold plants to extract the gold and silver. Tonnes treated are often used to calculate efficiency or intensity of use data such as GHG emissions and water used per tonne treated. |
Total recordable injury frequency rate (TRIFR): The total number of recordable injuries and fatalities that occurs per million hours worked. |
Traverse open stoping (TOS): One of the most used underground mining methods is open stope mining which involves extracting a large body of ore through drilling and blasting. This mining method allows for complex stope sequencing, and is considered more efficient for mining wide, steep orebodies. |
Underground mining: The extraction of rocks, minerals and industrial materials, other than coal, oil and gas, from the earth by developing entries or shafts from the surface to the seam or deposit before recovering the product by underground extraction methods. |
Underhand drift and fill (UHDF): A mining method which follows the local variations to the orebody and is considered to provide greater control on excavation and stability, with reduced dilution and increased mining recovery outcomes. |
Uniform conditioning (UC): The uniform conditioning method estimates a tonnage and grade of mineralisation that can be recovered using the selective mining unit at the chosen cut-off value. |
Waste: Material that contains insufficient mineralisation for consideration for future treatment and, as such, is discarded. |
Yield: The amount of valuable mineral or metal recovered from each unit mass of ore expressed as ounces per short ton or grams per metric tonne. |
Zinc precipitation: Zinc precipitation is the chemical reaction using zinc dust that converts gold in solution to a solid form for smelting into unrefined gold bars. |
° | Degree |
% | Percent |
%Cu | Percentage copper |
$ | United States dollar |
$/oz | United States dollar per ounce |
$/lb | United States dollar per pound |
3D | Three-dimensional space |
A2X | A2X Markets |
AAIL | AngloGold Ashanti (Iduapriem) Limited |
AARL | Anglo American Research Laboratories |
ABC | Archean-Birimian Contact |
ACCU | Australian Carbon Credit Unit |
ACH Committee | Aboriginal Cultural Heritage Committee |
Ag | Silver |
AGA | AngloGold Ashanti plc |
AGA Ghana | AngloGold Ashanti (Ghana) Limited |
AGA Iduapriem | AngloGold Ashanti (Iduapriem) Limited |
AGA Mineração | AngloGold Ashanti Córrego do Sítio Mineração |
AGAC | AngloGold Ashanti Colombia S.A.S. |
AGAG | AngloGold Ashanti (Ghana) Limited |
AGAH | AngloGold Ashanti Holdings plc |
AGANA | AngloGold Ashanti North America Inc. |
AGM | Annual General Meeting |
AI | Artificial intelligence |
AIG | The Australian Institute of Geoscientists |
AIM | Alternative Investment Market (London Stock Exchange) |
AISC | All-in sustaining costs |
ANAIM | Guinean national agency for the development of mining infrastructures |
ANLA | Colombian National Environmental Licencing Authority |
ANM | Brazilian National Mining Agency or Colombian National Mining Agency (as applicable) |
APPA | Colombian protected area for food production |
ARK | Agbarabo-Kombokolo-Rhino |
Au | Gold |
Augusta Gold | Augusta Gold Corp. |
AusIMM | The Australasian Institute of Mining and Metallurgy |
B2Gold | B2Gold Corp. |
Barrick | Barrick Mining Corporation |
BBSY | Bank Bill Swap Bid Rate |
BEng | Bachelor of Engineering |
BEPS | Base erosion and profit shifting |
BIF | Banded iron formation |
BIOX | Bacterial oxidation |
BIT | Bilateral investment treaty |
BLM | United States Federal Bureau of Land Management |
BMRR | State of Nevada Division of Environmental Protection’s Bureau of Mining Regulation and Reclamation |
Board | Company’s board of directors |
BSc | Bachelor of Science |
BSc Hons | Bachelor of Science Honours |
CCD | Counter Current Decant system in thickeners |
CdS | Córrego do Sítio |
Centamin | Centamin plc |
CEO | Chief Executive Officer |
CFEM | Brazilian Compensação Financeira pela Exploração Mineral |
CFO | Chief Financial Officer |
CGU | Cash Generating Unit |
CIC | Carbon-in-column |
CIL | Carbon-in-leach |
CIO | Chief Information Officer |
CIP | Carbon-in-pulp |
CIS | Center for Internet Security |
CISO | Chief Information Security Officer |
CO2 | Carbon Dioxide |
CODM | Chief Operating Decision Maker |
Coeur Sterling | Coeur Sterling, Inc. |
CompCo | Compensation and Human Resources Committee |
COO | Chief Operating Officer |
Corvus Gold | Corvus Gold Inc. |
COSO | Committee of Sponsoring Organisations of the Treadway Commission |
CPI | Consumer Prices index |
CPO | Chief People Officer |
Cu | Copper |
CVSA | Cerro Vanguardia S.A. |
Cyanisorb | Cyanide Recovery Plant |
DCE | Declaração de Condição de Estabilidade |
DCO | Declaração de Conformidade e Operacionalidade |
DCP | Disclosure controls and procedures |
DD | Diamond drilling |
DEI | Declaration of Environmental Impact |
Deloitte | Deloitte LLP |
DIAN | Colombian Tax Office |
DNU | Argentinean Decreto de Necesidad y Urgencia |
Dodd-Frank Act | United States Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010, as amended |
DRC | Democratic Republic of the Congo |
DSP | Deferred Share Plan |
DTC | The Depository Trust Company |
ECSA | The Engineering Council of South Africa |
EEAA | Egyptian Environment Affairs Agency |
EHS | Environmental, health and safety |
EIA | Environmental Impact Assessment |
EMRA | (Former) Egyptian Mineral Resources Authority |
ERP | Enterprise resource planning |
ESG | Environmental, social and governance |
ETF | Exchange traded fund |
EU | European Union |
Exchange Act | United States Securities Exchange Act of 1934, as amended |
FAP | Full Asset Potential Programme |
FAusIMM | Fellow of the Australasian Institute of Mining and Metallurgy |
FCCA | Fellow Member of Association of Chartered Certified Accountants |
FCF | Free cash flow |
FMA | Argentinean Federal Mining Agreement |
FMSHRC | United States Federal Mine Safety and Health Review Commission |
Fomicruz SE | Fomento Minero de Santa Cruz Sociedad del Estado |
FPI | Foreign Private Issuer |
FTSE | Financial Times Stock Exchange |
FVTOCI | Fair value through other comprehensive income |
FVTPL | Fair value through profit or loss |
G or g | Grams |
g/t | Grams per metric tonne |
G2 Goldfields | G2 Goldfields Inc. |
GGM | Geita Gold Mine |
Ghana EPA | Ghana Environmental Protection Agency |
GhDS | Ghanaian Depositary Share |
GHG | Greenhouse gas |
GSE | Ghana Stock Exchange |
GSL | Ghanaian Growth and Sustainability Levy |
GISTM | Global Industry Standard on Tailings Management |
GJ | Gigajoule |
GMM Act | Ghanaian Minerals and Mining Act, 2006 (Act 703), as amended |
Gold Fields | Gold Fields Limited |
GRI | Global Reporting Initiative |
GRIDCo | Ghana Grid Company Limited |
GSSA | The Geological Society of South Africa |
H2O-CO2 | Water-carbon dioxide |
HME | Heavy mining equipment |
HMRC | His Majesty’s Revenue and Customs |
IASB | International Accounting Standards Board |
ICFR | Internal control over financial reporting |
ICMM | International Council on Mining & Metals |
ID&E | Inclusion, Diversity and Equity |
IFRS | International Financial Reporting Standards as issued by the IASB |
IMF | International Monetary Fund |
IMMM | The Institute of Materials, Minerals and Mining |
Iron Quadrangle | Quadrilátero Ferrífero |
IRS | United States Internal Revenue Services |
IT | Information technology |
ITC | Indigenous Tanzanian company |
JSE | JSE Limited (Johannesburg Stock Exchange) |
JV | Joint venture |
KCD | Karagba, Chauffeur and Durba |
Kg or kg | Kilogram |
Km or km | Kilometres |
Km2 | Square kilometres |
KMS | Kwesi Mensa Shaft at the Obuasi mine in Ghana |
Koz | Thousand ounces |
kt | Kilotonne |
ktpa | Kilometric tonnes per annum |
kV | Kilovolt |
LBMA | London Bullion Market Association |
LHOS | Long Hole Open Stoping |
LOM | Life-of-mine |
LOS | Longitudinal Open Stoping |
LRS | Longitudinal Retreat Stoping |
LUC | Localised Uniform Conditioning |
M or m | Metre or million, depending on the context |
m3 | Cubic metre |
m3/s | Cubic metre per second |
MAusIMM | Member of the Australasian Institute of Mining and Metallurgy |
MC | Tanzania Mining Commission |
MCF | Mine call factor |
MCQ | Minera de Cobre Quebradona S.A.S. B.I.C. |
MEng | Master of Engineering |
MetRF | Metallurgical recovery factor |
Mine Act | United States Federal Mine Safety and Health Act of 1977, as amended |
Mlb | Million pounds |
MME | Brazilian Ministry of Mines and Energy |
MMEA | Egyptian Model Mining Exploitation Agreement |
Mo | Molybdenum |
MoP | Egyptian Minister of Petroleum and Mineral Resources |
Moto | Moto Goldmines Limited |
Moz | Million ounces |
MPhil | Master of Philosophy |
MRD | Mineral Reserve Development |
MRF | Mining recovery factor |
mRL | Metres relative level |
MRMIA | Egyptian Mineral Resources and Mining Industries Authority |
MSc | Master of Science |
MSG | Mineração Serra Grande Sociedade Anônima |
MSHA | United States Department of Labor's Mine Safety and Health Administration |
MSO | Mineable Shape Optimiser |
MSR | Minimum Shareholding Requirement |
Mt | Million tonnes |
Mtpa | Million tonnes per annum |
MW | Megawatt |
NATO | North Atlantic Treaty Organization |
NED | Non-Executive Director |
Nedbank | Nedbank Limited |
NGO | Non-governmental organisation |
NHIL | Ghanaian National Health Insurance Levy |
NIHL | Noise-induced hearing loss |
NSR | Net Smelter Return |
Northern Star Resources | Northern Star Resources Limited |
NYSE | New York Stock Exchange |
N/M | Not meaningful |
PGM | Pharaoh Gold Mines NL |
PTO | Colombian Plan de Trabajos y Obras |
OLD | Occupational lung diseases |
OTC | Over-The-Counter |
Oz or oz | Ounces |
oz/t | Ounces per tonne |
PCAOB | United States Public Company Accounting Oversight Board |
PFI | Potential Fatal Incident |
PFIC | Passive foreign investment company |
PFS | Pre-Feasibility Study |
PMMC | Precious Minerals Marketing Company Ltd |
POX | Pressure oxidation |
Pr.Sci.Nat | Professional Natural Scientist of the South African Council for Natural Scientific Professions |
PSP | Performance Share Plan |
PwC | PricewaterhouseCoopers Inc. |
QA/QC | Quality Assurance/Quality Control |
QLD | State of Queensland (Australia) |
Randgold | Randgold Resources Limited |
RC | Reverse circulation drilling |
RCubed | Resource and Reserve Reporting System |
RenGold | Renaissance Gold Inc. |
Resolute | Resolute Mining Limited |
RMF | Resource modification factor |
ROM | Run of mine |
RRLT | Mineral Resource and Mineral Reserve Leadership Team |
S | Sulphur |
SACNASP | South African Council for Natural Scientific Professions |
SAG | Société AngloGold Ashanti de Guinée S.A. |
SAG mill | Semi-Autogenous Grinding mill |
SASB | Sustainability Accounting Standards Board |
SBB | South Brasilia Belt |
SDG | Sustainable development goals |
SDRT | Stamp Duty Reserve Tax |
SEC | United States Securities and Exchange Commission |
Securities Act | United States Securities Act of 1933, as amended |
SES | Social, ethics and sustainability |
SGM | Sukari Gold Mines Company |
SLOS | Sub-Level Open Stoping |
SME | Society for Mining, Metallurgy and Exploration |
SMU | Selective mining unit |
SOC | Cyber Security Operations Centre |
SOFR | Secured Overnight Financing Rate |
SOKIMO | Société Minière de Kilo-Moto S.A. |
SOX | United States Sarbanes-Oxley Act of 2002, as amended |
SW | Southwest |
T or t | Tonnes |
Tanesco | Tanzania Electric Supply Company Limited |
TCFD | Task Force on Climate-related Financial Disclosures |
TOS | Transverse Open Stoping |
Tpa or tpa | Tonnes per annum |
Tpd or tpd | Tonnes per day |
TRA | Tanzania Revenue Authority |
TRIFR | Total recordable injury frequency rate |
TSF | Tailings storage facility |
TSR | Total Shareholder Return |
TSX | Toronto Stock Exchange |
UC | Uniform Conditioning |
UHDF | Underhand drift and fill (mining method) |
UK | United Kingdom |
UK Companies Act | UK Companies Act 2006, as amended |
UNCITRAL | United Nations Commission on International Trade Law |
UNECA | United Nations Economic Commission for Africa |
UNGC | United Nations Global Compact |
UNGPs | United Nations Guiding Principles for Business and Human Rights |
UNSDGs | United Nations Sustainable Development Goals |
US/U.S./USA/United States | United States of America |
VAT | Value added tax |
VPSHR | Voluntary Principles on Security and Human Rights |
WA | State of Western Australia (Australia) |
WGC | World Gold Council |
XBRL | eXtensible Business Reporting Language (including in-line XBRL, i-XBRL) |
Yatela | Société d’Exploitation des Mines d’Or de Yatela S.A. |
ZAPPA | Colombian protection zone for food production |

Americas | Africa | Australia | ||||
Argentina Cerro Vanguardia (92.5%) | Guinea Siguiri (85%) | Australia Sunrise Dam Tropicana (70%) | ||||
Brazil AGA Mineração | Ghana Iduapriem Obuasi | |||||
Projects | Democratic Republic of the Congo (DRC) Kibali (45%) (d) | |||||
United States of America Arthur Gold (a) North Bullfrog Nevada Regional Deposits (b) | Tanzania Geita | |||||
Colombia La Colosa (c) Quebradona | Egypt Sukari (50%) |

Gold production (000oz) | Average number of employees | ||
Managed operations | |||
Egypt | |||
Sukari (1) | 500 | 4,893 | |
Ghana | |||
Iduapriem | 199 | 2,660 | |
Obuasi | 266 | 5,566 | |
Guinea | |||
Siguiri (1) | 289 | 4,284 | |
Tanzania | |||
Geita | 492 | 7,508 | |
Non-managed joint venture | |||
Democratic Republic of the Congo | |||
Kibali (Attr. 45%) | 303 | 3,173 | |
Unit | 2025 | 2024 | 2023 | ||||
Managed operations | |||||||
Tonnes treated/milled (2) | Mt | 34.8 | 24.5 | 23.2 | |||
Recovered grade | g/t | 1.56 | 1.59 | 1.66 | |||
Gold production | 000oz | 1,746 | 1,254 | 1,237 | |||
Cost of sales | $m | 3,034 | 1,924 | 1,739 | |||
Total cash costs per ounce (3) | $/oz | 1,182 | 1,212 | 1,138 | |||
All-in sustaining costs per ounce (3) | $/oz | 1,647 | 1,709 | 1,576 | |||
Capital expenditure (4) | $m | 984 | 689 | 625 | |||
Safety | |||||||
Number of fatalities | 0 | 1 | 0 | ||||
TRIFR | Injuries per million hours worked | 0.52 | 0.49 | 0.39 | |||
People | |||||||
Average number of employees: Total | 24,911 | 24,942 | 18,851 | ||||
Permanent employees | 8,810 | 8,991 | 6,296 | ||||
Contractors | 16,101 | 15,951 | 12,555 |
Unit | 2025 | 2024 | 2023 | ||||
Non-managed joint ventures | |||||||
Tonnes treated/milled | Mt | 3.7 | 3.8 | 3.7 | |||
Recovered grade | g/t | 2.52 | 2.51 | 2.89 | |||
Gold production (attributable) | 000oz | 303 | 309 | 343 | |||
Cost of sales (5) | $m | 432 | 380 | 372 | |||
Total cash costs per ounce (3) | $/oz | 1,148 | 935 | 802 | |||
All-in sustaining costs per ounce (3) | $/oz | 1,317 | 1,146 | 951 | |||
Capital expenditure (5) | $m | 151 | 125 | 85 | |||
People | |||||||
Average number of employees: Total | 3,173 | 2,988 | 2,883 | ||||
Permanent employees | 1,005 | 950 | 1,014 | ||||
Contractors | 2,168 | 2,038 | 1,869 |

Gold production (000oz) | Average number of employees | ||
Operations | |||
Argentina | |||
Cerro Vanguardia (1) | 179 | 1,870 | |
Brazil | |||
AGA Mineração (2) | 273 | 6,242 | |
Serra Grande (3) | 53 | 2,138 |
Unit | 2025 | 2024 | 2023 | ||||
Operation | |||||||
Tonnes treated/milled (2) | Mt | 5.7 | 5.7 | 5.8 | |||
Recovered grade (2) | g/t | 2.73 | 2.85 | 2.70 | |||
Gold production (2) | 000oz | 505 | 526 | 502 | |||
Silver production | Moz | 3.3 | 3.4 | 4.4 | |||
Cost of sales | $m | 973 | 858 | 931 | |||
Total cash costs per ounce (2)(4) | $/oz | 1,195 | 1,027 | 1,122 | |||
All-in sustaining costs per ounce (2)(4) | $/oz | 1,741 | 1,514 | 1,710 | |||
Capital expenditure (5) | $m | 278 | 247 | 281 | |||
Safety | |||||||
Number of fatalities | 0 | 0 | 0 | ||||
TRIFR (5) | Injuries per million hours worked | 1.48 | 1.80 | 2.11 | |||
People | |||||||
Average number of employees: Total | 10,250 | 8,509 | 8,565 | ||||
Permanent employees | 5,374 | 5,008 | 5,519 | ||||
Contractors | 4,876 | 3,501 | 3,046 |

Gold production (000oz) | Average number of employees | ||
Operations | |||
Australia | |||
Sunrise Dam | 232 | 813 | |
Tropicana (1) | 305 | 974 |
Unit | 2025 | 2024 | 2023 | ||||
Operation | |||||||
Tonnes treated/milled | Mt | 10.3 | 10.1 | 10.5 | |||
Recovered grade | g/t | 1.62 | 1.75 | 1.66 | |||
Gold production (1) | 000oz | 537 | 572 | 562 | |||
Cost of sales (1) | $m | 1,009 | 945 | 867 | |||
Total cash costs per ounce (2) | $/oz | 1,530 | 1,287 | 1,251 | |||
All-in sustaining costs per ounce (2) | $/oz | 1,825 | 1,526 | 1,487 | |||
Capital expenditure (1) | $m | 185 | 153 | 135 | |||
Safety | |||||||
Number of fatalities | 0 | 0 | 0 | ||||
TRIFR | Per million hours worked | 2.92 | 2.36 | 3.20 | |||
People | |||||||
Average number of employees: Total | 1,787 | 1,777 | 1,741 | ||||
Permanent employees | 366 | 364 | 347 | ||||
Contractors | 1,421 | 1,413 | 1,394 |

Americas | Africa | Australia | ||||
Argentina Cerro Vanguardia (92.5%) | Guinea Siguiri (85%) | Australia Sunrise Dam Butcher Well (70%) Tropicana (70%) | ||||
Brazil AGA Mineração | Ghana Iduapriem Obuasi | |||||
Projects | Democratic Republic of the Congo (DRC) Kibali (45%) (d) | |||||
United States of America Arthur Gold Project (a) North Bullfrog Nevada Regional Deposits (b) | Tanzania Geita | |||||
Egypt Sukari (50%) | ||||||
Colombia La Colosa (c) Quebradona | ||||||
Mineral Resource | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Kibali (45%) | Measured | 5.92 | 2.86 | 16.93 | 0.54 |
Indicated | 27.16 | 2.30 | 62.36 | 2.01 | |
Measured & Indicated | 33.08 | 2.40 | 79.29 | 2.55 | |
Inferred | 21.98 | 2.10 | 46.11 | 1.48 | |
at 31 December 2025 | Kibali (45%) | |||
Category | Measured | Indicated | Measured & Indicated | Inferred |
Previous Year | 0.58 | 2.42 | 3.00 | 0.93 |
Exploration and Methodology | (0.05) | (0.50) | (0.55) | 0.48 |
Economic Assumptions | 0.03 | 0.14 | 0.17 | 0.08 |
Other | (0.02) | (0.05) | (0.08) | — |
Acquisition / Disposal | — | — | — | — |
Current Year | 0.54 | 2.01 | 2.55 | 1.48 |
Net Difference | (0.04) | (0.42) | (0.46) | 0.56 |
% Difference | (7) | (17) | (15) | 60 |
Mineral Reserve | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Kibali (45%) | Proven | 13.45 | 3.13 | 42.16 | 1.36 |
Probable | 36.87 | 2.92 | 107.49 | 3.46 | |
Total | 50.32 | 2.97 | 149.65 | 4.81 | |
at 31 December 2025 | Kibali (45%) | ||
Category | Proven | Probable | Total |
Previous Year | 1.42 | 3.15 | 4.57 |
Depletion | (0.36) | — | (0.36) |
Exploration and Methodology | 0.24 | 0.26 | 0.50 |
Economic Assumptions | 0.04 | 0.04 | 0.08 |
Other | 0.02 | — | 0.02 |
Acquisition / Disposal | — | — | — |
Current Year | 1.36 | 3.46 | 4.81 |
Net Difference | (0.06) | 0.31 | 0.24 |
% Difference | (4) | 10 | 5 |

Mineral Resource | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Obuasi | Measured | 6.12 | 7.21 | 44.13 | 1.42 |
Indicated | 43.72 | 5.33 | 233.05 | 7.49 | |
Measured & Indicated | 49.84 | 5.56 | 277.17 | 8.91 | |
Inferred | 43.93 | 7.81 | 342.95 | 11.03 | |
at 31 December 2025 | Obuasi | |||
Category | Measured | Indicated | Measured & Indicated | Inferred |
Previous Year | 1.21 | 7.63 | 8.84 | 11.51 |
Exploration and Methodology | — | (0.13) | (0.13) | (0.31) |
Economic Assumptions | (0.05) | 0.06 | — | (0.20) |
Other | 0.26 | (0.07) | 0.20 | 0.02 |
Acquisition / Disposal | — | — | — | — |
Current Year | 1.42 | 7.49 | 8.91 | 11.03 |
Net Difference | 0.21 | (0.14) | 0.07 | (0.49) |
% Difference | 17 | (2) | 1 | (4) |
Mineral Reserve | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Obuasi | Proven | 4.23 | 10.58 | 44.78 | 1.44 |
Probable | 17.06 | 10.25 | 174.80 | 5.62 | |
Total | 21.30 | 10.31 | 219.58 | 7.06 | |
at 31 December 2025 | Obuasi | ||
Category | Proven | Probable | Total |
Previous Year | 1.24 | 5.51 | 6.75 |
Depletion | (0.26) | — | (0.26) |
Exploration and Methodology | 0.21 | (0.18) | 0.02 |
Economic Assumptions | 0.22 | 0.41 | 0.63 |
Other | 0.04 | (0.12) | (0.08) |
Acquisition / Disposal | — | — | — |
Current Year | 1.44 | 5.62 | 7.06 |
at 31 December 2025 | Obuasi | ||
Category | Proven | Probable | Total |
Net Difference | 0.20 | 0.11 | 0.31 |
% Difference | 17 | 2 | 5 |

Mineral Resource | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Geita | Measured | 9.90 | 2.47 | 24.51 | 0.79 |
Indicated | 70.15 | 1.77 | 124.31 | 4.00 | |
Measured & Indicated | 80.05 | 1.86 | 148.82 | 4.78 | |
Inferred | 53.22 | 2.01 | 107.09 | 3.44 | |
at 31 December 2025 | Geita | |||
Category | Measured | Indicated | Measured & Indicated | Inferred |
Previous Year | 0.85 | 2.95 | 3.81 | 3.47 |
Exploration and Methodology | 0.03 | 0.76 | 0.79 | (0.06) |
Economic Assumptions | (0.10) | 0.23 | 0.13 | (0.02) |
Other | — | 0.05 | 0.05 | 0.06 |
Acquisition / Disposal | — | — | — | — |
Current Year | 0.79 | 4.00 | 4.78 | 3.44 |
Net Difference | (0.07) | 1.04 | 0.98 | (0.02) |
% Difference | (8) | 35 | 26 | (1) |
Mineral Reserve | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Geita | Proven | 21.20 | 1.06 | 22.44 | 0.72 |
Probable | 54.49 | 1.88 | 102.65 | 3.30 | |
Total | 75.69 | 1.65 | 125.09 | 4.02 | |
at 31 December 2025 | Geita | ||
Category | Proven | Probable | Total |
Previous Year | 0.51 | 2.74 | 3.25 |
Depletion | 0.19 | (0.75) | (0.57) |
Exploration and Methodology | — | 0.61 | 0.61 |
Economic Assumptions | 0.11 | 0.52 | 0.62 |
Other | (0.08) | 0.18 | 0.10 |
Acquisition / Disposal | — | — | — |
Current Year | 0.72 | 3.30 | 4.02 |
Net Difference | 0.21 | 0.56 | 0.78 |
% Difference | 42 | 20 | 24 |

Mineral Resource | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Sukari (50%) | Measured | 41.60 | 0.82 | 33.96 | 1.09 |
Indicated | 40.48 | 0.59 | 23.98 | 0.77 | |
Measured & Indicated | 82.08 | 0.71 | 57.94 | 1.86 | |
Inferred | 30.34 | 0.59 | 17.94 | 0.58 | |
at 31 December 2025 | Sukari (50%) | |||
Category | Measured | Indicated | Measured & Indicated | Inferred |
Previous Year | 1.31 | 0.78 | 2.09 | 0.54 |
Exploration and Methodology | 0.02 | (0.03) | (0.01) | (0.03) |
Economic Assumptions | (0.05) | 0.08 | 0.03 | 0.05 |
Other | (0.19) | (0.05) | (0.24) | 0.01 |
Acquisition / Disposal | — | — | — | — |
Current Year | 1.09 | 0.77 | 1.86 | 0.58 |
Net Difference | (0.22) | (0.01) | (0.23) | 0.03 |
% Difference | (17) | (1) | (11) | 6 |
Mineral Reserve | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Sukari (50%) | Proven | 55.61 | 1.00 | 55.39 | 1.78 |
Probable | 20.44 | 0.88 | 18.08 | 0.58 | |
Total | 76.06 | 0.97 | 73.48 | 2.36 | |
at 31 December 2025 | Sukari (50%) | ||
Category | Proven | Probable | Total |
Previous Year | 1.88 | 0.53 | 2.41 |
Depletion | (0.25) | — | (0.25) |
Exploration and Methodology | 0.01 | (0.03) | (0.03) |
Economic Assumptions | 0.12 | 0.08 | 0.20 |
Other | 0.03 | 0.01 | 0.04 |
Acquisition / Disposal | — | — | — |
Current Year | 1.78 | 0.58 | 2.36 |
Net Difference | (0.10) | 0.06 | (0.05) |
% Difference | (5) | 11 | (2) |

Mineral Resource | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Arthur Gold Project | Measured | — | — | — | — |
Indicated | 164.14 | 0.84 | 137.30 | 4.41 | |
Measured & Indicated | 164.14 | 0.84 | 137.30 | 4.41 | |
Inferred | 219.79 | 0.90 | 197.33 | 6.34 | |
Mineral Resource | Category | Tonnes | Grade | Contained Silver | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Arthur Gold Project | Measured | – | – | – | – |
Indicated | 164.14 | 3.33 | 546.51 | 17.57 | |
Measured & Indicated | 164.14 | 3.33 | 546.51 | 17.57 | |
Inferred | 219.79 | 2.26 | 496.48 | 15.96 | |
at 31 December 2025 | Arthur Gold Project | |||
Category | Measured | Indicated | Measured & Indicated | Inferred |
Previous Year | — | 3.40 | 3.40 | 12.91 |
Exploration and Methodology | — | 1.11 | 1.11 | (5.76) |
Economic Assumptions | — | (0.08) | (0.08) | (0.90) |
Other | — | (0.02) | (0.02) | 0.08 |
Acquisition / Disposal | — | — | — | — |
Current Year | — | 4.41 | 4.41 | 6.34 |
Net Difference | — | 1.01 | 1.01 | (6.57) |
% Difference | — | 30 | 30 | (51) |
Mineral Reserve | Category | Tonnes | Grade | Contained Gold | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Arthur Gold Project | Proven | — | — | — | — |
Probable | 87.64 | 1.75 | 153.68 | 4.94 | |
Total | 87.64 | 1.75 | 153.68 | 4.94 | |
Mineral Reserve | Category | Tonnes | Grade | Contained Silver | |
at 31 December 2025 | million | g/t | tonnes | Moz | |
Arthur Gold Project | Proven | — | — | — | — |
Probable | 87.64 | 2.76 | 242.03 | 7.78 | |
Total | 87.64 | 2.76 | 242.03 | 7.78 | |
at 31 December 2025 | Arthur Gold Project | ||
Category | Proven | Probable | Total |
Previous Year | — | — | — |
Depletion | — | — | — |
Exploration and Methodology | — | 4.94 | 4.94 |
Economic Assumptions | — | — | — |
Other | — | — | — |
Acquisition / Disposal | — | — | — |
Current Year | — | 4.94 | 4.94 |
Net Difference | — | 4.94 | 4.94 |
% Difference | — | 100 | 100 |

At December 31, | ||
2025 | 2024 | |
Mineral Resource gold price (US$/oz) | 2,000 | 1,900 |
Mineral Resource copper price (US$/lb) (1) | 3.50 | 3.50 |
Mineral Resource silver price (US$/oz) | 23.00 | 23.00 |
Mineral Resource molybdenum price (US$/lb) | 12.00 | 12.00 |
Mineral Reserve gold price (US$/oz) | 1,700 | 1,600 |
Mineral Reserve copper price (US$/lb) (1) | 3.10 | 2.90 |
Mineral Reserve silver price (US$/oz) | 19.50 | 19.50 |
Exchange Rate – Australia (AUD / US$) | 0.66 | 0.67 |
Exchange Rate – Brazil (US$ / BRL) | 5.82 | 5.20 |
Exchange Rate – Argentina (US$ / ARS) | 1,550 | 1,185 |
Exchange Rate – Colombia (US$ / COP) | 3,558 (for Mineral Resource and Mineral Reserve) | 3,558 (for Mineral Resource) 3,208 (for Mineral Reserve) |
Mineral Resource (1) | At 31 December 2025 | |||||||||||||||
Measured | Indicated | Total Measured and Indicated | Inferred | |||||||||||||
Gold | Tonnes (3) | Grade | Contained Gold | Tonnes (3) | Grade | Contained Gold | Tonnes (3) | Grade | Contained Gold | Tonnes (3) | Grade | Contained Gold | ||||
Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | |
Africa Region | 63.60 | 1.88 | 119.57 | 3.84 | 410.92 | 1.74 | 715.04 | 22.99 | 474.52 | 1.76 | 834.61 | 26.83 | 320.86 | 2.29 | 734.80 | 23.62 |
Democratic Republic of the Congo | 5.92 | 2.86 | 16.93 | 0.54 | 27.16 | 2.30 | 62.36 | 2.01 | 33.08 | 2.40 | 79.29 | 2.55 | 21.98 | 2.10 | 46.11 | 1.48 |
Kibali (45%) (2)(4)(13) | 5.92 | 2.86 | 16.93 | 0.54 | 27.16 | 2.30 | 62.36 | 2.01 | 33.08 | 2.40 | 79.29 | 2.55 | 21.98 | 2.10 | 46.11 | 1.48 |
Ghana | 6.18 | 7.14 | 44.18 | 1.42 | 118.32 | 2.88 | 340.24 | 10.94 | 124.51 | 3.09 | 384.42 | 12.36 | 102.58 | 4.24 | 435.24 | 13.99 |
Iduapriem (13) | 0.07 | 0.72 | 0.05 | 0.00 | 74.60 | 1.44 | 107.19 | 3.45 | 74.67 | 1.44 | 107.24 | 3.45 | 58.64 | 1.57 | 92.29 | 2.97 |
Obuasi (5)(13) | 6.12 | 7.21 | 44.13 | 1.42 | 43.72 | 5.33 | 233.05 | 7.49 | 49.84 | 5.56 | 277.17 | 8.91 | 43.93 | 7.81 | 342.95 | 11.03 |
Guinea | — | — | — | — | 154.81 | 1.06 | 164.14 | 5.28 | 154.81 | 1.06 | 164.14 | 5.28 | 112.74 | 1.14 | 128.42 | 4.13 |
Siguiri (85%) (2)(13) | — | — | — | — | 154.81 | 1.06 | 164.14 | 5.28 | 154.81 | 1.06 | 164.14 | 5.28 | 112.74 | 1.14 | 128.42 | 4.13 |
Tanzania | 9.90 | 2.47 | 24.51 | 0.79 | 70.15 | 1.77 | 124.31 | 4.00 | 80.05 | 1.86 | 148.82 | 4.78 | 53.22 | 2.01 | 107.09 | 3.44 |
Geita (6)(13) | 9.90 | 2.47 | 24.51 | 0.79 | 70.15 | 1.77 | 124.31 | 4.00 | 80.05 | 1.86 | 148.82 | 4.78 | 53.22 | 2.01 | 107.09 | 3.44 |
Egypt | 41.60 | 0.82 | 33.96 | 1.09 | 40.48 | 0.59 | 23.98 | 0.77 | 82.08 | 0.71 | 57.94 | 1.86 | 30.34 | 0.59 | 17.94 | 0.58 |
Sukari (50%) (2)(8)(13) | 41.60 | 0.82 | 33.96 | 1.09 | 40.48 | 0.59 | 23.98 | 0.77 | 82.08 | 0.71 | 57.94 | 1.86 | 30.34 | 0.59 | 17.94 | 0.58 |
Americas Region | 16.97 | 4.16 | 70.55 | 2.27 | 27.22 | 3.33 | 90.56 | 2.91 | 44.19 | 3.65 | 161.12 | 5.18 | 41.60 | 3.93 | 163.60 | 5.26 |
Argentina | 6.06 | 3.26 | 19.78 | 0.64 | 7.63 | 3.08 | 23.52 | 0.76 | 13.69 | 3.16 | 43.30 | 1.39 | 3.15 | 3.32 | 10.47 | 0.34 |
Cerro Vanguardia (92.5%) (2)(13) | 6.06 | 3.26 | 19.78 | 0.64 | 7.63 | 3.08 | 23.52 | 0.76 | 13.69 | 3.16 | 43.30 | 1.39 | 3.15 | 3.32 | 10.47 | 0.34 |
Brazil | 10.91 | 4.66 | 50.78 | 1.63 | 19.60 | 3.42 | 67.04 | 2.16 | 30.50 | 3.86 | 117.82 | 3.79 | 38.45 | 3.98 | 153.13 | 4.92 |
AGA Mineração - Córrego do Sítio (9) | 3.03 | 3.31 | 10.04 | 0.32 | 7.80 | 3.16 | 24.66 | 0.79 | 10.83 | 3.20 | 34.70 | 1.12 | 20.45 | 3.94 | 80.56 | 2.59 |
AGA Mineração - Cuiabá (13) | 5.52 | 6.29 | 34.71 | 1.12 | 6.20 | 4.93 | 30.57 | 0.98 | 11.72 | 5.57 | 65.29 | 2.10 | 11.87 | 5.01 | 59.49 | 1.91 |
AGA Mineração - Lamego (13) | 2.35 | 2.56 | 6.02 | 0.19 | 5.60 | 2.11 | 11.81 | 0.38 | 7.95 | 2.24 | 17.83 | 0.57 | 6.13 | 2.13 | 13.07 | 0.42 |
Australia Region | 41.71 | 1.89 | 78.70 | 2.53 | 31.28 | 1.85 | 57.88 | 1.86 | 72.99 | 1.87 | 136.58 | 4.39 | 51.55 | 2.19 | 113.07 | 3.64 |
Sunrise Dam (13) | 32.16 | 1.91 | 61.53 | 1.98 | 24.83 | 1.74 | 43.23 | 1.39 | 57.00 | 1.84 | 104.77 | 3.37 | 31.77 | 2.04 | 64.80 | 2.08 |
Butcher Well (70%) (2)(11) | — | — | — | — | — | — | — | — | — | — | — | — | 2.62 | 3.93 | 10.28 | 0.33 |
Tropicana (70%) (2)(13) | 9.55 | 1.80 | 17.17 | 0.55 | 6.45 | 2.27 | 14.65 | 0.47 | 15.99 | 1.99 | 31.81 | 1.02 | 17.16 | 2.21 | 37.98 | 1.22 |
Projects | 76.03 | 0.44 | 33.54 | 1.08 | 1,240.72 | 0.77 | 949.62 | 30.53 | 1,316.75 | 0.75 | 983.16 | 31.61 | 905.33 | 0.58 | 523.33 | 16.83 |
Colombia | 45.15 | 0.37 | 16.93 | 0.54 | 982.40 | 0.79 | 776.20 | 24.96 | 1,027.55 | 0.77 | 793.13 | 25.50 | 523.83 | 0.43 | 225.50 | 7.25 |
La Colosa (10)(11) | — | — | — | — | 833.49 | 0.87 | 726.31 | 23.35 | 833.49 | 0.87 | 726.31 | 23.35 | 217.89 | 0.71 | 154.86 | 4.98 |
Quebradona (12)(14) | 45.15 | 0.37 | 16.93 | 0.54 | 148.91 | 0.34 | 49.89 | 1.60 | 194.06 | 0.34 | 66.82 | 2.15 | 305.94 | 0.23 | 70.64 | 2.27 |
United States of America | 30.88 | 0.54 | 16.61 | 0.53 | 258.31 | 0.67 | 173.41 | 5.58 | 289.20 | 0.66 | 190.03 | 6.11 | 381.50 | 0.78 | 297.83 | 9.58 |
North Bullfrog (12) | — | — | — | — | 49.85 | 0.27 | 13.22 | 0.43 | 49.85 | 0.27 | 13.22 | 0.43 | 40.28 | 0.24 | 9.52 | 0.31 |
Arthur Gold (7)(12) | — | — | — | — | 164.14 | 0.84 | 137.30 | 4.41 | 164.14 | 0.84 | 137.30 | 4.41 | 219.79 | 0.90 | 197.33 | 6.34 |
Nevada Regional Deposits (15) | 30.88 | 0.54 | 16.61 | 0.53 | 44.32 | 0.52 | 22.89 | 0.74 | 75.20 | 0.53 | 39.51 | 1.27 | 121.43 | 0.75 | 90.97 | 2.92 |
AngloGold Ashanti Total | 198.31 | 1.52 | 302.36 | 9.72 | 1,710.14 | 1.06 | 1,813.10 | 58.29 | 1,908.46 | 1.11 | 2,115.47 | 68.01 | 1,319.34 | 1.16 | 1,534.79 | 49.34 |
Mineral Resource (1) | At 31 December 2025 | |||||||||||||||
Measured | Indicated | Total Measured and Indicated | Inferred | |||||||||||||
Copper | Tonnes (2) | Grade | Contained Copper | Tonnes (2) | Grade | Contained Copper | Tonnes (2) | Grade | Contained Copper | Tonnes (2) | Grade | Contained Copper | ||||
Million | %Cu | Tonnes Million | Pounds Million | Million | %Cu | Tonnes Million | Pounds Million | Million | %Cu | Tonnes Million | Pounds Million | Million | %Cu | Tonnes Million | Pounds Million | |
Projects | 45.15 | 0.69 | 0.31 | 684 | 148.91 | 0.68 | 1.01 | 2,218 | 194.06 | 0.68 | 1.32 | 2,902 | 305.94 | 0.48 | 1.47 | 3,231 |
Colombia | 45.15 | 0.69 | 0.31 | 684 | 148.91 | 0.68 | 1.01 | 2,218 | 194.06 | 0.68 | 1.32 | 2,902 | 305.94 | 0.48 | 1.47 | 3,231 |
Quebradona (3) | 45.15 | 0.69 | 0.31 | 684 | 148.91 | 0.68 | 1.01 | 2,218 | 194.06 | 0.68 | 1.32 | 2,902 | 305.94 | 0.48 | 1.47 | 3,231 |
AngloGold Ashanti Total | 45.15 | 0.69 | 0.31 | 684 | 148.91 | 0.68 | 1.01 | 2,218 | 194.06 | 0.68 | 1.32 | 2,902 | 305.94 | 0.48 | 1.47 | 3,231 |
Mineral Resource (1) | At 31 December 2025 | |||||||||||||||
Measured | Indicated | Total Measured and Indicated | Inferred | |||||||||||||
Silver | Tonnes (3) | Grade | Contained Silver | Tonnes (3) | Grade | Contained Silver | Tonnes (3) | Grade | Contained Silver | Tonnes (3) | Grade | Contained Silver | ||||
Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | |
Americas Region | 6.06 | 65.49 | 396.87 | 12.76 | 7.63 | 75.09 | 572.69 | 18.41 | 13.69 | 70.84 | 969.57 | 31.17 | 3.15 | 105.73 | 333.19 | 10.71 |
Argentina | 6.06 | 65.49 | 396.87 | 12.76 | 7.63 | 75.09 | 572.69 | 18.41 | 13.69 | 70.84 | 969.57 | 31.17 | 3.15 | 105.73 | 333.19 | 10.71 |
Cerro Vanguardia (92.5%) (2)(6) | 6.06 | 65.49 | 396.87 | 12.76 | 7.63 | 75.09 | 572.69 | 18.41 | 13.69 | 70.84 | 969.57 | 31.17 | 3.15 | 105.73 | 333.19 | 10.71 |
Projects | 75.28 | 3.25 | 244.63 | 7.87 | 403.79 | 3.21 | 1,297.84 | 41.73 | 479.07 | 3.22 | 1,542.47 | 49.59 | 652.80 | 2.61 | 1,705.92 | 54.85 |
Colombia | 45.15 | 4.52 | 203.91 | 6.56 | 148.91 | 4.63 | 688.92 | 22.15 | 194.06 | 4.60 | 892.84 | 28.71 | 305.94 | 3.66 | 1,121.25 | 36.05 |
Quebradona (5)(7) | 45.15 | 4.52 | 203.91 | 6.56 | 148.91 | 4.63 | 688.92 | 22.15 | 194.06 | 4.60 | 892.84 | 28.71 | 305.94 | 3.66 | 1,121.25 | 36.05 |
United States of America | 30.13 | 1.35 | 40.72 | 1.31 | 254.88 | 2.39 | 608.91 | 19.58 | 285.01 | 2.28 | 649.63 | 20.89 | 346.86 | 1.69 | 584.66 | 18.80 |
North Bullfrog (5) | — | — | — | — | 49.85 | 0.28 | 13.95 | 0.45 | 49.85 | 0.28 | 13.95 | 0.45 | 40.28 | 0.32 | 12.80 | 0.41 |
Arthur Gold (5)(8) | — | — | — | — | 164.14 | 3.33 | 546.51 | 17.57 | 164.14 | 3.33 | 546.51 | 17.57 | 219.79 | 2.26 | 496.48 | 15.96 |
Nevada Regional Deposits (4)(9) | 30.13 | 1.35 | 40.72 | 1.31 | 40.88 | 1.18 | 48.44 | 1.56 | 71.01 | 1.26 | 89.16 | 2.87 | 86.79 | 0.87 | 75.38 | 2.42 |
AngloGold Ashanti Total | 81.34 | 7.89 | 641.51 | 20.62 | 411.42 | 4.55 | 1,870.53 | 60.14 | 492.76 | 5.10 | 2,512.04 | 80.76 | 655.95 | 3.11 | 2,039.10 | 65.56 |
Mineral Resource (1) | At 31 December 2025 | |||||||||||||||
Measured | Indicated | Total Measured and Indicated | Inferred | |||||||||||||
Molybdenum | Tonnes (2) | Grade | Contained Molybdenum | Tonnes (2) | Grade | Contained Molybdenum | Tonnes (2) | Grade | Contained Molybdenum | Tonnes (2) | Grade | Contained Molybdenum | ||||
Million | ppm | Kilo- tonnes | Pounds Million | Million | ppm | Kilo- tonnes | Pounds Million | Million | ppm | Kilo- tonnes | Pounds Million | Million | ppm | Kilo- tonnes | Pounds Million | |
Projects | 45.15 | 168 | 7.58 | 17 | 148.91 | 155 | 23.12 | 51 | 194.06 | 158 | 30.70 | 68 | 305.94 | 135 | 41.35 | 91 |
Colombia | 45.15 | 168 | 7.58 | 17 | 148.91 | 155 | 23.12 | 51 | 194.06 | 158 | 30.70 | 68 | 305.94 | 135 | 41.35 | 91 |
Quebradona (3) | 45.15 | 168 | 7.58 | 17 | 148.91 | 155 | 23.12 | 51 | 194.06 | 158 | 30.70 | 68 | 305.94 | 135 | 41.35 | 91 |
AngloGold Ashanti Total | 45.15 | 168 | 7.58 | 17 | 148.91 | 155 | 23.12 | 51 | 194.06 | 158 | 30.70 | 68 | 305.94 | 135 | 41.35 | 91 |
Mineral Resource (1) | At 31 December 2025 | |||||||||||||||
Measured | Indicated | Total Measured and Indicated | Inferred | |||||||||||||
Sulphur | Tonnes (2) | Grade | Contained Sulphur | Tonnes (2) | Grade | Contained Sulphur | Tonnes (2) | Grade | Contained Sulphur | Tonnes (2) | Grade | Contained Sulphur | ||||
Million | %S | Tonnes Million | Pounds Million | Million | %S | Tonnes Million | Pounds Million | Million | %S | Tonnes Million | Pounds Million | Million | %S | Tonnes Million | Pounds Million | |
Americas Region | 7.87 | 4.5 | 0.35 | 777 | 11.80 | 3.1 | 0.37 | 806 | 19.67 | 3.6 | 0.72 | 1,583 | 18.00 | 3.8 | 0.68 | 1,508 |
Brazil | 7.87 | 4.5 | 0.35 | 777 | 11.80 | 3.1 | 0.37 | 806 | 19.67 | 3.6 | 0.72 | 1,583 | 18.00 | 3.8 | 0.68 | 1,508 |
AGA Mineração - Cuiabá (3) | 5.52 | 5.1 | 0.28 | 625 | 6.20 | 3.1 | 0.19 | 419 | 11.72 | 4.0 | 0.47 | 1,043 | 11.87 | 3.7 | 0.44 | 964 |
AGA Mineração - Lamego (3) | 2.35 | 2.9 | 0.07 | 152 | 5.60 | 3.1 | 0.18 | 387 | 7.95 | 3.1 | 0.24 | 539 | 6.13 | 4.0 | 0.25 | 544 |
AngloGold Ashanti Total | 7.87 | 4.5 | 0.35 | 777 | 11.80 | 3.1 | 0.37 | 806 | 19.67 | 3.6 | 0.72 | 1,583 | 18.00 | 3.8 | 0.68 | 1,508 |
Mineral Reserve | At 31 December 2025 | |||||||||||
Proven | Probable | Total Mineral Reserve | ||||||||||
Gold | Tonnes (2) | Grade | Contained Gold | Tonnes (2) | Grade | Contained Gold | Tonnes (2) | Grade | Contained Gold | |||
Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | |
Africa Region | 107.60 | 1.62 | 174.04 | 5.60 | 250.21 | 2.11 | 527.97 | 16.97 | 357.81 | 1.96 | 702.01 | 22.57 |
Democratic Republic of the Congo | 13.45 | 3.13 | 42.16 | 1.36 | 36.87 | 2.92 | 107.49 | 3.46 | 50.32 | 2.97 | 149.65 | 4.81 |
Kibali (45%) (1)(3)(8) | 13.45 | 3.13 | 42.16 | 1.36 | 36.87 | 2.92 | 107.49 | 3.46 | 50.32 | 2.97 | 149.65 | 4.81 |
Ghana | 8.45 | 5.75 | 48.58 | 1.56 | 64.67 | 3.68 | 237.93 | 7.65 | 73.13 | 3.92 | 286.51 | 9.21 |
Iduapriem (8) | 4.22 | 0.90 | 3.80 | 0.12 | 47.61 | 1.33 | 63.13 | 2.03 | 51.83 | 1.29 | 66.93 | 2.15 |
Obuasi (4)(8) | 4.23 | 10.58 | 44.78 | 1.44 | 17.06 | 10.25 | 174.80 | 5.62 | 21.30 | 10.31 | 219.58 | 7.06 |
Guinea | 8.89 | 0.62 | 5.47 | 0.18 | 73.73 | 0.84 | 61.82 | 1.99 | 82.62 | 0.81 | 67.29 | 2.16 |
Siguiri (85%) (1)(8) | 8.89 | 0.62 | 5.47 | 0.18 | 73.73 | 0.84 | 61.82 | 1.99 | 82.62 | 0.81 | 67.29 | 2.16 |
Tanzania | 21.20 | 1.06 | 22.44 | 0.72 | 54.49 | 1.88 | 102.65 | 3.30 | 75.69 | 1.65 | 125.09 | 4.02 |
Geita (5)(8) | 21.20 | 1.06 | 22.44 | 0.72 | 54.49 | 1.88 | 102.65 | 3.30 | 75.69 | 1.65 | 125.09 | 4.02 |
Egypt | 55.61 | 1.00 | 55.39 | 1.78 | 20.44 | 0.88 | 18.08 | 0.58 | 76.06 | 0.97 | 73.48 | 2.36 |
Sukari (50%) (1)(7)(8) | 55.61 | 1.00 | 55.39 | 1.78 | 20.44 | 0.88 | 18.08 | 0.58 | 76.06 | 0.97 | 73.48 | 2.36 |
Americas Region | 7.05 | 4.47 | 31.54 | 1.01 | 11.67 | 4.12 | 48.10 | 1.55 | 18.72 | 4.25 | 79.65 | 2.56 |
Argentina | 2.76 | 3.48 | 9.62 | 0.31 | 4.14 | 2.92 | 12.08 | 0.39 | 6.90 | 3.14 | 21.70 | 0.70 |
Cerro Vanguardia (92.5%) (1)(8) | 2.76 | 3.48 | 9.62 | 0.31 | 4.14 | 2.92 | 12.08 | 0.39 | 6.90 | 3.14 | 21.70 | 0.70 |
Brazil | 4.29 | 5.12 | 21.92 | 0.70 | 7.54 | 4.78 | 36.03 | 1.16 | 11.82 | 4.90 | 57.95 | 1.86 |
AGA Mineração - Córrego do Sítio (10) | 0.84 | 3.10 | 2.62 | 0.08 | 2.01 | 4.42 | 8.89 | 0.29 | 2.86 | 4.03 | 11.50 | 0.37 |
AGA Mineração - Cuiabá (8) | 2.58 | 6.43 | 16.61 | 0.53 | 4.48 | 5.39 | 24.15 | 0.78 | 7.07 | 5.77 | 40.75 | 1.31 |
AGA Mineração - Lamego (8) | 0.86 | 3.15 | 2.70 | 0.09 | 1.04 | 2.87 | 2.99 | 0.10 | 1.90 | 3.00 | 5.70 | 0.18 |
Australia Region | 23.89 | 1.31 | 31.39 | 1.01 | 17.52 | 2.37 | 41.52 | 1.34 | 41.40 | 1.76 | 72.91 | 2.34 |
Sunrise Dam (8) | 8.77 | 1.69 | 14.78 | 0.48 | 5.51 | 2.97 | 16.34 | 0.53 | 14.27 | 2.18 | 31.12 | 1.00 |
Tropicana (70%) (1)(8) | 15.12 | 1.10 | 16.61 | 0.53 | 12.01 | 2.10 | 25.19 | 0.81 | 27.13 | 1.54 | 41.79 | 1.34 |
Projects | 5.49 | 0.93 | 5.11 | 0.16 | 292.83 | 0.94 | 274.55 | 8.83 | 298.32 | 0.94 | 279.66 | 8.99 |
Colombia | — | — | — | — | 120.01 | 0.67 | 80.83 | 2.60 | 120.01 | 0.67 | 80.83 | 2.60 |
Quebradona (9)(12) | — | — | — | — | 120.01 | 0.67 | 80.83 | 2.60 | 120.01 | 0.67 | 80.83 | 2.60 |
United States of America | 5.49 | 0.93 | 5.11 | 0.16 | 172.81 | 1.12 | 193.71 | 6.23 | 178.30 | 1.12 | 198.82 | 6.39 |
North Bullfrog (9)(11) | — | — | — | — | 77.01 | 0.44 | 33.64 | 1.08 | 77.01 | 0.44 | 33.64 | 1.08 |
Arthur Gold (6)(9) | — | — | — | — | 87.64 | 1.75 | 153.68 | 4.94 | 87.64 | 1.75 | 153.68 | 4.94 |
Nevada Regional Deposits (13) | 5.49 | 0.93 | 5.11 | 0.16 | 8.16 | 0.78 | 6.39 | 0.21 | 13.65 | 0.84 | 11.50 | 0.37 |
AngloGold Ashanti Total | 144.03 | 1.68 | 242.08 | 7.78 | 572.23 | 1.56 | 892.15 | 28.68 | 716.26 | 1.58 | 1,134.22 | 36.47 |
Mineral Reserve | At 31 December 2025 | |||||||||||
Proven | Probable | Total Mineral Reserve | ||||||||||
Copper | Tonnes (1) | Grade | Contained Copper | Tonnes (1) | Grade | Contained Copper | Tonnes (1) | Grade | Contained Copper | |||
Million | %Cu | Tonnes Million | Pounds Million | Million | %Cu | Tonnes Million | Pounds Million | Million | %Cu | Tonnes Million | Pounds Million | |
Projects | — | — | — | — | 120.01 | 1.23 | 1.47 | 3,250 | 120.01 | 1.23 | 1.47 | 3,250 |
Colombia | — | — | — | — | 120.01 | 1.23 | 1.47 | 3,250 | 120.01 | 1.23 | 1.47 | 3,250 |
Quebradona (2) | — | — | — | — | 120.01 | 1.23 | 1.47 | 3,250 | 120.01 | 1.23 | 1.47 | 3,250 |
AngloGold Ashanti Total | — | — | — | — | 120.01 | 1.23 | 1.47 | 3,250 | 120.01 | 1.23 | 1.47 | 3,250 |
Mineral Reserve | At 31 December 2025 | |||||||||||
Proven | Probable | Total Mineral Reserve | ||||||||||
Silver | Tonnes (2) | Grade | Contained Silver | Tonnes (2) | Grade | Contained Silver | Tonnes (2) | Grade | Contained Silver | |||
Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | Million | g/t | Tonnes | Moz | |
Americas Region | 2.76 | 61.14 | 168.99 | 5.43 | 4.14 | 97.25 | 402.31 | 12.93 | 6.90 | 82.79 | 571.30 | 18.37 |
Argentina | 2.76 | 61.14 | 168.99 | 5.43 | 4.14 | 97.25 | 402.31 | 12.93 | 6.90 | 82.79 | 571.30 | 18.37 |
Cerro Vanguardia (92.5%) (1)(4) | 2.76 | 61.14 | 168.99 | 5.43 | 4.14 | 97.25 | 402.31 | 12.93 | 6.90 | 82.79 | 571.30 | 18.37 |
Projects | — | — | — | — | 284.66 | 4.31 | 1,227.68 | 39.47 | 284.66 | 4.31 | 1,227.68 | 39.47 |
Colombia | — | — | — | — | 120.01 | 7.29 | 874.33 | 28.11 | 120.01 | 7.29 | 874.33 | 28.11 |
Quebradona (3)(5) | — | — | — | — | 120.01 | 7.29 | 874.33 | 28.11 | 120.01 | 7.29 | 874.33 | 28.11 |
United States of America | — | — | — | — | 164.65 | 2.15 | 353.35 | 11.36 | 164.65 | 2.15 | 353.35 | 11.36 |
North Bullfrog (3) | — | — | — | — | 77.01 | 1.45 | 111.32 | 3.58 | 77.01 | 1.45 | 111.32 | 3.58 |
Arthur Gold (3)(6) | — | — | — | — | 87.64 | 2.76 | 242.03 | 7.78 | 87.64 | 2.76 | 242.03 | 7.78 |
AngloGold Ashanti Total | 2.76 | 61.14 | 168.99 | 5.43 | 288.80 | 5.64 | 1,629.99 | 52.41 | 291.56 | 6.17 | 1,798.98 | 57.84 |
Mineral Reserve | At 31 December 2025 | |||||||||||
Proven | Probable | Total Mineral Reserve | ||||||||||
Sulphur | Tonnes (1) | Grade | Contained Sulphur | Tonnes (1) | Grade | Contained Sulphur | Tonnes (1) | Grade | Contained Sulphur | |||
Million | %S | Tonnes Million | Pounds Million | Million | %S | Tonnes Million | Pounds Million | Million | %S | Tonnes Million | Pounds Million | |
Americas Region | 3.44 | 3.3 | 0.11 | 247 | 5.53 | 2.7 | 0.15 | 326 | 8.97 | 2.9 | 0.26 | 572 |
Brazil | 3.44 | 3.3 | 0.11 | 247 | 5.53 | 2.7 | 0.15 | 326 | 8.97 | 2.9 | 0.26 | 572 |
AGA Mineração - Cuiabá (2) | 2.58 | 3.7 | 0.09 | 209 | 4.48 | 2.8 | 0.12 | 272 | 7.07 | 3.1 | 0.22 | 481 |
AGA Mineração - Lamego (2) | 0.86 | 2.0 | 0.02 | 38 | 1.04 | 2.3 | 0.02 | 54 | 1.90 | 2.2 | 0.04 | 91 |
AngloGold Ashanti Total | 3.44 | 3.3 | 0.11 | 247 | 5.53 | 2.7 | 0.15 | 326 | 8.97 | 2.9 | 0.26 | 572 |
Responsibility | Qualified Person | Professional organisation | Membership number | Relevant experience | Qualification |
Kibali Mineral Resource | Richard Peattie (1) | FAusIMM | 301029 | 29 years | MPhil (Geostatistics) |
Kibali Mineral Reserve | Derek Holm (1) | FAusIMM | 3138099 | 25 years | BSc Hons (Mining Engineering) |
Obuasi Mineral Resource | Eric Kofi Owusu Acheampong | MAusIMM (CP) | 220644 | 28 years | MSc (Mineral Resource Evaluation), BSc (Geological Engineering) |
Obuasi Mineral Reserve | Douglas Atanga | SME RM | 5282632 | 17 years | BSc (Mining Engineering) |
Geita Mineral Resource | Janeth Luponelo | SME RM | 5345424 | 25 years | MEng (Mining Engineering), Bachelor in Mineral Sciences |
Geita Mineral Reserve | Duan Campbell | Pr. Eng | 202101953 | 23 years | BEng (Mining) |
Sukari Mineral Resource | Doxel Mutunda | MAIG | 8063 | 12 years | BSc (Geological Engineering, Exploration and Mining) |
Sukari Mineral Reserve (underground) | Mahmoud Abdelmonem | MIMMM QMR | 703310 | 8 years | BSc (Mining Engineering) |
Sukari Mineral Reserve (open pit) | Sherif Moemen | MAusIMM (CP) | 3152447 | 6 years | BSc (Mining Engineering) |
Arthur Gold Project Mineral Resource | Geoffrey Gushée | FAusIMM | 207957 | 37 years | MEng (Mineral Resource Management) |
Arthur Gold Project Mineral Reserve | Hamid Taghavi | SME RM | 4184627 | 23 years | BEng (Mining Engineering) |
AIG | The Australian Institute of Geoscientists. PO Box 576, Crows Nest, NSW 1585, Australia. Telephone: +61 2 9431 8662 |
AusIMM | The Australasian Institute of Mining and Metallurgy. 204 Lygon Street, Carlton , VIC 3053, Australia. Telephone: +61 3 9658 6100 |
ECSA | The Engineering Council of South Africa. Waterview Corner Building, 2 Ernest Oppenheimer Avenue, Bruma 2198, South Africa. Telephone: +27 86 122 5555 |
GSSA | The Geological Society of South Africa. Mandela Mining Precinct, Corner of Rustenburg and Carlow Roads, Melville 2092, South Africa. Telephone: +27 11 358 0028 |
IMMM | The Institute of Materials, Minerals and Mining. 297 Euston Road, London, NW1 3AS, United Kingdom. Telephone: +44 020 7451 7300 |
SACNASP | South African Council for Natural Scientific Professions. 1 Mark Shuttleworth Street, Lynwood 0087, South Africa. Telephone: +27 12 748 6500 |
SME | Society for Mining, Metallurgy and Exploration. 12 999 E Adam Aircraft Circle, Englewood, CO 80112, United States of America. Telephone: +1 720 574 1256 |

Annual Gold Production (in thousand ounces, except for percentages) | |||||||
Variance (25vs24) | Variance (24vs23) | ||||||
2025 | 2024 | Ounces | % | 2023 | Ounces | % | |
Africa (managed operations) | 1,746 | 1,254 | 492 | 39% | 1,237 | 17 | 1% |
Australia | 537 | 572 | (35) | (6%) | 562 | 10 | 2% |
Americas | 505 | 526 | (21) | (4%) | 544 | (18) | (3%) |
Managed operations | 2,788 | 2,352 | 436 | 19% | 2,343 | 9 | —% |
Non-managed joint ventures | 303 | 309 | (6) | (2%) | 343 | (34) | (10%) |
Group | 3,091 | 2,661 | 430 | 16% | 2,686 | (25) | (1%) |
Average annual exchange rates to the US dollar | 2025 | 2024 | 2023 | ||
Brazilian real | 5.59 | 5.39 | 5.00 | ||
Australian dollar | 1.55 | 1.52 | 1.51 | ||
Argentinean peso | 1,246.73 | 916.78 | 293.67 |
CONSOLIDATED INCOME STATEMENT | |||||||
Year | Year | Year | |||||
ended | ended | $ | % | ended | $ | % | |
Dec | Dec | Variance | Variance | Dec | Variance | Variance | |
(US dollar million, except as otherwise noted) | 2025 | 2024 | (25vs24) | (25vs24) | 2023 | (24vs23) | (24vs23) |
Revenue from product sales | 9,893 | 5,793 | 4,100 | 71% | 4,582 | 1,211 | 26% |
Cost of sales: | |||||||
Operating costs | (3,231) | (2,665) | (566) | 21% | (2,680) | 15 | (1%) |
Royalties | (424) | (246) | (178) | 72% | (190) | (56) | 29% |
Total operating costs | (3,655) | (2,911) | (744) | 26% | (2,870) | (41) | 1% |
Retrenchment Costs | (3) | (3) | — | — | (4) | 1 | (25%) |
Rehabilitation and other non-cash costs | (56) | (42) | (14) | 33% | (21) | (21) | 100% |
Amortisation of tangible assets | (1,186) | (666) | (520) | 78% | (579) | (87) | 15% |
Amortisation of right of use assets | (100) | (85) | (15) | 18% | (78) | (7) | 9% |
Amortisation of intangible assets | (1) | (1) | — | — | (1) | — | — |
Inventory change | (21) | (18) | (3) | 17% | 12 | (30) | (250%) |
Cost of sales | (5,022) | (3,726) | (1,296) | 35% | (3,541) | (185) | 5% |
Loss on non-hedge derivatives and other commodity contracts | — | — | — | — | (14) | 14 | (100%) |
Gross profit | 4,871 | 2,067 | 2,804 | 136% | 1,027 | 1,040 | 101% |
Corporate administration, marketing and related expenses | (138) | (118) | (20) | 17% | (94) | (24) | 26% |
Exploration and evaluation costs | (267) | (252) | (15) | 6% | (254) | 2 | (1%) |
Net (impairment) reversal of impairment and net loss on disposal and derecognition of assets | (88) | 58 | (146) | (252%) | (221) | 279 | (126%) |
Corporate restructuring costs | — | — | — | — | (314) | 314 | (100%) |
Other (expenses) income | (248) | (144) | (104) | 72% | (104) | (40) | 38% |
Finance income | 152 | 160 | (8) | (5%) | 127 | 33 | 26% |
Foreign exchange and fair value adjustments | (41) | (87) | 46 | (53%) | (154) | 67 | (44%) |
Finance costs and unwinding of obligations | (220) | (167) | (53) | 32% | (157) | (10) | 6% |
Share of associates and joint ventures’ profit | 255 | 155 | 100 | 65% | 207 | (52) | (25%) |
Profit before taxation | 4,276 | 1,672 | 2,604 | 156% | 63 | 1,609 | 2,554% |
Taxation | (1,102) | (623) | (479) | 77% | (285) | (338) | 119% |
Profit (loss) for the period | 3,174 | 1,049 | 2,125 | 203% | (222) | 1,271 | (573%) |
Total cash costs per ounce (in $/oz) (1) | 1,252 | 1,187 | 65 | 5% | 1,181 | 6 | 1% |
All-in sustaining costs per ounce (in $/oz) (1) | 1,751 | 1,672 | 79 | 5% | 1,657 | 15 | 1% |
Gold Produced (‘000 oz) | Gold Sold (‘000 oz) | Gold Income ($ million) | |||||||||||||||
2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | |||
Managed operations: | |||||||||||||||||
Iduapriem | 199 | 237 | (16%) | 268 | (12%) | 201 | 238 | (16%) | 268 | (11%) | 704 | 563 | 25% | 522 | 8% | ||
Obuasi | 266 | 221 | 20% | 224 | (1%) | 269 | 222 | 21% | 226 | (2%) | 942 | 530 | 78% | 439 | 21% | ||
Siguiri (1) | 289 | 273 | 6% | 260 | 5% | 289 | 272 | 6% | 260 | 5% | 990 | 653 | 52% | 505 | 29% | ||
Geita | 492 | 483 | 2% | 485 | — | 499 | 479 | 4% | 479 | — | 1,730 | 1150 | 50% | 934 | 23% | ||
Sukari (1) | 500 | 40 | N/M | — | N/M | 507 | 44 | N/M | — | N/M | 1,748 | 119 | N/M | — | N/M | ||
1,746 | 1,254 | 39% | 1,237 | 1% | 1,765 | 1,255 | 41% | 1,233 | 2% | 6,114 | 3,015 | 103% | 2,400 | 26% | |||
Non-managed joint venture: | |||||||||||||||||
Kibali (2) | 303 | 309 | (2%) | 343 | (10%) | 298 | 309 | (4%) | 343 | (10%) | 1,038 | 741 | 40% | 668 | 11% | ||
Total Africa | 2,049 | 1,563 | 31% | 1,580 | (1%) | — | 2,063 | 1,564 | 32% | 1,576 | (1%) | — | 7,152 | 3,756 | 90% | 3,068 | 22% |
Cost of Sales ($ million) | All-in sustaining costs ($/oz) | Total cash costs ($/oz) | |||||||||||||||
2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | |||
Managed operations: | |||||||||||||||||
Iduapriem | 424 | 351 | 21% | 387 | (9%) | 2,096 | 1,614 | 30% | 1,329 | 21% | 1,482 | 1,118 | 33% | 943 | 19% | ||
Obuasi | 458 | 360 | 27% | 313 | 15% | 2,026 | 1,942 | 4% | 1,777 | 9% | 1,325 | 1,214 | 9% | 1,114 | 9% | ||
Siguiri (1) | 591 | 518 | 14% | 473 | 10% | 2,165 | 2,093 | 3% | 1,976 | 6% | 1,783 | 1,703 | 5% | 1,650 | 3% | ||
Geita | 773 | 612 | 26% | 566 | 8% | 1,525 | 1,418 | 8% | 1,403 | 1% | 1,038 | 984 | 5% | 984 | — | ||
Sukari (1) | 789 | 83 | N/M | — | N/M | 1,094 | 1,858 | N/M | — | N/M | 783 | 1,165 | N/M | — | N/M | ||
Administration and other | (1) | — | N/M | — | N/M | — | — | N/M | — | N/M | — | — | N/M | — | N/M | ||
3,034 | 1,924 | 58% | 1,739 | 11% | 1,647 | 1,709 | (4%) | 1,576 | 8% | 1,182 | 1,212 | (2%) | 1,138 | 7% | |||
Non-managed joint venture: | |||||||||||||||||
Kibali (2) | 432 | 380 | 14% | 372 | 2% | 1,317 | 1,146 | 15% | 951 | 21% | 1,148 | 935 | 23% | 802 | 17% | ||
Total Africa | 3,466 | 2,304 | 50% | 2,111 | 9% | ||||||||||||
Gold Produced (‘000 oz) | Gold Sold (‘000 oz) | Gold Income ($ million) | |||||||||||||||
2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | |||
Managed operations: | |||||||||||||||||
Sunrise Dam | 232 | 259 | (10%) | 252 | 3% | 230 | 261 | (12%) | 256 | 2% | 789 | 626 | 26% | 495 | 26% | ||
Tropicana (1) | 305 | 313 | (3%) | 310 | 1% | 309 | 317 | (3%) | 301 | 5% | 1,087 | 768 | 42% | 586 | 31% | ||
Total Australia | 537 | 572 | (6%) | 562 | 2% | 539 | 578 | (7%) | 557 | 4% | 1,876 | 1,394 | 35% | 1,081 | 29% | ||
Cost of Sales ($ million) | All-in sustaining costs ($/oz) | Total cash costs ($/oz) | |||||||||||||||
2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | |||
Managed operations: | |||||||||||||||||
Sunrise Dam | 442 | 430 | 3% | 399 | 8% | 2,078 | 1,665 | 25% | 1,583 | 5% | 1,634 | 1,343 | 22% | 1,318 | 2% | ||
Tropicana (1) | 527 | 479 | 10% | 438 | 9% | 1,508 | 1,297 | 16% | 1,304 | (1%) | 1,330 | 1,132 | 17% | 1,105 | 2% | ||
Administration and other | 40 | 36 | 11% | 30 | 20% | — | — | N/M | — | N/M | — | — | N/M | — | N/M | ||
Total Australia | 1,009 | 945 | 7% | 867 | 9% | 1,825 | 1,526 | 20% | 1,487 | 3% | 1,530 | 1,287 | 19% | 1,251 | 3% | ||
Gold Produced (‘000 oz) | Gold Sold (‘000 oz) | Gold Income ($ million) | |||||||||||||||
2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | |||
Managed operations: | |||||||||||||||||
Cerro Vanguardia (1) | 179 | 175 | 2% | 164 | 7% | 178 | 183 | (3%) | 163 | 12% | 612 | 439 | 39% | 317 | 38% | ||
AGA Mineração (2) | 273 | 271 | 1% | 294 | (8%) | 272 | 274 | (1%) | 285 | (4%) | 946 | 634 | 49% | 515 | 23% | ||
Serra Grande (3) | 53 | 80 | (34%) | 86 | (7%) | 53 | 80 | (34%) | 86 | (7%) | 182 | 191 | (5%) | 167 | 14% | ||
Total Americas | 505 | 526 | (4%) | 544 | (3%) | 503 | 537 | (6%) | 534 | 1% | 1,740 | 1,264 | 38% | 999 | 27% | ||
Cost of Sales $ million) | All-in sustaining costs ($/oz) | Total cash costs ($/oz) | |||||||||||||||
2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | 2025 | 2024 | 25v24 | 2023 | 24v23 | |||
Managed operations: | |||||||||||||||||
Cerro Vanguardia (1) | 441 | 368 | 20% | 307 | 20% | 1,726 | 1,544 | 12% | 1,581 | (2%) | 1,227 | 1,073 | 14% | 1,045 | 3% | ||
AGA Mineração (2) | 391 | 352 | 11% | 453 | (22%) | 1,506 | 1,334 | 13% | 1,807 | (26%) | 976 | 876 | 11% | 1,210 | (28%) | ||
Serra Grande (3) | 139 | 136 | 2% | 169 | (20%) | 2,951 | 2,039 | 45% | 2,198 | (7%) | 2,165 | 1,411 | 53% | 1,498 | (6%) | ||
Administration and other | 2 | 2 | — | 2 | — | — | — | N/M | — | N/M | — | — | N/M | — | N/M | ||
Total Americas | 973 | 858 | 13% | 931 | (8%) | 1,741 | 1,514 | 15% | 1,805 | (16%) | 1,195 | 1,027 | 16% | 1,207 | (15%) | ||
Capital Expenditure ($ in millions, except for percentages) | |||||||
Variance (25vs24) | Variance (24vs23) | ||||||
2025 | 2024 | $ | % | 2023 | $ | % | |
Managed operations | |||||||
Africa | 984 | 689 | 295 | 43% | 625 | 64 | 10% |
Iduapriem | 173 | 169 | 4 | 2% | 142 | 27 | 19% |
Obuasi | 209 | 202 | 7 | 3% | 214 | (12) | (6%) |
Siguiri (1) | 102 | 102 | — | — | 78 | 24 | 31% |
Geita | 238 | 196 | 42 | 21% | 191 | 5 | 3% |
Sukari (1)(2) | 262 | 20 | 242 | N/M | — | 20 | N/M |
Australia | 185 | 153 | 32 | 21% | 135 | 18 | 13% |
Sunrise Dam | 87 | 65 | 22 | 34% | 47 | 18 | 38% |
Tropicana (3) | 98 | 88 | 10 | 11% | 88 | — | — |
Americas | 236 | 209 | 27 | 13% | 254 | (45) | (18%) |
AGA Mineração (4) | 135 | 98 | 37 | 38% | 124 | (26) | (21%) |
Serra Grande (5) | 37 | 40 | (3) | (8%) | 55 | (15) | (27%) |
Cerro Vanguardia (1) | 64 | 71 | (7) | (10%) | 75 | (4) | (5%) |
Projects | 42 | 38 | 4 | 11% | 27 | 11 | 41% |
Colombia | 13 | 13 | — | — | 11 | 2 | 18% |
North America | 29 | 25 | 4 | 16% | 16 | 9 | 56% |
Corporate and other | 2 | 1 | 1 | 100% | 1 | — | — |
Total Capital Expenditure | 1,449 | 1,090 | 359 | 33% | 1,042 | 48 | 5% |
Capital expenditure ($ in millions, except for percentages) | ||||||||
Variance (25vs24) | Variance (24vs23) | |||||||
2025 | 2024 | $ | % | 2023 (1) | $ | % | ||
Managed operations | 1,449 | 1,090 | 359 | 33% | 1,042 | 48 | 5% | |
Sustaining capital expenditure | 1,070 | 864 | 206 | 24% | 842 | 22 | 3% | |
Non-sustaining capital expenditure | 379 | 226 | 153 | 68% | 200 | 26 | 13% | |
($ in millions) | Year ended 31 December | ||||||||||
2025 | 2024 | 2023 | |||||||||
$ | % | $ | % | $ | % | ||||||
Geographical analysis of gold income by origin is as follows: | |||||||||||
Africa | 7,152 | 74% | 3,756 | 66% | 3,068 | 69% | |||||
Australia | 1,876 | 19% | 1,394 | 25% | 1,081 | 24% | |||||
Americas | 1,740 | 18% | 1,264 | 22% | 999 | 22% | |||||
10,768 | 6,414 | 5,148 | |||||||||
Less: Equity-accounted non-managed joint ventures included above | (1,038) | (11%) | (741) | (13%) | (668) | (15%) | |||||
9,730 | 100% | 5,673 | 100% | 4,480 | 100% | ||||||
($ in millions) | At 31 December | ||||||||||
2025 | 2024 (revised)(1) | 2023 (revised)(1) | |||||||||
$ | % | $ | % | $ | % | ||||||
Geographical analysis of assets by origin is as follows: | |||||||||||
Africa | 9,294 | 62% | 9,081 | 69% | 4,414 | 54% | |||||
Australia | 1,115 | 7% | 845 | 6% | 942 | 11% | |||||
Americas | 1,712 | 11% | 1,533 | 12% | 1,336 | 16% | |||||
Projects | 975 | 7% | 991 | 7% | 833 | 10% | |||||
Other, including non-gold producing managed operations | 1,982 | 13% | 780 | 6% | 732 | 9% | |||||
Total assets | 15,078 | 100% | 13,230 | 100% | 8,257 | 100% | |||||
Note A — All-in sustaining costs and total cash costs per ounce reconciliation | ||||
For the year ended 31 December 2025 | ||||||||||||||
(in US dollar million, except as otherwise noted) | ||||||||||||||
AFRICA | AUSTRALIA | |||||||||||||
Corporate and other(3) | Kibali | Non- managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Sukari | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
All-in sustaining costs | ||||||||||||||
Cost of sales per segmental information(2) | 6 | 432 | 432 | 424 | 458 | 591 | 773 | 789 | (1) | 3,034 | 442 | 527 | 40 | 1,009 |
By-product revenue | — | (2) | (2) | — | (1) | — | (4) | (4) | — | (9) | (2) | (4) | — | (6) |
Realised other commodity contracts | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
Amortisation of tangible, intangible and right of use assets | (4) | (107) | (107) | (113) | (87) | (64) | (256) | (379) | — | (899) | (67) | (113) | (1) | (181) |
Adjusted for decommissioning and inventory amortisation | — | — | — | — | (1) | — | (1) | — | — | (2) | 1 | — | — | 1 |
Corporate administration, marketing and related expenses | 135 | — | — | — | — | — | — | — | — | — | — | — | — | — |
Lease payment sustaining | 1 | (1) | (1) | 6 | — | 5 | 21 | 3 | — | 35 | 15 | 21 | 1 | 37 |
Sustaining exploration and study costs | — | — | — | 4 | 1 | 10 | 9 | — | — | 24 | 2 | — | — | 2 |
Total sustaining capital expenditure | 2 | 71 | 71 | 101 | 174 | 85 | 218 | 145 | — | 723 | 87 | 35 | — | 122 |
All-in sustaining costs(4) | 139 | 393 | 393 | 421 | 544 | 627 | 760 | 554 | — | 2,906 | 478 | 467 | 40 | 985 |
Gold sold - oz (000) | — | 298 | 298 | 201 | 269 | 289 | 499 | 507 | — | 1,765 | 230 | 309 | — | 539 |
All-in sustaining costs per ounce - $/oz(1) | — | 1,317 | 1,317 | 2,096 | 2,026 | 2,165 | 1,525 | 1,094 | — | 1,647 | 2,078 | 1,508 | — | 1,825 |
AMERICAS | Adjusted to exclude Sukari (5) | ||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non-managed joint ventures | Managed operations | Managed operations Africa | Managed operations | ||
All-in sustaining costs | |||||||||||
Cost of sales per segmental information(2) | 441 | 391 | 139 | 2 | 973 | — | 432 | 5,022 | 2,245 | 4,233 | |
By-product revenue | (130) | (18) | — | — | (148) | — | (2) | (163) | (5) | (159) | |
Realised other commodity contracts | — | — | — | — | — | — | — | — | — | — | |
Amortisation of tangible, intangible and right of use assets | (68) | (105) | (30) | — | (203) | — | (107) | (1,287) | (520) | (908) | |
Adjusted for decommissioning and inventory amortisation | (3) | (1) | — | — | (4) | — | — | (5) | (2) | (5) | |
Corporate administration, marketing and related expenses | — | — | — | — | — | 3 | — | 138 | — | 138 | |
Lease payment sustaining | — | 23 | 8 | — | 31 | 2 | (1) | 106 | 32 | 103 | |
Sustaining exploration and study costs | 6 | 1 | — | — | 7 | 1 | — | 34 | 24 | 34 | |
Total sustaining capital expenditure | 64 | 119 | 37 | — | 220 | 3 | 71 | 1,070 | 578 | 925 | |
All-in sustaining costs(4) | 309 | 410 | 154 | 3 | 876 | 8 | 393 | 4,914 | 2,352 | 4,360 | |
Gold sold - oz (000) | 178 | 272 | 53 | — | 503 | — | 298 | 2,807 | 1,258 | 2,300 | |
All-in sustaining costs per ounce - $/oz(1) | 1,726 | 1,506 | 2,951 | — | 1,741 | — | 1,317 | 1,751 | 1,870 | 1,895 | |
(1) In addition to the operational performances of the mines, “all-in sustaining costs per ounce” and “total cash costs per ounce” are affected by fluctuations in the foreign currency exchange rate. AngloGold Ashanti reports “all-in sustaining costs per ounce” calculated to the nearest US dollar amount and gold sold in ounces. AngloGold Ashanti reports “total cash costs per ounce” calculated to the nearest US dollar amount and gold produced in ounces. “All-in sustaining costs per ounce” and “total cash costs per ounce” may not be calculated based on amounts presented in this table due to rounding. | |||||||||||||||
(2) Refer to “Item 18: Financial Statements—Note 2—Segmental information”. | |||||||||||||||
(3) Corporate includes non-gold producing managed operations. | |||||||||||||||
(4) “Total cash costs” and “all-in sustaining costs” may not be calculated based on amounts presented in this table due to rounding. | |||||||||||||||
(5) Adjusted to exclude the Sukari operation which was acquired on 22 November 2024 as part of the Centamin acquisition. | |||||||||||||||
For the year ended 31 December 2025 | ||||||||||||||
(in US dollar million, except as otherwise noted) | ||||||||||||||
AFRICA | AUSTRALIA | |||||||||||||
Corporate and other(3) | Kibali | Non- managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Sukari | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
Total cash costs | ||||||||||||||
Cost of sales per segmental information(2) | 6 | 432 | 432 | 424 | 458 | 591 | 773 | 789 | (1) | 3,034 | 442 | 527 | 40 | 1,009 |
- By-product revenue | — | (2) | (2) | — | (1) | — | (4) | (4) | — | (9) | (2) | (4) | — | (6) |
- Inventory change | — | 8 | 8 | (3) | (4) | — | 3 | (12) | — | (16) | 3 | (5) | — | (2) |
- Amortisation of tangible assets | (3) | (106) | (106) | (107) | (87) | (59) | (234) | (377) | — | (864) | (52) | (89) | — | (141) |
- Amortisation of right of use assets | — | (1) | (1) | (6) | — | (5) | (22) | (2) | — | (35) | (15) | (24) | (1) | (40) |
- Amortisation of intangible assets | (1) | — | — | — | — | — | — | — | — | — | — | — | — | — |
- Environmental rehabilitation and other non-cash costs | — | 17 | 17 | (13) | (13) | (11) | (6) | (3) | — | (46) | 4 | — | (1) | 3 |
- Retrenchment costs | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
Total cash costs (4) | 2 | 348 | 348 | 295 | 353 | 516 | 510 | 391 | (1) | 2,064 | 379 | 406 | 37 | 822 |
Gold produced - oz (000) | — | 303 | 303 | 199 | 266 | 289 | 492 | 500 | — | 1,746 | 232 | 305 | — | 537 |
Total cash costs per ounce - $/oz(1) | — | 1,148 | 1,148 | 1,482 | 1,325 | 1,783 | 1,038 | 783 | — | 1,182 | 1,634 | 1,330 | — | 1,530 |
AMERICAS | Adjusted to exclude Sukari (5) | ||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non-managed joint ventures | Managed operations | Managed operations Africa | Managed operations | ||
Total cash costs | |||||||||||
Cost of sales per segmental information(2) | 441 | 391 | 139 | 2 | 973 | — | 432 | 5,022 | 2,245 | 4,233 | |
- By-product revenue | (130) | (18) | — | — | (148) | — | (2) | (163) | (5) | (159) | |
- Inventory change | (4) | — | 1 | — | (3) | — | 8 | (21) | (4) | (9) | |
- Amortisation of tangible assets | (68) | (86) | (24) | — | (178) | — | (106) | (1,186) | (487) | (809) | |
- Amortisation of right of use assets | — | (19) | (6) | — | (25) | — | (1) | (100) | (33) | (98) | |
- Amortisation of intangible assets | — | — | — | — | — | — | — | (1) | — | (1) | |
- Environmental rehabilitation and other non-cash costs | (18) | — | 5 | — | (13) | — | 17 | (56) | (43) | (53) | |
- Retrenchment costs | (1) | (1) | (1) | — | (3) | — | — | (3) | — | (3) | |
Total cash costs (4) | 220 | 266 | 115 | 2 | 603 | — | 348 | 3,491 | 1,673 | 3,100 | |
Gold produced - oz (000) | 179 | 273 | 53 | — | 505 | — | 303 | 2,788 | 1,246 | 2,288 | |
Total cash costs per ounce - $/oz(1) | 1,227 | 976 | 2,165 | — | 1,195 | — | 1,148 | 1,252 | 1,342 | 1,355 | |
(1) In addition to the operational performances of the mines, “all-in sustaining costs per ounce” and “total cash costs per ounce” are affected by fluctuations in the foreign currency exchange rate. AngloGold Ashanti reports “all-in sustaining costs per ounce” calculated to the nearest US dollar amount and gold sold in ounces. AngloGold Ashanti reports “total cash costs per ounce” calculated to the nearest US dollar amount and gold produced in ounces. “All-in sustaining costs per ounce” and “total cash costs per ounce” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(2) Refer to “Item 18: Financial Statements—Note 2—Segmental information”. | ||||||||||||||
(3) Corporate includes non-gold producing managed operations. | ||||||||||||||
(4) “Total cash costs” and “all-in sustaining costs” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(5) Adjusted to exclude the Sukari operation which was acquired on 22 November 2024 as part of the Centamin acquisition. | ||||||||||||||
For the year ended 31 December 2024 | ||||||||||||||
(in US dollar million, except as otherwise noted) | ||||||||||||||
AFRICA | AUSTRALIA | |||||||||||||
Corporate and other (3) | Kibali | Non-managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Sukari | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
All-in sustaining costs | ||||||||||||||
Cost of sales per segmental information(2) | (1) | 380 | 380 | 351 | 360 | 518 | 612 | 83 | — | 1,924 | 430 | 479 | 36 | 945 |
By-product revenue | — | (2) | (2) | — | (1) | (1) | (2) | — | — | (4) | (2) | (3) | — | (5) |
Realised other commodity contracts | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
Amortisation of tangible, intangible and right of use assets | (4) | (92) | (92) | (79) | (75) | (51) | (138) | (20) | — | (363) | (77) | (112) | (1) | (190) |
Adjusted for decommissioning and inventory amortisation | — | — | — | — | — | — | (1) | — | — | (1) | (1) | — | — | (1) |
Corporate administration, marketing and related expenses | 115 | — | — | — | — | — | — | — | — | — | — | — | — | — |
Lease payment sustaining | 1 | (1) | (1) | 6 | — | 3 | 22 | — | — | 31 | 18 | 10 | 1 | 29 |
Sustaining exploration and study costs | — | — | — | — | 2 | 6 | 6 | — | — | 14 | 1 | — | — | 1 |
Total sustaining capital expenditure | 1 | 68 | 68 | 108 | 145 | 93 | 181 | 20 | — | 547 | 65 | 37 | — | 102 |
All-in sustaining costs(4) | 112 | 354 | 354 | 385 | 430 | 569 | 680 | 83 | — | 2,147 | 434 | 411 | 36 | 881 |
Gold sold - oz (000) | — | 309 | 309 | 238 | 222 | 272 | 479 | 44 | — | 1,255 | 261 | 317 | — | 578 |
All-in sustaining costs per ounce - $/oz(1) | — | 1,146 | 1,146 | 1,614 | 1,942 | 2,093 | 1,418 | 1,858 | — | 1,709 | 1,665 | 1,297 | — | 1,526 |
AMERICAS | Adjusted to exclude Sukari (5) | ||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non-managed joint ventures | Managed operations | Managed operations Africa | Managed operations | ||
All-in sustaining costs | |||||||||||
Cost of sales per segmental information(2) | 368 | 352 | 136 | 2 | 858 | — | 380 | 3,726 | 1,841 | 3,643 | |
By-product revenue | (109) | (2) | — | — | (111) | — | (2) | (120) | (4) | (120) | |
Realised other commodity contracts | — | — | — | — | — | — | — | — | — | — | |
Amortisation of tangible, intangible and right of use assets | (61) | (112) | (22) | — | (195) | — | (92) | (752) | (343) | (732) | |
Adjusted for decommissioning and inventory amortisation | 9 | (1) | (1) | — | 7 | — | — | 5 | (1) | 5 | |
Corporate administration, marketing and related expenses | — | — | — | — | — | 3 | — | 118 | — | 118 | |
Lease payment sustaining | — | 27 | 10 | — | 37 | 1 | (1) | 99 | 31 | 99 | |
Sustaining exploration and study costs | 6 | 2 | — | — | 8 | 1 | — | 24 | 14 | 24 | |
Total sustaining capital expenditure | 71 | 98 | 40 | — | 209 | 5 | 68 | 864 | 527 | 844 | |
All-in sustaining costs(4) | 284 | 365 | 162 | 2 | 813 | 10 | 354 | 3,963 | 2,064 | 3,880 | |
Gold sold - oz (000) | 183 | 274 | 80 | — | 537 | — | 309 | 2,370 | 1,211 | 2,326 | |
All-in sustaining costs per ounce - $/oz(1) | 1,544 | 1,334 | 2,039 | — | 1,514 | — | 1,146 | 1,672 | 1,704 | 1,668 | |
(1) In addition to the operational performances of the mines, “all-in sustaining costs per ounce” and “total cash costs per ounce” are affected by fluctuations in the foreign currency exchange rate. AngloGold Ashanti reports “all-in sustaining costs per ounce” calculated to the nearest US dollar amount and gold sold in ounces. AngloGold Ashanti reports “total cash costs per ounce” calculated to the nearest US dollar amount and gold produced in ounces. “All-in sustaining costs per ounce” and “total cash costs per ounce” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(2) Refer to “Item 18: Financial Statements—Note 2—Segmental information”. | ||||||||||||||
(3) Corporate includes non-gold producing managed operations. | ||||||||||||||
(4) “Total cash costs” and “all-in sustaining costs” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(5) Adjusted to exclude the Sukari operation which was acquired on 22 November 2024 as part of the Centamin acquisition. | ||||||||||||||
For the year ended 31 December 2024 | ||||||||||||||
(in US dollar million, except as otherwise noted) | ||||||||||||||
AFRICA | AUSTRALIA | |||||||||||||
Corporate and other(3) | Kibali | Non-managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Sukari | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
Total cash costs | ||||||||||||||
Cost of sales per segmental information(2) | (1) | 380 | 380 | 351 | 360 | 518 | 612 | 83 | — | 1,924 | 430 | 479 | 36 | 945 |
- By-product revenue | — | (2) | (2) | — | (1) | (1) | (2) | — | — | (4) | (2) | (3) | — | (5) |
- Inventory change | — | 2 | 2 | 1 | (2) | 4 | 7 | (17) | — | (7) | (3) | (7) | — | (10) |
- Amortisation of tangible assets | (3) | (91) | (91) | (75) | (75) | (48) | (111) | (19) | — | (328) | (61) | (106) | — | (167) |
- Amortisation of right of use assets | (1) | (1) | (1) | (4) | — | (3) | (27) | (1) | — | (35) | (16) | (6) | (1) | (23) |
- Amortisation of intangible assets | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
- Environmental rehabilitation and other non-cash costs | — | 1 | 1 | (7) | (14) | (6) | (3) | — | — | (30) | (2) | (2) | (1) | (5) |
- Retrenchment costs | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
Total cash costs (4) | (5) | 289 | 289 | 265 | 268 | 465 | 476 | 46 | (1) | 1,519 | 347 | 354 | 34 | 735 |
Gold produced - oz (000) | — | 309 | 309 | 237 | 221 | 273 | 483 | 40 | — | 1,254 | 259 | 313 | — | 572 |
Total cash costs per ounce - $/oz(1) | — | 935 | 935 | 1,118 | 1,214 | 1,703 | 984 | 1,165 | — | 1,212 | 1,343 | 1,132 | — | 1,287 |
AMERICAS | Adjusted to exclude Sukari (5) | ||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non-managed joint ventures | Managed operations | Managed operations Africa | Managed operations | ||
Total cash costs | |||||||||||
Cost of sales per segmental information(2) | 368 | 352 | 136 | 2 | 858 | — | 380 | 3,726 | 1,841 | 3,643 | |
- By-product revenue | (109) | (2) | — | — | (111) | — | (2) | (120) | (4) | (120) | |
- Inventory change | 1 | (2) | — | — | (1) | — | 2 | (18) | 10 | (1) | |
- Amortisation of tangible assets | (61) | (89) | (18) | — | (168) | — | (91) | (666) | (309) | (647) | |
- Amortisation of right of use assets | — | (23) | (4) | — | (27) | — | (1) | (86) | (35) | (86) | |
- Amortisation of intangible assets | — | — | — | — | — | — | — | — | — | — | |
- Environmental rehabilitation and other non-cash costs | (10) | 2 | — | — | (8) | — | 1 | (43) | (30) | (43) | |
- Retrenchment costs | (1) | (1) | (1) | — | (3) | — | — | (3) | — | (3) | |
Total cash costs (4) | 189 | 237 | 113 | 2 | 541 | — | 289 | 2,790 | 1,473 | 2,744 | |
Gold produced - oz (000) | 175 | 271 | 80 | — | 526 | — | 309 | 2,352 | 1,214 | 2,312 | |
Total cash costs per ounce - $/oz(1) | 1,073 | 876 | 1,411 | — | 1,027 | — | 935 | 1,187 | 1,213 | 1,187 | |
(1) In addition to the operational performances of the mines, “all-in sustaining costs per ounce” and “total cash costs per ounce” are affected by fluctuations in the foreign currency exchange rate. AngloGold Ashanti reports “all-in sustaining costs per ounce” calculated to the nearest US dollar amount and gold sold in ounces. AngloGold Ashanti reports “total cash costs per ounce” calculated to the nearest US dollar amount and gold produced in ounces. “All-in sustaining costs per ounce” and “total cash costs per ounce” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(2) Refer to “Item 18: Financial Statements—Note 2—Segmental information”. | ||||||||||||||
(3) Corporate includes non-gold producing managed operations. | ||||||||||||||
(4) “Total cash costs” and “all-in sustaining costs” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(5) Adjusted to exclude the Sukari operation which was acquired on 22 November 2024 as part of the Centamin acquisition. | ||||||||||||||
For the year ended 31 December 2023 | ||||||||||||||
(in US dollar million, except as otherwise noted) | ||||||||||||||
AFRICA | AUSTRALIA | |||||||||||||
Corporate and other(3) | Kibali | Other | Non-managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
All-in sustaining costs | ||||||||||||||
Cost of sales per segmental information(2) | 4 | 372 | — | 372 | 387 | 313 | 473 | 566 | — | 1,739 | 399 | 438 | 30 | 867 |
By-product revenue | — | (2) | — | (2) | — | (1) | — | (2) | — | (3) | (1) | (3) | — | (4) |
Realised other commodity contracts | 7 | — | — | — | — | — | — | — | — | — | — | — | — | — |
Amortisation of tangible, intangible and right of use assets | (5) | (99) | — | (99) | (129) | (61) | (39) | (91) | — | (320) | (58) | (104) | (1) | (163) |
Adjusted for decommissioning and inventory amortisation | — | 1 | — | 1 | — | — | — | (1) | — | (1) | (1) | — | — | (1) |
Corporate administration, marketing and related expenses | 92 | — | — | — | — | — | — | — | — | — | — | — | — | — |
Lease payment sustaining | 2 | 2 | — | 2 | 3 | — | — | 26 | — | 29 | 16 | 11 | 1 | 28 |
Sustaining exploration and study costs | — | — | — | — | — | 2 | 6 | 12 | (1) | 19 | 2 | 1 | — | 3 |
Total sustaining capital expenditure | 1 | 52 | — | 52 | 96 | 148 | 74 | 162 | — | 480 | 47 | 50 | 1 | 98 |
All-in sustaining costs(4) | 101 | 326 | — | 326 | 357 | 401 | 514 | 672 | (1) | 1,943 | 404 | 393 | 31 | 828 |
Gold sold - oz (000) | — | 343 | — | 343 | 268 | 226 | 260 | 479 | — | 1,233 | 256 | 301 | — | 557 |
All-in sustaining costs per ounce - $/oz(1) | — | 951 | — | 951 | 1,329 | 1,777 | 1,976 | 1,403 | — | 1,576 | 1,583 | 1,304 | — | 1,487 |
AMERICAS | Adjusted to exclude the Córrego do Sítio operation (5) | ||||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non managed joint ventures | Managed operations | Córrego do Sítio | AngloGold Ashanti Mineração | Americas | Managed operations | ||
All-in sustaining costs | |||||||||||||
Cost of sales per segmental information(2) | 307 | 453 | 169 | 2 | 931 | — | 372 | 3,541 | 104 | 349 | 827 | 3,437 | |
By-product revenue | (93) | (2) | — | — | (95) | — | (2) | (102) | — | (2) | (95) | (102) | |
Realised other commodity contracts | — | — | — | — | — | — | — | 7 | — | — | — | 7 | |
Amortisation of tangible, intangible and right of use assets | (39) | (88) | (43) | — | (170) | — | (99) | (658) | (6) | (82) | (164) | (652) | |
Adjusted for decommissioning and inventory amortisation | 1 | (3) | — | — | (2) | (1) | 1 | (5) | — | (3) | (2) | (5) | |
Corporate administration, marketing and related expenses | — | — | — | — | — | 2 | — | 94 | — | — | — | 94 | |
Lease payment sustaining | — | 33 | 8 | (1) | 40 | 1 | 2 | 100 | 7 | 26 | 33 | 93 | |
Sustaining exploration and study costs | 6 | 1 | — | 1 | 8 | 2 | — | 32 | — | 1 | 8 | 32 | |
Total sustaining capital expenditure | 75 | 122 | 55 | — | 252 | 11 | 52 | 842 | 19 | 103 | 233 | 823 | |
All-in sustaining costs(4) | 257 | 516 | 189 | 2 | 964 | 15 | 326 | 3,851 | 124 | 392 | 840 | 3,727 | |
Gold sold - oz (000) | 163 | 285 | 86 | — | 534 | — | 343 | 2,324 | 43 | 242 | 491 | 2,281 | |
All-in sustaining costs per ounce - $/oz(1) | 1,581 | 1,807 | 2,198 | — | 1,805 | — | 951 | 1,657 | 2,894 | 1,615 | 1,710 | 1,634 | |
(1) In addition to the operational performances of the mines, “all-in sustaining costs per ounce” and “total cash costs per ounce” are affected by fluctuations in the foreign currency exchange rate. AngloGold Ashanti reports “all-in sustaining costs per ounce” calculated to the nearest US dollar amount and gold sold in ounces. AngloGold Ashanti reports “total cash costs per ounce” calculated to the nearest US dollar amount and gold produced in ounces. “All-in sustaining costs per ounce” and “total cash costs per ounce” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(2) Refer to “Item 18: Financial Statements—Note 2—Segmental information”. | ||||||||||||||
(3) Corporate includes non-gold producing managed operations. | ||||||||||||||
(4) “Total cash costs” and “all-in sustaining costs” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(5) Adjusted to exclude the Córrego do Sítio (CdS) operation which was placed on care and maintenance in August 2023. | ||||||||||||||
For the year ended 31 December 2023 | |||||||||||||
(in US dollar million, except as otherwise noted) | |||||||||||||
AFRICA | AUSTRALIA | ||||||||||||
Corporate and other(3) | Kibali | Non-managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
Total cash costs | |||||||||||||
Cost of sales per segmental information(2) | 4 | 372 | 372 | 387 | 313 | 473 | 566 | — | 1,739 | 399 | 438 | 30 | 867 |
- By-product revenue | — | (2) | (2) | — | (1) | — | (2) | — | (3) | (1) | (3) | — | (4) |
- Inventory change | — | 2 | 2 | (2) | 4 | 1 | 5 | (1) | 7 | (6) | 14 | — | 8 |
- Amortisation of tangible assets | (3) | (98) | (98) | (126) | (61) | (39) | (68) | — | (294) | (43) | (97) | — | (140) |
- Amortisation of right of use assets | (1) | (1) | (1) | (3) | — | — | (23) | — | (26) | (15) | (7) | (1) | (23) |
- Amortisation of intangible assets | (1) | — | — | — | — | — | — | — | — | — | — | — | — |
- Environmental rehabilitation and other non-cash costs | 1 | 2 | 2 | (3) | (6) | (6) | (1) | — | (16) | (1) | (2) | (1) | (4) |
- Retrenchment costs | — | — | — | — | — | — | — | — | — | — | — | — | — |
Total cash costs (4) | — | 275 | 275 | 253 | 249 | 429 | 477 | (1) | 1,407 | 333 | 343 | 28 | 704 |
Gold produced - oz (000) | — | 343 | 343 | 268 | 224 | 260 | 485 | — | 1,237 | 252 | 310 | — | 562 |
Total cash costs per ounce - $/oz(1) | 802 | 802 | 943 | 1,114 | 1,650 | 984 | — | 1,138 | 1,318 | 1,105 | — | 1,251 | |
AMERICAS | Adjusted to exclude the Córrego do Sítio operation (5) | ||||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non-managed joint ventures | Managed operations | Córrego do Sítio | AngloGold Ashanti Mineração | Americas | Managed operations | ||
Total cash costs | |||||||||||||
Cost of sales per segmental information(2) | 307 | 453 | 169 | 2 | 931 | — | 372 | 3,541 | 104 | 349 | 827 | 3,437 | |
- By-product revenue | (93) | (2) | — | — | (95) | — | (2) | (102) | — | (2) | (95) | (102) | |
- Inventory change | (2) | (2) | — | 1 | (3) | — | 2 | 12 | (2) | — | (1) | 14 | |
- Amortisation of tangible assets | (39) | (66) | (37) | — | (142) | — | (98) | (579) | (3) | (63) | (139) | (576) | |
- Amortisation of right of use assets | — | (22) | (6) | — | (28) | — | (1) | (78) | (3) | (19) | (25) | (75) | |
- Amortisation of intangible assets | — | — | — | — | — | — | — | (1) | — | — | — | (1) | |
- Environmental rehabilitation and other non-cash costs | (1) | (4) | 3 | (1) | (3) | — | 2 | (22) | (3) | (1) | — | (19) | |
- Retrenchment costs | — | (2) | (1) | (1) | (4) | — | — | (4) | — | (2) | (4) | (4) | |
Total cash costs (4) | 172 | 355 | 128 | 1 | 656 | — | 275 | 2,767 | 93 | 262 | 563 | 2,674 | |
Gold produced - oz (000) | 164 | 294 | 86 | — | 544 | — | 343 | 2,343 | 42 | 252 | 502 | 2,301 | |
Total cash costs per ounce - $/oz(1) | 1,045 | 1,210 | 1,498 | — | 1,207 | — | 802 | 1,181 | 2,217 | 1,041 | 1,122 | 1,162 | |
(1) In addition to the operational performances of the mines, “all-in sustaining costs per ounce” and “total cash costs per ounce” are affected by fluctuations in the foreign currency exchange rate. AngloGold Ashanti reports “all-in sustaining costs per ounce” calculated to the nearest US dollar amount and gold sold in ounces. AngloGold Ashanti reports “total cash costs per ounce” calculated to the nearest US dollar amount and gold produced in ounces. “All-in sustaining costs per ounce” and “total cash costs per ounce” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(2) Refer to “Item 18: Financial Statements—Note 2—Segmental information”. | ||||||||||||||
(3) Corporate includes non-gold producing managed operations. | ||||||||||||||
(4) “Total cash costs” and “all-in sustaining costs” may not be calculated based on amounts presented in this table due to rounding. | ||||||||||||||
(5) Adjusted to exclude the Córrego do Sítio (CdS) operation which was placed on care and maintenance in August 2023. | ||||||||||||||
Note B — Average gold price received per ounce reconciliation | ||||
Year ended 31 December | ||||||
(in US dollar million, except as otherwise noted) | 2025 | 2024 | 2023 | |||
Managed Operations | Non-Managed Joint Ventures | Managed Operations | Non-Managed Joint Ventures | Managed Operations | Non-Managed Joint Ventures | |
Gold income | 9,730 | 1,038 | 5,673 | 741 | 4,480 | 668 |
Adjustment for CdS gold income (1) | — | — | — | — | (84) | — |
9,730 | 1,038 | 5,673 | 741 | 4,396 | 668 | |
Gold sold - oz (000) (1) | 2,807 | 298 | 2,370 | 309 | 2,281 | 343 |
Average gold price received per ounce ($/oz) | 3,466 | 3,483 | 2,393 | 2,401 | 1,927 | 1,948 |
Note C — Sustaining capital expenditure and non-sustaining capital expenditure reconciliation | ||||
For the year ended 31 December 2025 | ||||||||||||||
(in US dollar million, except as otherwise noted) | ||||||||||||||
AFRICA | AUSTRALIA | |||||||||||||
Corporate and other | Kibali | Non-managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Sukari | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
Sustaining capital expenditure | 2 | 71 | 71 | 101 | 174 | 85 | 218 | 145 | — | 723 | 87 | 35 | — | 122 |
Non-sustaining capital expenditure | — | 80 | 80 | 72 | 35 | 17 | 20 | 117 | — | 261 | — | 63 | — | 63 |
Capital expenditure | 2 | 151 | 151 | 173 | 209 | 102 | 238 | 262 | — | 984 | 87 | 98 | — | 185 |
AMERICAS | Adjusted to exclude Sukari (1) | ||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non-managed joint operations | Managed operations | Managed operations Africa | Managed operations | ||
Sustaining capital expenditure | 64 | 119 | 37 | — | 220 | 3 | 71 | 1,070 | 578 | 925 | |
Non-sustaining capital expenditure | — | 16 | — | — | 16 | 39 | 80 | 379 | 144 | 262 | |
Capital expenditure | 64 | 135 | 37 | — | 236 | 42 | 151 | 1,449 | 722 | 1,187 | |
For the year ended 31 December 2024 | ||||||||||||||
(in US dollar million, except as otherwise noted) | ||||||||||||||
AFRICA | AUSTRALIA | |||||||||||||
Corporate and other | Kibali | Non-managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Sukari | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
Sustaining capital expenditure | 1 | 68 | 68 | 108 | 145 | 93 | 181 | 20 | — | 547 | 65 | 37 | — | 102 |
Non-sustaining capital expenditure | — | 57 | 57 | 61 | 57 | 9 | 15 | — | — | 142 | — | 51 | — | 51 |
Capital expenditure | 1 | 125 | 125 | 169 | 202 | 102 | 196 | 20 | — | 689 | 65 | 88 | — | 153 |
AMERICAS | Adjusted to exclude Sukari (1) | ||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non-managed joint Ventures | Managed operations | Managed operations Africa | Managed operations | ||
Sustaining capital expenditure | 71 | 98 | 40 | — | 209 | 5 | 68 | 864 | 527 | 844 | |
Non-sustaining capital expenditure | — | — | — | — | — | 33 | 57 | 226 | 142 | 226 | |
Capital expenditure | 71 | 98 | 40 | — | 209 | 38 | 125 | 1,090 | 669 | 1,070 | |
For the year ended 31 December 2023 | |||||||||||||
(in US dollar million, except as otherwise noted) | |||||||||||||
AFRICA | AUSTRALIA | ||||||||||||
Corporate and other | Kibali | Non-managed joint ventures | Iduapriem | Obuasi | Siguiri | Geita | Africa other | Managed operations | Sunrise Dam | Tropicana | Australia other | Australia | |
Sustaining capital expenditure | 1 | 52 | 52 | 96 | 148 | 74 | 162 | — | 480 | 47 | 50 | 1 | 98 |
Non-sustaining capital expenditure | — | 33 | 33 | 46 | 66 | 4 | 29 | — | 145 | — | 37 | — | 37 |
Capital expenditure | 1 | 85 | 85 | 142 | 214 | 78 | 191 | — | 625 | 47 | 87 | 1 | 135 |
AMERICAS | Adjusted to exclude the Córrego do Sítio operation (1) | ||||||||||||
Cerro Vanguardia | AngloGold Ashanti Mineração | Serra Grande | Americas other | Americas | Projects | Non-managed joint ventures | Managed operations | Córrego do Sítio | AngloGold Ashanti Mineração | Americas | Managed operations | ||
Sustaining capital expenditure | 75 | 122 | 55 | — | 252 | 11 | 52 | 842 | 19 | 103 | 233 | 823 | |
Non-sustaining capital expenditure | — | 2 | — | — | 2 | 16 | 33 | 200 | 2 | — | — | 198 | |
Capital expenditure | 75 | 124 | 55 | — | 254 | 27 | 85 | 1,042 | 21 | 103 | 233 | 1,021 | |
$ (million) | |
Total borrowings | 2,044 |
Less: Short-term maturities (current borrowings) | 19 |
Total non-current borrowings | 2,025 |
$ (million) | |
Within one year | 19 |
Between one and two years | — |
Between two and five years | 1,732 |
After five years | 293 |
Total | 2,044 |
$ (million) | |
2022 Multi-currency RCF | 1,400 |
2025 Geita RCF | 5 |
2025 Siguiri RCF | 65 |
Total undrawn facilities | 1,470 |
$ (million) | |
Non-current | 155 |
Current | 59 |
Total | 214 |
Obligor Group (1) | |
$ (million) | Year ended 31 December 2025 |
Net intergroup dividends, interest, royalties and fees with Non-Obligor Subsidiaries | 4 |
Loss for the period | (213) |
Obligor Group | |
$ (million) | As at 31 December 2025 |
ASSETS | |
Current assets | |
Receivables due from Non-Obligor Subsidiaries | 1,715 |
Receivables due from other related parties | 133 |
Other current assets | 1,707 |
3,555 | |
Non-current assets | |
Receivables due from other related parties | 200 |
Other non-current assets | 17 |
217 | |
LIABILITIES | |
Current liabilities | |
Payables due to Non-Obligor Subsidiaries | 623 |
Other current liabilities | 25 |
648 | |
Non-current liabilities | 1,732 |
Expiration per period | |||||||||
Commitment | Total amount | Less than 1 year | 1 – 3 years | 4 – 5 years | Over 5 years | ||||
(in millions) | $ | $ | $ | $ | $ | ||||
Capital expenditure (contracted and not yet contracted) (1) | 1,189 | 927 | 262 | — | — | ||||
Total | Less than 1 year | 1 – 3 years | 4 – 5 years | More than 5 years | |||||
(in millions) | $ | $ | $ | $ | $ | ||||
Long-term debt obligations including interest(1) | 2,614 | 108 | 1,229 | 792 | 485 | ||||
Purchase obligations: | |||||||||
- Contracted capital expenditure(2) | 378 | 368 | 10 | — | — | ||||
- Other purchase obligations(3) | 1,686 | 741 | 858 | 86 | 1 | ||||
Environmental rehabilitation costs(4) | 1,141 | 114 | 220 | 98 | 709 | ||||
Other(5) | 355 | 85 | 130 | 61 | 79 | ||||
Total | 6,174 | 1,416 | 2,447 | 1,037 | 1,274 |
Name | Age | Position | Year first appointed (1)(2) | |||
Jochen Tilk(3) | 62 | Independent non-executive director and Chair | 2019 | |||
Alan Ferguson (4) | 68 | Lead Independent Director | 2018 | |||
Kojo Busia | 63 | Independent non-executive director | 2020 | |||
Bruce Cleaver | 60 | Independent non-executive director | 2024 | |||
Albert Garner | 70 | Independent non-executive director | 2015 | |||
Jinhee Magie | 58 | Independent non-executive director | 2023 | |||
Nicky Newton-King | 59 | Independent non-executive director | 2024 | |||
Marcus Randolph | 70 | Independent non-executive director | 2025 | |||
Diana Sands | 60 | Independent non-executive director | 2023 | |||
Alberto Calderon | 66 | Executive director and Chief Executive Officer | 2021 | |||
Gillian Doran | 49 | Executive director and Chief Financial Officer | 2023 |
Jochen Tilk (62) | Board Committee Membership: | |
BSc and MSc in Mining Engineering | Nominations and Governance Committee (Chair) | |
Independent non-executive director and Chair | ||
Appointed to AngloGold Ashanti Board: 1 January 2019 | ||
Alan Ferguson (68) | Board Committee Membership: | |
BSc, CA (Scotland) | Audit and Risk Committee | |
Lead Independent Director | Compensation and Human Resources Committee | |
Appointed to AngloGold Ashanti Board: 1 October 2018 | Nominations and Governance Committee | |
Kojo Busia (63) | Board Committee Membership: | |
PhD, MA, BA | Audit and Risk Committee | |
Independent non-executive director | Social, Ethics and Sustainability Committee | |
Appointed to AngloGold Ashanti Board: 1 August 2020 | ||
Bruce Cleaver (60) | Board Committee Membership: | |
BSc, LLB, LLM | Audit and Risk Committee | |
Independent non-executive director | Social, Ethics and Sustainability Committee (Chair) | |
Appointed to AngloGold Ashanti Board: 22 July 2024 | ||
Albert Garner (70) | Board Committee Membership: | |
BSE | Audit and Risk Committee | |
Independent non-executive director | Compensation and Human Resources Committee (Chair) | |
Appointed to AngloGold Ashanti Board: 1 January 2015 | Nominations and Governance Committee | |
Jinhee Magie (58) | Board Committee Membership: | |
CPA, CA (Ontario, Canada), BCom | Audit and Risk Committee | |
Independent non-executive director | Social, Ethics and Sustainability Committee | |
Appointed to AngloGold Ashanti Board: 1 June 2023 | ||
Nicky Newton-King (59) | Board Committee Membership: | |
BA, LLB, LLM, LLD (hc) | Compensation and Human Resources Committee | |
Independent non-executive director | Social, Ethics and Sustainability Committee | |
Appointed to AngloGold Ashanti Board: 22 July 2024 | ||
Marcus Randolph (70) | Board Committee Membership: | |
BSc in Mining Engineering, MBA | Compensation and Human Resources Committee | |
Independent non-executive director | Social, Ethics and Sustainability Committee | |
Appointed to AngloGold Ashanti Board: 27 October 2025 | ||
Diana Sands (60) | Board Committee Membership: | |
CPA, BBA, MBA | Audit and Risk Committee (Chair) | |
Independent non-executive director | Compensation and Human Resources Committee | |
Appointed to AngloGold Ashanti Board: 1 June 2023 | Nominations and Governance Committee | |
Alberto Calderon (66) | Board Committee Membership: | |
PhD, MPhil, MA, Juris Doctor, BA | None | |
Chief Executive Officer and executive director | ||
Appointed to AngloGold Ashanti Board: 1 September 2021 | ||
Gillian Doran (49) | Board Committee Membership: | |
FCCA | None | |
Chief Financial Officer and executive director | ||
Appointed to AngloGold Ashanti Board: 1 January 2023 | ||
Board Committee | Membership |
Audit and Risk Committee | Kojo Busia Bruce Cleaver Alan Ferguson(1) Albert Garner Jinhee Magie Diana Sands (Chair)(1) |
Compensation and Human Resources Committee | Alan Ferguson Albert Garner (Chair) Nicky Newton-King Marcus Randolph Diana Sands |
Nominations and Governance Committee | Alan Ferguson Albert Garner Diana Sands Jochen Tilk (Chair) |
Social, Ethics and Sustainability Committee | Kojo Busia Bruce Cleaver (Chair) Jinhee Magie Nicky Newton-King Marcus Randolph |
Director Name | Year | Salary | Benefits (1) | Pension | Total fixed pay | Annual Cash Bonus | Transition Award (1/3 Cash portion) | Transition Award (2/3 Share Award) | Total Variable Pay (2) | Total |
USD | ||||||||||
Alberto Calderon | 2025 | 1,722,902 | 134,581 | 426,418 | 2,283,901 | 1,830,583 | 387,653 | 775,306 | 2,993,542 | 5,277,443 |
2024 | 1,689,120 | 121,861 | 418,057 | 2,229,038 | 1,579,327 | 267,937 | 535,873 | 2,383,137 | 4,612,175 | |
Gillian Doran | 2025 | 752,812 | 93,471 | 152,605 | 998,888 | 743,778 | 158,091 | 316,181 | 1,218,050 | 2,216,938 |
2024 | 627,343 | 143,852 | 99,855 | 871,050 | 500,620 | 92,878 | 185,756 | 779,254 | 1,650,304 | |
Director’s fees (1) | Committee fees (2) | Travel allowance | Total | Director’s fees (1) | Committee fees (2) | Travel allowance | Total | |
2025 (USD) | 2024 (USD) | |||||||
Jochen Tilk (Chair) | 295,800 | 32,500 | 20,000 | 348,300 | 225,000 | 58,800 | 25,000 | 308,800 |
Kojo Busia | 122,400 | 40,000 | 23,800 | 186,200 | 122,400 | 57,500 | 27,500 | 207,400 |
Bruce Cleaver | 122,400 | 52,500 | 11,300 | 186,200 | 54,300 | 17,800 | — | 72,100 |
Alan Ferguson(3) | 146,700 | 69,600 | 11,300 | 227,600 | 122,400 | 85,500 | 5,000 | 212,900 |
Albert Garner | 122,400 | 78,500 | 17,500 | 218,400 | 122,400 | 64,400 | 22,500 | 209,300 |
Rhidwaan Gasant (4) | 66,400 | 36,000 | 10,000 | 112,400 | 163,200 | 87,000 | 28,800 | 279,000 |
Jinhee Magie | 122,400 | 40,000 | 23,800 | 186,200 | 122,400 | 25,000 | 27,500 | 174,900 |
Nicky Newton-King | 122,400 | 43,500 | 17,500 | 183,400 | 54,300 | 17,800 | 11,300 | 83,400 |
Marcus Randolph (5) | 22,000 | 7,200 | 6,300 | 35,500 | — | — | — | — |
Diana Sands(6) | 122,400 | 72,400 | 22,500 | 217,300 | 122,400 | 43,500 | 21,300 | 187,200 |
Total | 1,265,300 | 472,200 | 164,000 | 1,901,500 | 1,108,800 | 457,300 | 168,900 | 1,735,000 |
Notes: | ||||||
(1) Includes the annual base fee paid to the non-executive directors as well as the fees paid for special Board meetings. | ||||||
(2) Includes the fee paid to the individual for their committee membership and committee Chair role, where applicable, as well as fees paid for special committee meetings. In 2025 this included an additional CompCo meeting in February 2025. | ||||||
(3) Alan Ferguson stepped down as Chair of the Audit and Risk Committee on 27 May 2025 and became Lead Independent Director on the same date. | ||||||
(4) Rhidwaan Gasant retired from the Board on 27 May 2025. | ||||||
(5) Marcus Randolph was appointed to the Board on 27 October 2025. | ||||||
(6) Diana Sands became Chair of the Audit and Risk Committee on 27 May 2025. | ||||||
USD | |
Board meetings | |
Chair allowance | 295,800 |
Lead Independent Director allowance | 163,200 |
Non-executive director allowance | 122,400 |
Additional Chair allowance per special Board meeting (1) | 13,000 |
Additional non-executive director allowance per special Board meeting (1) | 3,500 |
Committee meetings | |
Chair of the Audit and Risk Committee | 35,000 |
Members of the Audit and Risk Committee | 20,000 |
Chair of the Compensation and Human Resources Committee | 35,000 |
Members of the Compensation and Human Resources Committee | 20,000 |
Chair of the Social, Ethics and Sustainability Committee | 32,500 |
Members of the Social, Ethics and Sustainability Committee | 20,000 |
Chair of the Nominations and Governance Committee | 32,500 |
Members of the Nominations and Governance Committee | 20,000 |
Additional fee per meeting for ad hoc committee meetings | 3,500 |
Travel allowance for overnight away (2) | 1,250 |
Executive Committee member | Notice Period | Change of Control |
Chief Executive Officer | 12 months | 18 months |
Chief Financial Officer | 6 months | 12 months |
Other executive management team members | 6 months | 12 months |
Board | Audit and Risk | Compensation and Human Resources | Nominations and Governance | Social, Ethics and Sustainability | |
Number of meetings of AngloGold Ashanti in 2025 | 11 | 6 | 7 | 6 | 6 |
Jochen Tilk | 11/11 | n/a | n/a | 6/6 | n/a |
Kojo Busia | 11/11 | 6/6 | n/a | n/a | 6/6 |
Alberto Calderon | 11/11 | n/a | n/a | n/a | n/a |
Bruce Cleaver | 11/11 | 6/6 | n/a | n/a | 6/6 |
Gillian Doran(1) | 10/11 | n/a | n/a | n/a | n/a |
Alan Ferguson | 11/11 | 6/6 | 7/7 | 6/6 | n/a |
Albert Garner | 11/11 | 6/6 | 7/7 | 6/6 | n/a |
Rhidwaan Gasant (2) | 5/5 | 3/3 | 3/3 | 2/2 | 2/2 |
Jinhee Magie | 11/11 | 6/6 | n/a | n/a | 6/6 |
Nicky Newton-King | 11/11 | n/a | 7/7 | n/a | 6/6 |
Marcus Randolph(3) | 2/2 | n/a | 2/2 | n/a | 1/1 |
Diana Sands(4) | 10/11 | 5/6 | 7/7 | 6/6 | n/a |
Audit and Risk Committee | Kojo Busia (Independent NED) |
Bruce Cleaver (Independent NED) | |
Alan Ferguson (Independent NED) (1) | |
Albert Garner (Independent NED) | |
Jinhee Magie (Independent NED) | |
Diana Sands (Chair and Independent NED) (1) | |
Other individuals who regularly attended meetings (attended by invitation or if needed to contribute pertinent insights and information) | Jochen Tilk (Chair of the Board and Independent NED) |
Alberto Calderon (CEO) | |
Gillian Doran (CFO) | |
Jimmy Gwisai (SVP: Group Controller) | |
Lizelle Marwick (Chief Legal Officer) | |
Natesan Mahasenan (SVP: Group Internal Audit & Risk | |
Gelishan Naidoo (VP: Group Tax) | |
Pieter Botha (VP: SOX Compliance) | |
Thomas Croese (VP: Group Risk) | |
Robin Fell (SVP: Digital Technology) | |
Guillermo Erasmus (VP: Group Compliance) | |
Catherine Stead (VP: Company Secretary) | |
Kevin McGhee and Johan Potgieter representing external auditors PricewaterhouseCoopers LLP |
CompCo | Alan Ferguson (Independent NED) |
Albert Garner (Chair and Independent NED) | |
Nicky Newton-King (Independent NED) | |
Marcus Randolph (Independent NED) | |
Diana Sands (Independent NED) | |
Other individuals who regularly attended meetings (attended by invitation or if needed to contribute pertinent insights and information) | Alberto Calderon (CEO) |
Gillian Doran (CFO) | |
Lisa Ali (Chief People Officer) | |
Ali Sidat representing Deloitte LLP (Independent adviser to the CompCo) | |
Catherine Stead (VP: Company Secretary) | |
Elizabeth Martinez (VP: Performance and Reward) |
2025 (1) | 2024 | 2023 | |||
Africa (2) (3) | 28,084 | 27,930 | 21,734 | ||
Australia | 1,787 | 1,777 | 1,741 | ||
Americas | 10,250 | 8,509 | 8,565 | ||
Other, including corporate and non-gold producing subsidiaries | 1,295 | 1,268 | 1,618 | ||
Total (2) (3) | 41,416 | 39,484 | 33,658 |
Country | Employees covered by collective bargaining arrangements |
Argentina | 91% |
Brazil | 99% |
Ghana | 86% |
Guinea | 94% |
Tanzania | 85% |
Role | Within six years of appointment/from introduction of MSR | Holding requirement | Post-termination holding |
CEO | 300% of net annual base salary | Throughout employment as a director or an executive officer | The post-termination MSR will be based on the MSR policy at the time of termination. Should the executive depart (or no longer serve as a director or executive management team member before they have achieved the MSR), all vested shares allocated from the Company’s share incentive scheme will be held for one year post-termination. The holding will be up to their required MSR. |
CFO | 250% of net annual base salary | ||
Executive management team | 200% of net annual base salary | ||
The following count towards an individual MSR: •Ordinary shares purchased on the market, either directly or indirectly •Vested share awards from AngloGold Ashanti’s share incentive schemes •Previously granted DSP and transition awards (vested and unvested). Unvested awards that are not subject to further performance conditions are included on a post-tax basis | |||
Executive | Ordinary shares owned as at 31 December 2025 | Share awards exercised during the year(1) | Vested and unexercised share awards as at 31 December 2025 | Unvested share awards as at 31 December 2025(1) | Six-year target achievement date | Holding as at 31 December 2025 as a percentage of annual base pay(2) | Unvested PSP awards as at 31 December 2025(3) |
Executive directors | |||||||
Alberto Calderon | 55,764 | 80,296 | — | 283,085 | September-2027 | 2,942% | 253,965 |
Gillian Doran | 4,416 | 22,325 | — | 46,855 | January-2029 | 939% | 89,738 |
Other Members of executive management | |||||||
Lisa Ali | 24,790 | 21,066 | — | 80,471 | April-2028 | 2,082% | 81,769 |
Stewart Bailey | 8,982 | 60,933 | 51,176 | 85,931 | January-2025 | 3,749% | 61,815 |
Terry Briggs | 42,032 | 25,514 | — | 52,435 | April-2028 | 2,972% | 61,922 |
Marcelo Godoy | 76,596 | 25,745 | — | 92,722 | October-2027 | 3,532% | 82,960 |
Lizelle Marwick | 14,375 | 30,040 | — | 82,595 | July-2026 | 2,302% | 62,787 |
Marcelo Pereira(4) | — | 2,985 | — | 12,628 | June-2031 | 312% | 14,442 |
Director Name | Shares held (Ordinary shares) | Minimum shareholding requirement | ||
31 December 2025 | 31 December 2024 | Four-year target achievement date | Percentage of MSR target achieved as at 31 December 2025 (3) | |
Jochen Tilk (Chair) | 2,800 | 2,800 | May-2028 | 54% |
Kojo Busia | 4,000 | 4,000 | February-2028 | 186% |
Bruce Cleaver | — | — | July-2028 | — |
Alan Ferguson (Lead Independent Director) | 5,000 | 5,000 | May-2029 | 174% |
Albert Garner | 30,000 | 30,000 | February-2028 | 1,393% |
Rhidwaan Gasant (1) | — | — | — | — |
Jinhee Magie | 5,000 | 5,000 | February-2028 | 232% |
Nicky Newton-King | — | — | July-2028 | — |
Marcus Randolph (2) | — | — | October-2029 | — |
Diana Sands | 3,000 | 3,000 | February-2028 | 139% |
Annual Cash Bonus (STI) | Performance Share Plan (PSP) | Total Incentive | |
Level | On-Target Achievement | ||
Chief Executive Officer | 100% | 200% | 300% |
Chief Financial Officer | 90% | 180% | 270% |
Executive management team | 85% | 165% | 250% |
Theme | Measures | Target Weighting (%) | Threshold measures (50% of target) | Target measures (100% of target) | Stretch measures (150% of target) | 2025 Performance (2) | 2025 Achievement |
Financial performance | Free cash flow (pre-growth capital)(1) Performance versus budgeted FCF (excluding growth capital), 50% flexed : 50% unflexed | 10.0% | $1,355m (Unflexed) $2,277m (Flexed) | $1,815m (Unflexed) $2,737m (Flexed) | $2,276m (Unflexed) $3,198m (Flexed) | $3,020m | 13.9% |
Drive operational excellence, optimise costs and capital expenditure | Total cash cost | 15.0% | $1,309/oz | $1,241/oz | $1,173/oz | $1,248/oz(4) | 14.2% |
All-in sustaining cost | 15.0% | $1,856/oz | $1,756/oz | $1,656/oz | $1,745/oz | 15.8% | |
Improve portfolio quality | Production | 25.0% | 2,518koz | 2,701koz | 2,884koz | 2,797koz | 31.6% |
Maintain long-term optionality | Mineral Reserve additions (pre-depletion, asset sales, mergers, and acquisitions) | 7.5% | Plus 1.3Moz | Plus 2.6Moz | Plus 3.8Moz | 9.0Moz | 11.3% |
Mineral Resource additions (pre-depletion, asset sales, mergers, and acquisitions) | 7.5% | Plus 2.6Moz | Plus 5.1Moz | Plus 6.4Moz | 6.5Moz | 11.3% | |
Prioritise people and ESG | People: Gender diversity (female representation) Succession planning outcomes | 5.0% | 20% 40% | 22% 50% | 25% 80% | 21% 67% | 1.8% 3.2% |
Health and safety (one leading indicator applicable to both Health and Safety): Major hazard control verification compliance All supervisors and managers conduct critical control verifications on Health and Safety | 5.0% | 90% | 95% | 100% | 121% | 7.5% | |
Total recordable injury frequency rate (TRIFR) | 5.0% | 1.27 (0% Improvement) | 1.21 (5% Improve ment) | 1.17 (7.5% Improvement) | 0.97 | 7.5% | |
Community – % of community grievances cleared in 45 days. | 5.0% | 60% of grievances closed out/ cleared within 45 days | 70% of grievances closed out/ cleared within 45 days | 100% of grievances closed out/ cleared within 45 days | 89% | 3.3% | |
Environment – Operating assets to implement the water stewardship goals as approved by the Water Stewardship Committee.(3) | 40% attainment of 2025 milestones | 75% attainment of 2025 milestones | 100% attainment of 2025 milestones | 97% | 3.6% |
Performance Metrics | Threshold measures | Target measures | Stretch measures | Performance (%) | Achievement (%) |
Relative TSR | Median TSR of comparators | Halfway between median and upper quartile | Upper quartile TSR of comparators | 357.7 | 150.0 |
Scorecard | Comments |
Production, financial performance and growth Achievement against budget production ounces, total cash cost, AISC and free cash flow. Growth pipeline Continue to drive the Full Asset Potential (FAP) programme across the business to deliver both productivity and cost benefits for the year. Develop, optimise and grow the portfolio both organically and inorganically to create greater optionality for the business. Ensure a pipeline of projects that enhance cost, margin and cash generation profile and the longevity of the portfolio. Portfolio management assessed based on number of objective milestone targets met within the period. Key focus areas: •Complete the Obuasi project and ramp up production •Support the Nevada projects through the major developmental stages | Measured against gold production, total cash cost, all-in sustaining cost and free cash flow performance. Coordinated the successful implementation and delivery of FAP targets across several operations, in addition to completing a successful FAP review at Sukari with implementation to take place over the next 24 months. Undertook several business development assessments during 2025 and successfully consolidated the Nevada district. MSG and Doropo/ABC divested during 2025. Brownfields Exploration Plans tailored to meet current strategic and operational needs. The year-end production in Obuasi was 266koz vs. 280koz (P50) and 250koz (P80) and 2024 production of 221koz. Achieved objective of 65% engineering completion for North Bullfrog and approval for next stage to reach 85%. North Bullfrog remains on track for a Record of Decision (ROD) in December 2026. Arthur Gold Project: completion of pre-feasibility study phase A and delivery of 4.94Moz of first-time Mineral Reserve. The mine plan of operations for Arthur Gold Project was accelerated moving the ROD from 2032 to 2028. A significant step change for the advancement of the project with substantial value creation. |
Environmental, social and corporate governance (ESG) Health and safety Continued focus on delivering zero fatalities. Driving a proactive safety culture and implementing leading health and safety initiatives with global standardisation. Environment and community Ensuring a clear strategy and fit-for-purpose functions to address stakeholder expectations with a focus on community and government relations and operational, environmental and social priorities. Implementation of water stewardship goals and driving the strategic direction of the Decarbonisation Strategy to reduce emissions by 30% by 2030. | Health and safety TRIFR improved by a further 1% to 0.97 (from 0.98) at managed operations, while Lost Time Injury Frequency Rate (LTIFR) improved by 8% to 0.45 (from 0.49). We have achieved this while successfully integrating Centamin into our business and addressing several operational challenges that have arisen. Potential fatal incidents (PFIs) reduced significantly, improving by 16 cases year-on-year to 45 (from 61), including a reduction in repeat PFIs (from 23 to 19). Environment and community We have continued to strengthen our relationships with host communities and this has been demonstrated during the various political, social and civic challenges in African jurisdictions. From a security perspective, in times of significantly heightened risk we were able to maintain a good relationship with our key stakeholders in the government and security agencies, all while navigating these difficult situations. Focus on environmental performance has remained strong. The discipline is well advanced on the Decarbonisation Strategy with significant progress being made on the water stewardship goals. |
Other strategic priorities Expand the shareholder base in the US and continue to embed AngloGold Ashanti into the US markets. Reputation management across all jurisdictions. Finalisation of the operating model to realise the efficiencies and effectiveness of the revised organisational structures. Ensure the integration of Sukari is implemented according to the plan. Complete the 2025 global culture assessment to measure progress and identify opportunities. Deliver on the people pipeline with focus on executive team succession, critical skills and leadership training. | AngloGold Ashanti’s share price has outperformed its major peers, the GDX, the gold price, and the S&P 500. We have grown our sell-side coverage by almost a third through a deliberate campaign. New, important US names continued to appear in the register or grow their holdings, with South African funds maintaining their holdings. A rejuvenated Asia and Europe campaign started to bear fruit. Completed the implementation of the operating model in Africa, Latin America and Australia, which included significant finance transformation. We have seamlessly integrated Sukari Gold Mines (SGM) in a reasonably short time frame. We have completed the operating model implementation and change management for all functions. AngloGold Ashanti values were embedded and standards applied. 2025 global culture assessment completed with an 88% participation rate globally, up from 80% in 2021. Our 2025 culture score is 87, a strong increase from 73 in 2021. Both results set us apart in the industry. People pipeline — C-suite and top leadership level stability. We have developed a strong internal and external pipeline for the executive team, senior leadership and critical roles. |
CEO: Performance incentive outcome 2025 | |||
2025 Performance outcome | Transition Award outcome | Annual Cash Bonus award outcome | Total Incentive Award for 2025 |
Total % for Company performance | 150.00% | 125.00% | |
x | |||
Weighting: | 100.00% | 80.00% | |
A - Company performance weighted outcome: | 150.00% | 100.00% | |
Individual performance results | 20.00% | ||
Individual performance weighting: | x | ||
Performance rating award correlation: | 125.00% | ||
B - Opportunity based on individual performance: | 25.00% | ||
Total % of Pay opportunity (A+B) | 150.00% | 125.00% | |
x | x | ||
On-target total cash bonus opportunity (as % of base pay) | 15.00% | 85.00% | |
On-target total share award opportunity (as % of base pay) | 30.00% | —% | |
Final cash bonus result (as % of base pay) | 22.50% | 106.25% | |
Final share award result (as % of base pay) | 45.00% | —% | |
x | x | ||
Base pay as at 31 December 2025: | 1,722,902 | 1,722,902 | |
Annual cash bonus: | 387,653 | 1,830,583 | 2,218,236 |
Annual deferred share portion (to vest after three years): | 775,306 | — | 775,306 |
Total Incentive Award for 2025 | 1,162,959 | 1,830,583 | 2,993,542 |
Scorecard | Comments |
Leadership and stakeholder engagement | •Significant impact on the broader business through engagement with peers and regions which resulted in Russell indexation, PSP improvements, strengthening risk management governance, and delivery of all M&A activity and business planning. |
Projects | •Delivered the Centamin integration providing leadership and support to the integration lead and the Sukari Managing Director. •Established the finance shared services structure. |
Liquidity, credit ratings and balance sheet management | •Improved credit rating: Robust engagement with all four key credit rating agencies with a change to positive outlook from S&P in Q4 2025, the first positive move in the last decade. •Supporting and driving the delivery of best-in-class financial performance: ◦Outperformance in free cash flow generation. ◦Strengthened capital discipline in the business – continued evolution of our Management Investment Committee processes, clear embedding of stronger governance in capital and external spend. ◦Delivered largest dividend on record. |
Cost discipline and driving a cash culture | •Progressed the US GAAP transition in line with the implementation timeline. Led the integration of our external reporting and disclosure processes. •Cost leadership programme ready for implementation in 2026. •Supply chain team integration: Alignment with Finance and Procurement frameworks, fully operational total cost of ownership spend system, of record implementation. |
Governance and risk management | •Redesigned Group Internal Audit and Group Risk: reviewed and reframed the top 10 risks, with significant improvement in the integration of key risks and management plans from the Board to the asset. |
People | •Further transformed Finance and Supply Chain into a world-class fit-for-purpose service delivery function. |
CFO: Performance incentive outcome 2025 | |||
2025 Performance outcome | Transition Award outcome | Annual Cash Bonus award outcome | Total Incentive Award for 2025 |
Total % for Company performance | 150.00% | 125.00% | |
x | |||
Weighting: | 100.00% | 80.00% | |
A - Company performance weighted outcome: | 150.00% | 100.00% | |
Individual performance results | 20.00% | ||
Individual performance weighting: | x | ||
Performance rating award correlation: | 150.00% | ||
B - Opportunity based on individual performance: | 30.00% | ||
Total % of Pay opportunity (A+B) | 150.00% | 130.00% | |
x | x | ||
On-target total cash bonus opportunity (as % of base pay) | 14.00% | 76.00% | |
On-target total share award opportunity (as % of base pay) | 28.00% | —% | |
Final cash bonus result (as % of base pay) | 21.00% | 98.80% | |
Final share award result (as % of base pay) | 42.00% | —% | |
x | x | ||
Base pay as at 31 December 2025: | 752,812 | 752,812 | |
Annual cash bonus: | 158,091 | 743,778 | 901,869 |
Annual deferred share portion (to vest after three years): | 316,181 | — | 316,181 |
Total Incentive Award for 2025 | 474,272 | 743,778 | 1,218,050 |
Number of unvested DSP awards and movement during the reporting period | ||||||||||
DSP awards | Balance at 1 January | Granted | Vested, deemed settled | Forfeited / Lapsed | Balance at 31 December | Fair value of granted awards (1) | Fair value of vested awards (2) | Fair value of unvested awards at 31 December (3) | ||
Executive directors | USD ‘000 | |||||||||
Alberto Calderon | 2025 | 346,514 | — | 80,296 | — | 266,218 | — | 2,531 | 22,703 | |
2024 | 224,933 | 168,231 | 46,650 | — | 346,514 | 2,986 | 842 | 7,998 | ||
Gillian Doran | 2025 | 51,261 | — | 10,252 | — | 41,009 | — | 705 | 3,497 | |
2024 | — | 51,261 | — | — | 51,261 | 910 | — | 1,183 | ||
Total executive directors | 2025 | 397,775 | — | 90,548 | — | 307,227 | — | 3,236 | 26,200 | |
2024 | 224,933 | 219,492 | 46,650 | — | 397,775 | 3,896 | 842 | 9,181 | ||
Executive management | ||||||||||
Lisa Ali | 2025 | 95,602 | — | 21,066 | — | 74,536 | — | 662 | 6,356 | |
2024 | 48,669 | 56,666 | 9,733 | — | 95,602 | 1,006 | 176 | 2,206 | ||
Stewart Bailey | 2025 | 123,209 | — | 41,737 | — | 81,472 | — | 1,316 | 6,948 | |
2024 | 120,388 | 37,132 | 34,311 | — | 123,209 | 659 | 619 | 2,844 | ||
Terry Briggs | 2025 | 61,805 | — | 13,622 | — | 48,183 | — | 874 | 4,109 | |
2024 | 31,540 | 36,573 | 6,308 | — | 61,805 | 649 | 114 | 1,426 | ||
Marcelo Godoy | 2025 | 112,446 | — | 25,745 | — | 86,701 | — | 811 | 7,394 | |
2024 | 69,202 | 57,491 | 14,247 | — | 112,446 | 1,020 | 257 | 2,595 | ||
Richard Jordinson(4) | 2025 | 48,910 | — | 19,027 | — | 29,883 | — | 602 | 2,548 | |
2024 | 51,025 | 26,805 | 28,920 | — | 48,910 | 476 | 562 | 1,129 | ||
Lizelle Marwick | 2025 | 108,265 | — | 30,040 | — | 78,225 | — | 950 | 6,671 | |
2024 | 88,229 | 41,730 | 21,694 | — | 108,265 | 741 | 392 | 2,499 | ||
Marcelo Pereira(5) | 2025 | 8,956 | — | 2,985 | — | 5,971 | — | 93 | 509 | |
2024 | — | — | — | — | — | — | — | — | ||
Total executive management | 2025 | 559,193 | — | 154,222 | — | 404,971 | — | 5,307 | 34,536 | |
2024 | 409,053 | 256,397 | 115,213 | — | 550,237 | 4,551 | 2,120 | 12,699 | ||
Notes: | ||||||||||
(1) The fair value of awards granted during 2024 represents the value of awards calculated using a five business day volume-weighted average share price prior to 26 February 2024. | ||||||||||
(2) The fair value of vested awards represents the value deemed received on the settlement date. | ||||||||||
(3) The fair value of unvested awards is calculated using the closing share price as at 31 December. | ||||||||||
(4) Richard Jordinson retired from the Chief Operating Officer role with effect from 1 June 2025. | ||||||||||
(5) Marcelo Pereira was appointed as Chief Operating Officer with effect from 1 June 2025. | ||||||||||
Number of unvested PSP awards and movement during the reporting period | ||||||||||
PSP awards | Balance at 1 January | Granted | Vested, deemed settled | Forfeited / Lapsed | Balance at 31 December | Fair value of granted awards (1) | Fair value of vested awards (2) | Fair value of unvested awards at 31 December (3) | ||
Executive directors | ||||||||||
Alberto Calderon | 2025 | 161,774 | 92,191 | — | — | 253,965 | 2,929 | — | 21,658 | |
2024 | — | 161,774 | — | — | 161,774 | 2,871 | — | 3,734 | ||
Gillian Doran | 2025 | 53,721 | 36,017 | — | — | 89,738 | 1,144 | — | 7,653 | |
2024 | — | 53,721 | — | — | 53,721 | 954 | — | 1,240 | ||
Total executive directors | 2025 | 215,495 | 128,208 | — | — | 343,703 | 4,073 | — | 29,311 | |
2024 | — | 215,495 | — | — | 215,495 | 3,825 | — | 4,974 | ||
Executive management | ||||||||||
Lisa Ali | 2025 | 52,086 | 29,683 | — | — | 81,769 | 943 | — | 6,973 | |
2024 | — | 52,086 | — | — | 52,086 | 925 | — | 1,202 | ||
Stewart Bailey | 2025 | 37,889 | 23,926 | — | — | 61,815 | 760 | — | 5,272 | |
2024 | — | 37,889 | — | — | 37,889 | 673 | — | 874 | ||
Terry Briggs | 2025 | 37,319 | 24,603 | — | — | 61,922 | 782 | — | 5,281 | |
2024 | — | 37,319 | — | — | 37,319 | 662 | — | 861 | ||
Marcelo Godoy | 2025 | 52,845 | 30,115 | — | — | 82,960 | 957 | — | 7,075 | |
2024 | — | 52,845 | — | — | 52,845 | 938 | — | 1,220 | ||
Richard Jordinson(4) | 2025 | 42,502 | 24,137 | — | — | 66,639 | 767 | — | 5,683 | |
2024 | — | 42,502 | — | — | 42,502 | 754 | — | 981 | ||
Lizelle Marwick | 2025 | 38,357 | 24,430 | — | — | 62,787 | 776 | — | 5,354 | |
2024 | — | 38,357 | — | — | 38,357 | 681 | — | 885 | ||
Marcelo Pereira(5) | 2025 | 14,442 | 5,243 | — | — | 19,685 | 167 | — | 1,679 | |
2024 | — | — | — | — | — | — | — | — | ||
Total executive management | 2025 | 275,440 | 162,137 | — | — | 437,577 | 5,151 | — | 37,317 | |
2024 | — | 260,998 | — | — | 260,998 | 4,633 | — | 6,023 | ||
Notes: | ||||||||||
(1) The fair value of awards granted during 2025 represents the value of awards calculated using a five business day volume-weighted average share price prior to 20 February 2025. The fair value of awards granted during 2024 represents the value of awards calculated using a five business day volume-weighted average share price prior to 26 February 2024. | ||||||||||
(2) The fair value of vested awards represents the value deemed received on the settlement date. | ||||||||||
(3) The fair value of unvested awards is calculated using the closing share price as at 31 December. | ||||||||||
(4) Richard Jordinson retired from the Chief Operating Officer role with effect from 1 June 2025. | ||||||||||
(5) Marcelo Pereira was appointed as Chief Operating Officer with effect from 1 June 2025. | ||||||||||
Number of unvested transition share awards and movement during the reporting period | ||||||||||
Transition Share Awards | Balance at 1 January | Granted | Vested, deemed settled | Forfeited / Lapsed | Balance at 31 December | Fair value of granted awards (1) | Fair value of vested awards (2) | Fair value of unvested awards at 31 December (3) | ||
Executive directors | ||||||||||
Alberto Calderon | 2025 | — | 16,867 | — | — | 16,867 | 536 | — | 1,438 | |
2024 | — | — | — | — | — | — | — | — | ||
Gillian Doran | 2025 | — | 5,846 | — | — | 5,846 | 186 | — | 499 | |
2024 | — | — | — | — | — | — | — | — | ||
Total executive directors | 2025 | — | 22,713 | — | — | 22,713 | 722 | — | 1,937 | |
2024 | — | — | — | — | — | — | — | — | ||
Executive management | ||||||||||
Lisa Ali | 2025 | — | 5,935 | — | — | 5,935 | 189 | — | 506 | |
2024 | — | — | — | — | — | — | — | — | ||
Stewart Bailey | 2025 | — | 4,459 | — | — | 4,459 | 142 | — | 380 | |
2024 | — | — | — | — | — | — | — | — | ||
Terry Briggs | 2025 | — | 4,252 | — | — | 4,252 | 135 | — | 363 | |
2024 | — | — | — | — | — | — | — | — | ||
Marcelo Godoy | 2025 | — | 6,021 | — | — | 6,021 | 191 | — | 513 | |
2024 | — | — | — | — | — | — | — | — | ||
Richard Jordinson(4) | 2025 | — | 4,688 | — | — | 4,688 | 149 | — | 400 | |
2024 | — | — | — | — | — | — | — | — | ||
Lizelle Marwick | 2025 | — | 4,370 | — | — | 4,370 | 139 | — | 373 | |
2024 | — | — | — | — | — | — | — | — | ||
Marcelo Pereira(5) | 2025 | — | 1,413 | — | — | 1,413 | 45 | — | 121 | |
2024 | — | — | — | — | — | — | — | — | ||
Total executive management | 2025 | — | 31,138 | — | — | 31,138 | 989 | — | 2,655 | |
2024 | — | — | — | — | — | — | — | — | ||
Notes: | ||||||||||
(1) The fair value of awards granted during 2025 represents the value of awards calculated using a five business day volume-weighted average share price prior to 20 February 2025. | ||||||||||
(2) The fair value of vested awards represents the value deemed received on the settlement date. | ||||||||||
(3) The fair value of unvested awards is calculated using the closing share price as at 31 December. | ||||||||||
(4) Richard Jordinson retired from the Chief Operating Officer role with effect from 1 June 2025. | ||||||||||
(5) Marcelo Pereira was appointed as Chief Operating Officer with effect from 1 June 2025. | ||||||||||
Number of unvested buy-out share awards and movement during the reporting period | ||||||||||
Buy-out share awards | Balance at 1 January | Granted | Vested, deemed settled | Forfeited / Lapsed | Balance at 31 December | Fair value of granted awards (1) | Fair value of vested awards (2) | Fair value of unvested awards at 31 December (3) | ||
Executive directors | USD ‘000 | |||||||||
Gillian Doran | 2025 | 12,073 | — | 12,073 | — | — | — | 387 | — | |
2024 | 22,956 | — | 10,883 | — | 12,073 | — | 205 | 279 | ||
Total executive directors | 2025 | 12,073 | — | 12,073 | — | — | — | 387 | — | |
2024 | 22,956 | — | 10,883 | — | 12,073 | — | 205 | 279 | ||
Executive management | ||||||||||
Terry Briggs | 2025 | 11,892 | — | 11,892 | — | — | — | 446 | — | |
2024 | 25,409 | — | 13,517 | — | 11,892 | — | 300 | 274 | ||
Marcelo Godoy | 2025 | — | — | — | — | — | — | — | — | |
2024 | 21,470 | — | 21,470 | — | — | — | 419 | — | ||
Total executive management | 2025 | 11,892 | — | 11,892 | — | — | — | 446 | — | |
2024 | 46,879 | — | 34,987 | — | 11,892 | — | 719 | 274 | ||
Notes: | ||||||||||
(1) The fair value of granted awards represents the value of awards calculated using a five business day volume-weighted average share price prior to the grant date. The share awards were granted on the start date and will vest over a two- or three-year period in equal tranches. | ||||||||||
(2) The fair value of the vested awards represents the value received on the settlement date. | ||||||||||
(3) The fair value of unvested awards is calculated using the closing share price as at 31 December. | ||||||||||
Number of Ordinary Shares | US$ | |||
At 31 December 2024 | 503,527,052 | 503,527,052 | ||
Issued after 1 January 2025: | ||||
Exercise of options by participants in the AngloGold Ashanti 2024 Omnibus Incentive Compensation Plan | 1,480,413 | 1,480,413 | ||
At 31 December 2025 | 505,007,465 | 505,007,465 | ||
Ordinary Shares Held At | ||||||||||||
31 December 2025 | 31 December 2024 | 31 December 2023 | ||||||||||
Shareholder (1) | Number of Ordinary Shares | Percent Voting Rights (2) | Number of Ordinary Shares | Percent Voting Rights (3) | Number of Ordinary Shares | Percent Voting Rights (4) | ||||||
Public Investment Corporation of South Africa | 79,121,396 (5) | 15.67 | 56,445,405 (7) | 11.21 | 74,537,976 (7) | 17.76 | ||||||
BlackRock, Inc. | 35,765,465 (6) | 7.08 | 38,747,508 (7) | 7.70 | 34,192,912 (8) | 8.15 | ||||||
Van Eck Associates Corporation | n/a(9) | n/a | n/a(7) | n/a | 25,813,417 (7) | 6.15 | ||||||
England and Wales | Delaware | |||
Number of Directors | Under the UK Companies Act, a public limited company must have at least two directors and the number of directors may be fixed by or in the manner provided in a company’s articles of association. | Under Delaware law, a corporation must have at least one director and the number of directors shall be fixed by or in the manner provided in the bylaws. | ||
Removal of Directors | Under the UK Companies Act, shareholders may remove a director without cause by an ordinary resolution (which is passed by a simple majority of those voting in person or by proxy at a general meeting) irrespective of any provisions of any service contract the director has with the company, provided 28 clear days’ notice of the resolution has been given to the company and its shareholders. On receipt of notice of an intended resolution to remove a director, the company must forthwith send a copy of the notice to the director concerned. Certain other procedural requirements under the UK Companies Act must also be followed, such as allowing the director to make representations against his or her removal either at the meeting or in writing. | Under Delaware law, any director or the entire board of directors may be removed, with or without cause, by the holders of a majority of the shares then entitled to vote at an election of directors, except (i) unless the certificate of incorporation provides otherwise, in the case of a corporation whose board of directors is classified, stockholders may effect such removal only for cause, or (ii) in the case of a corporation having cumulative voting, if less than the entire board of directors is to be removed, no director may be removed without cause if the votes cast against such director’s removal would be sufficient to elect such director if then cumulatively voted at an election of the entire board of directors, or, if there are classes of directors, at an election of the class of directors of which such director is a part. | ||
Vacancies on the Board of Directors | Under English law, the procedure by which directors, other than a company’s initial directors, are appointed is generally set out in a company’s articles of association, provided that where two or more persons are appointed as directors of a public limited company by resolution of the shareholders, resolutions appointing each director must be voted on individually, unless at the meeting of the shareholders during which the directors are proposed to be appointed, a unanimous resolution is first passed that two or more directors may be appointed by a single resolution. | Under Delaware law, vacancies and newly created directorships may be filled by a majority of the directors then in office (even though less than a quorum) or by a sole remaining director unless (i) otherwise provided in the certificate of incorporation or bylaws of the corporation or (ii) the certificate of incorporation directs that a particular class of stock is to elect such director, in which case a majority of the other directors elected by such class, or a sole remaining director elected by such class, will fill such vacancy. | ||
Annual General Meeting | Under the UK Companies Act, a public limited company must hold an annual general meeting in each six-month period beginning with the day following the company’s annual accounting reference date. | Under Delaware law, the annual meeting of stockholders shall be held at such place, on such date and at such time as may be designated from time to time by the board of directors or as provided in the certificate of incorporation or by the bylaws. | ||
General Meeting | Under the UK Companies Act, a general meeting of the shareholders of a public limited company may be called by the directors. Shareholders holding at least 5% of the paid-up capital of the company carrying voting rights at general meetings (excluding any paid-up capital held as treasury shares) can require the directors to call a general meeting. If the directors fail to call a general meeting within a certain period, the requisitioning shareholders (or any of them representing more than half of the total voting rights of the shareholders requisitioning the meeting) may themselves convene a general meeting. | Under Delaware law, special meetings of the stockholders may be called by the board of directors or by such person or persons as may be authorised by the certificate of incorporation or by the bylaws. |
Notice of General Meetings | Subject to a company’s articles of association providing for a longer period, under the UK Companies Act, (i) at least 21 days’ notice must be given for an annual general meeting and any resolutions to be proposed at the meeting and (ii) at least 14 days’ notice is required for any other general meeting of a public limited company. In addition, certain matters, such as the removal of directors or auditors, require special notice, which is 28 days’ notice. The shareholders of a company may in all cases consent to a shorter notice period, the proportion of shareholders’ consent required being 100% of those entitled to attend and vote in the case of an annual general meeting and, in the case of any other general meeting, a majority in number of the members having a right to attend and vote at the meeting, being a majority who together hold not less than 95% in nominal value of the shares giving a right to attend and vote at the meeting. | Under Delaware law, unless otherwise provided in the certificate of incorporation or bylaws, written or electronic notice of any meeting of the stockholders must be given to each stockholder entitled to vote at the meeting not less than ten nor more than 60 days before the date of the meeting and shall specify the place, date and hour, the record date, and in the case of special meetings, the purpose or purposes of the meeting. | ||
Quorum | Subject to the provisions of a company’s articles of association, the UK Companies Act provides that two “qualifying persons” present at a meeting (in person, by proxy or authorised representative under the UK Companies Act (provided that the proxies and/or authorised representatives, represent different shareholders) shall constitute a quorum for companies with more than one shareholder. | The certificate of incorporation or bylaws may specify the number of shares, the holders of which shall be present or represented by proxy at any meeting in order to constitute a quorum, but in no event shall a quorum consist of less than one-third of the shares entitled to vote at the meeting. In the absence of such specification in the certificate of incorporation or bylaws, a majority of the shares entitled to vote, present in person or represented by proxy, shall constitute a quorum at a meeting of stockholders. | ||
Proxy | Under the UK Companies Act, at any meeting of shareholders, a shareholder may designate another person to attend, speak and vote at the meeting on their behalf by proxy. | Under Delaware law, at any meeting of stockholders, a stockholder may authorise another person to act for such stockholder by proxy, but no such proxy shall be voted or acted upon after three years from its date, unless the proxy provides for a longer period. A director of a Delaware corporation may not issue a proxy representing the director’s voting rights as a director. | ||
Preemptive Rights | Under the UK Companies Act, “equity securities”, being: (i) shares in the company other than shares that, with respect to dividends and capital, carry a right to participate only up to a specified amount in a distribution, referred to as “ordinary shares”; or (ii) rights to subscribe for, or to convert securities into, ordinary shares in the company, proposed to be allotted for cash must be offered first to the existing holders of equity shares in the company in proportion to the respective nominal value of their holdings of ordinary shares, unless an exception applies or a special resolution authorising the disapplication of pre-emption rights has been passed by shareholders in a general meeting or the articles of association provide otherwise in each case in accordance with the provisions of the UK Companies Act. | Under Delaware law, stockholders have no preemptive rights to subscribe to additional issues of stock or to any security convertible into such stock unless, and except to the extent that, such rights are expressly provided for in the certificate of incorporation. | ||
Authority to Allot | Under the UK Companies Act, the directors of a company may not exercise any power of the company to allot shares, to grant rights to subscribe for or convert any security into shares, unless an exception applies or an ordinary resolution to the contrary has been passed by shareholders in a general meeting or the articles of association provide otherwise, in each case in accordance with the provisions of the UK Companies Act. | Under Delaware law, if the corporation’s certificate of incorporation so provides, the board of directors has the power to authorise the issuance of stock. The board may authorise capital stock to be issued for consideration consisting of cash, any tangible or intangible property or any benefit to the corporation or any combination thereof. It may determine the amount of such consideration by setting a minimum amount of consideration or approving a formula. In the absence of actual fraud in the transaction, the judgment of the directors as to the value of such consideration is conclusive. |
Liability of Directors and Officers | Under the UK Companies Act, any provision, whether contained in a company’s articles of association or any contract or otherwise, that purports to exempt a director of a company, to any extent, from any liability that would otherwise attach to him in connection with any negligence, default, breach of duty or breach of trust in relation to the company, is void. Any provision by which a company directly or indirectly provides an indemnity, to any extent, for a director of the company or of an associated company against any liability attaching to him in connection with any negligence, default, breach of duty or breach of trust in relation to the company of which he is a director is also void except as permitted by the UK Companies Act, which provides exceptions for the company to (i) purchase and maintain insurance against such liability; (ii) provide a “qualifying third party indemnity”, or an indemnity against liability incurred by the director to a person other than the company or an associated company or criminal proceedings in which he is convicted; and (iii) provide a “qualifying pension scheme indemnity”, or an indemnity against liability incurred in connection with the company’s activities as trustee of an occupational pension plan. | Under Delaware law, a corporation’s certificate of incorporation may include a provision eliminating or limiting the personal liability of a director to the corporation and its stockholders for damages arising from a breach of fiduciary duty as a director. However, no provision can limit the liability of a director for: •any breach of the director’s duty of loyalty to the corporation or its stockholders; •acts or omissions not in good faith or that involve intentional misconduct or a knowing violation of law; •intentional or negligent payment of unlawful dividends or stock purchases or redemptions; or •any transaction from which the director derives an improper personal benefit. | ||
Voting Rights | Under English law, unless a poll is demanded by the shareholders of a company or is required by the chairman of the meeting or the company’s articles of association, shareholders shall vote on all resolutions on a show of hands. Under the UK Companies Act, a poll may be demanded by (i) not fewer than five shareholders having the right to vote on the resolution; (ii) any shareholder(s) representing not less than 10% of the total voting rights of all the shareholders having the right to vote on the resolution (excluding any voting rights attaching to treasury shares); or (iii) any shareholder(s) holding shares in the company conferring a right to vote on the resolution (excluding any voting rights attaching to treasury shares) being shares on which an aggregate sum has been paid up equal to not less than 10% of the total sum paid up on all the shares conferring that right. A company’s articles of association may provide more extensive rights for shareholders to call a poll. Under English law, an ordinary resolution is passed on a show of hands if it is approved by a simple majority (more than 50%) of the votes cast by shareholders present (in person or by proxy) and entitled to vote. If a poll is demanded, an ordinary resolution is passed if it is approved by holders representing a simple majority of the total voting rights of shareholders present, in person or by proxy, who, being entitled to vote, vote on the resolution. Special resolutions require the affirmative vote of not less than 75% of the votes cast by shareholders present, in person or by proxy, at the meeting. | Delaware law provides that, unless otherwise provided in the certificate of incorporation, each stockholder is entitled to one vote for each share of capital stock held by such stockholder. | ||
Shareholder Vote on Certain Transactions | The UK Companies Act provides for schemes of arrangement, which are arrangements or compromises between a company and any class of shareholders or creditors and used in certain types of reconstructions, amalgamations, capital reorganisations or takeovers. These arrangements require: •the approval at a shareholders’ or creditors’ meeting convened by order of the court, of (i) a majority in number; and (ii) representing 75% or more in value of the members or class of members (as the case may be), present and voting, either in person or by proxy; and •the approval of the court. | Generally, under Delaware law, unless the certificate of incorporation provides for the vote of a larger portion of the stock, completion of a merger, consolidation, sale, lease or exchange of all or substantially all of a corporation’s assets or dissolution requires: •the approval of the board of directors; and •the approval by the vote of the holders of a majority of the outstanding stock or, if the certificate of incorporation provides for more or less than one vote per share, a majority of the votes of the outstanding stock of the corporation entitled to vote on the matter. |
Standard of Conduct for Directors | Under English law, a director owes various statutory and fiduciary duties to the company, including: •to act in the way he considers, in good faith, would be most likely to promote the success of the company for the benefit of its members as a whole (and in doing so to have regard (amongst other matters) to: (i) the likely consequences of any decision in the long term, (ii) the interests of the company’s employees, (iii) the need to foster the company’s business relationships with suppliers, customers and others, (iv) the impact of the company’s operations on the community and the environment, (v) the desirability to maintain a reputation for high standards of business conduct and (vi) the need to act fairly as between members of the company); • to avoid a situation in which he has, or can have, a direct or indirect interest that conflicts, or possibly conflicts, with the interests of the company; • to act in accordance with the company’s constitution and only exercise his powers for the purposes for which they are conferred; • to exercise independent judgment; • to exercise reasonable care, skill and diligence; • not to accept benefits from a third party conferred by reason of his being a director or doing, or not doing, anything as a director; and • to declare any interest that he has, whether directly or indirectly, in a proposed or existing transaction or arrangement with the company. | Delaware law does not contain specific provisions setting forth the standard of conduct of a director. The scope of the fiduciary duties of directors is generally determined by the courts of the State of Delaware. In general, directors have a duty to act without self-interest, on a well- informed basis and in a manner they reasonably believe to be in the best interest of the stockholders. Directors of a Delaware corporation owe fiduciary duties of care and loyalty to the corporation and to its shareholders. The duty of care generally requires that a director acts in good faith, with the care that an ordinarily prudent person would exercise under similar circumstances. Under this duty, a director must inform himself of all material information reasonably available regarding a significant transaction. The duty of loyalty requires that a director act in a manner he reasonably believes to be in the best interests of the corporation. He must not use his corporate position for personal gain or advantage. In general, but subject to certain exceptions, actions of a director are presumed to have been made on an informed basis, in good faith and in the honest belief that the action taken was in the best interests of the corporation. However, this presumption may be rebutted by evidence of a breach of one of the fiduciary duties. Delaware courts have also imposed a heightened standard of conduct upon directors of a Delaware corporation who take any action designed to defeat a threatened change in control of the corporation. In addition, under Delaware law, when the board of directors of a Delaware corporation approves the sale or break-up of a corporation, the board of directors may, in certain circumstances, have a duty to obtain the highest value reasonably available to the shareholders. | ||
Shareholder Litigation | Under English law, generally, the company, rather than its shareholders, is the proper claimant in an action in respect of a wrong done to the company or where there is an irregularity in the company’s internal management. Notwithstanding this general position, the UK Companies Act provides that: (i) a court may allow a shareholder to bring a derivative claim (that is, an action in respect of and on behalf of the company) in respect of a cause of action vested in the company arising from a director’s negligence, default, breach of duty or breach of trust and seeking relief on behalf of the company; and (ii) a shareholder may bring a claim for a court order where the company’s affairs have been or are being conducted in a manner that is unfairly prejudicial to some or all of its shareholders. | Under Delaware law, a stockholder may initiate a derivative action to enforce a right of a corporation if the corporation fails to enforce the right itself. The complaint must: •state that the plaintiff was a stockholder at the time of the transaction of which the plaintiff complains or that the plaintiff’s shares thereafter devolved on the plaintiff by operation of law; and • allege with particularity the efforts made by the plaintiff to obtain the action the plaintiff desires from the directors and the reasons for the plaintiff’s failure to obtain the action; or •state the reasons for not making the effort. Additionally, the plaintiff must remain a stockholder through the duration of the derivative suit. The action will not be dismissed or compromised without the approval of the Delaware Court of Chancery. |
US Dollar millions (1) | 2026 | 2027 | 2028 | 2029 | 2030 | Thereafter | Total | Fair value |
Borrowings (2) | ||||||||
Fixed rate (US$) | — | — | 750 | — | 700 | 300 | 1,750 | 1,729 |
Average interest rate | 4.1% | 4.1% | 4.1% | 4.6% | 4.6% | 6.5% | ||
Variable rate (US$) | — | — | 180 | — | — | — | 180 | 180 |
Average interest rate | 10.9% | 10.9% | 10.9% | — | — | — | ||
Variable rate (TZS) | — | — | 117 | — | — | — | 117 | 117 |
Average interest rate | 12.8% | 12.8% | 12.8% | — | — | — | ||
— | — | 1,047 | — | 700 | 300 | 2,047 | 2,026 | |
Cash and cash equivalents | ||||||||
Variable rate (US$) | 1,158 | — | — | — | — | — | 1,158 | 1,158 |
Average interest rate | 2.6% | — | — | — | — | — | ||
Variable rate (ZAR) | 27 | — | — | — | — | — | 27 | 27 |
Average interest rate | 4.7% | — | — | — | — | — | ||
Variable rate (AUD) | 148 | — | — | — | — | — | 148 | 148 |
Average interest rate | 3.5% | — | — | — | — | — | ||
Variable rate (BRL) | 27 | — | — | — | — | — | 27 | 27 |
Average interest rate | 13.6% | — | — | — | — | — | ||
Variable rate (GBP) | 3 | — | — | — | — | — | 3 | 3 |
Average interest rate | 0.8% | — | — | — | — | — | ||
Variable rate (GHS) | 58 | — | — | — | — | — | 58 | 58 |
Average interest rate | 1.3% | — | — | — | — | — | ||
Variable rate (EGP) | 4 | — | — | — | — | — | 4 | 4 |
Average interest rate | 13.9% | — | — | — | — | — | ||
1,425 | — | — | — | — | — | 1,425 | 1,425 | |
Restricted cash | ||||||||
Variable rate (US$) | 23 | — | — | 9 | — | 35 | 67 | 67 |
Average interest rate | 1.1% | — | — | 13.3% | — | 1.3% | ||
23 | — | — | 9 | — | 35 | 67 | 67 |
($ in millions) | 2025 (5) | 2024 (5) | |
Audit fees(1) | 10.40 | 11.40 | |
Audit-related fees(2) | 2.60 | 2.60 | |
Tax fees(3) | — | 0.20 | |
All other fees(4) | 0.20 | 0.20 | |
Total | 13.20 | 14.40 |
Figures in millions, except per share amounts | Notes | 2025 | 2024 | 2023 | ||
US Dollars | ||||||
Revenue from product sales | 3 | |||||
Cost of sales | 4 | ( | ( | ( | ||
Loss on non-hedge derivatives and other commodity contracts | ( | |||||
Gross profit | ||||||
Corporate administration, marketing and related expenses | ( | ( | ( | |||
Exploration and evaluation costs | ( | ( | ( | |||
Net (impairment) reversal of impairment and net loss on disposal and derecognition of assets | 14, 15 | ( | ( | |||
Corporate restructuring costs | ( | |||||
Other (expenses) income | 5 | ( | ( | ( | ||
Finance income | 7 | |||||
Foreign exchange and fair value adjustments | ( | ( | ( | |||
Finance costs and unwinding of obligations | 6 | ( | ( | ( | ||
Share of associates and joint ventures’ profit | 19 | |||||
Profit before taxation | ||||||
Taxation | 10 | ( | ( | ( | ||
Profit (loss) for the year | ( | |||||
Attributable to: | ||||||
Equity shareholders | ( | |||||
Non-controlling interests | ||||||
( | ||||||
Earnings (loss) per ordinary share | ||||||
Basic earnings (loss) per ordinary share (US cents) | 11 | ( | ||||
Diluted earnings (loss) per ordinary share (US cents) | 11 | ( | ||||
Figures in millions | 2025 | 2024 | 2023 | |||
US Dollars | ||||||
Profit (loss) for the year | ( | |||||
Items that will be reclassified subsequently to profit or loss: | ( | |||||
Exchange differences on translation of foreign operations | ( | |||||
Items that will not be reclassified subsequently to profit or loss: | ( | |||||
Exchange differences on translation of non-foreign operations | ( | |||||
Fair value of equity securities through other comprehensive income | ( | |||||
Actuarial (loss) gain recognised | ( | |||||
Deferred taxation thereon | ( | ( | ||||
Other comprehensive income (loss) for the year, net of tax | ( | |||||
Total comprehensive income (loss) for the year, net of tax | ( | |||||
Attributable to: | ||||||
Equity shareholders | ( | |||||
Non-controlling interests | ||||||
( | ||||||
Figures in millions | Notes | 2025 | 2024 | 2023 | ||
Revised(1)(2) | Revised(1)(2) | |||||
US Dollars | ||||||
ASSETS | ||||||
Non-current assets | ||||||
Tangible assets | 15 | |||||
Right of use assets | 16 | |||||
Intangible assets | 17 | |||||
Investments in associates and joint ventures | 19 | |||||
Other investments | ||||||
Loan receivable | 19 | |||||
Inventories | 20 | |||||
Trade, other receivables and other assets (1) | 21 | |||||
Contingent considerations (1) | ||||||
Reimbursive right for post-retirement benefits | 27 | |||||
Deferred taxation (2) | 28 | |||||
Cash restricted for use | 22 | |||||
Current assets | ||||||
Loan receivable | 19 | |||||
Inventories | 20 | |||||
Trade, other receivables and other assets (1) | 21 | |||||
Contingent considerations (1) | ||||||
Cash restricted for use | 22 | |||||
Cash and cash equivalents | 23 | |||||
Assets held for sale (3) | ||||||
Total assets | ||||||
EQUITY AND LIABILITIES | ||||||
Share capital and premium | 24 | |||||
Accumulated profit (loss) and other reserves | ||||||
Shareholders’ equity | ||||||
Non-controlling interests | 18 | |||||
Total equity | ||||||
Non-current liabilities | ||||||
Borrowings | 25 | |||||
Lease liabilities | 16 | |||||
Environmental rehabilitation and other provisions | 26 | |||||
Provision for pension and post-retirement benefits | 27 | |||||
Trade and other payables | ||||||
Deferred taxation (2) | 28 | |||||
Current liabilities | ||||||
Borrowings | 25 | |||||
Lease liabilities | 16 | |||||
Trade and other payables | 29 | |||||
Environmental rehabilitation and other provisions | 26 | |||||
Bank overdraft | 23 | |||||
Taxation (2) | 30 | |||||
Liabilities held for sale (3) | ||||||
Total liabilities | ||||||
Total equity and liabilities | ||||||
Figures in millions | Notes | 2025 | 2024 | 2023 | ||
US Dollars | ||||||
Cash flows from operating activities | ||||||
Cash generated from operations | 31 | |||||
Dividends received from joint ventures | 19 | |||||
Taxation refund | 30 | |||||
Taxation paid | 30 | ( | ( | ( | ||
Net cash inflow from operating activities | ||||||
Cash flows from investing activities | ||||||
Capital expenditure on tangible and intangible assets | 15, 17 | ( | ( | ( | ||
Acquisition of assets | 13 | ( | ||||
Dividends from associates and other investments | ||||||
Proceeds from disposal of tangible assets | ||||||
Acquisition of subsidiary, net of cash acquired | ||||||
Other investments and assets acquired | ( | ( | ||||
Proceeds from disposal of other investments (1) | ||||||
Payment from disposal of joint ventures and associates | ( | |||||
Loans advanced to associates and joint ventures | ( | ( | ||||
Contingent consideration received | ||||||
Repayment of loans advanced to joint ventures | ||||||
Proceeds from disposal of subsidiaries, net of cash disposed | 14 | |||||
(Increase) decrease in cash restricted for use | ( | ( | ||||
Interest received | ||||||
Net cash outflow from investing activities | ( | ( | ( | |||
Cash flows from financing activities | ||||||
Share securities tax on redomicile and reorganisation | ( | |||||
Proceeds from borrowings | 25 | |||||
Repayment of borrowings | 25 | ( | ( | ( | ||
Repayment of lease liabilities | 16 | ( | ( | ( | ||
Finance costs - borrowings | 25 | ( | ( | ( | ||
Finance costs - leases | 16 | ( | ( | ( | ||
Other borrowing costs | ( | ( | ||||
Dividends paid to external shareholders and distributions to non-controlling interests | ( | ( | ( | |||
Net cash outflow from financing activities | ( | ( | ( | |||
Net increase (decrease) in cash and cash equivalents | ( | |||||
Translation | ( | ( | ( | |||
Cash and cash equivalents at beginning of year (net of bank overdraft) | ||||||
Cash and cash equivalents at end of year (net of bank overdraft) | 23 | |||||
Equity holders of the parent | ||||||||||
Figures in millions | Share capital and premium | Reorganisation and merger reserve | Other capital reserves (1) | (Accumulated losses) Retained earnings | Fair value through OCI | Actuarial gains (losses) | Foreign currency translation reserve (2) | Total | Non- controlling interests | Total equity |
US Dollars | ||||||||||
Balance at 31 December 2022 | ( | ( | ( | ( | ||||||
(Loss) profit for the year | — | — | — | ( | — | — | — | ( | ( | |
Other comprehensive (loss) income | — | — | — | — | ( | ( | — | |||
Total comprehensive (loss) income | — | — | — | ( | ( | ( | ( | ( | ||
Shares issued | — | — | — | — | — | — | — | |||
Share-based payment for share awards net of exercised | — | — | ( | — | — | — | — | ( | — | ( |
Dividends paid (Note 12) | — | — | — | ( | — | — | — | ( | — | ( |
Distributions paid to non-controlling interests | — | — | — | — | — | — | — | ( | ( | |
Redomicile and reorganisation | ( | — | — | — | — | — | — | |||
Share securities tax on redomicile and reorganisation | — | ( | — | — | — | — | — | ( | — | ( |
Issue of bonus shares | — | — | — | — | — | — | — | |||
Cancellation of bonus shares | ( | — | — | — | — | — | — | ( | — | ( |
Transfer on disposal and derecognition of equity investments | — | — | — | ( | — | — | — | |||
Translation | — | — | ( | — | — | — | ||||
Balance at 31 December 2023 | ( | ( | ( | ( | ||||||
Profit for the year | — | — | — | — | — | — | ||||
Other comprehensive income (loss) | — | — | — | — | ( | ( | — | ( | ||
Total comprehensive income (loss) | — | — | — | ( | ||||||
Employee share scheme issues | — | ( | — | — | — | — | — | |||
Equity-settled share-based payments | — | — | — | — | — | — | — | |||
Dividends paid (Note 12) | — | — | — | ( | — | — | — | ( | — | ( |
Distributions paid to non-controlling interests | — | — | — | — | — | — | — | ( | ( | |
Acquisition of Centamin | — | — | — | — | — | |||||
Balance at 31 December 2024 | ( | ( | ||||||||
Profit for the year | — | — | — | — | — | — | ||||
Other comprehensive income (loss) | — | — | — | — | ( | — | ||||
Total comprehensive income (loss) | — | — | — | ( | ||||||
Employee share scheme issues | — | ( | — | — | — | — | — | |||
Equity-settled share-based payments | — | — | — | — | — | — | — | |||
Dividends paid (Note 12) | — | — | — | ( | — | — | — | ( | — | ( |
Transfers from reserve to retained earnings | — | — | — | ( | — | — | ( | — | ( | |
Distributions paid to non-controlling interests | — | — | — | — | — | — | — | ( | ( | |
Other | — | — | — | — | — | — | — | ( | ( | |
Translation | — | — | — | — | — | — | — | |||
Balance at 31 December 2025 | ( | ( | ||||||||
As at 31 December 2024 | |||
US dollar millions | Previously reported | Adjustments | Revised |
Statement of financial position | |||
Non-current assets | |||
Deferred taxation | |||
Total assets | |||
Non-current liabilities | |||
Deferred taxation | ( | ||
Current liabilities | |||
Taxation | |||
Total liabilities | |||
Notes to the financial statements | |||
Segmental information - Total assets (Note 2.6) | |||
Americas | |||
AngloGold Ashanti Mineração | |||
Serra Grande | |||
Taxation (Note 10) | |||
Current year | |||
Current taxation | |||
Current year | ( | ||
Deferred taxation | ( | ||
Deferred taxation (Note 28) | |||
Tangible assets (owned) | ( | ||
Liabilities | ( | ||
Included in the statement of financial position as follows: | |||
Deferred tax assets | |||
Deferred tax liabilities | ( | ||
Net deferred taxation liability | ( | ||
Net taxation liability (Note 30) | |||
Balance at beginning of year | |||
Taxation of items included in the income statement | |||
Balance at end of year | |||
Included in the statement of financial position as follows: | |||
Tax liability | |||
As at 31 December 2023 | |||
US dollar millions | Previously reported | Adjustments | Revised |
Statement of financial position | |||
Non-current assets | |||
Deferred taxation | |||
Total assets | |||
Current liabilities | |||
Taxation | |||
Total liabilities | |||
Notes to the financial statements | |||
Segmental information - Total assets (Note 2.6) | |||
Americas | |||
AngloGold Ashanti Mineração | |||
Serra Grande | |||
Taxation (Note 10) | |||
Current year | |||
Current taxation | |||
Current year | ( | ||
Deferred taxation | ( | ||
Deferred taxation (Note 28) | |||
Tangible assets (owned) | ( | ||
Liabilities | ( | ||
Included in the statement of financial position as follows: | |||
Deferred tax assets | |||
Deferred tax liabilities | |||
Net deferred taxation liability | ( | ||
Net taxation liability (Note 30) | |||
Balance at beginning of year | |||
Taxation of items included in the income statement | |||
Balance at end of year | |||
Included in the statement of financial position as follows: | |||
Taxation liability | |||
Figures in millions | Gold income | ||||
US Dollars | 2025 | 2024 | 2023 | ||
Geographical analysis of gold income by origin is as follows: | |||||
Africa (1) | |||||
Kibali - Attributable 45% | |||||
Iduapriem | |||||
Obuasi | |||||
Siguiri | |||||
Geita | |||||
Sukari (8) | |||||
Australia | |||||
Sunrise Dam | |||||
Tropicana - Attributable 70% | |||||
Americas | |||||
Cerro Vanguardia | |||||
AngloGold Ashanti Mineração (2) | |||||
Serra Grande (9) | |||||
Equity-accounted joint ventures included above | ( | ( | ( | ||
Figures in millions | By-product revenue | ||||
US Dollars | 2025 | 2024 | 2023 | ||
Geographical analysis of by-product revenue by origin is as follows: | |||||
Africa (1) | |||||
Kibali - Attributable 45% | |||||
Obuasi | |||||
Siguiri | |||||
Geita | |||||
Sukari (8) | |||||
Australia | |||||
Sunrise Dam | |||||
Tropicana - Attributable 70% | |||||
Americas | |||||
Cerro Vanguardia | |||||
AngloGold Ashanti Mineração | |||||
Equity-accounted joint ventures included above | ( | ( | ( | ||
Figures in millions | Cost of sales | ||||
US Dollars | 2025 | 2024 | 2023 | ||
Africa (1) | |||||
Kibali - Attributable 45% | |||||
Iduapriem | |||||
Obuasi | |||||
Siguiri | |||||
Geita | |||||
Sukari (8) | |||||
Administration and other | ( | ||||
Australia | |||||
Sunrise Dam | |||||
Tropicana - Attributable 70% | |||||
Administration and other | |||||
Americas | |||||
Cerro Vanguardia | |||||
AngloGold Ashanti Mineração | |||||
Serra Grande (9) | |||||
Administration and other | |||||
Corporate and other | ( | ||||
Equity-accounted joint ventures included above | ( | ( | ( | ||
Figures in millions | Gross profit (3) | ||||
US Dollars | 2025 | 2024 | 2023 | ||
Africa (1) | |||||
Kibali - Attributable 45% | |||||
Iduapriem | |||||
Obuasi | |||||
Siguiri | |||||
Geita | |||||
Sukari (8) | |||||
Administration and other | |||||
Australia | |||||
Sunrise Dam | |||||
Tropicana - Attributable 70% | |||||
Administration and other | ( | ( | ( | ||
Americas | |||||
Cerro Vanguardia | |||||
AngloGold Ashanti Mineração | |||||
Serra Grande (9) | ( | ||||
Administration and other | ( | ( | ( | ||
Corporate and other | ( | ( | |||
Equity-accounted joint ventures included above | ( | ( | ( | ||
Figures in millions | Amortisation | ||||
US Dollars | 2025 | 2024 | 2023 | ||
Africa (1) | |||||
Kibali - Attributable 45% | |||||
Iduapriem | |||||
Obuasi | |||||
Siguiri | |||||
Geita | |||||
Sukari (8) | |||||
Australia | |||||
Sunrise Dam | |||||
Tropicana - Attributable 70% | |||||
Administration and other | |||||
Americas | |||||
Cerro Vanguardia | |||||
AngloGold Ashanti Mineração | |||||
Serra Grande (9) | |||||
Corporate and other | |||||
Equity-accounted joint ventures included above | ( | ( | ( | ||
Figures in millions | Total assets (4)(5) | ||||
US Dollars | 2025 | 2024 | 2023 | ||
Revised (7) | Revised (7) | ||||
Africa (1) | |||||
Kibali - Investment in joint venture and loan receivable | |||||
Iduapriem | |||||
Obuasi | |||||
Siguiri | |||||
Geita | |||||
Sukari (8) | |||||
Administration and other | |||||
Australia | |||||
Americas (7) | |||||
Cerro Vanguardia | |||||
AngloGold Ashanti Mineração (7) | |||||
Serra Grande (7)(9) | |||||
Administration and other | |||||
Projects | |||||
Colombian projects (10) | |||||
North American projects | |||||
Corporate and other | |||||
Figures in millions | Non-current assets (6) | ||||
US Dollars | 2025 | 2024 | 2023 | ||
Non-current assets considered material, by country are: | |||||
United Kingdom | |||||
Foreign entities | |||||
DRC | |||||
Egypt | |||||
Ghana | |||||
Tanzania | |||||
Australia | |||||
Brazil | |||||
United States | |||||
Figures in millions | Capital expenditure | ||||
US Dollars | 2025 | 2024 | 2023 | ||
Africa (1) | |||||
Kibali - Attributable 45% | |||||
Iduapriem | |||||
Obuasi | |||||
Siguiri | |||||
Geita | |||||
Sukari (8) | |||||
Australia | |||||
Sunrise Dam | |||||
Tropicana - Attributable 70% | |||||
Administration and other | |||||
Americas | |||||
Cerro Vanguardia | |||||
AngloGold Ashanti Mineração | |||||
Serra Grande (9) | |||||
Projects | |||||
Colombian projects | |||||
North American projects | |||||
Corporate and other | |||||
Equity-accounted joint ventures included above | ( | ( | ( | ||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Revenue consists of the following principal categories: | |||||
Gold income (2) | |||||
Spot market sales | |||||
Concentrate sales (1) | |||||
By-products (2) | |||||
Accounting policies Revenue from product sales comprises sales of: •refined gold and doré bars; •by-products including silver and sulphuric acid; and •gold concentrate. Revenue is recognised at a point in time when control of the goods passes to the customer and the performance obligations of transferring control have been met. Control of the goods passes to the customer mainly on settlement date, with some exceptions where control of the goods passes on the date of delivery depending on the agreed-upon terms in the contract. The amount of revenue recognised reflects the consideration to which the entity is entitled in exchange for the goods transferred and is driven by the market prices of gold. The amount of revenue recognised from the sale of doré bars is net of refining and treatment charges. Sales of gold concentrate are recorded when control of ownership passes to the customer, net of refining and treatment charges. Control of ownership passes to the customer either at the warehouse, on the date of issuance of a holding certificate to the customer, or at the time of shipment, depending on the terms agreed with the customer. Sales prices are provisionally set on a specified future date after shipment, based on market prices. Revenue is recorded using forward market gold prices on the expected date that the final sales will be determined. Changes in the fair value as a result of changes in forward gold prices are classified as provisional price adjustments and included as a component of revenue. |
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Salaries and wages | |||||
Stores and other consumables | |||||
Fuel, power and water | |||||
Mining contractors | |||||
Other | |||||
Operating costs | |||||
Royalties | |||||
Total operating costs | |||||
Retrenchment costs | |||||
Rehabilitation and other non-cash costs | |||||
Amortisation of tangible assets | |||||
Amortisation of right of use assets | |||||
Amortisation of intangible assets | |||||
Inventory change | ( | ||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Care and maintenance | |||||
Governmental fiscal claims | |||||
Legacy tailings storage facilities obligations | |||||
Pension and medical defined benefit | |||||
Royalties received | ( | ( | |||
Group reorganisation costs (1) | |||||
Legal fees, claims and transaction costs | ( | ||||
Other indirect taxes | ( | ( | |||
Business integration costs | |||||
Contractor claims and rate settlements | |||||
Net other income | ( | ( | |||
US Dollars | ||||||
Figures in millions | 2025 | 2024 | 2023 | |||
Finance costs | ||||||
Finance costs on bonds, bank loans and other | ||||||
Amortisation of fees | ||||||
Lease finance charges | ||||||
Interest on tax liability | ||||||
Unwinding of obligations | 26 | |||||
Total finance costs and unwinding of obligations | ||||||
US Dollars | ||||||
Figures in millions | 2025 | 2024 | 2023 | |||
Finance income | ||||||
Finance income on bank balances | ||||||
Guarantee fees received | ||||||
Interest on joint venture loan | 19 | |||||
Unwinding of long-term receivables | ||||||
Total finance income and unwinding of long-term receivables | ||||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Salaries and wages (1)(2) | |||||
Social security costs (2) | |||||
Pension costs (3) | |||||
Share-based payment expense (Note 9) | |||||
Other (4) | |||||
Included in cost of sales, other expenses and corporate administration, marketing and related expenses | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Equity-settled share incentive schemes | |||||
Deferred Share Plan (DSP) | |||||
Performance Share Plan (PSP) | |||||
Total share-based payment expense | |||||
Award date (unvested awards and awards vested during the year) | 2025 | 2024 | 2023 | ||
Calculated fair value (in ZAR) | |||||
Award date | — | 26 Feb 2024 | 24 Feb 2023 | ||
Expiry date | — | 26 Feb 2034 | 25 Feb 2033 |
Number of shares | ||||||
2025 | 2024 | 2023 | ||||
Awards outstanding at beginning of year | ||||||
Awards granted during the year | ||||||
Awards lapsed during the year | ( | ( | ( | |||
Awards exercised during the year | ( | ( | ( | |||
Awards transferred from BSP scheme | ||||||
Awards transferred from LTIP scheme | ||||||
Awards outstanding at end of year | ||||||
Awards exercisable at end of year | ||||||
Award date (unvested awards) | 2025 | 2024 | |
Calculated fair value (in USD) | |||
Award date | 20 Feb 2025 | 26 Feb 2024 | |
Expiry date | 20 Feb 2035 | 26 Feb 2034 |
Number of shares | 2025 | 2024 | |
Awards outstanding at beginning of year | |||
Awards granted during the year | |||
Awards lapsed during the year | ( | ( | |
Awards exercised during the year | ( | ( | |
Awards outstanding at end of year |
Valuation inputs and assumptions | 2025 | 2024 | |
Expected weighted average volatility | |||
Vesting period | |||
Expected dividend yield | |||
US Risk-free interest rate | |||
Expected forfeiture rate | |||
Grant date fair value (in USD) |
Award date (unvested awards) | 2025 | |
Calculated fair value (in USD) | ||
Award date | 20 Feb 2025 | |
Expiry date | 20 Feb 2035 |
Number of shares | 2025 | |
Awards outstanding at beginning of year | ||
Awards granted during the year | ||
Awards lapsed during the year | ( | |
Awards exercised during the year | ( | |
Awards outstanding at end of year |
Accounting policies The Group’s management awards certain employee bonuses in the form of equity-settled and cash-settled share-based payments on a discretionary basis. Equity-settled share-based payments The fair value of the equity instruments granted is calculated at grant date. For transactions with employees, fair value is based on market prices of the equity instruments granted, if available, taking into account the terms and conditions upon which those equity instruments were granted. If market prices of the equity instruments granted are not available, the fair value of the equity instruments granted is estimated using an appropriate valuation model. Vesting conditions, other than market conditions, are not taken into account when estimating the fair value of shares or share options at measurement date. Over the vesting period, the fair value at measurement date is recognised as an employee benefit expense with a corresponding increase in other capital reserves based on the Group’s estimate of the number of instruments that will eventually vest. The income statement charge or credit for a period represents the movement in cumulative expense recognised as at the beginning and end of that period. Vesting assumptions for non-market conditions are reviewed at each reporting date to ensure they reflect current expectations. When options are exercised or share awards vest, the proceeds received, net of any directly attributable transaction costs, are credited to share capital (nominal value) and share premium. Where the terms of an equity settled award are modified, as a minimum, an expense is recognised as if the terms had not been modified. In addition, an expense is recognised for any modification which increases the total fair value of the share-based payment arrangement, or is otherwise beneficial to the employee, as measured at the date of the modification. Cash-settled share-based payments A liability is recognised for the fair value of cash-settled share-based payment transactions. The fair value is measured initially and at each reporting date up to and including the settlement date, with changes in fair value recognised in employee benefits expense. The fair value is expensed over the period until the vesting date with recognition of a corresponding liability. The approach used to account for vesting conditions when measuring equity-settled transactions also applies to cash-settled transactions. |
Figures in millions | US Dollars | ||||
2025 | 2024 | 2023 | |||
Revised (1) | Revised (1) | ||||
Current taxation (1) | |||||
Current year (1) | |||||
Prior year under (over) provision | ( | ( | |||
Impairment and disposal of tangible assets | |||||
Deferred taxation (1) | |||||
Current year (1) | |||||
Prior year (over) under provision | ( | ||||
Impairment and disposal of tangible assets | ( | ||||
Change in corporate tax rate (2) | |||||
Figures in millions | US Dollars | ||||
2025 | 2024 | 2023 | |||
Reconciliation to UK taxation rate | |||||
Implied tax charge on profit before tax at | |||||
Increase (decrease) due to: | |||||
Expenses not tax deductible (1) | |||||
Share of associates and joint ventures' profit | ( | ( | ( | ||
Tax rate differentials (2) and withholding taxes (3) | |||||
Exchange variations and translation adjustments | ( | ||||
Top-up tax - Pillar Two | |||||
Unrecognised tax losses (expense): | |||||
Ghana | ( | ||||
UK | |||||
North America | |||||
South Africa | ( | ||||
Brazil | ( | ||||
Concession adjustments (4)(5) | ( | ( | ( | ||
Change in planned utilisation of deferred tax assets and impact of corporate tax rate change | |||||
Restructuring costs | |||||
Argentinian inflationary impact allowances | ( | ( | |||
Adjustment in respect of prior years | ( | ( | |||
Other (6) | |||||
Income tax expense | |||||
Figures in millions | US Dollars | ||||
2025 | 2024 | 2023 | |||
Revised (1) | Revised (1) | ||||
Analysis of unrecognised tax losses | |||||
Available to be utilised against future profits | |||||
–utilisation required within one year | |||||
–utilisation required between one and two years | |||||
–utilisation required between two and five years | |||||
–utilisation required between five and twenty years | |||||
–utilisation in excess of twenty years | |||||
Accounting policies Deferred taxation is recognised on all qualifying temporary differences at the reporting date between the tax bases of assets and liabilities and their carrying amounts for financial reporting purposes. Deferred tax assets are only recognised to the extent that it is probable that the deductible temporary differences will reverse in the foreseeable future and future taxable profit will be available against which the temporary difference can be utilised. The future taxable income are based on detailed cash flow forecasts for at least 12 months and updated life-of-mine plan models with longer- term cash flow projections from operations and the application of existing tax laws in each jurisdiction. The carrying amount of deferred tax assets is reviewed at each reporting date. Deferred tax assets and liabilities are measured at future anticipated tax rates, which have been enacted or substantively enacted at the reporting date. Current and deferred tax is recognised as income or expense and included in profit or loss for the period, except to the extent that the tax arises from a transaction or event which is recognised, in the same or a different period in other comprehensive income or directly in equity, or an acquisition that is a business combination. Current tax is measured on taxable income at the applicable statutory rate enacted or substantively enacted at the reporting date. Interest arising on income tax assessments relating to outstanding or underpaid income taxes is outside the scope of IAS 12 ‘Income Taxes’. Accordingly, such interest is not included in income tax expense and is recognised as a finance cost in profit or loss as incurred. Penalties and fines arising from income tax assessments are not considered income taxes under IAS 12 and are recognised as operating expenses in profit or loss in the period in which the obligation arises. Where, however, it is not possible to distinguish between income tax, interest and/ or penalties (e.g., a settlement of a tax dispute), the entire amount will be treated as an income tax. On an ad hoc basis when significant unusual transactions occur, the Group applies the approved tax strategy which includes obtaining external legal opinions, if required, for guidance in applying the requirements of the legislation in various jurisdictions. |
2025 | 2024 | 2023 | |||
US cents per share | |||||
Basic earnings (loss) per ordinary share | ( | ||||
The calculation of basic earnings (loss) per ordinary share is based on profits/(loss) attributable to equity shareholders of $ average number of ordinary shares in issue during the financial year. | |||||
Diluted earnings (loss) per ordinary share | ( | ||||
The calculation of diluted earnings (loss) per ordinary share is based on profits/(loss) attributable to equity shareholders of $ number of ordinary shares. | |||||
Number of shares | |||||
2025 | 2024 | 2023 | |||
Weighted average number of ordinary shares (1) | |||||
Dilutive potential of share options (2) | |||||
Diluted weighted average number of ordinary shares | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Headline earnings (loss) (1) | |||||
The profit (loss) attributable to equity shareholders was adjusted by the following to arrive at headline earnings (loss): | |||||
Profit (loss) attributable to equity shareholders | ( | ||||
Net impairment (reversal of impairment) of tangible assets, right of use assets and investment in joint venture, net | ( | ||||
Net impairment (reversal of impairment) of tangible and right of use assets | ( | ||||
Impairment of investment in joint venture | |||||
Taxation on net impairment (reversal of impairment) of tangible assets, right of use assets and investment in joint venture | ( | ||||
Loss on derecognition and disposal of tangible assets and right of use assets, net | |||||
Loss on derecognition of tangible assets and right of use assets | |||||
Loss (profit) on disposal of tangible assets | ( | ||||
Taxation on derecognition and disposal of tangible assets | ( | ||||
( | |||||
US Cents | |||||
Headline earnings (loss) per ordinary share (1) | |||||
Headline earnings (loss) per ordinary share (2) | ( | ||||
Diluted headline earnings (loss) per ordinary share (3) | ( | ||||
US Dollars | ||||||
Figures in millions | 2025 | 2024 | 2023 | |||
Ordinary shares (1) | ||||||
Dividend number 126 of and paid on 31 March 2023 ( | ||||||
Dividend number 127 of paid on 8 September 2023 ( | ||||||
Dividend number 1 of paid on 28 March 2024 | ||||||
Dividend number 2 of paid on 13 September 2024 | ||||||
Dividend number 3 of paid on 28 March 2025 | ||||||
Dividend number 4 of paid on 13 June 2025 | ||||||
Dividend number 5 of paid on 5 September 2025 | ||||||
Dividend number 6 of and paid on 12 December 2025 | ||||||
Figures in millions - US Dollars | ||
Allocation of the purchase price | 2025 | |
Tangible assets | ||
Trade, other receivables and other assets | ||
Environmental rehabilitation provision | ( | |
Purchase price | ||
Significant accounting judgements and estimates Control over Sukari Gold Mines Company (SGM, Sukari) The Group has reassessed whether it continues to control Sukari (or SGM) in accordance with IFRS 10 during the current reporting period. This reassessment considered whether there were any changes in relevant facts and circumstances affecting the Group’s: •Power over the relevant activities of the investee, including rights arising from contractual arrangements and governance structures; •Exposure, or rights, to variable returns from its involvement with the investee; and •Ability to use its power to affect those returns. Based on the analysis performed, management concluded that there have been no changes in facts and circumstances that would alter the initial control assessment. Accordingly, the existing consolidation treatment of Sukari remains appropriate as at the reporting date. Sukari is an entity EMRA). The relevant activities cover the operations throughout the life-of-mine (LOM) from exploration and evaluation of Mineral Reserve through to development and commercial mining production and relates to governing the strategic operating and financial policies of Sukari. The rights and duties of the Group (through PGM), which have resulted in the Group concluding that it has control over Sukari, are as follows: •PGM controls the appointment and replacement of the General Manager (GM) at Sukari; and •By controlling the appointment of the GM and directing their activities, the GM will make all day-to-day decisions to allow the mine to operate in a manner that aligns with Sukari’s objectives. These decisions, which are considered the main relevant activities, are as follows: ◦Preparing Sukari’s work programmes through determination of the daily and longer-term mine plans and the budgets covering the operations to be carried out throughout the LOM; ◦Managing capital expenditure, procurement, cost control and treasury; ◦Conducting exploration, development, production, and marketing operations; ◦Co-ordinating Sukari’s operations and activities, including its dealings with all contractors and subcontractors; ◦Bearing ultimate responsibility for all costs and expenses required in carrying out any and all operations under the Sukari Concession Agreement (Sukari CA) (entered into between PGM, MRMIA (formerly EMRA) and the Egyptian government); ◦Funding the operations of Sukari and recovering costs and expenses throughout the LOM (i.e., exploration, development, and production phases); ◦Funding additional exploration and expansion programmes within the mine during the production phase; ◦Taking custody of Sukari’s stock and management of its funds; ◦Selling and shipping of all gold and associated metals produced; ◦Authority to appoint employees within Sukari; ◦Managing cash flow plans including payment of MRMIA (formerly EMRA) profit share; and ◦Entering into and managing gold sales or hedging contracts and forward sale agreements. |
The duties of MRMIA (formerly EMRA) under the terms of the Sukari CA are to provide the required approvals to allow the mine to operate. The Board of Directors of Sukari (Sukari Board) has six members, three of whom are appointed by PGM and three by MRMIA (formerly EMRA). The executive chairman, as one of the MRMIA (formerly EMRA)-appointed board members, is a representative of MRMIA (formerly EMRA) and is appointed by the Egyptian Ministry of Finance. The General Assembly of Shareholders convenes a meeting in conjunction with the Sukari Board twice a year to facilitate a forum for information sharing between both shareholders of Sukari and to provide a mechanism to scrutinise the timing and amounts of expenses, rather than as a decision-making body over Sukari’s most significant relevant activities. The Sukari Board considers, reviews, and approves the budget, the annual financial statements, the cost recovery position and other compliance matters. The Sukari Board is not allowed to unreasonably withhold approval of any of the above. If there is a disputed matter or deadlock position within the Sukari Board, such matter is resolved through open discussion at board level; however, the executive chairman does not have a veto or casting vote. Where matters cannot be agreed upon, an ad-hoc committee is appointed with each party having equal representation. This committee will then recommend an appropriate course of action to the Sukari Board with the best interest of all shareholders in mind; and should the Sukari Board still not agree on a course of action, there is a provision for final and binding arbitration. The Sukari Board cannot appoint or remove the GM, this right belongs solely to PGM, under the terms of the Sukari CA. MRMIA (formerly EMRA) and/or the Egyptian government have no downside risk in their share of Sukari. If Sukari were to become loss-making or insolvent, these costs are absorbed in their entirety by PGM, in accordance with the Sukari CA. The Group, through PGM, is therefore exposed to the variable returns of Sukari, has the ability to affect the amount of those returns, has power over Sukari through its ability to direct its relevant activities and therefore meets all the criteria of control to consolidate Sukari’s results within the Group to reflect the substance and economic reality of the Sukari CA. |
Accounting policies Business combination The acquisition method of accounting is used to account for business combinations by the Group. The consideration transferred for the acquisition of the business is the fair value of the assets transferred, the liabilities incurred, and the equity interests issued by the Group. Acquisition-related costs are expensed as incurred. Identifiable assets acquired and liabilities and contingent liabilities assumed in a business combination are measured initially at their fair values at the acquisition date. On an acquisition-by-acquisition basis, the Group recognises any non-controlling interest (NCI) in the acquiree at the NCI’s proportionate share of the acquiree’s net assets or the fair value. Subsequently, the carrying amount of NCI is the amount of the interest at initial recognition plus the NCI’s share of the subsequent changes in equity. Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferred and the amount recognised for NCI and any previous interest held over the net identifiable assets acquired and liabilities assumed). Asset acquisitions For acquisitions outside the scope of IFRS 3, the purchase consideration is allocated to identifiable assets and liabilities based on their relative fair values. No goodwill is recognised. Transaction costs directly attributable to an asset acquisition are capitalised as part of the cost of the acquired assets. Any contingent consideration arising from an asset acquisition is included in the cost of the acquired assets and recognised when the consideration becomes probable and can be reliably measured. Subsequent changes in the estimate of the contingent consideration are recognised in profit or loss and accounted for as an adjustment to the cost of the related assets. |
Figures in millions - US Dollars | 2025 |
Tangible assets | |
Right of use assets | |
Inventories | |
Trade, other receivables and other assets | |
Cash and cash equivalents | |
Lease liabilities | ( |
Trade and other payables | ( |
Environmental rehabilitation and other provisions | ( |
Tax indemnity liability | |
Net assets disposed of | |
Consideration received | ( |
Cash | ( |
Contingent consideration asset | ( |
Figures in millions - US Dollars | 2025 |
Tangible assets | |
Net trade and other receivables | |
Cash and cash equivalents | |
Net assets disposed of | |
Consideration received | |
Cash | |
Contingent consideration | |
Deferred consideration | |
Loss on disposal |
Figures in millions | Mine development costs | Mine infrastructure | Exploration and evaluation assets (3) | Assets under construction | Land and buildings (2) | Total | |||||
US Dollars | |||||||||||
Cost | |||||||||||
Balance at 1 January 2023 | |||||||||||
Additions | |||||||||||
Disposals | ( | ( | ( | ( | ( | ( | |||||
Derecognition of assets | ( | ( | ( | ||||||||
Transfers and other movements (1) | ( | ||||||||||
Translation | ( | ( | ( | ||||||||
Balance at 31 December 2023 | |||||||||||
Accumulated amortisation and impairments | |||||||||||
Balance at 1 January 2023 | |||||||||||
Amortisation for the year | |||||||||||
Impairment of assets | |||||||||||
Impairment reversal of assets | ( | ( | ( | ( | |||||||
Disposals | ( | ( | ( | ( | ( | ||||||
Derecognition of assets | ( | ( | ( | ||||||||
Transfers and other movements (1) | ( | ( |
Figures in millions | Mine development costs | Mine infrastructure | Exploration and evaluation assets (3) | Assets under construction | Land and buildings (2) | Total | |||||
Transfer to assets and liabilities held for sale | |||||||||||
Translation | |||||||||||
Balance at 31 December 2023 | |||||||||||
Net book value at 31 December 2023 | |||||||||||
Cost | |||||||||||
Balance at 1 January 2024 | |||||||||||
Additions | |||||||||||
Acquired through business combination | |||||||||||
Disposals | ( | ( | ( | ||||||||
Derecognition of assets | ( | ( | ( | ||||||||
Transfers and other movements (1) | ( | ||||||||||
Translation | ( | ( | ( | ( | ( | ||||||
Balance at 31 December 2024 | |||||||||||
Accumulated amortisation and impairments | |||||||||||
Balance at 1 January 2024 | |||||||||||
Amortisation for the year | |||||||||||
Impairment reversal of assets | ( | ( | ( | ( | |||||||
Disposals | ( | ( | ( | ||||||||
Derecognition of assets | ( | ( | ( | ||||||||
Transfers and other movements (1) | ( | ||||||||||
Translation | ( | ( | ( | ( | ( | ||||||
Balance at 31 December 2024 | |||||||||||
Net book value at 31 December 2024 | |||||||||||
Cost | |||||||||||
Balance at 1 January 2025 | |||||||||||
Additions | |||||||||||
Acquired through asset acquisition | |||||||||||
Disposals | ( | ( | ( | ||||||||
Disposal of subsidiary (refer to Notes 14.1 and 14.2) | ( | ( | ( | ( | ( | ( | |||||
Derecognition of assets | ( | ( | ( | ( | ( | ||||||
Transfers and other movements (1) | ( | ( | |||||||||
Transfer to assets held for sale | ( | ( | ( | ||||||||
Translation | |||||||||||
Balance at 31 December 2025 | |||||||||||
Accumulated amortisation and impairments | |||||||||||
Balance at 1 January 2025 | |||||||||||
Amortisation for the year | |||||||||||
Impairment of assets | |||||||||||
Impairment reversal of assets | ( | ( | ( | ( | |||||||
Disposals | ( | ( | ( | ||||||||
Disposal of subsidiary (refer to Notes 14.1 and 14.2) | ( | ( | ( | ( | ( | ||||||
Derecognition of assets | ( | ( | ( | ( | |||||||
Transfers and other movements (1) | ( | ( | |||||||||
Transfer to assets held for sale | ( | ( | |||||||||
Translation | |||||||||||
Balance at 31 December 2025 | |||||||||||
Net book value at 31 December 2025 |
Figures in millions | Tangible Assets | Right of Use Assets | Total |
US Dollars | 2025 | ||
Group income statement | |||
Impairment of assets | ( | ( | |
Reversal of impairment of assets | |||
Net loss on disposal of assets and derecognition of assets | ( | ( | |
Net (impairment) reversal of impairment and net loss on disposal and derecognition of assets | ( | ( | |
2024 | |||
Group income statement | |||
Reversal of impairment of assets | |||
Profit (loss) on derecognition of assets | ( | ||
Net loss on disposal of assets | ( | ( | |
Reversal of impairment and net loss on disposal and derecognition of assets | |||
2023 | |||
Group income statement | |||
Impairment of assets | ( | ( | ( |
Reversal of impairment of assets | |||
Derecognition of assets | ( | ( | |
Net profit on disposal of assets | |||
Net (impairment) and net loss on disposal and derecognition of assets | ( | ( | ( |
Cash Generating Unit | Mine Development Cost | Mine Infrastructure | Exploration and evaluation costs | Assets under construction | Land and buildings | Total Tangible Asset (Impairment) Impairment Reversal | Goodwill | Right of use assets | Total (Impairment) Impairment Reversal | ||||||||
Figures in millions | |||||||||||||||||
US Dollars | |||||||||||||||||
2025 | |||||||||||||||||
Americas segment | |||||||||||||||||
Serra Grande | |||||||||||||||||
Projects segment | |||||||||||||||||
Colombian projects | ( | ( | ( | ||||||||||||||
( | ( | ( | |||||||||||||||
2024 | |||||||||||||||||
Americas segment | |||||||||||||||||
Cuiabá | |||||||||||||||||
2023 | |||||||||||||||||
Americas segment | |||||||||||||||||
CdS | ( | ( | ( | ( | ( | ( | ( | ||||||||||
Cuiabá | ( | ( | ( | ( | |||||||||||||
Serra Grande | ( | ( | ( | ( | ( | ( | ( | ||||||||||
Projects | |||||||||||||||||
Gramalote | ( | ( | ( | ( | ( | ||||||||||||
( | ( | ( | ( | ( | ( | ( | ( | ||||||||||
Significant accounting judgements and estimates Mineral Reserve estimates The Group reports its Mineral Resource and Mineral Reserve in accordance with Subpart 1300 of Regulation S-K (17 CFR § 229.1300) (“Regulation S-K 1300”). The Mineral Reserve estimates are based on information available at the time of estimation and reflect the application of modifying factors and economic assumptions (including commodity prices, exchange rates, operating and capital costs) that support the demonstration of economic viability. For the Mineral Reserve, the term “economically viable” means that profitable extraction or production has been established or analytically demonstrated in, at a minimum, a pre-feasibility study, to be economically viable under reasonable investment and market assumptions. A Mineral Reserve estimate is an estimate of tonnage and grade or quality of Indicated and Measured Mineral Resource that, in the opinion of the Qualified Person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a Measured or Indicated Mineral Resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. In order to estimate the Mineral Reserve, estimates and assumptions are required about a range of geological, technical and economic factors, including quantities, grades, production techniques, recovery rates, production costs, transport costs, commodity demand, commodity prices and exchange rates. Estimating the quantity and/or grade of the Mineral Reserve requires the size, shape and depth of ore bodies to be determined by analysing geological data such as the logging and assaying of drill samples. This process may require complex and difficult geological judgements and calculations to interpret the data. With the change in the economic assumptions used to estimate the Mineral Reserve from period to period, and because additional geological data is generated during the course of operations, estimates of the Mineral Reserve may change from period to period. Changes in the reported Mineral Reserve may affect the Group’s financial results and financial position in a number of ways, including the following: •asset carrying values may be affected due to changes in estimated future cash flows; •depreciation, depletion and amortisation charged in the income statement may change where such charges are determined by the units-of-production method, or where the useful economic lives of assets change; •overburden removal costs, including production stripping activities, recorded on the statement of financial position or charged in the income statement may change due to changes in stripping ratios or the units-of-production method of depreciation; •decommissioning site restoration and environmental provisions may change where changes in the estimated Mineral Reserve affect expectations about the timing or cost of these activities; and •the carrying value of deferred tax assets may change due to changes in estimates of the likely recovery of the tax benefits. |
Accounting policies Tangible assets are recorded at cost less accumulated amortisation, accumulated impairments and reversal of impairments. Cost includes the present value of related future decommissioning costs. Interest on borrowings relating to the financing of major capital projects under construction (which is considered to be qualifying assets that necessarily take a substantial period of time to get ready for their intended use or sale) is capitalised during the construction phase as part of the cost of the project. Such borrowing costs are capitalised over the period during which the asset is being acquired or constructed and borrowings have been incurred. Capitalisation ceases when construction is interrupted for an extended period or when the asset is substantially complete. Other borrowing costs are expensed as incurred. For assets amortised on the units-of-production method, amortisation is calculated to allocate the cost of each asset to its residual value over its estimated useful life. For assets not amortised on the units-of-production method, amortisation is calculated on a straight line basis over its expected useful life. |
Mine development costs Capitalised mine development costs include expenditure incurred to develop new ore bodies, to define further mineralisation in existing ore bodies and, to expand the capacity of a mine and include acquired Proven and Probable Mineral Reserve and Mineral Resource at fair value at the acquisition date when a business is acquired. Depreciation, depletion and amortisation of mine development costs are computed by the units-of-production method based on estimated Proven and Probable Mineral Reserve. The Proven and Probable Mineral Reserve reflects estimated quantities of Mineral Reserve which can be recovered economically in the future from known mineral deposits. Capitalised mine development costs also include stripping activity assets relating to production stripping activities incurred in the production phase of open-pit operations of the Group. Stripping activity assets are amortised on a units-of-production method based on the Mineral Reserve of the component of the orebody to which these assets relate. Amortisation of stripping activity assets is included in cost of sales. |
Mine infrastructure Mine plant facilities, including decommissioning assets, are amortised using the lesser of their useful life or units-of-production method based on estimated Proven and Probable Mineral Reserve. The straight-line method is used if the estimated useful life of the asset is used for amortisation as follows: •plant and machinery up to life-of-mine; •equipment and motor vehicles up to •computer equipment up to Assets are amortised to residual values. Residual values and useful lives are reviewed, and adjusted if appropriate, at the beginning of each financial year. |
Land and assets under construction Land and assets under construction are not depreciated and are measured at historical cost less impairments. |
Exploration and evaluation assets All pre-licence and exploration costs, including geological and geographical costs, labour and exploratory drilling cost, are expensed as incurred, until it is concluded that a future economic benefit will more likely than not be realised. In evaluating if expenditures meet this criterion to be capitalised, several different sources of information are used depending on the level of exploration. Exploration and evaluation assets also include the fair value of exploration potential attributable at the acquisition date when a business is acquired and the attributable purchase price in the case of an asset acquisition. While the criterion for concluding that expenditure should be capitalised is always probable, the information used to make that determination depends on the level of exploration: •Costs on greenfield sites, being those where the Group does not have any mineral deposits which are already being mined or developed under the planned method of extraction, are expensed as incurred until the Group is able to demonstrate that future economic benefits are probable, which generally will be the establishment of Proven and Probable Mineral Reserve at this location; •Costs on brownfield sites, being those adjacent to mineral deposits which are already being mined or developed under the planned method of extraction, are expensed as incurred until the Group is able to demonstrate that future economic benefits are probable, which generally will be the establishment of increased inclusive Proven and Probable Mineral Resource after which the expenditure is capitalised as mine development cost; and •Costs relating to extensions of mineral deposits, which are already being mined or developed, including expenditure on the definition of mineralisation of such mineral deposits, are capitalised as mine development. |
Accounting policies continued Stripping costs The Group has a number of surface mining operations that are in the production phase for which production stripping costs are incurred. The benefits that accrue to the Group as a result of incurring production stripping costs include (a) ore that can be used to produce inventory and (b) improved access to a component of the ore body that will be mined in future periods. Components of the various ore bodies at the operations of the Group are determined based on the geological areas identified for each of the ore bodies and are reflected in the Mineral Reserve reporting of the Group. In determining whether any production stripping costs are capitalised as a stripping activity asset, the Group uses the average stripping ratio measure over the life of the particular open pit operation as an indicator of the quantum of production stripping costs that should be capitalised. Once determined that any portion of the production stripping costs should be capitalised, the Group determines the amount of the production stripping costs that should be capitalised with reference to the average mine costs per tonne of the component and the actual waste tonnes that should be expensed. The average mine cost per tonne of the component is calculated as the total expected costs to be incurred to mine the relevant component of the ore body, divided by the number of tonnes expected to be mined from the component. The average mine cost per tonne of the component to which the stripping activity asset relates are recalculated annually in light of additional knowledge and changes in estimates. |
Development expenditure Development activities commence after project sanctioning by the appropriate level of management. Judgement is applied by management in determining when a project has reached a stage at which economically recoverable Mineral Reserve exists such that development may be sanctioned. In exercising this judgement, management is required to make certain estimates and assumptions that may change as new information becomes available. If, after having started the development activity, a judgement is made that a development asset is impaired, the appropriate amount will be written off to the income statement. |
Production start date The Group assesses the stage of each mine construction project to determine when a project moves into the production stage. The criteria used to assess the start date are determined by the unique nature of each mine construction project and include factors such as the complexity of a plant and its location. The Group considers various relevant criteria to assess when the construction project is substantially complete and ready for its intended use and moves into the production stage. The criteria used in the assessment would include, but are not limited to the following: •the level of capital expenditure compared to the construction cost estimates; •completion of a reasonable period of testing of the constructed asset; •adequacy of stope face; •ability to produce metals in saleable form (within specifications); and •ability to sustain ongoing production of metal. When a mine construction project moves into the production stage, the capitalisation of certain mine construction costs ceases and costs are either regarded as inventory or expensed, except for capitalisable costs related to mining asset additions or improvements, underground mine development, deferred stripping activities, or Mineral Reserve development. |
Impairment of non-financial assets The Group’s non-financial assets, other than inventories and deferred tax assets, are reviewed at each reporting date or whenever events or changes in circumstances indicate that the carrying amount may not be recoverable, to determine whether there is any indication of impairment. An impairment test is performed annually on all goodwill, intangible assets not yet in use and intangible assets with indefinite useful lives irrespective of whether any impairment indicators have been identified. For non-financial assets or cash generating units (CGUs), in circumstances in which indicators of impairment are identified, a formal impairment test is required to be carried out. The impairment test compares the assets or CGUs carrying amount with its recoverable amount. The recoverable amount is the higher of the amounts calculated under the fair value less cost of disposal and value in use approaches. The Group generally uses fair value less cost of disposal to determine the recoverable amount of each CGU. The future cash flows are adjusted for risks specific to the asset and is adjusted where applicable to consider any specific risks relating to the country where the asset or cash-generating unit is located. Future cash flows are discounted to their present value using a discount rate that reflects current market assessments of the time value of money. A CGU is the smallest identifiable Group of assets that generates cash inflows that are largely independent of the cash inflows from other assets or groups of assets. The composition and nature of the Group’s CGUs vary and is determined largely by identifying the smallest identifiable group of assets that generates independent cash inflows and factors specific to the Group’s mining operations. The Group’s CGUs are generally at the individual mine level, with some operating mines consisting of a combination of shafts and/or pits. Exploration assets are tested for impairment whenever facts and circumstances indicate that the carrying amount is not recoverable. Assets will be allocated to CGUs or groups of CGUs based on how the entity manages its operations, i.e., by mineral within a specific geographic area. An impairment loss is recognised for the amount by which the asset’s or CGU’s carrying amount exceeds their recoverable amount. At the reporting date the Group assesses whether any of the indicators which gave rise to previously recognised impairments have changed such that the impairment loss no longer exists or may have decreased. The impairment loss is then assessed on the original factors for reversal and if indicated, such reversal is recognised. |
Figures in millions | Mine infrastructure | Land and buildings | Total | |||
US Dollars | ||||||
Cost | ||||||
Balance at 1 January 2023 | ||||||
Additions | ||||||
Derecognition and other movements (1) | ( | ( | ||||
Translation | ( | |||||
Balance at 31 December 2023 | ||||||
Accumulated amortisation and impairments | ||||||
Balance at 1 January 2023 | ||||||
Amortisation for the year | ||||||
Impairment | ||||||
Impairment reversal | ( | ( | ||||
Derecognition and other movements (1) | ( | ( | ||||
Balance at 31 December 2023 | ||||||
Net book value at 31 December 2023 | ||||||
Cost | ||||||
Balance at 1 January 2024 | ||||||
Acquired through business combination | ||||||
Additions | ||||||
Derecognition and other movements (1) | ( | ( | ||||
Translation | ( | ( | ||||
Balance at 31 December 2024 | ||||||
Accumulated amortisation and impairments | ||||||
Balance at 1 January 2024 | ||||||
Amortisation for the year | ||||||
Derecognition and other movements (1) | ( | ( | ||||
Translation | ( | ( | ||||
Balance at 31 December 2024 | ||||||
Net book value at 31 December 2024 | ||||||
Cost | ||||||
Balance at 1 January 2025 | ||||||
Additions | ||||||
Derecognition and other movements (1) | ( | ( | ||||
Disposal of subsidiary (refer to Note 14.1) | ( | ( | ||||
Translation | ||||||
Balance at 31 December 2025 | ||||||
Accumulated amortisation and impairments | ||||||
Balance at 1 January 2025 | ||||||
Amortisation for the year | ||||||
Derecognition and other movements (1) | ( | ( | ||||
Impairment reversal | ( | ( | ||||
Disposal of subsidiary (refer to Note 14.1) | ( | ( | ||||
Translation | ||||||
Balance at 31 December 2025 | ||||||
Net book value at 31 December 2025 | ||||||
Figures in millions | 2025 | 2024 | 2023 |
US Dollars | |||
Amounts recognised in the statement of cash flows including expenses on short- term leases, variable lease payments and leases on low value assets | |||
Total cash outflow on leases including expenses on short-term leases, variable lease payments and leases on low value assets | |||
Amounts recognised in the income statement for lease payments not included in lease liabilities | |||
Expenses on short-term leases | |||
Expenses on variable lease payments (1) | |||
Expenses on leases of low value assets | |||
Figures in millions - US Dollars | 2025 | 2024 | 2023 |
Reconciliation of lease liabilities (1) | |||
A reconciliation of the lease liabilities included in the statement of financial position is set out in the following table: | |||
Opening balance | |||
Acquired through business combination | |||
Lease liabilities recognised | |||
Repayment of lease liabilities | ( | ( | ( |
Finance costs paid on lease liabilities | ( | ( | ( |
Interest charged to the income statement | |||
Modifications and terminations | ( | ( | |
Disposal of subsidiary (refer to Note 14.1) | ( | ||
Translation | ( | ||
Closing balance | |||
Lease liabilities | |||
Non-current | |||
Current | |||
Total |
Accounting policies The Group assesses whether a contract is or contains a lease, at inception of a contract. Various factors are considered in assessing whether an arrangement contains a lease, including whether a service contract includes the implicit right to substantially all the economic benefits from assets used in providing the service and whether the Group directs how and for what purpose the assets are used. In determining the lease term, the Group considers all facts and circumstances that create an economic incentive to exercise an extension option, or not exercise a termination option. Extension options (or periods after termination options) are only included in the lease term if the lease is reasonably certain to be extended (or not terminated). The assessment is reviewed if a significant event or a significant change in circumstances occurs which affects this assessment and that is within the control of the lessee. The Group applies the considerations for short- term leases where leases are modified to extend the period by 12 months or less on expiry and these modifications are assessed on a standalone-basis. The Group recognises a right of use asset and a corresponding lease liability with respect to all lease agreements in which it is the lessee, except for short-term leases (defined as leases with a lease term of 12 months or less with no purchase option) and leases of low value assets, where the recognition exemption is applied. For these leases, the Group recognises the lease payments as an operating expense on a straight- line basis over the term of the lease unless another systematic basis is more representative of the time pattern in which economic benefits from the leased asset are consumed. The lease liability is initially measured at the present value of the lease payments that are not paid at the commencement date, discounted by using the rate implicit in the lease. If this rate cannot be readily determined, the Group uses its incremental borrowing rate. The incremental borrowing rate is the rate that the Group would have to pay to borrow the funds necessary to obtain an asset of similar value to the right of use asset in a similar economic environment with similar terms, security and conditions. The Group applies a single discount rate for contracts that share similar characteristics. The Group has determined that contracts that are denominated in the same currency will use a single discount rate. Contracts may contain both lease and non-lease components. The Group allocates the consideration in the contract to the lease and non-lease components based on their relative stand-alone prices. Lease payments included in the measurement of the lease liability comprise: •fixed lease payments (including in-substance fixed payments), less any lease incentives; •variable lease payments that depend on an index or rate, initially measured using the index or rate at the commencement date; •amount expected to be payable by the lessee under residual value guarantees; •the exercise price of purchase options, if the lessee is reasonably certain to exercise the options; and •payments of penalties for terminating the lease, if the lease term reflects the exercise of an option to terminate the lease. The lease liability is subsequently measured by increasing the carrying amount to reflect interest on the lease liability (using the effective interest method) and by reducing the carrying amount to reflect the lease payments made. The Group has made the accounting policy choice to classify finance costs paid in relation to a lease liability as financing activities in the statement of cash flows. The Group remeasures the lease liability (and makes a corresponding adjustment to the related right of use asset) whenever: •the lease term has changed or there is a change in the assessment of exercise of a purchase option, in which case the lease liability is remeasured by discounting the revised lease payments using a revised discount rate; •the lease payments change due to changes in an index or rate or a change in expected payment under a guaranteed residual value, in which cases the lease liability is remeasured by discounting the revised lease payments using the initial discount rate (unless the lease payments change is due to a change in a floating interest rate, in which case a revised discount rate is used); or •a lease contract is modified and the lease modification is not accounted for as a separate lease, in which case the lease liability is remeasured by discounting the revised lease payments using a revised discount rate. The right of use assets comprise the initial measurement of the corresponding lease liability, lease payments made at or before the commencement day, any initial direct costs and restoration costs as described below. They are subsequently measured at cost less accumulated depreciation and impairment losses. The lease term is determined as the non-cancellable period of a lease, together with: •periods covered by an option to extend the lease if the Group is reasonably certain to make use of that option; and / or •periods covered by an option to terminate the lease, if the Group is reasonably certain not to make use of that option. Whenever the Group incurs an obligation for costs to dismantle and remove a leased asset, restore the site on which it is located or restore the underlying asset to the condition required by the terms and conditions of the lease, a provision is recognised and measured under IAS 37 ‘Provisions, Contingent Liabilities and Contingent Assets’. The costs are included in the related right of use asset, unless those costs are incurred to produce inventories. Right of use assets are depreciated over the shorter period of lease term and useful life of the underlying asset. If a lease transfers ownership of the underlying asset or the cost of the right of use asset reflects that the Group expects to exercise a purchase option, the related right of use asset is depreciated over the useful life of the underlying asset. The depreciation starts at the commencement date of the lease. The Group applies IAS 36 ‘Impairment of Assets’ to determine whether a right of use asset is impaired and accounts for any identified impairment loss accordingly. |
Figures in millions - US Dollars | Goodwill | Other | Total | ||
Cost | |||||
Balance at 1 January 2023 | |||||
Additions | |||||
Transfers and other movements (1) | |||||
Translation | ( | ( | |||
Balance at 31 December 2023 | |||||
Accumulated amortisation and impairments | |||||
Balance at 1 January 2023 | |||||
Amortisation for the year | |||||
Translation | ( | ( | |||
Balance at 31 December 2023 | |||||
Net book value at 31 December 2023 | |||||
Cost | |||||
Balance at 1 January 2024 | |||||
Additions | |||||
Translation | ( | ( | |||
Balance at 31 December 2024 | |||||
Accumulated amortisation and impairments | |||||
Balance at 1 January 2024 | |||||
Amortisation for the year | |||||
Translation | ( | ( | |||
Balance at 31 December 2024 | |||||
Net book value at 31 December 2024 | |||||
Cost | |||||
Balance at 1 January 2025 | |||||
Additions | |||||
Disposal of subsidiary | ( | ( | |||
Translation | |||||
Balance at 31 December 2025 | |||||
Accumulated amortisation and impairments | |||||
Balance at 1 January 2025 | |||||
Amortisation for the year | |||||
Disposal of subsidiary | ( | ( | |||
Translation | |||||
Balance at 31 December 2025 | |||||
Net book value as 31 December 2025 |
2025 | |||
Figures in millions - US Dollars | Carrying Value | Fair value less costs to dispose | |
Sunrise Dam | |||
Assumptions | Nominal gold price per oz ($) | Real gold price per oz ($) | Exchange rate (A$/US$) | ||||
2025 | 2024 | 2023 | 2025 | 2024 | 2023 | ||
Year 1 | |||||||
Year 2 | |||||||
Year 3 | |||||||
Year 4 | |||||||
Year 5 | |||||||
Long-term | |||||||
2024 | |||
Figures in millions - US Dollars | Carrying Value | Fair value less costs to dispose | |
Sunrise Dam | |||
2023 | |||
Figures in millions - US Dollars | Carrying Value | Fair value less costs to dispose | |
Sunrise Dam | |||
Significant accounting judgements and estimates For the significant assumptions relating to impairments in general see Note 17. The forecasted gold price is considered a significant input with estimation uncertainty. Value beyond Proven and Probable Mineral Reserve (including Inferred Mineral Resource and mineral inventory) have been included in the life- of-mine plan for the Sunrise Dam CGU. The inclusion of the mineral inventory is supported by the repeated ability of the operation to replenish depleted Mineral Resource from exploration success providing confidence that the mineral inventory ounces included in the plan will be drilled, converted and mined over the life-of-mine. The capital investment and exploration required to convert and mine this additional material are included in the life-of-mine plan. These ounces are included in the discounted cash flow model based on a sliding scale of conversion factors to ensure risk-adjusted progression of material reflecting geological confidence and economic feasibility. |
Accounting policies Where an investment in a subsidiary, joint venture or an associate is made, any excess of the consideration transferred, the amount of any non- controlling interest in the acquiree and the acquisition date fair value of any previous equity interest in the acquiree over the fair value of the identifiable net assets acquired is recorded as goodwill. Goodwill is not amortised, is tested annually for impairment or whenever events or changes in circumstances indicate that the carrying amount may not be recoverable and carried at cost less accumulated impairment losses. Gains and losses on the disposal of an entity include the carrying amount of goodwill relating to the entity sold. Goodwill is allocated to CGUs for the purpose of impairment testing. No unallocated goodwill exists within the Group. |
Percentage held | |||||
For the year ended 31 December | Country of incorporation | Holding | 2025 | 2024 | 2023 |
Principal operating subsidiaries | |||||
AngloGold Ashanti Australia Limited (1) | Australia | Indirect | |||
AngloGold Ashanti (Pty) Ltd | South Africa | Direct | |||
AngloGold Ashanti Holdings plc | Isle of Man | Direct | |||
AngloGold Ashanti USA Incorporated | United States of America | Indirect | |||
AngloGold Ashanti Córrego do Sítio Mineração S.A. | Brazil | Indirect | |||
AngloGold Ashanti (Ghana) Limited (2) | Ghana | Indirect | |||
AngloGold Ashanti (Iduapriem) Limited | Ghana | Indirect | |||
Cerro Vanguardia S.A. | Argentina | Indirect | |||
Geita Gold Mining Limited | Tanzania | Indirect | |||
Mineração Serra Grande S.A. (3) | Brazil | Indirect | |||
Société AngloGold Ashanti de Guinée S.A. | Republic of Guinea | Indirect | |||
Sukari Gold Mines Company | Egypt | Indirect | |||
Unincorporated joint operation | |||||
Tropicana joint operation | Australia | Indirect | |||
2025 | ||
Name | Non-controlling interest % holding | Country of incorporation |
Sukari Gold Mines Company | Egypt | |
Figures in millions - US Dollars | 2025 | 2024 |
Profit allocated to material non-controlling interests | ||
Accumulated balances of material non-controlling interests |
Figures in millions - US Dollars | 2025 | 2024 |
Statement of profit or loss | ||
Revenue | ||
Profit for the period | ||
Total comprehensive income for the period, net of tax | ||
Attributable to non-controlling interests |
Distributions paid to non-controlling interests | ( | ( |
Statement of financial position as at 31 December | ||
Non-current assets | ||
Current assets | ||
Non-current liabilities | ( | ( |
Current liabilities | ( | ( |
Total equity | ||
Statement of cash flows for the period ended 31 December | ||
Cash inflow from operating activities | ||
Cash outflow from investing activities | ( | ( |
Cash outflow from financing activities | ( | ( |
Net decrease in cash and cash equivalents | ( | ( |
Accounting policies Foreign currency translations Items included in the financial statements of each of the Group’s entities are measured using the currency of the primary economic environment in which the entity operates (the ‘functional currency’). The functional currency of the parent company is United States Dollars. Foreign currency transactions are translated into the functional currency using the exchange rates prevailing at the dates of the transactions. Foreign exchange gains and losses resulting from the settlement of such transactions, and from the translation of monetary assets and liabilities denominated in foreign currencies, are recognised in profit or loss. |
The results and financial position of all Group entities (none of which has the currency of a hyperinflationary economy) that have a functional currency different from the presentation currency are translated into the presentation currency using closing rates of exchange at the reporting date for assets and liabilities, average rates of exchange for the year for income and expense items and historical rates of exchange for equity items. All resulting exchange differences are recognised in other comprehensive income and presented as a separate component of equity (foreign currency translation reserve, or FCTR). Exchange differences arising from the translation of the net investment in foreign operations are accounted for as other comprehensive income on consolidation. On disposal of the foreign operation, the resulting FCTR is recycled to the income statement. The settlement or partial settlement of a permanent loan which is considered part of the net investment in the foreign operation, with no change in the percentage shareholding, does not constitute a disposal or partial disposal of the foreign operation. |
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Carrying value | |||||
Investments in associates | |||||
Investments in joint ventures (1) | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Aggregate statement of profit or loss for associates (attributable) | |||||
Revenue | |||||
Operating expenses | ( | ( | ( | ||
Taxation | ( | ( | ( | ||
Profit for the year (2) | |||||
Total comprehensive income for the year, net of tax | |||||
Name | Effective % | Description | Country of incorporation and operation | ||||||
2025 | 2024 | 2023 | |||||||
Kibali Goldmines S.A. (1) | Exploration and mine development | The Democratic Republic of the Congo | |||||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Carrying value of joint ventures | |||||
Kibali (Jersey) Limited | |||||
Impairment of investment in joint venture | |||||
Société d’Exploitation des Mines d’Or de Yatela S.A. (1) | ( | ( | |||
The cumulative unrecognised share of losses of the joint ventures: | |||||
Société d’Exploitation des Mines d’Or de Yatela S.A. (1) | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Statement of profit or loss | |||||
Revenue | |||||
Other operating costs and expenses | ( | ( | ( | ||
Amortisation of tangible and intangible assets | ( | ( | ( | ||
Finance costs, unwinding of obligations and cash repatriation fee | ( | ( | ( | ||
Interest received | |||||
Share of profits of equity accounted joint venture | |||||
Taxation | ( | ( | ( | ||
Profit for the year | |||||
Total comprehensive income for the year, net of tax | |||||
Dividends received from joint venture (attributable) | |||||
Statement of financial position | |||||
Non-current assets | |||||
Current assets | |||||
Cash and cash equivalents | |||||
Total assets | |||||
Non-current financial liabilities | |||||
Other non-current liabilities | |||||
Current financial liabilities | |||||
Other current liabilities | |||||
Total liabilities | |||||
Net assets | |||||
Group’s share of net assets | |||||
Other (1) | ( | ( | ( | ||
Carrying amount of interest in joint venture | |||||
Figures in millions | 2025 | 2024 |
Opening balance | ||
Dividend in specie declared (1) | ||
Repayments | ( | ( |
Interest accrued | ||
Closing balance (2) |
Accounting policies A joint venture is an entity in which the Group holds a long-term interest and which the Group and one or more other ventures jointly control under a contractual arrangement, that provides for strategic, financial and operating policy decisions relating to the activities requiring unanimous consent of the parties sharing control. In a joint venture, the Group has rights to the net assets of the arrangement, rather than rights to its assets and obligations for its liabilities. An associate is an investment over which the Group exercises significant influence, but not control or joint control, over the financial and operating policies and normally owns between 20% and 50% of the voting equity. Joint ventures and associates are equity-accounted from the effective date of acquisition to the effective date of disposal. Any losses of equity- accounted investments are accounted for in the consolidated financial statements until the investment in such investments is written down to zero. Thereafter, losses are accounted for only insofar as the Group is committed to providing financial support to such investees. The carrying value of equity-accounted investments represents the cost of each investment, including goodwill, balance outstanding on loans advanced if the loan forms part of the net investment in the investee, any impairment / impairment reversals recognised, the share of post- acquisition retained earnings and losses, and any other movements in reserves. The carrying value of equity-accounted investments is reviewed when indicators arise and if any impairment / impairment reversal has occurred; it is recognised in the period in which the impairment arose. If necessary, impairment and impairment reversals on loans and equity are reported under share of joint ventures and associates profit and loss. In the statement of cash flows, dividends received from joint ventures are included in operating activities as the Group has joint control over the strategic, financial and operating policy decisions. Dividends received from associates are included in investing activities as the Group only exercises significant influence over the financial and operating policies. |
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Non-current | |||||
Raw materials - ore stockpiles | |||||
Current | |||||
Raw materials | |||||
- ore stockpiles | |||||
- heap-leach inventory | |||||
Work in progress | |||||
- metals in process | |||||
- gold concentrate in process | |||||
Finished goods | |||||
- gold doré/bullion | |||||
- by-products | |||||
- gold concentrate | |||||
Total metal inventories | |||||
Mine operating supplies | |||||
Total inventories(1) | |||||
Accounting policies Inventories are valued at the lower of cost and net realisable value after appropriate allowances for redundant and obsolete items. Cost is determined on the following bases: •metals in process are valued at the average total production cost at the relevant stage of production; •gold doré/bullion is valued on an average total production cost method; •gold concentrate is valued on an average total production cost method; •ore stockpiles are valued at the average moving cost of mining and stockpiling the ore. Stockpiles are classified as a non-current asset where the stockpile exceeds current processing capacity and not expected to be processed in the next 12 months; •by-products, which include silver and sulphuric acid, are valued using an average total production cost method; •mine operating supplies are valued at average cost; and •heap leach pad materials are measured on an average total production cost basis. Surface and underground stockpiles and metals in process are measured by estimating the number of tonnes added and removed from the stockpile, the number of contained ounces based on assay data, and the estimated recovery percentage based on the expected processing method. Stockpile ore tonnages are verified by periodic surveys. A portion of the related depreciation, depletion and amortisation charge is included in the cost of inventory. Inventory write downs are included in cost of sales. Net realisable value tests are performed at least annually and represent the estimated future sales price of the product, based on prevailing and long-term metals prices, less estimated costs to complete production and bring the product to sale. |
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Revised (1) | Revised (1) | ||||
Non-current | |||||
Deferred consideration asset (financial assets) | |||||
Prepayments | |||||
Recoverable tax, rebates, levies and duties | |||||
Other receivables (financial assets) | |||||
Current | |||||
Trade receivables (financial assets) | |||||
Deferred consideration asset (financial assets) | |||||
Prepayments | |||||
Recoverable tax, rebates, levies and duties | |||||
Dividend receivable from Kibali joint venture | |||||
Other receivables (financial assets) | |||||
Total trade, other receivables and other assets | |||||
There is a concentration risk of recoverability in respect of amounts due from Revenue Authorities for recoverable tax, rebates, levies and duties from subsidiaries in the Africa Region segment. The Group uses probability weighted discounting models together with the expected timing of recovery of these refunds to quantify the current fair value and related discounting effects which are updated at each reporting period. Timing of the recoverability and the resultant probabilities is updated based on several factors including ongoing correspondence and meetings with the relevant authorities and income taxes available for off-sets, if applicable. A reasonable possible change in the risk-free discount rate and/or expected timing of recovery used in the weighted probability model would not have a material impact on the fair value recognised. | |||||
These values are summarised as follows: | |||||
Recoverable value added tax (2) | |||||
Appeal deposits | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Non-current | |||||
Cash restricted for environmental and rehabilitation obligations (1) | |||||
Current | |||||
Cash restricted by prudential solvency requirements (2) | |||||
Cash balances held by joint operations | |||||
Total cash restricted for use | |||||
Accounting policies Cash restricted for use comprises cash and cash equivalents including amounts held in escrow, trust, and separate bank accounts. Cash restricted for use for more than 12 months after year-end is classified as a non-current financial asset. |
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Cash and cash equivalents | |||||
Bank overdraft | ( | ( | ( | ||
Per Statement of Cash Flows | |||||
Accounting policies Cash and cash equivalents comprise cash on hand, deposits on call and other short-term highly liquid investments with a maturity period of three months or less at date of purchase. Cash and cash equivalents are stated at carrying amount which fairly approximates its fair value. For the purposes of the statement of cash flows, cash and cash equivalents is net of bank overdrafts as it forms an integral part of the Group’s cash management. The Group has made the accounting policy choice to classify interest received as investing activities in the statement of cash flows. |
Number of shares | |||||
2025 | 2024 | 2023 | |||
Issued and fully paid ordinary shares at a nominal value of $ | |||||
Ordinary shares issued at the beginning of the year | |||||
Issued in terms of the corporate restructuring | |||||
Issued in terms of acquisition of Centamin | |||||
Issued in terms of employee share awards | |||||
Ordinary shares issued at the end of the year | |||||
Accounting policies Ordinary shares are classified as equity and incremental costs directly attributable to the issue of new shares or options are shown directly in |
Figures in millions | US Dollars | |||||||
2025 | 2024 | 2023 | ||||||
Expiry date | Currency | Interest Rate | Contract Amount | Available facilities (2) | Utilised facilities | Utilised facilities | Utilised facilities | |
Unsecured | ||||||||
Debt arrangements (1) | ||||||||
Rated bonds | November 2028 | US dollar | ||||||
Rated bonds | October 2030 | US dollar | ||||||
Rated bonds | April 2040 | US dollar | ||||||
Unamortised loan costs | ( | ( | ( | |||||
Interest accrued | ||||||||
Banking facilities | ||||||||
Geita revolving credit facility (4) | February 2028 | US dollar, Tanzanian shilling | SOFR+credit adj+ Tanzanian Treasury Bill+ | |||||
Siguiri revolving credit facility (3)(4) | October 2028 | US dollar | SOFR+ | |||||
Multi-currency revolving credit facility (4) | June 2029 | US dollar, Australian dollar | SOFR+credit adj+ BBSY+ | |||||
Total borrowings | ||||||||
25 BORROWINGS (continued) | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Total borrowings | |||||
Current portion of borrowings | ( | ( | ( | ||
Total non-current borrowings | |||||
Amounts falling due | |||||
Within one year | |||||
Between one and two years | |||||
Between two and five years | |||||
After five years | |||||
Change in liabilities arising from financing activities: | |||||
Reconciliation of borrowings (excluding lease liabilities) (5) | |||||
A reconciliation of the total borrowings included in the statement of financial position is set out in the following table: | |||||
Opening balance | |||||
Proceeds from borrowings | |||||
Repayment of borrowings | ( | ( | ( | ||
Finance costs paid on borrowings | ( | ( | ( | ||
Deferred loan fees | ( | ||||
Interest charged to the income statement | |||||
Translation | ( | ( | |||
Closing balance | |||||
Reconciliation of finance costs paid: | |||||
A reconciliation of the finance cost paid included in the statement of cash flows is set out in the following table: | |||||
Finance costs paid on borrowings | |||||
Capitalised finance cost | |||||
Interest paid on tax liability | |||||
Commitment fees, utilisation fees and other borrowing costs | |||||
Total finance costs paid | |||||
Figure in millions | Provision for decommissioning | Provision for restoration | Provision for silicosis | Other provisions (2) | Total | |||||
Balance at 1 January 2025 | ||||||||||
Changes in estimates - recognised in profit or loss (1) | ||||||||||
Change in estimates - capitalised (1) | ( | ( | ||||||||
Acquired through asset acquisition (see Note 13.2) | ||||||||||
Transfer to held for sale | ( | ( | ||||||||
Utilised during the year | ( | ( | ( | ( | ||||||
Unwinding of provision | ||||||||||
Disposal of subsidiary (see Note 14.1) | ( | ( | ( | ( | ||||||
Translation | ||||||||||
Balance at 31 December 2025 | ||||||||||
Current portion | ||||||||||
Non-current portion |
Figure in millions | Provision for decommissioning | Provision for restoration | Provision for silicosis | Other provisions | Total | ||||
Expected cash flows | |||||||||
Within one year | |||||||||
Between one and two years | |||||||||
Between two and five years | |||||||||
Between five and ten years | |||||||||
After ten years | |||||||||
Figures in millions | 2025 |
Sensitivity analysis - Provision for decommissioning (3) | |
A change in cash flows has a significant impact on the amounts recognised in the statement of financial position. A reasonable possible change in the discount rate used in the calculation would not have a material impact on the value of the decommissioning provision. A 10% change in the cash flows would have the following impact: | |
Effect of increase in assumptions: | |
10% change in cash flows | |
Effect of decrease in assumptions: | |
10% change in cash flows | ( |
Sensitivity analysis - Provision for restoration (3) | |
A change in cash flows has a significant impact on the amounts recognised in the income statement. A reasonable possible change in the discount rate used in the calculation would not have a material impact on the value of the restoration provision. A 10% change in the cash flows would have the following impact: | |
Effect of increase in assumptions: | |
10% change in cash flows | |
Effect of decrease in assumptions: | |
10% change in cash flows | ( |
Figures in millions | 2025 | 2024 | 2023 |
Australia | |||
Amounts paid into Mine Rehabilitation Fund | |||
Iduapriem | |||
Cash component of bond | |||
Bond guarantee, issued by ABSA Bank Ghana Limited, Standard Chartered Bank Ghana Ltd, Ecobank Ghana Ltd, United Bank for Africa, First Rand Bank Ghana Ltd and Stanbic Bank Ghana Ltd for a current carrying value of the liability of $ | |||
Obuasi | |||
Cash component of bond | |||
Bond guarantee issued by First National Bank Ghana Limited, Stanbic Bank Ghana Ltd and Standard Chartered Bank Ghana PLC for a current carrying value of the liability of $ (2024: $ | |||
Córrego do Sítio | |||
Bank guarantee, issued by Banco De Desenvolvimento De Minas Gerais S.A., for a current carrying value of the liability of $ |
2025 | ||
Group environmental rehabilitation (excluding Australia and Brazil environmental rehabilitation) | ||
USD inflation rate (range) | ||
USD discount rate (range) | ||
Australia environmental rehabilitation | ||
AUD inflation rate (range) | ||
AUD discount rate (range) | ||
Brazil environmental rehabilitation | ||
Brazil inflation rate (range) | ||
Brazil discount rate (range) |
Accounting policies The Group incurs obligations to close, restore and rehabilitate its mine sites affected by mining and exploration activities which are subject to various laws and regulations governing the protection of the environment. The Group recognises management’s best estimate for decommissioning and restoration obligations in the period in which they are incurred and the costs can be reasonably estimated. The determination of the provision is based on, among other considerations, judgements and estimates of current damage caused, timing and amount of future costs to be incurred to rehabilitate the mine sites, estimates of future inflation, exchange rates and discount rates. Contingencies are included in the provision to cater for specific risks. Where the rehabilitation plans are only at a planning or conceptual stage and there is a low level of detail, this will require a higher contingency to cater for the risk and conversely a lower contingency is required where more detailed plans are available. This is in line with the engineering and environmental project management standard practice. |
Environmental expenditure The Group has long-term remediation obligations comprising decommissioning and restoration liabilities relating to its past operations which are based on the Group’s environmental management plans, in compliance with current environmental and regulatory requirements. Provisions for non-recurring remediation costs are made when there is a present obligation, it is probable that expenditure on remediation work will be required and the cost can be estimated within a reasonable range of possible outcomes. The costs are based on currently available facts, technology expected to be available at the time of the clean-up, laws and regulations presently or virtually certain to be enacted and prior experience in remediation of contaminated sites. |
Decommissioning costs The provision for decommissioning represents the cost that will arise from dismantling and removing an asset and restoring the site on which it is located. The obligation is incurred at the time the asset is put in place or as a consequence of using the asset for purposes other than to produce inventories. Accordingly, a provision and a decommissioning asset is recognised and included within mine infrastructure. Decommissioning costs are provided at the present value of the expenditures expected to settle the obligation, using estimated cash flows based on current prices. The unwinding of the decommissioning obligation is included in the income statement as finance costs. Estimated future costs of decommissioning obligations are reviewed regularly and adjusted as appropriate for new circumstances or changes in law or technology. Changes in estimates are capitalised or reversed against the relevant asset. Estimates are discounted at a pre-tax rate that reflects current market assessments of the time value of money. Gains or losses from the expected disposal of assets are not taken into account when determining the provision. |
Restoration costs The provision for restoration represents the cost of restoring site damage as a result of operating the asset to produce inventories. Changes in the provision are recorded in the income statement as a cost of production. Restoration costs are estimated at the present value of the expenditures expected to settle the obligation, using estimated cash flows based on current prices and adjusted for risks specific to the liability. The estimates are discounted at a pre-tax rate that reflects current market assessments of the time value of money. |
Other Litigation and administrative proceedings are evaluated on a case-by-case basis considering the information available, including that of legal counsel, to assess potential outcomes. Where it is considered probable that an obligation will result in an outflow of resources, a provision is recorded for the present value of the expected cash outflows if these are reasonably measurable. These provisions cover the estimated payments to plaintiffs, court fees and the cost of potential settlements. Where some or all of the expenditure required to settle a provision is expected to be reimbursed by another party, the reimbursement is recognised only when the reimbursement is virtually certain. The amount to be reimbursed is recognised as a separate asset. Where the Group has a joint and several liability with one or more other parties, no provision is recognised to the extent that those other parties are expected to settle part or all of the obligation. |
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Defined benefit plans | |||||
The retirement schemes consist of the following: | |||||
Post-retirement medical scheme for AngloGold Ashanti's South African employees | |||||
Other defined benefit plans | |||||
Post-retirement medical scheme for AngloGold Ashanti's South African employees | |||||
The provision for post-retirement medical funding represents the provision for healthcare benefits for employees and retired employees and their registered dependents. | |||||
The post-retirement benefit costs are assessed in accordance with the advice of independent professionally qualified actuaries. The actuarial method used is the projected unit credit funding method. The last valuation was performed as at 31 December 2025. | |||||
Information with respect to the defined benefit liability is as follows: | |||||
Benefit obligation | |||||
Balance at beginning of year | |||||
Interest cost | |||||
Benefits paid | ( | ( | ( | ||
Actuarial gain | ( | ( | ( | ||
Translation | ( | ( | |||
Balance at end of year | |||||
Assumptions | |||||
Assumptions used to determine benefit obligations at the end of the year are as follows: | |||||
Discount rate | |||||
Expected increase in healthcare costs | |||||
Assumed healthcare cost trend rates have a significant effect on the amounts reported for healthcare plans. A 1% point change in assumed healthcare cost trend rates would have the following effect: | |||||
Effect on post-retirement benefit obligation – | |||||
Effect on post-retirement benefit obligation – | ( | ( | ( | ||
The Company purchased annuities to partly meet its obligations to pay medical aid contributions. The annuities are payable monthly and cover contributions payable to retired members. | |||||
Reimbursive right for post-retirement benefits | |||||
Balance at the beginning of the year | |||||
Premiums paid | |||||
Benefits paid | ( | ( | ( | ||
Interest income | |||||
Actuarial loss | ( | ( | |||
Translation | ( | ( | |||
Balance at end of year | |||||
The fair value of the right of reimbursement has been determined as the present value of expected future annuity payments payable by the insurer in respect of continuation members. The future annuity payments make appropriate allowance for future increases in line with CPI. The main inputs used in the valuation model are healthcare cost inflation of | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Cash flows | |||||
Estimated future benefit payments | |||||
The following medical benefit payments, which reflect the expected future service, as appropriate, are expected to be paid through the purchased annuities: | |||||
2026 | |||||
2027 | |||||
2028 | |||||
2029 | |||||
2030 | |||||
Thereafter | |||||
Accounting policies Post-employment benefit obligations Some Group companies provide post-retirement healthcare benefits to their retirees. The entitlement to these benefits is usually conditional on the employee remaining in service up to retirement age and completion of a minimum service period. The expected costs of these benefits are accrued over the period of employment using an accounting methodology on the same basis as that used for defined benefit pension plans. Actuarial gains and losses arising from experience adjustments and changes in actuarial assumptions are recorded in other comprehensive income immediately. These obligations are valued annually by independent qualified actuaries. The determination of the Group's obligation and expense for post-retirement liabilities, including the Group’s reimbursive asset relating to annuities purchased to fund the obligation, depends on the selection of certain assumptions used by actuaries to calculate amounts. These assumptions include, among others, the discount rate, healthcare inflation costs, rates of increase in compensation costs and the number of employees who reach retirement age before the mine reaches the end of its life. While AngloGold Ashanti believes that these assumptions are appropriate, significant changes in the assumptions may materially affect post-retirement obligations as well as future expenses, which may result in an impact on earnings in the periods that the changes in these assumptions occur. Some of these obligations are funded with a purchased insurance policy to which the Group contributes premiums to. As this insurance policy does not meet the definition of a qualifying insurance policy the Group recognises its right to reimbursement under the insurance policy as a separate asset measured at fair value, similar to a defined benefit plan asset. Actuarial gains and losses arising from experience adjustments and changes in actuarial assumptions are recorded in other comprehensive income immediately. These assets are valued annually by independent qualified actuaries. |
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Revised (2) | Revised (2) | ||||
Deferred taxation relating to temporary differences is made up as follows: | |||||
Liabilities (2) | |||||
Tangible assets (owned) (2) | |||||
Right of use assets | |||||
Inventories | |||||
Other (1) | |||||
Assets | |||||
Provisions | |||||
Lease liabilities | |||||
Tax losses | |||||
Other | |||||
Net deferred taxation liability | |||||
Included in the statement of financial position as follows: | |||||
Deferred tax assets (2) | |||||
Deferred tax liabilities (2) | |||||
Net deferred taxation liability (2) | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Financial liabilities | |||||
Trade payables (1) | |||||
Accruals | |||||
Derivative financial liabilities | |||||
Other financial liabilities | |||||
Non financial liabilities | |||||
Employee related payables | |||||
Other payables | |||||
Total trade and other payables | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Revised (1) | Revised (1) | ||||
Balance at beginning of year (1) | |||||
Refunds during the year | |||||
Payments during the year | ( | ( | ( | ||
Taxation of items included in the income statement (1) | |||||
Offset of VAT and other taxes | ( | ( | ( | ||
Disposal of subsidiaries (2) | ( | ||||
Translation | ( | ( | ( | ||
Balance at end of year (1) | |||||
Included in the statement of financial position as follows: | |||||
Trade, other receivables and other assets | ( | ( | ( | ||
Taxation liability (1) | |||||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Profit before taxation | |||||
Adjusted for: | |||||
Movement on non-hedge derivatives and other commodity contracts | ( | ||||
Amortisation of tangible and right of use assets (Note 4) | |||||
Amortisation of intangible assets (Note 4) | |||||
Finance costs and unwinding of obligations (Note 6) | |||||
Environmental, rehabilitation, silicosis and other provisions | ( | ( | ( | ||
Net impairment (reversal of impairment) | ( | ||||
Net loss (profit) on sale of assets and derecognition of assets | ( | ( | |||
Other expenses (non-cash portion) | |||||
Finance income | ( | ( | ( | ||
Share of associates and joint ventures’ profit | ( | ( | ( | ||
Other non-cash movements | |||||
Other exchange losses | |||||
Movements in working capital | ( | ( | ( | ||
Movements in working capital: | |||||
Increase in inventories | ( | ( | ( | ||
Increase in trade, other receivables and other assets | ( | ( | ( | ||
Increase in trade and other payables | |||||
( | ( | ( | |||
US Dollars | |||||
Figures in millions | 2025 | 2024 | 2023 | ||
Material related party transactions were as follows (not attributable): | |||||
Purchases and services acquired from related parties | |||||
Associates | |||||
Loan advanced to joint ventures and associates | |||||
Joint ventures | |||||
US Dollar thousands | 2025 | 2024 | 2023 | |||||
Base salary | Pension scheme benefits | Other benefits(1) | Annual cash bonus | Transition award (2) | Total (3) | Total | Total | |
Executive Directors | ||||||||
US Dollar thousands | 2025 | 2024 | 2023 | |||||
Base salary | Pension scheme benefits | Other benefits(1) | Annual cash bonus | Transition award (2) | Total (3) | Total | Total | |
Executive Management | ||||||||
US Dollar thousands | 2025 | 2024 | 2023 | |||
Director fees (1) | Committee fees (2) | Travel allowance | Total | Total | Total | |
Non-executive Directors | ||||||
US Dollars | ||||||
Figures in millions | 2025 | 2024 | 2023 | |||
Capital commitments | ||||||
Acquisition of tangible assets | ||||||
Contracted for | ||||||
Not contracted for | ||||||
Authorised based on Group’s approval framework (1) | ||||||
Allocated to: | ||||||
Non-sustaining capital | ||||||
- within one year | ||||||
- thereafter | ||||||
Sustaining capital | ||||||
- within one year | ||||||
- thereafter | ||||||
Share of underlying capital commitments of joint ventures included above | ||||||
Purchase obligations | ||||||
Contracted for | ||||||
- within one year | ||||||
- thereafter | ||||||
Figures in millions - US Dollars | At fair value through profit or loss | At fair value through other comprehensive income | At amortised cost |
2025 | |||
Financial assets | |||
Other investments | |||
Loan receivable | — | — | |
Trade, other receivables and other assets | — | — | |
Contingent consideration assets | — | ||
Cash restricted for use | — | — | |
Cash and cash equivalents | — | — | |
Financial liabilities | |||
Borrowings | — | — | |
Lease liabilities | — | — | |
Trade and other payables | — | — | |
Bank overdraft | — | — | |
2024 | |||
Financial assets | |||
Other investments | |||
Loan receivable | — | — | |
Trade, other receivables and other assets (1) | — | — | |
Contingent consideration assets (1) | — | ||
Cash restricted for use | — | — | |
Cash and cash equivalents | — | — | |
Financial liabilities | |||
Borrowings | — | — | |
Lease liabilities | — | — | |
Trade and other payables | — | — | |
Bank overdraft | — | — | |
2023 | |||
Financial assets | |||
Other investments | — | ||
Loan receivable | — | — | |
Trade, other receivables and other assets (1) | — | — | |
Contingent consideration assets (1) | — | ||
Cash restricted for use | — | — | |
Cash and cash equivalents | — | — | |
Financial liabilities | |||
Borrowings | — | — | |
Lease liabilities | — | — | |
Trade and other payables | — | — | |
Derivative financial liabilities | — | ||
Bank overdraft | — | — | |
US Dollars | |||
Figures in millions | 2025 | 2024 | 2023 |
Cash and cash equivalents | |||
Australian dollar | |||
Ghanaian cedi | |||
Borrowings | |||
Tanzanian shilling | |||
US Dollars | ||||
Figures in millions | 2025 | 2024 | 2023 | |
Cash and cash equivalents | ||||
Australian dollar (AUD/$) | Spot +10% | ( | ( | ( |
Ghanaian cedi (GHS/$) | Spot +10% | ( | ( | ( |
Australian dollar (AUD/$) | Spot -10% | |||
Ghanaian cedi (GHS/$) | Spot -10% | |||
Borrowings | ||||
Tanzanian shilling (TZS/$) | Spot +10% | |||
Tanzanian shilling (TZS/$) | Spot -10% | ( | ( | |
US Dollars | |||
Figures in millions | 2025 | 2024 | 2023 |
Fixed rate instruments | |||
Borrowings | |||
Joint venture loan receivable | |||
Variable rate instruments | |||
Cash restricted for use | |||
Cash and cash equivalents | |||
Borrowings | |||
US Dollars | ||||
Figures in millions | 2025 | 2024 | 2023 | |
Cash and cash equivalents | ||||
United States dollar | 1% increase | |||
Australian dollar | 1% increase | |||
Borrowings | ||||
United States dollar | 1% increase | ( | ( | ( |
Tanzanian shilling | 1% increase | ( | ( | |
Figures in millions - US Dollars | Within one year | Between one and two years | Between two and five years | After five years | Total |
2025 | |||||
Non-derivative financial liabilities | |||||
Trade and other payables | |||||
Bank overdraft | |||||
Borrowings | |||||
Lease liabilities | |||||
Financial guarantee contract (1) | |||||
2024 | |||||
Non-derivative financial liabilities | |||||
Trade and other payables | |||||
Bank overdraft | |||||
Borrowings | |||||
Lease liabilities | |||||
2023 | |||||
Derivative financial liabilities | |||||
Oil forward contracts | |||||
Non-derivative financial liabilities | |||||
Trade and other payables | |||||
Bank overdraft | |||||
Borrowings | |||||
Lease liabilities | |||||
2025 | 2024 | 2023 | ||
Cash and cash equivalents | ||||
Low (AAA to A-) | ||||
Medium (BBB to B-) | ||||
High (CCC+ and below) | ||||
Restricted cash | ||||
Low (AAA to A-) | ||||
Medium (BBB to B-) | ||||
Figures in millions | US Dollars | ||||||||
Fair value | Carrying value | Fair value | Carrying value | Fair value | Carrying value | Valuation method | Significant inputs | Fair value hierarchy of inputs | |
As at December | As at December | As at December | As at December | As at December | As at December | ||||
Financial instrument | 2025 | 2024 | 2023 | ||||||
At fair value through profit and loss | |||||||||
Contingent consideration asset - Mponeng (1)(2) | Probability weighted discounted cash flow | The production plan over the contingent consideration period | Level 3 | ||||||
Contingent consideration asset - Gramalote (1)(2) | Probability weighted discounted cash flow | Stage gate payments over the contingent period and discount rates | Level 3 | ||||||
Contingent consideration asset - Mansala (2) | Probability weighted discounted cash flow | Contingent payment and discount rates | Level 3 | ||||||
Contingent consideration asset - ABC (2) | Probability weighted discounted cash flow | Stage gate payments over the contingent period and discount rates | Level 3 | ||||||
Contingent consideration asset - MSG (2) | Discounted cash flow | The production plan over the contingent consideration period, forecasted gold prices and discount rates | Level 3 | ||||||
Derivative financial liability - gold zero-cost collar contracts (3) | Black-Scholes-Merton option pricing model | Forward and spot prices, the number of outstanding ounces of gold on open contracts, risk free rates and volatilities | Level 2 | ||||||
At fair value through other comprehensive income | |||||||||
Listed equity investments | Level 1 | ||||||||
At amortised cost | |||||||||
Borrowings - Rated bonds | Level 1 | ||||||||
Borrowings - Revolving Credit Facilities | Discounted cash flow | Market related interest rates | Level 3 | ||||||
Deferred consideration asset - Doropo (4) | Discounted cash flow | Deferred payments over the consideration period and discount rates | Level 3 | ||||||
Joint venture loan receivable | Discounted cash flow | Market related interest rates | Level 3 | ||||||
US Dollar millions | |||
Figures in millions | 2025 | 2024 | 2023 |
Opening balance | |||
Unwinding of the contingent consideration assets | |||
Changes in estimates - fair value adjustments (1) | |||
Contingent consideration assets recognised on sale of business | |||
Part repayment of contingent consideration asset - Mponeng | ( | ( | |
Translation | ( | ( | |
Closing balance (2) | |||
Accounting policies Financial instruments are initially recognised at fair value when the Group becomes a party to their contractual arrangements. Transaction costs directly attributable to the instrument’s acquisition or issue are included in the initial measurement of financial assets and financial liabilities, except financial instruments classified as at fair value through profit or loss (FVTPL), which are expensed. The subsequent measurement of financial instruments is dealt with below. |
Financial liabilities Financial liabilities are classified as measured at amortised cost using the effective interest method. Financial liabilities subsequently measured at amortised cost compromises interest bearing borrowings, bank overdrafts and trade and other payables. A financial liability is derecognised when the obligation under the liability is discharged, cancelled or expires. The Group also derecognises a financial liability when its terms are modified and the cash flows of the modified liability are substantially different. In this case, a new financial liability based on the modified terms is recognised at fair value. The Group has elected the accounting policy choice to classify finance costs paid in relation to borrowings as financing activities in the |
Financial assets A financial asset is classified as measured at: •Amortised cost; •Fair value through other comprehensive income (FVTOCI) - equity instruments; or •FVTPL. Assets at amortised cost include trade, other receivables and other assets, cash restricted for use and cash and cash equivalents. Interest income from these financial assets is included in finance income using the effective interest method. The trade receivables from provisional gold concentrate sales are carried at fair value through profit or loss and are marked-to-market at the end of each period until final settlement occurs, with changes in fair value classified as provisional price adjustments and included as a component of revenue. Assets at FVTPL include contingent consideration assets. These assets are subsequently measured at fair value. Net gains or losses are recognised in the income statement. Assets at FVTOCI include listed equity instruments which are subsequently measured at fair value. Net gains or losses are recognised in other comprehensive income and never reclassified to the income statement. On derecognition of a financial asset, the difference between the proceeds received or receivable and the carrying amount of the asset is included in profit or loss. Impairment losses are presented in the statement of profit or loss. A gain or loss on a debt investment that is subsequently measured at FVTPL is recognised in profit or loss and presented net within foreign exchange and fair value adjustments in the period in which it arises. |
Exhibit Number | Description | Remarks | ||
Exhibit 19.1 | Articles of Association of AngloGold Ashanti plc adopted on 25 September 2023 | Incorporated by reference to Exhibit 19.1 to AngloGold Ashanti plc’s Annual Report on Form 20-F (No. 001-41815) filed with the Securities and Exchange Commission on 25 April 2024 | ||
Exhibit 19.2.1 | Indenture for guaranteed debt securities, dated as of 28 April 2010, among AngloGold Ashanti Holdings plc, as issuer, the guarantor party thereto, and The Bank of New York Mellon, as trustee | Incorporated by reference to Exhibit 4.2 to AngloGold Ashanti (Pty) Ltd (formerly known as AngloGold Ashanti Limited) and AngloGold Ashanti Holdings plc’s Registration Statement on Form F-3 (Nos. 333-182712 and 333-182712-02) filed with the Securities and Exchange Commission on 17 July 2012 | ||
Exhibit 19.2.2 | First Supplemental Indenture, dated as of 23 September 2023, among AngloGold Ashanti Holdings plc, as issuer, AngloGold Ashanti Limited (currently known as AngloGold Ashanti (Pty) Ltd), as guarantor, AngloGold Ashanti plc, as successor guarantor, and The Bank of New York Mellon, as trustee | Incorporated by reference to Exhibit 19.2.2 to AngloGold Ashanti plc’s Annual Report on Form 20-F (No. 001-41815) filed with the Securities and Exchange Commission on 25 April 2024 | ||
Exhibit 19.2.3 | Form of 6.50% Notes due 2040 and related Guarantee | Incorporated by reference to Exhibit 99(C) to AngloGold Ashanti (Pty) Ltd (formerly known as AngloGold Ashanti Limited) and AngloGold Ashanti Holdings plc’s Registration Statement on Form 8-A (Nos. 001-14846 and 001-34725) filed with the Securities and Exchange Commission on 28 April 2010 | ||
Exhibit 19.2.4 | Form of 3.75% Notes due 2030 and related Guarantee | Incorporated by reference to Exhibit 4.1 to AngloGold Ashanti (Pty) Ltd (formerly known as AngloGold Ashanti Limited) and AngloGold Ashanti Holdings plc’s report on Form 6-K (Nos. 001-14846 and 001-34725) filed with the Securities and Exchange Commission on 1 October 2020 | ||
Exhibit 19.2.5 | Form of 3.375% Notes due 2028 and related Guarantee | Incorporated by reference to Exhibit 4.1 to AngloGold Ashanti (Pty) Ltd (formerly known as AngloGold Ashanti Limited) and AngloGold Ashanti Holdings plc’s report on Form 6-K (Nos. 001-14846 and 001-34725) filed with the Securities and Exchange Commission on 22 October 2021 | ||
Exhibit 19.2.6 | Description of Securities Registered under Section 12 of the Securities Exchange Act of 1934 | Filed herewith | ||
Exhibit 19.4.1 | 2023 Deferred Share Plan of AngloGold Ashanti plc | Incorporated by reference to Exhibit 99.1 to AngloGold Ashanti plc’s Registration Statement on Form S-8 (No. 333-274681) filed with the Securities and Exchange Commission on 25 September 2023 | ||
Exhibit 19.4.2 | 2024 Omnibus Incentive Compensation Plan of AngloGold Ashanti plc | Incorporated by reference to Exhibit 99.1 to AngloGold Ashanti plc’s Registration Statement on Form S-8 (No. 333-278925) filed with the Securities and Exchange Commission on 25 April 2024 | ||
Exhibit Number | Description | Remarks | ||
Exhibit 19.4.3.1 | Syndicated Multi-currency Revolving Credit Facility Agreement, dated as of 9 June 2022, among AngloGold Ashanti Holdings plc and AngloGold Ashanti Australia Limited, as borrowers, and the Bank of Nova Scotia, as facility agent, and the financial institutions party thereto, as lenders (the “2022 multi- currency RCF”) | Incorporated by reference to Exhibit 19.4.4.1 to AngloGold Ashanti (Pty) Ltd’s (formerly known as AngloGold Ashanti Limited’s) Annual Report on Form 20-F (No. 001-14846) filed with the Securities and Exchange Commission on 17 March 2023 | ||
Exhibit 19.4.3.2 | Extension request letter relating to the 2022 multi-currency RCF, dated as of 24 May 2023, between AngloGold Ashanti Holdings plc, as obligors’ agent, and the Bank of Nova Scotia, as agent | Incorporated by reference to Exhibit 19.4.2.2 to AngloGold Ashanti plc’s Annual Report on Form 20-F (No. 001-41815) filed with the Securities and Exchange Commission on 25 April 2024 | ||
Exhibit 19.4.3.3 | Amendment Agreement relating to the 2022 multi-currency RCF, dated as of 7 November 2023, between AngloGold Ashanti Holdings plc, as obligors’ agent, and the Bank of Nova Scotia, as agent | Incorporated by reference to Exhibit 19.4.2.3 to AngloGold Ashanti plc’s Annual Report on Form 20-F (No. 001-41815) filed with the Securities and Exchange Commission on 25 April 2024 | ||
Exhibit 19.4.3.4 | Extension request letter relating to the 2022 multi-currency RCF, dated as of 4 July 2024, between AngloGold Ashanti Holdings plc, as obligors’ agent, and the Bank of Nova Scotia, as agent | Incorporated by reference to Exhibit 19.4.3.4 to AngloGold Ashanti plc’s Annual Report on Form 20-F (No. 001-41815) filed with the Securities and Exchange Commission on 15 April 2025. | ||
Exhibit 19.4.4.1 | Employment contract of Alberto Calderon — Chief Executive Officer | Filed herewith | ||
Exhibit 19.4.4.2 | Employment contract of Gillian Ann Doran — Chief Financial Officer | Incorporated by reference to Exhibit 19.4.3.2 to AngloGold Ashanti plc’s Annual Report on Form 20-F (No. 001-41815) filed with the Securities and Exchange Commission on 25 April 2024 | ||
Exhibit 19.8 | List of AngloGold Ashanti plc subsidiaries | Filed herewith | ||
Exhibit 19.11 | AngloGold Ashanti plc Insider Trading Group Standard | Filed herewith | ||
Exhibit 19.12.1 | Certification of Alberto Calderon as Chief Executive Officer of AngloGold Ashanti plc, pursuant to Section 302 of the Sarbanes- Oxley Act of 2002 | Filed herewith | ||
Exhibit 19.12.2 | Certification of Gillian Ann Doran as Chief Financial Officer of AngloGold Ashanti plc, pursuant to Section 302 of the Sarbanes- Oxley Act of 2002 | Filed herewith | ||
Exhibit 19.13 | Certification pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 | Filed herewith | ||
Exhibit 19.15.1 | Consent of PricewaterhouseCoopers Inc., independent registered public accounting firm | Filed herewith | ||
Exhibit Number | Description | Remarks | ||
Exhibit 19.15.2 | Consent of the Chairperson of the Mineral Resource and Mineral Reserve Leadership Team | Filed herewith | ||
Exhibit 19.15.3 | Arthur Gold Project, Nevada, Technical Report Summary on a Pre-feasibility Study, current at 31 December 2025 | Incorporated by reference to Exhibit 96.1 to AngloGold Ashanti plc’s report on Form 6-K (No. 001-41815) filed with the Securities and Exchange Commission on 26 March 2026 | ||
Exhibit 19.15.4 | Consents of the Qualified Persons for Arthur Gold Project, Nevada, Technical Report Summary on a Pre-feasibility Study | Filed herewith | ||
Exhibit 19.15.5 | Geita Gold Mine, Tanzania, Technical Report Summary, current at 31 December 2025 | Incorporated by reference to Exhibit 96.2 to AngloGold Ashanti plc’s report on Form 6-K (No. 001-41815) filed with the Securities and Exchange Commission on 26 March 2026 | ||
Exhibit 19.15.6 | Consents of the Qualified Persons for Geita Gold Mine, Tanzania, Technical Report Summary | Filed herewith | ||
Exhibit 19.15.7 | 2023 Technical Report Summary, Obuasi, A Life-of-Mine Summary Report, effective as of 31 December 2023 | Incorporated by reference to Exhibit 19.15.7 to AngloGold Ashanti plc’s Annual Report on Form 20-F (No. 001-41815) filed with the Securities and Exchange Commission on 25 April 2024 | ||
Exhibit 19.15.8 | Consents of the Qualified Persons for 2023 Technical Report Summary, Obuasi, A Life- of-Mine Summary Report | Filed herewith | ||
Exhibit 19.15.9 | Kibali Gold Mine, Democratic Republic of Congo, Technical Report Summary, current at 31 December 2025 | Incorporated by reference to Exhibit 96.4 to AngloGold Ashanti plc’s report on Form 6-K (No. 001-41815) filed with the Securities and Exchange Commission on 26 March 2026 | ||
Exhibit 19.15.10 | Consents of the Qualified Persons for Kibali Gold Mine, Democratic Republic of Congo, Technical Report Summary | Filed herewith | ||
Exhibit 19.15.11 | Sukari Gold Mine, Egypt, Technical Report Summary, current at 31 December 2025 | Incorporated by reference to Exhibit 96.3 to AngloGold Ashanti plc’s report on Form 6-K (No. 001-41815) filed with the Securities and Exchange Commission on 26 March 2026 | ||
Exhibit 19.15.12 | Consents of the Qualified Persons for Sukari Gold Mine, Egypt, Technical Report Summary | Filed herewith | ||
Exhibit 19.16 | Mine Safety Disclosure | Filed herewith | ||
Exhibit 19.17 | Subsidiary Issuer of Guaranteed Securities | Filed herewith | ||
Exhibit 19.97 | AngloGold Ashanti plc Incentive Compensation Recovery Policy | Incorporated by reference to Exhibit 19.97 to AngloGold Ashanti plc’s Annual Report on Form 20-F (No. 001-41815) filed with the Securities and Exchange Commission on 25 April 2024. | ||
Exhibit 19.101 | Interactive Data Files | |||
Exhibit Number | Description | Remarks | ||
Exhibit 19.104 | Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 19.101) | |||
Name | : | Gillian Ann Doran | ||
Title | : | Chief Financial Officer | ||
Date | : | 26 March 2026 |
FAQ
What is AngloGold Ashanti plc’s corporate structure and listing profile (AU)?
Which accounting standards does AngloGold Ashanti (AU) use in its Form 20-F?
How does AngloGold Ashanti (AU) define and use Non-GAAP measures like AISC?
What key regulatory and permitting risks does AngloGold Ashanti (AU) highlight in Colombia?
What environmental and tailings-related incidents affected AngloGold Ashanti (AU)?
What major categories of risk factors are outlined in AngloGold Ashanti’s 20-F?