Bitdeer (NASDAQ: BTDR) posts 430% Bitcoin production jump and expands AI capacity

Filing Impact
(Neutral)
Filing Sentiment
(Neutral)
Form Type
6-K

Rhea-AI Filing Summary

Bitdeer Technologies Group reported strong January 2026 operating figures, highlighting rapid growth in Bitcoin mining and AI infrastructure. Self-mining hashrate reached 63.2 EH/s, up from 55.2 EH/s in December, within 65.1 EH/s of proprietary hash rate and 78.1 EH/s total hash rate under management.

The company mined 668 Bitcoin, a 430% year-over-year increase from 126 Bitcoin in January 2025, while managing 314,000 mining rigs. Bitdeer is also expanding AI capacity, with 1,792 H100, H200, B200, and GB200 GPUs deployed at a 41% utilization rate and about $10 million ARR under external subscription.

Global electrical capacity totals 3,002 MW across online and pipeline sites, including major developments in Norway, the United States, Bhutan, Ethiopia, and Canada. Several large sites, such as Tydal and Wenatchee, are being converted to AI data centers, and the company is testing its first Litecoin/Dogecoin miner whose initial performance surpassed expectations.

Positive

  • Sharp growth in Bitcoin production and hash rate – Self-mining hashrate reached 63.2 EH/s and Bitcoin production rose to 668 coins in January 2026, a 430% year-over-year increase from 126 coins.

Negative

  • None.

Insights

Bitdeer shows rapid Bitcoin production growth and accelerating AI infrastructure build-out.

Bitdeer delivered notable January 2026 scale gains, with self-mining hashrate at 63.2 EH/s and total hash rate under management at 78.1 EH/s. Bitcoin production rose to 668 coins versus 126 a year earlier, a 430% increase, indicating substantially greater productive capacity.

The company is simultaneously pushing into AI infrastructure. It has deployed 1,792 GPUs (H100, H200, B200, GB200) at a 41% utilization rate and reports roughly $10 million ARR under external subscription, alongside launch of NVIDIA GB200 NVL72 infrastructure in Malaysia. This diversifies revenue beyond Bitcoin price–linked mining.

Bitdeer’s disclosed 3,002 MW of global electrical capacity, including 1,658 MW online and 1,344 MW in the pipeline, underpins future scaling. Several sites are being converted to AI or HPC with targeted completion dates such as Q4 2026 and Q2 2027, while some projects face timing dependencies like legal proceedings near Clarington, Ohio.

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

 

FORM 6-K

 

 

 

REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 UNDER
THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of February 2026

 

Commission file number: 001-41687

 

 

 

BITDEER TECHNOLOGIES GROUP

 

 

 

08 Kallang Avenue

Aperia tower 1, #09-03/04

Singapore 339509

(Address of Principal Executive Offices)

 

 

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F. 

 

Form 20-F            Form 40-F  

 

 

 

 

  

EXHIBITS

 

Exhibit No.

  Description
99.1   Press Release – Bitdeer Announces January 2026 Production and Operations Update

 

1

 

 

Signature

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

 

Bitdeer Technologies Group

   
  By: /s/ Jihan Wu
  Name: Jihan Wu
  Title: Chief Executive Officer

 

Date: February 10, 2026

 

2

 

Exhibit 99.1

 

Bitdeer Announces January 2026 Production and Operations Update

 

Monthly Highlights

 

Increased self-mining hashrate to 63.2 EH/s on continued deployment of SEALMINERs

 

Bitcoin production increased 430% year over year to 668 Bitcoin

 

Launch of NVIDIA GB200 NVL72 infrastructure in Malaysia

 

First design of Litecoin chip taped out and initial testing surpassed expectations

 

SINGAPORE, February 10, 2026 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ: BTDR) (“Bitdeer” or the “Company”), a world-leading technology company for Bitcoin mining and AI infrastructure, today announced its unaudited mining and operations updates for January 2026.

 

Operational Update

 

Self-mining: 
  
Mined 668 Bitcoins, an increase of approximately 430% year over year.
   
Self-mining hashrate reached 63.2 EH/s.
   
Bitdeer will continue deploying SEALMINER mining rigs for self-mining to continue the Company’s growth in self-mining capacity while concurrently retiring third-party, older-generation rigs.

 

SEALMINER Manufacturing:

 

Mining Rig Model (EH/s)  Stage  January
2026
   December
2025
 
SEALMINER A3  In final assembly   3.8    0.6 
   In transit   0.4    2.5 
   Cumulative A3 Deployed   8.7    5.9 
SEALMINER A2  In final assembly   2.9    1.8 
   Ready for shipping   0.1    0.1 
   In transit   2.6    3.4 
   Cumulative A2 external sales   8.1    7.9 
   Cumulative A2 Deployed   44.1    39.7 
SEALMINER A1  Cumulative A1 Deployed   4.2    4.2 
3rd Party Miners  Cumulative Deployed   8.1    8.2 
Total Proprietary Hash Rate  Deployed   65.1    58.0 

 

SEALMINER R&D:
  
Successfully taped out the Litecoin ASIC chip, SEAL-DL1, designed for mining DOGE and Litecoin. Initial test results of SEAL-DL1 have exceeded expectations.
   
SEALMINER DL1 is expected to generate more mining output compared to the SEALMINER A2 series with the same power capacity based on the recent market parameters. We plan to launch the product in Q1 2026.
   
SEALMINER 04-1 is targeting mass production in Q1 2026.
   
SEAL04-2 chip’s development continues.

 

U.S. Manufacturing: Preparations for Bitdeer’s U.S. factory are progressing, with the lease signed and construction permit application submitted to local municipal authorities.

 

 

 

GPU Cloud as of 1/31/2026:

 

GPU Amount Deployed   GPU Types  Utilization Rate   Under
External
Subscription
   ARR
 1,792   H100, H200, B200, GB200   41%   585   ~$10 million

 

On January 13, 2026, Bitdeer AI deployed its initial NVIDIA GB200 NVL72 infrastructure in Malaysia, marking the first phase of an accelerated capacity expansion designed to support enterprise-grade training workloads on the Blackwell architecture.
   
Actively evaluating U.S. data center leasing opportunities to deploy GPUs and bring AI cloud services online for U.S. customers as early as Q1 2026.

 

HPC colocation arrangements:

 

Potential colocation arrangements for various sites are under evaluation. Multiple potential hyperscaler customers have expressed strong interest, and active discussions are currently underway.

 

Infrastructure Summary:

 

Site / Location  Capacity (MW)   Status  Datacenter Type  Timing1
Electrical capacity              
 - Rockdale, Texas   563   Online  Crypto / Evaluating AI  Completed
 - Knoxville, Tennessee – phase 1   37   Online  Crypto converting to AI  Q4 2026
 - Knoxville, Tennessee – phase 2   49   Online  Crypto  Completed
 - Wenatchee, Washington   13   Online  Crypto converting to AI  Q4 2026
 - Molde, Norway   84   Online  Crypto  Completed
 - Tydal - 1, Norway   50   Online  Crypto converting to AI  Q4 2026
 - Tydal - 2, Norway   175   Online  Crypto converting to AI  Q4 2026
 - Gedu, Bhutan   100   Online  Crypto  Completed
 - Jigmeling, Bhutan   500   Online  Crypto  Completed
 - Oromia Region, Ethiopia   40   Online  Crypto  Completed
 - Massillon, Ohio   47   Online  Crypto  Completed
Total electrical capacity   1,6582          
Pipeline capacity              
 - Oromia Region, Ethiopia   20   In progress  Crypto  Q1 2026
- Massillon, Ohio   148/26  In progress  Crypto  Q2 2026/TBD
- Clarington, Ohio   570   In progress  HPC/AI  To be updated
- Niles, Ohio   300   In progress  HPC/AI  Q4 2028
- Rockdale, Texas   179   In planning  Crypto  Estimate 2026
- Alberta, Canada   101   In planning  Crypto  Q2 2027
Total pipeline capacity   1,344          
Total global electrical capacity   3,002          

 

1Indicative timing for completion of power and data center infrastructure. All timing references are to calendar quarters and years.

 

2Figures represent total available electrical capacity

 

2

 

 

Production and Operations Summary:

 

Metrics  January
2026
   December
2025
   January
2025
 
Total hash rate under management3 (EH/s)   78.1    71.0    22.4 
- Proprietary hash rate   65.1    58.0    9.2 
● Self-mining   63.2    55.2    8.7 
● Cloud Hash Rate   1.1    1.1    - 
● Delivered but not yet energized   0.8    1.7    0.5 
- Hosting   13.0    13.0    13.2 
Mining rigs under management   314,000    293,000    179,000 
- Self-owned4   232,000    211,000    87,000 
- Hosted   82,000    82,000    92,000 
Bitcoins mined (self-mining only)   668    636    126 
Bitcoin held5   1,530    2,017    724 

 

3Total hash rate under management as of January 31, 2026 across Bitdeer’s primary business lines: Self-mining, Cloud Hash Rate, and Hosting.

 

Self-mining refers to cryptocurrency mining for Bitdeer’s own account, which allows it to directly capture the high appreciation potential of cryptocurrency.
   
Cloud Hash Rate offers hash rate subscription plans and shares mining income with customers under certain arrangements. The Cloud Hash Rate stated above reflects the contracted hash rate with customers at month-end.
   
Hosting encompasses a one-stop mining machine hosting solution including deployment, maintenance, and management services for efficient cryptocurrency mining.

 

4Self-owned mining machines are for Bitdeer’s self-mining business and Cloud Hash Rate business.

 

5Bitcoins held do not include the Bitcoins from deposits of the customers, include the Bitcoins that are pledged as collateral.

 

Management Commentary

 

“Bitdeer has increased its focus on HPC/AI co-location opportunities for several of its larger sites including, but not limited to, Tydal, Norway. This is a high priority for us and the goal is to sign long term leases for these locations as soon as possible.” said Matt Kong, Chief Business Officer of Bitdeer. “In parallel, our self-mining hashrate continues to grow and has exceeded 63 EH/s, a 14% increase over December 2025, and we will continue to deploy more Sealminers in 2026. Furthermore, we have successfully tested our first LTC/Doge miner, the DL1, and its performance exceeded expectations. We plan to officially release the SEALMINER-DL1 in the first quarter of 2026.”

 

3

 

 

Infrastructure Construction Update

 

Tydal, Norway AI data center conversion – Planning and design continue to advance. Orders for critical long-lead equipment have been placed to support the targeted project timeline for completion around the end of 2026. Decommissioning of Bitcoin mining rigs has begun to make room for the new AI data center.

 

Wenatchee, Washington – AI data center design documents and building permit application were submitted for approval. Orders for long-lead-time equipment have been placed. Completion targeted for Q4 2026.

 

Knoxville, Tennessee – Phase 1 AI data center conversion design work initiated, targeting to complete by Q4 2026.

 

Massillon, Ohio – 47 MW is currently online. Approximately 26 MW in two fire-damaged buildings is expected to be rebuilt and energized by the end of September 2026. The remaining 148 MW is expected to be energized in phases during Q1 and Q2 2026.

 

Clarington, Ohio – 570 MW of power under contract with a local utility. The timing of power availability and construction may be affected by ongoing legal proceedings filed by a neighboring company, American Heavy Plate Solutions, LLC. Design and other preparation work continue.

 

Fox Creek, Alberta – 101 MW site acquired, fully licensed and permitted for the construction of an on-site natural gas power plant. We are assessing current design schemes for the mining site to accommodate potential future AIDC requirements, as the energization date has been targeted for Q2 2027.

 

Oromia Region, Ethiopia – Construction of the 60 MW site has been completed, with 20 MW not yet energized and 40 MW undergoing energization in phases driven by SEALMINER deliveries.  

 

Niles, Ohio – 300 MW grid-interconnected development site, with target energization in Q4 2028. The project includes 41.8 acres of owned land and a transmission line extension agreement with a local utility company.

 

Upcoming Conferences and Events

 

March 2 – 5, 2026: Morgan Stanley Technology, Media & Telecom Conference in San Francisco
   
March 10 – 11, 2026: 2026 Cantor Global Technology & Industrial Growth Conference in New York
   
March 22 – 24, 2026: 38th Annual Roth Conference in Laguna Niguel, CA

 

4

 

 

About Bitdeer Technologies Group

 

Bitdeer is a world-leading technology company for Bitcoin mining and AI infrastructure. Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers. Bitdeer handles complex processes involved in computing such as equipment procurement, transport logistics, data center design and construction, equipment management, and daily operations. Bitdeer also offers advanced cloud capabilities to customers with high demand for artificial intelligence. Headquartered in Singapore, Bitdeer has deployed data centers in the United States, Norway, and Bhutan, amongst other countries. To learn more, visit https://ir.bitdeer.com/ or follow Bitdeer on X @ BitdeerOfficial and LinkedIn @ Bitdeer Group.

 

Investors and others should note that Bitdeer may announce material information using its website and/or on its accounts on social media platforms, including X, formerly known as Twitter, Facebook, and LinkedIn. Therefore, Bitdeer encourages investors and others to review the information it posts on the social media and other communication channels listed on its website.

 

Forward-Looking Statements

 

Statements in this press release about future expectations, plans, and prospects, as well as any other statements regarding matters that are not historical facts, may constitute “forward-looking statements” within the meaning of The Private Securities Litigation Reform Act of 1995. The words “anticipate,” “look forward to,” “believe,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should,” “target,” “will,” “would” and similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain these identifying words. Actual results may differ materially from those indicated by such forward-looking statements as a result of various important factors, including factors discussed in the section entitled “Risk Factors” in Bitdeer’s annual report on Form 20-F, as well as discussions of potential risks, uncertainties, and other important factors in Bitdeer’s subsequent filings with the U.S. Securities and Exchange Commission. Any forward-looking statements contained in this press release speak only as of the date hereof. Bitdeer specifically disclaims any obligation to update any forward-looking statement, whether due to new information, future events, or otherwise. Readers should not rely upon the information on this page as current or accurate after its publication date.

 

For investor and media inquiries, please contact:

 

Investor Relations

ICR Inc.

John Ragozzino, CFA

bitdeer.ir@icrinc.com

 

Media

Elev8 New Media

Jessica Starman, MBA

bitdeer@elev8newmedia.com

 

Public Relations

BlocksBridge Consulting

Nishant Sharma

bitdeer@blocksbridge.com

 

5

 

FAQ

How many Bitcoin did Bitdeer (BTDR) mine in January 2026?

Bitdeer mined 668 Bitcoin through self-mining in January 2026. This compares with 636 Bitcoin in December 2025 and 126 Bitcoin in January 2025, representing a 430% year-over-year increase in monthly Bitcoin production.

What was Bitdeer (BTDR)'s total hash rate under management in January 2026?

Bitdeer reported a total hash rate under management of 78.1 EH/s in January 2026. This included 65.1 EH/s of proprietary hash rate and 13.0 EH/s from hosting, up from 71.0 EH/s total in December 2025.

How is Bitdeer (BTDR) expanding into AI and HPC infrastructure?

Bitdeer is building AI and HPC infrastructure with 1,792 GPUs (H100, H200, B200, GB200) deployed at a 41% utilization rate and about $10 million ARR under external subscription, plus new AI data center conversions in Norway, Washington, Tennessee, and other sites.

What is Bitdeer (BTDR)'s global electrical capacity for its data centers?

Bitdeer disclosed total global electrical capacity of 3,002 MW, combining 1,658 MW of online capacity and 1,344 MW in the development pipeline. Key locations include Texas, Ohio, Norway, Bhutan, Ethiopia, and Alberta, supporting both crypto and AI workloads.

How many mining rigs does Bitdeer (BTDR) manage and how many are self-owned?

Bitdeer manages 314,000 mining rigs as of January 2026. Of these, 232,000 rigs are self-owned and 82,000 rigs are hosted for customers, compared with 293,000 total rigs under management in December 2025 and 179,000 in January 2025.

What progress has Bitdeer (BTDR) made on its AI data center conversions?

Bitdeer advanced several AI conversion projects, including Tydal, Norway with completion targeted around the end of 2026, Wenatchee, Washington with Q4 2026 targeted completion, and Knoxville, Tennessee phase 1 aiming for completion by Q4 2026.

Filing Exhibits & Attachments

1 document
Bitdeer Technologies Group

NASDAQ:BTDR

BTDR Rankings

BTDR Latest News

BTDR Latest SEC Filings

BTDR Stock Data

3.08B
165.57M
44.29%
30.02%
10.91%
Software - Application
Technology
Link
Singapore
Singapore