STOCK TITAN

Bitdeer Technologies Group (NASDAQ: BTDR) mines 990 BTC and grows AI ARR

(Neutral)
(Neutral)
Form Type
6-K

Rhea-AI Filing Summary

Bitdeer Technologies Group reported June 2026 operating metrics showing growth in both Bitcoin mining and AI services. Bitcoin production was 990 BTC, described as up 388% year-over-year, with self-mining hash rate at 73.0 EH/s and total hash rate under management at 86.1 EH/s. Self-mining rigs totaled 243,000, with 289,000 mining rigs under management overall, and Bitdeer held 150 BTC at month end.

AI Cloud annualized recurring revenue reached approximately $76 million, up from about $69 million in May, supported by 4,248 deployed GPUs and a 95% utilization rate, with 3,517 GPUs under external subscription. Global electrical capacity was about 3.0 GW, including 1,797 MW online and 1,228.2 MW in the development pipeline across sites in the United States, Norway, Bhutan, Ethiopia, Malaysia, and Canada. Development milestones include a lease for the Tydal, Norway colocation AI data center subject to conditions precedent, ongoing AI-focused conversions in Knoxville and Wenatchee, reconstruction and partial insurance recovery at Massillon, and a 570 MW Clarington, Ohio project whose timing may be affected by ongoing legal proceedings.

Positive

  • Bitcoin production reached 990 BTC in June 2026, described by management as up 388% year-over-year, alongside a self-mining hash rate of 73.0 EH/s.
  • AI Cloud annualized recurring revenue increased to approximately $76M with 95% GPU utilization in June 2026, indicating strong demand for Bitdeer’s AI infrastructure services.

Negative

  • Timing of the planned 570 MW Clarington, Ohio site may be affected by ongoing legal proceedings, creating uncertainty around a sizable portion of Bitdeer’s development pipeline capacity.
Bitcoin mined 990 BTC June 2026 production, described as up 388% year-over-year
Self-mining hash rate 73.0 EH/s June 2026 self-mining hash rate operated in self-owned datacenters
AI Cloud ARR ~$76M AI Cloud annualized recurring revenue for June 2026 at 95% utilization
GPUs deployed 4,248 GPUs deployed for AI Cloud as of June 2026
GPU utilization rate 95% AI Cloud GPU utilization rate in June 2026
Total global electrical capacity 3,025.2 MW Total global electrical capacity combining online and pipeline sites
BTC held 150 BTC Bitcoin holdings at end of June 2026
Total hash rate under management 86.1 EH/s Total hash rate under management in June 2026
Self-Mining financial
"Self-Mining (Operated in self-owned datacenters) hash rate metric"
Self-mining is when a person or company uses its own equipment and resources to create new cryptocurrency coins rather than buying them or hiring someone else to mine. For investors, it matters because self-mining turns computing power into an ongoing source of revenue and digital assets, like owning a small factory instead of just selling its products; it affects costs, cash flow, asset holdings and exposure to energy and regulatory risks.
Co-Mining financial
"Co-Mining (Operated by 3 rd party datacenters) metric"
annualized recurring revenue financial
"AI Cloud ARR refers to annualized recurring revenue"
Annualized recurring revenue is the predictable income a business expects to earn over a year from ongoing customer subscriptions or contracts. It’s similar to estimating how much money you would make in a year if your current monthly income stayed the same. Investors use this figure to assess the stability and growth potential of a company's revenue stream.
colocation AI data center technical
"Colocation AI Data Center with Tydal, Norway lease executed"
Energization Timing technical
"Infrastructure Summary includes an Energization Timing column"

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates

FAQ

How much Bitcoin did Bitdeer Technologies Group (BTDR) mine in June 2026?

Bitdeer produced 990 BTC in June 2026, which management described as up 388% year-over-year. This output reflects higher self-mining hash rate and expanded mining capacity under management compared with the prior-year period.

What was Bitdeer (BTDR)’s AI Cloud ARR and utilization in June 2026?

AI Cloud annualized recurring revenue was approximately $76M in June 2026, with GPU utilization at 95%. Bitdeer reported 4,248 GPUs deployed and 3,517 under external subscription, highlighting strong usage of its AI infrastructure.

What are Bitdeer (BTDR)’s key hash rate metrics for June 2026?

In June 2026, Bitdeer reported self-mining hash rate of 73.0 EH/s and total hash rate under management of 86.1 EH/s. Co-mining operations contributed 15.9 EH/s, reflecting both self-owned and third-party datacenter activity.

How large is Bitdeer (BTDR)’s global electrical capacity for mining and AI?

Bitdeer reported total global electrical capacity of 3,025.2 MW, or about 3.0 GW. This includes 1,797 MW of online capacity and 1,228.2 MW in its development pipeline across multiple international sites.

How many GPUs does Bitdeer (BTDR) deploy for its AI Cloud services?

Bitdeer deployed 4,248 GPUs for AI Cloud as of June 2026, using H100, H200, B200, GB200, and GB300 types. Of these, 3,517 GPUs were under external subscription, supporting the reported $76M AI Cloud ARR.

What could impact the Clarington, Ohio project in Bitdeer (BTDR)’s pipeline?

The 570 MW Clarington, Ohio colocation/crypto project has power under contract, but timing of availability and construction may be affected by ongoing legal proceedings filed by a neighboring company, according to Bitdeer’s disclosure.

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

 

FORM 6-K

 

 

 

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16 UNDER

THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of July 2026

 

Commission file number: 001-41687

 

 

 

BITDEER TECHNOLOGIES GROUP

 

 

 

08 Kallang Avenue

Aperia tower 1, #09-03/04

Singapore 339509

(Address of Principal Executive Offices)

 

 

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F. Form 20-F ☒     Form 40-F ☐

 

 

 

 

 

EXHIBITS

 

Exhibit No.   Description
99.1   Press Release – Bitdeer Announces June 2026 Production and Operations Update

 

1

 

 

Signature

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

  Bitdeer Technologies Group
   
  By: /s/ Jihan Wu
  Name: Jihan Wu
  Title: Chief Executive Officer

 

Date: July 21, 2026

 

2

 

Exhibit 99.1

 

 

Bitdeer Announces June 2026 Production and Operations Update

 

Monthly Highlights

 

Bitcoin: Production increased 388% Y/Y to 990 Bitcoin
SEALMINERs: Recently announced groundbreaking of Sealminer manufacturing facility in Sparks, Nevada, slated for completion by the end of 2026
Colocation: Tydal, Norway lease has been executed, subject to certain conditions precedent
AI Cloud: Signed a new 10-year lease agreement for 21.7 IT MW of capacity in Malaysia, with handover to Bitdeer planned for Q1 2027

 

Key Metrics Summary
Global Energy Capacity Self-Mining Hash Rate1 Co-Mining Hash Rate2 Self-Mining Rigs BTC Mined AI Cloud ARR Colocation AI Data Center
3.0 GW 73.0 (EH/s) 15.9 (EH/s) 243K 990 ~$76M Tydal, Norway lease executed, subject to certain conditions precedent

 

SINGAPORE, July 21, 2026 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ: BTDR) (“Bitdeer” or the “Company”), a world-leading technology company for AI and Bitcoin mining infrastructure, today announced its unaudited operations updates for June 2026.

 

Management Commentary

 

“June reflected continued execution across Bitdeer’s AI infrastructure platform. AI Cloud ARR grew to approximately $76 million at 95% utilization, with GB300 NVL72 customer deliveries reinforcing our enterprise-grade capabilities,” said Michael G. Potter, Chief Financial Officer of Bitdeer. “Bitcoin production of 990 BTC, up 388% year-over-year, and self-mining hashrate of 73.0 EH/s reflect continued strength across our mining platform.” Mr. Potter continued, “We believe we have been making good progress at expanding powered land under our control. We look forward to sharing some of this at our upcoming Q2 earnings call. We also are encouraged by the interest being shown for our existing and planned AI Cloud services.”

 

 

 

Crypto Mining Update:

 

CRYPTO Mining, R&D, Manufacturing:

 

·Mined 990 Bitcoins3, an increase of 388% Y/Y; we continue to expect momentum in our mining results over the coming months.
·Self-mining hash rate reached ~73.0 EH/s. Co-mining hashrate of 15.9 EH/s driven by Co-Mining collaboration, using Bitdeer’s mining rigs operated by 3rd party datacenters.
·Recently announced groundbreaking of Sealminer manufacturing facility in Sparks, Nevada, slated for completion by the end of 2026.

 

Key Crypto Metrics:

 

Metric June 2026 May 2026 June 2025
Hash Rate Metrics:
Self-Mining (Operated in self-owned datacenters) 73.0 70.2 16.5
Other Proprietary Hash Rate4 4.9 4.7 0.2
Hosting5 8.2 8.2 13.9
Total Hash Rate under Mgmt.6 (EH/s) 86.1 83.1 30.6
       
Co-Mining (Operated by 3rd party datacenters) 15.9 10.0 -
       
Mining Rig Metrics:
Self-Mining 243,000 231,000 114,000
Hosted 46,000 46,000 86,000
Total Mining Rigs under Mgmt. 289,000 277,000 200,000
       
Co-Mining 56,000 39,000 -
 
BTC Mined3 990 921 203
BTC Held7 150 171 1,502

 

2

 

 

Bitdeer AI Update:

 

Colocation AI Data Center:

 

Tydal, Norway lease executed, subject to certain conditions precedent. Bitdeer remains in active dialogue at several additional sites.

 

AI Cloud Key Metrics:

 

Metric June 2026 May 2026
GPU Amount Deployed 4,248 4,248
GPU Types H100, H200, B200, GB200, GB300 H100, H200, B200, GB200, GB300
Utilization Rate8 95% 90%
GPUs Under External Subscription 3,517 3,305
ARR9 ~$76M ~$69M

 

GB300 Customer Delivery: 5-year GPU cloud sales contract executed and successfully completed customer deliveries following the deployment and production launch of 2 units of  NVIDIA GB300 NVL72 clusters, demonstrating strong technical execution and rapid delivery capabilities. 
10-year lease agreement signed for new data center in Malaysia to provide 21.7 IT MW of capacity, with handover to Bitdeer expected Q1 2027. Facility planned to support deployment of 128 NVIDIA GB300 NVL72 systems.
Named “AI Cloud Platform of the Year” in the 2026 AI Breakthrough Awards, recognizing Bitdeer AI Cloud’s full-stack capabilities, scalable GPU compute, and streamlined model deployment.

 

3

 

 

Infrastructure Summary:

 

Site (MW) Capacity Energization Timing10 Planned Usage Construction Update
Online Electrical Capacity:
1) Rockdale, TX 563 Online Crypto to Colocation / AI Cloud In active evaluation of AI transition
2) Knoxville, TN – phase 1 37 Q4 ’26 Crypto to AI Cloud Phase 1 AI data center conversion design work initiated, targeting to complete by Q4 ’26.
3) Knoxville, TN – phase 2 49 Q1 ’27
4) Wenatchee, WA 13 Q4 ’26 Crypto to AI Cloud AI data center design documents and building permit application submitted for approval. Core equipment is being delivered in succession; we plan to begin with a GB300 cluster. Dismantling of the crypto mining datacenter started in March 2026. Completion targeted by Q4 ’26 – early 2027.
5) Molde, Norway 84 Online Crypto and in early assessment of converting to AI Cloud  
6) Tydal, Norway – phase 1 50 Q4 ’26 Crypto to Colocation Planning and design continue to advance. Orders for critical long-lead equipment have been placed on an ongoing basis. Engaged Data Center Installations AS as Bitdeer’s design and construction partner for Tydal AI datacenter conversion.
7) Tydal, Norway – phase 2 175 Q4 ’26
8) Gedu, Bhutan 100 Online Crypto  
9) Jigmeling, Bhutan 500 Online Crypto  
10) Oromia Region, Ethiopia 50 Online Crypto  
11) Massillon, OH 174 Online Crypto  
12) Cyberjaya, Malaysia11 2 Online AI Cloud  
Online Electrical Subtotal: 1,797      

 

4

 

 

Pipeline Electrical Capacity:        
         
1) Massillon, OH 21 / 26 Q3 ’26 Crypto Due to delivery delays for key electrical components, 21 MW is expected to be energized in phases during Q3 ’26. Reconstruction of the two fire-damaged buildings (26MW) is currently underway and expected to be rebuilt and energized by the end of Q3’ 26. A significant portion of the reconstruction cost has now been successfully recovered through the supplier’s insurance coverage.
2) Clarington, OH 570 To be updated Colocation / Crypto 570 MW of power under contract with a local utility. Timing of power availability and construction may be affected by ongoing legal proceedings filed by a neighboring company, American Heavy Plate Solutions, LLC., which is under extensive influence from MHR, a New York based PE firm founded by Mark H. Rachesky. Design and other preparation work continues.
3) Niles, OH 300 Q4 ’28 Colocation / AI Cloud 300 MW grid-interconnected development site, with target energization in Q4 ’28. The project includes 41.8 acres of owned land and a transmission line extension agreement with a local utility company.
4) Rockdale, TX 179 2026 Crypto / Colocation / AI Cloud In Planning
5) Fox Creek, Alberta, Canada 101 Q3 ’27 Crypto 101 MW site acquired, fully licensed and permitted for the construction of an on-site natural gas power plant. Energization time is now expected for Q3 2027. Data center design accommodating both AIDC and crypto is currently underway, following the power plant groundbreaking in June 2026.
6) Cyberjaya, Malaysia11 9.5 Q4 ’26 AI Cloud In Progress
7) Johor Bahru, Malaysia11 21.7 Q1’27 AI Cloud 10-year lease agreement signed for new data center to provide 21.7 MW of IT capacity, with handover to Bitdeer expected Q1 2027. Facility planned to support deployment of 128 NVIDIA GB300 NVL72 systems.
Pipeline Electrical Subtotal: 1,228.2      
Total Global Electrical Capacity: 3,025.2      

 

5

 

 

Footnotes

 

1Self-Mining (Operated in self-owned datacenters) refers to cryptocurrency mining for Bitdeer’s own account, whereby its mining rigs are operated in self-owned datacenters
2Co-mining (Operated by 3rd party datacenters) refers to cryptocurrency mining for Bitdeer’s own account, whereby its mining rigs are operated by third-party datacenters
3Includes BTC from self-mining operations and BTC from co-mining operations.
4Other Proprietary Hash Rate includes the hashrate from Bitdeer’s cloud hashrate business, mining rigs delivered in the crypto mining datacenters but not deployed and the mining rigs temporarily offline due to limited economic benefit.
5Hosting encompasses a one-stop mining machine hosting solution including deployment, maintenance, and management services for efficient cryptocurrency mining.
6Total hash rate under management as of June 30, 2026, across Bitdeer’s primary business lines: Self-mining, Cloud Hash Rate, and Hosting.
7Bitcoins held does not include Bitcoins from customer deposits but does include Bitcoins that are pledged as collateral by us.
8Utilization Rate as of the last day of the respective month is calculated as the total number of GPUs under internal and external orders divided by the total number of deployed GPUs.
9ARR as of the last day of the respective month is calculated by multiplying the daily revenue generated from all contractually obligated GPU orders on that specific day by 365. This metric provides an annualized view of the revenue run-rate based on active contracts at the end of the reporting period.
10Indicative timing for completion of power. All timing references are to calendar quarters and years.
11Capacity under lease arrangement.

 

About Bitdeer Technologies Group

 

Bitdeer is a world-leading technology company for AI and Bitcoin mining infrastructure. Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers and building AI computational infrastructure to support the AI revolution. Bitdeer handles complex processes involved in computing such as equipment procurement, transport logistics, data center design and construction, equipment management, and daily operations. Bitdeer also offers advanced cloud capabilities to customers with high demand for artificial intelligence. Headquartered in Singapore, Bitdeer has deployed data centers across multiple countries, including the United States, Norway, Bhutan, and Ethiopia. To learn more, visit https://ir.bitdeer.com/ or follow Bitdeer on X@Bitdeer and LinkedIn @Bitdeer.

 

Investors and others should note that Bitdeer may announce material information using its website and/or on its accounts on social media platforms, including X, formerly known as Twitter, Facebook, and LinkedIn. Therefore, Bitdeer encourages investors and others to review the information it posts on social media and other communication channels listed on its website.

 

Forward-Looking Statements

 

Statements in this press release about future expectations, plans, and prospects, as well as any other statements regarding matters that are not historical facts, may constitute “forward-looking statements” within the meaning of The Private Securities Litigation Reform Act of 1995. The words “anticipate,” “look forward to,” “believe,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should,” “target,” “will,” “would” and similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain these identifying words. Actual results may differ materially from those indicated by such forward-looking statements as a result of various important factors, including factors discussed in the section entitled “Risk Factors” in Bitdeer’s annual report on Form 20-F, as well as discussions of potential risks, uncertainties, and other important factors in Bitdeer’s subsequent filings with the U.S. Securities and Exchange Commission. Any forward-looking statements contained in this press release speak only as of the date hereof. Bitdeer specifically disclaims any obligation to update any forward-looking statement, whether due to new information, future events, or otherwise. Readers should not rely upon the information on this page as current or accurate after its publication date.

 

For investor and media inquiries, please contact:

 

Investor Relations

Tesh Dahya, Head of Investor Relations

tesh.dahya@bitdeer.com

 

Media

Elev8 New Media

Jessica Starman, MBA

bitdeer@elev8newmedia.com

 

6

 

Filing Exhibits & Attachments

1 document