STOCK TITAN

DynaResource (DYNR) swings to 2025 profit as SJG mine boosts EBITDA

Filing Impact
(Moderate)
Filing Sentiment
(Neutral)
Form Type
8-K

Rhea-AI Filing Summary

DynaResource reported a strong turnaround for the year ended December 31, 2025 at its San Jose de Gracia gold mine. Full-year revenue rose 26% to $58.5 million, while net income reached $3.8 million compared with a net loss of $8.5 million in 2024. Adjusted EBITDA improved to $12.1 million from negative $1.3 million, reflecting better costs, higher gold prices, and operational efficiencies.

In Q4 2025, revenue was $14.8 million with net income of $1.4 million and adjusted EBITDA of $4.7 million, marking a fifth consecutive profitable quarter on this basis. The mine produced 21,393 ounces of gold in 2025, supported by higher mill throughput, improved recoveries from new Falcon gravity concentrators, and development that opened more high-grade stopes.

Positive

  • Strong earnings turnaround: 2025 net income of $3.8 million versus a net loss of $8.5 million in 2024, alongside a shift in adjusted EBITDA from -$1.3 million to $12.1 million, indicates a materially improved financial profile.
  • Revenue growth with margin expansion: Revenue grew 26% to $58.5 million in 2025 while gross profit rose to $17.3 million from a loss, showing both volume/price benefits and better cost control.
  • Consistent operating momentum: Q4 2025 marked the fifth consecutive quarter of positive adjusted EBITDA, with $4.7 million generated, suggesting the mine’s improved performance is becoming more sustainable.

Negative

  • None.

Insights

DynaResource delivered a notable financial and operational turnaround in 2025.

DynaResource shifted from a 2024 net loss of $8.5 million to 2025 net income of $3.8 million, while revenue increased 26% to $58.5 million. Adjusted EBITDA swung from negative $1.3 million to $12.1 million, indicating materially stronger cash-generation capacity.

Operationally, mill throughput rose and Q4 2025 gold recoveries reached 75.69%, aided by new Falcon gravity concentrators that captured roughly 30% of gold in a high-grade concentrate. Although annual gold output declined versus 2024, higher prices and lower costs supported margins.

For investors, this 8-K signals that the San Jose de Gracia mine is operating more efficiently, with five consecutive quarters of positive adjusted EBITDA and multiple ore bodies (San Pablo, La Mochomera, Palos Chinos, Tres Amigos) expected to underpin production into 2026 and beyond.

Item 9.01 Financial Statements and Exhibits Exhibits
Financial statements, pro forma financial information, and exhibit attachments filed with this report.
Full-year revenue 2025 $58.5 million Up 26% from $46.5 million in 2024
Net income 2025 $3.8 million Versus net loss of $8.5 million in 2024
Adjusted EBITDA 2025 $12.1 million Versus negative $1.3 million in 2024
Q4 2025 revenue $14.8 million Slightly above $14.1 million in Q3 2025
Q4 2025 adjusted EBITDA $4.7 million Fifth consecutive quarter of positive adjusted EBITDA
Gold production 2025 21,393 ounces Full-year production at San Jose de Gracia mine
Milled throughput 2025 262,224 tons Average 718 tons per day at SJG
Q4 2025 gold recovery 75.69% Improved after installation of Falcon concentrators
Adjusted EBITDA financial
"Adjusted EBITDA for the 12 months ending 2025 was $12.1 million compared to negative $1.3 million"
Adjusted EBITDA is a way companies measure how much money they make from their core operations, like running a business, by removing certain costs or income that aren’t part of regular business activities. It helps investors see how well a company is doing without distractions from unusual expenses or gains, making it easier to compare companies or track performance over time.
milled throughput technical
"Milled throughput in 2025 was 262,224 tons representing an increase of 257,676 tons over 2024."
Falcon gravity concentrators technical
"installation of three new Falcon gravity concentrators (the “Falcon” units) was completed in Q3 2025"
gold recoveries technical
"The aim of the installation of these Falcon units is to boost gold recoveries improving operational efficiency"
tailings storage facility technical
"A new tailings dam was completed during Q3 2024, with an estimated storage capacity of 670,751 cubic meters"
A tailings storage facility is a managed site—often a lined pond or engineered dam—where mining companies store the wet waste left after extracting minerals. Investors care because these sites carry long-term risks and costs (environmental damage, spills, regulatory fines, cleanup and closure liabilities) that can quickly reduce a mine’s value, halt production or trigger costly remediation, much like a leaking landfill can suddenly force unexpected expenses and legal trouble.
Revenue $58.5 million +26% YoY
Net income $3.8 million from -$8.5 million in 2024
Adjusted EBITDA $12.1 million from -$1.3 million in 2024
false0001111741NONE00011117412026-04-012026-04-01

 

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549

 

FORM 8-K

 

CURRENT REPORT

Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

Date of Report (Date of earliest event reported): April 01, 2026

 

 

DYNARESOURCE, INC.

(Exact name of Registrant as Specified in Its Charter)

 

 

Delaware

000-30371

94-1589426

(State or Other Jurisdiction
of Incorporation)

(Commission File Number)

(IRS Employer
Identification No.)

 

 

 

 

 

The Urban Towers

222 W. Las Colinas Blvd.

Suite 1910 - North Tower

 

Irving, Texas

 

75039

(Address of Principal Executive Offices)

 

(Zip Code)

 

Registrant’s Telephone Number, Including Area Code: (972) 869-9400

 

 

(Former Name or Former Address, if Changed Since Last Report)

 

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

Securities registered pursuant to Section 12(b) of the Act:


Title of each class

 

Trading
Symbol(s)

 


Name of each exchange on which registered

N/A

 

N/A

 

N/A

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§ 230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§ 240.12b-2 of this chapter).

Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.

 


Item 9.01 Financial Statements and Exhibits.

d)
Exhibits

Exhibit No.

Description

99.1

 

Press Release issued on April 1, 2026.

 104

Cover Page Interactive Data File (embedded within the Inline XBRL document).

 

 


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

 

 

DYNARESOURCE, INC.

 

 

 

 

Date:

April 2, 2026

By:

/s/ Rohan Hazelton

 

 

 

Rohan Hazelton, Chief Executive Officer

 


 

img259973804_0.jpg

 

 

OTCQX: DYNR WWW.DYNARESOURCE.COM

 

 

DynaResource Reports Year End 2025 Results at the San Jose de Gracia Mine, Net Income for 2025 of $3.8M, and Adjusted EBITDA for 2025 of $12.1M

 

All figures in United States Dollars (“USD”).

 

IRVING, TX / April 1, 2026 / DYNR-DynaResource, Inc. (OTCQX:DYNR) (“DynaResource”, or the “Company”) is pleased to report results for the fourth quarter and fiscal year ended December 31, 2025 at the San Jose de Gracia mine (the “SJG mine”) highlighted by continued financial momentum with both gross profit and adjusted EBITDA demonstrating continued growth.

 

Full Year and Q4 2025 Highlights:

Revenue increased 26% to $58.5 million in 2025 from $46.5 million in 2024 while Q4 2025 revenue of $14.8 million was up from $14.1 million in the previous quarter.
Full year 2025 net income of $3.8 million, compared to net loss of $8.5 million in 2024. Q4 2025 net income of $1.4 million compared to net loss of $0.3 million in Q4 2024 and $1.3 million in Q3 2025.
Adjusted EBITDA for the 12 months ending 2025 was $12.1 million compared to negative $1.3 million for the twelve months ending 2024. Q4 2025 demonstrated the fifth consecutive quarter of positive adjusted EBITDA totaling $4.7 million compared to $1.4 million in Q4 2024 and $1.4 million in Q3 2025.
Full year 2025 gold production of 21,393 ounces fell within the Company’s revised guidance. Q4 2025 gold production of 5,080 ounces compared to 4,830 ounces in Q3 2025 and 6,775 ounces in Q4 2024.
Milled throughput in 2025 was 262,224 tons representing an increase of 257,676 tons over 2024. Milled throughput of 65,275 tons versus 62,741 tons in Q3 2025 and 67,670 tons in Q4 2024.
Daily mill throughput average of 718 tons per day in 2025, an increase over 2024.

Rohan Hazelton, President & CEO DynaResource stated, “We delivered solid operational results in 2025, underscoring the strength of our San Jose de Gracia mine and the team’s continued focus on disciplined execution. This translated into strong financial momentum in the fourth quarter and across the full year, with revenues, net income, and adjusted EBITDA demonstrating meaningful growth. These results reflect improved efficiencies at both the operating and corporate levels, alongside a continued emphasis on cost management as well as higher gold prices. With the sustained improvements in net income and adjusted EBITDA, the Company hopes to see its valuation increasingly reflect the underlying quality of the mine and performance of its operations.”

 


 

Quarterly Results for the Three and Twelve Months Ended December 31, 2025 and 2024:

Three Months Ended

Twelve Months Ended

Key Operating Information

Unit

December 31, 2025

December 31, 2024

December 31, 2025

December 31, 2024

Operating Data

365

366

Ore mined

t

74,984

59,490

287,878

233,782

Mining rate

tpd

815

647

789

639

Ore Milled

t

65,275

67,670

262,224

257,676

Mill Throughput

tpd

710

736

718

704

Grade

g/t

                         3.20

4.12

                         3.46

                         4.07

Recovery Au

%

75.68%

75.58%

73.69%

76.24%

Gold Ounces Produced

oz

5,080

6,775

21,393

                      25,677

Gold Ounces Sold

oz

4,767

6,897

20,848

                      22,003

 

(1)
Gold concentrate sold during the period is not equal to gold concentrate recovered during the period due to timing of shipments to buyer, and due to buyer’s payability discount for the purchase of gold concentrate, and due to any adjustment from dry weight and assay in provisional settlements with the final assays.

 

Three Months Ended

Twelve Months Ended

Corporate Financial Highlights

Unit

December 31, 2025

December 31, 2024

December 31, 2025

December 31, 2024

Key Financial Data

Total revenue

$

                14,765,289

                14,787,053

                58,467,565

                46,503,016

Total operating expenses

$

                  1,487,986

                  8,584,248

                41,187,570

                47,898,208

Gross Profit

$

                13,277,303

                  6,202,805

                17,279,995

                 (1,395,192)

Net income (loss)

$

                  1,452,485

                      71,445

                  3,817,103

                 (8,521,443)

Operating cash flows before change in non-cash working capital items

$

                 (3,089,893)

                    738,946

                  3,634,203

                 (7,445,914)

Changes in working capital

$

                  4,885,941

                    260,523

                  2,122,945

                   (568,090)

Cash flow used in operating activities

$

                  1,796,048

                    999,469

                  5,757,148

                 (8,014,004)

 

 

 


 

Summary of Site-Based Processing and Operational Activity, 2018 to 2025

 

Year

 

Total Tons
Processed

 

 

Reported Mill
Feed Grade
(g/t Au)

 

 

Reported
Recovery
%

 

 

Gross Gold
Concentrates
Produced
(Au oz.)

 

 

Net Gold (1)
Concentrates
Sold
(Au oz.)

 

2018

 

 

52,038

 

 

 

9.82

 

 

 

86.11

%

 

 

14,147

 

 

 

13,418

 

2019

 

 

66,031

 

 

 

5.81

 

 

 

86.86

%

 

 

10,646

 

 

 

9,713

 

2020

 

 

44,218

 

 

 

5.65

 

 

 

87.31

%

 

 

7,001

 

 

 

5,828

 

2021

 

 

97,088

 

 

 

9.67

 

 

 

88.79

%

 

 

26,728

 

 

 

22,566

 

2022

 

 

137,740

 

 

 

8.18

 

 

 

88.05

%

 

 

31,905

 

 

 

25,554

 

2023

 

 

198,518

 

 

 

5.58

 

 

 

76.50

%

 

 

27,252

 

 

 

24,829

 

2024

 

 

257,676

 

 

 

4.07

 

 

 

76.24

%

 

 

25,677

 

 

 

22,003

 

2025

 

 

260,694

 

 

 

3.46

 

 

 

73.69

%

 

 

21,393

 

 

 

20,848

 

 

Operational Performance Overview

During Q4 2025, the Company continued to advance the optimization program at the SJG mine. This program is focused on increasing process plant throughput and recoveries, improving maintenance and equipment utilization, and ultimately enhancing operational efficiencies and profit margins at the SJG mine.

Operational results for Q4 2025 showed improved performance across several critical operational metrics (particularly in costs) due to the ongoing optimization program. The average underground development was 1,057 meters per month in Q4 2025 (1,267 in Q3 2025), compared to 383 meters per month in Q4 2024. This increase allowed the SJG mine to access over 20 production stopes. Expanded development work also led to the discovery of two new mineralized veins – one at the Tres Amigos mine (named Victoria) and one at La Mochomera (named 532) which are currently being mined as additional high-grade ore sources. Process plant reliability also improved. Electrical refurbishment and preventative maintenance programs resulted in ball mill availability averaging 96% for Q4 2025 compared to 94% Q3 2025.

A construction work program to establish a primary gravity gold circuit with the installation of three new Falcon gravity concentrators (the “Falcon” units) was completed in Q3 2025 with commissioning completed in early Q4 2025. These Falcon units were installed after the ball mills to recover the significant portion of free gold available in the San Pablo, San Pablo Sur and La Mochomera deposits. In addition, the process plant at the SJG mine has another Falcon unit already installed on the tailings circuit. The aim of the installation of these Falcon units is to boost gold recoveries improving operational efficiency and SJG mine’s economics, especially in the current higher priced gold environment.

Milled ore for Q4 2025 was 65,275 tons (approximately 710 tons per day), a 4% increase from the Q3 2025 production average of 682 tons per day. With the current high ball mill availability, the Company is evaluating cost-effective strategies to utilize additional processing capacity of approximately 100 tons per day. Gold metal recoveries for the quarter averaged 75.69%, an increase from the 73% gold recovery achieved in Q3 2025, primarily due to the installation and commissioning of the Falcon units.

During Q4 2025, metal production totaled 1,633 ounces of gold in October, 1,615 ounces in November, and 1,832 ounces in December. Total metal production for Q4 2025 was 5,080 ounces of gold, above Q3 2025 production of 4,830 ounces. The average gold feed grade was 3.20 g/t for Q4 2025, and for the full year 2025, the average gold feed grade was 3.46 g/t.

 


 

Mine development for Q4 2025 was on budget with 3,172 meters of development completed, compared to 3,013 meters in Q3 2025. The completion of new development drifts enabled the Company to maintain more than 20 stopes in production by the end of the quarter and the end of the year. This additional mining flexibility is expected to positively impact ore tonnage and grades in the coming months in 2026. The Company has also completed a capital works program to enhance mine ventilation across all three mines which included connecting the La Mochomera and San Pablo Sur mines which has had an immediate impact on the working environment. Improved ventilation time has resulted in an improvement in working conditions and faster re-entry times following blasting activities. Planning for a central Raise Bore ventilation shaft was cancelled due to unfavorable geotechnical conditions and this planned ventilation location was moved to Palos Chinos. This capital works program will involve approximately 100 meters of decline development which, in addition to helping ventilation will bring mine development closer to the Purisima historical works. Numerous exploration targets have been identified in this southern area of the mineral field. This ventilation development will also be a platform for underground exploration.

 

Detailed activities from the four main deposits include:

Tres Amigos

Original mine planning at Tres Amigos anticipated closure by the end of Q1 2025. However, geological reinterpretations and targeted short exploration drifts identified two additional mineralized structures – the Victoria and Alexa veins – located within 40 meters of existing underground infrastructure.

To date approximately 40,000 tons of high-grade ore have been extracted from this high-grade structure. In addition, a new ore drive was completed on the upper levels of the Tres Amigos North Zone which is an area well known for free gold occurrences, providing access to a new high-grade ore face. Mining from this area in Tres Amigos totaled 17,000 tons contributing to Q4 2025 production and is expected to continue throughout 2026. This new access will also enable future diamond drilling to test the north and south extensions of the deposit, with the goal of increasing inventory.

San Pablo Viejo and San Pablo Sur

Throughout Q4 2025, the Company continued mining multiple faces at the San Pablo deposit while advancing development toward the deeper southern extensions.

San Pablo Viejo and San Pablo Sur are expected to remain the primary sources of gold production through 2026 and 2027, with additional upside potential beyond that horizon. Particularly promising is the South Extension at the 500 level, which could yield high-grade (“Bonanza”-style) gold mineralization in the short to mid-term. Ongoing development efforts are positioning the mine for continued growth, including expansion deeper into the La Mochomera vein system.

La Mochomera

The La Mochomera vein is expected to be a significant source of gold production in 2026 and 2027, with especially promising high-grade potential at depth. During Q1 2025, development activities intersected a previously unrecognized high-grade mineralized structure, now designated as the “532 Vein”. The significance and potential of this new discovery are currently being evaluated with approximately 3,000 tons of high-grade material extracted from this vein.

 

 

 

Palos Chinos

Palos Chinos is an ore body which the Company exposed in January 2025 from the La Mochomera underground infrastructure with the first ore being extracted in January 2025. By the end of Q4 2025, the

 


 

Company had completed 4 development levels on this vein and mined 3,500 tons of ore. In 2026, this ore body will be an important source of high-grade ore.

 

Outlook at San Jose de Gracia

With the development progress achieved in Q4 2025 and the increase in mining faces now available to the Company, management remains confident in the ongoing progress and long-term performance of the SJG mine. The Company’s focus for 2026 is to improve production and grade through the implementation of additional and ongoing operational enhancements and development work.

While the Company made significant headway in 2025, optimization efforts will continue to focus on improving gold ore grades to the mill, throughput rates, and recoveries. San Pablo Sur, San Pablo, La Mochomera, Palos Chinos and the Tres Amigos ore bodies are expected to remain the main contributors to production in the year ahead. Further development in these areas will also be a key focus to access additional high-grade zones and additional mining faces.

The capital works program to add a primary gravity gold circuit to the processing plant involved the installation of three new Falcon units installed downstream of the ball mills to recover the significant portion of the free gold present in the San Pablo, San Pablo Sur, Tres Amigos and La Mochomera deposits. The three new Falcon units are performing as designed recovering approximately 30% of the gold in a specific gravity gold concentrate (average ~300 g/t Au) which achieves a higher payability factor. The target for 2026 is for the process plant to achieve a processing rate between 750 to 800 tpd.

 

A new tailings dam was completed during Q3 2024, with an estimated storage capacity of 670,751 cubic meters, distributed over four stages to accommodate up to three years of additional tailings. The third-stage facility is currently in use, and planning for construction of the fourth stage is underway. The Company has also begun evaluating a potential location for a third tailings storage facility at the SJG mine. These studies include environmental and geotechnical surveys to identify a preferred site.

 

On behalf of the Board of Directors of DynaResource, Inc.
Rohan Hazelton
President & CEO

 

About DynaResource
DynaResource is a junior gold mining producer trading on the OTCQX under the symbol “DYNR”. DynaResource is actively mining and expanding the historic San Jose de Gracia gold mining district in Sinaloa, Mexico.

 

For Information on DynaResource, Inc. please visit www.dynaresource.com, or contact:

 

Investor Relations:
Katherine Pryde, Investor Relations Manager
+1 972-869-9400
info@dynaresource.com 

 

 

 

 

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

 

 


 

This news release contains forward-looking statements within the meaning of Section 27 A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934.

 

Certain information contained in this news release, including any information relating to future financial or operating performance may be deemed “forward-looking”. All statements in this news release, other than statements of historical fact, that address events or developments that DynaResource expects to occur, are “forward-looking information”. These statements relate to future events or future performance and reflect the Company’s expectations regarding the future growth, results of operations, business prospects and opportunities of DynaResource. These forward-looking statements reflect the Company’s current internal projections, expectations or beliefs and are based on information currently available to DynaResource. In some cases, forward-looking information can be identified by terminology such as “may”, “will”, “should”, “expect”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “projects”, “potential”, “scheduled”, “forecast”, “budget” or the negative of those terms or other comparable terminology. Certain assumptions have been made regarding the Company’s plans at the San Jose de Gràcia property. Many of these assumptions are based on factors and events that are not within the control of DynaResource and there is no assurance they will prove to be correct. Such factors include, without limitation: capital requirements, fluctuations in the international currency markets and in the rates of exchange of the currencies of the United States and México; price volatility in the spot and forward markets for commodities; discrepancies between actual and estimated production, between actual and estimated reserves and resources and between actual and estimated metallurgical recoveries; changes in national and local governments in any country which DynaResource currently or may in the future carry on business; taxation; controls; regulations and political or economic developments in the countries in which DynaResource does or may carry on business; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits, diminishing quantities or grades of reserves; competition; loss of key employees; additional funding requirements; actual results of current exploration or reclamation activities; changes in project parameters as plans continue to be refined; accidents; labor disputes; defective title to mineral claims or property or contests over claims to mineral properties. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance or inability to obtain insurance, to cover these risks) as well as those risks referenced in the Annual Report on Form 10-K for DynaResource available at www.sec.gov. Forward-looking information is not a guarantee of future performance and actual results, and future events could differ materially from those discussed in the forward-looking information. All of the forward-looking information contained in this news release is qualified by these cautionary statements. Although DynaResource believes that the forward-looking information contained in this news release is based on reasonable assumptions, readers cannot be assured that actual results will be consistent with such statements. Accordingly, readers are cautioned against placing undue reliance on forward-looking information. DynaResource expressly disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, events or otherwise.

 

NON-GAAP FINANCIAL PERFORMANCE MEASURES

 

We have included adjusted EBITDA as a supplemental measure of our performance in this press release. In the gold mining industry, adjusted EBITDA is a common performance measure but does not have any standardized meaning and is considered a non-GAAP financial measure. We define adjusted EBITDA as net income (loss) plus (i) interest expense, (ii) provision for taxes, and (iii) depreciation and amortization, as further adjusted to eliminate the impact of certain items that we do not consider indicative of our ongoing operating performance. These further adjustments are itemized below. You are encouraged to evaluate these adjustments and the reasons we consider them appropriate for supplemental analysis. In evaluating adjusted EBITDA, you should be aware that in the future we may incur expenses that are the same as or

 


 

similar to some of the adjustments in this presentation. Our presentation of adjusted EBITDA should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items.

 

Set forth below is a reconciliation of adjusted EBITDA to net income (loss):

 

img259973804_1.jpg

 

We use adjusted EBITDA to evaluate our business on an ongoing basis and believe that, in addition to conventional measures prepared in accordance with GAAP, certain investors use non-GAAP measures, such as adjusted EBITDA to evaluate our performance and ability to generate cash flow. We also report this measure to provide investors and analysts with useful information about our underlying costs of operations and clarity over our ability to finance operations and capital activities separately from other activities. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP.

 

Adjusted EBITDA has limitations as an analytical tool. Some of these limitations include:

 

adjusted EBITDA does not reflect our cash expenditures, or future requirements, for capital expenditures or contractual commitments;
adjusted EBITDA does not reflect changes in, or cash requirements for, our working capital needs;
adjusted EBITDA does not reflect the significant interest expense, or the cash requirements necessary to service interest or principal payments, on our debts;
although depreciation and amortization are non-cash charges, the assets being depreciated and amortized will often have to be replaced in the future, and adjusted EBITDA does not reflect any cash requirements for such replacements;
non-cash compensation is and will remain a key element of our overall long-term incentive compensation package, although we exclude it as an expense when evaluating our ongoing operating performance for a particular period;
adjusted EBITDA does not reflect the impact of certain cash charges resulting from matters we consider not to be indicative of our ongoing operations; and
Other companies in our industry may calculate their adjusted EBITDA differently than we do, limiting the usefulness as a comparative measure.

 

Because of these limitations, adjusted EBITDA should not be considered in isolation or as a substitute for performance measures calculated in accordance with GAAP. We compensate for these limitations by relying primarily on our GAAP results and using adjusted EBITDA only supplementally.

 

 


FAQ

How did DynaResource (DYNR) perform financially in full-year 2025?

DynaResource posted net income of $3.8 million in 2025, a sharp improvement from a net loss of $8.5 million in 2024. Revenue grew 26% to $58.5 million, and adjusted EBITDA improved to $12.1 million from negative $1.3 million, reflecting stronger profitability.

What were DynaResource’s Q4 2025 results at the San Jose de Gracia mine?

In Q4 2025, DynaResource generated $14.8 million in revenue and net income of $1.4 million. Adjusted EBITDA was $4.7 million, marking the fifth consecutive quarter of positive adjusted EBITDA and highlighting sustained financial momentum at the San Jose de Gracia operation.

How much gold did DynaResource (DYNR) produce and sell in 2025?

In 2025, DynaResource produced 21,393 ounces of gold and sold 20,848 ounces from the San Jose de Gracia mine. Production fell within revised guidance, supported by higher mill throughput and ongoing optimization efforts across multiple ore bodies on the property.

What operational improvements did DynaResource achieve at San Jose de Gracia in 2025?

DynaResource increased milled throughput to 262,224 tons in 2025 and improved average daily mill throughput to 718 tons. Installation of three new Falcon gravity concentrators lifted gold recoveries to about 73.69% for the year and 75.69% in Q4, supporting better economics.

What is driving DynaResource’s adjusted EBITDA growth at the SJG mine?

Adjusted EBITDA rose to $12.1 million in 2025, helped by higher gold prices, improved plant reliability, better recoveries from Falcon concentrators, and tighter cost control. These factors contributed to stronger margins and five straight quarters of positive adjusted EBITDA performance.

What is DynaResource’s 2026 operational focus at San Jose de Gracia?

For 2026, DynaResource aims to boost production and grades by further optimizing throughput, recoveries, and development. Management targets a processing rate between 750–800 tpd and plans additional work at San Pablo, La Mochomera, Palos Chinos, and Tres Amigos to access more high-grade zones.

Filing Exhibits & Attachments

2 documents
Dynaresource

OTC:DYNR

View DYNR Stock Overview

DYNR Rankings

DYNR Latest News

DYNR Latest SEC Filings

DYNR Stock Data

38.92M
15.09M
Other Precious Metals & Mining
Basic Materials
Link
United States
Irving