Rhea-AI Filing Summary

Gold Resource Corporation returned to profitability in Q1 2026 as Don David Gold Mine performance improved sharply. Net sales rose to $43.9M from $12.4M, lifting mine gross profit to $19.0M versus a prior-period loss.

The company reported net income of $4.7M, or $0.03 per share, compared with an $8.3M loss a year earlier, driven by higher grades, better recoveries, and much stronger metal prices. Cash from operations reached $14.9M, boosting cash to $31.0M. Production of 8,749 gold-equivalent ounces and lower cash costs supported the turnaround.

A planned all-share merger with Goldgroup Mining Inc. would give Gold Resource stockholders 0.3619 Goldgroup shares per GORO share after Goldgroup’s share consolidation, leaving them with about 40% of the combined company if completed.

Positive

  • Sharp financial turnaround: Net sales increased to $43.9M from $12.4M, and net income improved to $4.7M from a prior $8.3M loss, reflecting stronger operations and pricing.
  • Stronger cash generation and balance sheet: Cash from operating activities reached $14.9M versus an outflow previously, raising cash and equivalents to $31.0M while funding higher capital investment.
  • Operational momentum at Don David Gold Mine: Gold production rose to 2,039 ounces and silver to 396,448 ounces, with notable improvements in recoveries and lower cash cost after co-product credits per gold-equivalent ounce.
  • Strategic merger pathway: The agreed all-share transaction with Goldgroup Mining Inc. would give existing stockholders approximately 40% of the combined company, potentially adding scale and diversification if completed.

Negative

  • High-cost capital structure via streaming: Gold and silver stream agreement liabilities total $95.6M, and quarterly interest on streaming liabilities was $4.7M, weighing on profitability.
  • Permitting and default risk at Back Forty: Failure to obtain required permits for Back Forty by agreed dates could trigger default under the Osisko stream agreements, potentially accelerating repayment or allowing Osisko to enforce security over project assets.
  • Rising tax and royalty burden: Q1 2026 income tax expense increased to $4.7M, and Mexican mining duties and taxes contribute to an effective rate above U.S. federal levels.
  • Elevated all-in costs: Consolidated all-in sustaining cost after co-product credits was $3,476 per gold-equivalent ounce sold, with total all-in cost at $3,640, leaving less margin if metal prices soften.

Insights

Q1 2026 shows a strong operational turnaround and a strategic merger path.

Gold Resource grew net sales to $43.9M from $12.4M, turning a $1.5M mine gross loss into a $19.0M mine gross profit. Higher throughput, better grades, and stronger metal prices drove gold-equivalent ounces sold to 8,749, more than doubling year over year.

Net income of $4.7M contrasts with the prior $8.3M loss, while cash from operations of $14.9M funded $8.8M of capital expenditures and lifted cash to $31.0M. However, the Osisko gold and silver stream liabilities total $95.6M, and interest on these streams was $4.7M in the quarter, a meaningful structural burden.

The proposed share-for-share merger with Goldgroup Mining Inc. would leave current stockholders with roughly 40% of the combined business if it closes in Q3 2026, adding scale while preserving management continuity. The Back Forty Project remains a key long-term growth option, but permitting milestones tied to the stream agreements and the feasibility study represent important execution factors for future filings.

Net sales Q1 2026 $43.9M Three months ended March 31, 2026; vs $12.4M in 2025
Net income Q1 2026 $4.7M Three months ended March 31, 2026; vs $8.3M loss in 2025
Cash from operations $14.9M Net cash provided by operating activities, Q1 2026
Cash and cash equivalents $31.0M Balance at March 31, 2026
Gold-equivalent ounces sold 8,749 AuEq oz Three months ended March 31, 2026
All-in sustaining cost $3,476/oz Total consolidated AISC after co-product credits per AuEq oz, Q1 2026
Osisko stream liability $95.6M Gold and silver stream agreements liability at March 31, 2026
Total assets $196.4M Total assets on balance sheet at March 31, 2026
Gold and silver stream agreements financial
"The following table presents the Company’s liabilities related to the Company’s Gold and Silver Stream Agreements"
all-in sustaining cost financial
"Total consolidated all-in sustaining cost after co-product credits per AuEq oz. sold"
All-in sustaining cost (AISC) is a per-unit measure that shows the full, ongoing cost to produce a commodity, typically an ounce of metal, including direct mining costs, sustaining capital (ongoing equipment and mine upkeep), royalties, and general overhead. For investors it matters because AISC reveals the durable earning power and true profit margin of a producer—like calculating the total monthly cost to own and operate a car to judge whether selling rides is profitable over time.
co-product credits financial
"Total cash cost after co-product credits per AuEq oz. sold"
asset retirement obligation financial
"Asset retirement obligation – balance at end of period"
A liability recorded for the future cost to retire, dismantle or clean up a long-lived asset — for example removing an oil rig, closing a mine, or decommissioning a plant. Investors care because it reduces reported profit and ties up capital: companies must estimate and set aside money now for a known future expense, and changes to that estimate can swing earnings, debt ratios and the company’s cash needs much like setting aside savings to repair or return a rented property later.
embedded derivatives financial
"Concentrate sales contracts contain embedded derivatives due to the provisional pricing terms"
An embedded derivative is a hidden financial option or payout rule built into a larger contract—like a bond, loan, or supply agreement—that makes part of the deal behave like a separate financial bet whose value swings with interest rates, currencies, commodity prices, or a company’s stock. Investors care because these built‑in features can change reported assets, liabilities and profits and add unexpected risk or upside, like finding a bonus or penalty clause inside a rental lease.
Reverse triangular merger financial
"The proposed Transaction will occur by way of a reverse triangular merger"
A reverse triangular merger is a deal structure where a buyer creates a new company it controls, that new company is merged into the target, and the target company continues to exist as a subsidiary of the buyer. Think of the buyer building a small box, inserting it into the seller’s box, and then making the seller sit inside the buyer’s group while keeping its shape. Investors care because this structure can change how shareholders are paid or exchanged, who carries legal liabilities, and how quickly the deal closes, all of which affect value and risk.
0001160791--12-312026Q1falseGOLD RESOURCE CORP0001160791us-gaap:AdditionalPaidInCapitalMembergoro:RegisteredDirectOfferingMember2025-01-012025-03-310001160791us-gaap:AdditionalPaidInCapitalMembergoro:AtMarketOfferingAgreementMember2025-01-012025-03-310001160791goro:RegisteredDirectOfferingMember2025-01-012025-03-310001160791goro:AtMarketOfferingAgreementMember2025-01-012025-03-310001160791goro:AtMarketOfferingAgreementMember2026-01-012026-03-310001160791us-gaap:CommonStockMembergoro:RegisteredDirectOfferingMember2025-01-012025-03-310001160791us-gaap:CommonStockMembergoro:AtMarketOfferingAgreementMember2025-01-012025-03-310001160791us-gaap:TreasuryStockCommonMember2026-03-310001160791us-gaap:RetainedEarningsMember2026-03-310001160791us-gaap:AdditionalPaidInCapitalMember2026-03-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-03-310001160791us-gaap:TreasuryStockCommonMember2025-12-310001160791us-gaap:RetainedEarningsMember2025-12-310001160791us-gaap:AdditionalPaidInCapitalMember2025-12-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-12-310001160791us-gaap:TreasuryStockCommonMember2025-03-310001160791us-gaap:RetainedEarningsMember2025-03-310001160791us-gaap:AdditionalPaidInCapitalMember2025-03-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-03-310001160791us-gaap:TreasuryStockCommonMember2024-12-310001160791us-gaap:RetainedEarningsMember2024-12-310001160791us-gaap:AdditionalPaidInCapitalMember2024-12-310001160791us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-12-310001160791us-gaap:CommonStockMember2026-03-310001160791us-gaap:CommonStockMember2025-12-310001160791us-gaap:CommonStockMember2025-03-310001160791us-gaap:CommonStockMember2024-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2026-03-310001160791us-gaap:RestrictedStockUnitsRSUMember2025-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2025-03-310001160791us-gaap:RestrictedStockUnitsRSUMember2024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:OsiskoStreamAgreementsMember2021-12-100001160791goro:ZincConcentrateMember2026-01-012026-03-310001160791goro:SilverConcentrateMember2026-01-012026-03-310001160791goro:LeadConcentrateMember2026-01-012026-03-310001160791goro:GoldConcentrateMember2026-01-012026-03-310001160791goro:CopperConcentrateMember2026-01-012026-03-310001160791goro:ZincConcentrateMember2025-01-012025-03-310001160791goro:SilverConcentrateMember2025-01-012025-03-310001160791goro:LeadConcentrateMember2025-01-012025-03-310001160791goro:GoldConcentrateMember2025-01-012025-03-310001160791goro:CopperConcentrateMember2025-01-012025-03-310001160791us-gaap:VehiclesMember2026-03-310001160791us-gaap:SoftwareDevelopmentMember2026-03-310001160791us-gaap:MineDevelopmentMember2026-03-310001160791us-gaap:MachineryAndEquipmentMember2026-03-310001160791us-gaap:LandMember2026-03-310001160791us-gaap:ConstructionInProgressMember2026-03-310001160791us-gaap:AssetRetirementObligationCostsMember2026-03-310001160791goro:MineralInterestsAndMineralRightsMember2026-03-310001160791goro:MillFacilitiesAndInfrastructureMember2026-03-310001160791goro:FurnitureAndOfficeEquipmentMember2026-03-310001160791us-gaap:VehiclesMember2025-12-310001160791us-gaap:SoftwareDevelopmentMember2025-12-310001160791us-gaap:MineDevelopmentMember2025-12-310001160791us-gaap:MachineryAndEquipmentMember2025-12-310001160791us-gaap:LandMember2025-12-310001160791us-gaap:ConstructionInProgressMember2025-12-310001160791us-gaap:AssetRetirementObligationCostsMember2025-12-310001160791goro:MineralInterestsAndMineralRightsMember2025-12-310001160791goro:MillFacilitiesAndInfrastructureMember2025-12-310001160791goro:FurnitureAndOfficeEquipmentMember2025-12-310001160791us-gaap:RetainedEarningsMember2026-01-012026-03-310001160791us-gaap:RetainedEarningsMember2025-01-012025-03-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldResourcesAcquisitionCompanyMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-300001160791goro:MaterialsAndSuppliesMember2026-03-310001160791goro:MaterialsAndSuppliesMember2025-12-310001160791country:MXus-gaap:TaxYear2015Member2026-03-310001160791country:MXus-gaap:TaxYear2015Member2023-10-310001160791us-gaap:GoldMember2025-01-012025-03-310001160791goro:ZincMember2025-01-012025-03-310001160791goro:SilverMember2025-01-012025-03-310001160791goro:LeadMember2025-01-012025-03-310001160791goro:CopperMember2025-01-012025-03-310001160791us-gaap:SalesMember2026-01-012026-03-310001160791us-gaap:AccountsReceivableMember2026-01-012026-03-310001160791us-gaap:AccountsReceivableMember2025-01-012025-12-310001160791us-gaap:SalesMember2025-01-012025-03-310001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2026-03-310001160791goro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2026-03-310001160791goro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2026-03-310001160791goro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2025-12-310001160791goro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2025-12-310001160791us-gaap:PerformanceSharesMember2026-03-310001160791goro:DeferredStockUnitMember2026-03-310001160791us-gaap:PerformanceSharesMember2025-12-310001160791goro:DeferredStockUnitMember2025-12-310001160791us-gaap:PerformanceSharesMember2025-03-310001160791goro:DeferredStockUnitMember2025-03-310001160791us-gaap:PerformanceSharesMember2024-12-310001160791goro:DeferredStockUnitMember2024-12-310001160791goro:ConcentrateMember2026-01-012026-03-310001160791goro:ConcentrateMember2025-01-012025-03-3100011607912025-03-310001160791us-gaap:FairValueInputsLevel1Member2026-03-310001160791us-gaap:FairValueInputsLevel1Member2025-12-310001160791goro:TwoHundredAndSeventyDaysAfterCommencementOfCommercialProductionMembergoro:BackFortyProjectMembergoro:BackFortyProjectMember2026-03-310001160791goro:NinetyDaysAfterCommencementOfCommercialProductionMembergoro:BackFortyProjectMembergoro:BackFortyProjectMember2026-03-310001160791goro:FourHundredAndFiftyDaysAfterCommencementOfCommercialProductionMembergoro:BackFortyProjectMembergoro:BackFortyProjectMember2026-03-310001160791goro:AquilaResourcesIncorporationMembergoro:BackFortyProjectMember2026-03-310001160791goro:AquilaResourcesIncorporationMembergoro:BackFortyProjectMember2025-12-310001160791goro:ShortTermIncentivePlanMember2026-03-310001160791us-gaap:FairValueInputsLevel2Member2026-03-310001160791us-gaap:FairValueInputsLevel2Member2025-12-310001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-300001160791us-gaap:AdditionalPaidInCapitalMember2026-01-012026-03-310001160791us-gaap:AdditionalPaidInCapitalMember2025-01-012025-03-310001160791us-gaap:CommonStockMember2026-01-012026-03-310001160791us-gaap:CommonStockMember2025-01-012025-03-310001160791us-gaap:PerformanceSharesMember2026-01-012026-03-310001160791us-gaap:PerformanceSharesMember2025-01-012025-03-310001160791us-gaap:RestrictedStockUnitsRSUMember2026-01-012026-03-310001160791us-gaap:RestrictedStockUnitsRSUMember2025-01-012025-12-310001160791us-gaap:RestrictedStockUnitsRSUMember2025-01-012025-03-310001160791us-gaap:RestrictedStockUnitsRSUMember2024-01-012024-12-310001160791goro:DeferredStockUnitMember2026-01-012026-03-310001160791goro:DeferredStockUnitMember2025-01-012025-03-310001160791country:MX2025-01-012025-01-010001160791goro:DonDavidGoldMineMember2026-03-310001160791goro:DonDavidGoldMineMember2025-12-3100011607912024-12-310001160791goro:CopperLeadAndZincMember2026-01-012026-03-310001160791goro:CopperLeadAndZincMember2025-01-012025-03-3100011607912021-04-232021-04-230001160791goro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2026-01-012026-03-310001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2026-01-012026-03-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2026-01-012026-03-310001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2025-01-012025-12-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2025-01-012025-12-310001160791goro:HudbayMichiganIncMembergoro:BackFortyProjectMember2024-12-310001160791goro:AquilaResourcesIncorporationMembergoro:BackFortyProjectMember2013-12-300001160791goro:HudbayMichiganIncMembergoro:HudbayMichiganIncMember2013-12-302013-12-300001160791goro:TaxTreatyIfCertainConditionsAreNotMetMember2026-01-012026-03-310001160791goro:TaxTreatyIfCertainConditionsAreMetMember2026-01-012026-03-310001160791country:MX2025-01-010001160791country:MX2026-03-310001160791us-gaap:OperatingSegmentsMembergoro:OaxacaMexicoSegmentMember2026-01-012026-03-310001160791us-gaap:OperatingSegmentsMembergoro:MichiganUsaSegmentMember2026-01-012026-03-310001160791us-gaap:OperatingSegmentsMember2026-01-012026-03-310001160791goro:OaxacaMexicoSegmentMember2026-01-012026-03-310001160791goro:MichiganUsaSegmentMember2026-01-012026-03-310001160791us-gaap:OperatingSegmentsMembergoro:OaxacaMexicoSegmentMember2025-01-012025-03-310001160791us-gaap:OperatingSegmentsMembergoro:MichiganUsaSegmentMember2025-01-012025-03-310001160791us-gaap:OperatingSegmentsMember2025-01-012025-03-310001160791goro:OaxacaMexicoSegmentMember2025-01-012025-03-310001160791goro:MichiganUsaSegmentMember2025-01-012025-03-310001160791goro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2026-03-310001160791goro:AtMarketOfferingAgreementMember2025-04-112025-04-110001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-300001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2017-11-300001160791us-gaap:GoldMember2026-01-012026-03-310001160791goro:ZincMember2026-01-012026-03-310001160791goro:SilverMember2026-01-012026-03-310001160791goro:LeadMember2026-01-012026-03-310001160791goro:CopperMember2026-01-012026-03-310001160791us-gaap:CorporateNonSegmentMember2026-01-012026-03-310001160791us-gaap:CorporateNonSegmentMember2025-01-012025-03-310001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2026-03-310001160791goro:BackFortyProjectMembergoro:BackFortyProjectMember2026-03-310001160791goro:BackFortyProjectMember2024-12-310001160791goro:PaymentOnCompletionMembergoro:BackFortyProjectMembergoro:BackFortyProjectMember2026-03-310001160791country:CA2026-03-3100011607912025-01-012025-03-310001160791goro:AquilaResourcesIncorporationMembergoro:SilverBullionMembergoro:SilverStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-012020-06-300001160791goro:AquilaResourcesIncorporationMembergoro:GoldBullionMembergoro:GoldStreamingAgreementWithOsiskoBermudaLimitedMember2020-06-012020-06-300001160791goro:HudbayMichiganIncMember2013-12-300001160791goro:HudbayMichiganIncMembergoro:BackFortyProjectMember2013-12-3000011607912025-01-012025-12-310001160791country:MX2026-01-012026-03-3100011607912026-03-3100011607912025-12-3100011607912026-05-0400011607912026-01-012026-03-31iso4217:MXNxbrli:sharesiso4217:USDxbrli:pureiso4217:CADutr:tutr:oziso4217:USDutr:tiso4217:USDutr:oziso4217:USDxbrli:shares

Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-Q

(Mark One)

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended March 31, 2026

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from ______ to ______

Commission File Number: 001-34857

Graphic

Gold Resource Corporation

(Exact Name of Registrant as Specified in its charter)

Colorado

84-1473173

(State or other jurisdiction of

incorporation or organization)

(I.R.S. Employer

Identification No.)

7887 E. Belleview Ave, Suite 1100, Denver, Colorado 80111

(Address of Principal Executive Offices) (Zip Code)

(303) 320-7708

(Registrant’s telephone number including area code) 

Securities registered pursuant to Section 12(b) of the Act:

a

Title of each class

Trading Symbol

Name of each exchange where registered

Common Stock, $0.001 par value

GORO

NYSE American

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.YesNo

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). YesNo

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer

Accelerated filer

Non-accelerated filer

Smaller reporting company

Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act

Indicate by check mark whether registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). YesNo

Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date: 161,882,909 shares of common stock outstanding as of May 4, 2026.

Table of Contents

GOLD RESOURCE CORPORATION

FORM 10-Q

Table of Contents

Page

First Quarter 2026 Summary

3

Part I - FINANCIAL INFORMATION

4

Item 1.

Condensed Consolidated Interim Financial Statements and Notes

4

Ø
Condensed Consolidated Interim Balance Sheets as of March 31, 2026 (unaudited) and December 31, 2025

4

Ø
Condensed Consolidated Interim Statements of Operations for the three months ended March 31, 2026 and 2025 (unaudited)

5

Ø
Condensed Consolidated Interim Statements of Changes in Shareholders’ Equity for the three months ended March 31, 2026 and 2025 (unaudited)

6

Ø
Condensed Consolidated Interim Statements of Cash Flows for the three months ended March 31, 2026 and 2025 (unaudited)

7

Ø
Notes to the Condensed Consolidated Interim Financial Statements (unaudited)

8

Item 2.

Management’s Discussion and Analysis of Financial Condition and Results of Operations

24

Item 3.

Quantitative and Qualitative Disclosures About Market Risk

42

Item 4.

Controls and Procedures

43

Part II - OTHER INFORMATION

44

Item 1.

Legal Proceedings

44

Item 1A.

Risk Factors

44

Item 2.

Unregistered Sales of Equity Securities and Use of Proceeds

44

Item 3.

Defaults upon Senior Securities

44

Item 4.

Mine Safety Disclosures

45

Item 5.

Other Information

45

Item 6.

Exhibits

46

Signatures

47

Graphic

DDGM Processing Plant

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
2

Table of Contents

FIRST QUARTER 2026 SUMMARY

A summary for the three months ended March 31, 2026 is presented below and discussed further under Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations:

Corporate and Financial

On January 26, 2026, the Company announced that it entered into a definitive arrangement agreement and plan of merger (the “Arrangement Agreement”) with Goldgroup Mining Inc. (“Goldgroup”), whereby Goldgroup agreed to acquire all of the issued and outstanding shares of the Company’s common stock (the “Transaction”). Pursuant to the Arrangement Agreement, the Company’s stockholders will receive 1.4476 common shares of Goldgroup for each share of the Company’s common stock (as adjusted by a share consolidation to be completed by Goldgroup prior to closing). The Transaction is expected to close in the third quarter of 2026, subject to customary closing conditions (including approval by the stockholders of each of the Company and Goldgroup). The parties received unconditional approval from the Mexican National Antitrust Commission in respect of the Transaction on April 27, 2026.
The Company has $40.2 million in working capital and $31.0 million in cash and cash equivalents as of March 31, 2026.
The Company had net income of $4.7 million, or $0.03 per share, for the quarter, which reflects the increased production and higher realized metal prices in 2026.
Total cash cost after co-product credits for the quarter was $2,164 per AuEq ounce, and total consolidated all-in sustaining cost (“AISC”) after co-product credits for the quarter was $3,476 per AuEq ounce. (See Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Non-GAAP Measures for a reconciliation of non-GAAP measures to applicable U.S. GAAP measures).

Don David Gold Mine (“DDGM”)

In the first quarter of 2026, DDGM, located in Mexico, produced and sold a total of 8,749 gold equivalent (“AuEq”) ounces, comprised of 1,548 gold ounces and 374,232 silver ounces, at an average realized sales price per ounce of $5,098 and $98.09, respectively. The 74,444 total tonnes milled was 31% higher than in the same period in 2025. Metal production for gold and silver increased by 126% and 54%, respectively. Copper, lead, and zinc production also increased by 39%, 36%, and 64%, respectively.
During the first quarter of 2026, exploration expenditures at DDGM increased as the Company continued to engage in strategic planning and prioritization of regional surface exploration activities across multiple projects, including Alta Gracia, Margaritas, Chamizo, El Rey, and Jabali, while limited surface expansion drilling also commenced, testing the Isabel SE target. Underground grade-control, infill, and selective expansion drilling continued to focus on near-term production targets at Arista and at the Alta Gracia project. At Arista, drilling supported production planning and refinement of the geologic model for veins within the Arista system, including the Viridiana, Gisela, Candelaria, Marena North and Splay 31 veins, as well as for veins within the Three Sisters system, focused on the Sandy and Sadie vein sets. At the Alta Gracia Project, surface and underground infill and expansion drilling advanced evaluation of the Mirador and Independencia vein systems.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
3

Table of Contents

PART I - FINANCIAL INFORMATION

ITEM 1. Financial Statements

GOLD RESOURCE CORPORATION

CONDENSED CONSOLIDATED INTERIM BALANCE SHEETS

(U.S. dollars in thousands, except share amounts)

(Unaudited)

As of

As of

March 31, 

December 31,

Note

2026

  ​ ​ ​

2025

ASSETS

Current assets:

Cash and cash equivalents

$

31,025

$

25,011

Accounts receivable, net

15,060

13,253

Inventories, net

4

8,739

8,234

Prepaid expenses and other current assets

6

2,667

2,784

Total current assets

57,491

49,282

Property, plant, and mine development, net

7

138,754

134,656

Other non-current assets

179

124

Total assets

$

196,424

$

184,062

LIABILITIES AND SHAREHOLDERS’ EQUITY

Current liabilities:

Accounts payable

$

7,288

$

7,360

Mining royalty taxes payable, net

2,663

2,860

Accrued expenses and other current liabilities

8

7,295

7,043

Total current liabilities

17,246

17,263

Reclamation and remediation liabilities

10

10,299

10,184

Gold and silver stream agreements liability

9

95,597

90,930

Deferred tax liabilities, net

5

18,028

15,527

Contingent consideration

11

3,494

3,554

Other non-current liabilities

8

2,946

2,575

Total liabilities

147,610

140,033

Commitments and contingencies

11

Shareholders’ equity:

Common stock - $0.001 par value, 200,000,000 shares authorized:
161,886,146 and 161,767,412 shares outstanding at March 31, 2026 and December 31, 2025, respectively

162

162

Additional paid-in capital

138,504

138,458

Accumulated deficit

(82,797)

(87,536)

Treasury stock at cost, 336,398 shares

(5,884)

(5,884)

Accumulated other comprehensive loss

(1,171)

(1,171)

Total shareholders’ equity

48,814

44,029

Total liabilities and shareholders’ equity

$

196,424

$

184,062

The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
4

Table of Contents

GOLD RESOURCE CORPORATION

CONDENSED CONSOLIDATED INTERIM STATEMENTS OF OPERATIONS

(U.S. dollars in thousands, except share and per share amounts)

(Unaudited)

For the three months ended

March 31, 

Note

  ​ ​ ​

2026

  ​ ​ ​

2025

Sales, net

3

$

43,943

$

12,354

Cost of sales:

Production costs

20,636

10,708

Depreciation and amortization

4,027

2,704

Reclamation and remediation

235

394

Total cost of sales

24,898

13,806

Mine gross profit (loss)

19,045

(1,452)

Costs and expenses:

General and administrative expenses

1,594

1,144

Mexico exploration expenses

1,230

281

Michigan Back Forty Project expenses

209

204

Stock-based compensation

15

1,024

400

Other expense, net

16

5,537

4,311

Total costs and expenses

9,594

6,340

Income (loss) before income taxes

9,451

(7,792)

Income tax provision

5

4,712

527

Net income (loss)

$

4,739

$

(8,319)

Net income (loss) per common share:

Basic and diluted income (loss) per common share

17

$

0.03

$

(0.07)

Weighted average shares outstanding:

Basic

17

161,863,094

112,442,135

Diluted

17

163,716,164

112,442,135

The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
5

Table of Contents

GOLD RESOURCE CORPORATION

CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CHANGES IN SHAREHOLDERS’ EQUITY

(U.S. dollars in thousands, except share amounts)

(Unaudited)

For the three months ended March 31, 2026 and 2025

  ​

Number of
Common
Shares

  ​

Par Value of
Common
Shares

  ​

Additional Paid-
in Capital

  ​

Accumulated Deficit

  ​

Treasury
Stock

  ​

Accumulated
Other
Comprehensive
Loss

  ​

Total
Shareholders'
Equity

Balance, December 31, 2024

95,661,347

$

96

$

115,319

$

(81,077)

$

(5,884)

$

(1,171)

$

27,283

Stock-based compensation

-

-

140

-

-

-

140

Common stock issued for vested restricted stock units

328,942

-

-

-

-

-

-

Issuance of common stock, net of issuance costs

9,287,601

9

3,013

-

-

-

3,022

Surrender of common stock for taxes due on net settlement

(123,806)

-

(42)

-

-

-

(42)

Registered direct offering

15,625,000

16

2,484

2,500

Net loss

-

-

-

(8,319)

-

-

(8,319)

Balance, March 31, 2025

120,779,084

$

121

$

120,914

$

(89,396)

$

(5,884)

$

(1,171)

$

24,584

Balance, December 31, 2025

162,103,810

$

162

$

138,458

$

(87,536)

$

(5,884)

$

(1,171)

$

44,029

Stock-based compensation

-

-

102

-

-

-

102

Common stock issued for vested restricted stock units

177,150

-

-

-

-

-

-

Surrender of common stock for taxes due on net settlement

(58,416)

-

(56)

-

-

-

(56)

Net income

-

-

-

4,739

-

-

4,739

Balance, March 31, 2026

162,222,544

$

162

$

138,504

$

(82,797)

$

(5,884)

$

(1,171)

$

48,814

The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
6

Table of Contents

GOLD RESOURCE CORPORATION

CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CASH FLOWS

(U.S. dollars in thousands)

(Unaudited)

For the three months ended March 31, 

Note

2026

  ​ ​ ​

2025

Cash flows from operating activities:

Net income (loss)

$

4,739

$

(8,319)

Adjustments to reconcile net income (loss) to net cash provided by (used in) operating activities:

Deferred income tax expense

2,524

427

Depreciation and amortization

4,088

2,918

Stock-based compensation

1,024

400

Interest on streaming liabilities

4,667

3,821

Other operating adjustments, net

19

(213)

164

Changes in operating assets and liabilities:

Accounts receivable

(1,807)

(1,050)

Inventories

113

514

Prepaid expenses and other current assets

117

161

Other non-current assets and liabilities

(127)

426

Accounts payable and other accrued liabilities

(119)

(454)

Cash settled liability awards

-

(33)

Mining royalty and income taxes payable, net

(156)

197

Net cash provided by (used in) operating activities

14,850

(828)

Cash flows from investing activities:

Capital expenditures

(8,764)

(2,182)

Proceeds from the sale of investments

-

854

Net cash used in investing activities

(8,764)

(1,328)

Cash flows from financing activities:

Proceeds from ATM Program sales, net of issuance costs

-

3,022

Net proceeds from the registered direct offerings

-

2,500

Other financing activities

(56)

(42)

Net cash (used in) provided by financing activities

(56)

5,480

Effect of exchange rate changes on cash and cash equivalents

(16)

(61)

Net increase in cash and cash equivalents

6,014

3,263

Cash and cash equivalents at beginning of period

25,011

1,628

Cash and cash equivalents at end of period

$

31,025

$

4,891

Supplemental Cash Flow Information

Income and mining taxes paid

$

1,897

$

-

Non-cash investing or financing activities:

Value of common shares issued for share-based compensation redemption

$

112

$

69

Balance of capital expenditures in accounts payable

$

1,041

$

339

Balance of equipment financing

$

328

$

539

The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
7

Table of Contents

GOLD RESOURCE CORPORATION

NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS

March 31, 2026
(Unaudited)

1. Basis of Preparation of Financial Statements

The Condensed Consolidated Interim Financial Statements (“interim financial statements”) of Gold Resource Corporation and its subsidiaries (collectively, the “Company”) are unaudited and have been prepared in accordance with the rules of the Securities and Exchange Commission (“SEC”) for interim statements. Certain information and footnote disclosures required by United States Generally Accepted Accounting Principles (“U.S. GAAP”) have been condensed or omitted as permitted by such rules. However, the Company believes that the disclosures included are adequate to make the information presented not misleading. In the opinion of management, all adjustments (including normal recurring adjustments) and disclosures necessary for a fair presentation of these interim financial statements have been included. The results reported in these interim financial statements do not necessarily indicate the results that may be reported for the entire year. These interim financial statements should be read in conjunction with the audited consolidated financial statements for the year ended December 31, 2025, included in the Company’s annual report on Form 10-K (the “2025 Annual Report”). The year-end balance sheet data was derived from the audited financial statements. Unless otherwise noted, there have been no material changes to the footnotes from those accompanying the audited consolidated financial statements contained in the 2025 Annual Report.

Recent Developments

On January 26, 2026, the Company announced that it entered into a definitive arrangement agreement and plan of merger (the “Arrangement Agreement”) with Goldgroup Mining Inc. (“Goldgroup”), whereby Goldgroup agreed to acquire all of the issued and outstanding shares of the Company’s common stock (the “Transaction”).

Pursuant to the Arrangement Agreement, the Company’s stockholders will receive 1.4476 common shares of Goldgroup for each share of the Company’s common stock (adjusted to 0.3619 common shares of Goldgroup for each share of the Company’s common stock as a result of a four-for-one share consolidation to be completed by Goldgroup prior to closing). Upon closing of the transaction, the Company will be a wholly owned subsidiary of Goldgroup.

The Transaction was unanimously approved by the boards of directors of the Company and Goldgroup. The Transaction is expected to close in the third quarter of 2026, subject to customary closing conditions (including approval by the stockholders of each of the Company and Goldgroup). The parties received unconditional approval from the Mexican National Antitrust Commission in respect of the Transaction on April 27, 2026.

2. New Accounting Pronouncements

Recently issued Accounting Standards Updates to become effective in future periods

In November 2024, the FASB issued ASU 2024-03, Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40) to improve the disclosures about a public business entity’s expense and provide more detailed information about the types of expenses included in certain expense captions in the consolidated financial statements. The amendments in this update are effective for annual reporting periods beginning after December 15, 2026, and interim reporting periods beginning after December 15, 2027. Early adoption is permitted and the amendments in this update should be applied either prospectively or retrospectively. The Company is evaluating the impact this guidance will have on the disclosures in the consolidated financial statements.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
8

Table of Contents

In December 2025, the FASB issued ASU 2025-11, Interim Reporting (Topic 270): Narrow-Scope Improvements. The update improves the guidance in Topic 270, Interim Reporting, by improving the navigability of the required interim disclosures and clarifying when that guidance is applicable. The amendments in ASU 2025-11 are effective for interim reporting periods within annual reporting periods beginning after December 15, 2027, with early adoption permitted. The amendments can be applied either prospectively or retrospectively to any or all prior periods presented in the financial statements. The Company is evaluating the impact this guidance will have on the disclosures in the consolidated financial statements.

In December 2025, the FASB issued ASU 2025-12, Codification Improvements. This project facilitates Codification updates for a broad range of Topics arising from technical corrections, the unintended application of the Codification, clarifications, and other minor improvements. The Company is evaluating the impact this guidance will have on the disclosures in the consolidated financial statements.

3. Revenue

The Company derives its revenue mainly from the sale of concentrates. The following table presents the Company’s net sales for each period presented, disaggregated by source:

For the three months ended March 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

(in thousands)

Concentrate sales

Gold

7,480

2,485

Silver

31,968

7,452

Copper

913

472

Lead

684

539

Zinc

3,113

1,751

Less: Treatment and refining charges

(3,047)

(447)

Total concentrate sales, net

41,111

12,252

Realized gain - embedded derivative, net (1)

5,187

24

Unrealized (loss) gain - embedded derivative, net

(2,355)

78

Total sales, net

$

43,943

$

12,354

(1)The Company's sales contain an embedded derivative related to a provisional pricing mechanism which is bifurcated and accounted for as a derivative. At the end of each reporting period, the Company records an adjustment to sales to reflect the mark-to-market of outstanding provisional invoices based on the forward price curve. The amount of realized gain or loss is highly driven by the amount of provisional sales from the prior quarter that is settled in the current quarter, as well as the difference between the provisional and final sales price. Copper, lead, and zinc are co-products. In the realized gain - embedded derivative, net, there is a $36 thousand gain related to these co-products for the three months ended March 31, 2026. There is a $72 thousand loss in the realized gain - embedded derivative, net, related to the co-products for the three months ended March 31, 2025.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
9

Table of Contents

4. Inventories, net

At March 31, 2026 and December 31, 2025, inventories, net, consisted of the following:

  ​ ​ ​

As of

  ​ ​ ​

As of

March 31, 

December 31, 

2026

2025

(in thousands)

Stockpiles - underground mine

$

230

$

491

Concentrates

2,983

2,301

Subtotal - product inventories

3,213

2,792

Materials and supplies (1)

5,526

5,442

Total

$

8,739

$

8,234

(1)Net of reserve for obsolescence of $0.9 million and $1.1 million as of March 31, 2026 and December 31, 2025, respectively.

5. Income Taxes

The Company recorded an income tax expense of $4.7 million for the three months ended March 31, 2026. For the three months ended March 31, 2025, the Company recorded an income tax expense of $0.5 million. In accordance with applicable accounting rules, the interim provision for taxes is calculated using the estimated consolidated annual effective tax rate. The consolidated effective tax rate is a function of the combined effective tax rates for the jurisdictions in which the Company operates. Variations in the relative proportions of jurisdictional income could result in fluctuations to the Company’s consolidated effective tax rate. At the federal level, the Company’s income in the U.S. is taxed at 21%. Income in Mexico is taxed at 38.5% (30% income tax and 8.5% mining tax), and Canada’s income is taxed at a combined federal and provincial rate of 26.5%, which results in a consolidated effective tax rate above statutory U.S. Federal rates.

Mexico Valuation Allowance

The Company recorded a valuation allowance on all of the Mexico Income Tax net deferred tax assets in 2024 and has continued with a valuation allowance on all of the Mexico Income Tax net deferred tax assets as of March 31, 2026. In accordance with applicable accounting rules, a valuation allowance is recorded when it is more likely than not that some portion of the deferred tax assets will not be realized, after considering all available evidence, both positive and negative. The Company determined a valuation allowance on Mexico Income Tax deferred tax assets was necessary due primarily to the three-year cumulative loss at the Mexico mine.

Mexico Mining Taxation

Mining entities in Mexico are subject to two mining duties, in addition to the 30% Mexico corporate income tax: (i) a “special” mining duty of 8.5%, effective January 1, 2025, of taxable income as defined under Mexican tax law (also referred to as “mining royalty tax”) on extraction activities performed by concession holders, and (ii) the “extraordinary” mining duty of 1.0%, also effective January 1, 2025, on gross revenue from the sale of gold, silver, and platinum. The mining royalty tax generally applies to earnings before income tax, depreciation, depletion, amortization, and interest. In calculating the mining royalty tax, there are no corporate deductions related to depreciable costs from operational fixed assets. However, prospecting and exploration expenses are amortized using a 10% rate in a 10-year straight line. Both duties are tax deductible for income tax purposes. As a result, the Company’s effective tax rate applicable to the Company’s Mexican operations is higher than Mexico’s statutory income tax rate.

The Company periodically transfers funds from its Mexican wholly owned subsidiary to the U.S. as dividends. Mexico requires a 10% Mexico withholding tax on all post-2013 earnings. The Company began distributing post-2013 earnings from Mexico in 2018. According to the existing U.S. – Mexico tax treaty, the dividend withholding tax between these countries is reduced to 5%, and in some cases to 0%, if certain requirements are met. At the end of 2024, the Company

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
10

Table of Contents

reviewed the tax treaty and believes that it qualifies for a 0% tax withholding. No dividends from Mexico were received by the Company for the three months ended March 31, 2026 and 2025.

In October 2023, the Company received a notification from the Mexican Tax Administration Services (“SAT”) with a sanction of 331 million pesos (approximately $18.3 million as of March 31, 2026) as the result of a 2015 tax audit that began in 2021. The 2015 tax audit performed by SAT encompassed various tax aspects, including but not limited to intercompany transactions, mining royalty tax, and extraordinary mining tax. Management is in process of disputing this tax notification and sent a letter of protest to the tax authorities along with providing all requested documentation. Management intends to pursue legal avenues of protest, including filing a lawsuit with the Mexico court system, if necessary, to ensure that these adjustments are removed. Management believes its position taken on the 2015 income tax return meets the more likely than not threshold and that as of March 31, 2026 and December 31, 2025, the Company has no liability for uncertain tax positions. If the Company were to determine there was an unrecognized tax benefit, the Company would recognize the liability and the related interest and penalties within income tax (benefit) provision.

6. Prepaid Expenses and Other Current Assets

At March 31, 2026 and December 31, 2025, prepaid expenses and other current assets consisted of the following:

  ​ ​ ​

As of

  ​ ​ ​

As of

March 31, 

December 31, 

2026

2025

(in thousands)

Advances to suppliers

$

1,558

$

1,080

Prepaid insurance

452

1,106

Other current assets

657

598

Total

$

2,667

$

2,784

7. Property, Plant, and Mine Development, net

At March 31, 2026 and December 31, 2025, property, plant, and mine development, net consisted of the following:

As of

As of

March 31, 

December 31, 

2026

2025

(in thousands)

Asset retirement costs (“ARO asset”)

$

4,106

$

4,106

Construction-in-progress

4,586

4,020

Furniture and office equipment

1,840

1,855

Land

9,033

9,033

Mineral interest

79,542

79,543

Light vehicles and other mobile equipment

2,409

2,371

Machinery and equipment

49,927

47,582

Mill facilities and infrastructure

36,614

36,524

Mine development

141,647

136,089

Software and licenses

1,554

1,554

Subtotal

331,258

322,677

Accumulated depreciation and amortization

(192,504)

(188,021)

Total

$

138,754

$

134,656

The Company recorded depreciation and amortization expense of $4.0 million and $2.7 million for the three months ended March 31, 2026 and 2025, respectively.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
11

Table of Contents

8. Accrued Expenses and Other Liabilities

At March 31, 2026 and December 31, 2025, accrued expenses and other liabilities consisted of the following:

  ​ ​ ​

As of

  ​ ​ ​

As of

March 31, 

December 31, 

2026

2025

(in thousands)

Accrued royalty payments

$

1,090

$

800

Accrual for short-term incentive plan

283

835

Liability for Aquila drillhole plugging

8

8

Share-based compensation liability - current

376

-

Equipment financing

328

437

Taxes payable, net (1)

1,515

1,407

Employee profit sharing obligation

1,449

880

Employee withholdings and taxes payable

2,175

2,597

Other payables

71

79

Total accrued expenses and other current liabilities

$

7,295

$

7,043

Accrued non-current labor obligation

$

1,281

$

1,431

Stock-based compensation liability

1,578

1,032

Other lease liability

37

49

Other long-term liabilities

50

63

Total other non-current liabilities

$

2,946

$

2,575

(1)Taxes payable, net includes IVA tax in Mexico, assessed on purchases of materials and services and sales of products. Likewise, businesses owe IVA taxes as they sell products and collect IVA taxes from their customers. Businesses are generally entitled to recover the taxes they have paid related to purchases of materials and services, either as a refund or credit to IVA tax payable. Amounts recorded as IVA taxes in the consolidated financial statements represent the net estimated IVA tax receivable or payable, since there is a legal right of offset of IVA taxes. As of March 31, 2026 and December 31, 2025, this resulted in a liability balance of $1.5 and $1.4 million, respectively, which is included in accrued expenses and other liabilities in the table above.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
12

Table of Contents

9. Gold and Silver Stream Agreements

The following table presents the Company’s liabilities related to the Company’s Gold and Silver Stream Agreements (the “Osisko Stream Agreements”) with Osisko Bermuda Limited, now called OR Royalties Inc., (“Osisko”) as of March 31, 2026 and December 31, 2025:

As of

As of

March 31, 

December 31, 

2026

2025

(in thousands)

Liability related to the Osisko Gold Stream Agreement

$

42,470

$

40,397

Liability related to the Osisko Silver Stream Agreement

53,127

50,533

Total liability

$

95,597

$

90,930

The Osisko Stream Agreements contain customary provisions regarding default and security. In the event that the Company’s subsidiary, Aquila Resources Inc., defaults under the Osisko Stream Agreements, including by failing to acquire the required permits and achieve commercial production by the agreed upon dates, it may be required to repay the deposit plus accumulated interest at a rate agreed with Osisko.

In March 2024, the Company secured an amendment to the Osisko Gold and Silver Stream Agreements that deferred the required completion of certain operational milestones related to permitting from 2024 to 2026. The amended Osisko Gold Stream Agreement requires the Company’s subsidiary to obtain all material permits necessary for the construction and operation of the Back Forty Project by June 20, 2026, with a grace period through November 30, 2026. If such permits are not obtained on time, the Company’s subsidiary may default on the streaming agreement and all funds, including interest, become due immediately or Osisko may be entitled to enforce its remedies as a secured party and take possession of the assets that comprise the Back Forty Project.

Feasibility Study activities commenced in April 2026, of which the first phase is scheduled to conclude during the second quarter of 2026. The second phase is planned to begin thereafter and is expected to last approximately one year. During the second phase, the data and technical information required to support permitting applications will be developed and formalized. Once sufficient information is available, the permitting application process will be initiated; this process is currently estimated to require approximately six months. The permitting timeline represents a risk, as the anticipated duration will likely exceed available time constraints, which would result in default unless another amendment is executed.

Gold Stream Agreement

In November 2017, Aquila entered into a stream agreement with Osisko, pursuant to which Osisko agreed to commit approximately $55.0 million to Aquila through a gold stream purchase agreement (the “Osisko Gold Stream Agreement”). In June 2020, Aquila amended the Osisko Gold Stream Agreement, reducing the total committed amount to $50.0 million, as well as adjusting certain milestone dates under the gold stream to align with the current project development timeline. Aquila received a total of $20.0 million of the funds committed at the time of the Company’s acquisition. Remaining deposits from Osisko are $5.0 million upon receipt of permits required for the development and operation of the Back Forty Project and $25.0 million upon the first drawdown of an appropriate project debt finance facility. Osisko has been provided a general security agreement over the Back Forty Project, which consists of the subsidiaries of Gold Resource Acquisition Sub. Inc., a 100% owned subsidiary of the Company. The initial term of the Osisko Gold Stream Agreement is for 40 years, automatically renewable for successive ten-year periods. The Osisko Gold Stream Agreement is subject to certain operating and financial covenants, which are in good standing as of March 31, 2026.

The $20.0 million received from Osisko pursuant to the Osisko Gold Stream Agreement through March 31, 2026 is shown as a long-term liability on the Interim Condensed Consolidated Balance Sheets. A periodic interest expense is calculated based on a fixed market rate of interest, which is reviewed quarterly if there are any contractual amendments relating to the Osisko Stream Agreements. The fixed interest rate is applied on the Osisko advance payments and calculated on the total expected life-of-mine production to be deliverable and was 22.2% per annum at March 31, 2026 and at

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
13

Table of Contents

December 31, 2025. As the remaining $30.0 million deposit is subject to the completion of specific milestones and the satisfaction of certain other conditions, this amount is not reflected on the Interim Condensed Consolidated Balance Sheets.

Per the terms of the Osisko Gold Stream Agreement, Osisko will purchase 18.5% of the refined gold from Back Forty (the “Threshold Stream Percentage”) until the Company has delivered 105,000 gold ounces (the “Production Threshold”). Upon satisfaction of the Production Threshold, the Threshold Stream Percentage will be reduced to 9.25% of the refined gold (the “Tail Stream”). In exchange for the refined gold delivered under the Osisko Gold Stream Agreement, Osisko will pay the Company ongoing payments equal to 30% of the spot price of gold on the day of delivery, subject to a maximum payment of $600 per ounce. Where the market price of gold is greater than the price paid, the difference realized from the sale of the gold will be applied against the deposit received from Osisko. Please see Note 11—Commitments and Contingencies in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information.

Silver Stream Agreement

Through a series of contracts, Aquila executed a silver stream agreement with Osisko to purchase 85% of the silver produced and sold at the Back Forty Project (the “Osisko Silver Stream Agreement”). A total of $17.2 million has been advanced under the Osisko Silver Stream Agreement as of March 31, 2026. There are no future deposits remaining under the Osisko Silver Stream Agreement. The initial term of the Osisko Silver Stream Agreement is for 40 years, automatically renewable for successive ten-year periods. The Osisko Silver Stream Agreement is subject to certain operating and financial covenants, which are in good standing as of March 31, 2026.

Per the terms of the Osisko Silver Stream Agreement, Osisko will purchase 85% of the silver produced from the Back Forty Project at a fixed price of $4.00 per ounce of silver. Where the market price of silver is greater than $4.00 per ounce, the difference realized from the sale of the silver will be applied against the deposit received from Osisko.

The $17.2 million received from Osisko pursuant to the Osisko Silver Stream Agreement through March 31, 2026 is shown as a long-term liability on the Interim Condensed Consolidated Balance Sheets. A periodic interest expense is calculated based on a fixed market rate of interest, which is reviewed quarterly if there are any contractual amendments relating to the Osisko Stream Agreements. The fixed interest rate is applied on the Osisko advance payments and calculated on the total expected life-of-mine production to be deliverable and was 22.2% per annum at March 31, 2026 and at December 31, 2025. Please see Note 11—Commitments and Contingencies in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information.

10. Reclamation and Remediation

The following table presents the changes in reclamation and remediation obligations for the three months ended March 31, 2026 and for the year ended December 31, 2025:

2026

2025

(in thousands)

Reclamation liabilities – balance at beginning of period

$

2,099

$

1,839

Foreign currency exchange (gain) loss

(12)

260

Reclamation liabilities – balance at end of period

2,087

2,099

Asset retirement obligation – balance at beginning of period

8,093

8,838

Changes in estimate (1)

-

(2,634)

Changes in liability for Aquila drillhole plugging

-

98

Accretion

176

499

Foreign currency exchange (gain) loss

(49)

1,292

Asset retirement obligation – balance at end of period

8,220

8,093

Total period end balance

$

10,307

$

10,192

(1)In 2025, the Company updated its closure plan study, which resulted in a $2.6 million decrease in the estimated liability and ARO asset.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
14

Table of Contents

The following table presents the reclamation and remediation obligations as of March 31, 2026 and December 31, 2025:

  ​ ​ ​

As of

As of

March 31, 

December 31,

2026

  ​ ​ ​

2025

(in thousands)

Current reclamation and remediation liabilities (1)

$

8

$

8

Non-current reclamation and remediation liabilities

10,299

10,184

Total

$

10,307

$

10,192

(1)The current portion of reclamation and remediation liabilities related to drill hole capping in Aquila, Michigan, are included in Accrued expenses and other current liabilities. Please see Note 8—Accrued Expenses and Other Liabilities in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information.

The Company’s undiscounted reclamation liabilities of $2.1 million and $2.1 million as of March 31, 2026 and December 31, 2025, respectively, are related to DDGM. These represent reclamation liabilities that were expensed through 2013 before proven and probable reserves were established and the Company was considered to be a development stage entity; therefore, most of the costs, including asset retirement costs, were not allowed to be capitalized as part of the Company’s property, plant, and mine development.

The Company’s asset retirement obligations reflect the additions to the asset for reclamation and remediation costs in Property, Plant, and Mine Development, post-2013 development stage status, which are discounted using a credit adjusted risk-free rate of 9%. As of March 31, 2026 and December 31, 2025, the Company’s asset retirement obligation was $8.2 million and $8.1 million, respectively, primarily related to DDGM in Mexico.

11. Commitments and Contingencies

Commitments

As of March 31, 2026 and December 31, 2025, the Company has equipment purchase commitments of $6.4 million and $4.3 million, respectively.

Contingent Consideration

With the Aquila acquisition, the Company assumed a contingent consideration. On December 30, 2013, Aquila’s shareholders approved the acquisition of 100% of the shares of HudBay Michigan Inc. (“HMI”), a subsidiary of HudBay Minerals Inc. (“HudBay”), effectively giving Aquila 100% ownership in the Back Forty Project (the “HMI Acquisition”). Pursuant to the HMI Acquisition, HudBay’s 51% interest in the Back Forty Project was acquired in consideration for the issuance of common shares of Aquila, future milestone payments tied to the development of the Back Forty Project and a 1% net smelter return royalty on production from certain land parcels in the Back Forty Project. The issuance of shares and 1% net smelter obligations were settled before the Company acquired Aquila.

The contingent consideration is composed of the following:

The value of future installments is based on C$9 million tied to the development of the Back Forty project as follows:

a.C$3 million payable on completion of any form of financing for purposes including the commencement of construction of Back Forty, up to 50% of the C$3 million can be paid, at the Company’s option in Gold Resource Corporation shares with the balance payable in cash;
b.C$2 million payable in cash 90 days after the commencement of commercial production;
c.C$2 million payable in cash 270 days after the commencement of commercial production; and
d.C$2 million payable in cash 450 days after the commencement of commercial production.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
15

Table of Contents

Initially, the Company intended to pay the first C$3 million in 2023 to prevent HudBay’s 51% buy-back option in the Back Forty Project. Management later decided that it was more likely than not that HudBay would not exercise its buy-back option, and consequently, this amount was not paid. Additionally, since financing of the Back Forty Project was not expected in 2024, this liability was reclassified to long-term. As of the end of January 2024, by the contractual deadline, HudBay did not exercise its buy-back option, and thus, it is forfeited.

The total value of the contingent consideration as of March 31, 2026 and December 31, 2025 was $3.5 million and $3.6 million, respectively. The contingent consideration is adjusted for the time value of money and the likelihood of the milestone payments. Any future change in the value of the contingent consideration is recognized in other expense, net, in the Condensed Consolidated Interim Statements of Operations.

The following table shows the change in the balance of the contingent consideration for the three months ended March 31, 2026 and for the year ended December 31, 2025:

  ​ ​ ​

2026

  ​ ​ ​

2025

(in thousands)

Beginning Balance of contingent consideration:

Non-current contingent consideration

$

3,554

$

3,389

Change in value of contingent consideration - non-current

(60)

165

Ending Balance of contingent consideration:

Non-current contingent consideration

$

3,494

$

3,554

Other Contingencies

The Company has certain other contingencies resulting from litigation, claims, and other commitments and is subject to various environmental and safety laws and regulations incident to the ordinary course of business. The Company currently has no basis to conclude that any or all such contingencies will materially affect its financial position, results of operations, or cash flows. However, in the future, there may be changes to these contingencies, or additional contingencies may occur, any of which might result in an accrual or a change in current accruals recorded by the Company. There can be no assurance that the ultimate disposition of contingencies will not have a material adverse effect on the Company’s financial position, results of operations, or cash flows.

On December 10, 2021, the Company acquired Aquila Resource Inc., which had substantial liabilities that relate to the Osisko Stream Agreements. Under the agreements, Osisko deposited a total of $37.2 million upfront in exchange for a portion of the future gold and silver production from the Back Forty Project. The Osisko Stream Agreements contain customary provisions regarding default and security. In the event that the Company’s subsidiary defaults under the Osisko Stream Agreements, including failing to obtain the required permits or achieve commercial production at a future date, Aquila Resource Inc. may be required to repay the deposit plus accumulated interest at a rate agreed with Osisko. If Aquila fails to do so, Osisko may be entitled to enforce its remedies as a secured party and take possession of the assets that comprise the Back Forty Project.

12. Shareholders’ Equity

The Company’s At-The-Market Offering Agreement with H.C. Wainwright & Co., LLC (the “Agent”), which was entered into in November 2019, was amended in May 2023 and renewed in June 2023 (as amended, the “ATM Agreement”). Pursuant to the ATM Agreement, the Agent has agreed to act as the Company’s sales agent with respect to the offer and sale, from time to time, of the Company’s common stock having an aggregate gross sales price of up to the amount registered on the registration statement on Form S-3 relating to the ATM Program, which is $15.85 million as of April 11, 2025. No shares of the Company’s common stock were sold through the ATM Program during the three months ended March 31, 2026.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
16

Table of Contents

13. Derivatives

Embedded Derivatives

Concentrate sales contracts contain embedded derivatives due to the provisional pricing terms for shipments pending final settlement. At the end of each reporting period, the Company records an adjustment to accounts receivable and sales to reflect the mark-to-market adjustments for outstanding provisional invoices based on forward metal prices. Please see Note 18—Fair Value Measurement in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information on the realized and unrealized gain (loss) recorded to adjust accounts receivable and revenue.

The following table summarizes the Company’s unsettled sales contracts at March 31, 2026 with the quantities of metals under contract subject to final pricing expected to occur through June 2026:

Gold

Silver

Copper

Lead

Zinc

Total

(ounces)

(ounces)

(tonnes)

(tonnes)

(tonnes)

Under contract

2,313

711,051

99

461

1,221

Average forward price (per ounce or tonne)

$

4,634

$

70

$

12,230

$

1,938

$

3,200

Unsettled sales contracts value (in thousands)

$

10,718

$

49,752

$

1,211

$

893

$

3,907

$

66,481

The Company manages credit risk by entering into arrangements with counterparties believed to be financially strong, and by requiring other credit risk mitigants, as appropriate. The Company actively evaluates the implicit creditworthiness of its counterparties, and monitors credit exposures.

14. Employee Benefits

Effective October 2012, the Company adopted a profit-sharing plan (the “Plan”), which covers all U.S. employees. The Plan meets the requirements of a qualified retirement plan pursuant to the provisions of Section 401(k) of the Internal Revenue Code. The Plan also allows eligible employees to make tax deferred contributions to a retirement trust account up to 90% of their qualified wages, subject to the IRS annual maximums.

On April 23, 2021, a decree that reforms labor outsourcing in Mexico was published in the Federation’s Official Gazette. This decree amended the outsourcing provisions, whereby operating companies can no longer source their labor resources used to carry out the core business functions from service entities or third-party providers. Under Mexican law, employees are entitled to receive statutory profit sharing (Participacion a los Trabajadores de las Utilidades or “PTU”) payments. The required cash payment to employees in the aggregate is equal to 10% of their employer’s profit subject to PTU, which differs from profit determined under U.S. GAAP. Please see Note 8Accrued Expenses and Other Liabilities in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
17

Table of Contents

15. Stock-Based Compensation

The Company’s compensation program comprises three main elements: (1) base salary, (2) an annual short-term incentive plan (“STIP”) award which may be in the form of cash or deferred share units (“DSUs”) with immediate vesting, and (3) long-term equity-based incentive compensation (“LTIP”) in the form of stock options, restricted stock units (“RSUs”), and performance share units (“PSUs”).

The Gold Resource Corporation 2016 Equity Incentive Plan (the “Incentive Plan”) allows for the issuance of up to 5 million shares of common stock in the form of incentive and non-qualified stock options, stock appreciation rights, RSUs, stock grants, stock units, performance shares, PSUs, and DSUs.

The Company’s STIP provides for an annual cash bonus payable upon achievement of specified performance metrics for its management team. STIP may also be settled as cash payable through the issuance of fully vested equity awards (such as fully vested stock grants or DSUs), or a combination of cash and stock DSUs. As of March 31, 2026, the Company accrued $46 thousand in accrued expenses and other liabilities related to the program.

Stock-based compensation expense for the periods presented is as follows:

For the three months ended March 31, 

2026

  ​ ​ ​

2025

(in thousands)

Restricted stock units

$

102

$

140

Performance share units

128

(5)

Deferred share units

794

265

Total

$

1,024

$

400

Stock Options

A summary of stock option activities under the Incentive Plan for the three months ended March 31, 2026 and 2025 is presented below:

  ​ ​ ​

Stock
Options

  ​ ​ ​

Weighted
Average Exercise
Price (per share)

Outstanding as of December 31, 2024

840,612

$

2.99

Granted, exercised, expired, or forfeited

-

-

Outstanding as of March 31, 2025

840,612

$

2.99

Outstanding as of December 31, 2025

760,408

$

3.05

Granted, exercised, expired, or forfeited

-

-

Outstanding as of March 31, 2026

760,408

$

3.05

Vested and exercisable as of March 31, 2026

760,408

$

3.05

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
18

Table of Contents

Restricted Stock Units

A summary of RSU activities under the Incentive Plan for the three months ended March 31, 2026 and 2025 is presented below:

  ​ ​ ​

Restricted
Stock
Units

  ​ ​ ​

Fair
Value
(in thousands)

Nonvested as of December 31, 2024

1,931,258

$

444

Vested but not redeemed (deferred)

(397,782)

Vested and redeemed

(205,136)

Vested and withheld for net settlement

(123,806)

Nonvested as of March 31, 2025

1,204,534

$

614

Nonvested as of December 31, 2025

782,583

$

648

Granted

884,135

Vested but not redeemed (deferred)

(260,237)

Vested and redeemed

(118,734)

Vested and withheld for net settlement

(58,416)

Forfeited

(54,075)

Nonvested as of March 31, 2026

1,175,256

$

1,410

Performance Share Units

A summary of PSU activities under the Incentive Plan for the three months ended March 31, 2026 and 2025 is presented below:

  ​ ​ ​

Performance
Share
Units

  ​ ​ ​

Liability Balance
(in thousands)

Outstanding as of December 31, 2024

1,328,922

$

148

Redeemed

(241,195)

Outstanding as of March 31, 2025

1,087,727

$

109

Outstanding as of December 31, 2025

735,168

$

248

Redeemed (1)

(273,638)

Forfeited

(29,893)

Outstanding as of March 31, 2026

431,637

$

376

(1)Due to Company performance, these PSUs were redeemed with zero value to the recipients.

Deferred Share Units

A summary of DSU activities under the Incentive Plan for the three months ended March 31, 2026 and 2025 is presented below:

  ​ ​ ​

Deferred
Stock
Units

  ​ ​ ​

Liability Balance
(in thousands)

Outstanding as of December 31, 2024

883,384

$

203

Granted in lieu of board fees

35,008

Outstanding as of March 31, 2025

918,392

$

468

Outstanding as of December 31, 2025

947,370

$

784

Granted

349,360

Granted in lieu of board fees

18,116

Outstanding as of March 31, 2026

1,314,846

$

1,578

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
19

Table of Contents

16. Other Expense, net

Other expense, net, for the periods presented consisted of the following:

For the three months ended March 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

(in thousands)

Unrealized currency exchange (gain) loss

$

(189)

$

49

Realized currency exchange loss

265

164

Realized and unrealized gain from gold and silver rounds, net

(14)

(21)

Interest on streaming liabilities (1)

4,667

3,821

Other expense

808

298

Total

$

5,537

$

4,311

(1)Periodic interest expense is based on a fixed market rate of interest which is reviewed quarterly if there are any contractual amendments relating to the Osisko Stream Agreements. Please see Note 9—Gold and Silver Stream Agreements in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information.

17. Net Income (Loss) per Common Share

Basic net income or loss per common share is calculated based on the weighted average number of shares of common stock outstanding for the period. Diluted earnings or loss per common share are calculated based on the assumption that stock options and other dilutive securities outstanding, which have an exercise price less than the average market price of the Company’s common stock during the period, would have been exercised on the later of the beginning of the period or the date granted and that the funds obtained from the exercise were used to purchase common stock at the average market price during the period. Dilutive potential common shares include stock options, RSUs, and warrants. Since PSUs and DSUs are expected to be settled in cash, they are not included in the dilutive calculation.

The effect of the Company’s dilutive securities is calculated using the treasury stock method, and only those instruments that result in a reduction in net income per common share are included in the calculation. Options to purchase 0.8 million shares of common stock at a weighted average exercise price of $3.05 were outstanding as of March 31, 2026, but were not included in the computation of diluted weighted average common shares outstanding, as the exercise price of the options exceeded the average price of the Company’s common stock during the reporting period, and therefore are antidilutive. Options to purchase 0.8 million shares of common stock at a weighted average exercise price of $2.99 were outstanding as of March 31, 2025 but had no dilutive effect due to the net loss for the period. Additionally, the exercise price of the options exceeded the average price of the Company’s common stock during this period, and therefore those options are considered to be anti-dilutive.

Basic and diluted net income per common share is calculated as follows:

For the three months ended

March 31, 

2026

  ​ ​ ​

2025

Numerator:

Net income (loss) (in thousands)

$

4,739

$

(8,319)

Denominator:

Basic weighted average shares of common stock outstanding

161,863,094

112,442,135

Dilutive effect of share-based awards

RSUs

1,075,292

-

Warrants

777,778

-

Diluted weighted average common shares outstanding

163,716,164

112,442,135

Basic and diluted net income (loss) per common share

$

0.03

$

(0.07)

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
20

Table of Contents

18. Fair Value Measurement

Fair value accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy are described below:

Level 1

Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities;

Level 2

Quoted prices in markets that are not active or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability; and

Level 3

Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity).

As required by accounting guidance, assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. These assets and liabilities are remeasured for each reporting period. The following tables set forth certain of the Company’s assets and liabilities measured at fair value by level within the fair value hierarchy as of March 31, 2026 and December 31, 2025:

  ​ ​ ​

As of

As of

  ​ ​ ​

March 31, 

December 31,

Input Hierarchy Level

2026

  ​ ​ ​

2025

(in thousands)

Cash equivalents

$

19,163

$

22,141

Level 1

Accounts receivable, net

$

15,060

$

13,253

Level 2

The following methods and assumptions were used to estimate the fair value of each class of financial instrument:

Cash equivalents: Cash equivalents primarily consist of a sweep account into money market funds, which are held at cost, which approximates fair value.

Accounts receivable, net: Accounts receivable, net include amounts due to the Company for deliveries of concentrates and doré sold to customers. Concentrate sales contracts provide for provisional pricing as specified in such contracts. These sales contain an embedded derivative related to the provisional pricing mechanism which is bifurcated and accounted for as a derivative. At the end of each reporting period, the Company records an adjustment to sales to reflect the mark-to-market of outstanding provisional invoices based on the forward price curve. Because these provisionally priced sales have not yet settled as of the reporting date, the mark-to-market adjustment related to these invoices is included in accounts receivable as of each reporting date. At March 31, 2026 and December 31, 2025, the Company had an unrealized gain of $3.5 million and an unrealized gain of $5.9 million, respectively, included in its accounts receivable on the accompanying Condensed Consolidated Interim Balance Sheets related to mark-to-market adjustments on the embedded derivatives. Please see Note 13—Derivatives in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information.

Gains and losses related to changes in the fair value of embedded derivatives were included in the Condensed Consolidated Interim Statements of Operations, as shown in the following table (in thousands):

For the three months ended March 31, 

Statements of Operations Classification

  ​ ​ ​

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

Note

Realized and unrealized derivative gain, net

13

$

2,832

$

102

Sales, net

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
21

Table of Contents

Realized/Unrealized Derivatives

The following tables summarize the Company’s realized/unrealized derivatives for the periods presented (in thousands):

Gold

Silver

Copper

Lead

Zinc

Total

For the three months ended March 31, 2026

Realized gain

$

410

$

4,740

$

24

$

-

$

12

$

5,186

Unrealized (loss) gain

(41)

(2,283)

(22)

(13)

5

(2,354)

Total realized/unrealized derivatives, net

$

369

$

2,457

$

2

$

(13)

$

17

$

2,832

Gold

Silver

Copper

Lead

Zinc

Total

For the three months ended March 31, 2025

Realized gain (loss)

$

53

$

43

$

9

$

-

$

(81)

$

24

Unrealized gain (loss)

24

66

6

4

(22)

78

Total realized/unrealized derivatives, net

$

77

$

109

$

15

$

4

$

(103)

$

102

19. Supplementary Cash Flow Information

Other operating adjustments, net within net cash provided by operating activities on the Condensed Consolidated Interim Statements of Cash Flows for the three months ended March 31, 2026 and 2025 consisted of the following:

  ​ ​ ​

For the three months ended March 31, 

2026

  ​ ​ ​

2025

(in thousands)

Unrealized gain on gold and silver rounds

$

(14)

$

(21)

Unrealized foreign currency exchange (gain) loss

(189)

49

Decrease in reserve for inventory

(185)

-

Other, net

175

136

Total other operating adjustments, net

$

(213)

$

164

20. Segment Reporting

The Company has organized its operations into two operating segments: Oaxaca, Mexico, and Michigan, U.S.A. Oaxaca, Mexico represents the Company’s only operating segment with a production stage property that produces gold and silver doré and copper, lead, and zinc concentrates that also contain gold and silver. Michigan, U.S.A. is an advanced exploration stage property with no current metal production. Intercompany revenue and expense amounts have been eliminated within each segment in order to report the net income (loss) before income taxes on the basis that the chief operating decision maker (“CODM”) uses internally for evaluating segment performance. The Company’s business activities that are not considered distinct segments are included in the reconciliation under the title Corporate and Other.

The Company’s operating segments reflect the way in which internally reported financial information is used to make decisions and allocate resources. The Chief Executive Officer, who is considered to be the CODM, reviews financial information presented on both a consolidated and an operating segment basis for purposes of making decisions and assessing financial performance. Net income or loss before income taxes is the measure of segment profit or loss that is regularly reviewed and is most consistent with the measurement principles used in the consolidated financial statements. The significant expenses reviewed by the CODM are production costs, depreciation and amortization, reclamation and remediation, exploration expense, and other expense, net. The CODM uses this information to assess current and/or future performance expectations, and the result of this assessment may be a reallocation of financial and/or non-financial resources among the reportable segments.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
22

Table of Contents

The following table shows selected information from the Condensed Consolidated Interim Statements of Operations relating to the Company’s segments (in thousands):

  ​ ​ ​

Oaxaca,
Mexico

  ​ ​ ​

Michigan,
USA

  ​ ​ ​

Total
Reportable
Segments

  ​ ​ ​

Corporate
and Other

  ​ ​ ​

Total

For the three months ended March 31, 2026

Sales, net

$

43,943

$

-

$

43,943

$

-

$

43,943

Production costs

20,636

-

20,636

-

20,636

Depreciation and amortization

4,004

23

4,027

-

4,027

Reclamation and remediation

235

-

235

-

235

Exploration expense

1,230

209

1,439

-

1,439

G&A expenses, including Stock-based compensation

-

-

-

2,618

2,618

Other expense, net (1)

(207)

4,607

4,400

1,137

5,537

Income (loss) before income taxes

$

18,045

$

(4,839)

$

13,206

$

(3,755)

$

9,451

Total assets as of March 31, 2026

$

87,223

$

89,363

$

176,586

$

19,838

$

196,424

Expenditures for long-lived assets

$

8,621

$

-

$

8,621

$

-

$

8,621

  ​ ​ ​

Oaxaca,
Mexico

  ​ ​ ​

Michigan,
USA

  ​ ​ ​

Total
Reportable
Segments

  ​ ​ ​

Corporate
and Other

  ​ ​ ​

Total

For the three months ended March 31, 2025

Sales, net

$

12,354

$

-

$

12,354

$

-

$

12,354

Production costs

10,708

-

10,708

-

10,708

Depreciation and amortization

2,673

26

2,699

5

2,704

Reclamation and remediation

394

-

394

-

394

Exploration expense

281

204

485

-

485

G&A expenses, including Stock-based compensation

-

-

-

1,544

1,544

Other expense, net (1)

246

4,096

4,342

(31)

4,311

Loss before income taxes

$

(1,948)

(4,326)

$

(6,274)

$

(1,518)

$

(7,792)

Total assets as of March 31, 2025

$

55,527

$

89,504

$

145,031

$

2,625

$

147,656

Expenditures for long-lived assets

$

1,821

$

-

$

1,821

$

-

$

1,821

(1)Please see Note 16 —Other Expense, net in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information.

Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
23

Table of Contents

ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The following discussion summarizes the results of operations of Gold Resource Corporation and its subsidiaries (“we,” “our,” “us,” or the “Company”) for the three months ended March 31, 2026 and compares those results with the three months ended March 31, 2025. It also analyzes the Company’s financial condition as of  March 31, 2026, and compares it to the financial condition as of December 31, 2025. This discussion should be read in conjunction with management’s discussion and analysis and the audited consolidated financial statements and footnotes contained in the 2025 Annual Report.

The discussion also presents certain non-GAAP financial measures that are important to management in its evaluation of the operating results, and which are used by management to compare the Company’s performance with what it perceives to be peer group mining companies and are relied on as part of management’s decision-making process. Management believes these measures may also be important to investors in evaluating the Company’s performance. For a detailed description of each of the non-GAAP financial measures and a reconciliation to U.S. GAAP financial measures, please see the discussion below under Non-GAAP Measures. Also see Forward-Looking Statements at the end of this Item 2 for important information regarding statements contained herein.

Overview

Recent Developments

On January 26, 2026, the Company announced that it entered into a definitive arrangement agreement and plan of merger (the “Arrangement Agreement”) with Goldgroup Mining Inc. (“Goldgroup”), whereby Goldgroup agreed to acquire all of the issued and outstanding shares of the Company’s common stock (the “Transaction”).

Pursuant to the Arrangement Agreement, the Company’s stockholders will receive 1.4476 common shares of Goldgroup for each share of the Company’s common stock (adjusted to 0.3619 common shares of Goldgroup for each share of the Company’s common stock as a result of a four-for-one share consolidation to be completed by Goldgroup prior to closing). The proposed Transaction will occur by way of a reverse triangular merger in which the Company will merge with a wholly owned subsidiary of Goldgroup under Colorado law and a plan of arrangement under the Business Corporations Act (British Columbia), with the Company surviving as a wholly owned subsidiary of Goldgroup. Upon completion of the Transaction, the Company’s stockholders are expected to own approximately 40% of the combined company on a fully diluted in-the-money basis.

The Transaction was unanimously approved by the boards of directors of the Company and Goldgroup. The Transaction is expected to close in the third quarter of 2026, subject to customary closing conditions (including approval by the stockholders of each of the Company and Goldgroup). The parties received unconditional approval from the Mexican National Antitrust Commission in respect of the Transaction on April 27, 2026. Upon closing, the board of directors of Goldgroup will be comprised of three directors selected by Goldgroup and two directors selected by the Company. The parties anticipate that the executive management team of the Company will become the officers of the combined company.

Gold Resource Corporation is a mining company focused on the development of precious and base metal projects that have the potential for high returns and limited development capital requirements. DDGM is the Company’s cornerstone operating asset comprised of six contiguous land parcels. The Company’s focus is unlocking the significant upside potential of DDGM through optimization of the current operations, growing the existing mineral resource by investing in exploration drilling, and identifying new opportunities near existing infrastructure. The primary mineral production comes from the Arista and Switchback underground mining areas, along with the recently added Three Sisters vein system. The mine and its processing facilities can produce gold and silver doré, as well as concentrates of copper, lead, and zinc.

The Back Forty Project, when developed, is expected to produce gold and silver doré and concentrates of copper and zinc bearing gold and silver. Optimization work related to metallurgy and the economic model was completed during the third quarter of 2023 and the Company filed the Back Forty Project Technical Report Summary, effective as of September 30, 2023, on October 26, 2023. Results of the work indicated a more robust economic project with no planned impacts to

Gold Resource Corporation
24

Table of Contents

wetlands that is more protective of the environment. In April 2026, the Company engaged Responsible Mining Solutions Corp., a part of SLR Consulting Ltd., to complete a comprehensive Feasibility Study, which the Company believes will facilitate a successful mine permitting process that would allow the Company to move forward with the Back Forty Project.

Graphic

Underground Exposure of the Splay 66 vein

Level 15 – Arista System

During the first quarter of 2026, DDGM continued to build on the operational initiatives implemented in 2025 to improve underground development rates, increase mining flexibility, and support more consistent production performance. Mine development and haulage improved as the quarter progressed, reflecting continued benefits from contractor-supported development, improved equipment availability, and refinement of mining methods.

These efforts supported continued access to, development of, and production from priority mining areas, including the Three Sisters vein system. In addition, DDGM initiated limited production from the Alta Gracia Project during the quarter, specifically from the Independencia mine area, representing an important step in reactivating mining activities in that area.

Ongoing grade-control and infill drilling programs at Arista continued to refine the geologic model and support short-term mine planning. DDGM also continued to apply cut-and-fill mining methods in selected narrow-vein areas, complementing long-hole stoping where appropriate, with the objective of reducing dilution and improving mined grade quality. While maintenance-related downtime on certain underground equipment remained an operational factor during the quarter, management believes these combined initiatives continued to support improved operational performance.

The Company remains focused on safety, operational efficiency, and continuous improvements. During the quarter, DDGM recorded two lost time injuries, neither of which had a material impact on operations.

DDGM Exploration Update

The Company’s portfolio of properties that are included in DDGM are located along a 55-kilometer stretch of the San Jose structural corridor in the Sierra Madre Sur mountain range in the state of Oaxaca, Mexico. This highly prospective district encompasses three historic mining centers, where the Company continues to engage in strategic planning and prioritization of regional surface exploration activities across multiple projects, including Alta Gracia, Margaritas, Chamizo, El Rey, and Jabali (see map below). In addition, prospects near the Arista mine are re-evaluated for potential near-term production to prioritized as high-value drill targets. These efforts reinforce the Company’s long-term commitment to investment in the Oaxaca region and improved operational performance at DDGM.

Gold Resource Corporation
25

Table of Contents

Graphic

Regional Geologic Map Showing Advanced Project and Prospect Locations and Exploration Concessions Controlled by Don David Gold Mine

During the first quarter, the Company completed a total of 35 underground diamond drill holes totaling 6,550 meters, along with 11 surface diamond drill holes totaling 3,027 meters. Drilling consisted of underground grade-control, infill, and expansion drilling at the Arista mine, together with limited surface expansion drilling targeting the nearby Isabel SE vein target. At the Alta Gracia project, both underground and surface infill and expansion drilling also continued from accessible underground drill stations and surface pads during the first quarter. Drilling activities were supported by multiple contract drill rigs and one Company-owned and operated rig. At Arista, drilling targeted the southern extensions of the Viridiana, Gisela, and Candelaria veins, as well as the upper, northern extensions of the Marena North and Splay 31 veins within the Arista vein system, in addition to the Sadie/Sasha and Sandy vein sets within the upper levels of the Three Sisters system. Limited surface expansion drilling also commenced at the Isabela SE vein target during the quarter. At Alta Gracia, both underground and surface drilling targeted the Mirador and Independencia vein systems. These programs continue to improve the geologic model, support mine planning, and evaluate opportunities for future production sequencing.

The primary objective of these drill programs is to increase confidence in the short-term geologic model, support prioritization of production areas with the highest potential net smelter return (“NSR”), and grow the inferred resource base by testing new targets and extensions of known veins. Importantly, the Company reinitiated expansion drilling during the first quarter of 2026 after pausing expansion drilling in 2025, marking a return to step-out testing aimed at defining additional inferred mineral resources. During the quarter, drilling continued to confirm continuity in several target areas at Arista, including the Viridiana, Splay 31, Marena North, Sadie, and Sandy veins, as well as the Mirador and Independencia vein systems at Alta Gracia. Infill and grade-control drilling also continued to refine the interpretation and limits of

Gold Resource Corporation
26

Table of Contents

mineralized zones within the Three Sisters and Arista vein systems. The Company believes these areas, together with other zones identified near existing mining areas, may provide opportunities to enhance future mine planning and support potential additions to the life-of-mine plan. Exploration potential remains strong across the vein systems, particularly along northwest-trending extensions of the Arista and Three Sisters vein systems, which remain open along strike and up- and down-dip.

During the first quarter, drilling by the Company focused on the following key areas:

oThree Sisters vein system: Drilling during the quarter focused initially on the Sadia/Sasha vein set and later on the Sandy vein set, including the Sandy 4 vein, to support near-term production planning and refinement of the geologic model. In March, underground grade-control drilling also commenced in the Sandy 4 area.
oArista vein system: Drilling during the quarter targeted the Viridiana, Gisela, Candelaria, Marena North, and the Splay 31 veins. These targets were selected to support near-term production planning and evaluate mineralization adjacent to existing mine infrastructure. In addition, limited surface expansion drilling commenced on the Isabel SE target; a new target identified immediately west of the Arista vein system.
oAlta Gracia Project: Surface and underground drilling during the quarter targeted the Mirador vein system, including the Mirador and Mirador West veins, as well as the Independencia vein system, including the Independencia, Independencia West, and San Juan veins. This work was designed to improve confidence in mineralized structures and support evaluation of near-term mining opportunities in the project area.

Graphic

Hole No. 526010: Viridiana vein (236.90 – 243.35 m; 6.45 m). Arista System Q1 2026.

5.6 m estimated true width at 7.97 g/t AuEq of $1,113/t NSR (0.49 g/t Au, 442 g/t Ag, 0.21% Cu, 5.27% Pb, 13.86% Zn)

Gold Resource Corporation
27

Table of Contents

Results of Operations

Don David Gold Mine

Mine activities during the first quarter of 2026 included development and ore extraction from the Arista mine.

The following table summarizes certain production statistics about DDGM for the periods indicated:

For the three months ended March 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Arista Mine

Milled

Tonnes Milled

74,444

56,906

Tonnes Milled per Day (1)

1,390

1,094

Grade

Average Gold Grade (g/t)

1.10

0.70

Average Silver Grade (g/t)

203

169

Average Copper Grade (%)

0.15

0.18

Average Lead Grade (%)

0.72

0.72

Average Zinc Grade (%)

1.91

1.68

Recoveries

Average Gold Recovery (%)

77.7

70.6

Average Silver Recovery (%)

81.7

83.3

Average Copper Recovery (%)

66.1

53.5

Average Lead Recovery (%)

68.9

66.3

Average Zinc Recovery (%)

80.2

73.2

Combined

Tonnes Milled (1)

74,444

56,906

Tonnes Milled per Day (1)

1,390

1,094

Metal production

Gold (ozs.)

2,039

903

Silver (ozs.)

396,448

257,285

Copper (tonnes)

75

54

Lead (tonnes)

370

272

Zinc (tonnes)

1,143

699

Metal produced and sold

Gold (ozs.)

1,548

859

Silver (ozs.)

374,232

230,320

Copper (tonnes)

69

50

Lead (tonnes)

353

277

Zinc (tonnes)

962

617

Percentage payable metal (2)

Gold (%)

76

95

Silver (%)

94

90

Copper (%)

92

93

Lead (%)

95

102

Zinc (%)

84

88

(1)Based on actual days the mill operated during the period.
(2)The difference between what the Company reports as “ounces/tonnes produced” and “payable ounces/tonnes sold” is attributable to the difference between the quantities of metals contained in the concentrates the Company produces versus the portion of those metals actually paid for according to the terms of the Company’s sales contracts. Differences can also arise from inventory changes incidental to shipping schedules, or variances in ore grades and recoveries, which impact the amounts of metals contained in concentrates produced and sold.

Gold Resource Corporation
28

Table of Contents

First quarter 2026 compared to first quarter 2025

Production

During the three months ended March 31, 2026, total tonnes milled of 74,444 were 31% higher than in the same period in 2025. Metal production for gold and silver increased by 126% and 54%, respectively. Copper, lead, and zinc production also increased by 39%, 36%, and 64%, respectively, during the three months ended March 31, 2026, as compared to the same period last year. The increased production in the first quarter of 2026 reflects the Company's effort in 2025 to increase the number of production headings to mine. Although higher tonnes were processed during the three months ended March 31, 2026, than in the same quarter of 2025, production was impacted by a seven-day illegal work stoppage in January.

Grades & recoveries

During the three months ended March 31, 2026, all of the ore processed came from the Arista mine with an average gold grade of 1.10 g/t and silver grade of 203 g/t, compared to an average gold grade of 0.70 g/t and silver grade of 169 g/t, respectively, for the same period in 2025. For the three months ending March 31, 2026, the average gold grade was 57% higher and the average silver grade was 20% higher when compared to the same period in 2025. The increase in gold and silver grades is in accordance with the mine plan, attributable to the commencement of production from the upper levels of the Three Sisters vein system. As shown in the updated Don David Gold Mine Technical Report Summary, effective as of December 31, 2025, which is incorporated by reference as Exhibit 96.2 to the 2025 Annual Report (the “DDGM Technical Report Summary”), the ore grades are generally expected to decline over time in line with the life of mine average shown in the estimates of mineral reserves  (as defined by Subpart 1300 of Regulation S-K, “Mineral Reserves”) and mineral resources (as defined by Subpart 1300 of Regulation S-K, “Mineral Resources”) contained therein. However, as new areas are developed and the mine plan and the technical report are updated, the life of mine averages shown in the estimates of mineral reserves may either increase or decrease. As grades decline below certain lower limits, recoveries are generally expected to decline as well. The Company’s base metals average grades during the three months ended March 31, 2026 were 0.15% for copper, 0.72% for lead, and 1.91% for zinc. Copper grade was lower by 17%, zinc grade was higher by 14%, while lead grade remained unchanged, as compared to the same period in 2025.

Gold and silver recoveries for the three months ended March 31, 2026 were 77.7% and 81.7%, respectively, reflecting a 10% increase for gold and a 2% decrease for silver over the same period in 2025. Copper, lead, and zinc recoveries for the three months ended March 31, 2026 were 66.1%, 68.9%, and 80.2%, respectively. Recoveries for copper, lead and zinc increased by 24%, 4% and 10%, respectively, in the three months ended March 31, 2026, when compared to the same period in 2025.

Gold Resource Corporation
29

Table of Contents

Sales Statistics

The following table summarizes certain sales statistics about DDGM operations for the periods indicated:

For the three months ended March 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Net sales (in thousands)

Gold

$

7,480

$

2,485

Silver

31,968

7,452

Copper

913

472

Lead

684

539

Zinc

3,113

1,751

Less: Treatment and refining charges

(3,047)

(447)

Realized and unrealized gain - embedded derivative, net

2,832

102

Total sales, net

$

43,943

$

12,354

Metal produced and sold

Gold (ozs.)

1,548

859

Silver (ozs.)

374,232

230,320

Copper (tonnes)

69

50

Lead (tonnes)

353

277

Zinc (tonnes)

962

617

Average metal prices realized (1)

Gold ($ per oz.)

$

5,098

$

2,956

Silver ($ per oz.)

$

98.09

$

32.54

Copper ($ per tonne)

$

13,649

$

9,656

Lead ($ per tonne)

$

1,938

$

1,950

Zinc ($ per tonne)

$

3,248

$

2,710

Gold equivalent ounces sold

Gold Ounces

1,548

859

Gold Equivalent Ounces from Silver

7,201

2,535

Total AuEq oz

8,749

3,394

(1)Average metal prices realized vary from the market metal prices due to final settlement adjustments from the Company’s provisional invoices when they are settled. The Company’s average metal prices realized will therefore differ from the average market metal prices in most cases.

First quarter 2026 compared to first quarter 2025

Besides the expected higher tonnes mined and improvements in metal grades and recoveries for the three months ended March 31, 2026 as compared to the same period in 2025, the key drivers of the production and financial results are the higher metal prices, offset by the lower-than-expected production due to the illegal blockade in January.

Metal sold

During the three months ended March 31, 2026, gold sales of 1,548 ounces and silver sales of 374,232 ounces increased by 80% and 62%, respectively, when compared to the same period in 2025. Similarly, copper sales of 69 tonnes, lead sales of 353 tonnes, and zinc sales of 962 tonnes increased by 38%, 27%, and 56%, respectively. The higher metal production was expected due to mine sequencing.

Average metal prices realized

During the three months ended March 31, 2026, the average metal prices were $5,098 per gold ounce, $98.09 per silver ounce, $13,649 per tonne for copper, $1,938 per tonne for lead, and $3,248 per tonne for zinc. Compared to the same period in 2025, the average metal price for gold, silver, copper, and zinc increased by 72%, 201%, 41%, and 20% respectively, while the average metal price for lead decreased by 1%.

Gold Resource Corporation
30

Table of Contents

Graphic

Graphic

Graphic

Graphic

Graphic

Gold Resource Corporation
31

Table of Contents

Financial Measures

The following table summarizes certain financial data of the Company for the periods indicated:

For the three months ended March 31, 

2026

  ​ ​ ​

2025

(in thousands)

Concentrate sales

$

44,158

$

12,699

Less: Treatment and refining charges

(3,047)

(447)

Realized/unrealized derivatives, net

2,832

102

Sales, net

43,943

12,354

Total cost of sales

24,898

13,806

Mine gross profit (loss)

19,045

(1,452)

Other costs and expenses, including taxes

14,306

6,867

Net income (loss)

$

4,739

$

(8,319)

First quarter 2026 compared to first quarter 2025

Sales, net

Net sales of $44.0 million for DDGM for the three months ended March 31, 2026 increased by $31.6 million, or 256%, when compared to the same period in 2025. The increase in 2026 net sales compared to the net sales in the first quarter of 2025 is the result of higher tonnes processed and higher metal prices, partially offset by the 582% increase in treatment and refining charges during the three months ended March 31, 2026 due to higher tonnes shipped.

Total cost of sales

Total cost of sales of $24.9 million for the three months ended March 31, 2026 increased by 80% from $13.8 million for the same period in 2025. The $11.1 million increase was primarily related to a $9.9 million increase in production cost and a $1.3 million increase in depreciation expense. Production costs of $20.6 million for the three months ended March 31, 2026 are 93% higher than the production costs of $10.7 million for the same period in 2025 due to the higher production in 2026.

Mine gross profit (loss)

For the three months ended March 31, 2026, the Company had a mine gross profit of $19.0 million, compared to a mine gross loss of $1.5 million for the three months ended March 31, 2025. Mine gross profit increased by $20.5 million, or 1,367%, compared to the same period in 2025. The increase in mine gross profit was primarily due to higher net sales that did not cause a proportional increase in production costs. While net sales increased by 256% in the quarter, the production costs increased by 93%, or $9.9 million, compared to the first quarter of 2025.

The mine gross profit or loss maintains a limited correlation to tonnes of ore processed; however, multiple factors will impact the net sales and operating costs figures contained within the mine gross profit or loss in comparison to the tonnes of ore processed. For example, concerning net sales, attributes of the tonnes of ore processed (including ore grade and processing recoveries) along with metal commodity prices can result in lower or higher sales. Mine operating costs include variable costs that maintain a correlation to the tonnes both mined and processed (i.e., equipment usage, reagents, inventory consumables, royalties etc.) and further include fixed costs which maintain a lower correlation to the tonnes of ore processed (i.e. payroll, utilities, insurance, mining concessions, etc.).

Gold Resource Corporation
32

Table of Contents

Net income (loss)

For the three months ended March 31, 2026, the Company recorded net income of $4.7 million, compared to a net loss of $8.3 million during the same period in 2025. The $13.0 million increase in net income is mainly attributable to the higher production combined with higher metal prices in 2026.

Other Costs and Expenses, Including Taxes

For the three months ended March 31, 

2026

  ​ ​ ​

2025

(in thousands)

Other costs and expenses:

General and administrative expenses

$

1,594

$

1,144

Mexico exploration expenses

1,230

281

Michigan Back Forty Project expenses

209

204

Stock-based compensation

1,024

400

Other expense, net

5,537

4,311

Total other costs and expenses

9,594

6,340

Income tax provision

4,712

527

Total other costs and expenses, including taxes

$

14,306

$

6,867

First quarter 2026 compared to first quarter 2025

General and administrative expenses: For the three months ended March 31, 2026 and 2025, general and administrative expenses were $1.6 million and $1.1 million, respectively. General and administrative expenses remained similar in the two periods as the Company continued the cost saving measures implemented in 2024.

Mexico exploration expenses: For the three months ended March 31, 2026, exploration expenses at DDGM totaled $1.2 million, compared to $0.3 million for the same period in 2025. Exploration expenditures in Oaxaca, Mexico, increased in 2026 as the Company continued to engage in strategic planning and prioritization of regional surface exploration activities across multiple projects, including Alta Gracia, Margaritas, Chamizo, El Rey, and Jabali, while limited surface expansion drilling also commenced during the quarter.

Michigan Back Forty Project expenses: For the three months ended March 31, 2026, costs for the Back Forty Project were $0.2 million, compared to $0.2 million for the same period in 2025. In April 2026, the Company engaged Responsible Mining Solutions Corp., a part of SLR Consulting Ltd., to complete a comprehensive Feasibility Study, which should facilitate a successful mine permitting process that would allow the Company to move forward with the Back Forty Project.

Stock-based compensation: Stock-based compensation increased by $0.6 million for the three months ended March 31, 2026, compared to the same period in 2025 due to additional grants and an increase in share price in the first quarter of 2026.

Other expense, net: For the three months ended March 31, 2026, the Company incurred $5.5 million of other expenses, an increase of $1.2 million from the same period in 2025. This increase is mainly driven by a $0.8 million increase in interest on the streaming liabilities and a $0.5 million higher other expense in the first quarter of 2026 related to mergers and acquisitions. Please see Note 16—Other Expense, net in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional details.

Income tax provision: For the three months ended March 31, 2026, income tax expense was $4.7 million, compared to $0.5 million for the same period in 2025. The increase in income tax expense for the three months ended March 31, 2026 is primarily driven by the income generated by the Company during the first quarter of 2026.

Gold Resource Corporation
33

Table of Contents

Other Non-GAAP Financial Measures

Certain non-GAAP financial measures are discussed below. For a detailed description of each of these measures and a reconciliation to U.S. GAAP financial measures, please see the discussion under Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Non-GAAP Measures below.

For the three months ended March 31, 

2026

  ​ ​ ​

2025

Other Non-GAAP Financial Measures:

(in thousands)

Total cash cost after co-product credits per AuEq oz. sold

$

2,164

$

2,494

Total consolidated all-in sustaining cost after co-product credits per AuEq oz. sold

$

3,476

$

3,252

Total all-in cost after co-product credits per AuEq oz. sold

$

3,640

$

3,745

First quarter 2026 compared to first quarter 2025

Total cash cost after co-product credits per AuEq oz. sold: For the three months ended March 31, 2026, the total cash cost after co-product credits per AuEq oz. sold is $2,164 compared to $2,494 for the same period in 2025. The decrease in the total cash cost is due to the 76% higher co-product credits the Company received during the first quarter of 2026 and the 158% increase in the total number of AuEq ounces sold, partially offset by a 582% increase in total treatment and refining charges and a 93% increase in production costs as a result of the increase in first quarter 2026 production as compared to first quarter 2025 production.

Total consolidated all-in sustaining cost after co-product credits per AuEq oz. sold: For the three months ended March 31, 2026, the total consolidated all-in sustaining cost after co-product credits per AuEq oz sold was $3,476 as compared to $3,252 for the same period in 2025. The 7% increase directly relates to the increased sustaining investments in 2026.

Total all-in cost after co-product credits per AuEq oz. sold: For the three months ended March 31, 2026, the total all-in cost after co-product credits per AuEq oz sold was $3,640 compared to $3,745 for the same period in 2025. The decrease is due to the 158% increase in the total number of AuEq ounces sold.

Gold Resource Corporation
34

Table of Contents

2026 Sustaining and Growth Investments Summary

For the three months ended March 31, 2026

2026

2025

Sustaining Investments:

Underground Development

Capital

$

3,797

$

468

Other Sustaining Capital

Capital

3,342

50

Infill Drilling

Capitalized Exploration

608

109

Surface and Underground Exploration Development & Other

Capitalized Exploration

874

6

Subtotal of Sustaining Investments:

8,621

633

Growth Investments:

DDGM growth:

Surface Exploration / Other

Exploration

1,140

281

Underground Exploration Drilling

Exploration

90

-

Underground Exploration Development

Capitalized Exploration

-

1,188

Back Forty growth:

Back Forty Project Optimization & Permitting

Exploration

209

204

Subtotal of Growth Investments:

1,439

1,673

Total Capital and Exploration:

$

10,060

$

2,306

The Company’s year-to-date capital investment and exploration costs in Mexico in 2026 totaled $8.6 million and $1.2 million, respectively. The Company’s year-to-date capital investment and exploration costs in Mexico in 2025 totaled $1.8 million and $0.3 million, respectively. The Company’s investment in Mexico is focused on favorably impacting its environment, social, and governance programs while creating operational efficiencies and sustainability.

Gold Resource Corporation
35

Table of Contents

Underground and Exploration Development:

During the first quarter of 2026, underground mine development included the construction of ramps and drifts to access different areas of the mine and raises for ventilation. A total of 202 meters of exploration development was completed at a cost of $0.61 million. Of this total, 82 meters were completed on Level 31 within the Switchback system to support future infill and expansion drilling targeting the Soledad South and Sagrario veins, and 120 meters were completed on Level 3 within the Three Sisters vein system to provide access for infill and expansion drilling targeting the Sandy and Gloria veins. Most underground drilling completed during the quarter utilized drill stations and related infrastructure developed in prior years. As part of ongoing safety and operational improvement initiatives, the Company also invested in additional ground support and ventilation. Improved equipment availability and cash flow allowed the Company to remain on time and budget with respect to the development of future production headings.

Graphic

Underground contract drill rig: Arista Mine – Level 25 – Viridiana vein, Arista vein system.

Gold Resource Corporation
36

Table of Contents

Non-GAAP Measures

Throughout this report, the Company has provided information prepared or calculated according to U.S. GAAP and has referenced certain non-GAAP performance measures that the Company believes will assist with understanding the performance of its business. These measures are based on precious metal gold equivalent ounces sold and include (i) cash cost after co-product credits per ounce and (ii) all-in sustaining cost after co-product credits (“AISC”) per ounce, and (iii) all-in cost after co-product credits per ounce. Because the non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. Accordingly, these measures should not be considered in isolation or as a substitute for, measures of performance prepared in accordance with U.S. GAAP. These non-GAAP measures are not necessarily indicative of operating profit or cash flow from operations as determined under U.S. GAAP. 

For financial reporting purposes, the Company reports the sale of base metals as part of its revenue. Revenue generated from the sale of base metals in the Company’s concentrates is considered a co-product of its gold and silver production for the purpose of calculating its total cash cost after co-product credits for DDGM. The Company periodically reviews its revenues to ensure that its reporting of primary products and co-products is appropriate. Because the Company considers copper, lead, and zinc to be co-products of its precious metal production, the value of these metals continues to be applied as a reduction to total cash costs in its calculation of total cash cost after co-product credits per precious metal gold equivalent ounce sold. Likewise, the Company believes identifying copper, lead, and zinc as co-product credits is appropriate due to their lower per unit economic value contribution compared to the precious metals and since gold and silver are the primary products it intends to produce.

Total cash cost after co-product credits is a measure developed by the Gold Institute to provide a uniform standard for industry comparison purposes, and it includes total cash cost before co-product credits, less co-product credits, or revenues earned from base metals. 

AISC includes total cash cost after co-product credits plus other costs related to sustaining production, including allocated sustaining general and administrative expenses and sustaining capital expenditures. The Company determined sustaining capital expenditures as those capital expenditures that are necessary to maintain current production and execute the current mine plan. AISC is calculated based on the current guidance from the World Gold Council.

Total all-in cost after co-product credits includes total AISC as described above, plus other growth investments, including exploration expenses and non-sustaining capital expenditures.

Gold Resource Corporation
37

Table of Contents

Reconciliations to U.S. GAAP

The table below presents reconciliations between the most comparable U.S. GAAP measure of total cost of sales to the non-GAAP measures of cash cost after co-product credits, all-in sustaining cost after co-product credits for DDGM and for the Company, and all-in cost after co-product credits for the three months ended March 31, 2026 and 2025:

Financial Statements Note #

For the three months ended March 31, 

2026

  ​ ​ ​

2025

Total cost of sales (1)

$

24,898

$

13,806

Less: Depreciation and amortization (1)

(4,027)

(2,704)

Less: Reclamation and remediation (1)

(235)

(394)

Treatment and refining charges for Concentrate sales

3

3,047

447

Co-product credits:

Concentrate sales - Copper

3

(913)

(472)

Concentrate sales - Lead

3

(684)

(539)

Concentrate sales - Zinc

3

(3,113)

(1,751)

Realized gain for embedded derivatives - Copper

18

(24)

(9)

Realized loss (gain) for embedded derivatives - Zinc

18

(12)

81

Total cash cost after co-product credits

$

18,937

$

8,465

Gold equivalent (AuEq) ounces sold (oz)

  ​

8,749

3,394

Total cash cost after co-product credits per AuEq oz. sold

$

2,164

$

2,494

Total cash cost after co-product credits from above

$

18,937

$

8,465

Sustaining Investments - Capital:

Underground Development (2)

3,797

468

Other Sustaining Capital (2)

3,342

50

Sustaining Investments - Capitalized Exploration:

Infill Drilling (2)

608

109

Surface and Underground Exploration Development & Other (2)

874

6

Reclamation and remediation (1)

235

394

DDGM all-in sustaining cost after co-product credits

$

27,793

$

9,492

AuEq ounces sold (oz)

8,749

3,394

DDGM all-in sustaining cost after co-product credits per AuEq oz. sold

$

3,177

$

2,797

DDGM all-in sustaining cost after co-product credits from above

$

27,793

$

9,492

Corporate Sustaining Expenses:

General and administrative expenses (1)

1,594

1,144

Stock-based compensation (1)

1,024

400

Consolidated all-in sustaining cost after co-product credits

$

30,411

$

11,036

AuEq ounces sold (oz)

8,749

3,394

Total consolidated all-in sustaining cost after co-product credits per AuEq oz. sold

$

3,476

$

3,252

Consolidated all-in sustaining cost after co-product credits from above

$

30,411

$

11,036

Underground Exploration Development (2)

-

1,188

Growth Investments - Exploration:

Mexico exploration expenses (1)

1,230

281

Michigan Back Forty Project expenses (1)

209

204

Total all-in cost after co-product credits

$

31,850

$

12,709

AuEq ounces sold (oz)

8,749

3,394

Total all-in cost after co-product credits per AuEq oz. sold

$

3,640

$

3,745

(1)Refer to Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Condensed Consolidated Interim Statements of Operations.
(2)Refer to Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations – 2026 Capital and Exploration Investment Summary and the previously filed Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations – 2025 Capital and Exploration Investment Summary.

Gold Resource Corporation
38

Table of Contents

Trending Highlights

2025

2026

Q1

Q2

Q3

Q4

Q1

Operating Data

Total tonnes milled

56,906

63,479

65,131

85,888

74,444

Average Grade

Gold (g/t)

0.70

0.56

1.11

0.96

1.10

Silver (g/t)

169

115

250

298

203

Copper (%)

0.18

0.13

0.16

0.16

0.15

Lead (%)

0.72

0.88

0.63

0.58

0.72

Zinc (%)

1.68

2.72

1.57

1.22

1.91

Metal production (before payable metal deductions)

Gold (ozs.)

903

758

1,646

1,993

2,039

Silver (ozs.)

257,285

196,435

453,057

687,523

396,448

Copper (tonnes)

54

50

73

87

75

Lead (tonnes)

272

373

241

306

370

Zinc (tonnes)

699

1,380

784

750

1,143

Metal produced and sold

Gold (ozs.)

859

878

1,422

1,785

1,548

Silver (ozs.)

230,320

150,365

417,710

663,503

374,232

Copper (tonnes)

50

43

67

80

69

Lead (tonnes)

277

272

212

253

353

Zinc (tonnes)

617

1,060

645

618

962

Average metal prices realized

Gold ($ per oz.)

$ 2,956

$ 3,350

$ 3,546

$ 4,234

$ 5,098

Silver ($ per oz.)

$ 32.54

$ 34.35

$ 41.39

$ 55.06

$ 98.09

Copper ($ per tonne)

$ 9,656

$ 9,619

$ 9,690

$ 11,224

$ 13,649

Lead ($ per tonne)

$ 1,950

$ 1,887

$ 1,937

$ 1,981

$ 1,938

Zinc ($ per tonne)

$ 2,710

$ 2,607

$ 2,841

$ 3,258

$ 3,248

Gold equivalent ounces sold

Gold Ounces

859

878

1,422

1,785

1,548

Gold Equivalent Ounces from Silver

2,535

1,542

4,876

8,628

7,201

Total AuEq oz

3,394

2,420

6,298

10,413

8,749

Gold Resource Corporation
39

Table of Contents

Liquidity and Capital Resources

As of March 31, 2026, working capital was $40.2 million, consisting of current assets of $57.5 million and current liabilities of $17.3 million. This represents an $8.2 million, or a 26%, increase from the working capital balance of $32.0 million as of December 31, 2025. The main factors influencing the increase in the Company’s working capital are the increase in the cash and cash equivalents balance by $6.0 million, an increase in accounts receivable by $1.8 million, and an increase in inventories by $0.5 million. The increase in cash and cash equivalents is due to the $14.9 million cash inflows from operating activities, partially offset by the cash used in investing activities of $8.8 million, as reported in the Condensed Consolidated Interim Statements of Cash Flows. The Company’s working capital balance fluctuates as it uses cash to fund its operations, financing, and investing activities, including exploration, mine development, and income taxes.

Long-term liabilities assumed with the Aquila acquisition, capital requirements to develop the Back Forty Project, and potential project financing may have an impact on liquidity in the long term. These long-term liabilities are contingent upon the approval of the Back Forty Project by the Company’s Board of Directors and securing project financing. Project financing requirements will not be determined until a Feasibility Study and permitting are completed and the Company’s Board of Directors approves a decision to proceed on the Back Forty Project. The Company’s Board of Directors continues to evaluate alternative options that could lead to the successful development of the Back Forty Project.

Of the $31.0 million cash and cash equivalents balance as of March 31, 2026, approximately $11.9 million was held in foreign subsidiaries, primarily held in U.S. dollar denominated accounts, with the remainder in foreign currencies readily convertible to U.S. dollars. DDGM’s primary source of liquidity is the sale of concentrates.

Net cash provided by operating activities for the three months ended March 31, 2026, was $14.9 million, compared to the $0.8 million net cash used by operating activities for the same period in 2025. The 1,963% increase in net cash provided by operating activities is mainly attributable to the higher production and higher net sales due to the increased metal prices in the first quarter of 2026 as compared to the same period in 2025.

Net cash used in investing activities for the three months ended March 31, 2026 and 2025 was $8.8 million and $1.3 million, respectively. The increase in investing activities reflects the Company’s commitment to renewing its aging mining equipment and increasing mine development.

Net cash used in financing activities for the three months ended March 31, 2026 was $56 thousand compared to the $5.5 million net cash provided by financing activities for the same period in 2025. The 101% decrease in net cash provided by financing activities is mainly because the Company did not utilize the ATM and did not have any registered direct offerings in 2026. Please see Note 12—Shareholders’ Equity in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above for additional information.

While current macro risk factors, such as economic uncertainties and supply chain interruptions have not had a significant adverse impact on exploration plans, results of operations, financial position, and cash flows during the current fiscal year, future impacts are unknown at this time.

Accounting Developments

For a discussion of recently adopted and recently issued accounting pronouncements, please see Note 2—New Accounting Pronouncements in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above.

Critical Accounting Estimates

The preparation of financial statements in accordance with U.S. GAAP requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues, expenses, and contingencies. These estimates and assumptions are inherently uncertain and involve judgments that may impact the Company’s financial position and results of operations. Management regularly evaluates these estimates based on historical experience, current conditions,

Gold Resource Corporation
40

Table of Contents

and other relevant factors. Areas involving significant estimates that are considered critical to the Company’s financial condition and results of operations are discussed in Item 7Management’s Discussion and Analysis of Financial Condition and Results of Operations in the 2025 Annual Report.

There have been no material changes to the critical accounting estimates disclosed in the 2025 Annual Report. While management believes the underlying assumptions and judgments are reasonable and appropriate, actual results may differ materially due to changes in conditions or additional information that becomes available.

Forward-Looking Statements

This report contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. The Company uses the words “anticipate,” “continue,” “likely,” “estimate,” “expect,” “may,” “could,” “will,” “project,” “should,” “believe,” and similar expressions (including negative and grammatical variations) to identify forward looking statements. Such forward-looking statements include, without limitation, statements regarding:

The Company’s ability to satisfy its financial and contractual obligations and other potential cash requirements over the next 12 months;
The Company’s anticipated near-term capital requirements and potential sources of capital;
Expectations regarding 2026 general and administrative costs;
The Company’s expectations regarding whether dividends will be paid in the future;
Compliance with existing legal and regulatory requirements, including future asset reclamation costs;
The Company’s strategy for significant future investment in Oaxaca, Mexico, and in Michigan, USA, for development and exploration activities;
Expectations regarding capital investment, exploration spending, and general and administrative costs, including the Company’s near-term estimates for the cost of additional mining equipment, mill upgrades, and working capital;
The Company’s expectations regarding future grades and recoveries from mining at DDGM and its expectations regarding its ability to generate positive cash flow from future production at DDGM;
Future exploration plans at DDGM, including vein systems targeted for future exploration activity;
Estimates of Mineral Resources and Mineral Reserves;
The sufficiency of the Company’s water rights;
The Company’s expectation for the outcome of the 2015 DDGM tax audit;
Expectations regarding 2026 DDGM and Back Forty capital investment;
The expected timetable for and completion of the potential Transaction; and
The expected timing and success of the Back Forty Project with respect to a positive Feasibility Study, permitting, detailed engineering, project financing, and contract amendments with Osisko.

Forward-looking statements are neither historical facts nor assurances of future performance. Rather, they are based only on the Company’s current beliefs, expectations, and assumptions regarding the future of its business, future plans and strategies, projections, anticipated events and trends, the economy, and other future conditions. Because forward-looking statements relate to the future, they are subject to inherent uncertainties, risks, and changes in circumstances that are difficult to predict, and many of which are outside of the Company’s control. The Company’s actual results and financial condition may differ materially from those indicated in the forward-looking statements. Therefore, you should not rely on any of these forward-looking statements. Important factors that could cause the Company’s actual results and financial condition to differ materially from those indicated in the forward-looking statements include, among others, the following:

Risks associated with the Company’s ability to complete the proposed Transaction on the terms anticipated or at all;
Whether the Company is able to raise the necessary capital required to continue its business on terms acceptable to it or at all;

Gold Resource Corporation
41

Table of Contents

The possibility of unforeseen production or processing challenges at DDGM, such as mechanical breakdowns, staffing shortages, weather events, unexpected decreases in grade, lower than anticipated production at existing mining faces, or inability or delays in the access and development of new mining faces;
Commodity price fluctuations;
Mine protests and work stoppages;
Rock formations, faults and fractures, water flow and possible CO2 gas exhalation, or other unanticipated geological challenges;
Unexpected changes in business and economic conditions, including supply chain challenges, the rate of inflation, fuel price, and their impact on operating and capital costs;
Changes in interest rates and currency exchange rates;
Adverse technological changes and cybersecurity threats;
Unanticipated increases in the Company’s operating costs and other costs of doing business;
Access to land and availability of materials, equipment, supplies, labor and supervision, power, and water;
Results of current and future Feasibility Studies;
Interpretation of drill hole results and the geology, grade, and continuity of mineralization;
Litigation by private parties or regulatory action by governmental entities;
Acts of God, such as excessively wet weather, floods, earthquakes, and any other natural disasters;
Changes in investor perception of the Company and/or the mining industry;
The inherent uncertainty of Mineral Resources and Mineral Reserves estimates;
The Company’s internal controls over financial reporting; and
Such other factors are discussed below under Item 1A—Risk Factors.

Many of these factors are beyond the Company’s ability to control or predict. Although the Company believes that the expectations reflected in its forward-looking statements are based on reasonable assumptions, such expectations may prove to be materially incorrect due to known and unknown risks and uncertainties. You should not unduly rely on any of the Company’s forward-looking statements. These statements speak only as of the date of this quarterly report on Form 10-Q. Except as required by law, the Company is not obliged to publicly release any revisions to these forward-looking statements to reflect future events or developments. All subsequent written and oral forward-looking statements attributable to the Company and persons acting on its behalf are qualified in their entirety by the cautionary statements contained in this section and elsewhere in this quarterly report on Form 10-Q.

ITEM 3. Quantitative and Qualitative Disclosures about Market Risk

The Company’s exposure to market risks includes, but is not limited to, the following risks: changes in commodity prices, foreign currency exchange rates, provisional sales contract risks, changes in interest rates, and equity price risks. Currently, the Company does not use derivative financial instruments as part of an overall strategy to manage market risk. However, the Company may consider such arrangements in the future as it evaluates its business and financial strategy.

Commodity Price Risk

The results of the Company’s operations, cash flows, and financial condition largely depend upon the market prices of gold, silver, copper, lead, and zinc. Metal prices fluctuate widely and are affected by numerous factors beyond the Company’s control. The level of interest rates, the rate of inflation, government fiscal and monetary policy, the stability of exchange rates, and the world supply of and demand for gold, silver, and other metals, among other factors, can all cause significant fluctuations in commodity prices. Such external economic factors are, in turn, influenced by changes in international investment patterns, monetary systems, and political developments. The metal price markets have fluctuated widely in recent years, and future price declines could cause a mineral project to become uneconomic, thereby having a material adverse effect on the Company’s business and financial condition. Currently, the Company is not utilizing derivative contracts to protect the selling price for gold, silver, copper, lead, or zinc. The Company may, in the future, more actively manage its exposure through additional derivative contracts, although the Company has no intention of doing so in the near term. 

Gold Resource Corporation
42

Table of Contents

In addition to materially adversely affecting the Company’s reserve estimates, results of operations and/or its financial condition, declining gold and silver prices could require a reassessment of the feasibility of a project. Even if a project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause delays in the implementation of a project.

Foreign Currency Risk

The Company’s foreign operation sells its gold, silver, copper, lead, and zinc production based on U.S. dollar metal prices. Fluctuations in foreign currency exchange rates do not have a material impact on the Company’s revenue since gold, silver, copper, lead, and zinc are sold worldwide in U.S. dollars.

Foreign currency exchange rate fluctuations can increase or decrease the Company’s costs to the extent that it pays costs in currencies other than the U.S. Dollar. The Company is primarily impacted by Mexican peso rate changes relative to the U.S. Dollar, as the Company incurs some costs in the Mexican peso. When the value of the peso rises in relation to the U.S. Dollar, some of the Company’s costs in Mexico may increase, thus materially adversely affecting the Company’s operating results. Alternatively, when the value of the peso drops in relation to the U.S. Dollar, peso-denominated costs in Mexico will decrease in U.S. Dollar terms. Future fluctuations may give rise to foreign currency exposure, which may affect the Company’s financial results. Approximately 50% to 60% of expenses are paid in currencies other than the U.S. dollar. 

The Company has not utilized market-risk sensitive instruments to manage its exposure to foreign currency exchange rates. However, the Company may, in the future, actively manage its exposure to foreign currency exchange rate risk. 

Provisional Sales Contract Risk 

The Company enters into concentrate sales contracts, which, in general, provide for a provisional payment to the Company based upon provisional assays and prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates determined at the quoted metal prices at the time of shipment delivery to the customer. The embedded derivative, which does not qualify for hedge accounting, is adjusted to market through revenue each period prior to settlement. Changes in the prices of metals between the shipment delivery and the final settlement date will result in adjustments to revenues related to the sales of concentrate previously recorded upon shipment delivery. Please see Note 13—Derivatives in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above for additional information. 

Interest Rate Risk 

The Company considers its interest rate risk exposure to be insignificant at this time.

 Equity Price Risk

The Company has, in the past, and may in the future, seek to acquire additional funding through the sale of common stock and other equity. The price of the Company’s common stock has been volatile in the past and may also be volatile in the future. As a result, there is a risk that the Company may not be able to sell its common stock at an acceptable price should the need for new equity funding arise.

ITEM 4. Controls and Procedures

Evaluation of Disclosure Controls and Procedures

The Company’s disclosure controls and procedures are designed to ensure that information required to be disclosed in the reports that the Company files under the Securities Exchange Act of 1934, as amended (the “Exchange Act”), is recorded, processed, summarized, and reported within the time periods specified in the rules and forms of the Securities

Gold Resource Corporation
43

Table of Contents

and Exchange Commission, and that such information is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. The Chief Executive Officer and the Chief Financial Officer, with assistance from management, have evaluated the effectiveness of disclosure controls and procedures as of March 31, 2026. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the disclosure controls and procedures were effective as of March 31, 2026.

Changes in Internal Control over Financial Reporting

There have been no changes in internal control over financial reporting (as defined in Rule 13a-15(f) under the Exchange Act) that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting during the quarter ended March 31, 2026.

PART II – OTHER INFORMATION

ITEM 1. Legal Proceedings

In February 2020, a local Ejido community (who claim to be an indigenous community) filed an injunction against the Mexican federal government alleging failure to conduct a prior consultation before granting mining concessions and seeking cancellation of several concessions, including certain concessions granted to DDGM. A federal suspension was issued in February 2020 prohibiting certain mining activities on the named concessions. DDGM’s operations are conducted on a concession that was not part of the original lawsuit, and DDGM does not presently perform such works in the concessions in lands of the indigenous community named in the injunction. The lawsuit is filed with the First District Courthouse in the state of Oaxaca and the case remains pending. If the lawsuit is successful, affected concessions, including the concession where DDGM currently operates, could be cancelled, and the Company would need to complete a consultation process and reapply for those concessions.

ITEM 1A. Risk Factors

Item 1A—Risk Factors of the 2025 Annual Report includes a discussion of the Company’s known material risk factors, other than risks that could apply to any issuer or offering. Other than the below, there have been no material changes in the Company’s risk factors from those described in the 2025 Annual Report.

We have issued warrants, which could result in dilution to our existing stockholders and may adversely affect the market price of our common stock.

In June 2025, we issued 1,500,000 warrants to purchase shares of our common stock to a private investor. The issuance and potential future exercise of these warrants may dilute the ownership interests of existing stockholders and may adversely affect the market price of our common stock. In addition, the existence of these warrants could make it more difficult or expensive for us to raise additional capital in the future.

ITEM 2. Unregistered Sales of Equity Securities and Use of Proceeds

None.

ITEM 3. Defaults upon Senior Securities

None.

Gold Resource Corporation
44

Table of Contents

ITEM 4. Mine Safety Disclosures

While the Company owns an advanced exploration project in Michigan, USA, the project is not yet subject to the Mine Safety and Health Administration jurisdiction and therefore, the mine safety disclosure requirements are not applicable.

ITEM 5. Other Information

Rule 10b5-1 Trading Arrangements

During the three months ended March 31, 2026, no director or Section 16 officer of the Company adopted, modified, or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408(a) of Regulation S-K.

Gold Resource Corporation
45

Table of Contents

ITEM 6. Exhibits

The following exhibits are filed or furnished herewith or incorporated herein by reference:

Exhibit
Number

Descriptions

2.1†

Arrangement Agreement and Plan of Merger, dated as of January 25, 2026, between Gold Resource Corporation, Goldgroup Mining Inc. and Goldgroup Merger Sub Inc. (incorporated by reference from Exhibit 2.1 to the Company’s Current Report on Form 8-K filed with the SEC on January 26, 2026).

3.1

Articles of Incorporation of the Company as filed with the Colorado Secretary of State on August 24, 1998 (incorporated by reference from Exhibit 3.1 to the Company’s Registration Statement on Form SB-2 filed with the SEC on October 28, 2005).

3.1.1

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on September 16, 2005 (incorporated by reference from Exhibit 3.1.1 to the Company’s Registration Statement on Form SB-2 filed with the SEC on October 28, 2005).

3.1.2

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on November 8, 2010 (incorporated by reference from Exhibit 3.1 to the Company’s Quarterly Report on Form 10-Q filed with the SEC on November 10, 2010).

3.1.3

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on June 4, 2021 (incorporated by reference from Exhibit 3.1.3 to the Company’s Annual Report on Form 10-K filed with the SEC on March 13, 2023).

3.2

Amended and Restated Bylaws of the Company dated August 9, 2010 (incorporated by reference from Exhibit 3.2 to the Company’s Current Report on Form 8-K filed with the SEC on August 12, 2010).

3.2.1

Amendment dated March 25, 2013 to Amended and Restated Bylaws of the Company dated August 9, 2010 (incorporated by reference from Exhibit 3.2 to the Company’s Current Report on Form 8-K filed with the SEC on March 27, 2013).

3.2.2

Amendment dated April 3, 2018 to the Amended and Restated Bylaws of the Company dated August 9, 2010 (incorporated by reference from Exhibit 3.2 to the Company’s Current Report on Form 8-K filed with the SEC on April 3, 2018).

3.2.3

Amendment dated August 6, 2024 to the Amended and Restated Bylaws of the Company dated August 9, 2010 (incorporated by reference from Exhibit 3.1 to the Company’s Current Report on Form 8-K filed with the SEC on August 7, 2024).

10.1

Form of Voting and Support Agreement, dated as of January 25, 2026 (incorporated by reference from Exhibit 10.1 to the Company’s Current Report on Form 8-K filed with the SEC on January 26, 2026).

31.1*

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Allen Palmiere.

31.2*

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Chet Holyoak.

32**

Certification pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 for Allen Palmiere and Chet Holyoak.

101

The following items from the Quarterly Report on Form 10-Q for the quarter ended March 31, 2026 are furnished herewith, formatted in inline XBRL: (A) the following financial statements: (i) the Condensed Consolidated Interim Balance Sheets, (ii) the Condensed Consolidated Interim Statements of Operations, (iii) the Condensed Consolidated Interim Statements of Changes in Shareholders’ Equity, (iv) the Condensed Consolidated Interim Statements of Cash Flows, and (v) the Notes to the Condensed Consolidated Interim Financial Statements; and (B) Rule 10b5-1 Trading Arrangements.

104

Cover Page Interactive Data File (embedded within the XBRL document).

*

Filed herewith.

**

This document is not being “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to the liabilities of that Section. Registration Statements or other documents filed with the SEC shall not incorporate this exhibit by reference, except as otherwise expressly stated in such filing.

Certain schedules or similar attachments to this exhibit have been omitted in accordance with Item 601(a)(5) of Regulation S-K. The registrant hereby agrees to furnish supplementally to the SEC upon request a copy of any omitted schedule or attachment to this exhibit.

Gold Resource Corporation
46

Table of Contents

SIGNATURES

In accordance with Section 13 or 15(d) of the Securities Exchange Act of 1934, as amended, the Company has caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.

GOLD RESOURCE CORPORATION

Dated: May 7, 2026

/s/ Allen Palmiere

By:

Allen Palmiere,

Chief Executive Officer,
President and Director

Dated: May 7, 2026

/s/ Chet Holyoak

By:

Chet Holyoak,

Chief Financial Officer

Gold Resource Corporation
47

FAQ

How did Gold Resource (GORO) perform financially in Q1 2026?

Gold Resource reported net sales of $43.9 million and net income of $4.7 million in Q1 2026, compared with $12.4 million of net sales and an $8.3 million net loss a year earlier. Higher production, improved grades, and stronger metal prices drove the turnaround.

What were Gold Resource (GORO)’s production levels at Don David Gold Mine in Q1 2026?

In Q1 2026, Don David Gold Mine produced 2,039 ounces of gold, 396,448 ounces of silver, plus copper, lead, and zinc. Gold-equivalent ounces sold totaled 8,749, more than doubling year over year, supported by higher tonnage milled and better recoveries.

What are the key terms of Gold Resource (GORO)’s planned merger with Goldgroup Mining Inc.?

Under the Arrangement Agreement, Gold Resource stockholders will receive 0.3619 Goldgroup shares for each GORO share after Goldgroup’s four-for-one share consolidation. Upon completion, GORO stockholders are expected to own about 40% of the combined company on a fully diluted in-the-money basis.

How strong is Gold Resource (GORO)’s cash position after Q1 2026?

At March 31, 2026, Gold Resource held $31.0 million in cash and cash equivalents, up from $25.0 million at year-end 2025. The company generated $14.9 million of cash from operating activities in Q1, funding capital expenditures and supporting liquidity.

What are Gold Resource (GORO)’s gold-equivalent costs in Q1 2026?

For Q1 2026, Gold Resource reported total cash cost after co-product credits of $2,164 per gold-equivalent ounce sold. Consolidated all-in sustaining cost after co-product credits was $3,476 per gold-equivalent ounce, and total all-in cost after co-product credits was $3,640 per ounce.

What streaming agreement obligations does Gold Resource (GORO) have at Back Forty?

Gold Resource’s subsidiary has gold and silver stream agreements with Osisko totaling a $95.6 million liability at March 31, 2026. Osisko is entitled to specified percentages of future gold and silver at fixed or capped prices, and missed permitting milestones could trigger default remedies.

How much did Gold Resource (GORO) invest in sustaining and growth projects in Q1 2026?

In Q1 2026, sustaining investments totaled $8.6 million, mainly for underground development and other capital at Don David Gold Mine. Growth investments were $1.4 million, including surface and underground exploration at DDGM and spending on the Back Forty Project optimization and permitting work.