Ioneer Limited (NASDAQ: IONR) lifts cash to $58.8M while advancing Rhyolite Ridge
Ioneer Ltd reported an interim net loss of $4.0 million for the six months ended 30 June 2026, similar to the prior six‑month loss of $4.1 million. The business remains in the development stage with no operating revenues, focused on the Rhyolite Ridge lithium‑boron project in Nevada.
Cash and cash equivalents increased to $58.8 million, driven by a $50.4 million equity capital raise that lifted issued capital to 3.07 billion shares and net assets to $276.7 million. Exploration and evaluation assets rose to $214.7 million, mainly at Rhyolite Ridge, and the group continues to prepare for a future Final Investment Decision.
The U.S. Bureau of Land Management’s favourable Record of Decision for Rhyolite Ridge was upheld by a U.S. District Court, and an appeal to the Ninth Circuit is in progress. Ioneer also discloses an undrawn $996 million U.S. Department of Energy loan facility and states the accounts are prepared on a going‑concern basis with no material uncertainties identified.
Positive
- None.
Negative
- None.
Filing Explained
Rhyolite Ridge has no development decision yet; FID remains conditional on specified permitting, engineering, offtake, and funding steps.
This Form 6-K furnishes ioneer Ltd’s interim financial report for the six months ended
The filing lists permits, construction-ready engineering, sufficient offtake agreements to support debt, and a mix of equity and debt funding as factors for a future Final Investment Decision. Once that decision is made, the related exploration and evaluation assets will be tested for impairment and transferred to development costs; amortization does not begin until mining operations commence.
The
Key Figures
Key Terms
Record of Decision regulatory
National Environmental Policy Act regulatory
Biological Opinion regulatory
Exploration and evaluation financial
Final Investment Decision financial
Monte Carlo model financial
AI-generated analysis. How Rhea-AI works. Not financial advice.
FAQ
How did Ioneer (IONR) perform financially for the six months ended 30 June 2026?
What is Ioneer (IONR)’s cash position as of 30 June 2026?
How much has Ioneer (IONR) invested in exploration and evaluation at Rhyolite Ridge?
What major financing arrangements does Ioneer (IONR) disclose for Rhyolite Ridge?
What is the status of permitting and legal proceedings for Ioneer (IONR)’s Rhyolite Ridge project?
How did Ioneer (IONR)’s equity and share count change during the period?
|
Exhibit
|
Description
|
|
|
99.1
|
Interim Financial Report for the Six Months ended June 30, 2026
|
|
ioneer Ltd
|
|||
|
(registrant)
|
|||
|
Date: August 13, 2026
|
By:
|
/s/ April Hashimoto
|
|
|
Name:
|
April Hashimoto
|
|
|
Title:
|
Chief Financial Officer
|

Contents
30 June 2026
|
Directors’ report
|
3
|
|
Auditor’s independence declaration
|
7
|
|
Statement of profit or loss and other comprehensive income
|
8
|
|
Statement of financial position
|
9
|
|
Statement of changes in equity
|
10
|
|
Statement of cash flows
|
11
|
|
Notes to the financial statements
|
12
|
|
Directors’ declaration
|
21
|
|
Independent auditor’s report to the members of ioneer Limited
|
22
|
Directors’ report
30 June 2026
|
Mr. J.D. Calaway
|
Executive Chairman
|
|
Mr. B. Rowe
|
Managing Director
|
|
Mr. A. Davies
|
Non-executive Director
|
|
Ms. R. McKinney-James
|
Non-executive Director
|
|
Ms. M. Walker
|
Non-executive Director
|
|
Mr. T. Woodall
|
Non-executive Director
|
|
6 months
ended
30 Jun 2026
|
6 months
ended
31 Dec 2025
|
Change
|
Change
|
|||||||||||||
|
$'000
|
$'000
|
$'000
|
%
|
|||||||||||||
|
Operating cash flows
|
(3,687
|
)
|
(3,069
|
)
|
(618
|
)
|
20
|
%
|
||||||||
|
Investing cash flows
|
(4,075
|
)
|
(6,329
|
)
|
2,254
|
(36
|
%)
|
|||||||||
|
Financing cash flows
|
47,965
|
1,982
|
45,983
|
2,320
|
%
|
|||||||||||
|
Total change in cash in the financial period
|
40,203
|
(7,416
|
)
|
47,619
|
||||||||||||
|
6 months
ended
30 Jun 2026
|
6 months
ended
31 Dec 2025
|
Change
|
Change
|
|||||||||||||
|
$'000
|
$'000
|
$'000
|
%
|
|||||||||||||
|
Cash and cash equivalents
|
58,840
|
17,863
|
40,977
|
229
|
%
|
|||||||||||
|
Capitalised exploration
|
5,728
|
5,850
|
(122
|
)
|
(2
|
%)
|
||||||||||
|
Net assets
|
276,687
|
230,219
|
46,468
|
20
|
%
|
|||||||||||
|
Net loss after tax
|
(4,007
|
)
|
(4,070
|
)
|
63
|
2
|
%
|
|||||||||
Directors' report
30 June 2026
|
30 Jun 2026
|
31 Dec 2025
|
|||||||
|
Summary of mineral resources and ore reserves (1)
|
mt
|
mt
|
||||||
|
Mineral Resource:
|
||||||||
|
Measured
|
158
|
158
|
||||||
|
Indicated
|
282
|
282
|
||||||
|
Inferred
|
108
|
108
|
||||||
|
Total Mineral Resource
|
548
|
548
|
||||||
|
Proved
|
92
|
92
|
||||||
|
Probable
|
174
|
174
|
||||||
|
Total Ore Reserve
|
266
|
266
|
|
(1)
|
Further detail on Mineral Resources and Ore Reserves can be found in the Group’s annual report for the six months ended 31 December 2025.
|
| ● |
Ioneer completed an equity raise for approximately US$50 million (A$72 million) with participation from new and existing shareholders, including high quality offshore and domestic
institutions.
|
| ● |
The Company signed non-binding Memorandums of Understanding to advance the development of Rhyolite Ridge.
|
| ● |
Ioneer received a conditional award from the United States Army for a long-term land lease on the Tooele Army Depot for the purpose of establishing a critical mineral processing
facility.
|
| ● |
The Company continued to maintain compliance with terms of its closed loan facility with the U.S. Department of Energy.
|
| ● |
The Company filed a Form F-3 shelf prospectus with the Security and Exchange Commission which gives Ioneer the ability to issue debt and equity securities in the United Statement
in the future.
|
| ● |
Ioneer continued ongoing engagement with the U.S. Government and potential strategic partners.
|
| ● |
The U.S. District Court for the District of Nevada upheld the federal permit for Rhyolite Ridge.
|
| ● |
Ioneer completed the first phase of the multi-year Tiehm's buckwheat introduction program by transplanting 35 plants from its greenhouse to an approved introduction site after
receiving all necessary approvals from the Bureau of Land Management ("BLM") and U.S. Fish and Wildlife Service (“USFWS”).
|
| ● |
Ioneer continued to maintain compliance with the issued U.S. Department of Interior Bureau of Land Management’s Record of Decision, State of Nevada Water Pollution Control and
Class II Air Permits.
|
| ● |
Ioneer completed a pre-feasibility study for a battery-grade lithium carbonate circuit which has confirmed feasibility to produce battery-grade lithium carbonate at Rhyolite
Ridge.
|
| ● |
The Company commissioned a pre-feasibility study to evaluate the feasibility of building a plant to produce defense -grade boron carbide from boron produced at Rhyolite Ridge.
|
| ● |
Ioneer issued the Technical Report under Subpart 1300 of the U.S. Securities and Exchange Regulations S-K, incorporating the materially improved project economics due to reduction
in leach duration.
|
| ● |
EcoPro completed its Lithium Clay Research & Development project - a final project report has been prepared, which includes a process flow sheet
developed with commercially feasible operating costs.
|
Directors' report
30 June 2026
Directors' report
30 June 2026
|
/s/ James D Calaway
|
||
|
James D Calaway
|
||
|
Executive Chairman
|
||
|
13 August 2026
|
||
Auditor's independence declaration
| 6 months |
6 months |
|||||||||||
| ended | ended | |||||||||||
| Note |
30-Jun-2026
|
31-Dec-2025
|
||||||||||
| $'000 | $'000 | |||||||||||
|
Revenue
|
||||||||||||
|
Interest revenue calculated using the effective interest method
|
5
|
|
|
|||||||||
|
Expenses
|
||||||||||||
|
Employee benefits expense
|
3 |
(
|
)
|
(
|
)
|
|||||||
|
Other expenses
|
4 |
(
|
)
|
(
|
)
|
|||||||
|
Finance costs
|
5
|
(
|
)
|
(
|
)
|
|||||||
|
Loss before income tax expense
|
(
|
)
|
(
|
)
|
||||||||
|
Income tax expense
|
|
|
||||||||||
|
Loss after income tax expense for the period attributable to the owners of ioneer Limited
|
(
|
)
|
(
|
)
|
||||||||
|
Other comprehensive income
|
||||||||||||
|
Items that may be reclassified subsequently to profit or loss
|
||||||||||||
|
Foreign currency translation
|
|
|
||||||||||
|
Other comprehensive income for the period, net of tax
|
|
|
||||||||||
|
Total comprehensive income for the period attributable to the owners of ioneer Limited
|
(
|
)
|
(
|
)
|
||||||||
| Cents |
Cents |
|||||||||||
|
Basic earnings per share
|
(
|
)
|
(
|
)
|
||||||||
|
Diluted earnings per share
|
(
|
)
|
(
|
)
|
||||||||
| Note |
30-Jun-2026
|
31-Dec-2025
|
||||||||||
| $'000 | $'000 | |||||||||||
|
Assets
|
||||||||||||
|
Current assets
|
||||||||||||
|
Cash and cash equivalents
|
6
|
|
|
|||||||||
|
Receivables
|
7
|
|
|
|||||||||
|
Total current assets
|
|
|
||||||||||
|
Non-current assets
|
||||||||||||
|
Receivables
|
|
|
||||||||||
|
Property, plant and equipment
|
8 |
|
|
|||||||||
|
Right-of-use assets
|
|
|
||||||||||
|
Exploration and evaluation
|
9 |
|
|
|||||||||
| Other |
10 | |||||||||||
|
Total non-current assets
|
|
|
||||||||||
|
Total assets
|
|
|
||||||||||
|
Liabilities
|
||||||||||||
|
Current liabilities
|
||||||||||||
|
Payables
|
11
|
|
|
|||||||||
| Provisions | 12 |
|
|
|||||||||
| Lease liabilities | ||||||||||||
|
Total current liabilities
|
|
|
||||||||||
|
Non-current liabilities
|
||||||||||||
|
Lease liabilities
|
|
|
|
|||||||||
|
Total non-current liabilities
|
|
|
||||||||||
|
Total liabilities
|
|
|
||||||||||
|
Net assets
|
|
|
||||||||||
|
Equity
|
||||||||||||
|
Issued capital
|
13
|
|
|
|||||||||
|
Reserves
|
(
|
)
|
(
|
)
|
||||||||
|
Accumulated losses
|
(
|
)
|
(
|
)
|
||||||||
|
Total equity
|
|
|
||||||||||
|
Issued capital
|
Foreign currency
translation reserve
|
Equity
compensation
reserve
|
Accumulated
losses
|
Total equity
|
||||||||||||||||
|
$'000
|
$'000
|
$'000
|
$'000
|
$'000
|
||||||||||||||||
|
Balance at 1 July 2025
|
|
(
|
)
|
|
(
|
)
|
|
|||||||||||||
|
Loss after income tax expense for the period
|
|
|
|
(
|
)
|
(
|
)
|
|||||||||||||
|
Foreign currency translation differences
|
|
|
|
|
|
|||||||||||||||
|
Total comprehensive income for the period
|
|
|
|
(
|
)
|
(
|
)
|
|||||||||||||
|
Contributions of equity, net of transaction costs (Note 13)
|
||||||||||||||||||||
| Share issue costs from capital raise (Note 13) |
( |
) | ( |
) | ||||||||||||||||
|
Fair value of performance rights vested (Note 13)
|
( |
) | ||||||||||||||||||
|
Share-based payments expensed/capitalised
|
|
|
|
|
|
|||||||||||||||
|
Balance at 31 December 2025
|
|
(
|
)
|
|
(
|
)
|
|
|||||||||||||
|
Issued capital
|
Foreign currency
translation reserve
|
Equity
compensation
reserve
|
Accumulated
losses
|
Total equity
|
||||||||||||||||
|
$'000
|
$'000
|
$'000
|
$'000
|
$'000
|
||||||||||||||||
|
Balance at 1 January 2026
|
|
(
|
)
|
|
(
|
)
|
|
|||||||||||||
|
Loss after income tax expense for the period
|
|
|
|
(
|
)
|
(
|
)
|
|||||||||||||
|
Foreign currency translation differences
|
|
|
|
|
|
|||||||||||||||
|
Total comprehensive income for the period
|
|
|
|
(
|
)
|
(
|
)
|
|||||||||||||
|
Share issued from capital raise (Note 13)
|
||||||||||||||||||||
|
Share issue costs from capital raise (Note 13)
|
( |
) | ( |
) | ||||||||||||||||
|
Share-based payments expensed/capitalised
|
|
|
|
|
|
|||||||||||||||
|
Balance at 30 June 2026
|
|
(
|
)
|
|
(
|
)
|
|
|||||||||||||
| 6 months | 6 months | |||||||||||
| ended | ended | |||||||||||
| Note |
30-Jun-2026
|
31-Dec-2025
|
||||||||||
| $'000 | $'000 | |||||||||||
|
Cash flows from operating activities
|
||||||||||||
|
Payments to suppliers and employees
|
|
(
|
)
|
(
|
)
|
|||||||
|
Net cash used in operating activities
|
(
|
)
|
(
|
)
|
||||||||
|
Cash flows from investing activities
|
||||||||||||
|
Payments for plant and equipment
|
8 |
|
(
|
)
|
||||||||
|
Expenditure on exploration and evaluation
|
(
|
)
|
(
|
)
|
||||||||
|
Interest received
|
|
|
||||||||||
|
Net cash used in investing activities
|
(
|
)
|
(
|
)
|
||||||||
|
Cash flows from financing activities
|
||||||||||||
|
Proceeds from issue of shares
|
13 |
|||||||||||
|
Transaction costs related to issues of equity securities
|
13 |
(
|
)
|
(
|
)
|
|||||||
|
Repayment of lease liabilities
|
(
|
)
|
(
|
)
|
||||||||
|
Net cash from financing activities
|
|
|
||||||||||
| Net increase/(decrease) in cash and cash equivalents |
|
(
|
)
|
|||||||||
|
Cash and cash equivalents at the beginning of the period
|
|
|
||||||||||
|
Effects of exchange rate changes on cash and cash equivalents
|
|
|
||||||||||
|
Cash and cash equivalents at the end of the period
|
6 |
|
|
|||||||||
Notes to the financial statements
30 June 2026
| Note 1. |
Basis of preparation and Material accounting policies
|
| 1.1 |
Corporate information
|
| 1.2 |
Basis of preparation
|
The Group has prepared the interim financial statements on the basis that it will continue to operate as a going concern. The Directors consider that there are no material uncertainties that may cast significant doubt over this assumption. They have formed a judgement that there is reasonable expectation that the Group has adequate resources to continue in operational existence for the foreseeable future, and not less than 12 months from the end of the reporting period.
These general purpose financial statements do not include all the notes of the type normally included in annual financial statements. Accordingly, these financial statements are to be read in conjunction with the financial report for the transition period ended 31 December 2025 and any public announcements made by the Company during the interim reporting period in accordance with the continuous disclosure requirements of the Corporations Act 2001.
The accounting policies adopted are consistent with those of the previous financial period and corresponding interim reporting period, unless otherwise stated.
|
1.3
|
Change in fiscal year
|
| 1.4 |
New or amended Accounting Standards and Interpretations
|
|
ioneer Limited
|
|
Notes to the financial statements
|
|
30 June 2026
|
|
North America
|
Represents activity in the US primarily in relation to Rhyolite Ridge and the Reno office.
|
|
Australia
|
Represents head office expenditure, including ASX listing costs, employee benefits, exchange gains and losses and corporate assets (predominantly cash).
|
|
North
America
|
North
America
|
Australia
|
Australia
|
Total
|
Total
|
|||||||||||||||||||
|
6 months
ended
|
6 months
ended
|
6 months
ended
|
6 months
ended
|
6 months
ended
|
6 months
ended
|
|||||||||||||||||||
|
30-Jun-2026
|
31-Dec-2025
|
30-Jun-2026
|
31-Dec-2025
|
30-Jun-2026
|
31-Dec-2025
|
|||||||||||||||||||
| ($'000) |
($'000) |
($'000) |
($'000) |
($'000) |
($'000) |
|||||||||||||||||||
|
Other expenses
|
( |
) | ( |
) | ( |
) | ( |
) | ( |
) | ( |
) | ||||||||||||
|
Employee benefits and other expenses
|
( |
) | ( |
) | ( |
) | ( |
) | ( |
) | ( |
) | ||||||||||||
|
Net financing (expense)/income
|
(
|
)
|
(
|
)
|
|
|
|
|
||||||||||||||||
|
Loss before income tax
|
(
|
)
|
(
|
)
|
|
(
|
)
|
(
|
)
|
(
|
)
|
|||||||||||||
|
Segment assets
|
||||||||||||||||||||||||
|
Exploration assets
|
|
|
|
|
|
|
||||||||||||||||||
|
Other assets
|
|
|
|
|
|
|
||||||||||||||||||
|
Total assets
|
|
|
|
|
|
|
||||||||||||||||||
|
Segment liabilities
|
||||||||||||||||||||||||
|
Payables
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
||||||||||||
|
Provisions
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
||||||||||||
|
Total current liabilities
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
||||||||||||
|
Payables
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
||||||||||||
|
Total non-current liabilities
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
(
|
)
|
||||||||||||
|
Net assets
|
|
|
|
|
|
|
|
ioneer Limited
|
|
Notes to the financial statements
|
|
30 June 2026
|
|
6 months
ended
30-Jun-2026
|
6 months
ended
31-Dec-2025
|
|||||||
| $'000 | $'000 | |||||||
|
Non-executive director fees
|
|
|
||||||
|
Executive director fees
|
||||||||
|
Employee benefits expense
|
|
|
||||||
|
Share-based payments
|
|
|
||||||
|
Total employee benefits expensed
|
|
|
||||||
|
6 months
ended
30-Jun-2026
|
6 months
ended
31-Dec-2025
|
|||||||
|
$'000
|
$'000
|
|||||||
| Other expenses |
||||||||
|
General and administration expenses
|
|
|
||||||
|
Consulting and professional costs
|
|
|
||||||
|
Depreciation and amortisation
|
|
|
||||||
| Total other expenses |
|
|
||||||
|
6 months
ended
30-Jun-2026
|
6 months
ended
31-Dec-2025
|
|||||||
|
$'000
|
$'000
|
|||||||
|
Interest income from external parties
|
|
|
||||||
|
Net foreign exchange gain
|
|
|
||||||
|
Finance income
|
|
|
||||||
| Bank charges |
( |
) | ( |
) | ||||
| Lease interest |
( |
) | ( |
) | ||||
| Finance costs |
( |
) | ( |
) | ||||
| Net finance income |
||||||||
|
30-Jun-2026
|
31-Dec-2025
|
|||||||
|
$'000
|
$'000
|
|||||||
|
Cash at bank
|
|
|
||||||
| Cash on deposit |
|
|
||||||
|
|
|
|||||||
|
ioneer Limited
|
|
Notes to the financial statements
|
|
30 June 2026
|
|
30-Jun-2026
|
31-Dec-2025
|
|||||||
|
$'000
|
$'000
|
|||||||
|
Other debtors
|
|
|
||||||
|
Prepayments
|
|
|
||||||
| Total current receivables |
|
|
||||||
|
30-Jun-2026
|
31-Dec-2025 |
|||||||
|
$'000
|
$'000
|
|||||||
| Leasehold improvements - at cost |
||||||||
| Less: Accumulated depreciation |
( |
) | ( |
) | ||||
|
Plant and equipment - at cost
|
|
|
||||||
|
Less: Accumulated depreciation
|
(
|
)
|
(
|
)
|
||||
|
|
|
|||||||
|
Leasehold
improvements
|
Plant and
equipment
|
Total | ||||||||||
| $'000 |
$'000 |
$'000
|
||||||||||
| Balance at 1 July 2025 |
||||||||||||
| Additions |
||||||||||||
| Transfers in/(out) |
||||||||||||
| Depreciation expense |
( |
) | ( |
) | ( |
) | ||||||
|
Balance at 31 December 2025
|
|
|||||||||||
| Depreciation expense | ( |
) | ( |
) | ( |
) | ||||||
| Balance at 30 June 2026 |
||||||||||||
|
ioneer Limited
|
|
Notes to the financial statements
|
|
30 June 2026
|
| ● |
such costs are expected to be recouped through successful development and exploitation of the area, or alternatively through its
sale; or
|
| ● |
exploration and/or evaluation activities in the area have not yet reached a stage which permits a reasonable assessment of the existence or otherwise of economically
recoverable reserves.
|
|
30-Jun-2026
|
31-Dec-2025
|
|||||||
|
$'000
|
$'000
|
|||||||
|
Exploration assets
|
|
|
||||||
|
Exploration
assets
|
||||
|
$'000
|
||||
|
Balance at 1 July 2025
|
|
|||
|
Additions - Rhyolite Rydge
|
|
|||
|
Exploration expenditure - noncore
|
|
|||
|
Balance at 31 December 2025
|
|
|||
|
Additions - Rhyolite Rydge
|
||||
|
Balance at 30 June 2026
|
||||
|
ioneer Limited
|
|
Notes to the financial statements
|
|
30 June 2026
|
|
30-Jun-2026
|
31-Dec-2025
|
|||||||
|
$'000
|
$'000
|
|||||||
|
Unamortised loan fees
|
|
|
||||||
The Company paid fees to establish a loan with the US Department of Energy (DOE). The fees will be amortised over the life of the loan. Amortisation begins after the first draw on said loan. The total loan amount is US$
|
30-Jun-2026
|
31-Dec-2025
|
|||||||
|
$'000
|
$'000
|
|||||||
|
Trade payables
|
|
|
||||||
|
Accrued expenses
|
|
|
||||||
|
|
|
|||||||
After initial measurement, financial liabilities are subsequently measured at amortised cost. Current payables, other than lease liabilities, due to their short-term nature, are measured at amortised cost and are not discounted.
The current payables, other than lease liabilities, are unsecured and are non-interest bearing generally on
|
30-Jun-2026
|
31-Dec-2025
|
|||||||
|
$'000
|
$'000
|
|||||||
|
Provisions for employee benefits
|
|
|
||||||
|
ioneer Limited
|
|
Notes to the financial statements
|
|
30 June 2026
|
|
30-Jun-2026
|
31-Dec-2025
|
30-Jun-2026
|
31-Dec-2025
|
|||||||||||||
|
Shares
|
Shares
|
$'000
|
$'000
|
|||||||||||||
|
Ordinary shares - fully paid
|
|
|
|
|
||||||||||||
| Details |
Shares
|
$'000
|
||||||
|
Balance as at 1 July 2025
|
|
|
||||||
|
Share issue from capital raise
|
|
|
||||||
| Share issue costs from capital raise | - | ( |
) | |||||
|
Performance rights vested 1
|
|
|
||||||
| Balance at year ended 31 December 2025 |
||||||||
| Share issue from capital raise |
||||||||
| Share issue costs from capital raise |
- | ( |
) | |||||
|
Balance as at 30 June 2026
|
|
|
||||||
|
(1)
|
|
|
ioneer Limited
|
|
Notes to the financial statements
|
|
30 June 2026
|
|
(a)
|
Credit risk
|
|
(b)
|
Liquidity risk
|
|
(c)
|
Capital management risk
|
|
(d)
|
Market risk related to commodity pricing, interest rates and currency fluctuations.
|
|
Level 1:
|
Quoted prices (unadjusted) in active markets for identical assets or liabilities;
|
|
Level 2:
|
Inputs other than quoted prices included within level 1 that are observable for the asset or liability, either directly (as prices) or indirectly (derived from prices); and
|
|
Level 3:
|
Inputs for the assets or liabilities which are not based on observable market data (unobservable inputs).
|
The fair value of performance based performance rights is determined by using the Monte Carlo model.
|
ioneer Limited
|
|
Notes to the financial statements
|
|
30 June 2026
|
| ● |
Pay Boundary Peak LLC US $
|
| ● |
Issue shares (or a mix of both shares and cash) to Boundary Peak LLC, to the equivalent of US$
|
|
ioneer Limited
|
|
Directors' declaration
|
|
30 June 2026
|
| ● |
the attached financial statements and notes comply with the Corporations Act 2001, the Accounting Standards, the Corporations Regulations 2001 and other
mandatory professional reporting requirements;
|
| ● |
the attached financial statements and notes give a true and fair view of the company's financial position as at 30 June 2026 and of its performance for the
financial period ended on that date; and
|
| ● |
there are reasonable grounds to believe that the company will be able to pay its debts as and when they become due and payable.
|
|
/s/ James D
Calaway
|
||
|
James D Calaway
|
||
|
Executive Chairman
|
||
|
13 August 2026
|
||
| ioneer Limited |
|
Independent auditor's report to the members of ioneer Limited
|