Here are the 10-K annual reports from Ivanhoe Electric Inc (IVNHW) in our archive since June 2025, newest first, and each one links through to the document itself with the summary and the scores our analysis gives it.
A 10-K covers the audited annual report, with the full financial statements, so if you follow IVNHW and want that one kind of document rather than the whole filing history, this is the page to keep. The company's other filings, of every form, are on the full IVNHW filings page.
Ivanhoe Electric’s annual report centers on advancing its Santa Cruz Copper Project in Arizona from exploration toward development. A 2025 Preliminary Feasibility Study outlines an underground mine and heap leach operation projected to produce 1.4 million tonnes of copper cathode over a 23-year mine life, with an initial capital cost of $1.24 billion, an after-tax net present value of $1.4 billion at an 8% discount rate, and an internal rate of return of 20% at a base copper price of $4.25/lb.
The PFS supports probable mineral reserves of 136,173 kt at 1.08% total copper and a planned production rate of about 20,000 tonnes per day. The company targets supplying at least 70% of site power from renewables via a large solar and battery system. Beyond Santa Cruz, Ivanhoe Electric highlights U.S. and international copper-focused exploration partnerships, including a funded U.S. alliance with BHP, a 50/50 Saudi joint venture with Maaden, and a copper exploration collaboration with SQM in Chile, alongside proprietary Typhoon™ geophysical technology, data analytics subsidiary CGI, and grid-scale energy storage interests through VRB Energy.