STOCK TITAN

NexMetals Mining (Nasdaq: NEXM) reports Q1 2026 loss and cash burn

Filing Impact
(Moderate)
Filing Sentiment
(Neutral)
Form Type
10-Q

Rhea-AI Filing Summary

NexMetals Mining Corp. reported a net loss of $10.6 million for the quarter ended March 31, 2026, reflecting ongoing spending on its Botswana copper-nickel projects and corporate costs. Total comprehensive loss was $12.1 million. The company generated no revenue and remains in the exploration stage.

Cash and cash equivalents were $26.2 million, down from $39.8 million at December 31, 2025, after using $12.2 million in operating cash and $0.8 million in investing cash during the quarter. Total assets declined to $81.1 million, mainly due to lower cash and foreign currency translation on exploration assets and equipment.

General exploration expenses rose to $7.7 million, driven largely by Selebi Main drilling and site activities. Management highlights that the company is dependent on external financing, with material uncertainties that cast substantial doubt on its ability to continue as a going concern, even as it advances drilling, technical studies and early project economics at the Selebi and Selkirk mines.

Positive

  • None.

Negative

  • Going concern uncertainty and high cash burn: NexMetals incurred a quarterly net loss of $10.6 million, used $12.2 million in operating cash, and explicitly states material uncertainties that cast substantial doubt on its ability to continue as a going concern without additional financing.

Insights

Exploration spend is high, losses continue, and funding risk remains elevated.

NexMetals Mining Corp. remains firmly in the exploration stage, posting a quarterly net loss of $10.6 million and comprehensive loss of $12.1 million. The main cost driver is general exploration of the Selebi and Selkirk assets, with $7.7 million spent this quarter.

Cash and cash equivalents fell to $26.2 million after $12.2 million of operating cash burn, while total assets declined to $81.1 million. The balance sheet still has modest financial debt, mainly a mortgage and vehicle financing, alongside a $2.75 million NSR option liability and a cash-based DSU liability.

Management explicitly raises going concern uncertainty, noting continued negative operating cash flows and reliance on future equity or other financing to advance drilling, underground development and studies, including a planned Preliminary Economic Assessment for the Selebi Mines in the second half of 2026. Actual impact on shareholders will depend on exploration results, metal prices, and the company’s ability to secure additional capital on acceptable terms.

Total assets $81.1 million As at March 31, 2026
Cash and cash equivalents $26.2 million As at March 31, 2026
Net loss $10.6 million Three months ended March 31, 2026
Total comprehensive loss $12.1 million Three months ended March 31, 2026
General exploration expenses $7.7 million Three months ended March 31, 2026
Net cash used in operating activities $12.2 million Three months ended March 31, 2026
Exploration and evaluation assets $41.4 million Botswana properties as at March 31, 2026
Common shares outstanding 35,623,164 shares As at March 31, 2026
going concern financial
"These material uncertainties cast substantial doubt about the Company’s ability to continue as a going concern."
A going concern is a business that is expected to continue its operations and meet its obligations for the foreseeable future, rather than shutting down or selling off assets. This assumption matters to investors because it indicates stability and ongoing profitability, making the business a more reliable investment. Think of it as believing a restaurant will stay open and serve customers, rather than closing down suddenly.
net smelter returns royalty financial
"The royalty agreement consists of a net smelter returns royalty (the “Selebi NSR”) of 2% on the net value of sales of concentrate."
A net smelter returns (NSR) royalty is a contractual right to receive a percentage of the revenue generated from mined minerals after the ore has been processed and sold, with common deductions for refining, smelting and transport costs. Think of it like a landlord taking a slice of a tenant’s monthly sales after the tenant pays basic operating bills. Investors care because an NSR affects the future cash flow and valuation of a mining project and shifts some upside and downside risk away from the operator to the royalty holder.
Preliminary Economic Assessment financial
"to complete updated Mineral Resource Estimates in the third quarter of 2026 and a Preliminary Economic Assessment in the second half of 2026."
A preliminary economic assessment is an initial analysis that estimates the potential profitability and feasibility of a project or resource, such as a new mineral deposit or development venture. It provides a rough idea of costs, benefits, and risks, helping investors decide whether to pursue more detailed studies. This early evaluation is important because it offers a snapshot of whether the project is worth further investment and development.
Inferred Mineral Resources financial
"S-K 1300 provides for the disclosure of: (i) “Inferred Mineral Resources”, which investors should understand have the lowest level of geological confidence."
An inferred mineral resource is an estimate of the quantity and grade of minerals in the ground based on limited sampling and geological information, where confidence is low and continuity is uncertain. For investors it signals potential value but also higher risk—like a rough sketch of a hidden treasure that requires much more exploration and testing before you can reliably judge its size or economic worth.
Omnibus Plan financial
"The Company has a long-term omnibus incentive plan (the “Omnibus Plan”) which provides for the award of RSUs, DSUs and Options."
An omnibus plan is a single, broad employee compensation program that groups together different types of pay awards — such as stock options, restricted shares, cash bonuses and other incentives — under one set of rules and administration. Think of it as a single toolbox that lets a company give and track many kinds of employee pay from one place; investors care because it affects potential share dilution, how executive incentives are structured, and the size and timing of compensation expense.
false Q1 --12-31 0000795800 00-0000000 Unlimited Unlimited Unlimited 0000795800 2026-01-01 2026-03-31 0000795800 2026-05-13 0000795800 2026-03-31 0000795800 2025-12-31 0000795800 2025-01-01 2025-12-31 0000795800 NEXM:Series1ConvertiblePreferredStockMember 2026-03-31 0000795800 NEXM:Series1ConvertiblePreferredStockMember 2025-12-31 0000795800 2025-01-01 2025-03-31 0000795800 us-gaap:CommonStockMember 2025-12-31 0000795800 us-gaap:PreferredStockMember 2025-12-31 0000795800 us-gaap:AdditionalPaidInCapitalMember 2025-12-31 0000795800 us-gaap:RetainedEarningsMember 2025-12-31 0000795800 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2025-12-31 0000795800 us-gaap:CommonStockMember 2024-12-31 0000795800 us-gaap:PreferredStockMember 2024-12-31 0000795800 us-gaap:AdditionalPaidInCapitalMember 2024-12-31 0000795800 us-gaap:RetainedEarningsMember 2024-12-31 0000795800 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2024-12-31 0000795800 2024-12-31 0000795800 us-gaap:CommonStockMember 2026-01-01 2026-03-31 0000795800 us-gaap:PreferredStockMember 2026-01-01 2026-03-31 0000795800 us-gaap:AdditionalPaidInCapitalMember 2026-01-01 2026-03-31 0000795800 us-gaap:RetainedEarningsMember 2026-01-01 2026-03-31 0000795800 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2026-01-01 2026-03-31 0000795800 us-gaap:CommonStockMember 2025-01-01 2025-03-31 0000795800 us-gaap:PreferredStockMember 2025-01-01 2025-03-31 0000795800 us-gaap:AdditionalPaidInCapitalMember 2025-01-01 2025-03-31 0000795800 us-gaap:RetainedEarningsMember 2025-01-01 2025-03-31 0000795800 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2025-01-01 2025-03-31 0000795800 us-gaap:CommonStockMember 2026-03-31 0000795800 us-gaap:PreferredStockMember 2026-03-31 0000795800 us-gaap:AdditionalPaidInCapitalMember 2026-03-31 0000795800 us-gaap:RetainedEarningsMember 2026-03-31 0000795800 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2026-03-31 0000795800 us-gaap:CommonStockMember 2025-03-31 0000795800 us-gaap:PreferredStockMember 2025-03-31 0000795800 us-gaap:AdditionalPaidInCapitalMember 2025-03-31 0000795800 us-gaap:RetainedEarningsMember 2025-03-31 0000795800 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2025-03-31 0000795800 2025-03-31 0000795800 NEXM:NexMetalsMiningCorpMember 2026-01-01 2026-03-31 0000795800 NEXM:NANExplorationIncMember 2026-01-01 2026-03-31 0000795800 NEXM:NANExplorationIncMember 2026-03-31 0000795800 NEXM:PNRAmalcoLtdMember 2026-01-01 2026-03-31 0000795800 NEXM:PNRAmalcoLtdMember 2026-03-31 0000795800 NEXM:PremiumResourcesInternationalLtdMember 2026-01-01 2026-03-31 0000795800 NEXM:PremiumResourcesInternationalLtdMember 2026-03-31 0000795800 NEXM:PremiumResourcesSelkirkBarbadosLimitedMember 2026-01-01 2026-03-31 0000795800 NEXM:PremiumResourcesSelkirkBarbadosLimitedMember 2026-03-31 0000795800 NEXM:PremiumResourcesSelebiBarbadosLimitedMember 2026-01-01 2026-03-31 0000795800 NEXM:PremiumResourcesSelebiBarbadosLimitedMember 2026-03-31 0000795800 NEXM:PremiumNickelGroupProprietaryLimitedMember 2026-01-01 2026-03-31 0000795800 NEXM:PremiumNickelGroupProprietaryLimitedMember 2026-03-31 0000795800 NEXM:PremiumNickelResourcesProprietaryLimitedMember 2026-01-01 2026-03-31 0000795800 NEXM:PremiumNickelResourcesProprietaryLimitedMember 2026-03-31 0000795800 country:BW NEXM:SelebiMember us-gaap:MiningPropertiesAndMineralRightsMember 2024-12-31 0000795800 country:BW NEXM:SelkrikMember us-gaap:MiningPropertiesAndMineralRightsMember 2024-12-31 0000795800 country:BW NEXM:SelebiMember us-gaap:MiningPropertiesAndMineralRightsMember 2025-01-01 2025-12-31 0000795800 country:BW NEXM:SelkrikMember us-gaap:MiningPropertiesAndMineralRightsMember 2025-01-01 2025-12-31 0000795800 country:BW NEXM:SelebiMember us-gaap:MiningPropertiesAndMineralRightsMember 2025-12-31 0000795800 country:BW NEXM:SelkrikMember us-gaap:MiningPropertiesAndMineralRightsMember 2025-12-31 0000795800 country:BW NEXM:SelebiMember us-gaap:MiningPropertiesAndMineralRightsMember 2026-01-01 2026-03-31 0000795800 country:BW NEXM:SelkrikMember us-gaap:MiningPropertiesAndMineralRightsMember 2026-01-01 2026-03-31 0000795800 country:BW NEXM:SelebiMember us-gaap:MiningPropertiesAndMineralRightsMember 2026-03-31 0000795800 country:BW NEXM:SelkrikMember us-gaap:MiningPropertiesAndMineralRightsMember 2026-03-31 0000795800 NEXM:SelebiAPAMember 2021-09-01 2021-09-30 0000795800 NEXM:FirstInstalmentMember NEXM:SelebiMember 2021-09-01 2021-09-30 0000795800 NEXM:SelebiMember 2021-03-22 2022-01-31 0000795800 NEXM:SecondInstalmentMember NEXM:SelebiMember 2021-09-01 2021-09-30 0000795800 NEXM:SelebiAndSelkirkMinesMember 2021-09-01 2021-09-30 0000795800 NEXM:ThirdInstalmentMember NEXM:SelebiMember 2021-09-01 2021-09-30 0000795800 NEXM:FirstInstalmentMember NEXM:SelebiMember 2021-03-22 2022-01-31 0000795800 NEXM:SecondInstalmentMember NEXM:SelebiMember 2021-03-22 2022-01-31 0000795800 2021-03-22 2022-01-31 0000795800 NEXM:SelkirkMember 2021-04-01 2022-08-31 0000795800 NEXM:ThirdInstalmentMember NEXM:SelebiMember 2021-04-01 2022-08-31 0000795800 NEXM:PremiumNickelGroupProprietaryLimitedMember NEXM:SelkirkNetSmelterReturnMember 2021-04-01 2022-08-31 0000795800 2023-08-31 2023-08-31 0000795800 NEXM:PreciousMetalsMember 2026-03-31 0000795800 NEXM:BaseMetalsMember 2026-03-31 0000795800 NEXM:SelebiMember NEXM:DrillingMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:DrillingMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:DrillingMember 2026-01-01 2026-03-31 0000795800 NEXM:DrillingMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:DrillingMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:DrillingMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:DrillingMember 2025-01-01 2025-03-31 0000795800 NEXM:DrillingMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember us-gaap:ElectricityMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember us-gaap:ElectricityMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember us-gaap:ElectricityMember 2026-01-01 2026-03-31 0000795800 us-gaap:ElectricityMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember us-gaap:ElectricityMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember us-gaap:ElectricityMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember us-gaap:ElectricityMember 2025-01-01 2025-03-31 0000795800 us-gaap:ElectricityMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:SiteOperationsAdministrationAndOverheadMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:SiteOperationsAdministrationAndOverheadMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:SiteOperationsAdministrationAndOverheadMember 2026-01-01 2026-03-31 0000795800 NEXM:SiteOperationsAdministrationAndOverheadMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:SiteOperationsAdministrationAndOverheadMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:SiteOperationsAdministrationAndOverheadMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:SiteOperationsAdministrationAndOverheadMember 2025-01-01 2025-03-31 0000795800 NEXM:SiteOperationsAdministrationAndOverheadMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:EngineeringAndTechnicalStudiesMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:EngineeringAndTechnicalStudiesMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:EngineeringAndTechnicalStudiesMember 2026-01-01 2026-03-31 0000795800 NEXM:EngineeringAndTechnicalStudiesMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:EngineeringAndTechnicalStudiesMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:EngineeringAndTechnicalStudiesMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:EngineeringAndTechnicalStudiesMember 2025-01-01 2025-03-31 0000795800 NEXM:EngineeringAndTechnicalStudiesMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:InfrastructureAndEquipmentMaintainenceMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:InfrastructureAndEquipmentMaintainenceMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:InfrastructureAndEquipmentMaintainenceMember 2026-01-01 2026-03-31 0000795800 NEXM:InfrastructureAndEquipmentMaintainenceMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:InfrastructureAndEquipmentMaintainenceMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:InfrastructureAndEquipmentMaintainenceMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:InfrastructureAndEquipmentMaintainenceMember 2025-01-01 2025-03-31 0000795800 NEXM:InfrastructureAndEquipmentMaintainenceMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:GeologyMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:GeologyMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:GeologyMember 2026-01-01 2026-03-31 0000795800 NEXM:GeologyMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:GeologyMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:GeologyMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:GeologyMember 2025-01-01 2025-03-31 0000795800 NEXM:GeologyMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:MineDevelopementMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:MineDevelopementMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:MineDevelopementMember 2026-01-01 2026-03-31 0000795800 NEXM:MineDevelopementMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:MineDevelopementMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:MineDevelopementMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:MineDevelopementMember 2025-01-01 2025-03-31 0000795800 NEXM:MineDevelopementMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:FreightToolsSuppliesAndOtherConsumablesMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:FreightToolsSuppliesAndOtherConsumablesMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:FreightToolsSuppliesAndOtherConsumablesMember 2026-01-01 2026-03-31 0000795800 NEXM:FreightToolsSuppliesAndOtherConsumablesMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:FreightToolsSuppliesAndOtherConsumablesMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:FreightToolsSuppliesAndOtherConsumablesMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:FreightToolsSuppliesAndOtherConsumablesMember 2025-01-01 2025-03-31 0000795800 NEXM:FreightToolsSuppliesAndOtherConsumablesMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:GeophysicsMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:GeophysicsMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:GeophysicsMember 2026-01-01 2026-03-31 0000795800 NEXM:GeophysicsMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:GeophysicsMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:GeophysicsMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:GeophysicsMember 2025-01-01 2025-03-31 0000795800 NEXM:GeophysicsMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:HealthAndSafetyMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:HealthAndSafetyMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:HealthAndSafetyMember 2026-01-01 2026-03-31 0000795800 NEXM:HealthAndSafetyMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:HealthAndSafetyMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:HealthAndSafetyMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:HealthAndSafetyMember 2025-01-01 2025-03-31 0000795800 NEXM:HealthAndSafetyMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:EnvironmentalSocialAndGovernanceMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:EnvironmentalSocialAndGovernanceMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:EnvironmentalSocialAndGovernanceMember 2026-01-01 2026-03-31 0000795800 NEXM:EnvironmentalSocialAndGovernanceMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:EnvironmentalSocialAndGovernanceMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:EnvironmentalSocialAndGovernanceMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:EnvironmentalSocialAndGovernanceMember 2025-01-01 2025-03-31 0000795800 NEXM:EnvironmentalSocialAndGovernanceMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember NEXM:ShareBasedCompensationMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember NEXM:ShareBasedCompensationMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember NEXM:ShareBasedCompensationMember 2026-01-01 2026-03-31 0000795800 NEXM:ShareBasedCompensationMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember NEXM:ShareBasedCompensationMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember NEXM:ShareBasedCompensationMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember NEXM:ShareBasedCompensationMember 2025-01-01 2025-03-31 0000795800 NEXM:ShareBasedCompensationMember 2025-01-01 2025-03-31 0000795800 NEXM:SelebiMember 2026-01-01 2026-03-31 0000795800 NEXM:SelkirkMember 2026-01-01 2026-03-31 0000795800 NEXM:OtherMember 2026-01-01 2026-03-31 0000795800 NEXM:SelebiMember 2025-01-01 2025-03-31 0000795800 NEXM:SelkirkMember 2025-01-01 2025-03-31 0000795800 NEXM:OtherMember 2025-01-01 2025-03-31 0000795800 NEXM:LandAndBuildingsMember 2024-12-31 0000795800 us-gaap:EquipmentMember 2024-12-31 0000795800 us-gaap:FurnitureAndFixturesMember 2024-12-31 0000795800 us-gaap:VehiclesMember 2024-12-31 0000795800 NEXM:ComputerAndSoftwareMember 2024-12-31 0000795800 NEXM:LandAndBuildingsMember 2025-01-01 2025-12-31 0000795800 us-gaap:EquipmentMember 2025-01-01 2025-12-31 0000795800 us-gaap:FurnitureAndFixturesMember 2025-01-01 2025-12-31 0000795800 us-gaap:VehiclesMember 2025-01-01 2025-12-31 0000795800 NEXM:ComputerAndSoftwareMember 2025-01-01 2025-12-31 0000795800 NEXM:LandAndBuildingsMember 2025-12-31 0000795800 us-gaap:EquipmentMember 2025-12-31 0000795800 us-gaap:FurnitureAndFixturesMember 2025-12-31 0000795800 us-gaap:VehiclesMember 2025-12-31 0000795800 NEXM:ComputerAndSoftwareMember 2025-12-31 0000795800 NEXM:LandAndBuildingsMember 2026-01-01 2026-03-31 0000795800 us-gaap:EquipmentMember 2026-01-01 2026-03-31 0000795800 us-gaap:FurnitureAndFixturesMember 2026-01-01 2026-03-31 0000795800 us-gaap:VehiclesMember 2026-01-01 2026-03-31 0000795800 NEXM:ComputerAndSoftwareMember 2026-01-01 2026-03-31 0000795800 NEXM:LandAndBuildingsMember 2026-03-31 0000795800 us-gaap:EquipmentMember 2026-03-31 0000795800 us-gaap:FurnitureAndFixturesMember 2026-03-31 0000795800 us-gaap:VehiclesMember 2026-03-31 0000795800 NEXM:ComputerAndSoftwareMember 2026-03-31 0000795800 NEXM:SecondMarcotteDeepDrillMember 2026-03-31 0000795800 NEXM:CriticalSparesMember 2026-03-31 0000795800 NEXM:FormerChiefExecutiveOfficerMember 2025-12-31 0000795800 NEXM:FormerChiefExecutiveOfficerMember NEXM:DecemberThirtyOneTwoThousandTwentySixMember 2026-03-31 0000795800 srt:ChiefFinancialOfficerMember NEXM:JulyThirtyOneTwoThousandTwentySixMember 2026-03-31 0000795800 NEXM:SyringaMember 2026-03-31 0000795800 NEXM:SyringaMember 2026-01-01 2026-03-31 0000795800 NEXM:TermLoanMember NEXM:CymbriaCorporationMember 2026-03-31 0000795800 NEXM:TermLoanMember NEXM:CymbriaCorporationMember 2026-01-01 2026-03-31 0000795800 NEXM:TermLoanMember NEXM:CymbriaCorporationMember 2025-03-18 2025-03-18 0000795800 NEXM:TermLoanMember NEXM:CymbriaCorporationMember 2025-03-18 0000795800 NEXM:TermLoanMember NEXM:CymbriaCorporationMember us-gaap:CommonStockMember 2025-03-18 2025-03-18 0000795800 NEXM:TermLoanMember NEXM:CymbriaCorporationMember us-gaap:WarrantMember 2025-03-18 2025-03-18 0000795800 NEXM:TermLoanMember NEXM:CymbriaCorporationMember 2025-01-01 2025-03-31 0000795800 NEXM:TriViewCapitalLtdMember 2025-03-18 2025-03-18 0000795800 NEXM:FioreManagementAndAdvisoryCorpMember 2025-03-18 2025-03-18 0000795800 NEXM:BoweringProjectsLtdMember 2025-03-18 2025-03-18 0000795800 NEXM:FinancialAdvisorMember 2025-03-18 2025-03-18 0000795800 2025-03-18 2025-03-18 0000795800 NEXM:SettlementWarrantsMember 2026-01-01 2026-03-31 0000795800 NEXM:SettlementWarrantsMember us-gaap:MeasurementInputExpectedDividendRateMember 2025-03-18 0000795800 NEXM:SettlementWarrantsMember us-gaap:MeasurementInputSharePriceMember 2025-03-18 0000795800 NEXM:SettlementWarrantsMember us-gaap:MeasurementInputPriceVolatilityMember 2025-03-18 0000795800 NEXM:SettlementWarrantsMember us-gaap:MeasurementInputRiskFreeInterestRateMember 2025-03-18 0000795800 NEXM:SettlementWarrantsMember us-gaap:MeasurementInputExpectedTermMember 2025-03-18 0000795800 NEXM:TermLoanMember 2024-12-31 0000795800 NEXM:TermLoanMember 2025-01-01 2025-12-31 0000795800 NEXM:TermLoanMember 2025-12-31 0000795800 NEXM:ContractualRightsOptionArrangementMember 2023-01-01 2023-12-31 0000795800 NEXM:ContractualRightsOptionArrangementMember NEXM:PremiumNickelResourcesProprietaryLimitedMember 2023-01-01 2023-12-31 0000795800 NEXM:ContractualRightsOptionArrangementMember NEXM:PremiumNickelGroupProprietaryLimitedMember 2023-01-01 2023-12-31 0000795800 NEXM:CymbriaMember NEXM:ContractualRightsOptionArrangementMember 2026-03-31 0000795800 NEXM:CymbriaMember NEXM:ContractualRightsOptionArrangementMember 2025-12-31 0000795800 NEXM:PremiumNickelResourcesProprietaryLimitedMember NEXM:SelebiNetSmelterReturnMember 2022-01-31 0000795800 NEXM:PremiumNickelGroupProprietaryLimitedMember NEXM:SelkirkNetSmelterReturnMember 2022-08-31 0000795800 NEXM:PremiumNickelGroupProprietaryLimitedMember NEXM:CymbriaMember 2026-03-31 0000795800 NEXM:SelebiMinesAndSelkirkMineMember NEXM:CymbriaMember 2026-03-31 0000795800 NEXM:CymbriaMember NEXM:SelebiMinesMember 2026-01-01 2026-03-31 0000795800 NEXM:CymbriaMember NEXM:SelkirkMineMember 2026-01-01 2026-03-31 0000795800 NEXM:DeferredShareUnitsMember 2026-01-01 2026-03-31 0000795800 NEXM:DeferredShareUnitsMember 2025-01-01 2025-03-31 0000795800 NEXM:Series1ConvertiblePreferredStockMember 2026-01-01 2026-03-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember us-gaap:CommonStockMember 2026-01-01 2026-03-31 0000795800 NEXM:DeferredShareUnitsMember us-gaap:CommonStockMember 2026-01-01 2026-03-31 0000795800 us-gaap:EmployeeStockOptionMember us-gaap:CommonStockMember 2025-01-01 2025-12-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember us-gaap:CommonStockMember 2025-01-01 2025-12-31 0000795800 us-gaap:PrivatePlacementMember 2025-11-17 2025-11-17 0000795800 us-gaap:PrivatePlacementMember 2025-11-17 0000795800 NEXM:PrivatePlacementWarrantMember 2025-11-17 0000795800 us-gaap:PrivatePlacementMember 2025-03-18 2025-03-18 0000795800 us-gaap:PrivatePlacementMember 2025-03-18 0000795800 NEXM:PrivatePlacementWarrantMember 2025-03-18 0000795800 2025-03-18 0000795800 us-gaap:EmployeeStockOptionMember 2026-01-01 2026-03-31 0000795800 us-gaap:EmployeeStockOptionMember 2025-01-01 2025-12-31 0000795800 us-gaap:EmployeeStockOptionMember NEXM:ConsultantsMember 2026-01-01 2026-03-31 0000795800 us-gaap:EmployeeStockOptionMember 2025-01-01 2025-03-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember 2026-01-01 2026-03-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember us-gaap:ShareBasedCompensationAwardTrancheOneMember 2026-01-01 2026-03-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember us-gaap:ShareBasedCompensationAwardTrancheTwoMember 2026-01-01 2026-03-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember 2025-01-01 2025-03-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember 2026-03-31 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputExpectedDividendRateMember 2025-11-17 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputSharePriceMember 2025-11-17 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputPriceVolatilityMember 2025-11-17 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputRiskFreeInterestRateMember 2025-11-17 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputExpectedTermMember 2025-11-17 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputExpectedDividendRateMember 2025-03-18 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputSharePriceMember 2025-03-18 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputPriceVolatilityMember 2025-03-18 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputRiskFreeInterestRateMember 2025-03-18 0000795800 NEXM:PrivatePlacementWarrantsMember us-gaap:MeasurementInputExpectedTermMember 2025-03-18 0000795800 NEXM:WarrantsExpiryDateJune282026Member 2026-03-31 0000795800 NEXM:WarrantsExpiryDateJune142029Member 2026-03-31 0000795800 NEXM:WarrantsExpiryDateJune212029Member 2026-03-31 0000795800 NEXM:WarrantsExpiryDateMarch182028Member 2026-03-31 0000795800 NEXM:WarrantsExpiryDateMarch182028OneMember 2026-03-31 0000795800 NEXM:WarrantsExpiryDateNovember172027Member 2026-03-31 0000795800 us-gaap:EmployeeStockOptionMember 2025-12-31 0000795800 us-gaap:EmployeeStockOptionMember 2024-12-31 0000795800 us-gaap:EmployeeStockOptionMember 2026-03-31 0000795800 srt:MinimumMember us-gaap:EmployeeStockOptionMember 2025-12-31 0000795800 srt:MaximumMember us-gaap:EmployeeStockOptionMember 2025-12-31 0000795800 us-gaap:EmployeeStockOptionMember srt:MinimumMember 2025-01-01 2025-12-31 0000795800 us-gaap:EmployeeStockOptionMember srt:MaximumMember 2025-01-01 2025-12-31 0000795800 NEXM:OptionsWithExpiryDateSeptember292026Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateSeptember292026Member 2026-01-01 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateOctober252026Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateOctober252026Member 2026-01-01 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateJanuary202027Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateJanuary202027Member 2026-01-01 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateAugust82028Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateAugust82028Member 2026-01-01 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateAugust142029Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateAugust142029Member 2026-01-01 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateDecember42029Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateDecember42029Member 2026-01-01 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateMarch182030Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateMarch182030Member 2026-01-01 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateApril242030Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateApril242030Member 2026-01-01 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateFebruary12028Member 2026-03-31 0000795800 NEXM:OptionsWithExpiryDateFebruary12028Member 2026-01-01 2026-03-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember 2025-12-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember 2024-12-31 0000795800 us-gaap:RestrictedStockUnitsRSUMember 2025-01-01 2025-12-31 0000795800 NEXM:DeferredShareUnitsMember 2024-12-31 0000795800 NEXM:DeferredShareUnitsMember 2025-01-01 2025-12-31 0000795800 NEXM:DeferredShareUnitsMember 2025-12-31 0000795800 NEXM:DeferredShareUnitsMember 2026-03-31 0000795800 NEXM:DirectorsAndOfficersMember 2026-03-31 0000795800 NEXM:DirectorsAndOfficersMember 2025-12-31 0000795800 us-gaap:RelatedPartyMember NEXM:SalariesAndManagementFeesMember 2026-01-01 2026-03-31 0000795800 us-gaap:RelatedPartyMember NEXM:SalariesAndManagementFeesMember 2025-01-01 2025-03-31 0000795800 us-gaap:RelatedPartyMember NEXM:SiteOperationsAndAdministrationMmeberMember 2026-01-01 2026-03-31 0000795800 us-gaap:RelatedPartyMember NEXM:SiteOperationsAndAdministrationMmeberMember 2025-01-01 2025-03-31 0000795800 us-gaap:RelatedPartyMember NEXM:DSUsGrantedNetOfFairValueMovementsMember 2026-01-01 2026-03-31 0000795800 us-gaap:RelatedPartyMember NEXM:DSUsGrantedNetOfFairValueMovementsMember 2025-01-01 2025-03-31 0000795800 us-gaap:RelatedPartyMember NEXM:ShareBasedPaymentMember 2026-01-01 2026-03-31 0000795800 us-gaap:RelatedPartyMember NEXM:ShareBasedPaymentMember 2025-01-01 2025-03-31 0000795800 us-gaap:RelatedPartyMember 2026-01-01 2026-03-31 0000795800 us-gaap:RelatedPartyMember 2025-01-01 2025-03-31 0000795800 us-gaap:FairValueInputsLevel1Member NEXM:DSULiabilityMember 2026-03-31 0000795800 us-gaap:FairValueInputsLevel1Member NEXM:DSULiabilityMember 2025-12-31 0000795800 us-gaap:FairValueInputsLevel2Member NEXM:NSROptionLiabilityMember 2026-03-31 0000795800 us-gaap:FairValueInputsLevel2Member NEXM:NSROptionLiabilityMember 2025-12-31 0000795800 country:CA 2026-03-31 0000795800 country:CA 2025-12-31 0000795800 country:BB 2026-03-31 0000795800 country:BB 2025-12-31 0000795800 country:BW 2026-03-31 0000795800 country:BW 2025-12-31 iso4217:USD xbrli:shares iso4217:USD xbrli:shares xbrli:pure NEXM:Integer iso4217:DKK iso4217:CAD iso4217:CAD xbrli:shares iso4217:BWP utr:sqft NEXM:Segment

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 10-Q

 

(Mark One)

 

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the quarterly period ended March 31, 2026

 

OR

 

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from _______ to _______

 

Commission File Number: 001-42750

 

 

NEXMETALS MINING CORP.

(Exact name of registrant as specified in its charter)

 

Province of British Columbia, Canada   N/A

(State or other jurisdiction of

incorporation or organization)

 

(I.R.S. Employer

Identification No.)

 

1111 West Hastings Street, 15th Floor,

Vancouver, British Columbia, Canada

  V6E 2J3
(Address of principal executive offices)   (Zip Code)

 

1-866-794-6396

(Registrant’s telephone number, including area code)

 

Securities registered pursuant to Section 12(b) of the Act:

 

Title of each class   Trading Symbol(s)   Name of each exchange on which registered
Common Shares, no par value   NEXM   The Nasdaq Stock Market LLC

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

 

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

 

Large accelerated filer Accelerated filer
Non-accelerated filer Smaller reporting company
    Emerging growth company

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No

 

As of May 13, 2026, there were 35,648,164 Common Shares issued and outstanding.

 

 

 

 
 

 

TABLE OF CONTENTS

 

Part I Financial Information 3
     
  Item 1. Financial Statements 3
     
  Unaudited Condensed Interim Consolidated Balance Sheets 3
     
  Unaudited Condensed Interim Consolidated Statements of Operations and Comprehensive Loss 4
     
  Unaudited Condensed Interim Consolidated Statements of Changes in Shareholders’ Equity 5
     
  Unaudited Condensed Interim Consolidated Statements of Cash Flows 6
     
  Notes to the Unaudited Condensed Interim Consolidated Financial Statements 7
     
  Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations 24
     
  Cautionary Note Regarding Forward Looking Statements 24
     
  Item 3. Quantitative and Qualitative Disclosures About Market Risk 40
     
  Item 4. Controls and Procedures 40
     
Part II Other Information 41
     
  Item 1. Legal Proceedings 41
     
  Item 1A. Risk Factors 41
     
  Item 2. Unregistered Sales of Equity Securities and Use of Proceeds 41
     
  Item 3. Defaults Upon Senior Securities 41
     
  Item 4. Mine Safety Disclosures 41
     
  Item 5. Other Information 41
   
  Item 6. Exhibits 42
     
Exhibit Index 42
     
Signatures 43

 

2
 

 

PART I - FINANCIAL INFORMATION

 

Item 1. FINANCIAL STATEMENTS

 

 

Unaudited Condensed Interim Consolidated Balance Sheets

(Expressed in Canadian dollars)

 

             
       As at 
   Notes   March 31, 2026
$
   December 31, 2025
$
 
ASSETS              
CURRENT ASSETS              
Cash and cash equivalents  3    26,220,756    39,780,384 
Prepaid expenses  4    3,266,925    1,039,206 
Other receivables  5    979,501    5,655,947 
TOTAL CURRENT ASSETS       30,467,182    46,475,537 
               
NON-CURRENT ASSETS              
Exploration and evaluation assets  6    41,404,363    42,730,629 
Property, plant and equipment  7    9,216,705    9,312,414 
TOTAL NON-CURRENT ASSETS       50,621,068    52,043,043 
TOTAL ASSETS       81,088,250    98,518,580 
               
LIABILITIES              
CURRENT LIABILITIES              
Trade payables and accrued liabilities  8    3,579,946    9,459,971 
Vehicle financing – current       126,358    148,862 
Mortgage payable – current  9    241,600    244,260 
DSU liability – current  12(c)   -    104,720 
TOTAL CURRENT LIABILITIES       3,947,904    9,957,813 
               
NON-CURRENT LIABILITIES              
Provision for leave and severance       1,374,923    1,365,850 
Vehicle financing – non-current       106,717    137,361 
Mortgage payable – non-current  9    993,014    1,089,094 
NSR option liability  11    2,750,000    2,750,000 
DSU liability – non-current  12(c)   214,882    268,672 
TOTAL NON-CURRENT LIABILITIES       5,439,536    5,610,977 
TOTAL LIABILITIES       9,387,440    15,568,790 
               
SHAREHOLDERS’ EQUITY              
Common Shares (no par value, unlimited Common Shares authorized) (issued and outstanding: March 31, 2026 – 35,623,164, December 31, 2025 – 35,502,754)  12    -    - 
Preferred shares (no par value, 20,000,000 authorized) Series 1 Convertible Preferred Shares (no par value, 4,000,000 authorized) (issued and outstanding: March 31, 2026 – 118,186; December 31, 2025 – 118,186)  12    31,516    31,516 
Additional paid-in capital       292,742,702    291,858,035 
Deficit       (216,696,861)   (206,073,424)
Accumulated other comprehensive loss       (4,376,547)   (2,866,337)
TOTAL SHAREHOLDERS’ EQUITY       71,700,810    82,949,790 
TOTAL LIABILITIES AND SHAREHOLDERS’ EQUITY       81,088,250    98,518,580 
Nature of Operations and Going Concern (Note 1)              

 

The accompanying notes are an integral part of these unaudited condensed interim consolidated financial statements.

 

3
 

 

 

Unaudited Condensed Interim Consolidated Statements of Operations and Comprehensive Loss

(Expressed in Canadian dollars)

 

           
       Three months ended March 31, 
       2026   2025 
   Notes   $   $ 
EXPENSES            
General exploration expenses  6    7,720,395    6,135,777 
Depreciation and amortization  7    589,089    635,828 
General and administrative expenses  17    1,978,411    1,660,382 
Investor relations and communications       221,671    209,398 
Director fees  13    126,134    - 
Fair value movement of DSUs  12(c)   (99,619)   (10,824)
Net foreign exchange loss       237,210    251,425 
LOSS FOR THE PERIOD BEFORE OTHER ITEMS       10,773,291    8,881,986 
               
OTHER ITEMS              
Interest income, net       (149,854)   (64,461)
Interest expense and accretion on Term Loan  10    -    428,371 
Loss on Term Loan extinguishment  10    -    5,982,434 
NET LOSS FOR THE PERIOD       10,623,437    15,228,330 
               
OTHER COMPREHENSIVE LOSS (INCOME)              
Exchange differences on translation of foreign operations       1,510,210    (479,748)
               
TOTAL COMPREHENSIVE LOSS FOR THE PERIOD       12,133,647    14,748,582 
               
Basic and diluted loss per share       0.30    1.36 
Weighted average number of Common Shares outstanding – basic and diluted       35,519,587    11,177,591 

 

The accompanying notes are an integral part of these unaudited condensed interim consolidated financial statements.

 

4
 

 

 

Unaudited Condensed Interim Consolidated Statements of Changes in Shareholders’ Equity

(Expressed in Canadian dollars)

 

                             
   Notes   Number of
shares
   Preferred
shares
$
   Additional
paid-in
capital
$
   Deficit
$
   Accumulated
other
comprehensive (loss) income
$
   Total
shareholders’
 equity (deficiency)
$
 
BALANCE, DECEMBER 31, 2025       35,502,754-   31,516    291,858,035    (206,073,424)   (2,866,337)   82,949,790 
Net loss for the period       --   -    -    (10,623,437)   -    (10,623,437)
Exercise/settlement of share-based awards, net  12(c)   120,410    -    (15,389)   -    -    (15,389)
Share-based compensation  12(c)    -    -    900,056    -    -    900,056 
Exchange differences on translation of foreign operations       -    -    -    -    (1,510,210)   (1,510,210)
BALANCE, MARCH 31, 2026       35,623,164-   31,516    292,742,702    (216,696,861)   (4,376,547)   71,700,810 
                                   
BALANCE, DECEMBER 31, 2024       9,285,424-   31,516    145,025,333    (146,987,099)   (1,516,810)   (3,447,060)
Net loss for the period       --   -    -    (15,228,330)   -    (15,228,330)
Share capital issued through private placement       8,394,953    -    49,709,891    -    -    49,709,891 
Share issue costs – private placement       -    -    (5,389,306)   -    -    (5,389,306)
Share capital issued through debt conversion       3,768,941    -    26,594,817    -    -    26,594,817 
Share issue costs – debt conversion       -    -    (2,161,483)   -    -    (2,161,483)
Share-based compensation       -    -    1,027,581    -    -    1,027,581 
Exchange differences on translation of foreign operations       -    -    -    -    479,748    479,748 
BALANCE, MARCH 31, 2025       21,449,318-   31,516    214,806,833    (162,215,429)   (1,037,062)   51,585,858 

 

The accompanying notes are an integral part of these unaudited condensed interim consolidated financial statements.

 

5
 

 

 

Unaudited Condensed Interim Consolidated Statements of Cash Flows

(Expressed in Canadian dollars)

 

             
       Three months ended March 31, 
   Notes  

2026

$

  

2025

$

 
OPERATING ACTIVITIES              
Net loss for the period       (10,623,437)   (15,228,330)
Adjustments to reconcile net loss to net cash used in operating activities:              
DSU expense amortization       55,791    - 
Fair value movement of DSUs  12(c)   (99,619)   (10,824)
Share-based compensation  12(c)   900,056    1,027,581 
Depreciation and amortization  7    589,089    635,828 
Provision for leave and severance       9,073    76,567 
Interest and accretion, net       60,306    170,847 
Loss on Term Loan extinguishment  10    -    5,982,434 
Unrealized foreign exchange loss       363,419    - 
Changes in non-cash working capital              
Prepaid expenses and other receivables       2,421,399    282,670 
Trade payables and accrued expenses       (5,880,024)   768,263 
Net cash used in operating activities       (12,203,947)   (6,294,964)
               
INVESTING ACTIVITIES              
Acquisition of property, plant and equipment  7    (768,496)   (50,033)
Net cash used in investing activities       (768,496)   (50,033)
               
FINANCING ACTIVITIES              
Proceeds from issuance of units  12(a)   -    46,000,000 
Share issue costs  10,12(a)   -    (397,250)
Taxes paid related to net settlement of RSUs and DSUs       (130,073)   - 
Vehicle loan financing, net of payments       (51,226)   (34,518)
Mortgage payments  9    (84,898)   - 
Net cash (used in)/provided by financing activities       (266,197)   45,568,232 
               
Effect of exchange rate changes on cash and cash equivalents       (320,988)   137,671 
Change in cash and cash equivalents for the period       (13,559,628)   39,360,906 
Cash and cash equivalents at the beginning of the period       39,780,384    6,105,933 
Cash and cash equivalents at the end of the period       26,220,756    45,466,839 
               
Supplemental cash flow information              
Non-cash financing activities:              
Fair value of Common Shares issued for conversion of Term Loan       -    17,727,018 
Fair value of Settlement Warrants issued for conversion of Term Loan       -    7,398,104 
Fair value of Common Shares issued for
finder’s fees and advisory services
       -    5,179,586 
Other cash flow information:              
Income taxes paid       -    - 
Interest paid       32,977    273,731 

 

See Note 10 and 12(a) for non-cash Financing Activities.

 

The accompanying notes are an integral part of these unaudited condensed interim consolidated financial statements.

 

6
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

1. NATURE OF OPERATIONS AND GOING CONCERN

 

a) Nature of Operations

 

NexMetals Mining Corp. and its wholly owned subsidiaries’ (collectively, the “Company” or “NEXM”) principal business activity is the exploration and evaluation of the Selebi and Selebi North copper-nickel-cobalt (“Cu-Ni-Co”) mines in Botswana and related infrastructure (together, the “Selebi Mines”), as well as the exploration and evaluation of the copper, nickel, cobalt, platinum-group elements (“Cu-Ni-Co-PGE”) Selkirk mine in Botswana, together with associated infrastructure and four surrounding prospecting licences (collectively, the “Selkirk Mine” and together with the Selebi Mines, the “Mines”).

 

The common shares of NEXM (“Common Shares”) are listed and posted for trading on the Nasdaq Capital Market (the “Nasdaq”) and on the TSX Venture Exchange (the “TSXV”) under the symbol “NEXM”. The Company’s head and registered office is located at 1111 West Hastings Street, 15th Floor, Vancouver, British Columbia, Canada, V6E 2J3.

 

b) Going Concern

 

The Company, being in the exploration stage, is subject to risks and challenges similar to companies in a comparable stage of exploration and development. These risks include the challenges of securing adequate capital for exploration and advancement of the Company’s material projects, operational risks inherent in the mining industry, and global economic and metal price volatility, and there is no assurance management will be successful in its endeavours.

 

These unaudited condensed interim consolidated financial statements have been prepared on the assumption that the Company will continue as a going concern, meaning it will continue in operation for the foreseeable future and will be able to realize assets and discharge liabilities in the ordinary course of operations. The ability of the Company to continue operations as a going concern is ultimately dependent upon achieving profitable operations and its ability to obtain adequate financing. The Company incurred a net loss of $10,623,437 for the three months ended March 31, 2026. To date, the Company has not generated profitable operations from its resource activities and will need to invest additional funds in carrying out its planned evaluation, development and operational activities.

 

It is not possible to predict whether future financing efforts will be successful or if the Company will attain a profitable level of operations. These material uncertainties cast substantial doubt about the Company’s ability to continue as a going concern. These unaudited condensed interim consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded asset amounts and classification of liabilities and the reported expenses and comprehensive loss that might be necessary should the Company be unable to continue as a going concern. These adjustments could be material.

 

The properties in which the Company currently has an interest are in pre-revenue stage. As such, the Company is dependent on external financing to fund its activities. In order to carry out the planned activities and cover administrative costs, the Company will use its existing working capital and raise additional amounts as needed.

 

Although the Company has been successful in its past fundraising activities, the Company will need further funding to support advancement of the Selebi Mines and the Selkirk Mine toward the development stage and there is no assurance as to the success of future fundraising efforts or as to the sufficiency of funds raised in the future.

 

7
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

2. BASIS OF PRESENTATION AND SIGNIFICANT ACCOUNTING POLICIES

 

(a) Statement of Compliance

 

These unaudited condensed interim consolidated financial statements reflect the accounts of the Company and have been prepared in accordance with generally accepted accounting principles in the United States of America (“US GAAP”) and pursuant to the rules and regulations of the U.S. Securities and Exchange Commission (the “SEC”).

 

Certain information or footnote disclosures normally included in annual financial statements prepared in accordance with US GAAP have been condensed or omitted, pursuant to the rules and regulations of the SEC for interim financial reporting. Accordingly, they do not include all the information and footnotes necessary for a complete presentation of financial position, results of operations, or cash flows. In the opinion of management, the accompanying unaudited condensed interim consolidated financial statements include all adjustments, consisting of a normal recurring nature, which are necessary for a fair presentation of the financial position, operating results and cash flows for the periods presented.

 

The accompanying unaudited condensed interim consolidated financial statements should be read in conjunction with the Company’s audited consolidated financial statements for the year ended December 31, 2025. The interim period results do not necessarily indicate the results that may be expected for any other interim period or for the full fiscal year.

 

(b) Basis of Preparation

 

These unaudited condensed interim consolidated financial statements have been prepared under the historical cost convention, modified by the revaluation of any financial assets and financial liabilities where applicable. The preparation of these unaudited condensed interim consolidated financial statements in accordance with US GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities at the date of the financial statements, and the reported amounts of revenues and expenses during the reporting periods. Actual results could differ materially from those estimates. The Company assessed certain accounting matters that generally require consideration of forecasted financial information in context with the information reasonably available to the Company as of March 31, 2026, and through the date of this Report filing.

 

Operating segments are reported in a manner consistent with the internal reporting provided to executive management. The Company determined that it has one reportable operating segment being that of the acquisition, exploration and evaluation of mineral properties in three geographic segments, which are Canada, Barbados and Botswana (Note 15).

 

The Company’s presentation currency is Canadian dollars. Reference herein of $ or CAD is to Canadian dollars, US$ or USD is to United States dollars, and BWP is to Botswana pula.

 

The significant accounting policies used in the preparation of these unaudited condensed interim consolidated financial statements are consistent with those used in the preparation of the audited annual consolidated financial statements for the year ended December 31, 2025. There were no changes in significant accounting policies during the three months ended March 31, 2026.

 

(c) Basis of Consolidation

 

These unaudited condensed interim consolidated financial statements include the financial statements of the Company and its wholly owned subsidiaries as summarized in the table below. All intercompany transactions, balances, income and expenses are eliminated upon consolidation.

SCHEDULE OF ITS WHOLLY-OWNED SUBSIDIARIES INCLUDED IN THE CONSOLIDATED FINANCIAL STATEMENTS 

Name of Entity   Place of Incorporation   Percentage Ownership   Functional Currency
             
NexMetals Mining Corp.   British Columbia, Canada       CAD
NAN Exploration Inc.   Ontario, Canada   100   CAD
PNR Amalco Ltd.   Ontario, Canada   100   CAD
Premium Resources International Ltd.   Barbados   100   USD
Premium Resources Selkirk (Barbados) Limited   Barbados   100   USD
Premium Resources Selebi (Barbados) Limited   Barbados   100   USD
Premium Nickel Group Proprietary Limited   Botswana   100   BWP
Premium Nickel Resources Proprietary Limited   Botswana   100   BWP

 

8
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

Recently Issued Accounting Pronouncements and Disclosures Not Yet Adopted

 

(i) ASU 2024-03, Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures and ASU 2025-01 (Subtopic 220-40): Clarifying the Effective Date

 

In November 2024, Financial Accounting Standards Board (“FASB”) issued an Accounting Standards Update (“ASU”) which will require entities to provide disaggregated disclosure of specified categories of expenses that are included on the face of the income statement, including: purchases of inventory, employee compensation, depreciation, amortization and depletion. In January 2025, FASB clarified the effective dates of this ASU, which becomes effective January 1, 2027. The Company is assessing the impact of this ASU, and upon adoption, may be required to include certain additional disclosures in the notes to its consolidated financial statements.

 

3. CASH AND CASH EQUIVALENTS

 

A summary of the Company’s cash and cash equivalents is detailed in the table below:

SCHEDULE OF CASH AND CASH EQUIVALENTS 

       
  

March 31, 2026

$

  

December 31, 2025

$

 
         
Cash   25,933,256    39,492,884 
Short-term deposits   287,500    287,500 
Total cash and cash equivalents   26,220,756    39,780,384 

 

4. PREPAID EXPENSES

 

As of March 31, 2026, prepaid expenses include $2,095,715 relating to drilling consumables for the Selebi Main surface drilling program (December 31, 2025 - $64,411). These amounts represent advance payments for consumables not yet received by the Company.

 

5. OTHER RECEIVABLES

 

A summary of the Company’s other receivables is detailed in the table below:

SCHEDULE OF OTHER RECEIVABLES 

       
  

March 31, 2026

$

  

December 31, 2025

$

 
         
HST on purchases   257,701    319,180 
VAT on purchases   662,336    5,249,975 
Other receivables   59,464    86,792 
Total other receivables   979,501    5,655,947 

 

VAT on purchases at December 31, 2025, includes a receivable in the amount of $4,813,564 (Note 8) arising from the second instalment payment in respect of the Selebi Mines and Selkirk Mine (Note 6), which the Company received on February 18, 2026.

 

9
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

6. EXPLORATION AND EVALUATION ASSETS

 

The exploration and evaluation assets of the Company consist of the acquisition costs of mining assets located in Botswana:

 

SCHEDULE OF EXPLORATION AND EVALUATION ASSETS

             
   Botswana     
  

Selebi

$

  

Selkirk

$

  

Total

$

 
             
Balance, December 31, 2024   8,528,478    318,343    8,846,821 
Impairment loss – Phikwe South and Southeast Extension   (501,497)   -    (501,497)
Addition – Selebi APA Second Instalment   34,441,488    -    34,441,488 
Foreign currency translation   (60,249)   4,066    (56,183)
Balance, December 31, 2025   42,408,220    322,409    42,730,629 
Foreign currency translation   (1,316,259)   (10,007)   (1,326,266)
Balance, March 31, 2026   41,091,961    312,402    41,404,363 

 

The following is a description of the Company’s exploration and evaluation assets and the related spending commitments:

 

Botswana Assets - Selebi and Selkirk

 

In September 2021, the Company executed the Selebi Asset Purchase Agreement (“Selebi APA”) with the BCL Limited (“BCL”) liquidator to acquire the Selebi Mines formerly operated by BCL. In January 2022, the Company closed the transaction and ownership of the Selebi Mines transferred to the Company.

 

Pursuant to the Selebi APA, the aggregate purchase price payable to the seller for the Selebi Mines shall be the sum of $78,345,318 (US$56,750,000), which amount shall be paid in three instalments:

 

$2,086,830 (US$1,750,000) payable on the closing date. This payment has been made. The Company also made care and maintenance funding contributions in respect of the Selebi Mines from March 22, 2021, to the closing date of $6,164,688 (US$5,178,747).
   
$34,441,488 (US$25,000,000) payable upon the approval by the Botswana Ministry of Mineral Resources, Green Technology and Energy Security (“MMRGTES”) of the Company’s Section 42 and Section 43 applications (for the further extension of the mining license and amendment of mining programme, respectively) which are to be submitted along with a compliant economic study on or prior to December 31, 2026. The Company prepaid the non-refundable $34,441,488, securing unencumbered title to both Selebi and Selkirk mines.
   
$41,817,000 (US$30,000,000) payable on the earlier of completion of mine construction and production start-up (commissioning) by the Company, or December 1, 2029.

 

The total acquisition cost of the Selebi Mines includes the first instalment of $2,086,830 (US$1,750,000), the payment of the care and maintenance funding contribution of $6,164,688 (US$5,178,747), and the second instalment of $34,441,488 (US$25,000,000).

 

In addition to the Selebi APA, the purchase of the Selebi Mines is also subject to a royalty agreement as well as a contingent consideration agreement with the liquidator. The royalty agreement consists of a net smelter returns royalty (the “Selebi NSR”) of 2% on the net value of sales of concentrate or other materials with respect to production from the Selebi mining licence, of which the Company has the right to buy-back 50% (Note 11). The contingent consideration agreement consists of two components: (i) a sliding scale payment of US$0.50/tonne of ore up to US$1.40/tonne of ore with respect to the discovery of new mineable deposits greater than 25 million tonnes of ore from a base case of 15.9 million tonnes, with a minimum grade of 2.5% nickel equivalent, accrued at the time of a decision to mine; and (ii) price participation of 15% on post-tax net earnings directly attributable to an increase of 25% or more in commodity prices, on a quarterly basis, for a period of seven years from the date of first shipment of concentrate or other materials.

 

10
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

The Company also negotiated a separate asset purchase agreement (the “Selkirk APA”) with the liquidator of Tati Nickel Mining Company (“TNMC”) in January 2022 to acquire the Selkirk deposit and related infrastructure formerly operated by TNMC. The transaction closed in August 2022.

 

The Selkirk APA does not provide for a purchase price or initial payment for the purchase of the assets. The acquisition cost of the Selkirk Mine of $327,109 (US$244,954) was the care and maintenance funding contribution from April 1, 2021, to the closing date of the Selkirk APA. The Selkirk APA provides that if the Company elects to develop the Selkirk Mine first, the payment of the second Selebi instalment of $34,441,488 (US$25,000,000) would be upon the approval by the MMRGTES of the Company’s Section 42 and Section 43 applications (for the further extension of the Selkirk mining licence and amendment of the Selkirk mining program, respectively). The Company prepaid the non-refundable second instalment. For the third Selebi instalment of $41,817,000 (US$30,000,000), if the Selkirk Mine were to be commissioned earlier than the Selebi Mines, the payment would trigger on the Selkirk Mine’s commission date. The Selkirk APA provides for a three-year study phase originally expiring August 17, 2025, which has been extended for one year to August 17, 2026.

 

In addition to the Selkirk APA, the purchase of the Selkirk Mine is also subject to a royalty agreement as well as a contingent consideration agreement with the liquidator. The royalty agreement consists of a net smelter returns royalty (the “Selkirk NSR”) of 1% on the net value of sales of concentrate or other materials with respect to production from the Selkirk mining licence, which the Company has the right to buy-back in full (Note 11). The contingent consideration agreement is on similar terms as the Selebi Mines contingent consideration.

 

In August 2023, the Company entered into a binding commitment letter with the liquidator of BCL to acquire a 100% interest in two additional deposits (“Phikwe South” and the “Southeast Extension”) located adjacent to and immediately north of the Selebi North shaft. The agreement has since lapsed and in August 2025, the Company informed the liquidator of BCL that it would no longer be pursuing the acquisition of the Phikwe South and the Southeast Extension deposits. As a result, the Company recorded an impairment loss of $501,497 during the year ended December 31, 2025, related to care and maintenance costs during the evaluation period of the properties in 2023, which had been previously capitalized as part of the Selebi Mines acquisition cost.

 

Both the Selebi Mines and Selkirk Mine are subject to a royalty payable to the Botswana Government of 5% of all precious metals sales and 3% of all base metals sales.

 

11
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

General Exploration Expenses

 

Details of the general exploration expenses by nature are presented as follows:

 

SCHEDULE OF GENERAL EXPLORATION EXPENSES

                                 
   Three months ended March 31, 2026   Three months ended March 31, 2025 
  

Selebi

$

  

Selkirk

$

  

Other

$

  

Total

$

  

Selebi

$

  

Selkirk

$

  

Other

$

  

Total

$

 
Drilling   1,720,192    -    -    1,720,192    684,092    -    -    684,092 
Electricity   1,016,525    3,787    -    1,020,312    863,913    4,356    -    868,269 
Site operations, administration, & overhead   895,405    73,501    18,165    987,071    931,327    42,263    39,656    1,013,246 
Engineering & technical studies   769,869    52,256    -    822,125    842,773    11,679    -    854,452 
Infrastructure & equipment maintenance   768,875    -    -    768,875    710,929    -    -    710,929 
Geology   281,552    428,965    -    710,517    567,974    26,535    -    594,509 
Mine development   560,032    -    -    560,032    668,619    -    -    668,619 
Freight, tools, supplies, & other consumables   515,192    2,209    -    517,401    130,195    10,964    -    141,159 
Geophysics   253,560    8,406    -    261,966    226,810    -    -    226,810 
Health & safety   100,181    640    -    100,821    93,584    -    -    93,584 
Environmental, social & governance   85,939    -    -    85,939    74,408    -    -    74,408 
Share-based compensation   148,630    16,514    -    165,144    199,529    6,171    -    205,700 
Total   7,115,952    586,278    18,165    7,720,395    5,994,153    101,968    39,656    6,135,777 

 

7. PROPERTY, PLANT AND EQUIPMENT

 

The tables below set out costs and accumulated depreciation and amortization as at March 31, 2026, and December 31, 2025:

 

SCHEDULE OF PROPERTY, PLANT AND EQUIPMENT

Cost 

Land and Buildings

$

  

Equipment(1)

$

  

Furniture & Fixtures

$

  

Vehicles

$

  

Computer & Software

$

  

Total

$

 
Balance – December 31, 2024   3,068,950    6,583,695    225,877    521,222    609,267    11,009,011 
Additions   -    2,461,636    2,826    276,385    45,851    2,786,698 
Foreign currency translation   39,191    30,335    2,234    7,485    8,275    87,520 
Balance – December 31, 2025   3,108,141    9,075,666    230,937    805,092    663,393    13,883,229 
Additions   -    768,496    -    -    -    768,496 
Foreign currency translation   (96,470)   (262,018)   (5,546)   (24,989)   (20,590)   (409,613)
Balance – March 31, 2026   3,011,671    9,582,144    225,391    780,103    642,803    14,242,112 

 

Accumulated Depreciation and Amortization  Land and Buildings   Equipment   Furniture & Fixtures   Vehicles   Computer & Software   Total 
Balance – December 31, 2024   283,400    1,644,614    34,579    224,352    333,661    2,520,606 
Depreciation during the period   100,514    1,494,323    28,066    166,145    279,773    2,068,821 
Foreign currency translation   4,703    (35,881)   631    4,657    7,278    (18,612)
Balance – December 31, 2025   388,617    3,103,056    63,276    395,154    620,712    4,570,815 
Depreciation during the period   28,434    502,165    5,701    46,277    6,512    589,089 
Foreign currency translation   (12,482)   (88,000)   (1,705)   (12,948)   (19,362)   (134,497)
Balance – March 31, 2026   404,569    3,517,221    67,272    428,483    607,862    5,025,407 

 

Carrying Value  Land and Buildings   Equipment(1)    Furniture & Fixtures   Vehicles   Computer & Software   Total 
Balance – December 31, 2025   2,719,524    5,972,610    167,661    409,938    42,681    9,312,414 
Balance – March 31, 2026   2,607,102    6,064,923    158,119    351,620    34,941    9,216,705 

 

Notes:

 

(1)

 

Included within Equipment is $609,398 related to a second Marcotte deep drill and $47,034 related to critical spares which were in transit to site at March 31, 2026. These items are currently non-depreciable. The drill and critical spares arrived at site on April 28, 2026.

 

12
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

8. TRADE PAYABLES AND ACCRUED LIABILITIES

 

A summary of trade payables and accrued liabilities is detailed in the table below:

 

SCHEDULE OF TRADE PAYABLES AND ACCRUED LIABILITIES

         
  

March 31, 2026

$

  

December 31, 2025

$

 
         
Amounts due to related parties (Note 13)   -    540,443 
Trade payables   1,923,981    7,147,173 
Accrued liabilities   960,587    751,511 
Severance payable   695,378    1,020,844 
Total   3,579,946    9,459,971 

 

Amounts due to related parties at December 31, 2025, includes severance payable of $500,000 to the Company’s former Chief Executive Officer in accordance with the succession plan announced on December 15, 2025, which was paid upon his departure in January 2026.

 

Trade payables at December 31, 2025, include $4,813,564 (Note 5) of VAT due to the BCL liquidator arising from the second instalment payment in respect of the Selebi Mines and Selkirk Mine (Note 6).

 

Severance payable at March 31, 2026, includes amounts due to the Company’s former Chief Executive Officer and Chief Financial Officer who departed the Company in December 2024 and July 2025, respectively, of which $48,697 is payable in equal monthly instalments until December 31, 2026, and $59,792 is payable in equal monthly instalments until July 31, 2026.

 

9. MORTGAGE PAYABLE

 

In August 2025, the Company’s indirectly wholly owned Botswanan subsidiary, Premium Nickel Resources Proprietary Limited (“PNRPL”), entered into a mortgage in respect of the Company’s previously acquired Syringa Lodge located near the Selebi Mines. The Company acquired the Syringa Lodge to house non-local personnel and consultants when visiting the Selebi Mines and for additional office space.

 

The remaining principal amount of the mortgage is $1,234,614 (BWP 12,358,504), is denominated in Botswanan pula, bears interest at Absa Prime Lending Rate (6.76% at March 31, 2026) plus 1.5% per annum, is repayable in fifty three (53) remaining equal monthly blended instalments of principal and interest with a maturity date of August 20, 2030, and is secured by the Syringa Lodge. There is no fee for prepayment, and the mortgage is subject to a cash flow to debt service covenant which takes into consideration parent company capital contributions and is to be assessed based on each calendar year. The Company was in compliance with this covenant as of December 31, 2025.

 

13
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025.

(Expressed in Canadian dollars)

 

10. TERM LOAN

 

The Company had a three-year term loan (the “Term Loan”) with Cymbria Corporation (“Cymbria”), the lender and an affiliate of the Company’s largest shareholder, EdgePoint Investment Group Inc. (“EdgePoint”), in the amount of $20,882,353 which bore interest at a rate of 10% per annum and was to mature on June 28, 2026.

 

On March 18, 2025, the Company closed a financing transaction (the “March 2025 Financing”) which included a non-brokered private placement (Note 12(a)) and the conversion of the Term Loan to equity (the “Debt Conversion”).

 

The Company issued to Cymbria an aggregate of 3,480,392 units (each, a “Settlement Unit”) at a deemed issue price of $6.00 per Settlement Unit in full satisfaction of the $20,882,353 principal amount outstanding under the Term Loan. Each Settlement Unit consisted of one Common Share of the Company and one Common Share purchase warrant (each, a “Settlement Warrant”) of the Company. Accrued interest under the Term Loan, up to the date of the Debt Conversion, in the amount of $268,896, was settled in cash.

 

Each Settlement Warrant entitles the holder to acquire one additional Common Share of the Company at a price of $8.00 per Common Share until March 18, 2028. If, at any time prior to the expiry date, the volume-weighted average trading price of the Common Shares is at least $40.00 per Common Share for a period of 20 trading days, the Company may, at its option, accelerate the expiry date with 30 days’ notice to the Settlement Warrant holders.

 

The fair value of the Common Shares issued as part of the Settlement Units was estimated at $17,727,018 and was determined by applying an implied discount of 37.9% per Common Share for lack of marketability to the market observed price on the date of issuance. The fair value of the Settlement Warrants was estimated at $7,398,104 using a Monte Carlo model. The $5,982,434 difference between the fair value of the Settlement Units issued of $25,125,122 and the carrying amount of the Term Loan of $19,142,687 was recognized as a loss in the three months ended March 31, 2025.

 

The Monte Carlo model used to value the Settlement Warrants was based on the following assumptions:

 

   Settlement Warrants 
Expected dividend yield   0%
Share price  $5.00 
Expected share price volatility   81.8%
Risk free interest rate   2.57%
Expected life of warrant   3 years 

 

The volatility was determined by calculating the historical volatility of the Company’s share price over a 3-year period using daily closing prices. The formula used to compute historical volatility is the standard deviation of the logarithmic returns. The same implied discount for lack of marketability for purposes of the Common Shares valuation was also applied to the share price for the Settlement Warrants valuation.

 

In connection with the March 2025 Financing, the Company issued: (i) 200,000 Common Shares to TriView Capital Ltd. (“TriView”) for its services as finder; (ii) 450,000 Common Shares to Fiore Management and Advisory Corp. (“Fiore”) and 187,500 Common Shares to Bowering Projects Ltd. (“Bowering”) for certain advisory services; and (iii) 179,335 Common Shares to a financial advisor for financial advisory services. The fair value of these shares was determined to be $5,179,586. In addition to the Common Shares, the Company incurred various legal, listing and financing fees payable in cash totalling $2,371,203. Certain of these fees were allocated between the non-brokered private placement (Note 12(a)) and Debt Conversion transactions based on the value of the units issued under each transaction.

 

All securities issued as part of the Debt Conversion were subject to a hold period, which expired July 19, 2025, with the exception of the Common Shares issued to Fiore and Bowering which had a hold period which expired March 18, 2026.

 

The following is a continuity of the Term Loan:

 

   $ 
Term Loan balance, December 31, 2024   18,983,212 
Accrued interest   268,896 
Accretion of warrant value and transaction costs   159,475 
Interest paid   (268,896)
Debt Conversion   (19,142,687)
Term Loan balance, December 31, 2025   - 

 

14
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

11. NSR OPTION

 

In 2023, Cymbria paid an aggregate of $2,750,000 (“Option Payment”) to two subsidiaries of NEXM to acquire a right to participate with such subsidiaries in the exercise of certain contractual rights. The Option Payment was allocated to PNRPL and PNGPL (defined below) for $2,500,000 and $250,000, respectively.

 

As the NSR options are exercisable entirely at the discretion of Cymbria and the underlying projects are in the exploration stage, the fair value of the call and put on the options as at March 31, 2026, and December 31, 2025, is $nil. The Option Payment received in cash was recorded as a non-current liability.

 

NEXM’s indirect wholly owned subsidiary, PNRPL, acquired the Selebi Mines in January 2022 out of liquidation. Pursuant to the acquisition agreement, the liquidator retained a 2% net smelter returns royalty on the Selebi Mines. PNRPL has a contractual right to repurchase one half of the Selebi NSR at a future time on payment by PNRPL to the liquidator of $27,878,000 (US$20,000,000).

 

NEXM’s indirect wholly owned subsidiary, Premium Nickel Group Proprietary Limited (“PNGPL”), acquired the Selkirk Mine in August 2022 out of liquidation. Pursuant to the acquisition agreement, the liquidator retained a 1% net smelter returns royalty on the Selkirk Mine. PNGPL has a contractual right to repurchase the entirety of the Selkirk NSR at a future time on payment by PNGPL to the liquidator of $2,787,800 (US$2,000,000).

 

Each of PNRPL and PNGPL has agreed to grant Cymbria, in exchange for the Option Payment, an option to participate in any such repurchase of the applicable portion of its NSR from the relevant liquidator. Cymbria will, following the exercise of its option to participate in any such repurchase, acquire a 0.5% NSR royalty on the applicable property by paying an amount equal to one half of the repurchase price payable by PNRPL or PNGPL pursuant to the applicable NSR, less the Option Payment paid at closing pursuant to the relevant option agreement among Cymbria and PNRPL or PNGPL. Cymbria also has the right: (i) at any time following the date of any buyback exercise notice from PNRPL and/or PNGPL and prior to the first anniversary of sale of product, to terminate the option and receive from PNRPL and/or PNGPL a refund of the related option price paid by Cymbria; (ii) upon receipt from PNRPL and/or PNGPL of any termination, settlement or waiver of the buyback right or royalty agreement and prior to the first anniversary of sale of product, to exercise the option or terminate the option, and if terminated PNRPL and/or PNGPL shall refund the related option price paid by Cymbria; (iii) to exercise the option and compel PNRPL and/or PNGPL to exercise the buyback right at any time within the first nine months immediately following the first anniversary of sale of product and not less than 60 days prior to the date of exercise of the buyback right; and (iv) to require PNRPL and/or PNGPL to repurchase the option from Cymbria for an amount equal to the option price at any time commencing on the first anniversary of sale of product, provided PNRPL and/or PNGPL have not provided a buyback exercise notice or notice of any termination, settlement or waiver of the buyback right or royalty agreement to Cymbria.

 

Under the NSR option purchase agreements, Cymbria could acquire a 0.5% net smelter returns royalty on the Selebi Mines and Selkirk Mine upon payment of $11,294,075 (US$8,102,500) and $1,129,407 (US$810,250), respectively.

 

15
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

12. SHARE CAPITAL

 

The authorized capital of the Company comprises an unlimited number of Common Shares without par value and 20,000,000 Preferred Shares, issuable in series, of which 4,000,000 are authorized to be designated as Series 1 Convertible Preferred Shares.

 

There are currently 118,186 Series 1 Convertible Preferred Shares outstanding, without par value, which are convertible at a ratio of 180:1, to 657 Common Shares.

 

a) Common Shares Issued and Outstanding

 

Three months ended March 31, 2026

 

During the three months ended March 31, 2026, 110,558 Common Shares were issued for the vesting and net settlement of restricted share units (“RSUs”), and 9,852 Common Shares were used for the vesting and net settlement of deferred share units (“DSUs”).

 

As at March 31, 2026, the Company had 35,623,164 Common Shares issued and outstanding (December 31, 2025 – 35,502,754).

 

Year ended December 31, 2025

 

During the year ended December 31, 2025, 2,124 Common Shares were issued for the net exercise of 12,000 options to purchase Common Shares (“Options”), and 16,212 Common Shares were issued for the vesting and settlement of RSUs.

 

November 2025 Financing

 

On November 17, 2025, the Company closed a brokered public offering in Canada (the “November 2025 Financing”) which consisted of issuing 14,035,100 units (each, a “November 2025 Unit”) of the Company at a price of $5.70 per unit for aggregate proceeds of $80,000,070. Each November 2025 Unit consisted of one Common share of the Company and one Common Share purchase warrant of the Company (each a “November 2025 Warrant”). Each November 2025 Warrant entitles the holder to acquire one additional Common Share at a price of $8.00 per share until November 17, 2027.

 

In connection with the November 2025 Financing, the agents received a total cash fee of $4,512,017 equal to 6.0% of the gross proceeds and a reduced cash fee equal to 2.0% for sales to certain individuals. The Company also incurred various legal, listing and financing fees payable in cash totalling $821,864.

 

The relative fair value of the Common Shares issued under the November 2025 Financing was estimated at $61,884,376 and was determined based on the market observed price on the date of issuance. The relative fair value of the November 2025 Warrants was estimated at $18,115,694 using the Black-Scholes Option Pricing Model. Gross proceeds raised of $80,000,070 and related issuance costs were allocated to the Common Shares and warrants based on relative fair values.

 

The fair value of the November 2025 Warrants was calculated using the following assumptions:

 

   November 2025 Warrants 
Expected dividend yield   0%
Share price  $4.91 
Expected share price volatility   77.47%
Risk free interest rate   2.49%
Expected life of warrant   2 years 

 

The volatility was determined by calculating the historical volatility of the Company’s share price over a 2-year period using daily closing prices. The formula used to compute historical volatility is the standard deviation of the logarithmic returns.

 

16
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

March 2025 Financing

 

On March 18, 2025, the Company closed the March 2025 Financing which included a non-brokered private placement and the conversion of its $20,882,353 three-year Term Loan with Cymbria (Note 10).

 

The non-brokered private placement (the “Private Placement”) consisted of issuing 7,666,667 units (each, a “Private Placement Unit”) of the Company at a price of $6.00 per unit for aggregate gross proceeds of $46,000,000. Each Private Placement Unit consisted of one Common Share of the Company and one-half of one Common Share purchase warrant (each whole warrant, a “Private Placement Warrant”) of the Company. Each Private Placement Warrant entitles the holder to acquire one additional Common Share at a price of $11.00 per share until March 18, 2028.

 

In connection with the March 2025 Financing, the Company issued: (i) 200,000 Common Shares to TriView for its services as finder; (ii) 450,000 Common Shares to Fiore and 187,500 Common Shares to Bowering for certain advisory services; and (iii) 179,335 Common Shares to a financial advisor for financial advisory services. The fair value of these shares was determined to be $5,179,586. In addition to the Common Shares, the Company incurred various legal, listing and financing fees payable in cash totalling $2,371,203. Certain of these fees were allocated between the Private Placement and Debt Conversion (Note 10) transactions based on the value of the units issued under each transaction.

 

All securities issued as part of the Private Placement were subject to a hold period which expired July 19, 2025, with the exception of the Common Shares issued to Fiore and Bowering which had a hold period which expired March 18, 2026.

 

The fair value of the Common Shares issued under the Private Placement was estimated at $39,048,922 and was determined by applying an implied discount of 37.9% per Common Share for lack of marketability to the market observed price on the date of issuance. The fair value of the Private Placements Warrants was estimated at $6,951,078 using the Black-Scholes Option Pricing Model.

 

The fair value of the Private Placement Warrants was calculated using the following assumptions:

 

   Private Placement Warrants 
Expected dividend yield   0%
Share price  $5.00 
Expected share price volatility   81.8%
Risk free interest rate   2.57%
Expected life of warrant   3 years 

 

The volatility was determined by calculating the historical volatility of the Company’s share price over a 3-year period using daily closing prices. The formula used to compute historical volatility is the standard deviation of the logarithmic returns. The same implied discount for lack of marketability for purposes of the Common Shares valuation was also applied to the share price for the Settlement Warrants valuation.

 

17
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

b) Warrants

 

The following summarizes Common Share purchase warrant activity:

 

   Three months ended   Year ended 
   March 31, 2026   December 31, 2025 
   Number Outstanding   Weighted Average Exercise Price $   Number Outstanding  

Weighted Average Exercise Price

$

 
Outstanding, beginning of the year   23,464,096    9.84    2,126,342    23.02 
Issued   -    -    21,348,826    8.54 
Expired   -    -    (11,072)   35.00 
Outstanding, end of the period   23,464,096    9.84    23,464,096    9.84 

 

At March 31, 2026, the Company had outstanding Common Share purchase warrants exercisable to acquire Common Shares as follows:

 

Warrants

Outstanding

  

Warrants

Exercisable

  

Expiry

Date

 

Exercise

Price

$

  

Intrinsic Value

$

 
 301,200    301,200   June 28, 2026   28.75         - 
 1,012,981    1,012,981   June 14, 2029   22.00    - 
 801,089    801,089   June 21, 2029   22.00    - 
 3,833,334    3,833,334   March 18, 2028   11.00    - 
 3,480,392    3,480,392   March 18, 2028   8.00    - 
 14,035,100    14,035,100   November 17, 2027   8.00    - 
 23,464,096    23,464,096            - 

 

c) Omnibus Plan

 

The Company has a long-term omnibus incentive plan (the “Omnibus Plan”) which provides for the award of RSUs, DSUs and Options (RSUs, DSUs, and Options collectively referred to herein as “Awards”) to directors, officers, employees and consultants upon approval by the board of directors of the Company (the “Board of Directors” or the “Board”). The maximum aggregate number of Common Shares issuable in respect of all past and future Awards granted or issued, at any point, shall not exceed 10% of the total number of issued and outstanding Common Shares on a non-diluted basis at such point in time, subject to certain participation limits on grants. No Award granted or issued under the Omnibus Plan, other than Options, may vest before the date that is one year following the date it is granted or issued.

 

Options

 

An Option is an Award that gives a participant the right to purchase one Common Share at a specified price. The exercise price of each Option shall not be less than the discounted market price on the grant date and as approved by the Board of Directors of the Company. The Options can be granted for a maximum term of ten years.

 

The following summarizes the Option activity:

 

   Three months ended   Year ended 
   March 31, 2026   December 31, 2025 
   Number Outstanding  

Weighted Average Exercise Price

$

   Number Outstanding  

Weighted Average Exercise Price

$

 
Outstanding, beginning of the year   1,012,740    21.51    779,343    25.60 
Granted   50,000    8.00    299,000    9.99 
Exercised   -    -    (12,000)   9.00 
Expired / Cancelled   (186,569)   11.08    (53,603)   19.58 
Outstanding, end of the period   876,171    22.96    1,012,740    21.51 

 

18
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

No Options were exercised for the three months ended March 31, 2026. The total intrinsic value of Options exercised for the year ended December 31, 2025, was $30,996.

 

During the three months ended March 31, 2026, the Company granted an aggregate of 50,000 Options to consultants. The Options have a term of 2 years, vested immediately on the date of grant and have a weighted average exercise price of $8.00 per Common Share.

 

The fair value of Options granted was calculated using the Black-Scholes Option Pricing Model. The volatility was determined using the historical daily volatility over the expected life of the Options. The expected life of the Options considered the contractual term of the Options, as well as an estimate of the time to exercise. The Black-Scholes Option Pricing Model used the following assumptions:

 

   Three months ended   Year ended 
   March 31, 2026   December 31, 2025 
Share price   5.37    8.208.70 
Strike price   8.00    9.8010.00 
Expected dividend yield   0%   0%
Expected forfeiture rate   0%   0%
Expected share price volatility range   77.39%   76.3-78.6%
Weighted average expected share price volatility   77.39%   77.5%
Risk free interest rate   2.56%   2.54%-2.70%
Expected life of Options   2 years    2.5-3.5 years 

 

For the three months ended March 31, 2026, a total of $252,699 (three months ended March 31, 2025 - $879,513) was recorded as share-based compensation expense and credited to additional paid-in capital related to Options.

 

Details of Options outstanding as at March 31, 2026, are as follows:

 

Options

Outstanding

  

Options

Exercisable

  

Expiry

Date

 

Exercise

Price

$

  

Intrinsic Value

$

 
 55,335    55,335   September 29, 2026   18.20    - 
 49,940    49,940   October 25, 2026   40.00    - 
 97,499    97,499   January 20, 2027   48.00    - 
 160,830    108,887   August 8, 2028   35.00    - 
 148,567    100,433   August 14, 2029   22.00    - 
 15,000    12,917   December 4, 2029   9.80    - 
 287,500    287,500   March 18, 2030   10.00    - 
 11,500    8,500   April 24, 2030   9.80    - 
 50,000    50,000   February 1, 2028   8.00    - 
 876,171    771,011            - 

 

19
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

RSUs

 

An RSU is an Award that, upon settlement, entitles the recipient participant to receive one Common Share. The number, terms, and vesting conditions of RSUs awarded will be determined by the Board of Directors from time to time. The Company uses the fair value method of accounting for the recording of RSU grants, and the fair value of the RSUs is determined based on the closing price of the Company’s Common Shares on the grant date.

 

During the three months ended March 31, 2026, the Company granted an aggregate of 134,300 RSUs to employees, directors, officers and consultants with 47,800 vesting in full on the first anniversary of the date of grant, and the remaining 86,500 vesting in equal instalments on the second and third anniversary of the grant date.

 

The following is a continuity of the RSUs which are fixed and are not subject to vesting conditions other than service:

 

   Three months ended   Year ended 
   March 31, 2026   December 31, 2025 
  

Number Outstanding

  

Weighted Average Grant-Date Fair Value Per Award

$

  

Number Outstanding

  

Weighted Average Grant-Date Fair Value Per Award

$

 
Outstanding, beginning of the year   524,592    7.51    50,000    12.00 
Granted   134,300    5.37    491,262    7.20 
Vested / Settled   (133,750)   8.13    (16,670)   12.00 
Expired / Cancelled   (12,502)   4.91    -    - 
Outstanding, end of the period   512,640    5.67    524,592    7.51 

 

For the three months ended March 31, 2026, a total of $647,357 (three month ended March 31, 2025 – $148,068) was recorded as share-based compensation expense and credited to additional paid-in capital related to RSUs. The total intrinsic value of RSUs redeemed during the three months ended March 31, 2026, was $422,650 and intrinsic value of shares withheld for taxes was $75,374 (three months ended March 31, 2025 – $nil and $nil, respectively).

 

DSUs

 

DSUs are granted annually by the Board of Directors and outstanding DSUs are settled in cash upon redemption. The number and vesting conditions of DSUs awarded will be determined by the Board of Directors from time to time. Each director may elect to receive any part or all of their cash-based portion of director fees in DSUs.

 

The DSUs credited to the account of a director may be redeemed no earlier than 90 days after the end of the year in which they ceased to be a director, and no later than the end of the calendar year following the year in which the holder ceases to be a director.

 

The following is a continuity of the DSUs:

 

   Number of Awards  

Price(1)

$

 
DSUs outstanding at December 31, 2024   108,236    8.70 
Granted   46,600    4.91 
Redeemed   (39,749)   7.49 
Cancelled   (4,699)   4.90 
DSUs outstanding at December 31, 2025   110,388    5.37 
Redeemed   (19,501)   5.88 
DSUs outstanding at March 31, 2026   90,887    3.50 

 

Note:

 

(1) For DSUs granted/cancelled and outstanding, price represents the closing price of the Company’s Common Shares on the grant date/cancellation date and balance sheet date, respectively. For DSUs redeemed, price represents the volume weighted average price on the TSXV for the last five trading days immediately preceding the redemption date.

 

 

20
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

During the three months ended March 31, 2026, the Company did not grant DSUs to Directors. During the three months ended March 31, 2026, the Company recorded a fair value adjustment gain of $99,619 on the outstanding DSUs (three months ended March 31, 2025 – gain of $10,824). During the three months ended March 31, 2026, the DSU compensation, net of fair value adjustments was a net gain of $43,828 (three months ended March 31, 2025 - net gain of $10,824). The total intrinsic value of DSUs redeemed during the three months ended March 31, 2026, was $114,683 and intrinsic value of shares withheld for taxes was $54,699 (March 31, 2025 –$nil and $nil, respectively).

 

The DSUs are classified as a derivative financial liability measured at fair value, with changes in fair value recorded in profit or loss. The fair value of the DSUs was determined based on the closing price of the Company’s Common Shares on the respective balance sheet date. As at March 31, 2026, the Company reassessed the fair value of the DSUs at $214,882 and recorded the amount as a DSU liability (December 31, 2025 - $373,392).

 

13. RELATED PARTY TRANSACTIONS

 

The following amounts due to related parties are included in trade payables and accrued liabilities (Note 8).

 

  

March 31, 2026

$

  

December 31, 2025

$

 
         
Directors and officers of the Company      -    540,443 
Total   -    540,443 

 

Amounts due to related parties at December 31, 2025, include severance payable of $500,000 due to the Company’s former Chief Executive Officer in accordance with the succession plan announced on December 15, 2025, which was paid upon his departure in January 2026.

 

Key management personnel are defined as members of the Board of Directors and certain senior management.

 

Key management compensation was related to the following:

 

   Three months ended March 31, 
  

2026

$

  

2025

$

 
Salaries and management fees   205,311    196,104 
Site operations and administration   205,010    426,914 
Director fees, net of DSU fair value movements   26,515    (10,824)
Share-based compensation   304,445    328,536 
Total compensation   741,281    940,730 

 

21
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

14. FAIR VALUE OF FINANCIAL INSTRUMENTS

 

ASC 820 - Fair Value Measurement establishes a three-tier fair value hierarchy. The fair value hierarchy’s three tiers are based on the extent to which inputs used in measuring fair value are observable in the market, and are as follows:

 

  Level 1: Quoted prices (unadjusted) in active markets for identical assets or liabilities;
     
  Level 2: Inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly; and
     
  Level 3: One or more significant inputs used in a valuation technique are unobservable in determining fair values of the asset or liability.

 

Determination of fair value and the resulting hierarchy requires the use of observable market data whenever available. The classification of an asset or liability in the hierarchy is based upon the lowest level of input that is significant to the measurement of fair value.

 

The carrying value of cash and cash equivalents, trade payables, accrued liabilities, vehicle financing and mortgage payable approximate their fair value due to their short-term nature or are at market rates. A summary of the carrying value and fair value of other financial instruments were as follows:

 

       March 31, 2026   December 31, 2025 
   Classification  

Carrying Value

$

  

Fair Value

$

  

Carrying Value

$

  

Fair Value

$

 
DSU liability(1)  Level 1    214,882    214,882    373,392    373,392 
NSR option liability(2)  Level 3    2,750,000    2,750,000    2,750,000    2,750,000 

 

Notes:

 

(1) For DSU liability, the fair value of the DSUs is measured using the closing price of the Company’s Common Shares at the end of each reporting period.
   
(2) The fair value of the NSR options is determined using a valuation model that incorporates such factors as discounted cash flow projections, metal price volatility, and risk-free interest rate. As the NSR options are exercisable entirely at the discretion of Cymbria and the underlying projects are in the exploration stage, the fair value of the call and put on the options as at March 31, 2026, and December 31, 2025, is $nil. The Option Payment of $2,750,000 was recorded as a non-current liability.

 

The following represents a summary of the Company’s future debt maturities based on the principal amounts outstanding for vehicle financing and mortgage payable at March 31, 2026:

 

2026

$

  

2027

$

  

2028

$

  

2029

$

  

2030

$

  

Total

$

 
 279,300    349,992    319,127    302,977    216,293    1,467,689 

 

22
 

 

 

Notes to the Unaudited Condensed Interim Consolidated Financial Statements

For the three months ended March 31, 2026 and 2025

(Expressed in Canadian dollars)

 

15. SEGMENTED INFORMATION

 

The Company has identified its Chief Executive Officer as its Chief Operating Decision Maker (“CODM”). The CODM evaluates the Company’s performance and segmented results based on Loss for the Period Before Other Items. The significant segment expenses reviewed by the CODM are consistent with the expense line items presented in Loss for the Period Before Other Items in the Company’s unaudited condensed interim consolidated statements of operations and comprehensive loss. The CODM uses Loss for the Period Before Other Items to assess segment performance against the Company’s planned results, and to allocate capital investment.

 

The Company operates in one reportable operating segment being that of the acquisition, exploration and evaluation of mineral properties in three geographic segments, being Botswana, Barbados and Canada. The Company’s geographic segments are as follows:

 

  

March 31, 2026

$

  

December 31, 2025

$

 
Current assets          
Canada   24,178,976    33,301,948 
Barbados   149,134    167,178 
Botswana   6,139,072    13,006,411 
Total   30,467,182    46,475,537 
           
Exploration and evaluation assets          
Botswana   41,404,363    42,730,629 
Property, plant and equipment          
Botswana   9,216,705    9,312,414 

 

16. CONTINGENT LIABILITIES

 

There are no environmental liabilities associated with the Mines as at the acquisition dates as all liabilities incurred prior to the acquisitions are the responsibility of the sellers, BCL and TNMC. The Company has an obligation for the rehabilitation costs arising subsequent to the acquisitions. As of March 31, 2026, there were no material rehabilitation costs for which the Company expects to incur, and management is not aware of or anticipating any contingent liabilities that could impact the financial position or performance of the Company related to its exploration and evaluation assets.

 

17. GENERAL AND ADMINISTRATIVE EXPENSES

 

Details of the general and administrative expenses are presented in the following table:

 

         
  

Three months ended

March 31,

 
  

2026

$

  

2025

$

 
Advisory and consultancy   67,995    11,489 
Filing fees   75,017    32,995 
General office expenses   135,827    32,015 
Insurance   176,725    76,478 
Professional fees   341,609    265,513 
Salaries and management fees   446,326    420,011 
Share-based compensation   734,912    821,881 
Total   1,978,411    1,660,382 

 

23
 

 

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

 

CAUTIONARY NOTE TO U.S. RESIDENTS CONCERNING DISCLOSURE OF MINERAL RESOURCES

 

On October 31, 2018, the U.S. Securities and Exchange Commission (the “SEC”) adopted the Modernization of Property Disclosures for Mining Registrants (the “New Rule”), introducing significant changes to the existing mining disclosure framework to better align it with international industry and regulatory practice, including NI 43-101. The New Rule was codified as 17 CFR Subpart 220.1300 and 229.601(b)(96) (collectively, “S-K 1300”) and replaced SEC Industry Guide 7. The New Rule became effective as of February 25, 2019, and issuers are required to comply with the New Rule as of the annual report for their first fiscal year beginning on or after January 1, 2021, and earlier in certain circumstances.

 

All mineral estimates constituting mining operations that are material to our business or financial condition included in this Quarterly Report on Form 10-Q (this “Report”), and in the documents incorporated by reference herein, have been prepared in accordance with S-K 1300 and are supported by initial assessments prepared in accordance with the requirements of S-K 1300. S-K 1300 provides for the disclosure of: (i) “Inferred Mineral Resources”, which investors should understand have the lowest level of geological confidence of all mineral resources and thus may not be considered when assessing the economic viability of a mining project and may not be converted to a Mineral Reserve; (ii) “Indicated Mineral Resources,” which investors should understand have a lower level of confidence than that of a “Measured Mineral Resource” and thus may be converted only to a “Probable Mineral Reserve”; and (iii) “Measured Mineral Resources,” which investors should understand have sufficient geological certainty to be converted to a “Proven Mineral Reserve” or to a “Probable Mineral Reserve”. Investors are cautioned not to assume that all or any part of Measured Mineral Resources or Indicated Mineral Resources will ever be converted into Mineral Reserves as defined by S-K 1300. Investors are cautioned not to assume that all or any part of an Inferred Mineral Resource exists or is economically or legally mineable, or that an Inferred Mineral Resource will ever be upgraded to a higher category.

 

CAUTIONARY NOTE REGARDING EXPLORATION STAGE COMPANIES

 

We are an exploration stage issuer and do not currently have any known mineral reserves and cannot expect to have known mineral reserves unless and until an appropriate technical and economic study is completed for the Mines (as defined below) that shows “Proven Mineral Reserves” or “Probable Mineral Reserves” as defined by Regulation S-K 1300. We currently do not have any “Proven Mineral Reserves” or “Probable Mineral Reserves”. There can be no assurance that the Mines or any of our other properties contains or will contain any such SEC-compliant “Proven Mineral Reserves” or “Probable Mineral Reserves” or that, even if such reserves are found, the quantities of any such reserves warrant continued operations or that we will be successful in economically recovering them.

 

Cautionary Note Regarding Forward-Looking Statements

 

This Report for NexMetals Mining Corp. contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian and U.S. securities laws. Forward-looking information and forward-looking statements in this Report include, but are not limited to, those relating to: the estimated timing and anticipated costs for the Company’s exploration and development activities at the Selebi Mines and Selkirk Mine for the period to September 30, 2026, including surface drilling programmes, capital expenditures, metallurgical and economic study work, and operating costs; the Company’s expected reporting on drill results; the Company’s anticipation of expansion of the Mineral Resource at the Selebi Mines through resource expansion drilling and underground development, and to complete updated Mineral Resource Estimates in the third quarter of 2026 and a Preliminary Economic Assessment in the second half of 2026; the Company’s intended metallurgical flowsheet and processing pathway, including the expectation that an on-site smelter or hydrometallurgical facility may not be required and that the Company intends to construct a new concentrator facility at the Selebi Mines; the Company’s plans to advance an updated MRE and metallurgical test work at the Selkirk Mine; the expectation that separate copper and nickel concentrates will be a viable alternative to bulk concentrate production; the expectation that negative operating cash flows will continue and that additional financing will be required to continue development of the Company’s material projects; the expectation that the proceeds from the November 2025 Financing will be sufficient to fund planned activities, including the completion of a PEA study for the Selebi Mines, and cover administrative costs into the fourth quarter of 2026; and the Company’s belief that it is well positioned in 2026 to accelerate resource growth and advance both projects toward future economic assessments. In some cases, you can identify forward-looking information by terminology such as “may,” “will,” “should,” “expects,” “plans,” “anticipates,” “believes,” “estimates,” “predicts,” “potential,” “continue” or the negative of these terms or other comparable terminology. In addition, any statements that refer to expectations, intentions, projections or other characterizations of future events or circumstances contain forward-looking information. Statements containing forward-looking information are not historical facts but instead represent management’s expectations, estimates and projections regarding future events or circumstances.

 

24
 

 

Forward-looking statements and forward-looking information are not guarantees of future performance and are based upon a number of estimates and assumptions of management at the date the statements are made. Such factors and assumptions may include, but are not limited to: the existing Selebi Mines MRE and the Selkirk MRE, and the assumptions regarding tonnages, grades, recoveries, and metal prices underlying those estimates, remain valid and reliable for purposes of the Company’s exploration planning; that approximately 30,000 metres of drilling at Selebi Main will generate sufficient geological data to support an updated MRE; the Company will be able to generate clean, high-grade separate copper and nickel concentrates from the Mines that meet industry-standard smelter acceptance criteria; the proceeds from the November 2025 Financing will be sufficient to fund planned activities, including the completion of a PEA study for the Selebi Mines, and cover administrative costs into the fourth quarter of 2026; the Company will be able to raise additional financing on acceptable terms to continue development beyond the current funding horizon; the Company’s interpretation of what constitutes a “compliant economic study” under the Botswana Mines and Minerals Act will be accepted by regulators; Section 42 and Section 43 applications will be submitted by December 31 2026; the Selkirk APA study phase (as extended to August 17, 2026) will be complied with, and the Company’s mining licences will remain in good standing; there will be no material changes to the Company’s current operational plans, workforce, contractor arrangements, or input costs (including fuel, power, and labour costs in Botswana); metal prices, exchange rates, and economic conditions will remain consistent with those prevailing at the date of this Report or, in the case of long-term price assumptions used in CuEq calculations, as disclosed herein.

 

Forward-looking statements and forward-looking information involve known and unknown risks, uncertainties and other factors that may cause our actual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by the forward-looking statements. These risks and other factors include, without limitation, the following risk factors, which should be read in conjunction with the risks and uncertainties described in Part I, Item 1A under the heading “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2025, in addition to the other information included in this Quarterly Report: drilling results may not confirm the anticipated continuity, grade, or thickness of mineralization; Mineral Resource Estimates may require material downward revision; operational risks (including equipment failures, contractor underperformance, weather, and supply chain disruptions) could delay programmes and increase costs; the Company may be unable to establish Mineral Reserves; the Selebi Mines Preliminary Economic Assessment may not demonstrate economic viability given the preliminary nature of the estimates and the significant expenses required to develop the Selebi Mines; metallurgical recoveries achieved in laboratory testing may not be reproducible at commercial scale; concentrates may not meet smelter acceptance criteria at larger production volumes; further economic evaluation may demonstrate that a hydrometallurgical facility or smelter is in fact required, materially increasing capital requirements; construction of a new processing facility may be subject to permitting delays, cost overruns, or infrastructure limitations; additional financing may not be available or may not be available on favourable terms; unfavourable economic conditions or investor sentiment may impair the Company’s ability to obtain financing; changes to the operational plan may require expenditures in excess of current working capital, shortening the anticipated funding horizon; the Company’s interpretation of a “compliant economic study” under the Botswana Mines and Minerals Act may not be accepted by regulators; the Company may be unable to obtain or retain necessary permits and licences; the Selkirk APA study phase extension may not be further extended; changes to taxation or environmental laws could increase costs or preclude economic development; the Company is exposed to political, economic, and currency risks inherent in operating in Botswana; metal prices and exchange rates may differ materially from those assumed, which could render the Company’s projects uneconomical and cause actual costs and economics to differ materially from those projected; and the other risk factors stated in the Company’s other public filings available on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov. Readers are cautioned that this list of risk factors should not be construed as exhaustive.

 

Given these uncertainties, you should not place undue reliance on these forward-looking statements and forward-looking information. Also, forward-looking statements and forward-looking information represent our management’s beliefs and assumptions only as of the date hereof. You should read this Report and the documents that we have filed as exhibits to this Report completely and with the understanding that our actual future results may be materially different from what we expect.

 

Except as required by law, we assume no obligation to update these forward-looking statements and forward-looking information publicly, or to update the reasons actual results could differ materially from those anticipated in these forward-looking statements, even if new information becomes available in the future. Given these risks and uncertainties, readers are cautioned not to place undue reliance on such forward-looking statements.

 

Unless otherwise indicated, all references to “$”, “C$” and “dollars” in this Report refer to Canadian dollars, references to “US$” in this Report refer to United States dollars and references to “BWP” in this Report refer to Botswanan pula. On March 31, 2026, the daily exchange rate: (i) for one United States dollar expressed in Canadian dollars was US$1.00 = C$1.3939 (or C$1.00 = US$0.7174); (ii) for one Botswanan pula expressed in Canadian dollars was BWP 1.00 = C$0.0999 (or C$1.00 = BWP 10.01); and (iii) for one Botswanan pula expressed in United States dollars was BWP 1.00 = US$0.0745 (or US$1.00 = BWP 13.42). “This quarter” or “the quarter” means the first quarter (“Q1”) of 2026.

 

25
 

 

Introduction

 

The following management’s discussion and analysis (this “MD&A”) of our financial condition and results of operation should be read in conjunction with the unaudited condensed interim consolidated financial statements of the Company and accompanying notes thereto for the quarters ended March 31, 2026, and 2025, (the “Quarterly Financial Statements”) appearing elsewhere in this Report. This discussion and analysis below includes forward-looking statements within the meaning of applicable securities laws that are subject to risks, uncertainties and other factors described in the “Risk Factors” section in Part II, Item 1A and elsewhere in this Report that could cause actual results to differ materially from those anticipated in these forward-looking statements as a result of various factors. Additionally, our historical results are not necessarily indicative of the results that may be expected for any period in the future. We caution you to read the “Cautionary Note Regarding Forward-Looking Statements” section of this Report.

 

This MD&A is intended to assist the reader to assess material changes in the financial condition of the Company during the quarter ended March 31, 2026, and the results of operations of the Company for the three-month periods ended March 31, 2026, and March 31, 2025. The Quarterly Financial Statements and the financial information contained in this MD&A were prepared in accordance with US GAAP and pursuant to the rules and regulations of the SEC.

 

In this MD&A, unless the context otherwise requires, references to “we”, “our”, “us”, “the Company” or “NEXM” refer to NexMetals Mining Corp. and its consolidated subsidiaries. All monetary amounts in the discussion are expressed in Canadian dollars unless otherwise indicated.

 

Company Overview

 

NEXM is a mineral exploration and development company focused on the discovery and advancement of high-quality Cu-Ni-Co-PGE resources. The principal assets of the Company are the Selebi Main and Selebi North Cu-Ni-Co mines in Botswana and related infrastructure, as well as the Cu-Ni-Co-PGE Selkirk mine in Botswana, together with associated infrastructure and four surrounding prospecting licenses.

 

The Company’s principal business activity is the exploration and evaluation of the Mines. The Selebi and Selkirk Mines are permitted with 10-year mining licences, granted in 2022, and renewable upon the submission of approved mine plans and other customary conditions, and benefit from significant local infrastructure. The Company’s Selebi Mines include two shafts, the Selebi Main and Selebi North shafts, and related infrastructure such as rail, power and roads.

 

NEXM is headquartered in Vancouver, British Columbia, Canada and its Common Shares are publicly traded on the Nasdaq and the TSXV under the symbol “NEXM”.

 

Highlights and Key Developments:

 

  On January 15, 2026, Sean Whiteford, the Company’s then President, assumed the role of Chief Executive Officer replacing Morgan Lekstrom.
     
  The Company announced the following appointment and reappointment to the Board of Directors:
       

    Warwick Morley-Jepson appointed on January 8, 2026; and
    Sean Whiteford, the Company’s CEO, reappointed on February 9, 2026, replacing Morgan Lekstrom.

 

  On February 2, 2026, the Company announced the appointment of David Eichenberg as Vice President, Geology.
     
  On March 19, 2026, the Company announced that it has engaged NH IR Advisory Corp to provide investor relations and strategic advisory services.
     
 

On April 9, 2026, the Company announced that Chris Leavy and James Gowans would not be standing for re-election as directors, and that Keith Marshall would stand for election at the Company’s annual general meeting to be held on May 27, 2026.

 

Corporate Social Responsibility

 

The Company is committed to conducting its business in a socially responsible and sustainable manner, with a focus on environmental stewardship, health and safety, community engagement and ethical conduct. The Company has established policies and procedures in its Code of Business Conduct and Ethics to ensure compliance with applicable laws and regulations, as well as industry standards for responsible mining. NEXM recognizes the importance of stakeholder engagement and works closely with local communities, indigenous groups and other stakeholders to ensure their concerns and perspectives are heard and addressed.

 

26
 

 

Mineral Properties

 

Statement on Disclosure Regarding Mineral Properties

 

The information that follows relating to the Selebi Mines is derived from, and in some instances is an extract from, the Selebi Technical Report Summary (“Selebi TRS”) entitled “S-K 1300 Technical Report Summary Selebi Mines, Central District, Republic of Botswana” with an effective date of June 30, 2024 and a signature date of December 17, 2024, prepared by SLR Consulting (Canada) Ltd., prepared in compliance with the SEC’s Modernization of Property Disclosures for Mining Registrants set forth in subpart 1300 of Regulation S-K.

 

The information that follows relating to the Selkirk Mine is derived from, and in some instances is an extract from, the Selkirk Technical Report Summary (“Selkirk TRS”) entitled “S-K 1300 Technical Report Summary, Selkirk Nickel Project, North East District, Republic of Botswana” with an effective date of November 1, 2024, and a signature date of January 8, 2025, prepared by SLR Consulting (Canada) Ltd., prepared in compliance with the SEC’s Modernization of Property Disclosures for Mining Registrants set forth in subpart 1300 of Regulation S-K.

 

The qualified persons of SLR Consulting (Canada) Ltd. meet the qualifications specified under the definition of “qualified person” under Item 1300 of Regulation S-K. Portions of the following information are based on assumptions, qualifications and procedures which are not fully described herein. Reference should be made to the full text of the Selebi TRS and Selkirk TRS, which have been included as Exhibit 96.1 and 96.2 to the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2025, respectively. In the event that we determine that any modifying factors, estimates and other scientific and technical information in the reports materially change, we may update or file a new technical report in the future. The Selebi Mines and Selkirk Mine are exploration stage properties.

 

Further information on assay results can be found in the Company’s news releases which are available on the Company’s website (https://nexmetalsmining.com/). The Company’s website is not incorporated in this Report. Assay results are publicly released as they are received and confirmed by the Company.

 

Exploration and Evaluation Activities

 

The following table outlines the key milestones, estimated timing and costs related to each of the Mines, based on the Company’s reasonable expectations, intended courses of action and current assumptions and judgement, with information based as of March 31, 2026.

 

Key Milestones for Project   Expected Timing of Completion   Anticipated Costs
Exploration and Development        
Selebi Main Surface Drilling Program   Ongoing, costs to September 30, 2026   $7.2 million to $8.0 million
Selebi Mines underground development(1)   Ongoing, costs to September 30, 2026   $0.3 million to $0.7 million
Capital expenditures(2)   Ongoing, costs to September 30, 2026   $0.7 million to $1.3 million
Studies & Operating Costs        
Advancing project economics(3)   Ongoing, costs to September 30, 2026   $2.0 million to $2.5 million
Operating costs   Ongoing, costs to September 30, 2026   $7.0 million to $7.6 million

 

Notes:

 

  (1) Includes Selebi Mines underground development costs for April and May 2026. The Company has reallocated funds originally planned for underground development works over the remainder of 2026 to expanding and extending the Selebi Main Surface Drilling Program.
  (2) Includes mobile equipment refurbishments, pumps, electrical equipment, and critical spares for drills.
  (3) Includes advancing project economics through further metallurgical sampling and testing, further refinement of flowsheet design, Mineral Resource Estimates for the Mines, and the Selebi Mines Preliminary Economic Assessment.

 

Readers are cautioned that the above represents the opinions, assumptions and estimates of management considered reasonable at the date the statements are made and are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those described above. See “Cautionary Note Regarding Forward Looking Statements.”

 

27
 

 

Selebi Mines, Botswana

 

The Selebi Mines are located in Botswana approximately 150 km southeast of the city of Francistown, and 410 km northeast of the national capital Gaborone. The Selebi Mines consist of a single mining licence covering an area of 11,504 hectares which expires May 26, 2032 and can be renewed. The mining licence is centred approximately at 22°03’00”S and 27°47’00”E. The Selebi Mines’ current infrastructure includes two previously operating mines, Selebi Main (#2 Shaft) and Selebi North (#4 Shaft), and associated surface infrastructure.

 

Selebi Mines Mineral Resource Estimate, June 30, 2024

 

      Tonnage   Grade   Contained Metal 
Classification  Deposit  (Mt)   (% Cu)   (% Ni)   (000 t Cu)   (000 t Ni) 
Indicated  Selebi North   3.00    0.90    0.98    27.1    29.5 
   Total Indicated   3.00    0.90    0.98    27.1    29.5 
Inferred  Selebi Main   18.89    1.69    0.88    319.2    165.5 
   Selebi North   5.83    0.90    1.07    52.5    62.4 
   Total Inferred   24.72    1.50    0.92    371.7    227.9 

 

The key assumptions, parameters, and methods used to estimate the mineral resources are contained in the Selebi TRS. Readers are cautioned not to assume that all or any part of Indicated Mineral Resources will ever be converted into Mineral Reserves as defined by S-K 1300. Readers are cautioned not to assume that all or any part of an Inferred Mineral Resource exists or that, if it exists, is economically or legally mineable, or that an Inferred Mineral Resource will ever be upgraded to a higher category.

 

Selebi North

 

In 2023, an underground resource and exploration drilling program at Selebi North was initiated. The program was a combination of infill and exploration drilling to follow the extension of the mineralization down-dip and down-plunge. In March 2025, the Selebi North Underground (“SNUG”) Resource Expansion Drilling program commenced targeting Borehole Electromagnetic (“BHEM”) plates located down-dip and down-plunge from the N3, N2, and South Limbs.

 

The 2025 program comprised 9,656 metres in 11 completed holes and 6 abandoned holes, was designed to support resource expansion and more specifically, the down plunge and strike continuity of mineralization in the South Limb and down plunge extent of N3. The program has been successfully completed in 2026, with results confirming the continuity of high-grade mineralization along key target zones. The program extended the footprint of the South Limb mineralization approximately 315 metres down-plunge beyond the 2024 Mineral Resource Estimate (“2024 Selebi Mines MRE”), expanding the South Limb plunge extent by roughly 35% and the deepest holes indicating improving copper grades down-plunge.

 

Highlights from hole SNUG-25-197, a step-out hole that was testing South Limb mineralization continuity down dip and along strike and one of three final holes released on April 1, 2026, included 18.80 metres of 4.69% CuEq1 (2.10% Cu, 1.26% Ni) including 6.45 metres of 5.67% CuEq1 (2.25% Cu, 1.66% Ni).

 

Drilling continues to reinforce confidence in the scale and continuity of the SNUG deposit, with recent step-out results complementing previously reported thick, continuous high-grade intervals, supporting the potential to rapidly add tonnage to an updated Mineral Resource Estimate. Assays for a total of approximately 42,672 metres across 95 completed holes at Selebi North have been completed subsequent to the 2024 Selebi Mines MRE.

 

 

1CuEq was calculated using the formula CuEq=Cu+2.06*Ni assuming long-term prices of US$10.50/lb Ni and US$4.75/lb Cu, and nickel and copper recoveries of 72.0% and 92.4%, respectively, derived from metallurgical studies which consider a conceptual bulk concentrate scenario.

 

28
 

 

Selebi Main Surface Drilling & Flexure Zone

 

During the second quarter of 2025, the Company commenced the surface drilling program targeting BHEM plates in the 2-kilometre gap zone between the Selebi North and Selebi Main deposits known as the “Hinge”. The program was designed to demonstrate the broader scale potential of the Selebi Mines and to further support the Company’s core thesis that these deposits are larger than previously recognized.

 

Initial Hinge drilling consisted of four widely spaced holes, with all holes intersecting multiple zones of mineralization, supporting potential continuous mineralization between Selebi Main and Selebi North. SMD-25-201, located down plunge of Selebi Main, intersected three zones including 3 metres of massive sulphides. BHEM results refined targeting down plunge of the existing Selebi Main resource, leading to follow-up hole SMD-25-205, which intersected 11.05 metres of 7.31% CuEq1 (3.00% Cu and 2.09% Ni), including 5.75 metres of 8.73% CuEq1 (3.98% Cu and 2.31% Ni) located 130 metres beyond the existing Selebi Main resource within the emerging Selebi Main Flexure Zone.

 

Following results from the BHEM data on drill hole SMD-25-201, historic hole sd144 was extended and a subsequent BHEM survey identified a high-priority conductive anomaly (the “Super Conductor”) with results indicating that the strongest portion of the anomaly remained untested and defining additional high-priority targets to the north. The Super Conductor reflects the highest-amplitude BHEM response recorded at Selebi Main in the Company’s history.

 

Further drilling results have confirmed the presence of an emerging Flexure Zone at Selebi Main where the mineralized system changes orientation, extending both down-dip and down-plunge from the existing Selebi Main resource, highlights of which include:

 

  SMD-25-203 - tested the southern portion of the two kilometre gap between the Selebi Main and Selebi North deposits and intersected 16.10 metres of sulphide mineralization, located 385 metres down-plunge of SMD-25-201 and 620 metres beyond the 2024 MRE.
  SMD-26-208 - intersected three mineralized horizons, including a lower zone with a thickness of 7.45 metres.
  SMD-26-209 - intersected 10.40 metres of 6.82% CuEq (3.09% Cu, 1.83% Ni), located 320 metres down-dip of the 2024 MRE.

 

To date, a total of 22,247 metres has been drilled as part of the surface program, comprising eight completed holes, one hole extension, four abandoned holes and four holes currently in progress.

 

The program is being executed using three company-owned underground U5 drills which were converted into surface A5 drills, and two Marcotte HTM2500 drills purchased by the Company capable of drilling to depths of 2,500 metres (NQ core), the second of which arrived on site on April 28, 2026.

 

A third U5 to A5 drill conversion kit arrived on site during the first quarter of 2026 and the A5 surface drill was mobilized on February 18, 2026. The Company has also purchased a second Marcotte deep drill which is now mobilized and drilling.

 

Operating a Company-owned drill fleet provides increased operational flexibility, cost efficiency, and scheduling control, while reducing reliance on third-party contractor availability. The Company also expects the in-house fleet to support improved capital efficiency over the longer term as drilling activity continues to scale across the Selebi Project.

 

The presence of thick, continuous massive sulphide intervals in holes spaced more than 300 metres apart supports the Company’s interpretation of a robust and laterally extensive mineralized system at Selebi Main. These results confirm that the Selebi Main mineralized system remains open well beyond current resource boundaries, highlighting strong potential to add significant tonnes in a new MRE planned for the second half of 2026.

 

 

1CuEq was calculated using the formula CuEq=Cu+2.06*Ni assuming long-term prices of US$10.50/lb Ni and US$4.75/lb Cu, and nickel and copper recoveries of 72.0% and 92.4%, respectively, derived from metallurgical studies which consider a conceptual bulk concentrate scenario.

 

29
 

 

Studies

 

Following the completion of comprehensive technical and trade-off studies, the Company began evaluating the construction of a new processing facility at the Selebi Mines to produce concentrate for commercial sale, or, alternatively, for further refining, and does not plan to restart the existing concentrator or smelter from the original BCL operations, which were placed on care and maintenance in 2016 and remain under separate ownership. The Company is also evaluating pre-concentration using x-ray transmission technology (“XRT”) which, to date, has demonstrated the potential to reduce the amount of waste rock being sent to the processing circuit and enhance the head grade by over 15% compared to a bulk sample. By reducing the volume of waste that is directed to the processing circuit, the waste volume directed to grinding and flotation circuits could be substantially reduced, improving cost and efficiency.

 

During the first quarter of 2026, the Company completed the metallurgical studies at Blue Cost Research (“BCR”) labs. The program comprised flowsheet development, optimization and variability testing using the master Selebi Mines composite sample. Locked Cycle Tests (“LCT”) were successful in minimizing the nickel content in the copper concentrate and increasing nickel recoveries in the nickel concentrate. Preliminary LCTs achieved copper recovery of 80.6% at a grade of 29.4% copper in copper concentrate and nickel recovery of 53.0% at a grade of 10.0% nickel in nickel concentrate. Final LCTs aimed at reducing nickel in copper concentrate achieved copper recovery of 86.4% with nickel misplacement at less than 1%. Final concentrate assay results confirmed that both copper and nickel concentrates are expected to meet industry-standard smelter acceptance criteria, supporting a clear pathway to commercial sales. The concentrates exhibit very low levels of deleterious elements, all below penalty thresholds, which enhances marketability and potential offtake terms.

 

The optionality to produce separate saleable concentrates supports potential restart scenarios with significantly lower capital intensity and decreased execution risk. Based on these results, and subject to further economic evaluation, the Company now expects to have an alternative path forward, in which an on-site smelter or hydrometallurgical facility may not be required, significantly derisking the capital requirements and operational complexity of future production at the Selebi Mines.

 

The Company commenced a Preliminary Economic Assessment (“PEA”) in October 2025 for the Selebi Mines under the separate saleable concentrates scenario, the scope of which includes mine design and scheduling, process engineering, infrastructure planning, a processing facility and capital and operating cost estimation. The PEA is expected to be completed in the second half of 2026, following the completion of the new MRE. To date, the environmental documentation in support of the PEA has been completed, and engineering activities have focused on completing trade-off studies in advance of completing the new MRE.

 

Costs

 

During the three months ended March 31, 2026, the Company incurred $7,115,952 (three months ended March 31, 2025 - $5,944,153) in exploration and evaluation expenditures on the Selebi Mines.

 

As of March 31, 2026, the Company had incurred $43,176,889 to acquire the Selebi Mines, and a further $107,028,311 in exploration and evaluation expenditures project-to-date.

 

30
 

 

Outlook

 

Building on the targets identified to-date, the Company is executing on a Selebi Main resource expansion drilling program from surface using BHEM surveys to define drill targets, with approximately 30,000 metres planned to support resource expansion at Selebi Main throughout 2026. Drilling will continue to test both the Main Zone and Lower Zone, where historical drilling and BHEM modelling indicate increasing thickness and continuity down-dip and down plunge to the north. Drilling is now focused on a 200-metre spacing to allow for the expansion of the Inferred Resource, and sequencing will be guided by ongoing geophysical interpretation, allowing the Company to target conductive plates as results are received. The program is anticipated to materially expand the Inferred Resource and generate the geological data required for an updated MRE planned for the second half of 2026. Drill results are expected to be reported on a regular basis throughout 2026.

 

Underground development to support future infill drilling for economic studies at Selebi North was completed during the period. Key infrastructure milestones include the completion of critical ventilations, stormwater drainage works and development of the diamond drill bay. The Company will be pausing underground development works in May to prioritize resources toward expanding and extending the Selebi Main Surface Drilling Program.

 

The completed BCR metallurgical program demonstrated the ability to produce two separate saleable concentrates with controlled nickel deportment to the copper concentrate, while identifying key parameters for further optimization in future test work. The results have been incorporated into the development of a recovery estimation model.

 

Results from the Selebi North Underground Resource Expansion Drilling program, ongoing results from the Selebi Main resource expansion drilling program, and BCR metallurgical test results and recovery work will be incorporated into a new MRE and PEA planned for completion in the second half of 2026.

 

Selkirk Mine, Botswana

 

The Selkirk Mine is located in the northeast of Botswana approximately 28 km southeast of the city of Francistown, and 450 km northeast of the national capital Gaborone. The Selkirk Mine consists of a single mining licence (2022/7L) covering an area of 1,458 hectares (14.58 km2) and four prospecting licences (PL050/2010, PL051/2010, PL210/2010, and PL071/2011) covering a total of 12,670 hectares (126.7 km2). The mining and prospecting licences expire May 26, 2032, and March 31, 2027, respectively, and are renewable.

 

Selkirk Mine Mineral Resource Estimate, November 1, 2024

 

   Tonnage   Grade   Contained Metal 
Classification  (Mt)   (% Cu)   (% Ni)   (g/t Pd)   (g/t Pt)   (000 t Cu)   (000 t Ni)   (000 oz Pd)   (000 oz Pt) 
Inferred   44.2    0.30    0.24    0.55    0.12    132    108    775    174 

 

The key assumptions, parameters, and methods used to estimate the mineral resources are contained in the Selkirk TRS. Readers are cautioned not to assume that all or any part of an Inferred Mineral Resource exists or that, if it exists, is economically or legally mineable or that an Inferred Mineral Resource will ever be upgraded to a higher category.

 

Exploration

 

In July 2025, the Company commenced a 3-hole exploration program targeting untested historical Versatile Time-Domain Electromagnetic anomalies located immediately south of the Selkirk resource. The Company has completed the 3-hole exploration program, which consisted of 522 metres. Two of the three drill holes are located along the same geological horizon of the Selkirk deposit and intersected intervals of massive and disseminated sulphides. Assays for the 3-hole exploration program are pending.

 

During the first quarter of 2026, the Company received the results of its historical drill core re-sampling program, which was undertaken to obtain complete cobalt and PGE analyses in support of resource expansion and reclassification in an updated MRE. A total of 17 holes from a previous program were completed with assays announced in October 2024, while results from an initial 6 holes of the current 34-hole program were released on August 28, 2025. The assays for the remaining 28 holes were released March 19, 2026, highlights of which include 180.80 metres of 1.31% CuEq2 in hole DSLK211. High grade footwall mineralization was also identified as an exploration target, with assays of 6.90 metres of 7.92% CuEq2 in hole DSLK077 and 5.90 metres of 2.79% CuEq2 in hole DSLK134.

 

The results for the program have confirmed wide intervals of Cu-Ni-Co-PGE mineralization exceeding the current resource cut-off grade of 0.46% CuEq2 outside the 2024 Selkirk Mineral Resource Estimate (“2024 Selkirk MRE”) and within the conceptual pit shell. This data will be incorporated into the updated MRE expected in the second quarter of 2026.

 

Work continues on the four prospecting licences, consisting of soil sampling programs designed to follow up on historic exploration data.

 

 

2CuEq% calculated using the formula Cu% + Ni%*(55.605/53.913) + Pd g/t*(22.948/53.913) + Pt g/t*(14.891/53.913) from the Selkirk Technical Report. 

 

31
 

 

Studies

 

On April 27, 2026, the Company reported initial LCT results using large diameter core from the 2025 drill program which confirmed the ability to produce separate copper and nickel concentrates, supporting a viable alternative to historical bulk concentrate production. Copper concentrate achieved 81.3% recovery at a high 30.2% Cu grade with minimal nickel content (0.62%), while nickel concentrate achieved 54.4% recovery at a grade of 10.9% Ni. When compared to the concentrate parameters used in the 2024 Selkirk MRE:

 

Copper recovery in copper concentrate increased 16%, from 70.0% to 81.3%;
Copper losses to tailings cut by 56%, from 26.2% to 11.4%;
Nickel concentrate grade jumped 60%, from 6.8% to 10.9%;
Copper concentrate grade held firm at approximately 30%; and
Gold, Silver and Cobalt are expected to be payable in the Copper and Nickel concentrates respectively.

 

PGEs, along with gold, silver and cobalt, which were not comprehensively assayed historically, are now being evaluated, with silver and cobalt being assessed for the first time. These additional metals have the potential to provide meaningful incremental upside to overall project economics. Ongoing metallurgical flowsheet development is aimed at further improving recoveries and concentrate quality, including the evaluation of XRT pre-concentration sorting. The study results will be incorporated into an updated MRE and future economic evaluations.

 

Costs

 

During the quarter ended March 31, 2026, the Company incurred $586,278 (three months ended March 31, 2025 - $101,968) in exploration and evaluation expenditures on the Selkirk Mine. The Company incurred $327,109 to acquire the Selkirk Mine, and has incurred a further $8,837,191 in exploration and evaluation expenditures project-to-date as at March 31, 2026.

 

Outlook

 

With the recent re-sampling program now complete and the receipt of LCT results, the Company will integrate these results into an updated MRE which is expected to be completed in the second quarter of 2026. In parallel, the Company will continue with additional flowsheet development testwork to further improve recoveries and concentrate quality. Soil sampling assay results on the adjoining prospecting licences will guide further work programs in 2026.

 

Other Properties

 

Canadian Nickel Projects - Sudbury, Ontario

 

Post Creek Property

 

The Post Creek property is located 35 kilometres east of Sudbury in Norman, Parkin, Alymer and Rathburn townships and consists of 64 unpatented mining claim cells, covering a total area of 847 hectares held by the Company. The Company acquired the property through an option agreement in April 2010, which was subsequently amended in March 2013. As at the date of this Report, the Company holds a 100% interest in the Post Creek property and is obligated to pay advances on a net smelter return of $10,000 per annum, which will be deducted from any payments to be made under the net smelter return.

 

The claims have sufficient work credits to keep them in good standing until 2030. No exploration work was completed in 2026 on the Post Creek property, and no work is currently planned for the remainder of 2026.

 

Halcyon Property

 

The Halcyon property is located 35 kilometres northeast of Sudbury in the Parkin and Aylmer townships and consists of 62 unpatented mining cells for a total of 1,024 hectares. Halcyon is adjacent to the Post Creek property and is approximately two kilometres north of the Podolsky Mine. The property was acquired through an option agreement and as at the date of this Report, the Company holds a 100% interest in the Halcyon property and is obligated to pay advances on a net smelter return of $8,000 per annum, which will be deducted from any payments to be made under the net smelter return.

 

The claims are in good standing through 2030. No exploration work was completed in 2026 on the Halcyon property, and no work is currently planned for the remainder of 2026.

 

32
 

 

Overall Performance and Results of Operations

 

As at the date of this Report, the Company has not earned revenue nor proved the economic viability of its projects. The Company’s expenses are not subject to seasonal fluctuations or general trends other than factors affecting costs such as inflation and input prices. The Company’s expenses and cash requirements will fluctuate from period to period depending on the level of activity at the projects, which may be influenced by the Company’s ability to raise capital to fund these activities. Comparisons of activity made between periods should be viewed with this in mind. The Company’s quarterly results may be affected by many factors such as timing of exploration activity, share-based compensation costs, capital raised, marketing activities and other factors that affect the Company’s exploration and evaluation activities.

 

The following table summarizes the Company’s operations for the three-month periods ended March 31, 2026, and March 31, 2025:

 

   Three months ended March 31, 
   2026   2025 
   $   $ 
         
EXPENSES          
General exploration expenses   7,720,395    6,135,777 
Depreciation and amortization   589,089    635,828 
General and administrative expenses   1,978,411    1,660,382 
Investor relations and communications   221,671    209,398 
Director fees   126,134    - 
Fair value movement of DSUs   (99,619)   (10,824)
Net foreign exchange loss   237,210    251,425 
LOSS FOR THE PERIOD BEFORE OTHER ITEMS   10,773,291    8,881,986 
           
OTHER ITEMS          
Interest income, net   (149,854)   (64,461)
Interest expense and accretion on Term Loan   -    428,371 
Loss on Term Loan extinguishment   -    5,982,434 
NET LOSS FOR THE PERIOD   10,623,437    15,228,330 

 

  General exploration expenses increased by $1,584,618 for the three months ended March 31, 2026, as the Company advanced its drilling and study work at the Mines through expansionary drilling, metallurgical flowsheet development, and other studies and evaluation work. In the prior year comparable period, the Company put drilling activities on hold mid-February 2025 through to the end of the quarter to conserve cash. For more information relating to the activities, see “Exploration and Evaluation Activities”.
     
  Depreciation and amortization decreased by $46,739 for the three months ended March 31, 2026, due to the acceleration of depreciation on certain software assets for the three months ended March 31, 2025, partially offset by significant property, plant and equipment acquisitions throughout 2025.
     
  General and administrative expenses increased by $318,029 for the three months ended March 31, 2026. The increase is attributable to higher insurance premiums following the Company’s Nasdaq listing, as well as costs related to the enhancement of cybersecurity and internal controls which were implemented during 2025.

 

  Director fees increased by $126,134 for the three months ended March 31, 2026, due to the timing of cash-based director fee payments and the expense amortization of DSUs granted in November 2025. During the first quarter of 2025, no DSUs were granted and no cash-based director fees were paid as the Company was evaluating its Boards’s compensation plan.
     
  Fair value movement of DSUs reflects the mark-to-market revaluation of outstanding DSUs based on the Company’s Common Share price as of March 31, 2026.
     
  Interest income, net represents interest earned on cash and cash equivalent deposits and interest incurred on the Company’s vehicle financing and mortgage payable. Net interest income increased by $85,393 for the three months ended March 31, 2026, due to higher cash balances during the period which was partially offset by interest expense from the Syringa Lodge mortgage which commenced part way through the third quarter of 2025.
     
  Interest expense and accretion on Term Loan comprises accrued interest and related accretion recognized prior to the conversion of the Term Loan to equity during the first quarter of 2025.
     
  Loss on Term Loan extinguishment represents the difference between the fair value of the Settlement Units issued and the carrying amount of the Term Loan on the date it was converted to equity.

 

33
 

 

Cash Flows

 

The following table summarizes the Company’s cash flows:

 

  

Three months ended

March 31,

 
  

2026

$

  

2025

$

 
Cash flows          
Operating activities   (12,203,947)   (6,294,964)
Investing activities   (768,496)   (50,033)
Financing activities   (266,197)   45,568,232 
Change in cash and cash equivalents before effects of exchange rate changes   (13,238,640)   39,223,235 
Effect of exchange rate changes on cash and cash equivalents   (320,988)   137,671 
Change in cash and cash equivalents for the period   (13,559,628)   39,360,906 
Cash and cash equivalents at the beginning of the period   39,780,384    6,105,933 
Cash and cash equivalents at the end of the period   26,220,756    45,466,839 

 

Operating Activities

 

Net cash used in operating activities for the three months ended March 31, 2026, increased by $5,908,983 compared to the prior year comparable period. This increase was primarily driven by: (i) net working capital movements, including the prepayment of consumables for expansionary drilling to capture volume discounts and preferential pricing, as well as the settlement of accrued severance obligations from prior periods in the current quarter, compared to an increase in trade payables in the prior-year period as part of cash conservation measures; and (ii) an increase in general exploration expenses as the Company executed on its expansionary drilling, metallurgical flowsheet development, and other studies and evaluation work in the current year period, compared to scaled-back activities in the prior year comparable period.

 

Investing Activities

 

Key investing activities relate to the acquisition of property, plant and equipment. Net cash used in investing activities for the three months ended March 31, 2026, increased by $718,463 compared to the prior year comparable period. The higher spending in 2026 primarily relates to the remaining payment on a second deep drill and additional mobile and electrical equipment.

 

Financing Activities

 

Net cash provided by financing activities for the three months ended March 31, 2026, decreased by $45,834,429 compared to the prior year comparable period. The decrease primarily reflects the closing of the Private Placement financing (as defined herein) in March 2025 for gross proceeds of $46,000,000. The Company did not execute any public or private placements during the current year period.

 

34
 

 

Liquidity & Capital Resources

 

The Company, being in the exploration and evaluation stage, is subject to risks and challenges similar to companies in a comparable stage of exploration and evaluation. These risks include the challenges of securing adequate capital for exploration and advancement of the Company’s material projects, operational risks inherent in the mining industry, and global economic and metal price volatility. There is no assurance management will be successful in its endeavours.

 

The properties in which the Company currently has an interest are in the pre-revenue stage. Operating cash outflows are highly dependent upon the exploration and evaluation programs taking place at that time. As such, the Company is dependent on external financing to fund its activities and the advancement of its projects. In order to carry out the planned project advancement and cover administrative costs, the Company will need to use its existing working capital and raise additional amounts as needed.

 

As at March 31, 2026, the Company had $26,220,756 in available cash and cash equivalents (December 31, 2025 – $39,780,384), with no source of operating cash flows, nor any significant credit lines in place. As at March 31, 2026, the Company had working capital (calculated as total current assets less total current liabilities) of $26,519,278 (December 31, 2025 – $36,517,724). The decrease in working capital is a result of the use of cash in general exploration expenses and investment in drilling and other equipment.

 

Based on the Company’s current operational plan, the Company has sufficient working capital to advance its currently planned activities, including the completion of a PEA for the Selebi Mines, and to fund administrative costs into the fourth quarter of 2026.

 

The Company continues to actively monitor its funding requirements and intends to pursue a range of financing alternatives in advance of year-end 2026 to support the continued advancement of the Selebi Mines and the Selkirk Mine toward development.

 

Although the Company has been successful in prior financing activities, there can be no assurance that future financing efforts will be successful or that sufficient funds will be available on terms acceptable to the Company.

 

Going Concern

 

The ability of the Company to continue operations as a going concern is ultimately dependent upon achieving profitable operations and its ability to obtain adequate financing. The Company incurred a net loss of $10,623,437 for the three months ended March 31, 2026 (net loss of $15,228,330 for the three months ended March 31, 2025). To date, the Company has not generated profitable operations from its resource activities. It is not possible to predict whether future financing efforts will be successful or if the Company will attain a profitable level of operations. These material uncertainties cast substantial doubt about the Company’s ability to continue as a going concern. The accompanying unaudited condensed interim consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded asset amounts and classification of liabilities, and the reported expenses and comprehensive loss that might be necessary should the Company be unable to continue as a going concern. These adjustments could be material. In assessing whether a going concern assumption is appropriate, management considers all available information about the future, which is at least, but not limited to, twelve months from the date of this Report.

 

Contractual Obligations and Contingencies

 

As of March 31, 2026, the Company had commitments for capital expenditures over the next 12 months of $nil and the following other contractual obligations and commitments:

 

Selebi Mines

 

As per the Selebi APA, the final US$30,000,000 milestone payment remains outstanding and is payable on the earlier of completion of mine construction and production start-up (commissioning) by the Company, or December 1, 2029.

 

In addition to the Selebi APA, the purchase of the Selebi Mines is also subject to a royalty agreement as well as a contingent consideration agreement with the BCL Liquidator. The royalty agreement consists of a Net Smelter Return (“NSR”) royalty of 2% on the net value of sales of concentrate or other materials with respect to production from the Selebi mining licence, of which the Company has the right to buy-back 50%. The contingent consideration agreement consists of two components: (i) a sliding scale payment of US$0.50/tonne of ore up to US$1.40/tonne of ore with respect to the discovery of new mineable deposits greater than 25 million tonnes of ore from a base case of 15.9 million tonnes, with a minimum grade of 2.5% nickel equivalent, accrued at the time of a decision to mine; and (ii) price participation of 15% on post-tax net earnings directly attributable to an increase of 25% or more in commodity prices, on a quarterly basis, for a period of seven years from the date of first shipment of concentrate or other materials.

 

Both the Selebi Mines and Selkirk Mine are subject to a royalty payable to the Botswana Government of 5% of all precious metals sales and 3% of all base metals sales.

 

35
 

 

Selkirk Mine

 

In regard to the Selkirk Mine, the purchase agreement does not provide for a purchase price or initial payment for the purchase of the assets. The Selkirk APA provides that if Selkirk were commissioned earlier than Selebi, the payment of the third Selebi instalment of US$30 million, would trigger on Selkirk’s commission date. The Selkirk APA provides for a three-year study phase originally expiring August 17, 2025, which has been extended for one year to August 17, 2026.

 

In addition to the Selkirk APA, the purchase of the Selkirk Mine is also subject to a royalty agreement as well as a contingent consideration agreement with the TNMC Liquidator. The royalty agreement consists of an NSR of 1% on the net value of sales of concentrate or other materials with respect to production from the Selkirk mining licence, which the Company has the right to buy-back in full. The contingent consideration agreement is on similar terms as the Selebi Mines contingent consideration.

 

NSR Option

 

The Company received $2,750,000 from Cymbria for their right to participate in the Company’s right to repurchase one-half of the Selebi NSR and the entirety of the Selkirk NSR. Cymbria also has the right: (i) at any time following the date of any buyback exercise notice from PNRPL and/or PNGPL and prior to the first anniversary of sale of product, to terminate the option and receive from PNRPL and/or PNGPL a refund of the related option price paid by Cymbria; (ii) upon receipt from PNRPL and/or PNGPL of any termination, settlement or waiver of the buyback right or royalty agreement and prior to the first anniversary of sale of product, to exercise the option or terminate the option, and if terminated PNRPL and/or PNGPL shall refund the related option price paid by Cymbria; (iii) to exercise the option and compel PNRPL and/or PNGPL to exercise the buyback right at any time within the first nine months immediately following the first anniversary of sale of product and not less than 60 days prior to the date of exercise of the buyback right; and (iv) to require PNRPL and/or PNGPL to repurchase the option from Cymbria for an amount equal to the option price at any time commencing on the first anniversary of sale of product, provided PNRPL and/or PNGPL have not provided a buyback exercise notice or notice of any termination, settlement or waiver of the buyback right or royalty agreement to Cymbria.

 

Contingencies

 

There are no environmental liabilities associated with the Mines as at the acquisition dates as all liabilities incurred prior to the acquisitions are the responsibility of the sellers, BCL and TNMC. The Company has an obligation for the rehabilitation costs arising subsequent to the acquisitions. As of March 31, 2026, there were no material rehabilitation costs that the Company expects to incur, and management is not aware of or anticipating any contingent liabilities that could impact the financial position or performance of the Company related to its exploration and evaluation assets.

 

The Company’s exploration and evaluation assets are affected by the laws and environmental regulations that exist in the various jurisdictions in which the Company operates. It is not possible to estimate any future contingent liabilities and the impact on the Company’s operating results due to future changes in the Company’s development of its projects or future changes in such laws and environmental regulations. Such determinations are typically a component of a development project’s impact assessment and permitting.

 

36
 

 

Segmented Disclosure

 

The Company operates in one reportable operating segment, being that of the acquisition, exploration and evaluation of mineral properties, in three geographic segments, being Canada, Barbados, and Botswana. The Company’s geographic segments are as follows:

 

  

March 31, 2026

$

  

December 31, 2025

$

 
Current assets          
Canada   24,178,976    33,301,948 
Barbados   149,134    167,178 
Botswana   6,139,072    13,006,411 
Total   30,467,182    46,475,537 
           
Exploration and evaluation assets          
Botswana   41,404,363    42,730,629 
Property, plant and equipment          
Botswana   9,216,705    9,312,414 

 

The Company’s exploration and evaluation activities are assessed at the individual project level. The Selebi and Selkirk projects below make up the Botswana geographic segment.

 

   Three months ended March 31, 2026 
  

Selebi

$

  

Selkirk

$

  

Other

$

  

Total

$

 
Drilling   1,720,192    -    -    1,720,192 
Electricity   1,016,525    3,787    -    1,020,312 
Site operations, administration, & overhead   895,405    73,501    18,165    987,071 
Engineering & technical studies   769,869    52,256    -    822,125 
Infrastructure & equipment maintenance   768,875    -    -    768,875 
Geology   281,552    428,965    -    710,517 
Mine development   560,032    -    -    560,032 
Freight, tools, supplies, & other consumables   515,192    2,209    -    517,401 
Geophysics   253,560    8,406    -    261,966 
Health & safety   100,181    640    -    100,821 
Environmental, social & governance   85,939    -    -    85,939 
Share-based compensation   148,630    16,514    -    165,144 
Total   7,115,952    586,278    18,165    7,720,395 

 

37
 

 

Financial Instruments

 

ASC 820 - Fair Value Measurement establishes a three-tier fair value hierarchy. The fair value hierarchy’s three tiers are based on the extent to which inputs used in measuring fair value are observable in the market, and are as follows:

 

  Level 1: Quoted prices (unadjusted) in active markets for identical assets or liabilities;
  Level 2: Inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly; and
  Level 3: One or more significant inputs used in a valuation technique are unobservable in determining fair values of the asset or liability.

 

Determination of fair value and the resulting hierarchy requires the use of observable market data whenever available. The classification of an asset or liability in the hierarchy is based upon the lowest level of input that is significant to the measurement of fair value.

 

The carrying value of cash and cash equivalents, trade payables, accrued liabilities, vehicle financing and mortgage payable approximate their fair value due to their short-term nature or are at market rates. A summary of the carrying value and fair value of other financial instruments were as follows:

 

       March 31, 2026   December 31, 2025 
   Classification  

Carrying
Value

$

  

Fair

Value

$

  

Carrying
Value

$

  

Fair

Value

$

 
DSU liability (1)   Level 1    214,882    214,882    373,392    373,392 
NSR option liability (2)   Level 3    2,750,000    2,750,000    2,750,000    2,750,000 

 

Notes:

 

(1) For DSU liability, the fair value of the DSUs is measured using the closing price of the Company’s Common Shares at the end of each reporting period.
   
(2) The fair value of the NSR options is determined using a valuation model that incorporates such factors as discounted cash flow projections, metal price volatility, and risk-free interest rate. As the NSR options are exercisable entirely at the discretion of Cymbria and the underlying projects are in the exploration stage, the fair value of the call and put on the options as of March 31, 2026, and December 31, 2025, is $nil. The Option Payment of $2,750,000 was recorded as a non-current liability.

 

38
 

 

The Company’s financial instruments are exposed to certain risks as discussed below:

 

Interest Rate Risk

 

The Company’s exposure to interest rate risk arises from the interest rate impact on its cash and cash equivalents and debt facilities. Interest incurred on the vehicle financing and mortgage payable is based upon a variable base rate, being the lending institution’s prime lending rate, plus a fixed rate margin. Each one percentage point change in interest rates would result in a $14,677 change in annual interest expense.

 

Foreign Currency Exchange Risk

 

The Company primarily operates in Canada, Barbados and Botswana and undertakes transactions denominated in foreign currencies such as the US dollar and Botswana pula and, consequently, is exposed to exchange rate risks. The value of cash and other financial assets and liabilities denominated in foreign currencies can fluctuate with changes in currency exchange rates. Exchange risks are managed by matching levels of foreign currency balances with the related obligations and by maintaining operating cash accounts in non-Canadian dollar currencies.

 

The following table illustrates the estimated impact a 5% USD and BWP change against the CAD would have on net loss before tax as a result of translating the Company’s foreign denominated financial instruments:

 

Currency  Change  

Effect on
Net Loss

(Earnings)

Before Tax
$

   Change  

Effect on
Net Loss

(Earnings)

Before Tax

$

 
USD   +5%    (36,750)   -5%   36,750 
BWP   +5%    5,883    -5%   (5,883)

 

Credit Risk

 

The Company’s credit risk is primarily associated with its cash and cash equivalents. The Company’s exposure to credit risk arises from the potential default of the counterparty to its cash and cash equivalents, and the maximum exposure is limited to the carrying value of these instruments. The Company limits exposure to credit risk on its cash and cash equivalents by holding these instruments at highly rated financial institutions.

 

Liquidity Risk

 

Liquidity risk is the risk that the Company will encounter difficulty in meeting obligations associated with financial liabilities that are settled by delivering cash or another financial asset. The Company manages the liquidity risk inherent in these financial obligations by regularly monitoring actual cash flows against its budget, which forecasts expected cash availability to meet future obligations. The Company will defer discretionary expenditures, as required, to manage and conserve cash required for current liabilities.

 

39
 

 

Critical Accounting Estimates and Judgments

 

This management’s discussion and analysis of our financial condition and results of operations is based on our unaudited condensed interim consolidated financial statements, which have been prepared in accordance with U.S. GAAP. The preparation of these unaudited condensed interim consolidated financial statements requires us to make estimates and judgments that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities in our unaudited condensed interim consolidated financial statements. We base our estimates on historical experience, known trends and events, and other assumptions that we believe are reasonable under the circumstances, and we evaluate these estimates on an ongoing basis. Actual results may differ from these estimates under different assumptions or conditions. We consider an accounting estimate or assumption to be material when it involves a higher degree of complexity or significant management judgement. Our significant accounting policies are described in greater deal in “Note 2 – Basis of Presentation and Significant Accounting Policies” of our audited consolidated financial statements for the year ended December 31, 2025.

 

There have been no significant changes to the critical accounting estimates and judgements disclosed in our Annual Report on Form 10-K for the year ended December 31, 2025.

 

Item 3. Quantitative and Qualitative Disclosures About Market Risk

 

Quantitative and qualitative disclosures about market risk have been omitted as permitted under rules applicable to smaller reporting companies.

 

Item 4. Controls and Procedures

 

Disclosure Controls and Procedures

 

We maintain disclosure controls and procedures, as defined in Rule 13a-15(e) and Rule 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to ensure that information required to be disclosed by us in the reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and that such information is accumulated and communicated to our Chief Executive Officer and Chief Financial Officer as appropriate to allow timely decisions regarding required disclosure.

 

We carried out an evaluation, under the supervision and with the participation of our Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of our disclosure controls and procedures as of March 31, 2026. Based on the evaluation of these disclosure controls and procedures, management concluded that the Company’s disclosure controls and procedures were effective as of March 31, 2026.

 

Changes in Internal Control over Financial Reporting

 

There were no changes in our internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) during the quarter ended March 31, 2026, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

 

40
 

 

PART II — OTHER INFORMATION

 

Item 1. Legal Proceedings

 

We have no knowledge of any material, active, pending or threatened legal, administrative or judicial proceeding against us or our subsidiaries, nor are we, or any subsidiary, involved as a plaintiff or defendant in any material proceeding or pending litigation.

 

Item 1A. Risk Factors

 

Risks and other factors include those listed under “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2025, and elsewhere in this Report.

 

We caution readers that our business activities involve risks and uncertainties that could cause actual results to differ materially from those currently expected by management. We described the most significant risks that could impact our results in Part I, Item 1A. “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2025.

 

Investing in our common shares involves a high degree of risk. You should carefully consider the risks and uncertainties described in Part I, Item 1A under the heading “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2025, in addition to the other information included in this Quarterly Report on Form 10-Q before making an investment decision regarding our Common Shares. If any of these risks actually occur, our business, financial condition, or operating results would likely suffer, possibly materially, the trading price of our Common Shares could decline, and you could lose part or all of your investment.

 

Item 2. Unregistered Sales of Equity Securities AND USE OF PROCEEDS

 

The following table outlines the number of Common Shares and securities that are convertible to Common Shares issued by the Company pursuant to Section 4(a)(2) of the Securities Act of 1933, as amended (the “Securities Act”) as a transaction not involving a public offering and Rule 506 promulgated under the Securities Act, during the three months ended March 31, 2026.

 

Convertible Securities

 

On February 1, 2026, the Board approved a grant of RSUs representing an aggregate of 134,300 Common Shares to certain officers, employees and consultants. The RSUs were granted at a deemed price of $5.80 per RSU, representing the 10-Day volume weighted average price of the Company’s shares on the TSXV as of January 27, 2026. Of these RSUs, 47,800 will vest in full on the first anniversary of the date of grant, and the remaining 86,500 will vest in equal instalments on the second and third anniversary of the grant date.

 

On February 1, 2026, the Board also approved a grant of 50,000 Options to certain consultants. The Options have a term of 2 years, vested immediately on the date of grant and have an exercise price of $8.00 per Common Share.

 

Date of Issuance   Security  

Exercise Price per

Security ($)

  Number of Securities  
February 1, 2026   RSUs   N/A     134,300  
February 1, 2026   Options   8.00     50,000  

 

Item 3. Defaults Upon Senior Securities

 

None.

 

Item 4. Mine Safety Disclosures

 

Not applicable.

 

Item 5.  Other Information

 

Insider Trading Arrangements

 

During the three months ended March 31, 2026, none of our directors or officers (as defined in Rule 16a-1(f) of the Exchange Act) adopted, modified or terminated a Rule 10b5-1 trading arrangement or non-Rule 10b5-1 trading arrangement (as such terms are defined in Item 408 of Regulation S-K of the Securities Act).

 

41
 

 

Item 6. Exhibits

 

Exhibit No.   Description of Exhibit
     
10.1***   Consulting Services Agreement dated January 14, 2026, by and between the Company, Elkam Consulting Ltd. and Sean Whiteford (incorporated by reference to Exhibit 10.1 to the Company’s Current Report on Form 8-K filed on January 20, 2026)
     
10.2   Consulting Services Agreement dated February 9, 2026, between the Company and Morgan Lekstrom (incorporated by reference to Exhibit 10.1 to the Company’s Current Report on Form 8-K filed on February 13, 2026)
     
31.1*   Rule 13a-14(a)/15d-14(a) certification of Chief Executive Officer
     
31.2*   Rule 13a-14(a)/15d-14(a) certification of Chief Financial Officer
     
32.1**   Section 1350 certification, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
     
101. INS*   Inline XBRL Instance Document
     
101.SCH*   Inline XBRL Taxonomy Extension Schema Document
     
101.CAL*   Inline XBRL Taxonomy Extension Calculation Linkbase Document
     
101.DEF*   Inline XBRL Taxonomy Extension Definition Linkbase Document
     
101.LAB*   Inline XBRL Taxonomy Extension Labels Linkbase Document
     
101.PRE*   Inline XBRL Taxonomy Extension Presentation Linkbase Document
     
104   Cover Page Interactive Data File (formatted as inline XBRL and contained in Exhibit 101)

 

* Filed herewith.

** Furnished herewith.

*** Certain of the schedules (and similar attachments) to this exhibit have been omitted in accordance with Item 601(a)(5) of Regulation S-K under the Securities Act because they do not contain information material to an investment or voting decision and that information is not otherwise disclosed in the exhibit or the disclosure document. The registrant hereby agrees to furnish a copy of all omitted schedules (or similar attachments) to the SEC upon its request.

†Indicates a management contract or compensatory plan or arrangement.

 

42
 

 

SIGNATURES

 

Pursuant to requirements of the Securities Exchange Act of 1934, the Company has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

 

Date: May 13, 2026 NEXMETALS MINING CORP.
  (Registrant)
     
  By: /s/ Sean Whiteford
  Name: Sean Whiteford
  Title: Chief Executive Officer
    (principal executive officer)
     
  By: /s/ Brett MacKay
  Name: Brett MacKay
  Title: Chief Financial Officer
    (principal financial and accounting officer)

 

43

FAQ

What was NexMetals Mining Corp. (NEXM) net loss for Q1 2026?

NexMetals reported a net loss of $10.6 million for the quarter ended March 31, 2026. The loss mainly reflects exploration spending at the Selebi and Selkirk mines, depreciation, share-based compensation, and corporate overhead, with no offsetting revenue as the company remains in the exploration stage.

How much cash did NexMetals (NEXM) have at March 31, 2026?

NexMetals held $26.2 million in cash and cash equivalents at March 31, 2026, down from $39.8 million at year-end 2025. The decrease was driven by $12.2 million of operating cash outflows and $0.8 million of capital spending, partly offset by small financing movements and currency effects.

What were NexMetals’ exploration expenses in Q1 2026?

General exploration expenses totaled $7.7 million for the three months ended March 31, 2026, up from $6.1 million a year earlier. Spending focused on Selebi Main drilling, site operations, engineering studies, geology, mine development, and related support costs across the Selebi and Selkirk projects.

Does NexMetals Mining Corp. face going concern risks?

Yes. NexMetals states that material uncertainties cast substantial doubt on its ability to continue as a going concern. The company has no profitable operations, continues to incur losses and negative operating cash flows, and will require additional financing to advance its Botswana mining projects and fund corporate activities.

How many NexMetals (NEXM) shares were outstanding in Q1 2026?

As of March 31, 2026, NexMetals had 35,623,164 common shares issued and outstanding, compared with 35,502,754 at December 31, 2025. The increase primarily reflects settlement of restricted and deferred share units granted under the company’s omnibus equity incentive plan.

What are NexMetals’ key assets in Botswana?

NexMetals’ principal assets are the Selebi Main and Selebi North copper-nickel-cobalt mines and the Selkirk Cu-Ni-Co-PGE mine, all in Botswana. These exploration-stage properties include existing shafts, infrastructure and mining licences, and are being advanced through drilling, technical studies and early economic assessments.