STOCK TITAN

New Found Gold narrows Q3 net loss to C$7.11M

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

New Found Gold Corp. achieved commercial production at its Hammerdown mine in Q3 2026, producing 4,863 ounces of gold and selling 6,935 ounces. Quarterly revenue was C$41,579,812 and net loss was C$7,113,806, compared with C$12,944,794 a year earlier; operating cash outflow was C$6,766,801. Cash and cash equivalents were C$167,111,584 as of September 30, 2026.

For the first nine months, net loss was C$37,300,811 versus C$32,445,437 in 2025, and operating cash outflow was C$31,287,215. Management said material uncertainties may cast significant doubt on the company’s ability to continue as a going concern, which depends on steady Hammerdown production, Queensway advancement and access to financing. A preliminary Queensway study estimated after-tax NPV at 5% of C$1.728 billion at US$3,600 per ounce of gold. The updated Measured and Indicated Mineral Resource estimate was 1.920 million ounces, up 38%; the study includes Inferred Mineral Resources and has no certainty of realization.

2 points · 1 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

1 major · 2 points

How the balance works

Positive

  • Major pointHammerdown achieved commercial production in Q3 2026, with 4,863 ounces produced.
  • Moderate pointQuarterly net loss was C$7,113,806, down from C$12,944,794 a year earlier.

Negative

  • Major pointManagement cited material uncertainties that may cast significant doubt on the company’s ability to continue as a going concern.
  • Moderate pointNine-month net loss was C$37,300,811, versus C$32,445,437 in 2025.

Filing Explained

Only $70 million of the $105 million credit facility was drawn by September 30; the remaining $35 million was optional within the $220 million package.

This Form 6-K furnishes third-quarter interim statements and MD&A; by September 30, 2026, the April bought deal had issued 38,870,000 common shares and total shares outstanding were 385,930,765, reducing existing holders’ percentage ownership absent offsetting changes.

The MD&A calls the financing a $220 million package, but that total combines $115,055,200 of equity proceeds with an up-to-$105,000,000 secured facility; only the $70,000,000 first tranche had been drawn by September 30, 2026, while the $35,000,000 second tranche remained optional.

At September 30, 2026, the facility’s amortized-cost balance was $65,475,516, including $6,256,421 current and $59,219,095 non-current; its fixed annual interest rate is 8.75%, and it matures three years after the May 15, 2026 drawdown.

For the first draw, New Found issued EdgePoint 2,489,818 warrants, each allowing purchase of one share for $3.30 through May 15, 2029; exercise would add shares and reduce existing holders’ ownership percentages absent offsets.

The second tranche could be drawn at the company’s election only up to 12 months after May 15, 2026, subject to customary conditions precedent.

Revenue C$41,579,812 Three months ended September 30, 2026
Gold produced 4,863 ounces Three months ended September 30, 2026
Gold sold 6,935 ounces Three months ended September 30, 2026
Net loss C$7,113,806 Three months ended September 30, 2026
Net loss C$37,300,811 Nine months ended September 30, 2026
Cash and cash equivalents C$167,111,584 As of September 30, 2026
After-tax NPV at 5% C$1.728 billion Preliminary Queensway study; base-case gold price of US$3,600 per ounce
Measured and Indicated Mineral Resources 1.920 million ounces of gold Updated Queensway estimate; increased 38%
going concern financial
"significant doubt as to the Company's ability to continue as a going concern"
Going concern is the accounting assumption that a company will keep operating and meeting its obligations for the foreseeable future. The phrase matters most when a company or its auditors disclose substantial doubt about it, a formal warning that the business may not have enough resources to continue without raising money, restructuring, or selling assets. That language in a filing or press release signals elevated financial risk.
commercial production technical
"achieved commercial production at Hammerdown"
Commercial production is the full-scale manufacturing and release of a product for sale to customers after development and any required approvals. It matters to investors because it signals a shift from testing and one-off batches to steady revenue, larger costs for facilities and supplies, and risks around meeting demand and quality standards — like turning a home-cooked recipe into a restaurant menu that must be produced consistently and profitably.
after-tax net present value at a 5% discount rate financial
"after-tax net present value at a 5% discount rate"
all-in sustaining cost financial
"Cash cost and all-in sustaining cost (“AISC”) of US$985 per ounce"
All-in sustaining cost (AISC) is a per-unit measure that shows the full, ongoing cost to produce a commodity, typically an ounce of metal, including direct mining costs, sustaining capital (ongoing equipment and mine upkeep), royalties, and general overhead. For investors it matters because AISC reveals the durable earning power and true profit margin of a producer—like calculating the total monthly cost to own and operate a car to judge whether selling rides is profitable over time.
Measured and Indicated Mineral Resources technical
"Measured and Indicated Mineral Resources increased by 38%"
Measured and indicated mineral resources are estimates of how much ore and valuable material are present in a deposit, based on sampling, drilling and geological study. “Measured” denotes a high level of confidence in the quantity and quality, while “indicated” means there is reasonable but lower confidence; together they give investors a clearer picture of a project's size, potential revenue and risk—like using multiple spoonfuls to judge how much soup is in a pot before committing to cook it or buy it.
Inferred Mineral Resources technical
"includes Inferred Mineral Resources that are considered too speculative"
An inferred mineral resource is an estimate of the quantity and grade of minerals in the ground based on limited sampling and geological information, where confidence is low and continuity is uncertain. For investors it signals potential value but also higher risk—like a rough sketch of a hidden treasure that requires much more exploration and testing before you can reliably judge its size or economic worth.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How much gold did NFGC produce and sell in Q3 2026?

NFGC produced 4,863 ounces of gold and sold 6,935 ounces in Q3 2026. Average gold recovery was 84%, and average processed grade was 2.77 g/t Au for the quarter.

What is NFGC’s projected Queensway NPV?

The preliminary Queensway study estimated after-tax NPV at a 5% discount rate of C$1.728 billion at a base-case gold price of US$3,600 per ounce. It estimated C$2.225 billion at US$4,100 per ounce and states there is no certainty the study will be realized.

Why does NFGC disclose going-concern uncertainty?

Management said material uncertainties may cast significant doubt on the company’s ability to continue as a going concern. It identified dependence on steady-state production at Hammerdown, advancing Queensway to first production, and continued access to financing for required capital and operating expenditures.

What are the terms of NFGC’s EdgePoint credit facility?

The senior secured facility is for up to $105,000,000, with a fixed interest rate of 8.75% per annum. The $70,000,000 first tranche was drawn on May 15, 2026; the $35,000,000 second tranche is available at the company’s election up to 12 months after that date, subject to customary conditions precedent.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13A-16 OR 15D-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of November 2026
Commission File Number 001--39966
New Found Gold Corp.
(Translation of Registrant’s name into English)
Suite 3500, The Stack, 1133 Melville Street,
Vancouver, British Columbia,
Canada V6E 4E5
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
Form 20-F ☐           Form 40-F x



INCORPORATION BY REFERENCE
Exhibits 99.1 and 99.2 to this Form 6-K are incorporated by reference as additional exhibits to the registrant’s Registration Statement on Form F-10 (File No. 333-287547).
DOCUMENTS INCLUDED AS PART OF THIS REPORT
Exhibit
99.1
Unaudited condensed interim financial statements for the three and nine months ended September 30, 2026 and 2025.
99.2
Management’s discussion and analysis of financial condition and results of operations for the three and nine months ended September 30, 2026.
99.3
Form 52-109F2 CEO Certification of Interim Filings Third Quarter 2026
99.4
Form 52-109F2 CFO Certification of Interim Filings Third Quarter 2026



SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
New Found Gold Corp.
Date: November 11, 2026By:/s/ Hashim Ahmed
Name: Hashim Ahmed
Title:Chief Financial Officer


Exhibit 99.1
a2a.jpg
CONDENSED CONSOLIDATED INTERIM
FINANCIAL STATEMENTS
For the Three and Nine Months Ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, unless otherwise stated)



TABLE OF CONTENTS
Condensed consolidated interim statements of financial position
2
Condensed consolidated interim statements of loss and comprehensive loss
3
Condensed consolidated interim statements of cash flows
4
Condensed consolidated interim statements of changes in equity
5
Notes to the consolidated financial statements
1.
Nature of operations and going concern
6
2.
Basis of presentation
6
3.
Material accounting policy information
7
4.
Acquisition of Maritime Resources Corp.
9
5.
Receivables
10
6.
Inventories
10
7.
Investments
11
8.
Property, plant and equipment
12
9.
Exploration and evaluation properties
13
10.
Accounts payable and accrued liabilities
14
11.
Flow-through share premium
14
12.
Other current liabilities
14
13Loans payable15
14
Reclamation and closure cost provisions
16
15
Share capital and reserves
17
16
Related party transactions
20
17
Basic and diluted loss per share
21
18
Revenue
21
19
Operating expenses
22
20
General and administrative expenses
22
21
Cash flow disclosures
22
22
Financial instruments
23



a1a.jpg
Condensed Consolidated Interim Statements of Financial Position
At September 30, 2026 and December 31, 2025
(Unaudited, expressed in Canadian Dollars)
September 30, 2026
December 31, 2025 (1)
Note$$
Assets
Current assets
Cash and cash equivalents167,111,584 58,838,699 
Receivables56,995,542 4,325,473 
Inventories4,621,013,297 4,722,848 
Investments79,902,863 8,895,559 
Prepayments and deposits2,463,116 3,353,473 
207,486,402 80,136,052 
Non-current assets
Property, plant and equipment8292,385,208 250,544,133 
Exploration and evaluation assets977,958,361 77,664,022 
Goodwill4124,536,089 124,536,089 
Other assets3,409,547 2,616,726 
Total assets705,775,607 535,497,022 
Liabilities and Equity
Current liabilities
Accounts payable and accrued liabilities1031,255,849 12,339,524 
Current tax liability2,211,541 – 
Flow-through share premium11– 8,677,099 
   Other current liabilities126,746,724 654,832 
40,214,114 21,671,455 
Non-current liabilities
Loans payable1360,389,760 503,417 
Lease liabilities1,122,316 340,155 
Deferred income tax liabilities490,226,222 82,492,946 
   Reclamation and closure cost provisions1410,353,004 10,870,068 
Total liabilities202,305,416 115,878,041 
Shareholders’ equity
Share capital15827,665,284 703,264,118 
Reserves1540,857,240 42,820,506 
Warrants1527,426,887 30,349,683 
   Deficit(392,479,220)(356,815,326)
Total shareholders’ equity503,470,191 419,618,981 
Total liabilities and shareholders’ equity705,775,607 535,497,022 
(1) see Note 4
Nature of operations and going concern (Note 1)
Subsequent events (Note 15)
These condensed consolidated interim financial statements are authorized for issue by the Board of Directors on November 10, 2026. They are signed on the Company’s behalf by:
“Paul Huet”“Allen Palmiere”
DirectorDirector
The accompanying notes are an integral part of these condensed consolidated interim financial statements.
- 2 -


a1a.jpg
Condensed Consolidated Interim Statements of Loss and Comprehensive Loss
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)
Three Months Ended September 30, 2026Three Months Ended September 30, 2025Nine Months Ended September 30, 2026Nine Months Ended September 30, 2025
Note$$$$
Revenue1841,579,812 – 67,189,809 – 
Cost of Sales
Operating expenses1922,540,580 – 44,625,061 – 
Selling expenses468,920 – 633,430 – 
23,009,500 – 45,258,491 – 
Income from mine operations18,570,312 – 21,931,318 – 
Expenses
Exploration and evaluation914,654,674 13,423,595 42,022,145 27,794,432 
General and administrative203,099,315 3,081,478 10,844,323 8,617,468 
Share-based compensation151,474,292 766,158 4,970,612 2,125,090 
19,228,281 17,271,231 57,837,080 38,536,990 
Loss from operations(657,969)(17,271,231)(35,905,762)(38,536,990)
Other income (expenses)
Settlement of flow-through share premium113,124,124 3,495,191 8,677,099 4,249,959 
Gains on investments7572,250 361,729 1,007,304 1,088,582 
Interest, accretion and financing expenses(1,899,050)(3,409)(3,101,928)(12,882)
Interest income1,179,576 511,795 2,283,247 892,946 
Other expenses(229,100)(38,869)(315,958)(127,052)
2,747,800 4,326,437 8,549,764 6,091,553 
Income (loss) before income and mining taxes2,089,831 (12,944,794)(27,355,998)(32,445,437)
Mining tax expenses - current(2,211,541)– (2,211,541)– 
Income and mining tax expenses - deferred(6,992,096)– (7,733,272)– 
Net loss and comprehensive loss for the period(7,113,806)(12,944,794)(37,300,811)(32,445,437)
Loss per share – basic and diluted17(0.02)(0.06)(0.14)(0.15)
Weighted average number of shares outstanding
Basic and diluted17323,904,901 235,018,399 259,853,577 214,761,519 






The accompanying notes are an integral part of these condensed consolidated interim financial statements.
- 3 -


a1a.jpg
Condensed Consolidated Interim Statements of Cash Flows
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars)
Three Months Ended September 30, 2026Three Months Ended September 30, 2025Nine Months Ended September 30, 2026Nine Months Ended September 30, 2025
$$$$
Operating cash flows
Loss for the period(7,113,806)(12,944,794)(37,300,811)(32,445,437)
Adjustments for:
   Depreciation9,101,404 183,182 9,775,805 582,363 
   Gains on investments(572,250)(361,729)(1,007,304)(1,088,582)
   Change in estimate of reclamation and closure cost provisions300,878 – 450,387 – 
   Accretion on reclamation and closure cost provisions85,060 – 236,817 – 
   Interest income(1,179,576)– (2,283,247)(74,468)
   Interest expense2,115,119 3,409 3,178,894 12,882 
   Gain on sale of secured notes– – – (55,911)
   Income and mining tax expenses9,203,637 – 9,944,813 – 
   Revaluation of secured notes– 105,799 – 105,799 
   Foreign exchange loss (gain)23,999 (135,422)(19,357)– 
   Settlement of flow-through share premium(3,124,124)(3,495,191)(8,677,099)(4,249,959)
   Share-based compensation1,474,292 766,158 4,970,612 2,125,090 
Interest received887,820 – 1,837,104 – 
Operating cash flow before changes in non-cash working capital11,202,453 (15,878,588)(18,893,386)(35,088,223)
Change in non-cash working capital (Note 21)(17,969,254)(149,213)(12,393,829)374,522 
Net cash and cash equivalents used in operating activities(6,766,801)(16,027,801)(31,287,215)(34,713,701)
Investing cash flows
   Purchases of exploration and evaluation assets(224,060)(1,425)(294,339)(746,221)
   Proceeds on disposal of investments– – – 752,634 
   Proceeds from sale of secured notes – – – 2,778,000 
   Purchases of property, plant and equipment(18,644,155)(231,692)(38,615,392)(365,948)
   Other assets(186,997)(173,025)(959,547)(173,025)
Net cash and cash equivalents (used in) from investing activities(19,055,212)(406,142)(39,869,278)2,245,440 
Financing cash flows
   Proceeds of repayable government contribution277,649 – 872,915 – 
   Issuance of common shares in a private placement– 20,000,001 – 20,000,001 
   Issuance of common shares in equity offering– – 115,055,200 63,480,000 
   Share issue costs(63,646)(308,094)(6,063,298)(3,912,782)
   Proceeds from Senior Secured Credit Facility– – 69,300,000 – 
   Debt financing costs– – (1,832,088)– 
   Stock options exercised– 1,441,400 2,108,767 1,797,025 
   Warrants exercised1,410,986 – 2,697,624 – 
   Repayment of loans(2,393,504)– (2,454,401)– 
   Lease principal payments(89,980)(10,431)(229,722)(53,912)
   Loan and lease interest payments(16,237)(3,409)(45,276)(12,882)
Net cash and cash equivalents (used in) from financing activities(874,732)21,119,467 179,409,721 81,297,450 
Effect of exchange rate fluctuations on cash and cash equivalents(24,080)30,289 19,657 (10,616)
Net (decrease) increase in cash and cash equivalents(26,720,825)4,715,813 108,272,885 48,818,573 
Cash and cash equivalents at beginning of the period193,832,409 66,420,308 58,838,699 22,317,548 
Cash and cash equivalents at end of the period167,111,584 71,136,121 167,111,584 71,136,121 
Supplemental disclosure with respect to cash flows (Note 21)
The accompanying notes are an integral part of these condensed consolidated interim financial statements.
- 4 -


a1a.jpg
Condensed Consolidated Interim Statements of Changes in Equity
For the nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except per share amounts)
Share CapitalReserves
NumberAmountEquity settled
 share-based
 payments
Warrants
Deficit (1)
Total equity
of shares$$$$$
Balance at January 1, 2025200,457,994341,346,716 34,984,503 3,918 (309,764,432)66,570,705 
Issued in prospectus offering 28,980,00063,480,000 – – – 63,480,000 
Issued in private placement 12,269,93920,000,001 – – – 20,000,001 
Flow-through premium–(16,242,600)– – – (16,242,600)
Share issue costs–(3,912,782)– – – (3,912,782)
Stock options exercised1,329,3293,151,654 (1,354,629)– – 1,797,025 
Share-based compensation–– 2,084,281 – – 2,084,281 
Loss and comprehensive loss for the period–– – – (32,445,437)(32,445,437)
Balance at September 30, 2025243,037,262407,822,989 35,714,155 3,918 (342,209,869)101,331,193 
Balance at January 1, 2026342,329,665703,264,118 42,820,506 30,349,683 (356,815,326)419,618,981 
Shares issued in equity offering (Note 15)38,870,000115,055,200 – – – 115,055,200 
Share issue costs (Note 15)–(6,063,298)– – – (6,063,298)
Warrants issued to EdgePoint (Note 13)–– – 2,740,000 – 2,740,000 
Warrants exercised (Note 15)2,547,1368,360,420 – (5,662,796)– 2,697,624 
Stock options exercised (Note 15)1,501,9644,587,247(2,478,480)––2,108,767 
RSUs settled (Note 15)682,0002,461,597(2,461,597)––– 
Share-based compensation (Note 15)––2,976,811–1,636,9174,613,728 
Loss and comprehensive loss for the period––––(37,300,811)(37,300,811)
Balance at September 30, 2026385,930,765827,665,284 40,857,240 27,426,887 (392,479,220)503,470,191 
(1) See Note 4










The accompanying notes are an integral part of these condensed consolidated interim financial statements.
- 5 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)


1.     NATURE OF OPERATIONS AND GOING CONCERN
New Found Gold Corp. (“New Found Gold” or the “Company”) was incorporated on January 6, 2016, under the Business Corporations Act in the Province of Ontario. On September 23, 2020, the Company continued as a British Columbia corporation under the Business Corporations Act in the Province of British Columbia. The Company’s shares are listed on the Toronto Stock Exchange (“TSX”) and on the NYSE American Stock Exchange in the United States under the symbol “NFGC”. The Company’s registered office is located at Suite 3500, The Stack, 1133 Melville Street, Vancouver, British Columbia V6E 4E5.
The Company is principally engaged in the production and sale of gold, as well as the acquisition, exploration, evaluation and development of resource properties with a focus on gold properties located in Newfoundland and Labrador, Canada. The Company’s gold production and sales activities commenced after its acquisition of all of the issued and outstanding shares of Maritime Resources Corp. (“Maritime”) on November 13, 2025 (Note 4). As part of the transaction, the Company acquired Maritime’s Hammerdown Gold Project (“Hammerdown”) and Pine Cove Mill (“Pine Cove”). During the quarter ended September 30, 2026, the Company achieved commercial production at Hammerdown.

These condensed consolidated interim financial statements (herein referred to as “consolidated financial statements”) have been prepared assuming the Company will continue on a going concern basis and do not include adjustments to amounts and classifications of assets and liabilities that might be necessary, should the Company be unable to continue operations. Such adjustments could be material. The ability of the Company to continue as a going concern depends upon its ability to develop profitable operations and to continue to raise adequate financing. As at September 30, 2026, the Company had an accumulated deficit of $392,479,220 and shareholders’ equity of $503,470,191. In addition, the Company has a working capital surplus, calculated as current assets less current liabilities, of $167,272,288, consisting primarily of cash and cash equivalents, receivables, investments and inventories. For the three and nine months ended September 30, 2026, the Company incurred a net loss of $7,113,806 and $37,300,811, respectively, and negative cash flow from operating activities of $6,766,801 and $31,287,215, respectively.
On April 27, 2026, the Company completed a finance package consisting of (i) a bought deal equity financing of 38,870,000 common shares at $2.96 per share for aggregate gross proceeds of $115,055,200, and (ii) a $105,000,000 senior secured credit facility with EdgePoint Investment Group Inc. (“EdgePoint”), the $70,000,000 first tranche of which the Company had drawn on May 15, 2026 (collectively, the "Finance Package"). While the Company has been successful in closing these financing arrangements, its continuation as a going concern remains dependent on its ability to maintain steady-state production at the Hammerdown Gold Project, advance the Queensway Gold Project to first production, and continue to access additional financing, including the optional second tranche under the EdgePoint credit facility, project-level financing, further equity financing or other arrangements, to fund the substantial capital and operating expenditures required to bring the Queensway Gold Project into production. Although the Company has been successful in raising financing in the past, there is no assurance that it will be able to do so in the future, nor is there any assurance that the terms of any future debt or project financing obtained will be favourable to the Company. These conditions give rise to material uncertainties that may cast significant doubt as to the Company's ability to continue as a going concern.

2.    BASIS OF PRESENTATION
These consolidated financial statements have been prepared in accordance with International Accounting Standards (“IAS”) 34, Interim Financial Reporting, as issued by the International Accounting Standards Board (“IASB”). These consolidated financial statements do not include all of the disclosures required by International Financial Reporting Standards (“IFRS”) as issued by the IASB for annual financial statements and should be read in conjunction with the audited consolidated financial statements for the year ended December 31, 2025.
- 6 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

These consolidated financial statements are expressed in Canadian dollars and have been prepared on a historical cost basis except for financial instruments classified as subsequently measured at fair value and certain financial assets and liabilities measured at present value. In addition, these consolidated financial statements have been prepared using the accrual basis of accounting, except for cash flow information.

These consolidated financial statements were approved and authorized for issuance by the Board of Directors of the Company on November 10, 2026. Certain comparative figures on the consolidated statement of financial position, consolidated statement of loss and comprehensive loss, and consolidated statement of cash flows have been reclassified to conform to the current period presentation.
3.    MATERIAL ACCOUNTING POLICY INFORMATION
(a)Accounting policies
The accounting policies applied in these consolidated financial statements are the same as those applied in the Company’s audited consolidated financial statements for the year ended December 31, 2025 except as follows:
Government grants and government assistance
Government grants, including the benefit of government loans at below-market rates of interest, are recognized when there is reasonable assurance that the Company will comply with the conditions attaching to the grant and that the grant will be received.
Government loans that bear interest at a rate that is below the prevailing market rate of interest are initially measured at fair value, calculated as the present value of the contractual cash flows discounted at a market rate of interest for a similar instrument. The benefit of the below-market rate of interest is measured as the difference between the proceeds received and the fair value of the loan and is accounted for as a government grant in accordance with IAS 20, Accounting for Government Grants and Disclosure of Government Assistance. Government grants related to assets are deducted from the carrying amount of the related asset. The grant is recognized in profit or loss over the useful life of the depreciable asset by way of a reduced depreciation charge. Government grants related to expense items are recognized in profit or loss in the same period in which the related expenses are recognized, by way of a reduction of the related expense.

Subsequent to initial recognition, government loans are measured at amortized cost using the effective interest method, with the related accretion of the discount reflected within "Interest, accretion and financing expenses" in the consolidated statement of loss and comprehensive loss.
Amendments to IFRS 9 and IFRS 7 – Amendments to the Classification and Measurement of Financial Instruments

In May 2024, the IASB issued Amendments to the Classification and Measurement of Financial Instruments –Amendments to IFRS 9 and IFRS 7. These amendments updated classification and measurement requirements in IFRS 9, Financial Instruments and related disclosure requirements in IFRS 7, Financial Instruments: Disclosures. The IASB clarified the recognition and derecognition date of certain financial assets and liabilities, and amended the requirements related to settling financial liabilities using an electronic payment system. It also clarified how to assess the contractual cash flow characteristics of financial assets in determining whether they meet the solely payments of principal and interest criterion, including financial assets that have environmental, social and corporate governance (ESG)-linked features and other similar contingent features. The IASB added disclosure requirements for financial instruments with contingent features that do not relate directly to basic lending risks and costs, and amended disclosures relating to equity instruments designated at fair value through other comprehensive income.
- 7 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

The Company has assessed the impact of these amendments on its financial instruments, including its senior secured credit facility with EdgePoint (Note 13). The Company has not elected to apply the option to derecognize a financial liability before its settlement date where payment is made through an electronic payment system; accordingly, scheduled interest and principal on the facility are derecognized when the obligation is settled on the payment date. The facility's contractual features, including the optional and mandatory prepayment provisions and the default interest provision, relate to basic lending risks and costs (interest-rate risk and the Company's credit risk) rather than to a contingent event unrelated to those risks, and therefore do not give rise to the additional disclosures introduced by the amendments. The amendments have no impact on the classification or measurement of the facility.

The amendments were effective for periods beginning on or after January 1, 2026, and adoption of these amendments did not have an effect on the Company’s consolidated financial statements.
(b)Significant judgments, estimates and assumptions
The significant judgments, estimates and nature of assumptions made by management in applying the Company’s accounting policies are consistent with those applied in the audited consolidated financial statements for the year ended December 31, 2025, except as follows:
Available for use assessment over Hammerdown and Pine Cove assets

Determining when the Hammerdown Mine and the Pine Cove Mill are in the location and condition necessary to be capable of operating in the manner intended by management is a matter of significant judgment. Until that point, directly attributable costs are capitalized and no depreciation or depletion is recognized. In making this assessment, the Company considers a range of factors, which depend on the specific facts and circumstances, including:

•the completion of substantially all major capital expenditures necessary for the mine and mill to operate in the manner intended by management;
•the completion of a reasonable period of commissioning and testing of the mine, mill and related equipment;
•the ability to produce gold in saleable form;
•the ability to sustain a pre-determined level of throughput, with gold recoveries and head grades near expected levels; and
•the ability to sustain ongoing production of mineralized material.

No single factor is determinative. The thresholds applied are set below design capacity, as the assessment considers whether the assets are capable of operating as intended rather than at full capacity.

(c)Accounting pronouncements
IFRS 18 – Presentation and Disclosure in Financial Statements
In April 2024, the IASB issued IFRS 18, Presentation and Disclosure in Financial Statements ("IFRS 18"), which replaces IAS 1, Presentation of Financial Statements (“IAS 1”). IFRS 18 retains many of the requirements of IAS 1 but introduces significant changes in the following key areas:
The statement of profit or loss will be required to present three new defined categories: operating, investing, and financing, with specified subtotals including operating profit and profit before financing and income taxes. The classification of income and expenses into these categories is based on the nature of the entity's main business activities.
- 8 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

IFRS 18 also introduces requirements for entities to disclose management-defined performance measures ("MPMs") in the notes to the financial statements. MPMs are subtotals of income and expenses that are used in public communications outside the financial statements, that complement the totals and subtotals specified by IFRS Standards, and that communicate management's view of an aspect of the entity's financial performance. Companies will be required to provide reconciliations of MPMs to the most directly comparable subtotal specified by IFRS 18, along with disclosure of the income tax effect and effect on non-controlling interests. In addition, IFRS 18 introduces enhanced guidance on aggregation and disaggregation of financial information in the primary financial statements and the notes, including principles for grouping items that share similar characteristics, and for providing useful labels for line items.

IFRS 18 is effective for annual reporting periods beginning on or after January 1, 2027, and is to be applied retrospectively, with early adoption permitted. The Company is currently assessing the impact of the standard on the presentation and disclosure in its consolidated financial statements.
4.    ACQUISITION OF MARITIME RESOURCES CORP.
On November 13, 2025 (the "Closing Date"), the Company completed the acquisition of all of the issued and outstanding common shares of Maritime that it did not already own pursuant to a plan of arrangement (the "Transaction"). The Transaction was accounted for as a business combination under IFRS 3, Business Combinations. Total consideration of $311,044,914 was satisfied by the issuance of New Found Gold common shares, replacement options and warrants, and the fair value of Maritime shares previously held by the Company. The consideration transferred and the principal assets acquired (including the Hammerdown, Pine Cove) and the Nugget Pond Hydrometallurgical Gold Plant) are described in Note 5 to the Company's audited consolidated financial statements for the year ended December 31, 2025.
The following table summarizes the recognized amounts of the assets acquired and liabilities assumed as of the Closing Date, as adjusted during the measurement period:
Preliminary
Net assets acquired:November 13,
2025
Adjustments(1)
November 13,
2025
 (Revised)
Cash$9,028,587$–$9,028,587
Receivables1,644,055 – 1,644,055 
Inventories10,075,453 (5,164,927)4,910,526 
Prepaids and deposits2,943,423 – 2,943,423 
Property and equipment (Note 8)70,508,742 – 70,508,742 
Mining interests (Note 8)167,737,597 – 167,737,597 
Exploration and evaluation assets (Note 9)29,929,410 – 29,929,410 
Goodwill121,074,297 3,461,792 124,536,089 
Accounts payable and accrued liabilities(9,421,347)– (9,421,347)
Loans payable(620,238)– (620,238)
Lease liabilities(486,195)– (486,195)
Reclamation and closure cost provisions(7,327,000)– (7,327,000)
Deferred income tax liabilities(84,041,870)1,703,135 (82,338,735)
Total assets acquired, net of liabilities$311,044,914$–$311,044,914
(1) During the nine months ended September 30, 2026, the Company obtained new information about the fair value of in-circuit gold inventory acquired at the Closing Date that was not available at the time the preliminary purchase price allocation was prepared. As a result, the Company revised the fair value of inventories acquired by $5,164,927, deferred income tax liabilities by $1,703,135 and goodwill by $3,461,792, recognized as at November 13, 2025.
As a consequence of the change in the fair value of inventories at the Closing Date, the Company recognized a decrease in cost of sales of $1,070,507 for the period from the Closing Date to December 31, 2025, with a related
- 9 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

increase in deferred income and mining tax expense of $548,781. The net impact of $521,726 on the net loss for the year ended December 31, 2025 is reflected in the cumulative deficit as part of the consolidated statement of changes in equity for the year ended December 31, 2025. The comparative information presented in the condensed consolidated interim statement of financial position at December 31, 2025 has been retrospectively revised to reflect the effect of these changes.

Of the $29,929,410 of exploration and evaluation (“E&E”) assets recognized in the preliminary purchase price allocation, $22,000,000 was attributed to the Orion underground deposit, which was measured at fair value using an adjusted implied value per ounce with reference to market multiples from comparable transactions, and $7,929,410 related to other E&E properties that were carried at historical cost as an approximation of fair value. These other properties had no established mineral resource or reserve at the acquisition date; their carrying amounts comprise the cost of acquiring the mineral rights together with exploration expenditures (including drilling, geology and geophysics) that a market participant would incur to acquire the properties and reproduce the associated geological data.

At September 30, 2026, the fair values of the assets acquired and liabilities assumed continue to be determined on a provisional basis and are subject to change pending completion of the valuation process. The procedures still necessary to complete the fair value determination include completing the assessment of the technical data acquired, and finalizing the related fair value and deferred tax inputs. These determinations will be completed within the measurement period, which ends no later than November 13, 2026, and could result in material revisions to the amounts allocated to these assets and liabilities.

5.    RECEIVABLES
September 30, 2026December 31, 2025
Sales tax receivable$6,455,676$4,323,080
Interest receivable446,861 718 
Other93,0051,675
$6,995,542$4,325,473
6.    INVENTORIES
September 30, 2026December 31, 2025
(As revised – Note 4)
Stockpiled mineralized material$15,943,527$1,604,549
Work-in-process1,958,524 1,366,911 
Finished goods638,363 1,120,998 
Supplies and consumables2,472,883 630,390 
$21,013,297$4,722,848
No write-downs or reversals were recognized during the three and nine months ended September 30, 2026 (three and nine months ended September 30, 2025 - $nil). For the three and nine months ended September 30, 2026, the Company recognized $22,540,580 and $44,625,061 of inventory cost in operating expenses, respectively (three and nine months ended September 30, 2025 - $nil).
- 10 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

7.    INVESTMENTS
Investments consisted of the following as at September 30, 2026 and December 31, 2025:
September 30, 2026December 31, 2025
SharesCostFair ValueSharesCostFair Value
Epic Gold Corp (formerly Exploits Discovery Corp.) (1)
831,493$2,659,473$174,6134,157,466$2,659,473$311,809
Kirkland Lake Discoveries Corp.28,612,5002,861,250 9,728,250 28,612,5002,861,250 8,583,750 
$5,520,723$9,902,863$5,520,723$8,895,559
(1) On February 13, 2026, Exploits Discovery Corp. announced a corporate rebranding, including a name change to Epic Gold Corp. On May 25, 2026, it announced a 5-for-1 share consolidation of all its issued and outstanding securities. The total number of shares held by the Company has been adjusted to reflect the share consolidation. The Company had no disposition of shares of Epic Gold Corp. and no change in the cost base of these shares were made during the three and nine months ended September 30, 2026.
An analysis of investments including related gains and losses for the nine months ended September 30, 2026 and year ended December 31, 2025 is as follows:
Nine months ended Year ended
September 30, 2026December 31, 2025
Investments, beginning of period$8,895,559$926,019
Disposal of investments– (752,634)
Realized gains on investments– 160,701 
Unrealized gains on investments1,007,304 979,160 
Transferred from investment in associates– 7,582,313 
Investments, end of period$9,902,863$8,895,559

Investments represent investments in public companies that are quoted on an active exchange and are measured using the quoted market price of these companies.
- 11 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

8.    PROPERTY, PLANT AND EQUIPMENT
Property, plant
 and equipment
Mining
 interests
Construction-
 in-progress
Total
Cost
Balance, January 1, 2025$11,392,729$–$–$11,392,729
Maritime Acquisition(1) (Note 4)
57,237,532 167,737,597 13,271,209 238,246,338 
Adjustment to reclamation provisions1,081,882 413,457 – 1,495,339 
Additions1,366,671 658,824 1,548,182 3,573,677 
Balance, December 31, 202571,078,814 168,809,878 14,819,391 254,708,083 
Additions8,038,609 – 44,282,212 52,320,821 
Disposals(79,452)– (150,730)(230,182)
Transfer from construction-in-progress10,968,212 – (10,968,212)– 
Contribution received (Note 13)––(237,826)(237,826)
Adjustment to reclamation provisions(73,917)(227,265)– (301,182)
Balance, September 30, 2026$89,932,266$168,582,613$47,744,835$306,259,714
Accumulated Depreciation
Balance, January 1, 2025$3,336,071$–$–$3,336,071
Depreciation(2)
827,879 – – 827,879 
Balance, December 31, 20254,163,950––4,163,950
Disposals(65,250)– – (65,250)
Depreciation(3)
2,986,068 6,789,737 – 9,775,805 
Balance, September 30, 2026$7,084,768$6,789,737$–$13,874,505
Property, plant
 and equipment
Mining
 interests
Construction-
 in-progress
Total
Net book value
At December 31, 2025$66,914,864$168,809,878$14,819,391$250,544,133
At September 30, 2026$82,847,498$161,792,875$47,744,835$292,385,208
(1) Maritime Acquisition amounts represent the fair values of the acquired assets at the close of the Transaction. Plant and equipment acquired includes $449,532 of right-of-use assets.
(2) Additions for the year ended December 31, 2025 include $77,341 of depreciation capitalized to inventories.
(3) Additions for the nine months ended September 30, 2026 include $9,090,387 of depreciation capitalized to inventories.

During the three and nine months ended September 30, 2026, mineral interests and plant and equipment of $10,968,212 at the Hammerdown Mine and the Pine Cove Mill were determined to be capable of operating in the manner intended by management, as a result, the Company commenced depreciation and depletion of the related assets.

During the three and nine months ended September 30, 2026, borrowing costs of $230,994 and $236,940, respectively, were capitalized to construction-in-progress (three and nine months ended September 30, 2025 - $nil).

- 12 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

9.    EXPLORATION AND EVALUATION PROPERTIES
The schedules below summarize the carrying amounts of acquisition costs and exploration expenditures incurred to date for each exploration and evaluation asset that the Company is continuing to explore as at September 30, 2026 and December 31, 2025:
(a)Exploration and evaluation assets
Newfoundland
QueenswayOthersTotal
Balance, December 31, 2024$34,390,976$114,508$34,505,484
Claim staking, option payments and license renewal costs377,988 41,382 419,370 
Acquisition cost – Maritime Resources Corp. (Note 4)– 29,929,410 29,929,410 
Acquisition cost – Epic (formerly Exploits)12,548,526 – 12,548,526 
Acquisition cost – Other claims261,232 – 261,232 
Balance, December 31, 202547,578,722 30,085,300 77,664,022 
Acquisition cost – Epic (formerly Exploits) 16,465 – 16,465 
Claim staking & license renewal costs99,016 178,858 277,874 
Balance, September 30, 2026$47,694,203$30,264,158$77,958,361
(b)Exploration and evaluation expenses
Newfoundland
QueenswayOthersTotal
Cumulative exploration expense, December 31, 2024$267,847,694$575,695$268,423,389
Assaying and metallurgical testing5,089,668 – 5,089,668 
Drilling15,995,380 – 15,995,380 
Trenching499,146 – 499,146 
Environmental, permitting and reclamation1,026,461 – 1,026,461 
Geological and geophysical studies1,638,692 135,402 1,774,094 
Personnel, consulting and overheads11,592,629 – 11,592,629 
Technical studies and resource evaluation3,350,234 30,734 3,380,968 
Property holding and other costs2,022,061 – 2,022,061 
41,214,271 166,136 41,380,407 
Cumulative exploration expense, December 31, 2025$309,061,965$741,831$309,803,796
Newfoundland
Queensway OthersTotal
Cumulative exploration expense, December 31, 2025$309,061,965$741,831$309,803,796
Assaying and metallurgical testing$4,128,672$10,668$4,139,340
Drilling14,524,022 – 14,524,022 
Trenching278,916 – 278,916 
Environmental, permitting and reclamation(255,083)16,799 (238,284)
Geological and geophysical studies3,258,497 291,074 3,549,571 
Personnel, consulting and overheads10,684,965 2,066,486 12,751,451 
Technical studies and resource evaluation4,624,196 1,500 4,625,696 
Property holding and other costs2,347,655 43,778 2,391,433 
39,591,840 2,430,305 42,022,145 
Cumulative exploration expense, September 30, 2026$348,653,805$3,172,136$351,825,941

- 13 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

10.    ACCOUNTS PAYABLE AND ACCRUED LIABILITIES
September 30, 2026December 31, 2025
Accounts payable$11,689,789$8,684,103
Accrued liabilities19,536,560 3,651,432 
Due to related parties (Note 16)29,500 3,989 
$31,255,849$12,339,524
11.    FLOW-THROUGH SHARE PREMIUM
September 30, 2026December 31, 2025
Balance, beginning of period$8,677,099$–
Liability incurred on flow-through shares issued– 16,242,600 
Settlement of flow-through share premium on expenditures incurred(8,677,099)(7,565,501)
$–$8,677,099
Flow-through share arrangements entitle the holder of the flow-through share to a 100% tax deduction in respect of qualifying Canadian exploration expenses as defined in the Income Tax Act of Canada (“Qualifying CEE”).
During the three and nine months ended September 30, 2026, the Company incurred $10,876,904 and $30,517,930, respectively (three and nine months ended September 30, 2025 – $12,127,255 and $14,746,070, respectively) in Qualifying CEE and amortized a total of $3,124,124 and $8,677,099, respectively (three and nine months ended September 30, 2025 – $3,495,191 and $4,249,959, respectively) of its flow-through share premium liabilities. The flow-through share premium liability does not represent a cash liability to the Company and is to be fully amortized to the statement of loss and comprehensive loss pro-rata with the amount of qualifying expenditures that will be incurred. As at September 30, 2026, the Company has incurred sufficient Qualifying CEE and extinguished all of its flow-through premium liabilities.
During the three and nine months ended September 30, 2026, the Company incurred $25,353 and $238,311, respectively (three and nine months ended September 30, 2025 - $67,143 and $67,143, respectively) in Part XII.6 tax in respect of unspent flow-through proceeds renounced under the Look-Back Rule, in accordance with the Income Tax Act of Canada.
12.    OTHER CURRENT LIABILITIES
September 30, 2026December 31, 2025
Share-based compensation (Note 15)$–$357,058
Current portion of lease liabilities210,942 197,497 
Current portion of loans payable6,535,782 100,277 
$6,746,724$654,832





- 14 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

13.    LOANS PAYABLE
September 30, 2026December 31,
Senior
Secured
Credit Facility
ACOA
Repayable
Contribution
Vehicle
Loans
Total2025
Balance, beginning of period$–$–$603,694$603,694$–
Drawdown69,300,000 635,089 328,725 70,263,814 621,710 
Allocation to warrants(2,740,000)– – (2,740,000)– 
Financing costs(1,832,088)– – (1,832,088)– 
Payments(2,307,675)(48,750)(109,169)(2,465,594)(19,921)
Interest and accretion3,055,279 29,076 11,361 3,095,716 1,905 
Balance, end of period$65,475,516$615,415$834,611$66,925,542$603,694
Less: current portion(6,256,421)(125,078)(154,283)(6,535,782)(100,277)
Non-current portion$59,219,095$490,337$680,328$60,389,760$503,417

EdgePoint Senior Secured Credit Facility
On April 20, 2026, the Company entered into a credit agreement (the “Credit Agreement”) with EdgePoint for a senior secured credit facility of up to $105,000,000 (the “Facility”), comprised of Tranche 1 ($70,000,000) and Tranche 2 ($35,000,000). The Facility bears interest at a fixed rate of 8.75% per annum, payable quarterly in arrears, and matures three years from the drawdown of Tranche 1. Each tranche is subject to a 2.00% original issue discount and a 1.00% establishment fee, deductible from the proceeds at the Company's election. The Company incurred total transaction costs of $1,832,088 related to the Facility.

Tranche 1 was fully drawn on May 15, 2026 (the “Tranche 1 Drawdown Date”) and the Company received total cash proceeds of $69,300,000, net of the establishment fee. Tranche 2 is available at the Company's election at any time up to 12 months after the Tranche 1 Drawdown Date, subject to satisfaction of customary conditions precedent. Tranche 2 had not been drawn as at September 30, 2026.

In connection with Tranche 1 drawdown, the Company issued EdgePoint 2,489,818 common share purchase warrants (the “Tranche 1 Warrants”) on the Tranche 1 Drawdown Date. Each warrant entitles the holder to purchase one common share (each, a “Common Share”) of the Company at an exercise price of $3.30 per Common Share and is exercisable until May 15, 2029.

The Company may prepay the outstanding principal amount of either tranche, in whole or in part at a minimum of $1,000,000, at any time on two business days' notice, without penalty or premium (the “Optional Prepayment Right”). The Company is also required to prepay the Facility, without premium, from the net proceeds of certain asset dispositions, incurrence of non-permitted debt, and insurance proceeds in excess of $1,000,000 in a trailing twelve-month period, subject to customary reinvestment rights (the “Mandatory Prepayment Provisions”).

The Company identified the Facility as a compound financial instrument in accordance with IFRS 9 Financial Instruments and IAS 32, Financial Instruments: Presentation. The liability host component is classified as a debt instrument and measured at amortized cost. The Tranche 1 Warrants offered EdgePoint the right to purchase a fixed number of the Company’s shares at a fixed price and are classified as equity instruments and not remeasured in future periods. The prepayment options included in the Facility are embedded derivatives that are closely related to the debt host and are valued together with the liability component.

Upon initial recognition on the Tranche 1 Drawdown Date, the total cash proceeds were allocated to the liability component at its fair value of $66,560,000, with the balance of $2,740,000 allocated to the Tranche 1 Warrants and
recorded as equity. Total transaction costs of $1,832,088 incurred were deducted against the fair value of liability component. The liability component is amortized over its three-year term at an effective interest rate of 13.16%. As
- 15 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

at September 30, 2026, the amortized cost of the liability was $65,475,516, with $6,256,421 classified as current and $59,219,095 as non-current. During the nine months ended September 30, 2026, the Company recognized $3,055,279 in interest expense representing total interest payments of $2,307,675 and accretion expense of $747,604.

Under the Credit Agreement, the Company is required to maintain a minimum consolidated cash balance of $3,000,000, and a positive consolidated working capital balance which, as defined in the Credit Agreement, excludes ore and raw-material inventory, the current portion of the Credit Facility, and the current portion of any reclamation and closure cost provision. The Company was in compliance with both covenants at September 30, 2026.

ACOA Loan

On March 24, 2026, the Company received the first drawdown of $595,266 under a repayable contribution agreement with the Atlantic Canada Opportunities Agency (“ACOA”) under the REGI – Business Scale-Up and Productivity program (Project No. 226929) (the "ACOA Contribution Agreement"), which provides for a non-interest-bearing, unsecured repayable contribution of up to $975,000 in respect of eligible project costs relating to the upgrade of the Pine Cove Mill. The contribution is repayable in 60 equal monthly principal installments commencing July 1, 2026.
On initial recognition, the loan component was measured at fair value of $427,480 and is included within loans payable. At initial recognition, the loan was calculated as the present value of the contractual cash flows discounted at an estimated market rate of interest of 12.50% per annum. The benefit of the below-market interest rate, totaling $167,786, was accounted for as a government contribution deducted from the carrying amount of the Pine Cove Mill within property, plant and equipment.
On August 24, 2026, the Company received the second drawdown of $277,649 of the ACOA loan. At initial recognition, consistent with the valuation of the first drawdown, the loan component was measured at fair value of $207,609. Government contribution of $70,040 was recognized against the carrying amount of the Pine Cove Mill within property, plant and equipment.

As at September 30, 2026, the amortized cost of the liability was $615,415, with $125,078 classified as current and $490,337 as non-current. During the three and nine months ended September 30, 2026, total interest and accretion expense recognized for the loan was $15,578 and $29,076, respectively (three and nine months ended September 30, 2025 - $nil).

14.    RECLAMATION AND CLOSURE COST PROVISIONS
The Company recognizes a provision for future reclamation and closure costs associated with disturbances resulting from exploration, development and operating activities at its properties. The reclamation liability reflects management’s best estimate of the present value of the expenditures required to settle the obligation at the end of the expected operating life of the assets, consistent with reclamation and closure plans submitted or to be submitted to the applicable regulatory authorities.
- 16 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

The movement in the Company’s reclamation and closure cost provisions is as follows:

September 30, 2026December 31, 2025
Balance, beginning of period$10,870,068$2,426,378
Change in reclamation and closure cost estimates(763,675)1,229,082 
Reclamation costs incurred(37,175)(151,052)
ARO accretion283,786 38,660 
Maritime Acquisition (Note 4)–7,327,000
Balance, end of period$10,353,004$10,870,068
On an ongoing basis, the Company evaluates its estimates and assumptions, and future expenditures could differ from current estimates. In calculating the best estimate of the Company's obligation on a net present value basis, the Company used risk-free discount rates ranging from 3.99% to 4.30% and a long-term inflation rate of 2%.
The Company maintains a surety bonding arrangement totaling $7,783,255 with the Government of Newfoundland and Labrador. The arrangement requires the Company to provide a cash collateral of $2,400,000, included in other assets in the consolidated statements of financial position, and pay an annual bond fee equal to 3% of the bond amount. On April 10, 2026, the cash collateral required increased to $2,725,000. On September 16, 2026, the total required bonding arrangement increased to $10,203,749, with a required cash collateral of $2,042,000. The surety bonds secure, but do not extinguish, the Company’s reclamation obligations.
15.    SHARE CAPITAL AND RESERVES
(a)Authorized share capital
At September 30, 2026, the authorized share capital comprised an unlimited number of common shares. The common shares do not have a par value. All issued shares are fully paid.
(b)Common shares issued during the nine months ended September 30, 2026
On April 27, 2026, the Company closed a bought deal equity financing and issued 38,870,000 common shares at $2.96 per share, for aggregate gross proceeds of $115,055,200. The Company incurred share issuance costs of $6,063,298 in cash of which $5,165,790 was paid to the underwriters.
During the nine months ended September 30, 2026, the Company issued 1,501,964 common shares on exercise of options with a weighted average exercise price of $1.40 for gross proceeds of $2,108,767.

During the nine months ended September 30, 2026, the Company issued 682,000 common shares to settle 717,667 vested restricted share units.
During the nine months ended September 30, 2026, the Company issued 2,547,136 common shares for warrants exercised with a weighted average exercise price of $1.06 for gross proceeds of $2,697,624.

Subsequent to September 30, 2026, the Company issued 129,224 common shares pursuant to an existing mineral property option agreement.

(c)Common shares issued during the year ended December 31, 2025
On December 5, 2025, the Company issued 2,821,556 common shares with a value of $12,160,906 to Epic Gold Corp. pursuant to the acquisition of exploration and evaluation assets in accordance with the terms of a property acquisition agreement (Note 9).
- 17 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

On November 13, 2025, the Company issued 94,254,209 common shares valued at $275,222,290 pursuant to the Maritime Acquisition (Note 4).
On November 26, 2025, the Company issued 1,085,003 common shares valued at $4,632,963 for the settlement of advisory fees incurred by Maritime relating to the Maritime Acquisition.

On August 27, 2025, the Company completed a non-brokered private placement and issued 12,269,939 common shares at a price of $1.63 per common share for gross proceeds of $20,000,001.
On June 12, 2025, the Company completed a bought deal offering of 24,610,000 flow-through common shares, closing the first tranche of the offering on June 3, 2025 and the second and final tranche of the offering on June 12, 2025, at a price of $2.29 per common share and 4,370,000 non-flow-through common shares at a price of $1.63 per common share, for aggregate gross proceeds of $63,480,000. The Company incurred share issuance costs of $4,004,528 in cash of which $2,602,373 was paid to the underwriters. The premium received on the flow-through shares issued was determined to be $16,242,600.
During the year ended December 31, 2025, 1,838,399 common shares were issued on exercise of 1,854,070 stock options. The options were exercised at a weighted average exercise price of $1.38 per share for gross proceeds of $2,547,271.
(d)Share purchase options
The following table sets out activity with respect to the Company’s outstanding stock options:
Nine months ended September 30, 2026Year ended December 31, 2025
Number of
 stock options
Weighted
 average
 exercise price
Number of
 stock options
Weighted
 average
 exercise price
Outstanding, beginning of period7,631,500$2.8510,556,750$4.50
Granted1,741,2782.50 7,122,0701.74 
Exercised(1,501,964)1.40 (1,854,070)1.38 
Forfeited(542,538)5.48 (8,193,250)4.68 
Outstanding, end of period7,328,276$2.327,631,500$2.85
Options exercisable, end of period4,008,397$2.344,818,723$3.29
The following table sets out information about the Company’s options outstanding and exercisable as at September 30, 2026:
Stock options outstandingStock options exercisable
Range of Exercise
Prices
Number
 outstanding
Weighted
 average
 remaining
 contractual
 life (days)
Weighted
 average
 exercise
 price
Number
 outstanding
Weighted
 average
 remaining
 contractual
 life (days)
Weighted
 average
 exercise
 price
$0.67 - $1.67
4,178,6751,312$1.623,127,8421,311$1.21
$2.40 - $4.59
2,662,1011,5962.77 393,0551,1601.48 
$5.00 - $6.79
472,5004015.71 472,5004015.71 
$8.04 - $8.98
15,000684.55 15,000688.51 
The Company has reserved for issuance 7,328,276 common shares in the event that these stock options are exercised. With certain exceptions, the stock options generally vest in equal installments on each anniversary date of the grant over a three-year period.
- 18 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

The number of common shares available for the grant of stock options under the Option Plan as at September 30, 2026 was 31,264,801.

The following table summarizes the weighted average fair value and assumptions used in estimating the fair value of stock options granted using the Black-Scholes option pricing model and the key values of options exercised.
September 30, 2026December 31, 2025
Options granted
Weighted average fair value of options granted$1.32$1.34
Risk-free interest rate3.64 %2.67 %
Expected option life in years5.005.00
Expected share price volatility62.89 %64.64 %
Grant date share price$2.26$2.74
Expected forfeiture rateNilNil
Expected dividend yieldNilNil
Options exercised
Weighted average share price at date of exercise$1.42$1.40
Weighted average grant-date fair value of options exercised$1.94$1.17
Compensation expense related to stock options amounted to $487,310 and $1,654,634 for the three and nine months ended September 30, 2026, respectively (three and nine months ended September 30, 2025 - $666,400 and $2,025,332, respectively).

During the nine months ended September 30, 2026, a total of 542,538 (nine months ended September 30, 2025 – 6,243,750) outstanding and exercisable stock options expired unexercised. The Company recorded a reduction of $1,636,917 in its share-based payment reserves with a corresponding adjustment to accumulated deficit.

Subsequent to September 30, 2026, a total of 260,000 stock options were granted to the Company's officers at a weighted average exercise price of $2.27 and 33,750 options were exercised at a weighted average exercise price of $1.14 for gross proceeds of $38,475. In addition, 33,333 exercisable options expired unexercised.

(e)Restricted share units
The Company recorded a share-based compensation expense of $195,542 and $356,885, respectively, net of fair value adjustment, during the three and nine months ended September 30, 2026 related to the cash-settled RSUs (three and nine months ended September 30, 2025 – $40,808). As at September 30, 2026, the Company has settled these RSUs and extinguished the liability in full. The Company also recorded a share-based compensation expense of $752,239 and $2,919,893 during the three and nine months ended September 30, 2026 related to the equity-settled RSUs (three and nine months ended September 30, 2025 – $58,950).
The following table sets out activity with respect to the Company’s outstanding RSUs:
Nine months ended
September 30, 2026
Year ended
December 31, 2025
Balance, beginning of period2,694,348 — 
Granted (cash-settled)–300,000
Granted (equity-settled)782,6802,394,348
Settled (cash-settled)(300,000)–
Settled (equity-settled)(717,667)–
Outstanding, end of period2,459,361 2,694,348 
- 19 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

Subsequent to September 30, 2026, 50,000 RSUs were granted to an officer of the Company.
(f)Deferred share units
During the three and nine months ended September 30, 2026, the Company granted 128,454 DSUs to directors of the Company. These DSUs are expected to be equity-settled and will fully vest on the one-year anniversary date from the date of the grants. Vested DSUs are settled upon the departure of the holders from the Company.
During the three and nine months ended September 30, 2026, the Company recorded a share-based compensation expense of $39,201 related to these DSUs (three and nine months ended September 30, 2025 – $nil).
Nine months ended
September 30, 2026
Year ended
December 31, 2025
Balance, beginning of period––
Granted128,454–
Outstanding, end of period128,454–

(g)Warrants
The following table sets out activity with respect to the Company’s outstanding warrants:
Nine months ended September 30, 2026Year ended December 31, 2025
Warrants
 outstanding
Weighted
 average
 exercise price
Warrants
 outstanding
Weighted
 average
 exercise price
Outstanding, beginning of period14,952,035$1.34–$–
Maritime Acquisition (Note 4)–– 15,485,1371.33 
EdgePoint Financing Package2,489,8183.30 –– 
Exercised(2,547,136)1.04 (533,102)1.03 
Outstanding, end of period14,894,717$1.7214,952,035$1.34
Subsequent to September 30, 2026, a total of 150,000 warrants were exercised at a weighted average exercise price of $1.60 per warrant for gross proceeds of $240,000.

16.    RELATED PARTY TRANSACTIONS
The Company’s related parties include its subsidiaries, key management personnel and companies having common directors and officers. All transactions with related parties have occurred in the normal course of operations and are measured at the amount of consideration paid or received.
Key management personnel compensation
Key management personnel include those persons having authority and responsibility for planning, directing and controlling the activities of the Company as a whole. The Company has determined that key management personnel consist of executive and non-executive directors and members of executive management.
The remuneration of the Company’s directors and other key management personnel during the three and nine months ended September 30, 2026 and 2025 were as follows:
- 20 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

Three months ended September 30Nine months ended September 30
2026202520262025
Salaries and consulting (1)
$535,693$542,047$1,746,649$1,304,821
Share-based compensation1,205,662 676,896 4,214,873 2,141,549 
Bonus– – 1,015,167 1,031,760 
Termination benefits– – – 929,520 
$1,741,355$1,218,943$6,976,689$5,407,650
(1)Salary recorded in exploration and evaluation expenditures in the condensed consolidated interim statements of loss and comprehensive loss for the three and nine months ended September 30, 2026 - $94,500 and $283,500, respectively.


At September 30, 2026, there was $29,500 (December 31, 2025 - $3,989) payable to management and directors for accrued salaries, bonuses and expense reimbursements of travel expenditures included in accounts payable and accrued liabilities. The amounts are unsecured, non-interest bearing and without fixed terms of repayment.

17.    BASIC AND DILUTED LOSS PER SHARE
Three months ended September 30Nine months ended September 30
2026202520262025
Loss and comprehensive loss for the period$(7,113,806)$(12,944,794)$(37,300,811)$(32,445,437)
Basic weighted average number of common shares outstanding323,904,901 235,018,399 259,853,577 214,761,519 
Loss per share – basic and diluted(0.02)(0.06)(0.14)(0.15)
The Company incurred net losses for the three and nine months ended September 30, 2026 and 2025. As such, diluted loss per share excludes any potential conversion of 7,328,276 share purchase options (nine months ended September 30, 2025 – 7,547,167), 2,459,361 RSU's (nine months ended September 30, 2025 – 2,353,000), 128,454 DSU's (nine months ended September 30, 2025 – nil) and 14,894,717 warrants (nine months ended September 30, 2025 – nil), as their inclusions would be anti-dilutive.
18.    REVENUE
Revenue from contracts with customers during the three and nine months ended September 30, 2026 and 2025 disaggregated by metal were as follows:
Three months ended September 30Nine months ended September 30
2026202520262025
Gold$41,517,993$–$67,059,335$–
Silver61,819 – 130,474 – 
Total revenue$41,579,812$–$67,189,809$–
The Company generates its revenue in Canada from the sale of refined gold. During the three and nine months ended September 30, 2026, one customer accounted for 100% of revenues. However, because gold can be sold through numerous gold market traders worldwide, the Company is not economically dependent on a limited number of customers for the sale of its products.
- 21 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

19.    OPERATING EXPENSES
Operating expenses during the three and nine months ended September 30, 2026 and 2025 consist of the following expenses by nature:
Three months ended September 30Nine months ended September 30
2026202520262025
Raw materials and consumables$2,626,961$–$6,982,376$–
Salaries and employee benefits2,738,571 – 7,187,138 – 
Contractors12,688,124 – 32,978,203 – 
Repairs and maintenance56,495 – 345,160 – 
Site administration1,066,745 – 3,395,960 – 
Depreciation8,883,376 – 9,090,387 – 
28,060,272 – 59,979,224 – 
Change in inventories(5,519,692)– (15,354,163)– 
Total operating expense$22,540,580$–$44,625,061$–
20.    GENERAL AND ADMINISTRATIVE EXPENSES
General and administrative expenses during the three and nine months ended September 30, 2026 and 2025 consist of the following expenses by nature:
Three months ended September 30Nine months ended September 30
2026202520262025
Salaries and benefits$1,609,934$1,298,781$5,270,272$4,026,378
Professional fees268,968 399,731 946,469 1,239,264 
Office and other expenses1,002,383 1,199,784 3,942,164 2,769,463 
Depreciation218,030 183,182 685,418 582,363 
Total general and administrative expenses$3,099,315$3,081,478$10,844,323$8,617,468
21.    CASH FLOW DISCLOSURES
(a)Change in non-cash working capital
Three months ended September 30Nine months ended September 30
2026202520262025
(Increase) decrease in prepayments and deposits$(517,267)$(694,598)$890,360$26,156
Decrease (increase) in receivables3,085,872 (672,026)(2,181,120)459,456 
Increase in inventories(5,851,184)– (16,290,448)– 
Decrease in other assets– 988 166,726 179,703 
Decrease in deferred revenue(5,126,202)– – – 
Increase (decrease) in accounts payable and accrued liabilities(9,560,473)1,216,423 5,020,653 (290,793)
$(17,969,254)$(149,213)$(12,393,829)$374,522


- 22 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

(b)Supplemental cash flow disclosures
Three months ended September 30Nine months ended September 30
2026202520262025
Non-cash investing and financing activities:
 Property, plant and equipment in accounts payable and accrued liabilities$13,250,396$–$14,018,670$–
   Cash paid for interest2,216,616 3,409 2,317,075 12,882 
   Cash received for interest1,042,207 511,561 1,837,104 818,196 
22.    FINANCIAL INSTRUMENTS
(a)Fair values
Financial assets and liabilities measured at fair value are recognized according to a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets and liabilities and the lowest priority to unobservable inputs. The three levels of fair value hierarchy are as follows:
▪Level 1 – Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities.
▪Level 2 – Quoted prices in markets that are not active, or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability.
▪Level 3 – Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity).
The Company’s financial instruments measured at fair value comprise its investments, which include equities held. The fair value of equities held is determined using closing prices at the statement of financial position date with any unrealized gain or loss recognized in profit or loss. These investments are classified as Level 1 financial instruments. The carrying values of other financial instruments, including cash and cash equivalents, receivables, accounts payable and accrued liabilities and lease liabilities approximate their fair values due to the short-term maturity of these financial instruments.

The Company’s financial instruments carried at fair value and categorized according to the fair value hierarchy are as follows as at September 30, 2026:
September 30, 2026December 31, 2025
Level 1Level 2Level 3Level 1Level 2Level 3
Investments$9,902,863$–$–$8,895,559$–$–
(b)Financial instrument risk exposure
Liquidity risk
Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they fall due. The Company has in place a planning and budgeting process to help determine the funds required to ensure the Company has the appropriate liquidity to meet its operating and growth objectives. The Company has historically relied on the issuance of shares to fund exploration programs and may require doing so again in the future.

On April 27, 2026, the Company closed a finance package consisting of a bought deal equity financing for gross proceeds of $115,055,200, and a $105,000,000 senior secured credit facility, the $70,000,000 first tranche of which
- 23 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

was drawn on May 15, 2026. As at September 30, 2026, the Company has total liabilities of $202,305,416 and cash and cash equivalents of $167,111,584 which is available to discharge these liabilities (December 31, 2025 – total liabilities of $115,878,041 and cash of $58,838,699).

The following table summarizes the maturity profile of the Company’s financial liabilities at September 30, 2026. The amounts presented represent the future undiscounted principal and interest cash flows, and therefore, do not equate to the carrying amounts on the consolidated statements of financial position.
Within 1
 year
2-3
 years
4-5
 years
More than
 5 years
Total
Accounts payable and accrued liabilities$31,255,849$–$–$–$31,255,849
Lease liabilities348,160 686,485 507,127 278,925 1,820,697 
Loans payable6,448,683 82,101,244 516,423 23,359 89,089,709 
Reclamation and closure cost provisions– 928,038 990,229 14,571,725 16,489,992 
$38,052,692$83,715,767$2,013,779$14,874,009$138,656,247
Market risks
Market risk is the risk that changes in market prices, such as commodity prices, interest rates and foreign exchange rates will affect the Company’s net earnings or the value of financial instruments. The objective of the Company is to manage and mitigate market risk exposures within acceptable limits, while maximizing returns.
(i)Currency risk
Financial instruments that impact the Company’s net earnings or other comprehensive income due to currency fluctuation include cash accounts and accounts payable denominated in US dollars. The sensitivity of the Company’s net loss to changes in the exchange rate between the US dollar and the Canadian dollar at September 30, 2026 would change the Company’s net loss by $72,293 (December 31, 2025 - $144,145) as a result of a 10% change in the exchange rate.
(ii)Interest rate risk
Interest rate risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate due to changes in market interest rates. As the Company deposits its cash and cash equivalents into demand accounts with minimal interest rates, interest rate risk is not significant. Following the first drawdown of Tranche 1 of the EdgePoint Senior Credit Facility for $70,000,000, the Company is exposed to fixed-rate interest expense at 8.75% per annum over a three-year term, which limits exposure to interest rate movements on this borrowing.
(iii)Commodity price risk
Commodity price risk is the potential adverse impact on earnings and economic value due to commodity price movements and volatilities. The Company is primarily exposed to gold prices, which significantly affect the value of its mineral properties and investments. As at September 30, 2026, the Company had no financial instruments subject to provisional pricing or other commodity-linked arrangements. Accordingly, a reasonably possible change in gold prices at the reporting date would not have a material impact on the Company's net loss or comprehensive loss.
(iv)Equity price risk
Equity price risk is the risk that the fair value of future cash flows from the Company’s financial instruments will significantly fluctuate because of changes in market prices. The Company is exposed to market risk in trading its investments in unfavorable market conditions which could result in dispositions of investments at less than favorable prices. Additionally, the Company adjusts its investments to fair value at the end of each reporting period.
- 24 -

a1a.jpg
Notes to the Condensed Consolidated Interim Financial Statements
For the three and nine months ended September 30, 2026 and 2025
(Unaudited, expressed in Canadian Dollars, except share and per share amounts)

This process could result in write-downs of the Company’s investments over one or more reporting periods, particularly during periods of overall market instability.
The sensitivity of the Company’s net loss to changes in market prices at September 30, 2026 would change the Company’s net loss by $990,286 (December 31, 2025 - $889,556) as a result of a 10% change in the market price of its investments.
There have been no changes in management’s methods for managing market risks since December 31, 2025.
- 25 -

Exhibit 99.2
a11.jpg
MANAGEMENT'S DISCUSSION
AND ANALYSIS
For the Three and Nine Months Ended September 30, 2026



This document contains management’s discussion and analysis (“MD&A”) of the results and financial condition of New Found Gold Corp. (“New Found Gold” or the “Company”) and should be read in conjunction with the accompanying unaudited condensed consolidated interim financial statements for the three and nine months ended September 30, 2026 and September 30, 2025 and related notes thereto. In addition, this MD&A should be read in conjunction with the audited annual financial statements and the related notes for the years ended December 31, 2025 and December 31, 2024. The financial data was prepared using accounting policies consistent with International Financial Reporting Standards (“IFRS”) as applicable to interim financial reports including International Accounting Standards 34 – Interim Financial Reporting issued by the International Accounting Standards Board ("IASB"), and all figures are reported in Canadian dollars unless otherwise indicated. Please refer to the cautionary note regarding forward-looking statements and information within this MD&A and the Risk Factors discussed in the Company’s most recent Annual Information Form (“AIF") on file with the Canadian provincial securities, regulatory authorities and Form 40-F on file with the U.S. Securities and Exchange Commission (the “SEC”).

Unless otherwise indicated, references in this MD&A to “Q3 2026” or the “Quarter” mean the three months ended September 30, 2026, and references to “YTD 2026” mean the nine months ended September 30, 2026 (with “Q3 2025” and “YTD 2025” referring to the corresponding three- and nine-month periods ended September 30, 2025, respectively). Where a discussion applies equally to both periods, this MD&A refers to the “three and nine months ended September 30, 2026”; where the analysis differs by period, results for Q3 2026 and YTD 2026 are presented separately.

Forward-Looking Statements and Technical Disclosure

This MD&A contains forward-looking information and forward-looking statements, within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities legislation. The effective date of this report is November 10, 2026 (the “Effective Date”).

Unless otherwise indicated, technical disclosure regarding the Company’s properties included or incorporated by reference herein, including use of the capitalized terms “Mineral Resources” and “Mineral Reserves”, has been prepared in accordance with the requirements of, and imports the meaning of such terms as defined in, National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the “CIM Definition Standards”), as applicable, and should be read in conjunction with the cautionary statements provided in section “Cautionary Note for United States Investors” at the end of this MD&A.

The scientific and technical information disclosed in this MD&A was reviewed and approved by Keith Boyle, P. Eng., CEO and Director, and a Qualified Person as defined under NI 43-101. Mr. Boyle consents to the publication of this MD&A by New Found Gold. Unless otherwise indicated, the scientific and technical information in this MD&A relating to the Queensway Gold Project (“Queensway” or the “Project”) is derived from the “NI 43-101 Technical Report, Queensway Gold Project, Newfoundland and Labrador, Canada” with an effective date of June 30, 2025 (the “Queensway Technical Report”). The scientific and technical information relating to the Hammerdown Gold Project (“Hammerdown”) is derived from “Hammerdown Gold Project, Preliminary Economic Assessment Technical Report, Newfoundland and Labrador, Canada”, with an effective date of February 18, 2026 prepared by WSP Canada Inc. (“WSP”) in compliance with NI 43-101 (the “Hammerdown Technical Report”). Both are available under the Company’s profile on SEDAR+ at www.sedarplus.ca and on EDGAR (www.sec.gov/edgar). Scientific and technical information relating to the revised Queensway PEA and updated MRE (as defined below) announced on October 22, 2026 is derived from the Company's 2026 PEA News Release (as defined below) and updates certain disclosures contained in the Queensway Technical Report. The supporting NI 43-101 technical report will be filed within 45 days of the news release.







Table of Contents
Overview and Highlights
1
Description of the Business
3
Queensway
3
Hammerdown
9
Environmental, Social and Governance
11
Financial Results
13
Financial Position Review
16
Liquidity and Capital Resources
18
Commitments and Contingencies
19
Summary of Quarterly Results
21
Outstanding Share Data
23
Related Party Transactions
24
Risks and Uncertainties
24
Critical IFRS Accounting Policies and Estimates
25
Non-IFRS Financial Measures
25
Internal Controls Over Financial Reporting and Disclosure Controls and Procedures
27
Maritime Acquisition28
Cautionary Notes Regarding Forward-Looking Statements
28
Cautionary Note for United States Investors
30
Off-Balance Sheet Arrangements
30
Proposed Transactions
30
Additional Information
30


tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
Overview and Highlights
Q3 2026 was a transformational quarter for the Company, with the milestone of commercial production at the Company’s 100% owned Hammerdown Gold Mine (“Hammerdown”) achieved during the quarter, making New Found Gold Canada's newest gold producer.

The Company graduated from the TSX Venture Exchange ("TSXV") to the Toronto Stock Exchange ("TSX"), with its common shares commencing trading on the TSX on August 26, 2026 under the symbol “NFGC”. The Company’s trading symbol changed to “NFGC” upon the commencement of trading on the TSX to align with its stock symbol on the NYSE American stock exchange (“NYSE American”). The CUSIP and ISIN remained unchanged. Q3 2026 was the first quarter to include a period of commercial production at Hammerdown, following the November 13, 2025 acquisition of Maritime Resources Corp. ("Maritime").

At the Company’s 100% owned flagship Queensway Gold Project (“Queensway”), the Company advanced Phase I detailed engineering and permitting and continued to execute on its 2026 work program. Following the end of the quarter the Company released the results of a revised Preliminary Economic Assessment (“2026 PEA”) and updated mineral resource estimate (“Updated MRE”) for Queensway.

At the Company’s 100% owned Pine Cove mill and in-pit tailings facility (“Pine Cove” or the “Mill”) work advanced on a planned circuit conversion, with work to expand the Mill planned for 2027 pending receipt of a permit amendment.

Key Q3 2026 Strategic and Corporate Highlights

•Safety. Zero lost-time incidents in 2026 to September 30, 2026, over more than 328,000 person-hours worked.

•Queensway Phase I permitting advanced. Following the province of Newfoundland and Labrador (“NL”) Minister of Environment, Conservation and Climate Change’s July 3, 2026 decision letter requiring an Environmental Preview Report (“EPR”) for Queensway Phase I, the Company received the EPR guidelines on September 2, 2026 and submitted the EPR on November 3, 2026 (see “Subsequent Events”).

•Pine Cove conversion and expansion. The Company announced receipt of the permit amendment to convert the Pine Cove circuit to gravity-carbon-in-leach (“Gravity-CIL”) during the quarter. A separate permit amendment to expand throughput capacity to 1,400 tpd will be applied for in due course.

•Continued Queensway exploration and de-risking. On July 21, 2026, the Company reported high-grade channel sample and infill drill results from the Lotto Zone ("Lotto") within the Appleton Fault Zone Core ("AFZ Core"), including 23.7 grams of gold per tonne ("g/t Au") over 15.88 metres ("m") from channel sampling and 43.5 g/t Au over 4.75 m from underground infill drilling, consistent with the MRE block model.

•Graduation to the Toronto Stock Exchange. On August 26, 2026, the Company’s common shares commenced trading on the TSX under the symbol “NFGC”, aligning with its NYSE American symbol.

•Commercial production achieved at Hammerdown. During Q3 2026, the Company achieved commercial production at Hammerdown, completing the operational ramp-up that began following the Maritime acquisition and transitioning Hammerdown from a development-stage asset to a producing gold mine.

•Q3 2026 production and costs. Hammerdown produced 4,863 ounces of gold and sold 6,935 ounces during Q3 2026 (nine months ended September 30, 2026: 10,670 ounces produced and 10,878 ounces sold), at an average gold recovery of 84% for the quarter and an average processed grade of 2.77 g/t Au. Cash costs for the quarter were US$2,887 per ounce and AISC was US$3,279 per ounce of gold produced,
1

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
with an average realized gold price of US$4,285 per ounce (approximately $5,996 per ounce), generating revenue of $41.6 million (“M”). Contributing factors to the cash costs and AISC for the quarter in which commercial production was achieved at Hammerdown were attributed to mine schedule reorganization to complete overburden stripping and pioneering activities in more favorable seasonal conditions, grade, infill drill costs, fuel surcharges and water treatment costs. (Cash costs and AISC are non-IFRS measures and have been defined and reconciled to the most directly comparable IFRS measures in the “Non-IFRS Financial Measures” section of the MD&A.)

Subsequent Events

The following events occurred between September 30, 2026 and the Effective Date:

•Revised Queensway PEA and Updated MRE. On October 22, 2026, the Company announced the 2026 PEA and an Updated MRE for Queensway, with an after-tax net present value at a 5% discount rate ("NPV5%") of $1.728 billion ("B") at a base case gold price of US$3,600 per ounce (increasing to $2.225B at US$4,100 per ounce), an internal rate of return ("IRR") of 126% (164% at the upside price), 1.744 M ounces of gold produced over a 15-year phased open-pit and underground life of mine ("LOM"), Phase 1 initial capital of approximately $149.8M, and a 38% increase in Measured and Indicated Mineral Resources.

•Queensway Phase I EPR submitted. The EPR was submitted to the provincial government on November 3, 2026, addressing information requests and feedback from public comments, government review, and engagement activities, including an open house in the Town of Appleton. The EPR is now subject to a 35-day public review period, with the Minister’s decision expected in due course.

Looking Ahead

The Company's priorities for the balance of 2026 and into 2027 are:

•Maintaining steady-state commercial production at Hammerdown and completing the installation and commissioning of the permanent on-site crusher and sorter (targeted for substantial completion in Q4 2026, with commissioning and ramp-up in Q1 2027);

•Advancing Queensway Phase I through EPCM work with WSP, the Pine Cove conversion and expansion, and the NL environmental assessment ("EA") process, targeting first Queensway Phase I mineralized material to the mill in Q4 2027;

•Executing the 2026 Queensway work program and filing the Updated Technical Report (as defined below) supporting the 2026 PEA and Updated MRE within 45 days of their October 22, 2026 announcement; and

•Commencing exploration, data compilation, interpretation and geological modelling of the Hammerdown Gold Project landholdings.

With commercial production achieved at Hammerdown and a $220M finance package closed in Q2 2026 (the “Finance Package”), comprising a $115M bought deal equity financing and a $105M senior secured credit facility, in place, the Company expects Hammerdown operating cash flow to complement its balance sheet in funding these priorities.



2

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
Description of the Business
Corporate Overview
New Found Gold is Canada's newest gold producer, with its principal assets located in NL, Canada. Effective August 26, 2026, the Company's common shares are listed on the TSX under the symbol "NFGC" and on the NYSE American under the symbol "NFGC"; the common shares were voluntarily delisted from the TSXV in connection with the TSX listing. The Company is principally engaged in the production and sale of gold, as well as the acquisition, exploration, evaluation, and development of resource properties.

The Company’s principal mineral assets consist of Queensway and Hammerdown. During the year ended December 31, 2025, the Company completed the strategic acquisition of Maritime, acquiring a permitted mill and in-pit tailings facility at Pine Cove, expanding its asset base and advancing its corporate strategy toward becoming a mid-tier Canadian gold producer. With the achievement of commercial production at Hammerdown during Q3 2026, the Company now holds a diversified portfolio of gold assets ranging from a producing gold mine and processing infrastructure through to near-term development and advanced exploration.

The Company’s business strategy is centered on creating long-term shareholder value through disciplined technical execution, responsible environmental and social practices, and the strategic consolidation of high-quality gold assets within a stable and globally recognized mining-positive jurisdiction.

Apart from those noted above, there were no other material changes in the Company's business or corporate structure during Q3 2026.

Queensway
Queensway is the Company's flagship, 100%-owned gold exploration and development asset, encompassing 210,550 hectares ("ha") in central Newfoundland, NL, Canada. Queensway is situated along two regional-scale fault systems, the Appleton Fault Zone (“AFZ”) and the Joe Batts Pond Fault Zone ("JBPFZ"), each with a strike extent of more than 110 kilometres (“km”) and is accessible by the Trans-Canada Highway with proximity to power, ports and an established mining services sector in the Town of Gander.
3

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
image.jpg
Figure 1. Location of Queensway, Hammerdown and Pine Cove, NL, Canada.

Revised Queensway PEA and Updated MRE

Subsequent to quarter-end, the Company released the results of the 2026 PEA and the Updated MRE for the Queensway Gold Project on October 22, 2026, each prepared in accordance with NI 43-101. The 2026 PEA has an effective date of October 19, 2026 and was prepared using the Updated MRE, which has an effective date of July 6, 2026 (with a database cut-off date of February 28, 2026). The Company intends to file a technical report in respect of the 2026 PEA and the Updated MRE (the “Updated Technical Report”) on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under New Found Gold’s issuer profile within 45 days of October 22, 2026.

Scientific and technical information in this MD&A relating to the 2026 PEA and the Updated MRE is supported by the news release disseminated by the Company on October 22, 2026 (titled “New Found Gold Announces Queensway Gold Project Revised PEA and Updated MRE: After-Tax NPV Increases to $1.7 B with 126% IRR; Measured and Indicated Mineral Resource Increases by 38%”) (the “2026 PEA News Release”). The 2026 PEA was prepared by, and the 2026 PEA News Release has been reviewed and approved by, independent representatives of Evomine Consulting Inc. (Stephen Coates, P.Eng.), Minéralis Consulting Services Inc. (Christian Beaulieu, P.Geo.), ASA Geotech Inc. (Ali Jalbout, P.Eng.), Stantec Consulting Ltd. (Sheldon H. Smith, P.Geo.), Knight Piésold Ltd. (J. Alex McIntyre, P.Eng.), Lincoln Metallurgical, Inc. (Neil J. Lincoln, P.Eng.) and WSP (Michelle Murphy, P.Eng., and William Richard McBride, P.Eng.), each of whom is a “qualified person” (within the meaning of NI 43-101) (each, a “QP”). Each QP is independent of New Found Gold and has reviewed and approved the content of this MD&A as it pertains to their respective responsibilities, and confirms that it fairly and accurately reflects, in both form and context, the information contained in the corresponding sections of the 2026 PEA. At the effective date of the 2026 PEA, each QP has certified that, to the best of their knowledge, information and belief, the parts of the 2026 PEA for which they were responsible contain all scientific and technical information required to be disclosed to make the 2026 PEA not misleading.

When filed, the Updated Technical Report will supersede the Queensway Technical Report, which supported the Company’s initial MRE (effective date March 15, 2025) and the preliminary economic assessment released on July
4

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
21, 2025 (the “2025 PEA”). The 2026 PEA and the Updated MRE replace the 2025 PEA and the initial MRE in their entirety. Readers are cautioned that there are material changes to the scientific and technical information since the Queensway Technical Report, as outlined in the 2026 PEA News Release. The key assumptions, parameters and methods used in the 2026 PEA, certain of which are described in the 2026 PEA News Release, will be further described in the Updated Technical Report. For readers to fully understand the information contained in the 2026 PEA, reference should be made to the full text of the Updated Technical Report, once filed, including all assumptions, qualifications and limitations therein. The Updated Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context.

The 2026 PEA confirms robust economics for a phased, high-grade open-pit and underground operation that leverages the Company’s existing, permitted milling and tailings infrastructure at Pine Cove under a hub-and-spoke configuration before transitioning to a purpose-built on-site Queensway processing facility. Queensway is an orogenic, structurally controlled gold system that begins within a few m of surface, allowing the Company to systematically de-risk Queensway through drilling, excavation and channel sampling. The 2026 PEA contemplates a three-phase development: Phase 1 comprising open-pit mining of the Keats and Iceberg deposits with milling of mineralized material at the converted and expanded Pine Cove from Q4 2027; Phase 2 comprising open-pit and underground mining of all deposits through a newly built 4,900-tonnes-per-day Queensway mill; and Phase 3 comprising a further expansion of the Queensway processing circuit, for total planned processing capacity of 7,000 tonnes per day.

Updated PEA and MRE highlights include:

•After-tax NPV₅% of $1.728B at a base case gold price of US$3,600 per ounce, increasing to $2.225B at an upside price of US$4,100 per ounce;

•IRR of 126% at the base case price (164% at the upside price), with a payback period of less than one year;

•1.744 M ounces of gold produced over a 15-year phased open-pit and underground LOM, with average annual production of approximately 116,000 ounces and peak annual production of approximately 190,000 ounces in 2032;

•Average head grade of 13.41 g/t Au for Phase I and an LOM average head grade of 2.09 g/t Au with projected LOM recovery of 91.5%;

•Phase 1 initial capital of approximately $150M, in line with the previous estimate, $832M in growth capital and $971M sustaining capital over LOM, with cash flows from Phases 1 and 2 anticipated to fund growth capital for Phases 2 and 3, respectively;

•Cash cost and all-in sustaining cost (“AISC”) of US$985 per ounce of gold (“/oz Au”) and US$1,375/oz Au, respectively; and

•A 38% increase in Measured and Indicated Mineral Resources (to 27.3 M tonnes at 2.19 g/t Au for 1.92 M contained ounces), in part from the addition of the Dropkick Zone, with Inferred Mineral Resources of 12.5 M tonnes at 1.51 g/t Au.










5

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)

PEA Summary

Key financial and operating metrics from the 2026 PEA are summarized below:

ItemUnitsValue
Production
Project life (from start of construction to closure)years17
Mine lifeyears15
Total Potential Mill Feed TonnageMt28.3
Average Feed Grade, Aug/t2.09
Mill recoveries (Avg)%91.5
Doré Payable%99.949
Concentrate Payable%87.0
Total Payable Gold (weighted)%97.813
Total Gold SoldMoz Au1.706
Commodity Prices
Au AverageUS$/oz3,600
Project Costs (LOM average)1
Mining Cost - OP$/t milled29.77
Mining Cost - UG$/t mined171.91
Milling Cost$/t milled26.78
On-Site Crushing Cost$/t milled1.75
Tailings Storage Facility (“TSF”) Cost$/t milled0.16
General & Administrative Cost$/t milled2.15
Material Haulage to Pine Cove$/t milled2.38
Water Management Costs$/t milled4.57
Total Cash Cost (2) (4)
US$/oz Au985
AISC (LOM) (3) (4)
US$/oz Au1,375
Project Economics
Gross Revenue$M8,538.6
Total Selling Cost Estimate$M53.9
Effective Royalty Rate%0.42
Total Royalties$M35.8
Total Operating Cost Estimate$M2,245.6
Total Sustaining Capital Cost Estimate$M970.8
Total Growth Capital Cost Estimate$M832.1
Initial Capital Cost Estimate$M149.8
Project Economics
Taxes$M1,700.0
Pre-Tax Cash Flow$M4,250.7
After-Tax Cash Flow$M2,550.6
Pre-Tax Net Present Value @ 5%$M2,972.8
Pre-Tax Internal Rate of Return%204.4
After-Tax Net Present Value @ 5%$M1,727.6
After-Tax Internal Rate of Return%125.8
After-Tax payback periodyears<1 y
(1) Total operating costs comprise on-site OP and UG mining, processing, material handling and on-site G&A costs.
(2) Cash cost and AISC are non-IFRS measures, calculated per ounce of gold sold as defined in the 2026 PEA. Cash cost comprises doré and concentrate transportation, treatment and refining charges, royalties and on-site operating costs. AISC adds sustaining capital costs. Refer to “Non-IFRS Financial Measures”.
(3) AISC is calculated as the sum of doré transportation, treatment and refining charges, royalties, onsite operating costs, and sustaining capital costs, divided by the quantity of ounces sold.
(4) Denotes a “specified financial measure” within the meaning of National Instrument 52-112 – Non-GAAP and Other Financial Measures Disclosure. See note on “Non-IFRS Financial Measures
6

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)

The 2026 PEA is preliminary in nature. It includes Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the 2026 PEA will be realized. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. No Mineral Reserves have been defined for Queensway. Readers should refer to the October 22, 2026 news release and, once filed, the Updated Technical Report for the assumptions, qualifications and limitations of the 2026 PEA and MRE.

Updated MRE

The Updated MRE has an effective date of July 6, 2026 and a database cut-off date of February 28, 2026. Combined open pit (“OP”) and underground (“UG”) Measured and Indicated (“M&I”) Mineral Resources increased by 38% (528 koz) from the initial MRE to 1.920 Moz Au. Inferred Mineral Resources were unchanged at 606 koz Au. Updated pit optimizations and the addition of the Dropkick Zone account for most of the growth.

CategoryTonnageGradeGold Content
(kt)(g/t Au)(koz Au)
Open Pit (0.30 g/t cut-off grade)
Measured259 7.2861 
Indicated26,557 2.081,780 
M&I26,816 2.131,840 
Inferred11,044 1.17414 
Underground (1.90 g/t cut-off grade)
Measured– – – 
Indicated509 4.8980 
M&I509 4.8980 
Inferred1,427 4.17191 
Total Open Pit and Underground
Measured259 7.2861 
Indicated27,066 2.141,860 
M&I27,325 2.191,920 
Inferred12,471 1.51606 
Notes:
1.Mineral resources completed by Christian Beaulieu, P.Geo., of Mineralis Consulting Services inc., an independent qualified person as defined by NI 43-101.
2.The Mineral Resources described above have been prepared in accordance with the CIM Standards (Canadian Institute of Mining, Metallurgy and Petroleum, 2014).
3.The effective date of the mineral resource estimate is July 6, 2026, with a database cut-off date of February 28, 2026.
4.A cut-off of 0.30 g/t Au is used to report open pit Mineral Resources, and a cut-off of 1.90 g/t Au is used to report underground Mineral Resources.
5.The Queensway deposits have been classified as Measured, Indicated and Inferred Mineral Resources according to drill spacing and confidence in the geological models.
6.Bulk density was assigned based on bulk density measurements and the proportions of veining and host lithologies, with average values ranging from 2.68 to 2.71 grams per cubic centimetre (“g/cm3”) in the mineralized wireframes.
7.The MRE is based on a regularized model with a block size of 2.5 m x 2.5 m x 2.5 m.
8.The open pit MRE is reported within an optimized pit shell, and the underground MRE is reported within optimized stopes. No mining dilution or losses are assumed; however, must-take material is accounted for in underground mineable shapes.
9.Open pit and underground optimization and cut-off grade are assuming a gold price of US$4,000/oz, a CAD/USD exchange rate of 1.38, mill recoveries of 88% for open pit and 92% for underground and total mineralized material-based costs of 33.25CAD/t milled for open pit and 298.25CAD/t milled for underground
10.Tonnage has been expressed in the metric system, and gold metal content has been expressed in troy ounces. The tonnages have been rounded to the nearest 1,000 tons, and the metal content has been rounded to the nearest 1,000 ounces. Totals may not add up due to rounding errors.

These Mineral Resources are not mineral reserves as they have not demonstrated economic viability. The quantity and grade of reported Inferred Mineral Resources are uncertain in nature and there has been insufficient exploration to define these resources as indicated or measured. The QP responsible for Mineral Resources is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant considerations that could materially influence the Mineral Resource estimate.

7

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
Queensway 2026 Work Program

The Company is currently progressing on its 2026 Queensway work program (the “Queensway 2026 Program”). The Queensway 2026 Program is focused on project de-risking in advance of development in addition to discovery and resource growth. At the end of Q3 2026 there were four drill rigs active at Queensway with a total of 61,557 metres drilled in 439 diamond drill holes (“DDH”).

Advanced exploration drilling is focused on the conversion of Inferred Mineral Resources within the Phase 2 open pits and portions of the underground to Indicated Mineral Resources. Pre-development drilling includes ongoing grade control drilling at the Keats Zone and geotechnical drilling of the Phase 2 open pits, while exploration drilling and conversion drilling continues at the Dropkick Zone, approximately 11 km north of the AFZ Core in the AFZ Peripheral area, and at earlier-stage regional targets. At the end of Q3, exploration drilling was wound down, and drilling activities shifted exclusively to infill and geotechnical drilling. Quarterly drilling activity was lower than anticipated due to contractor drill-rig maintenance and deep infill drilling using directional drilling within UG portions of the AFZ Core.

On July 21, 2026, the Company reported results from 729 m of channel samples collected across 57 lines over the Lotto excavation and from seven DDH totaling 1,928 m of infill drilling at Lotto, located in the AFZ Core approximately 1.6 km north of the Keats and Iceberg Zones. The excavation exposed a network of gold-bearing quartz veins over a 210 m strike length beneath 2.5 to 9 m of overburden. Highlight results included 23.7 g/t Au over 15.88 m from channel sampling, and 43.5 g/t Au over 4.75 m and 22.3 g/t Au over 3.60 m from infill drilling of Phase 2 open-pit and underground inferred mineral resource blocks. These high grades over significant widths correlate well with the Queensway MRE block model, confirming the continuity of high-grade, near-surface gold mineralization at Lotto and supporting the Company’s Phase 2 open-pit and underground mine planning. The Lotto work forms part of a cost-effective excavation and channel-sampling program, extended during 2026 from the Keats and Iceberg zones to Lotto, through which the Company is progressively de-risking its geological model and mine plan as it advances Queensway toward near-term production. These and other 2025 exploration results fed into the mine planning and resource modelling underpinning the Updated MRE and 2026 PEA announced on October 22, 2026.

Phase I EPCM Contract

On January 26, 2026, the Company entered into a Phase I EPCM contract with WSP for the development of Queensway Phase I as outlined in the 2025 PEA. The EPCM scope of work includes Queensway site development and detailed engineering for the conversion and expansion of Pine Cove which the Company selected as the offsite milling facility for Queensway Phase I. Detailed engineering, early works and geotechnical drilling at Pine Cove commenced in Q1 2026 and continued through Q3 2026, alongside procurement of long-lead items and securing of major contracts, with the objective of completing the Pine Cove conversion and expansion to accept first mineralized material from Queensway by Q4 2027.

2026-2027 Outlook

The Company is advancing the Queensway 2026 Program, which is focused on de-risking, discovery and growth.
Following release from the EA process, the Company plans to apply for and obtain a range of provincial and federal permits and to work with the province of NL to obtain a Surface and Mining Lease through mid-2027.

Once the required permits are received, key Queensway development milestones include:

•Pine Cove expansion to 1,400 tpd capacity, targeted for completion in Q4 2027;
•Mobilization of contractors at Queensway in Q1 2027;
•Early works at the Queensway site beginning in Q2 2027, including clearing, grubbing, overburden removal, construction of the sound berm, site roads and water management facilities; and
•Mining, anticipated to begin in Q3 2027, to build a stockpile for delivery to Pine Cove commencing in Q4 2027.
8

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)

Hammerdown
The Hammerdown Gold Project is the Company's 100%-owned gold project in central Newfoundland. The Hammerdown mine was declared to be in commercial production during Q3 2026, completing the operational ramp-up. The Hammerdown Gold Project comprises the Hammerdown and Orion deposits located on the Hammerdown property, the Stog'er Tight deposit and Pine Cove, located on the Pine Cove property, and a 45,661 ha land package with associated infrastructure. Access, infrastructure, ownership interests and royalty obligations were unchanged during Q3 2026 and are described in greater detail in the 2025 Annual MD&A and the Hammerdown Technical Report. The February 26, 2026 Hammerdown PEA and updated MRE, and the Hammerdown Technical Report filed on March 17, 2026, are also described in detail in the Q1 2026 MD&A.

Operating and Financial Highlights
The following table summarizes key operating and financial data and unit analysis.

UnitThree months endedNine months ended
September 30, 2026September 30, 2025September 30, 2026September 30, 2025
Operating data
Mineralized material minedkt97 –235 –
Waste minedkt1,197 –2,973 –
Strip ratio(4)
w:mm12.40–12.63–
Mineralized material processedkt66 –189 –
Average gradeg/t2.77 –2.12–
Recovery%84.2 –83.1–
Gold producedoz4,863 –10,670 –
Gold soldoz6,925 –10,857 –
Silver soldoz697 –1,417 –
Total gold equivalent ounces soldoz6,935 –10,878 –
Financial data
Revenue(1)
K$41,580 –67,190 –
Cash costs(2)
K$19,646 –51,522 –
Sustaining costs(2)
K$2,665 –6,889 –
AISC(2)
K$22,311 –58,411 –
Unit analysis
Average realized gold price(2)
US$/oz4,285 –4,459 –
Average realized gold price(2)
$/oz5,996 –6,177 –
Cash costs per oz produced(2)
US$/oz2,887 –3,486 –
Cash costs per oz produced(2)
$/oz4,040 –4,829 –
AISC per oz produced(2)
US$/oz3,279 –3,952 –
AISC per oz produced(2)
$/oz4,588 –5,474 –
Material movement cost per tonne moved (mineralized material and waste)$/t11.51–11.91–
Milling cost per tonne processed$/t53.63–53.27–
G&A cost per tonne processed$/t11.52–13.22–
Notes:
(1) Revenue is presented inclusive of by-product silver revenue.
(2) Cash costs, AISC, average realized gold price, cash costs per ounce produced and AISC per ounce produced are non-IFRS financial measures. They do not have standardized meanings under IFRS and may not be comparable to similar measures presented by other issuers. Each measure is defined, and reconciled to the most directly comparable IFRS measure, in the “Non-IFRS Financial Measures” section of this MD&A. Per-unit figures under “Unit analysis” are calculated from underlying unrounded data and may therefore not recompute exactly from the rounded thousand-dollar amounts presented above.
(3)No comparative operating or financial data is presented for the three and nine months ended September 30, 2025. The Company had no mining or processing operations during those periods, which precede the November 13, 2025 acquisition of Maritime Resources Corp.
(4) Strip ratio is expressed as tonnes of waste mined per tonne of mineralized material mined (w:mm).
9

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
(5) US$ amounts are converted from Canadian dollars at average exchange rates of C$1.3992 per US$1.00 for Q3 2026 and C$1.3851 per US$1.00 for YTD 2026.

Operational Review

During Q3 2026, Hammerdown produced 4,863 oz of gold, accounting for approximately 46% of gold production through the first three quarters of 2026, reflecting the Company’s continued ramp-up and achievement of commercial production during the quarter. The Q3 2026 production was driven by increased mining and processing activity: 97,000 tonnes of mineralized material were mined at Hammerdown, and Pine Cove processed 66,000 tonnes, during the three months ended September 30, 2026. The average grade for Q3 2026 was 2.77 g/t, 31% higher than the year-to-date average of 2.12 g/t, while gold recovery of 84.2% was in line with the year-to-date average of 83.1%. The Company sold 6,935 oz of gold during Q3 2026, including 900 oz delivered in July against customer prepayments received in June 2026.

For the nine months ended September 30, 2026, Hammerdown produced a total of 10,670 oz of gold as it ramped up to commercial production, mining 235,000 tonnes of mineralized material and processing 189,000 tonnes through Pine Cove at an average grade of 2.12 g/t and an average recovery of 83.1%. The Company sold 10,878 oz of gold over the same period.

Financial Review

For the three months ended September 30, 2026, the Company generated $41.6M in revenue from metal sales at an average realized gold price of US$4,285 ($5,996) per ounce of gold sold. Total cash costs for Q3 2026 were $19.6M and all-in sustaining costs were $22.3M. On a per-unit basis, Hammerdown incurred:

•Cash costs of US$2,887 ($4,040) per ounce of gold produced;
•All-in sustaining costs of US$3,279 ($4,588) per ounce of gold produced;
•Material movement costs of $11.51 per tonne of mineralized material and waste moved;
•Milling costs of $53.63 per tonne of mineralized material processed; and
•G&A costs of $11.52 per tonne of mineralized material processed.

For the nine months ended September 30, 2026, the Company generated $67.2M in revenue from metal sales at an average realized gold price of US$4,459 ($6,177) per ounce of gold sold.

Compared with the 2026 Hammerdown Preliminary Economic Assessment (“2026 Hammerdown PEA”), Q3 2026 AISC showed a variance of US$904/oz, or 38% of AISC. The variance was primarily due to higher strip ratio by 30% (12.4 vs 9.6) and lower head grade by 11%. The higher strip ratio resulted from the commencement of mining activities in Q3 in the Rumbullion pit to increase the total material movement from 12,000 tpd to 16,000 tpd as outlined in the 2026 Hammerdown PEA and impacted AISC by US$350/oz. This activity was advanced from the first quarter of 2027 to Q3 2026 in order to ensure that early-stage activities, including stripping overburden to reach bedrock blasting and establishing the ramp system, were completed during more favorable seasonal conditions. Overall, lower head grade versus the 2026 Hammerdown PEA impacted AISC by US$135/oz. A grade-control drilling program covering most of the Phase 1 open pit is now complete and has since expanded to cover portions of the Rumbullion pit. Modelling incorporating the new high-density data is nearing completion and will be integrated into grade-control practices. Other contributing factors to the AISC variance include infill drilling costs (approximately US$180/oz or 8% of AISC), fuel surcharges on various external services contracts (approximately US$85/oz or 4% of AISC), higher mill labour costs (approximately US$45/oz or 2% of AISC) and Pine Cove water treatment costs (approximately US$30/oz or 1% of AISC). The remaining variances are attributable to other individually minor cost differences. The Company is currently assessing the potential impact of elevated fuel prices and water treatment costs with respect to achieving 2026 Hammerdown PEA level production metrics and closing this cost variance in future quarters.

Hammerdown 2026 Drill Program

Drilling at Hammerdown in 2026 included infill, location verification drilling in proximity to historic underground workings, grade control and condemnation to support mine infrastructure planning. Infill, location verification
10

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
drilling and condemnation drilling for 2026 is complete; grade control drilling is ongoing. A total of 27,484 m had been drilled in 293 DDH at the end of Q3 2026.

Pine Cove Conversion and Expansion

Pine Cove currently processes mineralized material from Hammerdown through a flotation–leach–Merrill-Crowe circuit. The Company plans to convert Pine Cove to a Gravity-CIL circuit to also accept Queensway Phase I feed, creating a single processing facility supporting both projects under a hub-and-spoke configuration.
On July 6, 2026, the Company reported that the permit amendment to convert the circuit to Gravity-CIL has been received, with the permit to expand throughput to 1,400 tpd to be applied for in due course. Recent test work indicates the conversion is expected to increase recoveries of Hammerdown deposit feed from the 87% design criterion to approximately 92%. The circuit conversion is progressing on schedule, with anticipated completion in Q4 2027.

2026-2027 Outlook

Hammerdown priorities for the balance of 2026 and into 2027 are:

•Maintaining steady-state production;
•Substantial completion of the permanent on-site crusher and sorter in Q4 2026, followed by commissioning and ramp-up in Q1 2027, which is expected to reduce crushing costs and allow delivery of higher-grade material to the mill;
•Completion of infill and grade control drilling at the Hammerdown deposit in support of an updated Hammerdown MRE in 2027;
•Advance of the Pine Cove conversion and expansion; and
•Commencement of exploration on the Hammerdown Gold Project landholdings.

Environmental, Social and Governance
Environmental, social and governance ("ESG") remain an integral part of the Company's priorities, the framework for which is described in full in the 2025 Annual MD&A. Q3 2026 ESG activities focused on operating Hammerdown and Pine Cove safely and responsibly, advancing the Queensway EA, and maintaining consistent ESG policies and governance across the Company's multi-asset operations.

Environmental Stewardship

Queensway

The Queensway Phase I ER was submitted to the NL Department of Environment, Conservation and Climate Change on April 30, 2026 and registered on May 7, 2026, commencing the provincial EA process under the NL Environmental Protection Act. By decision letter dated July 3, 2026, the Minister notified the Company that an EPR is required for Queensway Phase I. On September 2, 2026, the Company received the EPR guidelines from the Minister and submitted the EPR on November 3, 2026. Following the submission, the EPR will be subject to a 35-day review by the Environmental Assessment Committee and the public, and under provincial legislation a decision on the EPR will be provided within 45 days of submission, with the potential for the Minister to request a fourteen-day extension.

Following release from the EA process, Queensway is expected to require a range of provincial and federal permits and approvals typical of mine development projects in NL, including, but not limited to, approvals relating to water management, fish and fish habitat protection, air emissions and effluent discharge, mine rehabilitation and closure, and the construction and operation of mine infrastructure. The Company will also work with the provincial government to obtain a Surface and Mining Lease as part of the permitting process. Environmental sensitivities identified in the 2025 baseline program are generally manageable with standard permitting conditions and mitigation strategies, and no critical habitat for species at risk was identified within the area studied. The current EA
11

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
process applies to the Keats, Iceberg, Dome and Jackpot open pits of the Project; future open pits, underground works and later phases, including expansion of processing capacity and development of additional deposits, would be subject to their own environmental assessment, permitting and regulatory approval processes.

The Project has been designed with consideration for progressive reclamation and eventual closure. Closure planning will continue to evolve through future engineering, environmental, permitting and closure studies, and will include reclamation of disturbed areas, decommissioning of infrastructure and long-term environmental management measures in accordance with applicable regulatory requirements.

Hammerdown

Hammerdown continued to operate under existing permits during Q3 2026. The Company received the permit amendment to convert the Pine Cove circuit to Gravity-CIL, which is permitted to operate at 700 tpd, and continued scoping the permit amendments required to support the planned expansion of Pine Cove to 1,400 tpd in connection with Queensway Phase I. The separate permit to expand throughput capacity to 1,400 tpd to also accept Queensway Phase I feed will be applied for in due course.

Reclamation and closure cost provisions are disclosed in the "Financial Position Review" section and the unaudited condensed consolidated interim financial statements for the three and nine months ended September 30, 2026.

Health and Safety

The Company continued to prioritize the health and safety of employees, contractors and visitors across all sites during Q3 2026.

To the end of Q3 2026, Hammerdown and Pine Cove recorded zero lost time incidents over more than 328,846 person-hours worked. Health and safety practices during Q3 2026 focused on hazard identification, training and adherence to applicable occupational health and safety regulations, and on the continued alignment of policies and procedures across the combined portfolio following the Maritime acquisition. There were no material health and safety incidents at Hammerdown during Q3 2026.

Community and Stakeholder Engagement

Engagement activities continued at both projects during Q3 2026. At Queensway, these included continued communication with local communities, land users and other stakeholders, together with the public engagement activities forming part of the provincial EA process. Local hiring remained a priority at Hammerdown, where the operating workforce is substantially drawn from NL, reflecting the Company's commitment to local economic participation in the established mining communities of central Newfoundland.

Queensway is located near the communities of Appleton, Glenwood and Gander and plans to draw on the skilled workforce, contractors and service providers locally available. As Queensway advances, the Company expects to create employment and procurement opportunities within NL and will continue to engage local communities, Indigenous groups, businesses and government agencies. Over the LOM, a total of 530 new jobs are expected to be created in central Newfoundland, comprising 410 jobs at the Queensway mining operations and 120 jobs at the Queensway Mill.

Governance

The Company's governance framework, described in the 2025 Annual MD&A, continued to support oversight of the Company's multi-asset operations during Q3 2026. Governance activities of note during the quarter included:

12

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
•TSX graduation. The Board and management oversaw completion of the graduation from the TSXV to the TSX, with the Company’s common shares commencing trading on the TSX under the symbol “NFGC” on August 26, 2026 and being voluntarily delisted from the TSXV.

•Equity incentive grants. On August 14, 2026, the Company granted stock options, RSUs and DSUs to officers, employees and directors under its shareholder-approved equity incentive plans.

There were no changes to the composition of the Board of Directors or executive management during Q3 2026.

Financial Results
The following discussion of results of operations should be read in conjunction with the Company's unaudited condensed consolidated interim financial statements for the three and nine months ended September 30, 2026 and the audited consolidated financial statements for the year ended December 31, 2025 and the related notes thereto.
Comparability of Results

Comparisons between the current and prior periods are affected by several significant factors. The acquisition of Maritime, which closed on November 13, 2025, resulted in the consolidation of Maritime's financial results from the acquisition date onward. Q3 2026 represents the third full quarter of Maritime's mining and processing operations at Hammerdown and Pine Cove, while the comparative Q3 2025 and YTD 2025 periods predate the acquisition and do not include any contribution from Maritime, including revenue, cost of sales, or the associated segment assets and liabilities. In addition, the Hammerdown Mine and Pine Cove Mill achieved their operating levels intended by management during Q3 2026, when depreciation and depletion of the related assets commenced, and the Company achieved commercial production at Hammerdown during Q3 2026. Accordingly, the results for Q3 2026 and YTD 2026 are not directly comparable to those of Q3 2025 and YTD 2025, or to prior quarters of 2026.

Certain comparative figures on the condensed consolidated interim statements of financial position, statements of loss and comprehensive loss and statements of cash flows have been reclassified to conform to the current period presentation.

Three months endedNine months ended
September 30, 2026September 30, 2025September 30, 2026September 30, 2025
Revenue$41,579,812$–$67,189,809$–
Cost of sales23,009,500 – 45,258,491–
Income from mine operations18,570,312 – 21,931,318–
Exploration and evaluation expenses14,654,674 13,423,595 42,022,14527,794,432
General and administrative expenses3,099,315 3,081,478 10,844,3238,617,468
Share-based compensation1,474,292 766,158 4,970,6122,125,090
Loss from operations(657,969)(17,271,231)(35,905,762)(38,536,990)
Other income (net)2,747,800 4,326,437 8,549,7646,091,553
Income (loss) before income and mining taxes2,089,831 (12,944,794)(27,355,998)(32,445,437)
Mining tax expense – current(2,211,541)– (2,211,541)–
Income and mining tax expenses – deferred(6,992,096)– (7,733,272)–
Net loss and comprehensive loss$(7,113,806)$(12,944,794)$(37,300,811)$(32,445,437)
Loss per share — basic and diluted$(0.02)$(0.06)$(0.14)$(0.15)
13

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
Revenue
Revenue of $41,579,812 and $67,189,809 was recognized for Q3 2026 and YTD 2026, respectively, comprising gold revenue of $41,517,993 and $67,059,335, respectively, and silver revenue of $61,819 and $130,474, respectively. Gold doré bars produced at Pine Cove from Hammerdown mineralized material are shipped to the Royal Canadian Mint, where they are refined into gold bullion, with the resulting refined gold bullion (and associated silver by-product) sold by the Company to its customer. No revenue was recognized in the prior comparable periods, as Maritime had not yet been acquired.
During Q3 2026, the Company sold 6,935 ounces of gold at an average realized gold price of $5,996 per ounce (YTD 2026 – 10,878 ounces at $6,177 per ounce), calculated as gold revenue divided by ounces of gold sold.

Cost of Sales

Cost of sales for Q3 2026 was $23,009,500, comprising operating expenses of $22,540,580 and selling expenses of $468,920. Operating expenses were composed of contractor costs ($12,688,124), salaries and employee benefits ($2,738,571), raw materials and consumables ($2,626,961), site administration ($1,066,745), repairs and maintenance ($56,495) and depreciation and depletion ($8,883,376), aggregating to $28,060,272, less a $5,519,692 credit reflecting the change in inventories during the period, representing production-related costs capitalized into stockpile, work-in-process and finished-goods inventories. Depreciation and depletion increased from $105,350 in Q2 2026, as depreciation and depletion of Hammerdown and Pine Cove assets commenced during Q3 2026. No cost of sales was incurred in Q3 2025.

Cost of sales for YTD 2026 was $45,258,491, comprising operating expenses of $44,625,061 and selling expenses of $633,430. Operating expenses consisted of contractor costs ($32,978,203), salaries and employee benefits ($7,187,138), raw materials and consumables ($6,982,376), site administration ($3,395,960), repairs and maintenance ($345,160) and depreciation and depletion ($9,090,387), aggregating to $59,979,224, less a $15,354,163 credit reflecting the change in inventories during the period. No cost of sales was incurred in YTD 2025.

Income from Mine Operations

Income from mine operations was $18,570,312 and $21,931,318 for Q3 2026 and YTD 2026, respectively, compared to $1,924,777 for Q2 2026. The increase reflects higher gold sales in Q3 2026, partially offset by depreciation and depletion of $8,883,376 recognized in cost of sales during Q3 2026. Income from mine operations represented 45% of revenue in Q3 2026.

Exploration and Evaluation Expenditures

Exploration and evaluation (“E&E”) expenditures during Q3 2026 were $14,654,674, an increase of $1,231,079 (or 9%) compared to $13,423,595 in Q3 2025, reflecting the continued execution of the expanded 2026 Queensway drill program. The principal components of Q3 2026 E&E expenditures were personnel, consulting and overheads ($5,312,316), drilling ($5,116,266), technical studies and resource evaluation ($1,605,515), geological and geophysical studies ($1,462,113), assaying and metallurgical testing ($895,234), property holding and other costs ($365,621) and trenching ($239,598), partially offset by a net recovery of $341,989 in environmental, permitting and reclamation costs. The Queensway Project accounted for $13,460,995 (92%) of total Q3 2026 E&E expenditures, with the balance of $1,193,679 incurred on Maritime-acquired exploration assets.

E&E expenditures YTD 2026 were $42,022,145, an increase of $14,227,713 (or 51%) compared to $27,794,432 in YTD 2025, reflecting the expanded 2026 Queensway drill program in contrast to the comparatively slower drilling pace in the first half of 2025. The principal components of YTD 2026 E&E expenditures were drilling ($14,524,022), personnel, consulting and overheads ($12,751,451), technical studies and resource evaluation ($4,625,696), assaying and metallurgical testing ($4,139,340), geological and geophysical studies ($3,549,571), property holding and other costs ($2,391,433) and trenching ($278,916), partially offset by a net recovery of $238,284 in
14

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
environmental, permitting and reclamation costs. The Queensway Project accounted for $39,591,840 (94%) of total YTD 2026 E&E expenditures, with the balance of $2,430,305 incurred on Maritime-acquired exploration assets. Cumulative exploration expense as at September 30, 2026 was $351,825,941.

General and Administrative Expenses

General and administrative (“G&A”) expenses for Q3 2026 were $3,099,315, compared to $3,081,478 for Q3 2025, an increase of $17,837. The principal movements were:
•An increase of $311,153 in salaries and benefits reflecting the strengthened management and corporate team and the broader corporate footprint following the Maritime acquisition;
•A decrease of $197,401 in office and other expenses;
•A decrease of $130,763 in professional fees for external legal, finance and advisory services; and
•An increase of $34,848 in depreciation.

G&A expenses for YTD 2026 were $10,844,323, compared to $8,617,468 for YTD 2025, an increase of $2,226,855. The increase was primarily driven by:

•An increase of $1,243,894 in salaries and benefits reflecting the strengthened management and corporate team appointed during 2025 and the broader corporate footprint following the Maritime acquisition;
•An increase of $1,172,701 in office and other expenses reflecting the larger operating footprint, expanded governance and compliance activities, increased marketing and shareholder outreach activities, and incremental insurance and IT costs supporting a multi-asset organization; and
•An increase of $103,055 in depreciation.

These increases were partially offset by a decrease of $292,795 in professional fees for external legal, finance and advisory services.

Share-Based Compensation

Share-based compensation expense (“SBC”) for Q3 2026 and YTD 2026 was $1,474,292 and $4,970,612, respectively, compared to $766,158 and $2,125,090 for Q3 2025 and YTD 2025, respectively. The 2026 expense reflects ongoing vesting of stock options and equity-settled restricted share units (“RSUs”) granted during 2025 and 2026, fair value adjustments on cash-settled RSUs up to their settlement during 2026, and deferred share units (“DSUs”) granted to directors in Q3 2026. Of the YTD 2026 expense, $1,654,634 related to stock options, $2,919,893 to equity-settled RSUs, $356,885 to cash-settled RSUs and $39,201 to DSUs. Share-based compensation is non-cash in nature and is recognized over the vesting period of the respective awards in accordance with IFRS 2, Share-based Payment.

Other Income and Expenses

Net other income was $2,747,800 for Q3 2026 and $8,549,764 for YTD 2026, compared to $4,326,437 and $6,091,553 for Q3 2025 and YTD 2025, respectively. The principal movements were:

•Settlement of flow-through share premium of $3,124,124 for Q3 2026 and $8,677,099 for YTD 2026 (Q3 2025 – $3,495,191; YTD 2025 – $4,249,959), reflecting the pro-rated de-recognition of the flow-through share premium liability as qualifying Canadian exploration expenses (“Qualifying CEE”) were incurred pursuant to the Company's June 2025 flow-through financings. The flow-through share premium liability was fully extinguished as at September 30, 2026.
•Gains on investments of $572,250 for Q3 2026 and $1,007,304 for YTD 2026 (Q3 2025 – $361,729; YTD 2025 – $1,088,582), substantially comprising unrealized fair-value gains on the Company's equity investment in Kirkland Lake Discoveries Corp., partially offset by fair-value losses on the Company's investment in Epic Gold Corp.
15

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
•Interest income of $1,179,576 for Q3 2026 and $2,283,247 for YTD 2026 (Q3 2025 – $511,795; YTD 2025 – $892,946), reflecting interest earned on higher average cash balances following the completion of the $115M bought deal financing and the $70M Tranche 1 drawdown on the EdgePoint Senior Credit Facility.
•Interest, accretion and financing expenses of $1,899,050 for Q3 2026 and $3,101,928 for YTD 2026 (Q3 2025 – $3,409; YTD 2025 – $12,882), primarily reflecting interest and accretion on the $70M Tranche 1 drawdown on the Credit Facility at an annual coupon rate of 8.75%, together with accretion on the reclamation and closure cost provisions and the ACOA repayable contribution. YTD 2026, $236,940 of interest was capitalized to construction-in-progress.
•Other expenses of $229,100 for Q3 2026 and $315,958 for YTD 2026 (Q3 2025 – $38,869; YTD 2025 – $127,052), including Part XII.6 tax of $25,353 and $238,311, respectively, in respect of unspent flow-through proceeds under the Look-Back Rule in accordance with the Income Tax Act (Canada). Q3 2025 other expenses comprised Part XII.6 tax of $67,143, partially offset by a foreign exchange gain of $28,272. YTD 2025 other expenses also included a foreign exchange loss of $115,821 and a gain on secured notes of $55,911.

Income and Mining Taxes

Income and mining tax expenses were $9,203,637 for Q3 2026 and $9,944,813 for YTD 2026 (Q3 2025 and YTD 2025 – $nil). Q3 2026 included current mining tax expense of $2,211,541, relating to Newfoundland and Labrador mining tax on income from Maritime. Deferred income and mining tax expenses were $6,992,096 for Q3 2026 and $7,733,272 for YTD 2026. The increase in income and mining tax expense in Q3 2026 reflects higher taxable income at Maritime, driven by the significant increase in revenue to $41.6M in Q3 2026 from $15.7M in Q2 2026.

Net Loss

The Company recorded a net loss of $7,113,806, or $0.02 per common share (basic and diluted), for Q3 2026, compared to $12,944,794, or $0.06 per common share, for Q3 2025. Net loss for YTD 2026 was $37,300,811, or $0.14 per common share, compared to $32,445,437, or $0.15 per common share, for YTD 2025.

The Q3 2026 net loss decreased by $5,830,988 compared to Q3 2025, mainly due to income from mine operations of $18,570,312 and higher interest income, partially offset by income and mining tax expense of $9,203,637, higher E&E expenditures, higher interest, accretion and financing expenses on the Credit Facility and higher share-based compensation. The YTD 2026 net loss increased by $4,855,374 compared to YTD 2025, as income and mining tax expense of $9,944,813, higher E&E expenditures of $14,227,713, and higher G&A, share-based compensation and financing expenses more than offset income from mine operations of $21,931,318, higher interest income and a higher settlement of flow-through share premium.

Financial Position Review
Cash and Cash Equivalents
Cash and cash equivalents increased by $108,272,885, from $58,838,699 at December 31, 2025, to $167,111,584 at September 30, 2026. The increase primarily reflects proceeds from the Bought Deal, the Tranche 1 drawdown on the Credit Facility and the exercise of stock options and warrants, partly offset by cash used in operating activities and capital expenditures at Hammerdown, Pine Cove and Queensway. During Q3 2026, cash and cash equivalents decreased by $26,720,825 from $193,832,409 at June 30, 2026, primarily reflecting capital expenditures at Hammerdown and Pine Cove and the settlement of accounts payable and accrued liabilities.

Inventories

Inventories increased by $16,290,449, from $4,722,848 (as revised) at December 31, 2025 to $21,013,297 at September 30, 2026, including an increase of $5,851,184 in Q3 2026 (June 30, 2026 – $15,162,113). The main movements were:
16

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
•Stockpiled mineralized material increased by $14,338,978 to $15,943,527 for YTD 2026, including $8,781,879 in Q3 2026. Mineralized material mined at Hammerdown exceeded mineralized material processed at Pine Cove by approximately 30,900 tonnes in Q3 2026 and 46,100 tonnes YTD 2026, as mining rates outpaced mill throughput. Beginning in Q3 2026, the cost of stockpiled material also includes depreciation and depletion of the Hammerdown mining assets, which increased the carrying cost per tonne.
•Supplies and consumables increased by $1,842,493 to $2,472,883 for YTD 2026, including $1,237,677 in Q3 2026. The increase reflects higher quantities held to support increased mining and processing activity.
•Work-in-process and finished goods. Work-in-process increased by $591,613 to $1,958,524 for YTD 2026, despite a decrease of $1,068,002 in Q3 2026, as gold poured during the quarter exceeded gold recovered into the circuit, drawing down gold-in-circuit inventory. Finished goods decreased by $482,635 to $638,363 for YTD 2026, including a decrease of $3,100,370 in Q3 2026, as gold sold during the quarter exceeded gold poured.

Investments

Investments increased by $1,007,304, from $8,895,559 at December 31, 2025 to $9,902,863 at September 30, 2026, attributable to unrealized fair-value gains on the Company's equity investment in Kirkland Lake Discoveries Corp. ($1,144,500), partially offset by unrealized fair-value losses on Epic Gold Corp. ($137,195). The Company did not dispose of any investments during the period.

Property, Plant and Equipment

PP&E increased by $41,841,075, from $250,544,133 at December 31, 2025 to $292,385,208 at September 30, 2026. Additions of $52,320,821, comprising $44,282,212 of construction-in-progress and $8,038,609 of plant and equipment, were partially offset by depreciation and depletion of $9,775,805, a $301,182 reduction from changes in reclamation and closure cost estimates, $237,826 of government contributions under the ACOA Contribution Agreement deducted from the carrying amount of the Pine Cove Mill, and disposals with a net book value of $164,932. Beginning in Q3 2026, $10,968,212 of mining interests and plant and equipment at Hammerdown and Pine Cove were determined to be capable of operating in the manner intended by management and were transferred from construction-in-progress, with depreciation and depletion commencing during Q3 2026.

Exploration and Evaluation Assets

E&E assets increased by $294,339, from $77,664,022 at December 31, 2025 to $77,958,361 at September 30, 2026, comprising claim staking and license renewal costs of $99,016 at Queensway and $178,858 at other properties, and $16,465 of legal fees related to the Epic Gold Corp. claims acquired in 2025.

Other Asset Items

•Receivables increased by $2,670,069 to $6,995,542 (December 31, 2025 – $4,325,473), representing mainly sales tax receivable of $6,455,676.
•Prepayments and deposits decreased by $890,357 to $2,463,116 (December 31, 2025 – $3,353,473), mainly from the amortization of prepaid insurance.
•Other assets increased by $792,821 to $3,409,547 (December 31, 2025 – $2,616,726), representing mainly additional reclamation of financial assurance.

Liabilities

•Accounts payable and accrued liabilities increased by $18,916,325 to $31,255,849 at September 30, 2026 (December 31, 2025 – $12,339,524), primarily reflecting increases in accrued liabilities of $15,885,128 and in accounts payable of $3,005,686, associated with capital expenditures at Hammerdown and Pine Cove and the 2026 Queensway drill program.
17

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
•Deferred revenue of $5,126,202 at June 30, 2026, representing customer prepayments for refined gold, was recognized as revenue on delivery during Q3 2026. No deferred revenue was outstanding at September 30, 2026 (December 31, 2025 – $nil).
•The flow-through share premium liability of $8,677,099 at December 31, 2025 was fully extinguished as of September 30, 2026, as the Company incurred sufficient Qualifying CEE to satisfy its obligations in respect of the June 2025 flow-through financings.
•Loans payable (current and non-current portions combined) increased by $66,321,848 to $66,925,542 at September 30, 2026 (December 31, 2025 – $603,694), comprising the amortized cost of the Tranche 1 drawdown on the Credit Facility ($65,475,516), the ACOA repayable contribution ($615,415) and vehicle loans ($834,611). The current portion of $6,535,782 is presented within other current liabilities.
•Reclamation and closure cost provisions decreased by $517,064 to $10,353,004 at September 30, 2026 (December 31, 2025 – $10,870,068), reflecting changes in estimates of $763,675 and reclamation costs incurred of $37,175, partially offset by accretion of $283,786.
•Current tax liability of $2,211,541 (December 31, 2025 – $nil) represents mining tax payable in respect of Q3 2026.
•Deferred income tax liabilities increased by $7,733,276 to $90,226,222 at September 30, 2026 (December 31, 2025 – $82,492,946, as revised), reflecting the deferred income and mining tax expense recognized by YTD 2026.

Shareholders’ Equity

Shareholders' equity increased by $83,851,210, from $419,618,981 at December 31, 2025 to $503,470,191 at September 30, 2026. Share capital increased by $124,401,166 to $827,665,284, mainly from the Bought Deal ($115,055,200, less share issue costs of $6,063,298) and the exercise of warrants and stock options and settlement of RSUs. This was partly offset by the YTD 2026 net loss of $37,300,811, which increased the accumulated deficit to $392,479,220. Reserves were $40,857,240 and warrants were $27,426,887 at September 30, 2026.

Liquidity and Capital Resources
As at September 30, 2026, the Company had cash and cash equivalents of $167,111,584, a working capital surplus of $167,272,288 (current assets of $207,486,402 less current liabilities of $40,214,114), total assets of $705,775,607 and total shareholders' equity of $503,470,191 (December 31, 2025 – cash and cash equivalents of $58,838,699, working capital surplus of $58,464,597, total assets of $535,497,022 and total shareholders' equity of $419,618,981). The working capital surplus increased by $108,807,691 compared to the prior year-end, reflecting proceeds from the $115M Bought Deal and the $70M Tranche 1 drawdown on the Credit Facility, partially offset by cash used in operating and investing activities.

The Company manages its cash balances conservatively, holding funds primarily in high-quality financial institutions in Canada. Working capital fluctuations during YTD 2026 were primarily driven by exploration expenditures at Queensway, operating and capital expenditures at Hammerdown and Pine Cove, and corporate activities.

Cash Flow Summary

18

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
Three months endedNine months ended
September 30, 2026September 30, 2025September 30, 2026September 30, 2025
Cash used in operating activities$(6,766,801)$(16,027,801)$(31,287,215)$(34,713,701)
Cash (used in) generated from investing activities(19,055,212)(406,142)(39,869,278)2,245,440
Cash (used in) generated from financing activities(874,732)21,119,467179,409,72181,297,450
Effect of exchange rate fluctuations on cash$(24,080)$30,289$19,657$(10,616)
Net (decrease) increase in cash$(26,720,825)$4,715,813$108,272,885$48,818,573
Operating Activities
Net cash used in operating activities was $6,766,801 for Q3 2026 and $31,287,215 for YTD 2026 (Q3 2025 – $16,027,801; YTD 2025 – $34,713,701). Before changes in non-cash working capital, operating cash flow was $11,202,453 in Q3 2026, reflecting income from mine operations at Hammerdown, offset by Queensway E&E and G&A expenditures. Working capital used was $17,969,254 in Q3 2026, mainly from lower accounts payable and accrued liabilities, higher inventories and the delivery of gold prepaid in June 2026.

Investing Activities

Net cash used in investing activities was $19,055,212 for Q3 2026 and $39,869,278 for YTD 2026 (Q3 2025 – $406,142 used; YTD 2025 – $2,245,440 generated). Purchases of PP&E were $18,644,155 in Q3 2026 and $38,615,392 in YTD 2026, mainly at Hammerdown, Pine Cove and Queensway.

Financing Activities

Net cash used in financing activities was $874,732 for Q3 2026, mainly for loan repayments of $2,393,504, principally Credit Facility interest, partly offset by warrant exercise proceeds of $1,410,986 and the second ACOA drawdown of $277,649. Net cash from financing activities for YTD 2026 was $179,409,721 (YTD 2025 – $81,297,450), mainly from the $115,055,200 Bought Deal and the $69,300,000 Tranche 1 drawdown, net of share issue costs of $6,063,298 and debt financing costs of $1,832,088.

Capital Management

The Company's objectives in managing capital are to ensure sufficient liquidity to support planned activities, maintain financial flexibility, and minimize undue shareholder dilution while advancing its portfolio of gold assets. Management monitors capital resources on an ongoing basis and adjusts exploration, development and operational plans as necessary to align with available funding. Other than the financial covenants under the Credit Agreement described under the EdgePoint Senior Secured Credit Facility, the Company was not subject to externally imposed capital requirements during the nine months ended September 30, 2026.

Commitments and Contingencies
Contractual obligations recognized in the condensed consolidated interim statements of financial position as at September 30, 2026 are shown below. The amounts presented represent the future undiscounted principal and
19

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
interest cash flows, and therefore, do not equate to the carrying amounts on the consolidated statements of financial position.

Within 1
 year
2-3
 years
4-5
 years
More than
 5 years
Total
Accounts payable and accrued liabilities$31,255,849$–$–$–$31,255,849
Lease liabilities348,160 686,485 507,127 278,925 1,820,697 
Loans payable6,448,683 82,101,244 516,423 23,359 89,089,709 
Reclamation and closure cost provisions– 928,038 990,229 14,571,725 16,489,992 
$38,052,692$83,715,767$2,013,779$14,874,009$138,656,247
Mineral Property Commitments
The Company's mineral property commitments at September 30, 2026 were substantially consistent with those described in the 2025 Annual MD&A:
•Queensway royalty obligations include net smelter return ("NSR") royalties ranging from 0.4% to 3.00%, with buy-back provisions totaling $4,250,000 that, if exercised, would reduce NSRs to 0.5%–1.5%. The Epic Gold Corp. claims acquired in 2025 carry a 1.0% NSR with a right to repurchase 0.5% for $750,000 within three years.
•Kingsway Project carries a 1.0% NSR and a $1 per ounce Resource Payment at commencement of commercial production, together with an advance royalty of $50,000 per year. The advance royalty commitment commenced on March 3, 2026 and the Company made its first annual payment during Q1 2026; subsequent annual payments are payable on each anniversary thereafter.
•Green Bay, Sprucy Pond and Inomin properties are subject to various NSRs with buy-back provisions, all assumed in connection with the Maritime acquisition.
•VOA Option Agreement — entered into on November 2, 2022, as amended and restated, to acquire a 100% interest in five mineral licenses located in Gander, Newfoundland and Labrador. Remaining option payments consist of $800,000 cash plus 119,284 common shares on or before November 2, 2027.
•Epic Gold Corp. claims purchase agreement — additional consideration of up to 725,543 common shares may become payable depending on the outcome of a court case relating to the underlying claims.

No new material mineral property acquisitions or option agreements were entered into YTD 2026 that materially altered the Company's mineral property commitment profile.

Flow-Through Expenditure Commitments

In connection with the June 2025 flow-through share financings, the Company was required to incur Qualifying CEE by December 31, 2026. During Q3 2026 and YTD 2026, the Company incurred $10,876,904 and $30,517,930, respectively, in Qualifying CEE (Q3 2025 and YTD 2025 – $12,127,255 and $14,746,070, respectively). As at September 30, 2026, the Company had fully satisfied its flow-through expenditure commitment (December 31, 2025 – $30,106,905 outstanding), and the flow-through share premium liability was fully extinguished.

ACOA Repayable Contribution

On March 24, 2026 and August 24, 2026, the Company received drawdowns of $595,266 and $277,649, respectively, under a repayable contribution agreement with ACOA (the “ACOA Contribution Agreement”) for up to $975,000 of eligible costs to upgrade Pine Cove. The contribution is non-interest-bearing and unsecured and is repayable in 60 equal monthly instalments that commenced on July 1, 2026. As at September 30, 2026, the amortized cost of the liability was $615,415, of which $125,078 was current.

EdgePoint Senior Secured Credit Facility

20

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
On April 20, 2026, the Company entered into a credit agreement (the “Credit Agreement”) with EdgePoint for a senior secured credit facility of up to $105,000,000 (the “Facility”), comprising Tranche 1 ($70,000,000) and Tranche 2 ($35,000,000). The Facility bears interest at a fixed rate of 8.75% per annum, payable quarterly, and matures three years after the Tranche 1 drawdown. Tranche 1 was drawn on May 15, 2026 for net cash proceeds of $69,300,000, together with the issuance to EdgePoint of 2,489,818 warrants exercisable at $3.30 until May 15, 2029 (the “Tranche 1 Warrants”). Tranche 2 is available at the Company's election until May 15, 2027, subject to conditions precedent, and was undrawn at September 30, 2026.

As at September 30, 2026, the carrying amount of the Facility was $65,475,516, of which $6,256,421 was current. The Company recognized interest and accretion of $3,055,279 on the Facility in YTD 2026, including interest of $2,307,675, all of which was paid during the period. The accounting for the Facility is described in Note 13 of the condensed consolidated interim financial statements for the three and nine months ended September 30, 2026.

Under the Credit Agreement, the Company is required to maintain a minimum consolidated cash balance of $3,000,000 and a positive consolidated working capital balance, as defined in the Credit Agreement. The Company was in compliance with both covenants at September 30, 2026.

Contingencies

In connection with the Maritime acquisition, the Company assumed obligations under a royalty deed relating to the Green Bay block within the Hammerdown Property. Under the terms of the royalty deed, the Company is required to pay holders of 21,070,000 royalty units an amount equal to 10% of Net Cash Flow from Green Bay, commencing on the first anniversary of the date of commencement of Commercial Production. Total payments under the royalty deed are capped at $3,160,500, and royalty payments may be made, at the Company's option, in cash, physical gold, or a combination thereof. No Royalty Payments were made or payable as of September 30, 2026.

Summary of Quarterly Results
The following discussion summarizes selected quarterly financial information for New Found Gold for the eight most recently completed fiscal quarters. This information should be read in conjunction with the Company's unaudited condensed consolidated interim financial statements for the three and nine months ended September 30, 2026 and the audited consolidated financial statements for the year ended December 31, 2025 prepared in accordance with IFRS.

Amounts in $000’s except per share amountsQ3 2026Q2 2026Q1 2026
Q4 2025 (1)
Q3 2025Q2 2025Q1 2025Q4 2024
Revenue$41,580$15,722$9,888$5,807$–$–$–$–
Cost of sales(23,010)(13,797)(8,452)(4,618)– – – – 
Exploration and evaluation expenses(14,655)(14,813)(12,555)(13,586)(13,424)(8,640)(5,730)(15,413)
General and administrative expenses(3,099)(2,651)(5,094)(3,040)(3,081)(1,710)(3,826)(1,354)
Share-based compensation(1,474)(1,717)(1,779)(4,160)(766)(1,511)153 (74)
Transaction costs– – – (4,788)– – – – 
Other income (expenses)2,748 6,453 (651)9,933 4,326 1,299 466 3,433 
Income and mining tax expenses(9,204)(275)(466)(154)– – – – 
Net loss and comprehensive loss(7,114)(11,078)(19,109)(14,606)(12,945)(10,562)(8,937)(13,408)
Loss per share – basic and diluted(0.02)(0.03)(0.08)(0.05)(0.06)(0.05)(0.04)(0.07)
Total assets705,776705,676521,207535,497119,946113,13361,72074,019
Cash and cash equivalents167,112193,83237,91558,83971,13666,42012,36822,318
21

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
(1)Q4 2025 cost of sales decreased by $1.1M and income and mining tax expenses increased by $0.5M as a result of the measurement period adjustments relating to the fair value of inventories from the Maritime acquisition purchase price allocation. Refer to Note 4 of the unaudited condensed consolidated interim financial statements for the three and nine months ended September 30, 2026 for the full revised purchase price allocation.
The Company's quarterly results are primarily driven by the timing and scale of exploration and development activities at Queensway, mining and milling activities at Hammerdown and Pine Cove following the November 13, 2025 Maritime acquisition, the level of general and administrative activity supporting a multi-asset organization, and transaction-related costs and other income items including the settlement of flow-through share premium liabilities, gains and losses on the Company's equity investments, interest income on cash balances and interest expense on the Credit Facility. Quarterly results fluctuate based on the level and timing of activities undertaken during each period, and period-to-period fluctuations may not be indicative of underlying trends or future performance.
Q3 2026 Compared to Previous Quarters

Selected observations from quarterly financial information are as follows:

•Revenue and cost of sales. Revenue of $41.6M was recognized for Q3 2026, compared to $15.7M in Q2 2026 and $9.9M in Q1 2026, reflecting higher gold sales following the operational ramp-up and the achievement of commercial production at Hammerdown. Cost of sales of $23.0M in Q3 2026 (Q2 2026 – $13.8M) includes depreciation and depletion of $8.9M, following the commencement of depreciation and depletion of the Hammerdown and Pine Cove assets during Q3 2026. The Company recognized income from mine operations of $18.6M in Q3 2026, compared to $1.9M in Q2 2026.
•Exploration and evaluation expenditures. E&E expenditures of $14.7M in Q3 2026 (Q2 2026 – $14.8M) reflect the continued execution of the expanded 2026 Queensway drill program. E&E expenditure levels vary from quarter to quarter, reflecting different program intensities during each period.
•General and administrative expenses. G&A of $3.1M in Q3 2026 (Q2 2026 – $2.7M; Q1 2026 – $5.1M) reflects the strengthened management team appointed during 2025, the broader corporate footprint following the Maritime acquisition, and dual-listing-related compliance and audit activity.
•Share-based compensation. SBC of $1.5M in Q3 2026 (Q2 2026 – $1.7M; Q1 2026 – $1.8M) reflects ongoing vesting of the stock options and RSUs granted during 2025 and 2026 and DSUs granted to directors during the quarter. The Q1 2025 SBC recovery of $0.2M primarily reflects forfeitures of previously granted awards in connection with the 2025 management transition.
•Transaction costs. Q4 2025 transaction costs of $4.8M related primarily to legal, advisory, valuation and accounting fees incurred in connection with the Maritime acquisition. No transaction costs were incurred in 2026 or in the other comparative quarters presented.
•Other income (expenses). Q3 2026 net other income of $2.7M includes the $3.1M settlement of flow-through share premium, interest income of $1.2M and $0.6M of unrealized fair-value gains on equity investments, partially offset by interest, accretion and financing expenses of $1.9M. Q2 2026 net other income of $6.5M included $3.8M of net unrealized fair-value gains on equity investments, and the Q1 2026 net other expense of $0.7M included unrealized investment losses partly offset by flow-through share premium settlements.
•Net loss and loss per share. Q3 2026 net loss was $7.1M ($0.02 per share, basic and diluted), compared to $11.1M in Q2 2026 and $19.1M in Q1 2026. Income from mine operations of $18.6M was partially offset by income and mining tax expenses of $9.2M, including the current mining tax expense of $2.2M.
•Balance sheet items. Total assets were $535.5M at December 31, 2025, reflecting the November 13, 2025 Maritime acquisition, $521.2M at March 31, 2026, $705.7M at June 30, 2026, following the proceeds of the Finance Package, and $705.8M at September 30, 2026. Cash and cash equivalents increased from $58.8M at December 31, 2025 to $193.8M at June 30, 2026, and decreased to $167.1M at September 30, 2026, primarily reflecting capital expenditures and working capital movements in Q3 2026.

22

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
Outstanding Share Data
As at September 30, 2026, New Found Gold had 385,930,765 common shares issued and outstanding (December 31, 2025 – 342,329,665). The Company's common shares are listed for trading on the TSX and on the NYSE American under the symbol “NFGC”. In connection with the Company's graduation to the TSX on August 26, 2026, the common shares were voluntarily delisted from the TSXV.
Share Capital Movements

For YTD 2026, 43,601,100 common shares were issued, comprising:

•38,870,000 common shares issued relating to the bought deal equity financing component of the Finance Package, which closed on April 27, 2026, for gross proceeds of $115,055,200;
•1,501,964 common shares issued on the exercise of 1,501,964 stock options at a weighted average exercise price of $1.40 per share, for cash proceeds of $2,108,767 (with a corresponding transfer of $2,478,480 from reserves to share capital);
•2,547,136 common shares issued on the exercise of 2,547,136 share purchase warrants at a weighted average exercise price of $1.06 per share, for cash proceeds of $2,697,624 (with a corresponding transfer of $5,662,796 from warrants to share capital); and
•682,000 common shares issued on the settlement of 717,667 vested equity-settled RSUs, with a corresponding transfer of $2,461,597 from reserves to share capital.

Stock Options
As at September 30, 2026, the Company had 7,328,276 stock options outstanding (December 31, 2025 – 7,631,500) with exercise prices ranging from $0.67 to $8.98 and a weighted average exercise price of $2.32. Of these, 4,008,397 options were exercisable at a weighted average exercise price of $2.34.

YTD 2026, 1,741,278 stock options were granted at a weighted average exercise price of $2.50 per option, 1,501,964 options were exercised at a weighted average exercise price of $1.40, and 542,538 options were forfeited or expired at a weighted average exercise price of $5.48.

Restricted Share Units

As at September 30, 2026, 2,459,361 equity-settled RSUs were outstanding (December 31, 2025 – 2,394,348). YTD 2026, 782,680 equity-settled RSUs were granted and 717,667 were settled, and the 300,000 cash-settled RSUs outstanding at December 31, 2025 were settled.

Deferred Share Units

During Q3 2026, the Company granted 128,454 DSUs to directors. The DSUs are expected to be equity-settled, vest in full on the first anniversary of the grant date and are settled when the holder departs the Company. As at September 30, 2026, 128,454 DSUs were outstanding (December 31, 2025 – nil). Share-based compensation of $39,201 was recognized for the DSUs in Q3 2026.

Warrants

As at September 30, 2026, the Company had 14,894,717 warrants outstanding (December 31, 2025 – 14,952,035) with a weighted average exercise price of $1.72. Warrants outstanding include replacement warrants issued in connection with the Maritime acquisition, whereby each outstanding Maritime warrant became exercisable for New Found Gold common shares adjusted per the 0.75 Exchange Ratio, and the 2,489,818 Tranche 1 Warrants issued to EdgePoint. A total of 2,547,136 replacement warrants were exercised for gross proceeds of $2,697,624 YTD 2026.

Fully Diluted Share Capital
23

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)

Assuming the exercise of all outstanding stock options and warrants and the settlement of all outstanding equity-settled RSUs and DSUs, the Company would have 410,741,573 common shares outstanding on a fully diluted basis as at September 30, 2026.

Subsequent Changes

Subsequent to September 30, 2026, 129,224 common shares were issued in connection with the VOA Option Agreement, 150,000 common shares were issued on the exercise of share purchase warrants, and 33,750 common shares were issued on the exercise of stock options. In addition, 33,333 stock options expired unexercised, and 260,000 stock options and 50,000 RSUs were granted.

The table below summarizes the Company’s outstanding equity instruments as at September 30, 2026 and November 10, 2026.

InstrumentSeptember 30, 2026November 10, 2026
Common shares outstanding385,930,765386,243,739
Stock options7,328,2767,521,193
RSUs (equity-settled)2,459,3612,509,361
DSUs (equity-settled)128,454128,454
Warrants14,894,71714,744,717
Fully diluted shares410,741,573 411,147,464 
Related Party Transactions
The Company’s related parties include its subsidiaries, key management personnel and companies having common directors and officers.
Key management personnel include the Company’s directors and executive officers, who have the authority and responsibility for planning, directing and controlling the activities of the Company. Compensation of key management personnel for the three and nine months ended September 30, 2026 was as follows:
Three months ended September 30Nine months ended September 30
2026202520262025
Salaries and consulting (1)
$535,693$542,047$1,746,649$1,304,821
Share-based compensation1,205,662 676,896 4,214,873 2,141,549 
Bonus– – 1,015,167 1,031,760 
Termination benefits– – – 929,520 
$1,741,355$1,218,943$6,976,689$5,407,650
(1) Salary recorded in exploration and evaluation expenditures in the condensed consolidated interim statements of loss and comprehensive loss for the three and nine months ended September 30, 2026 - $94,500 and $283,500, respectively.
Key management personnel compensation includes salaries of $94,500 and $283,500 for Q3 2026 and YTD 2026, respectively, recorded in E&E expenditures. As at September 30, 2026, $29,500 (December 31, 2025 – $3,989) was payable to key management personnel and directors for accrued salaries, bonuses and expense reimbursements, included in accounts payable and accrued liabilities. These amounts are unsecured, non-interest bearing, and without fixed terms of repayment.
Risks and Uncertainties
The Company’s business operations are subject to a number of risks, uncertainties, and other factors that may impact the Company’s actual results, performance, or the development of the Company’s ongoing projects. Such
24

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
factors include those described in the section “Risks and Uncertainties” in the Company’s annual Management’s Discussion and Analysis for the year ended December 31, 2025, the Management’s Discussion and Analysis for the three and six months ended June 30, 2026, in the section “Risks” in the Company’s most recently filed Annual Information Form, and in the Company’s Annual Report on Form 40-F filed with the United States Securities and Exchange Commission, each of which is available on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov/edgar.
Critical IFRS Accounting Policies and Accounting Estimates
The Company’s consolidated financial statements are prepared in accordance with IFRS as issued by the IASB. New Found Gold’s material accounting policies, including a summary of current and future changes in accounting policies, are disclosed in Note 3 to the condensed consolidated interim financial statements for the three and nine months ended September 30, 2026 and in the audited consolidated financial statements for the year ended December 31, 2025.
The preparation of the consolidated financial statements in accordance with IFRS requires management to make estimates and judgments that affect the reported amounts of assets, liabilities, revenues, and expenses. Critical accounting estimates have a reasonable likelihood that materially different amounts could be reported under different conditions or using different assumptions. The critical judgments and key sources of estimation uncertainty in the application of accounting policies during the year ended December 31, 2025 are disclosed in Note 4 to the 2025 audited consolidated financial statements. YTD 2026, management applied significant judgment in determining when the Hammerdown Mine and Pine Cove Mill achieved their operating levels intended by management, which the Company concluded occurred during Q3 2026, as disclosed in Note 3 and 8 to the condensed consolidated interim financial statements for the three and nine months ended September 30, 2026. In addition, the fair values of the assets acquired, and liabilities assumed in the Maritime acquisition remain provisional, with the measurement period ending no later than November 13, 2026.

Management has discussed the development and selection of critical accounting policies and estimates with the Audit Committee which has reviewed the Company’s disclosures included or incorporated by reference in this MD&A.

Non-IFRS Financial Measures
This MD&A refers to cash costs, cash costs per ounce of gold produced, AISC, AISC per ounce of gold produced, average realized gold price and EBITDA, which are non-IFRS financial measures or non-IFRS ratios. These measures do not have standardized meanings prescribed by IFRS and may not be comparable to similar measures presented by other issuers.
Management uses these measures to assess the operating performance of Hammerdown and the Company's ability to generate cash flow from its operations and believes that investors and analysts use them to compare gold producers. They are intended to supplement, and not replace, measures prepared in accordance with IFRS.

Cash Costs

Cash costs comprise mining, processing and site administration costs incurred at Hammerdown and Pine Cove, together with selling expenses, and exclude depreciation and depletion, reclamation, sustaining capital, exploration, corporate G&A and financing costs. Cash costs are calculated as operating expenses within cost of sales, less depreciation and depletion, adjusted for the change in inventories, plus selling expenses. Cash costs per ounce produced is cash costs divided by gold ounces produced. Silver revenue is not deducted from cash costs.

Cash costs are a non-IFRS measure and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS.
25

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)

All-In Sustaining Costs

AISC is based on guidance published by the World Gold Council (“WGC”). AISC comprises cash costs plus reclamation expense, sustaining exploration and sustaining capital expenditures at Hammerdown and Pine Cove. Sustaining capital expenditures are those required to maintain current production. AISC excludes growth capital, including the Pine Cove conversion and expansion, Queensway exploration and development, corporate G&A, share-based compensation, financing costs and income taxes. AISC per ounce produced is AISC divided by gold ounces produced.

Average realized gold price is revenue under IFRS divided by gold equivalent ounces sold in the period.

The following table reconciles cash costs, AISC and the related per-ounce measures, and average realized gold price, to the condensed consolidated interim financial statements for the three and nine months ended September 30, 2026. No comparative figures are presented because the Company had no mining operations in 2025.

Three months ended September 30,Nine months ended September 30,
2026202520262025
Operating expenses (Note 19)$22,540,580$–$44,625,061$–
Less: depreciation and depletion(8,883,376)– (9,090,387)– 
Add: change in inventories5,519,692 – 15,354,163 – 
Add: selling expenses468,920 – 633,430 – 
Cash costs$19,645,816$–$51,522,267$–
Reclamation expense85,060 – 236,817 – 
Sustaining exploration1,193,679 – 2,430,305 – 
Sustaining capital expenditures1,386,419 – 4,221,476 – 
All-in sustaining costs$22,310,974$–$58,410,865$–
Gold produced (ounces)4,863 – 10,670 – 
Cash costs per ounce produced ($/oz)4,040 – 4,829 – 
AISC per ounce produced ($/oz)4,588 – 5,474 – 
Revenue$41,579,812$–$67,189,809$–
Gold equivalent ounces sold (ounces)6,935 – 10,878 – 
Average realized gold price ($/oz)5,996 – 6,177 – 

EBITDA

EBITDA is net income (loss) before income and mining taxes, interest, accretion and financing expenses, and depreciation and depletion. Management uses EBITDA to assess operating performance before the effects of financing, taxes, and non-cash depreciation and depletion. The following table reconciles net loss to EBITDA:

Three months ended September 30,Nine months ended September 30,
2026202520262025
Net loss$(7,113,806)$(12,944,794)$(37,300,811)$(32,445,437)
Add: income and mining tax expense9,203,637 – 9,944,813 – 
Add: interest, accretion and financing expenses1,899,050 3,409 3,101,928 12,882 
Add: depreciation and depletion9,101,404 183,182 9,775,805 582,363 
EBITDA$13,090,285$(12,758,203)$(14,478,265)$(31,850,192)

26

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
Forward-Looking Non-IFRS Measures
Cash cost and AISC estimates disclosed in this MD&A for Queensway and Hammerdown are derived from the respective PEAs. They are forward-looking, are calculated per ounce of gold sold as defined in each PEA and cannot be reconciled to historical IFRS measures. Actual results may differ materially due to changes in gold prices, operating conditions, cost inflation, regulatory requirements and other factors described in “Risks and Uncertainties”.

Internal Controls Over Financial Reporting and Disclosure Controls and Procedures
The Company's management is responsible for establishing and maintaining adequate disclosure controls and procedures ("DC&P") and internal control over financial reporting ("ICFR"), as those terms are defined in National Instrument 52-109 — Certification of Disclosure in Issuers' Annual and Interim Filings ("NI 52-109"). DC&P are designed to provide reasonable assurance that information required to be disclosed by the Company in reports it files or submits under securities legislation is recorded, processed, summarized and reported within the time periods specified by securities legislation, and is accumulated and communicated to management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate to allow timely decisions regarding required disclosure. ICFR is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of the Company's financial statements for external purposes in accordance with IFRS as issued by the IASB.
In accordance with the requirements of NI 52-109, the Company's CEO and CFO, with the participation of management, have designed, or caused to be designed under their supervision, the Company's DC&P and ICFR.

In accordance with section 3.3 of NI 52-109, the Company's management has limited the scope of the design of DC&P and ICFR to exclude controls, policies and procedures of Maritime, which was acquired by the Company on November 13, 2025. Summary financial information relating to Maritime that has been consolidated in the Company's condensed consolidated interim financial statements for the three and nine months ended September 30, 2026 is as follows:

•Revenue: $67,189,809
•Net income: $9,376,808
•Total assets: $481,387,743
•Total liabilities: $160,508,773

The Company is in the process of integrating Maritime's controls, policies and procedures within the Company's overall DC&P and ICFR framework, and expects to complete this integration during the year ending December 31, 2026.

Other than the continued integration of Maritime's controls, policies and procedures referred to above, there were no changes in the Company's ICFR during Q3 2026 that materially affected, or are reasonably likely to materially affect, the Company's ICFR.

The Company's management, including the CEO and CFO, recognizes that any system of DC&P or ICFR, no matter how well designed and operated, can provide only reasonable, and not absolute, assurance of achieving the desired control objectives. Inherent limitations on the effectiveness of any system of controls and procedures include the possibility of human error, lapses in judgment, the circumvention or override of controls by individuals, breakdowns in operation, and cost-benefit considerations applied in the design of any control system. Because of these inherent limitations, even effective DC&P and ICFR may not prevent or detect all misstatements or instances of fraud.

Maritime Acquisition

27

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
On November 13, 2025, the Company completed the acquisition of Maritime Resources Corp. (“Maritime”) by way of a plan of arrangement, issuing common shares together with replacement stock options and replacement share purchase warrants for aggregate purchase consideration of $311.0M. Through the acquisition, the Company acquired the Hammerdown, Orion and Stog’er Tight deposits, the Pine Cove Mill, the Nugget Pond Hydrometallurgical Gold Plant and associated land and infrastructure. The acquisition was accounted for as a business combination under IFRS 3, Business Combinations, and is described in detail in Note 5 to the Company’s audited consolidated financial statements for the year ended December 31, 2025.

The purchase price allocation remained preliminary and provisional as at September 30, 2026, with goodwill of $124.5M, and is subject to refinement during the IFRS 3 measurement period, which ends no later than November 13, 2026. During Q1 2026, the Company recognized a measurement period adjustment to the provisional fair value of acquired in-circuit gold inventory, with the comparative information retrospectively revised in accordance with IFRS 3; the adjustment is non-cash. Full details of the revised purchase price allocation and the measurement period adjustment are set out in Note 4 to the Company’s unaudited condensed consolidated interim financial statements for the three and nine months ended September 30, 2026.

Cautionary Notes Regarding Forward-Looking Statements

This MD&A contains forward-looking statements which reflect management's expectations regarding the Company’s future growth, results from operations (including, without limitation, statements about the Company’s opportunities, strategies, competition, expected activities and expenditures as the Company pursues its business plan, the adequacy of the Company’s available cash resources and other statements about future events or results), performance (both operational and financial) and business prospects, future business plans and opportunities. Wherever possible, words such as “expects”, “plans”, “anticipates”, “believes”, “interpreted”, “intends”, “estimates”, “projects”, “aims”, “suggests”, “appears”, “indicate”, “often”, “target”, “future”, “likely”, “pending”, “potential”, “goal”, “objective”, “prospective”, “possibly”, “preliminary”, “initial”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative or grammatical variation thereof or other variations thereof, or comparable terminology have been used to identify forward-looking statements.

These forward-looking statements include, among other things, statements relating to the Queensway Gold Project; mineralization on Queensway; the interpretation of the results and benefits of the drilling program; statements related to the Hammerdown Gold Project and planned activities on the project; future drilling and the related timing and expected benefits thereof; updated MREs and related timing; the filing of the 2026 PEA; the completion of a pre-feasibility or feasibility study and related timing and costs; assay results; the interpretation of assay results; the extent of mineralization and the discovery of zones of high-grade gold mineralization; plans for future exploration and drilling and the focus and timing of same; the merits of Queensway and Hammerdown gold projects; production at Queensway and Hammerdown gold projects and related timing; submission of environmental assessment and related timing; the Company’s areas of focus; estimates related to the mineral resources; the Company’s future business plans; advancing Queensway as a district-scale exploration and development asset with long-term growth potential; future commercial production at Hammerdown and Pine Cove; maintaining financial discipline and access to capital; applying disciplined and consistent technical, and governance standards across assets; the market price of gold; expectations regarding any environmental issues that may affect planned or future exploration and development programs and the potential impact of complying with existing and proposed environmental laws and regulations; the ability to qualify for, retain and/or maintain any required permits, licenses or other necessary approvals for the exploration or development of its mineral properties; government regulation of mineral exploration and development operations in the Province of Newfoundland and Labrador, including the EPR; the Company’s compensation policy and practices; the Company’s expected reliance on key management personnel, advisors and consultants and the potential impact of any tariffs, countervailing duties or other trade restrictions.
Forward-looking statements are not a guarantee of future performance and are based upon a number of estimates and assumptions of management in light of management’s experience and perception of trends, current conditions
28

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances.

As of the date of this MD&A, these include, without limitation, assumptions about: the ability to raise any necessary additional capital on reasonable terms to advance exploration and development of the Company’s mineral properties; future prices of gold and other metal prices; the timing and results of exploration and drilling programs; the demand for, and price of gold; that general business and economic conditions will not change in a material adverse manner; the Company’s ability to procure equipment and operating supplies in sufficient quantities and on a timely basis; the geology of Queensway as described in the Queensway Technical Report; the geology of Hammerdown as described in the Hammerdown Technical Report; the accuracy of budgeted exploration and development costs and expenditures; future currency exchange rates and interest rates; operating conditions being favourable such that the Company is able to operate in a safe, efficient and effective manner; the Company’s ability to attract and retain skilled personnel; political and regulatory stability; the receipt of governmental, regulatory and third-party approvals, licenses and permits on favourable terms; obtaining required renewals for existing approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital goods markets and availability of equipment.

Furthermore, such forward-looking information involves a variety of known and unknown risks, uncertainties and
other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation: the Company may fail to find a commercially viable deposit at any of its mineral properties; there are no mineral reserves on any of the properties in which the Company has an interest; the Company’s plans may be adversely affected by the Company’s reliance on historical data compiled by previous parties involved with its mineral properties; mineral exploration and development are inherently risky; the mineral exploration industry is intensely competitive; additional financing may not be available to the Company when required or, if available, the terms of such financing may not be favourable to the Company; fluctuations in the demand for gold; the Company may not be able to identify, negotiate or finance any future acquisitions successfully, or to integrate such acquisitions with its current business; the Company’s exploration activities are dependent upon the grant of appropriate licenses, concessions, leases, permits and regulatory consents, which may be withdrawn or not granted; the Company’s operations could be adversely affected by possible future government legislation, policies and controls or by changes in applicable laws and regulations; there is no guarantee that title to the properties in which the Company has a material interest will not be challenged or impugned; the Company faces various risks associated with mining exploration that are not insurable or may be the subject of insurance which is not commercially feasible for the Company; the volatility of global capital markets over the past several years has generally made the raising of capital more difficult; compliance with environmental regulations can be costly; social and environmental activism can negatively impact exploration, development and mining activities; the success of the Company is largely dependent on the performance of its directors and officers; the Company’s operations may be adversely affected by First Nations land claims; the Company and/or its directors and officers may be subject to a variety of legal proceedings, the results of which may have a material adverse effect on the Company’s business; the Company may be adversely affected if potential conflicts of interests involving its directors and officers are not resolved in favour of the Company; the Company’s future profitability may depend upon the world market prices of gold; dilution from future equity financing could negatively impact holders of the Company’s securities; failure to adequately meet infrastructure requirements could have a material adverse effect on the Company’s business; the Company’s projects now or in the future may be adversely affected by risks outside the control of the Company; any new acquisitions may not be completed as anticipated; the Company is subject to various risks associated with climate change; and other factors discussed in the Company’s Annual Information Form filed under the Company’s profile at www.sedarplus.ca.

Although the Company has attempted to identify important factors that could cause actual actions, events, conditions, results, performance or achievements to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events, conditions, results, performance or achievements to differ from those anticipated, estimated or intended.
29

tm2612884d1_ex99-1img003.jpg
Management’s Discussion and Analysis
For the three and nine months ended September 30, 2026
(Expressed in Canadian Dollars, except share and per share amounts, unless otherwise indicated)
The Company cautions that the foregoing lists of important assumptions and factors are not exhaustive. Other events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking statements contained herein. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking statements.

Forward-looking statements contained herein are made as of the date of this MD&A and the Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as and to the extent required by applicable securities laws.

Cautionary Note for United States Investors

Disclosure regarding the Company’s mineral properties, including with respect to MREs included in this MD&A, was prepared in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. NI 43-101 differs significantly from the disclosure requirements of the SEC generally applicable to U.S. companies. Accordingly, information contained in this MD&A is not comparable to similar information made public by U.S. companies reporting pursuant to SEC disclosure requirements.

Off-Balance Sheet Arrangements

The Company does not utilize off-balance sheet arrangements.

Proposed Transactions

The Company does not have any proposed transactions.

Additional Information

Additional information relating to the Company, including the Company’s Annual Information Form, is available under the Company’s profile on SEDAR+ at www.sedarplus.ca, on EDGAR at www.sec.gov/edgar and the Company’s website at www.newfoundgold.ca.

30

Form 52-109F2
Certification of Interim Filings Full Certificate

I, Keith Boyle, Chief Executive Officer of New Found Gold Corp., certify the following:
1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of New Found Gold Corp. (the “issuer”) for the interim period ended September 30, 2026.

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other
certifying officer(s) and I have, as at the end of the period covered by the interim filings
(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

5.1Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is Internal Control – Integrated Framework published by the Committee of Sponsoring Organizations of the Treadway Commission.
5.2ICFR – material weakness relating to design: N/A
5.3Limitation on scope of design: The issuer has disclosed in its interim MD&A


(a)the fact that the issuer’s other certifying officer(s) and I have limited the scope of our design of DC&P and ICFR to exclude controls, policies and procedures of
(i)N/A;
(ii)N/A; or
(iii)A business that the issuer acquired not more than 365 days before the last day of the period covered by the interim filings; and

(c)Summary financial information about the proportionately consolidated entity, special purpose entity or business that the issuer acquired that has been proportionately consolidated or consolidated in the issuer’s financial statements.

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2026, and ended on September 30, 2026, that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.
Date:    November 11, 2026



/s/ Keith Boyle    
Keith Boyle
Chief Executive Officer

Form 52-109F2
Certification of Interim Filings Full Certificate

I, Hashim Ahmed, Chief Financial Officer of New Found Gold Corp., certify the following:
1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of New Found Gold Corp. (the “issuer”) for the interim period ended September 30, 2026.

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other
certifying officer(s) and I have, as at the end of the period covered by the interim filings
(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

5.1Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is Internal Control – Integrated Framework published by the Committee of Sponsoring Organizations of the Treadway Commission.
5.2ICFR – material weakness relating to design: N/A

5.3Limitation on scope of design: The issuer has disclosed in its interim MD&A


(a)the fact that the issuer’s other certifying officer(s) and I have limited the scope of our design of DC&P and ICFR to exclude controls, policies and procedures of

(i)N/A;
(ii)N/A; or
(iii)A business that the issuer acquired not more than 365 days before the last day of the period covered by the interim filings; and

(b)Summary financial information about the proportionately consolidated entity, special purpose entity or business that the issuer acquired that has been proportionately consolidated or consolidated in the issuer’s financial statements.

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2026, and ended on September 30, 2026, that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.
Date:    November 11, 2026

/s/ Hashim Ahmed    
Hashim Ahmed
Chief Financial Officer

Filing Exhibits & Attachments

4 documents

Keep reading