Nicola Mining Inc. (NICM) reports results of an independent underground inspection of its 100%-owned Treasure Mountain Silver Mine in British Columbia, supporting its intention to pursue a phased restart in 2027.

(Neutral)
(Neutral)
Form Type
6-K

Rhea-AI Filing Summary

Nicola Mining Inc. (NICM) reports results of an independent underground inspection of its 100%-owned Treasure Mountain Silver Mine in British Columbia, supporting its intention to pursue a phased restart in 2027. Engineering firm McElhanney Ltd. found both main portals accessible, substantial underground development open, natural ventilation functioning, and historic infrastructure largely intact, with no conditions identified that would prevent advancing to the next evaluation stage.

The findings highlight existing underground drill stations, partially developed headings, and a significant volume of muck material near the Level 1 portal that will be sampled and assayed as a potential near-term processing feed. Nicola plans further geotechnical and rehabilitation assessment, surveying and mapping, and reconciliation with historical mine plans to prioritize exploration and potential mining areas as part of a disciplined, capital-efficient restart strategy.

Positive

  • None.

Negative

  • None.

Filing Explained

The 6-K reports an inspection supporting continued evaluation—not a completed mine restart: access and infrastructure remain available, but rehabilitation, system upgrades, sampling, and further studies still precede any possible recommencement of extraction.

Inspection date July 27, 2026 Date of underground inspection at Treasure Mountain Silver Mine
Years of inactivity 13 years Approximate period Treasure Mountain had been inactive before the inspection
Proposed restart timing 2027 Nicola Mining’s stated intention to reopen Treasure Mountain
New Craigmont Project area Over 10,800 hectares Size of Nicola’s high-grade copper New Craigmont Project
Treasure Mountain Property area Over 2,200 hectares Area covered by 30 mineral claims and a mineral lease
Distance to Treasure Mountain Approximately 30 kilometres Location of Treasure Mountain northeast of Hope, British Columbia
portal technical
"The inspection included both <b>Portal 1 (Level 1) and Portal 2 (Level 2)</b>"
muck technical
"a significant volume of <b>muck</b> material was observed in a crosscut near the Level 1 portal"
stopes technical
"accessible, including access drifts, crosscuts, historic <b>stopes</b>, raises, draw points"
NI 43-101 regulatory
"Qualified Person as defined by <b>NI 43-101</b>"
A Canadian regulatory standard that sets the rules for how mining and exploration companies must report mineral resources and reserves, requiring technical reports prepared or signed off by an independent, certified expert. It matters to investors because it creates a consistent, transparent “inspection report” for mining projects, making it easier to compare prospects, judge the reliability of claims, and assess geological and financial risk before investing.
ventilation technical
"<b>Natural ventilation</b> remains evident throughout much of the mine"
Ventilation is the process of moving air in and out of the lungs to deliver oxygen and remove carbon dioxide, either by a patient’s own breathing or with the help of a machine that acts like a mechanical fan for the lungs. It matters to investors because need for ventilation is a key indicator of severe respiratory illness, drives demand for hospital equipment and supplies, influences healthcare spending and reimbursement, and affects capacity and operating costs for providers.
Qualified Person regulatory
"who is the <b>Qualified Person</b> as defined by NI 43-101"
A qualified person is someone with specialized knowledge, experience, and training in a particular field, allowing them to accurately assess and verify information or work. Their expertise helps ensure that reports, evaluations, or decisions are trustworthy and meet required standards. For investors, a qualified person provides confidence that the information they rely on is credible and properly validated.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What did NICM’s latest 6-K disclose about the Treasure Mountain Silver Mine?

It disclosed results of an independent underground inspection of Treasure Mountain. McElhanney Ltd. found both main portals accessible, extensive development open, ventilation functioning, and no conditions that would prevent moving to the next evaluation stage, supporting Nicola’s phased restart plans.

When does NICM plan to potentially restart operations at Treasure Mountain?

Nicola Mining states that the inspection corresponds with its intention of reopening the Treasure Mountain Silver Mine in 2027. The company plans staged technical work, including geotechnical assessment, surveying, and mine planning, before recommencing mineral extraction.

What opportunities did NICM identify underground at Treasure Mountain?

The assessment identified existing underground drill stations, partially developed workings, unexplored areas, and a significant volume of muck near the Level 1 portal. Nicola intends to sample and assay this muck, which could provide readily accessible processing feed if mineralization is confirmed.

Who conducted the inspection of NICM’s Treasure Mountain Silver Mine?

The first-stage evaluation was conducted by McElhanney Ltd., an independent Canadian engineering and consulting firm. McElhanney’s July 27, 2026 inspection covered Portals 1 and 2, underground workings, and surface infrastructure.

Who is the Qualified Person for NICM’s technical disclosure in this 6-K?

The scientific and technical information was reviewed and approved by Will Whitty, P.Geo., Nicola Mining’s Vice President of Exploration. He is identified as the Qualified Person as defined by NI 43-101.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of September 2026

Commission File Number: 001-43228

Nicola Mining Inc.
(Translation of registrant's name into English)

Suite 1212 – 1030 West Georgia Street, Vancouver,
British Columbia V6E 2Y3, Canada

(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F ☐      Form 40-F ☒


SUBMITTED HEREWITH

Exhibits

Exhibit   Description
   
99.1   News Release dated September 9, 2026


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  Nicola Mining Inc.
  (Registrant)
   
Date: September 9, 2026 By: /s/ Sam Wong
    Sam Wong
  Title: Chief Financial Officer



NASDAQ: NICM

TSX.V: NIM

FSE: HLIA

NICOLA MINING REOPENS PORTALS 1 AND 2 AT TREASURE MOUNTAIN SILVER MINE WITH
INTENTION TO RECOMMENCE OPERATIONS IN 2027

VANCOUVER, B.C., September 9, 2026 - Nicola Mining Inc. (NASDAQ: NICM) (TSX.V: NIM) (FSE: HLIA) (the "Company" or "Nicola") is pleased to announce the results of an independent underground inspection and factual assessment of its Treasure Mountain Silver Mine (Permit M-239), located approximately 30 kilometres northeast of Hope, British Columbia. The genesis of the underground inspection corresponds with the Company's intention of reopening the mine in 2027.

McElhanney Ltd. ("McElhanney"), an independent Canadian engineering and consulting firm, was retained by Nicola to conduct the first stage of an evaluation associated with the proposed restart of the historic underground silver-lead-zinc mine. The assessment was designed to establish a baseline understanding the conditions of existing underground workings, access, and infrastructure.

The inspection found that Treasure Mountain is in generally better condition than anticipated following approximately 13 years of inactivity expediting the timing of potentially recommencing mining activities.

Both principal portals remain accessible, significant portions of the underground development remain open, natural ventilation pathways are functioning, and much of the historical underground infrastructure remains in place. Most importantly, no conditions were observed that would prevent the project from advancing to the next stage of evaluation.

Key Findings

The July 27, 2026, inspection included both Portal 1 (Level 1) and Portal 2 (Level 2), underground workings and surface infrastructure. Among the principal findings:

  • Both portals remain accessible and generally intact, with minimal evidence of sloughing or burial. Access roads were passable by standard pickup truck.
  • No flooded workings or major inaccessible collapse zones were encountered within the inspected areas, while atmospheric conditions remained acceptable throughout the inspection.
  • Extensive existing underground development remains accessible, including access drifts, crosscuts, historic stopes, raises, draw points, diamond-drill bays, remuck stations and sump infrastructure.
  • Most existing ground-support installations appeared functional, although localized rehabilitation, scaling and support replacement will be required, particularly near the Portal 2 entrance.
  • Natural ventilation remains evident throughout much of the mine, with strong airflow observed through connected raises.
  • Existing compressed-air lines, water lines and portions of the electrical distribution infrastructure remain throughout the accessible workings, although these systems will require assessment and, where necessary, replacement or upgrading before recommissioning.

Photos of Treasure Mountain Underground

Portal 1 Level 1 Level 1 Raise for Mining

Portal 2 Level 2 Level 2 Raise for Mining


Existing Development Creates Exploration Opportunities

The assessment also identified several features that may provide meaningful opportunities as Nicola advances its evaluation of Treasure Mountain.

In addition, a significant volume of muck material was observed in a crosscut near the Level 1 portal. McElhanney noted that the material could represent broken ore from historical mining or development. Following establishment of safe access, Nicola intends to evaluate the material through representative sampling and assaying. If mineralization is confirmed, it could represent a readily accessible source of processing feed during future restart activities.

It was also concluded that the combination of accessible underground drill stations, partially developed headings, potential unprocessed material and unexplored areas indicates that exploration potential remains within the currently accessible workings.

Advancing Toward a Phased Restart

The assessment establishes a clear technical pathway for Nicola's continued evaluation of Treasure Mountain Silver Mine. The next phase is expected to include a detailed geotechnical and rehabilitation assessment, followed by surveying and mapping of the underground workings. Nicola would then reconcile the updated survey with historical mine plans, geological models and production records to prioritize exploration and potential mining areas.

This work would form the basis for subsequent mine planning, ventilation design, rehabilitation and recommencing of mineral extraction. Initial recommendations focus on rehabilitation expenditures on areas offering the greatest operational value potential, thereby supporting a phased and cost-effective mine restart strategy.

Peter Espig, Chief Executive Officer of Nicola Mining, commented:

"The findings provide an encouraging starting point for our evaluation of restarting Treasure Mountain. After approximately 13 years of inactivity, both portals remain accessible, substantial underground development remains open, natural ventilation continues to function, and much of the historical infrastructure remains in place.


"Also of interest are the existing underground drill stations and partially developed workings, which may allow Nicola to advance exploration while leveraging development completed by previous operators. Our objective is to proceed methodically-first establishing safe access and an accurate understanding of the existing workings and then recommence mining activities on Level 1 and Level 2, prior to conduction exploration.

"Treasure Mountain is not simply an exploration concept; it is an existing underground mine with considerable historical development already completed. Combined with Nicola's permitted Merritt milling infrastructure, we believe this provides the Company with a differentiated opportunity to evaluate a disciplined and capital-efficient pathway toward renewed silver production."

Qualified Person

The scientific and technical disclosures included in this news release have been reviewed and approved by Will Whitty, P.Geo., who is the Qualified Person as defined by NI 43-101. Mr. Whitty is Vice President of Exploration for the Company.

About Nicola Mining

Nicola Mining Inc. is a junior mining company listed on the NASDAQ, the TSX Venture Exchange and Frankfurt Exchange that maintains a 100% owned mill and tailings facility, located near Merritt, British Columbia. It has signed Mining and Milling Profit Share Agreements with high grade gold projects. Nicola's fully permitted mill can process both gold and silver mill feed via gravity and flotation processes.


The Company owns 100% of the New Craigmont Project, a high-grade copper property, which covers an area of over 10,800 hectares along the southern end of the Guichon Batholith and is adjacent to Highland Valley Copper, Canada's largest copper mine. The Company also owns 100% of the Treasure Mountain Property, which includes 30 mineral claims and a mineral lease, spanning an area exceeding 2,200 hectares.

On behalf of the Board of Directors

"Peter Espig"

Peter Espig

CEO & Director

For additional information: Contact: Bill Cawker


Phone: (604) 649-0080

Email: info@nicolamining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Filing Exhibits & Attachments

1 document

Keep reading