Nicola Mining Commences First-Ever Drill Program at Treasure Mountain's MB Zone and Reports Intense Mineralization
Nicola Mining advances Treasure Mountain from care and maintenance to a four-hole drill test of the high-potential MB Zone.
Rhea-AI Summary
Nicola Mining (NICM) has started its 2026 diamond drilling program at the MB Zone on the Treasure Mountain silver property in British Columbia. The four-hole program totals approximately 800 m and is the first-ever drill test of the MB Zone, located about 1 km northwest of the historical Treasure Mountain mine, which has been on care and maintenance since 2013. Prior surface sampling from 2019–2022 returned high-grade values, including up to 1,300 g/t silver, 2.59 g/t gold, 27.4% lead and 27.2% zinc from a vein sample. Core from the first hole has visually shown intense pyrite-pyrrhotite-sphalerite mineralization, though the company stresses that only assays will confirm grades. Drilling is expected to finish by the end of September, with multi-element assay results targeted for release by year-end.
Positive
- Four-hole, 800 m drill program launched to test the undrilled MB Zone at Treasure Mountain
- Historical surface sampling returned up to 1,300 g/t Ag, 2.59 g/t Au, 27.4% Pb and 27.2% Zn from a vein sample
- Initial core logging shows visually intense pyrite-pyrrhotite-sphalerite mineralization in the first hole
- Assay timeline drilling completion targeted by end of September and results by year-end
Negative
- None.
News Explained
The first-hole core is being sampled and submitted to AGAT Laboratories for multi-element analysis; Nicola says assay results will be reported only after receipt, verification and review.
Key Figures
- Drill holes
- 4 holes
- 2026 Treasure Mountain drilling program
- Planned drilling
- approximately 800 m
- MB Zone
- Sample 2100151 mineralization
- 813 g/t Ag; 0.52 g/t Au; 19% Zn; 4.66% Cu
- 2019/2020 surface sampling
- Sample 2100152 mineralization
- 105 g/t Ag; 1.18% Cu
- 2019/2020 surface sampling
- Sample 2100207 mineralization
- 1,300 g/t Ag; 2.59 g/t Au; 1.16% Cu; 27.4% Pb; 27.2% Zn
- Exposed vein surface sampling
- Expected assay timing
- By year-end
- 2026 drilling program assay results
Historical Context
-
Inspection found accessible portals and infrastructure while evaluating a potential 2027 restart
24h Move is the share-price change in the day after each event; other market factors may also have contributed.
Key Terms
diamond drilling technical
assay results technical
multi-element analysis technical
sphalerite technical
pyrrhotite technical
national instrument 43-101 regulatory
AI-generated analysis. How Rhea-AI works. Not financial advice.
Vancouver, British Columbia--(Newsfile Corp. - September 18, 2026) - Nicola Mining Inc. (NASDAQ: NICM) (TSXV: NIM) (FSE: HLIA) (the "Company" or "Nicola") is pleased to announce that it has commenced its 2026 exploration drilling program (the "2026 TM Program") at Treasure Mountain. Treasure Mountain is a permitted silver mine located approximately 30 km northeast of Hope, British Columbia, and roughly a three-hour drive from Vancouver. The mine was placed on care and maintenance in 2013 during a period of depressed silver prices. Notwithstanding the suspension of mining operations, Treasure Mountain has remained a core asset within Nicola's portfolio, with the Company maintaining the project in anticipation of a more constructive silver-price environment and an appropriate opportunity to advance systematic exploration.
The 2026 TM Program includes diamond drilling at the MB target area, a previously undrilled zone approximately 1 km northwest of the historical Treasure Mountain silver mine (Figure 1). The Company considers the MB target area a compelling exploration target for high-grade silver-lead-zinc mineralization similar to that encountered at the historical mine, with the additional presence of copper and gold. From 2019 to 2022, Nicola carried out soil and surface rock sampling that returned encouraging results indicating silver-lead-zinc-copper-gold mineralization along a vein system exposed at several locations along strike.
Figure 1: Location Map of the Planned Drill Holes and Geological Setting
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4873/314839_c9cb36f0a4778bd1_001full.jpg
Encouraging results from the 2019/2020 sampling programs include:
- Sample 2100151: 813 g/t Ag, 0.52 g/t Au,
19% Zn and4.66% Cu; - Sample 2100152: 105 g/t Ag and
1.18% Cu; and - Sample 2100207 (taken from the exposed vein): 1,300 g/t Ag, 2.59 g/t Au,
1.16% Cu,27.4% Pb and27.2% Zn.
Drilling for the 2026 season is expected to be completed by the end of September, with assay results expected to be released by year-end.
The 2026 TM Program comprises four drill holes totaling approximately 800 m and targeting the MB Zone, an area characterized by mineralized veins at surface that has not previously been drill-tested at depth. The Company is working with Western Exploration Diamond Drilling Ltd. to execute the 2026 TM Program. The holes are designed to intersect and test previously sampled quartz-sulphide veins trending northeast-southwest along the length of the valley.
Core from the first hole is being sampled and submitted to AGAT Laboratories for multi-element analysis. Visual examination of the core has identified intervals exhibiting intense mineralization, examples of which are shown in Figure 2. While these observations are geologically encouraging, visual estimates are not a substitute for analytical results. The Company will report assay results following receipt, verification and review in accordance with its disclosure procedures.
TM26-001 Core Photos
Figure 2: Semi-massive pyrite-pyrrhotite-sphalerite mineralization occurring as irregular blebs, patches and sulphide-rich aggregates throughout the host rock. Pyrrhotite and pyrite are predominant, with subordinate sphalerite occurring as coarse, silvery-grey blebs and aggregates.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4873/314839_nicola2.jpg
CEO COMMENT
Peter Espig, Chief Executive Officer of Nicola Mining, commented: "Treasure Mountain has remained a vital component of Nicola's asset portfolio throughout a prolonged period in which silver-market conditions did not justify aggressive capital deployment. Commencing drilling at the MB Zone marks a deliberate transition from asset preservation to value-oriented exploration. We are particularly encouraged by the intensity of mineralization observed in the first drill core; however, our interpretation will remain disciplined, and assay driven. The 2026 TM Program was designed to test whether mineralized surface veins demonstrate continuity and scale at depth. Positive analytical results would materially enhance our geological understanding of the MB Zone and help define the next phase of exploration at Treasure Mountain."
Qualified Person
The scientific and technical disclosures contained in this news release have been reviewed and approved by Will Whitty, P.Geo., Vice President of Exploration for the Company and a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
About Nicola Mining
Nicola Mining Inc. is a junior mining company listed on the Nasdaq Stock Market, the TSX Venture Exchange and the Frankfurt Stock Exchange. The Company owns a
The Company owns
On behalf of the Board of Directors
"Peter Espig"
Peter Espig
CEO & Director
For additional information, contact: Bill Cawker
Phone: (604) 649-0080
Email: info@nicolamining.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/314839
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
What is the objective of the 2026 Treasure Mountain (TM) drilling program?
The 2026 TM Program is designed to test whether mineralized quartz-sulphide surface veins at the MB Zone demonstrate continuity and scale at depth. The company said positive analytical results would improve the geological understanding of the MB Zone and help define the next phase of exploration at Treasure Mountain.
How many drill holes are planned and what area are they targeting?
The program comprises four diamond drill holes totaling about 800 m. All holes are targeting the MB Zone, an area with mineralized veins at surface located approximately 1 km northwest of the historical Treasure Mountain silver mine.
Which contractors and laboratories are involved in the 2026 TM Program?
Western Exploration Diamond Drilling Ltd. is executing the drilling, and core from the first hole is being sampled and submitted to AGAT Laboratories for multi-element analysis.
What notable historical sampling results support drilling at the MB Zone?
From 2019 to 2022, soil and rock sampling at the MB target returned encouraging results, including sample 2100151 with 813 g/t Ag, 0.52 g/t Au, 19% Zn and 4.66% Cu, and sample 2100207 from the exposed vein with 1,300 g/t Ag, 2.59 g/t Au, 1.16% Cu, 27.4% Pb and 27.2% Zn.
Who is the Qualified Person responsible for the technical information?
The scientific and technical disclosures have been reviewed and approved by Will Whitty, P.Geo., Vice President of Exploration for Nicola Mining and a Qualified Person as defined by National Instrument 43-101.
What other core assets does Nicola Mining own besides Treasure Mountain?
Nicola owns a 100% interest in a permitted mill and tailings facility near Merritt, British Columbia, with profit share agreements on high-grade gold projects. It also owns 100% of the New Craigmont Project, a high-grade copper property of more than 10,800 hectares, and 100% of the Treasure Mountain Property, which includes 30 mineral claims and a mineral lease covering more than 2,200 hectares.

