STOCK TITAN

ONE Nuclear Energy posts $73M Q3 2026 net loss

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
10-Q

Rhea-AI Filing Summary

ONE Nuclear Energy Inc. (ONEN) reported a $74.8 million net loss for the nine months ended September 30, 2026, including a $73.0 million loss in the third quarter. The quarter included $60.2 million in net other expenses, driven by initial recognition and fair-value changes in Earnout Shares and Forward Purchase Agreement liabilities; operating expenses were $12.8 million. The company said it has not generated revenue and has no projects under construction.

At September 30, ONEN had $1.5 million in cash and a $62.7 million working capital deficit. Management said it needs additional financing and that its liquidity raises substantial doubt about its ability to continue as a going concern through twelve months from issuance. After quarter-end, ONEN signed a letter of intent with SOO Green to explore sourcing nuclear energy and capacity through a planned 2,100-megawatt line, including from its Iowa project with a development target of up to 1,000 megawatts; commercial arrangements remain subject to definitive agreements and other requirements.

0 points · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

2 major · 2 points

How the balance works

Positive

  • None.

Negative

  • Major pointManagement cited substantial doubt about going concern through 12 months from issuance.
  • Major pointThird-quarter net loss was $73.0 million, with $60.2 million in other expenses.

Filing Explained

The November fifteenth settlement provides for ninety-five thousand two hundred seventy-eight shares, which would dilute existing holders if issued.

This 10-Q adds two post-quarter arrangements: the November 14, 2026 amendment requests a $1.0 million FPA advance tied to share sales, while the November 15, 2026 settlement provides for 95,278 common shares to settle consultant amounts instead of cash and other compensation.

The FPA amendment describes the advance as requested; the seller is to sell existing FPA shares worth 1.3 times the advance, unsold shares can extend the agreement beyond natural expiration, and ONEN may repay advanced amounts at 1.3 times.

The settlement provides for 95,278 shares—64,286 in place of $90,000 cash, 16,902 for the equity component, and 14,090 for late payment—and says they will be registered in the company’s next Form S-1.

If issued, these shares increase the common share count and reduce existing holders’ percentage ownership.

Net loss, nine months $74.8 million Nine months ended September 30, 2026
Net loss, third quarter $73.0 million Three months ended September 30, 2026
Operating expenses $12.8 million Three months ended September 30, 2026
Cash $1.5 million As of September 30, 2026
Working capital deficit $62.7 million As of September 30, 2026
Cash used in operating activities $539,000 Nine months ended September 30, 2026
Total liabilities $80.5 million As of September 30, 2026
reverse recapitalization financial
"accounted for as a reverse recapitalization"
A reverse recapitalization is a way for a privately held company to become publicly traded by taking control of an existing public company and swapping ownership rather than going through a traditional public offering. For investors it matters because it can quickly change who controls a company and reshape its share structure and value — like a homeowner swapping houses and keys rather than building a new one — so it can create sudden shifts in stock supply, dilution and market expectations.
Level 3 financial
"classified within Level 3 of the fair value hierarchy"
Level 3 describes the lowest-confidence category in the accounting “fair value” hierarchy, covering assets or liabilities whose prices are not observable in the market and must be estimated using judgment and internal models. For investors, Level 3 items matter because they can introduce greater uncertainty and potential valuation swings—like valuing a unique antique versus checking a price tag on a supermarket shelf—so they signal higher model risk and lower liquidity.
FPA embedded derivative liability financial
"FPA embedded derivative liability was measured at fair value"
contingently issuable shares financial
"Earnout Shares are contingently issuable shares"
working capital deficit financial
"working capital deficit of $62,677,882"
A working capital deficit occurs when a company's short-term obligations—like bills, supplier payments and near-term debt—are larger than its readily available short-term resources such as cash, money expected from customers, and inventory that can be sold. Like a household whose monthly bills exceed its checking account, it signals potential difficulty paying immediate expenses, which matters to investors because it raises the chance the company will need outside financing or cut operations, affecting risk and value.
behind-the-meter (BTM) microgrids technical
"behind-the-meter (BTM) microgrids and energy parks"

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What was ONEN’s third-quarter 2026 net loss?

ONEN reported a $73.0 million net loss for the three months ended September 30, 2026. The quarter included $60.2 million in net other expenses, driven by initial recognition and fair-value changes in Earnout Shares and Forward Purchase Agreement liabilities.

Why did ONEN disclose substantial doubt about continuing as a going concern?

Management cited $1.5 million in cash and a $62.7 million working capital deficit as of September 30, 2026, along with a $74.8 million net loss for the nine months then ended. The company said it needs additional financing and intends to seek equity and, where possible, project finance debt, but said it could not assure financing would be available on acceptable terms or at all.

What is ONEN’s agreement with SOO Green?

On November 5, 2026, ONEN and SOO Green signed a letter of intent to explore potential nuclear energy and capacity sourcing through SOO Green’s planned 2,100-megawatt underground transmission line, including from ONEN’s Iowa project, which has a development target of up to 1,000 megawatts. Any commercial arrangements depend on definitive agreements and applicable development, regulatory and financing requirements.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
false --12-31 Q3 0001846416 0001846416 2026-01-01 2026-09-30 0001846416 2026-11-16 0001846416 2026-09-30 0001846416 2025-12-31 0001846416 ONEN:BRileyMember 2026-09-30 0001846416 ONEN:BRileyMember 2025-12-31 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember 2026-09-30 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember 2025-12-31 0001846416 us-gaap:CommonClassAMember 2026-09-30 0001846416 us-gaap:CommonClassAMember 2025-12-31 0001846416 2026-07-01 2026-09-30 0001846416 2025-07-01 2025-09-30 0001846416 2025-02-10 2025-09-30 0001846416 us-gaap:MemberUnitsMember 2024-12-31 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2024-12-31 0001846416 us-gaap:AdditionalPaidInCapitalMember 2024-12-31 0001846416 us-gaap:RetainedEarningsMember 2024-12-31 0001846416 2024-12-31 0001846416 us-gaap:MemberUnitsMember 2025-12-31 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2025-12-31 0001846416 us-gaap:AdditionalPaidInCapitalMember 2025-12-31 0001846416 us-gaap:RetainedEarningsMember 2025-12-31 0001846416 us-gaap:MemberUnitsMember 2026-03-31 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2026-03-31 0001846416 us-gaap:AdditionalPaidInCapitalMember 2026-03-31 0001846416 us-gaap:RetainedEarningsMember 2026-03-31 0001846416 2026-03-31 0001846416 us-gaap:MemberUnitsMember 2026-06-30 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2026-06-30 0001846416 us-gaap:AdditionalPaidInCapitalMember 2026-06-30 0001846416 us-gaap:RetainedEarningsMember 2026-06-30 0001846416 2026-06-30 0001846416 us-gaap:MemberUnitsMember 2025-02-09 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2025-02-09 0001846416 us-gaap:AdditionalPaidInCapitalMember 2025-02-09 0001846416 us-gaap:RetainedEarningsMember 2025-02-09 0001846416 2025-02-09 0001846416 us-gaap:MemberUnitsMember 2025-01-01 2025-12-31 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2025-01-01 2025-12-31 0001846416 us-gaap:AdditionalPaidInCapitalMember 2025-01-01 2025-12-31 0001846416 us-gaap:RetainedEarningsMember 2025-01-01 2025-12-31 0001846416 2025-01-01 2025-12-31 0001846416 us-gaap:MemberUnitsMember 2026-01-01 2026-03-31 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2026-01-01 2026-03-31 0001846416 us-gaap:AdditionalPaidInCapitalMember 2026-01-01 2026-03-31 0001846416 us-gaap:RetainedEarningsMember 2026-01-01 2026-03-31 0001846416 2026-01-01 2026-03-31 0001846416 us-gaap:MemberUnitsMember 2026-04-01 2026-06-30 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2026-04-01 2026-06-30 0001846416 us-gaap:AdditionalPaidInCapitalMember 2026-04-01 2026-06-30 0001846416 us-gaap:RetainedEarningsMember 2026-04-01 2026-06-30 0001846416 2026-04-01 2026-06-30 0001846416 us-gaap:MemberUnitsMember 2026-07-01 2026-09-30 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2026-07-01 2026-09-30 0001846416 us-gaap:AdditionalPaidInCapitalMember 2026-07-01 2026-09-30 0001846416 us-gaap:RetainedEarningsMember 2026-07-01 2026-09-30 0001846416 us-gaap:MemberUnitsMember 2025-02-10 2025-09-30 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2025-02-10 2025-09-30 0001846416 us-gaap:AdditionalPaidInCapitalMember 2025-02-10 2025-09-30 0001846416 us-gaap:RetainedEarningsMember 2025-02-10 2025-09-30 0001846416 us-gaap:MemberUnitsMember 2026-09-30 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2026-09-30 0001846416 us-gaap:AdditionalPaidInCapitalMember 2026-09-30 0001846416 us-gaap:RetainedEarningsMember 2026-09-30 0001846416 us-gaap:MemberUnitsMember 2025-09-30 0001846416 us-gaap:CommonStockMember us-gaap:CommonClassAMember 2025-09-30 0001846416 us-gaap:AdditionalPaidInCapitalMember 2025-09-30 0001846416 us-gaap:RetainedEarningsMember 2025-09-30 0001846416 2025-09-30 0001846416 ONEN:MembershipUnitsMember 2025-12-31 0001846416 us-gaap:CommonClassAMember 2026-01-01 2026-09-30 0001846416 us-gaap:MoneyMarketFundsMember 2026-09-30 0001846416 us-gaap:MoneyMarketFundsMember 2025-12-31 0001846416 2026-09-23 0001846416 ONEN:BRileyMember 2026-01-01 2026-09-30 0001846416 us-gaap:CommonClassAMember 2026-09-23 0001846416 us-gaap:CommonClassAMember ONEN:NewCircleCapitalSolutionsLPMember 2026-09-23 2026-09-23 0001846416 us-gaap:CommonClassAMember ONEN:NewCircleCapitalSolutionMember 2026-09-23 2026-09-23 0001846416 us-gaap:CommonClassAMember ONEN:NewCircleCapitalSolutionMember 2026-09-23 0001846416 2026-09-23 2026-09-23 0001846416 ONEN:HVIIPublicRightsMember 2026-09-23 2026-09-23 0001846416 us-gaap:PrivatePlacementMember 2026-09-23 2026-09-23 0001846416 us-gaap:CommonClassAMember ONEN:ONENuclearLLCEquityHoldersMember 2026-09-23 0001846416 us-gaap:CommonClassAMember ONEN:BrooksMcAualyWinstonStrategiesLLCMember 2026-09-23 0001846416 us-gaap:CommonClassAMember ONEN:CohenCompanySecuritiesLLCMember 2026-09-23 2026-09-23 0001846416 us-gaap:CommonClassAMember ONEN:CohenCompanySecuritiesLLCMember 2026-09-23 0001846416 2026-09-24 2026-09-24 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember us-gaap:CommonClassAMember 2026-09-23 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:FPASellerMember 2026-09-23 2026-09-23 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:HVIIPublicRightsMember 2026-09-23 2026-09-23 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:HVIIFounderSharesMember 2026-09-23 2026-09-23 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:HVIIPrivatePlacementSharesMember 2026-09-23 2026-09-23 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:HVIIShareholdersMember 2026-09-23 2026-09-23 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:ONENuclearLLCEquityHoldersMember 2026-09-23 2026-09-23 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:CohenCompanyMember 2026-09-23 2026-09-23 0001846416 ONEN:HennessyCapitalInvestmentCorpVIIMember 2026-09-23 0001846416 us-gaap:CommonClassAMember ONEN:NewCircleCapitalSolutionsLPMember 2026-09-23 0001846416 ONEN:PromissoryNoteMember ONEN:HennessyCapitalInvestmentCorpVIIMember 2025-12-19 0001846416 ONEN:PromissoryNoteMember ONEN:HennessyCapitalInvestmentCorpVIIMember 2025-12-19 2025-12-19 0001846416 ONEN:PromissoryNoteMember ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:OmnibusAmendmentMember 2026-03-31 2026-03-31 0001846416 ONEN:PromissoryNoteMember ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:OmnibusAmendmentTwoMember 2026-06-01 2026-06-01 0001846416 ONEN:PromissoryNoteMember ONEN:OmnibusAmendmentTwoMember srt:MinimumMember 2026-06-30 0001846416 ONEN:PromissoryNoteMember ONEN:OmnibusAmendmentTwoMember srt:MaximumMember 2026-06-30 0001846416 ONEN:PromissoryNoteMember ONEN:HennessyCapitalInvestmentCorpVIIMember ONEN:OmnibusAmendmentThreeMember 2026-08-07 2026-08-07 0001846416 ONEN:PromissoryNoteMember ONEN:OmnibusAmendmentThreeMember srt:MinimumMember 2026-08-07 2026-08-07 0001846416 ONEN:PromissoryNoteMember ONEN:OmnibusAmendmentThreeMember srt:MaximumMember 2026-08-07 2026-08-07 0001846416 ONEN:PromissoryNoteMember 2026-09-23 0001846416 ONEN:PromissoryNoteMember 2026-09-30 0001846416 ONEN:PromissoryNoteMember 2025-12-31 0001846416 ONEN:BRileyPrincipalCapitalLLCMember 2026-02-18 0001846416 ONEN:PromissoryNoteMember ONEN:BRileyPrincipalCapitalLLCMember 2026-02-18 2026-02-18 0001846416 ONEN:SecondAmendmentMember 2026-06-04 0001846416 ONEN:PromissoryNoteMember ONEN:SecondAmendmentMember 2026-06-04 2026-06-04 0001846416 ONEN:BRileyPrincipalCapitalLLCMember ONEN:AmendmentThreeMember 2026-07-06 0001846416 ONEN:BRileyPrincipalCapitalLLCMember ONEN:AmendmentThreeMember 2026-07-06 2026-07-06 0001846416 ONEN:FourthAmendmentMember 2026-07-09 0001846416 ONEN:FourthAmendmentMember 2026-07-09 2026-07-09 0001846416 ONEN:AmendmentFiveMember 2026-07-22 0001846416 ONEN:AmendmentSixMember 2026-08-09 0001846416 ONEN:AmendmentFiveMember 2026-07-22 2026-07-22 0001846416 ONEN:AmendmentSixMember 2026-08-09 2026-08-09 0001846416 ONEN:AmendmentSevenMember ONEN:BRileyPrincipalCapitalLLCMember 2026-09-23 2026-09-23 0001846416 ONEN:AmendmentSevenMember ONEN:BRileyPrincipalCapitalLLCMember 2026-09-23 0001846416 ONEN:PromissoryNoteMember 2026-01-01 2026-09-30 0001846416 ONEN:PromissoryNoteMember 2026-07-01 2026-09-30 0001846416 ONEN:PromissoryNoteMember ONEN:BRileyPrincipalCapitalLLCMember 2026-09-30 0001846416 ONEN:PromissoryNoteMember ONEN:BRileyPrincipalCapitalLLCMember 2026-01-01 2026-09-30 0001846416 ONEN:TriggeringEventOneMember 2026-09-23 0001846416 ONEN:TriggeringEventTwoMember 2026-09-23 0001846416 ONEN:TriggeringEventThreeMember 2026-09-23 0001846416 ONEN:TriggeringEventOneMember 2026-09-30 0001846416 ONEN:TriggeringEventTwoMember 2026-09-30 0001846416 ONEN:TriggeringEventThreeMember 2026-09-30 0001846416 2026-09-30 2026-09-30 0001846416 us-gaap:CommonClassAMember ONEN:NewCircleCapitalSolutionsLPMember 2026-01-01 2026-09-30 0001846416 ONEN:ForwardPurchaseAgreementMember 2026-09-24 2026-09-24 0001846416 ONEN:TriggeringEventOneMember 2026-09-23 2026-09-23 0001846416 ONEN:TriggeringEventTwoMember 2026-09-23 2026-09-23 0001846416 ONEN:TriggeringEventThreeMember 2026-09-23 2026-09-23 0001846416 us-gaap:FairValueInputsLevel3Member 2026-06-30 0001846416 us-gaap:FairValueInputsLevel3Member 2026-07-01 2026-09-30 0001846416 us-gaap:FairValueInputsLevel3Member 2026-09-30 0001846416 us-gaap:MeasurementInputSharePriceMember 2026-09-23 0001846416 us-gaap:MeasurementInputSharePriceMember 2026-09-30 0001846416 ONEN:MeasurementInputResetPriceMember 2026-09-23 0001846416 ONEN:MeasurementInputResetPriceMember 2026-09-30 0001846416 us-gaap:MeasurementInputPriceVolatilityMember 2026-09-23 0001846416 us-gaap:MeasurementInputPriceVolatilityMember 2026-09-30 0001846416 us-gaap:MeasurementInputExpectedTermMember 2026-09-23 0001846416 us-gaap:MeasurementInputExpectedTermMember 2026-09-30 0001846416 us-gaap:MeasurementInputRiskFreeInterestRateMember 2026-09-23 0001846416 us-gaap:MeasurementInputRiskFreeInterestRateMember 2026-09-30 0001846416 us-gaap:MeasurementInputExpectedDividendRateMember 2026-09-23 0001846416 us-gaap:MeasurementInputExpectedDividendRateMember 2026-09-30 0001846416 ONEN:MeasurementInputSharePerPriceMember 2026-09-23 0001846416 ONEN:MeasurementInputSharePerPriceMember 2026-09-30 0001846416 ONEN:MembershipUnitsMember 2026-09-22 0001846416 us-gaap:MemberUnitsMember 2026-09-22 2026-09-22 0001846416 us-gaap:CommonClassAMember 2026-09-22 2026-09-22 0001846416 us-gaap:MemberUnitsMember 2026-01-01 2026-09-30 0001846416 us-gaap:MemberUnitsMember ONEN:BCRABLLLCMember 2026-01-01 2026-09-30 0001846416 us-gaap:CommonClassBMember 2026-09-30 0001846416 ONEN:BusinessCombinationAgreementMember 2026-01-01 2026-09-30 0001846416 ONEN:OneNuclearLLCMember 2026-09-30 0001846416 ONEN:CohenAndCompanyMember 2026-09-30 0001846416 ONEN:OneNuclearLLCMember us-gaap:CommonStockMember 2026-09-30 0001846416 us-gaap:CommonStockMember 2026-09-30 0001846416 ONEN:CommonStockOneMember 2026-09-30 0001846416 ONEN:CommonStockTwoMember 2026-09-30 0001846416 ONEN:OneNuclearLLCMember ONEN:ForwardPurchaseAgreementMember 2026-09-22 0001846416 ONEN:ForwardPurchaseAgreementMember 2026-09-24 0001846416 ONEN:ForwardPurchaseAgreementMember 2026-09-30 0001846416 ONEN:ForwardPurchaseAgreementMember 2026-01-01 2026-09-30 0001846416 2025-08-18 2025-08-18 0001846416 ONEN:CoenWeddepohlConsultingAgreementMember 2025-08-18 2025-08-18 0001846416 ONEN:CoenWeddepohlConsultingAgreementMember 2026-01-01 2026-01-01 0001846416 ONEN:CoenWeddepohlConsultingAgreementMember 2026-09-30 0001846416 ONEN:CoenWeddepohlConsultingAgreementMember 2025-12-31 0001846416 ONEN:CoenWeddepohlConsultingAgreementMember 2026-07-01 2026-09-30 0001846416 ONEN:CoenWeddepohlConsultingAgreementMember ONEN:OneYearMember 2026-07-01 2026-09-30 0001846416 ONEN:CoenWeddepohlConsultingAgreementMember ONEN:TwoYearMember 2026-07-01 2026-09-30 0001846416 ONEN:CoenWeddepohlConsultingAgreementMember ONEN:ThreeYearMember 2026-07-01 2026-09-30 0001846416 ONEN:BRileyMember 2026-02-18 2026-02-18 0001846416 ONEN:BRileyMember 2026-02-18 0001846416 ONEN:BRileyMember srt:MinimumMember 2026-02-18 2026-02-18 0001846416 ONEN:SecondAmendedAndRestatedBRileyEngagementLetterMember 2026-09-23 2026-09-23 0001846416 ONEN:SecondAmendedAndRestatedBRileyEngagementLetterMember 2026-09-23 0001846416 ONEN:BRileyMember 2026-02-23 0001846416 ONEN:BRileyMember ONEN:SecondAmendedAndRestatedBRileyEngagementLetterMember 2026-02-23 0001846416 ONEN:BRileyMember ONEN:SecondAmendedAndRestatedBRileyEngagementLetterMember 2026-02-23 2026-02-23 0001846416 ONEN:BRileyMember ONEN:SecondAmendedAndRestatedBRileyEngagementLetterMember 2026-09-23 2026-09-23 0001846416 ONEN:ConsultingAgreementMember 2026-02-28 0001846416 ONEN:ConsultingAgreementMember 2026-02-01 2026-02-28 0001846416 ONEN:ConsultingAgreementMember 2026-09-30 0001846416 ONEN:IndependentContractorAgreementMember 2026-08-11 2026-08-11 0001846416 ONEN:IndependentContractorAgreementMember 2026-09-28 2026-09-28 0001846416 ONEN:ExecutiveEmploymentAgreementMember 2026-08-01 2026-08-31 0001846416 ONEN:ConsultingAgreementMember 2026-08-01 2026-08-31 0001846416 ONEN:ConsultingAgreementMember 2026-09-28 2026-09-28 0001846416 ONEN:ExecutiveEmploymentAgreementMember 2026-08-01 2026-08-31 0001846416 ONEN:SingleReportableSegmentMember 2026-01-01 2026-09-30 0001846416 us-gaap:SubsequentEventMember ONEN:ForwardPurchaseAgreementMember 2026-11-14 0001846416 ONEN:ConsultantMember ONEN:SettlementAgreementMember 2026-02-23 0001846416 ONEN:ConsultantMember ONEN:SettlementAgreementMember 2026-02-23 2026-02-23 0001846416 us-gaap:SubsequentEventMember ONEN:SettlementAgreementMember 2026-11-15 0001846416 ONEN:SettlementAgreementMember 2026-09-24 0001846416 us-gaap:SubsequentEventMember ONEN:SettlementAgreementMember 2026-11-15 2026-11-15 0001846416 us-gaap:SubsequentEventMember ONEN:ConsultantMember ONEN:SettlementAgreementMember 2026-11-15 2026-11-15 iso4217:USD xbrli:shares iso4217:USD xbrli:shares xbrli:pure ONEN:Segment

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 10-Q

 

(Mark One)

 

☒ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the quarterly period ended September 30, 2026

 

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from to

 

Commission File No. 001-42479

 

ONE Nuclear Energy Inc.

(Exact name of registrant as specified in its charter)

 

Delaware   99-4813262

(State or other jurisdiction of

incorporation or organization)

 

(I.R.S. Employer

Identification No.)

 

700 S. Rosemary Avenue, Suite 204, West Palm Beach, FL 33401

(Address of Principal Executive Offices, including zip code)

 

(561) 779-9400

(Registrant’s telephone number, including area code)

 

 N/A

(Former name, former address and former fiscal year, if changed since last report)

 

Securities registered pursuant to Section 12(b) of the Act:

 

Title of each class   Trading Symbol(s)   Name of each exchange on which registered
Common Stock   ONEN   The Nasdaq Stock Market LLC

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

 

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

 

☐ Large accelerated filer ☐ Accelerated filer
☒ Non-accelerated filer ☒ Smaller reporting company
  ☒ Emerging growth company

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act): Yes ☐ No ☒

 

As of November 16, 2026, there were 108,258,978 shares of the registrant’s common stock outstanding

 

 

 

 
 

 

TABLE OF CONTENTS

 

    Page
PART I - FINANCIAL INFORMATION 3
     
Item 1. CONDENSED CONSOLIDATED FINANCIAL STATEMENTS 4
     
Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS 30
     
Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK 38
     
Item 4. CONTROLS AND PROCEDURES 38
     
PART II - OTHER INFORMATION 40
     
Item 1. LEGAL PROCEEDINGS 40
     
Item 1A. RISK FACTORS 40
     
Item 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS 61
     
Item 3. DEFAULTS UPON SENIOR SECURITIES 61
     
Item 4. MINE SAFETY DISCLOSURES 61
     
Item 5. OTHER INFORMATION 61
     
Item 6. EXHIBITS 62
     
PART III - SIGNATURES 63

 

i
 

 

Cautionary Note Regarding Forward-Looking Statements

 

This Quarterly Report on Form 10-Q (this “Quarterly Report”) of ONE Nuclear Energy Inc. (“ONE Nuclear,” the “Company,” “we,” “our,” and “us”) contains certain forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements, other than statements of historical fact included in this Quarterly Report, are forward-looking statements. Forward-looking statements include, but are not limited to, statements regarding our business strategy, the development, financing, construction, ownership and operation of behind-the-meter microgrids and energy parks; the deployment of nuclear energy technologies and related power generation infrastructure; anticipated demand for our energy solutions; the identification and development of potential projects; our ability to secure customers and enter into commercial arrangements with technology providers, contractors and strategic partners; expected timing of operations; capital requirements; liquidity; financing plans; regulatory approvals, licensing and permitting; equipment procurement and construction activities; market conditions; public company costs; and other statements that are not historical facts.

 

Words such as “anticipate,” “believe,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “might,” “plan,” “possible,” “potential,” “project,” “seek,” “should,” “target,” “will,” “would,” and similar expressions may identify forward-looking statements, although not all forward-looking statements contain these words.

 

These forward-looking statements are based on current expectations, estimates, assumptions and projections and are subject to risks and uncertainties that could cause actual results to differ materially from those expressed or implied by such statements. These risks and uncertainties include, but are not limited to: risks relating to our limited operating history; our ability to successfully implement our business strategy; our ability to develop, finance, construct, own and operate behind-the-meter microgrids and energy parks; our ability to obtain sufficient financing to fund our operations and planned projects; our ability to execute our development plans within anticipated timelines and budgets; uncertainties associated with the development, commercialization and deployment of nuclear energy technologies and related infrastructure; our ability to secure suitable project sites, customers and commercially viable power purchase and other contractual arrangements; the availability, cost and reliability of nuclear power generation technologies, equipment, fuel and related infrastructure; regulatory, licensing, permitting, environmental and other governmental requirements applicable to nuclear energy and power generation projects; potential delays, cost overruns and other risks associated with the development, construction and operation of energy infrastructure projects; our dependence on third-party technology providers, contractors, suppliers, advisors and other service providers; competition and fluctuations in demand for reliable energy solutions, including from data centers and other energy-intensive customers; our ability to attract and retain qualified personnel; public company costs and compliance obligations; our ability to maintain Nasdaq listing requirements; volatility in the trading price of our securities; and the other risks and uncertainties described under “Risk Factors” in Part II, Item 1A of this Quarterly Report and in our Registration Statement on Form S-4, as amended, and in our other filings with the Securities and Exchange Commission. The discussion in this Quarterly Report should be read in conjunction with the condensed consolidated financial statements and notes thereto included in Item 1 of this Quarterly Report. Should one or more of these risks or uncertainties materialize, or should any of our assumptions prove incorrect, actual results may differ materially from those projected in these forward-looking statements. We undertake no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required under applicable securities laws. You should not place undue reliance on any forward-looking statements.

 

Forward-looking statements speak only as of the date they are made. This Quarterly Report and all subsequent written and oral forward-looking statements attributable to us or any person acting on our behalf are expressly qualified in their entirety by the cautionary statements contained or referred to in this Quarterly Report.

 

2

 

 

PART I - FINANCIAL INFORMATION

 

ITEM 1. FINANCIAL STATEMENTS.

 

  PAGE
   
Condensed Consolidated Balance Sheets as of September 30, 2026 (Unaudited) and December 31, 2025 4
Condensed Consolidated Statements of Operations for the three months ended September 30, 2026 and 2025, the nine months ended September 30, 2026 and the Period from February 10, 2025 (inception) through September 30, 2025 (Unaudited) 5
Condensed Consolidated Statements of Changes in Stockholders’ Deficit for the three months ended September 30, 2026 and 2025, the nine months ended September 30, 2026 and the Period from February 10, 2025 (inception) through September 30, 2025 (Unaudited) 6
Condensed Consolidated Statements of Cash Flows for the nine months ended September 30, 2026 and for the Period from February 10, 2025 (inception) through September 30, 2025 (Unaudited) 7
Notes to Condensed Consolidated Financial Statements (Unaudited) 8

 

3

 

 

ONE NUCLEAR ENERGY INC.

CONDENSED CONSOLIDATED BALANCE SHEETS

 

   September 30, 2026   December 31, 2025 
    (Unaudited)      
ASSETS          
Cash  $1,495,641   $130 
Prepaid expenses   725,866    - 
Total current assets   2,221,507    130 
TOTAL ASSETS  $2,221,507   $130 
           
LIABILITIES AND STOCKHOLDERS’ DEFICIT          
Accounts payable and accrued expenses  $16,487,448   $650,213 
Accrued offering costs   25,000    - 
Notes payable - B. Riley   227,363    - 
Notes payable - Hennessy Capital   -    300,000 
Earnout Shares liability   6,452,031    - 
FPA embedded derivative liability   41,707,547    - 
Total current liabilities   64,899,389    950,213 
Deferred legal fees   3,635,000    - 
Earnout Shares liability   11,980,972    - 
TOTAL LIABILITIES   80,515,361    950,213 
           
COMMITMENTS AND CONTINGENCIES (Note 10)   -    - 
           
STOCKHOLDERS’ DEFICIT          
Preferred stock, $0.0001 par value; 1,000,000 shares authorized at September 30, 2026; none issued and outstanding   -    - 
           
Class A common stock, $0.0001 par value; 500,000,000 shares authorized at September 30, 2026; 108,258,978 and 94,403,842 shares issued and outstanding at September 30, 2026 and December 31, 2025, respectively (Retroactively adjusted for recapitalization - Note 4)   10,826    9,440 
Additional paid-in Capital   -    16,379 
Accumulated deficit   (78,304,680)   (975,902)
Total stockholders’ deficit   (78,293,854)   (950,083)
TOTAL LIABILITIES AND STOCKHOLDERS’ DEFICIT  $2,221,507   $130 

 

The accompanying notes are an integral part of these unaudited condensed consolidated financial statements

 

4

 

 

ONE NUCLEAR ENERGY INC.

CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS

 

   2026   2025   2026   2025 
   For the Three Months Ended September 30,   For the Nine Months Ended September 30,   For the Period from February 10, 2025 (inception) through September 30, 
   2026   2025   2026   2025 
  

(Unaudited)

       (Unaudited)     
Operating expenses                    
General and administrative  $12,782,281   $472,795   $14,502,713   $472,805 
Loss from operations   (12,782,281)   (472,795)   (14,502,713)   (472,805)
                     
Other (income) expenses                    
Commitment fees   50,673    -    133,164    - 
Initial recognition of Earnout Shares liability   106,081,000    -    106,081,000    - 
Change in fair value of Earnout Shares liability   (87,647,997)   -    (87,647,997)   - 
Initial recognition of FPA embedded derivative liability   14,107,525    -    14,107,525    - 
Change in fair value of FPA embedded derivative liability   27,600,022    -    27,600,022    - 
Total other (income) expenses   60,191,223    -    60,273,714    - 
                     
Net loss  $(72,973,504)  $(472,795)  $(74,776,427)  $(472,805)
                     
Weighted average shares of common stock outstanding, basic and diluted (retroactively adjusted)   95,458,037    94,403,842    94,759,102    94,403,842 
Basic and diluted net loss per share  $(0.76)  $(0.01)  $(0.79)  $(0.01)

 

The accompanying notes are an integral part of these unaudited condensed consolidated financial statements.

 

5

 

 

ONE NUCLEAR ENERGY INC.

CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN STOCKHOLDERS’ DEFICIT

(Unaudited)

 

   Units   Amount   Shares   Amount   Capital   Deficit   Total 
   Membership Units   Class A Common Stock  

Additional

Paid-in

   Accumulated     
   Units   Amount   Shares   Amount   Capital   Deficit   Total 
Balance, December 31, 2025 (as previously reported)   10,000,000   $100    -   $-   $25,719   $(975,902)  $(950,083)
Retroactive application of recapitalization (Note 4)   (10,000,000)   (100)   94,403,842    9,440    (9,340)   -    - 
Balance, December 31, 2025, as adjusted   -    -    94,403,842    9,440    16,379    (975,902)   (950,083)
Equity-based compensation   -    -    -    -    8,354    -    8,354 
Net loss   -    -    -    -    -    (803,856)   (803,856)
Balance, March 31, 2026   -    -    94,403,842    9,440    24,733    (1,779,758)   (1,745,585)
Equity-based compensation   -    -    -    -    8,447    -    8,447 
Net loss   -    -    -    -    -    (999,067)   (999,067)
Balance, June 30, 2026   -    -    94,403,842    9,440    33,180    (2,778,825)   (2,736,205)
Equity-based compensation   -    -    -    -    8,539    -    8,539 
Reverse recapitalization, net of transaction costs (Note 4)   -    -    13,855,136    1,386    (41,719)   (2,552,351)   (2,592,684)
Net loss   -    -    -    -    -    (72,973,504)   (72,973,504)
Balance, September 30, 2026   -   $-    108,258,978   $10,826   $-   $(78,304,680)  $(78,293,854)

 

   Membership Units   Class A Common Stock   Additional Paid-in   Accumulated     
   Units   Amount   Shares   Amount   Capital   Deficit   Total 
Balance, February 10, 2025 (inception)   -   $-    -   $-   $-   $-   $- 
Issuance of membership units   10,000,000    100    -    -    -    -    100 
Retroactive application of recapitalization (Note 4)   (10,000,000)   (100)   94,403,842    9,440    (9,340)        - 
Equity-based compensation   -    -    -    -    3,541    -    3,541 
Net loss   -    -    -    -    -    (472,805)   (472,805)
Balance, September 30, 2025   -   $-    94,403,842   $9,440   $(5,799)  $(472,805)  $(469,164)

 

The accompanying notes are an integral part of these unaudited condensed consolidated financial statements.

 

6

 

 

ONE NUCLEAR ENERGY INC.

CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS

(Unaudited)

 

   For the Nine Months Ended September 30, 2026   For the Period from February 10, 2025 (inception) through September 30, 2025 
         
CASH FLOWS FROM OPERATING ACTIVITIES          
Net loss  $(74,776,427)  $(472,805)
Adjustments to reconcile net loss to net cash used in operations:          
Equity-based compensation   25,340    3,541 
Initial recognition of Earnout Shares liability   106,081,000    - 
Change in fair value of Earnout Shares liability   (87,647,997)   - 
Initial recognition of FPA embedded derivative liability   14,107,525    - 
Change in fair value of FPA embedded derivative liability   27,600,022    - 
Professional fees paid by HCVII on behalf of the Company   55,313    - 
Changes in operating assets and liabilities:          
Prepaid expenses   (12,792)   - 
Accounts payable and accrued expenses   14,029,016    469,224 
CASH (USED) IN OPERATING ACTIVITIES   (539,000)   (40)
           
CASH FLOWS FROM FINANCING ACTIVITIES          
Issuance of Class A Common Stock   -    100 
Proceeds from notes payable   327,363    - 
Repayment of note payable - B. Riley   (100,000)   - 
Proceeds from reverse recapitalization (Note 4)   1,807,148    - 
CASH PROVIDED BY FINANCING ACTIVITIES   2,034,511    100 
           
NET CHANGE IN CASH   1,495,511    60 
Cash, beginning of period   130    - 
Cash, end of period  $1,495,641   $60 
           
SUPPLEMENTAL CASH FLOW DISCLOSURES:          
Cash paid for interest  $-   $- 
Cash paid for income taxes  $-   $- 
           
SUPPLEMENTAL DISCLOSURE OF NONCASH FINANCING ACTIVITIES:          
Accrued commitment fees - Hennessy Capital  $90,000   $- 
Accrued commitment fees - B. Riley  $42,763   $- 
Transaction costs accrued and charged to additional paid-in capital  $731,126   $- 
Prepaid insurance accrued in connection with the Business Combination  $687,341   $- 
Liabilities assumed in reverse recapitalization  $4,153,625   $- 
Settlement of note payable - Hennessy Capital in reverse recapitalization  $355,313   $- 
Accrued commitment fees payable to HVII eliminated in reverse recapitalization  $93,871   $- 

 

The accompanying notes are an integral part of these unaudited condensed consolidated financial statements.

 

7

 

 

ONE NUCLEAR ENERGY INC.

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

SEPTEMBER 30, 2026

(Unaudited)

 

NOTE 1 – ORGANIZATION AND BASIS OF PRESENTATION

 

Organization

 

One Nuclear Energy LLC (“ONE Nuclear LLC”) was formed on February 10, 2025 (inception) under the laws of Delaware to engage as a development stage Independent Power Producer (“IPP”). On September 23, 2026 (the “Closing Date”), ONE Nuclear LLC consummated the Business Combination (as defined below) with Hennessy Capital Investment Corp. VII (“HVII” or “HCVII”), following which ONE Nuclear LLC became a direct wholly-owned subsidiary of HVII and HVII was renamed “ONE Nuclear Energy Inc.” Unless the context otherwise requires, references to “ONE Nuclear,” “the Company,” or “ONE” refer to ONE Nuclear Energy Inc. and its consolidated subsidiary following the Closing Date and to ONE Nuclear LLC prior to the Closing Date. The Company is structured to develop, own, and operate a portfolio of behind-the-meter (BTM) microgrids and energy parks that bypass the congested centralized energy transmission infrastructure of the United States. By combining the rapid deployment capabilities of high-efficiency natural gas generation with the long-term decarbonization and baseload potential of advanced Small Modular Reactors (SMRs), ONE Nuclear will offer a differentiated, dual-phase infrastructure solution tailored to the inelastic demand of hyperscale artificial intelligence (AI) data centers and critical industrial facilities. ONE Nuclear’s objective is to cultivate a diverse and sector-agnostic client base of energy-intensive end-users, including not just hyperscale AI and cloud data centers, but also industrial manufacturers, refineries, desalination plants, and critical-infrastructure customers. Upon the Closing Date, the Company reconstituted its Board of Directors with the appointment of four independent directors.

 

The Company’s common stock commenced trading on The Nasdaq Stock Market LLC (“Nasdaq”) on September 24, 2026 under the ticker symbol “ONEN.”

 

Basis of Presentation

 

The accompanying unaudited condensed consolidated financial statements of the Company as of September 30, 2026 have been prepared in accordance with U.S. GAAP (“U.S. GAAP”) issued by the Financial Accounting Standards Board (“FASB”). The accompanying condensed consolidated financial statements reflect all adjustments including normal recurring adjustments, which, in the opinion of management, are necessary to present fairly the financial position, results of operations, and cash flows for the periods presented. References to GAAP issued by the FASB in these accompanying notes to the condensed consolidated financial statements are to the FASB Accounting Standards Codification (“ASC”).

 

The unaudited condensed consolidated financial statements include the accounts of ONE Nuclear Energy Inc. and, from the Closing Date, its wholly-owned subsidiary, ONE Nuclear LLC. All intercompany balances and transactions have been eliminated in consolidation.

 

On October 22, 2025, HVII, a Cayman Islands exempted company with limited liability (the “Purchaser”), Solis Merger Sub LLC, a Delaware limited liability company and a direct wholly-owned subsidiary of the Purchaser (“Merger Sub”), and ONE Nuclear LLC entered into a business combination agreement (as amended by Omnibus Amendment No. 1 dated March 31, 2026, Omnibus Amendment No. 2 dated June 1, 2026 and Omnibus Amendment No. 3 dated August 7, 2026, the “Business Combination Agreement”). The registration statement on Form S-4 (File No. 333-292440) filed by HVII and ONE Nuclear LLC in connection with the Business Combination was declared effective by the U.S. Securities and Exchange Commission (the “SEC”) on August 3, 2026, and HVII’s shareholders approved the Business Combination and related proposals at an extraordinary general meeting held on August 24, 2026. On September 23, 2026, HVII domesticated as a Delaware corporation, Merger Sub merged with and into ONE Nuclear LLC, with ONE Nuclear LLC surviving as a direct wholly-owned subsidiary of HVII, and HVII was renamed ONE Nuclear Energy Inc. (collectively, the “Business Combination”). See Note 4 – Reverse Recapitalization and Note 10 – Commitments and Contingencies.

 

8

 

 

The Business Combination was accounted for as a reverse recapitalization in accordance with U.S. GAAP. Under this method of accounting, HVII was treated as the “acquired” company for financial reporting purposes and ONE Nuclear LLC was treated as the accounting acquirer. Accordingly, the Business Combination was treated as the equivalent of ONE Nuclear LLC issuing shares for the net assets of HVII, accompanied by a recapitalization. The net assets of HVII were stated at historical cost, with no goodwill or other intangible assets recorded. The historical financial statements prior to the Business Combination are those of ONE Nuclear LLC. The 10,000,000 membership units of ONE Nuclear LLC outstanding prior to the Business Combination are presented as membership units in the condensed consolidated balance sheet as of December 31, 2025 and in the condensed consolidated statements of changes in stockholders’ deficit through the Closing Date, at which time they were converted into Class A common stock at the exchange ratio of 9.4403842 shares of Class A common stock per ONE Nuclear LLC membership unit established in the Business Combination (the “Exchange Ratio”). The equity structure of ONE Nuclear LLC prior to the Business Combination has been retroactively adjusted to reflect the Exchange Ratio. Accordingly, the membership units and related amounts outstanding prior to the Business Combination are presented as shares of Class A common stock in the condensed consolidated balance sheet as of December 31, 2025 and in the condensed consolidated statements of changes in stockholders’ deficit for all periods presented. Weighted average shares outstanding and net loss per share for periods prior to the Business Combination have been retroactively adjusted using the Exchange Ratio.

 

Because ONE Nuclear LLC was formed on February 10, 2025, the comparative period presented in the accompanying condensed consolidated statements of operations, changes in stockholders’ deficit and cash flows is the period from February 10, 2025 (inception) through September 30, 2025, which comprises less than eight months of activity. Accordingly, the comparative period is not directly comparable to the nine months ended September 30, 2026, and period-over-period comparisons of operating results and cash flows are of limited usefulness. The interim results for the three and nine months ended September 30, 2026 are not necessarily indicative of the results to be expected for the year ending December 31, 2026 or for any future periods.

 

The condensed consolidated balance sheet as of December 31, 2025 has been derived from the audited financial statements of ONE Nuclear LLC as of December 31, 2025 and for the period from February 10, 2025 (inception) through December 31, 2025, as retroactively adjusted for the recapitalization described above, but does not include all of the information and disclosures required by U.S. GAAP for complete financial statements. Certain information and note disclosures normally included in annual financial statements prepared in accordance with U.S. GAAP have been condensed or omitted pursuant to the rules and regulations of the SEC for interim financial reporting. These unaudited condensed consolidated financial statements should be read in conjunction with the audited financial statements of ONE Nuclear LLC and the notes thereto included in the Form S-4/A filed with the SEC on April 3, 2026.

 

9

 

 

NOTE 2 – GOING CONCERN

 

The Company’s only sources of liquidity have been cash from financing activities, including the net proceeds received in connection with the Business Combination. The Company had a net loss of $74,776,427 for the nine months ended September 30, 2026, and a working capital deficit of $62,677,882 as of September 30, 2026. Cash held as of September 30, 2026 was $1,495,641.

 

The Company’s future capital requirements will depend on many factors, including the timing and extent of spending. In order to finance these opportunities, the Company will need to raise additional financing. While there can be no assurances, the Company intends to raise such capital through issuances of additional equity, and where possible, project finance debt. If additional financing is required from outside sources, the Company may not be able to raise it on terms acceptable to the Company or at all. If the Company is unable to raise additional capital when desired, the Company’s business, results of operations and financial condition would be materially and adversely affected.

 

As a result of the above, in connection with the Company’s assessment of going concern considerations in accordance with Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) Subtopic 205-40, “Going Concern,” management has determined that the Company’s liquidity condition raises substantial doubt about the Company’s ability to continue as a going concern through twelve months from the date these unaudited condensed consolidated financial statements are issued. These condensed consolidated financial statements do not include any adjustments relating to the recovery of the recorded assets or the classification of the liabilities that might be necessary should the Company be unable to continue as a going concern.

 

NOTE 3 – SIGNIFICANT ACCOUNTING POLICIES

 

Use of Estimates

 

The preparation of unaudited condensed consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect reported amounts of assets, liabilities, and expenses. Actual results may differ from such estimates, judgments, and assumptions.

 

Making estimates requires management to exercise significant judgment. It is at least reasonably possible that the estimate is the effect of a condition, situation or set of circumstances that existed at the date of the unaudited condensed consolidated financial statements, which could change in the near term due to one or more future confirming events. Accordingly, the actual results could differ significantly from those estimates.

 

For the three and nine months ended September 30, 2026, the Company recorded significant estimates related to equity-based compensation expense, including assumptions used in determining the fair value of equity awards, and the fair value of the Earnout Shares liability and the FPA embedded derivative liability. Changes in these assumptions or differences between estimated and actual outcomes could result in material adjustments to equity-based compensation expense and to the change in fair value of the Earnout Shares liability and the FPA embedded derivative liability in future periods.

 

10

 

 

Cash and Cash Equivalents

 

Cash and cash equivalents include cash on hand and deposits with financial institutions with original maturities of three months or less. At September 30, 2026 and December 31, 2025, cash totaled $1,495,641 and $130, respectively. There were no cash equivalents held during either period.

 

Concentration of Credit Risk

 

Financial instruments that potentially subject the Company to concentrations of credit risk consist of a cash account in a financial institution, which, at times may exceed the Federal Deposit Insurance Corporation (FDIC) coverage limit of $250,000. As of September 30, 2026, the Company had cash of $1,495,641 held at one financial institution, of which approximately $1,245,641 exceeded the FDIC coverage limit and was uninsured. As of December 31, 2025, the Company had no cash in excess of the FDIC coverage limit. The Company has not experienced any losses related to these deposits and believes its exposure to credit risk is minimal.

 

Prepaid Expenses

 

Prepaid expenses consist primarily of prepaid directors’ and officers’ liability insurance and other insurance premiums, which are expensed over the related coverage periods. Prepaid expenses totaled $725,866 and $0 at September 30, 2026 and December 31, 2025, respectively, including $687,341 of directors’ and officers’ liability insurance obtained in connection with the Business Combination, $12,792 of commercial insurance policies bound on September 23, 2026, and $25,733 of prepaid expenses of HVII acquired in the Business Combination. 

 

Accounts Payable and Accrued Expenses

 

Accounts payable and accrued expenses include unpaid vendor invoices, accrued professional and legal services, accrued compensation, accrued commitment fees and accrued transaction costs owed totaling $16,487,448 and $650,213 at September 30, 2026 and December 31, 2025, respectively.

 

Operating Expenses

 

Operating expenses consist primarily of professional fees, consulting, legal, personnel and general administrative costs. Total operating expenses for the three and nine months ended September 30, 2026 were $12,782,281 and $14,502,713, respectively. During the three months ended September 30, 2025 and the period from February 10, 2025 (inception) through September 30, 2025, the Company incurred operating expenses of $472,795 and $472,805, respectively.

 

Transaction Costs

 

Transaction costs incurred by ONE Nuclear LLC that were directly attributable to the Business Combination were charged to additional paid-in capital upon the consummation of the Business Combination. The $12.0 million Sale Transaction Fee earned by B. Riley Securities, Inc. upon the consummation of the Business Combination (see Note 10) was recognized in general and administrative expenses.

 

Income Taxes

 

Prior to the Business Combination, ONE Nuclear LLC was treated as a pass-through entity for U.S. federal income tax purposes. Accordingly, no provision for income taxes has been recorded for periods prior to the Closing Date, as taxable income or losses were included in the tax returns of ONE Nuclear LLC’s members. Following the Business Combination, ONE Nuclear Energy Inc. is a Delaware corporation subject to U.S. federal and state income taxes.

 

11

 

 

Management has evaluated uncertain tax positions under ASC 740-10 and determined no liabilities for unrecognized tax benefits are required.

 

Fair Value Measurements

 

The Company measures certain assets and liabilities at fair value using a three-level hierarchy based on observability of inputs. As of September 30, 2026, the Earnout Shares liability and the FPA embedded derivative liability were measured at fair value on a recurring basis and were classified within Level 3 of the fair value hierarchy (see Note 7). As of December 31, 2025, the Company held no assets or liabilities measured at fair value. The carrying amounts of cash, accounts payable and accrued expenses and notes payable approximate their fair values due to their short-term nature.

 

Level 1 — Quoted prices (unadjusted) in active markets for identical assets or liabilities.

Level 2 — Observable, market-based inputs, other than quoted prices included in Level 1, for the assets or liabilities either directly or indirectly.

Level 3 — Unobservable inputs in which there is little or no market data, which require the reporting entity to develop its own assumptions.

 

Earnout Shares Liability

 

The contingent right of the pre-Business Combination holders of ONE Nuclear LLC membership units to receive up to 13,000,000 Earnout Shares (see Note 10) is classified as a liability and was measured at fair value at the Closing Date. The Earnout Shares liability is remeasured to fair value at each reporting date until the Earnout Shares are issued or the earnout period expires, with changes in fair value recognized in the condensed consolidated statements of operations. The initial fair value of the Earnout Shares liability at the Closing Date was recognized in the condensed consolidated statements of operations. See Note 7.

 

Forward Purchase Agreement Embedded Derivative Liability

 

The Company evaluates its contracts, including the Forward Purchase Agreement (see Note 10), to determine whether they contain features that qualify as embedded derivatives under ASC 815, Derivatives and Hedging. The Forward Purchase Agreement contains an embedded feature, the value of which is based on the reset price of $10.6096 per FPA Share and the trading price of the Company’s common stock over the remaining term of the Forward Purchase Agreement, that is bifurcated and accounted for as a derivative liability (the “FPA embedded derivative liability”). The FPA embedded derivative liability was measured at fair value at the Closing Date, with the initial fair value recognized in the condensed consolidated statements of operations, and is remeasured to fair value at each reporting date until the Forward Purchase Agreement is settled or terminated, with changes in fair value recognized in the condensed consolidated statements of operations. The Prepayment Amount paid to the FPA Seller was recorded as a reduction of equity in the reverse recapitalization (see Note 4). See Note 7.

 

12

 

 

Net Loss Per Share

 

Basic net loss per share is computed by dividing net loss by the weighted average number of shares of common stock outstanding during the period. Weighted average shares outstanding for periods prior to the Business Combination have been retroactively adjusted using the Exchange Ratio. Diluted net loss per share is the same as basic net loss per share for all periods presented because the Company reported net losses. The Earnout Shares are contingently issuable shares and are excluded from the computation of basic and diluted net loss per share because the share price conditions had not been satisfied as of September 30, 2026.

 

Equity-based Compensation

 

The Company grants equity-classified awards, including membership units and at the Closing, equity awards, to employees and non-employee service providers (see Note 9). The Company accounts for equity-based compensation arrangements granted to employees and non-employee service providers in accordance with ASC 718, Stock Compensation, by measuring the grant date fair value of the award and recognizing the resulting expense over the period during which the grantee is required to perform service in exchange for the award. Equity-based compensation expense is only recognized for awards subject to performance conditions if it is probable that the performance condition will be achieved. The Company accounts for forfeitures when they occur.

 

The fair value of the membership units was determined using an invested capital model, which incorporated assumptions including enterprise value, discount rates, expected volatility, lack of marketability, and other relevant factors.

 

Segment Reporting

 

The Company complies with ASU 2023-07, Segment Reporting (Topic 280): Improvements to Reportable Segment Disclosures (“ASU 2023-07”), which improves reportable segment disclosure requirements, primarily through enhanced disclosures about significant segment expenses among other disclosure requirements.

 

The Company has a single operating and reportable segment. The Company’s Chief Executive Officer (“CEO”) is its Chief Operating Decision Maker (“CODM”). The CODM assesses performance for the single segment and decides how to allocate resources based on net income or loss that is also reported on the statements of operations as net income or loss. The measure of segment assets is reported on the balance sheets as total assets when evaluating the Company’s performance and making key decisions regarding resource allocation. The significant segment expense category regularly provided to the CODM is general and administrative expense. Other segment items included in segment net loss consist of commitment fees, the initial recognition of and change in fair value of the Earnout Shares liability, and the initial recognition of and change in fair value of the FPA embedded derivative liability. The Company has applied the disclosure requirements of ASU 2023-07 to all periods presented. See Note 11.

 

Emerging Growth Company Status

 

The Company is an “emerging growth company,” as defined in Section 2(a) of the Securities Act of 1933, as amended, (the “Securities Act”), as modified by the Jumpstart Our Business Startups Act of 2012, (the “JOBS Act”), and it may take advantage of certain exemptions from various reporting requirements that are applicable to other public companies that are not emerging growth companies including, but not limited to, not being required to comply with the auditor attestation requirements of Section 404 of the Sarbanes-Oxley Act, reduced disclosure obligations regarding executive compensation in its periodic reports and proxy statements, and exemptions from the requirements of holding a nonbinding advisory vote on executive compensation and shareholder approval of any golden parachute payments not previously approved.

 

13

 

 

Further, Section 102(b)(1) of the JOBS Act exempts emerging growth companies from being required to comply with new or revised financial accounting standards until private companies (that is, those that have not had a Securities Act registration statement declared effective or do not have a class of securities registered under the Exchange Act) are required to comply with the new or revised financial accounting standards. The JOBS Act provides that a company can elect to opt out of the extended transition period and comply with the requirements that apply to non-emerging growth companies but any such election to opt out is irrevocable. The Company has elected not to opt out of such extended transition period, which means that when a standard is issued or revised and it has different application dates for public or private companies, the Company, as an emerging growth company, can adopt the new or revised standard at the time private companies adopt the new or revised standard. This may make comparison of the Company’s financial statements with another public company which is neither an emerging growth company nor an emerging growth company which has opted out of using the extended transition period difficult or impossible because of the potential differences in accounting standards used.

 

Recently Adopted Accounting Standards

 

There were no new accounting standards adopted during the three and nine months ended September 30, 2026 and the period from February 10, 2025 (inception) through December 31, 2025 that had a material impact on the Company’s unaudited condensed consolidated financial statements.

 

Accounting Standards Not Yet Adopted

 

On November 4, 2024, the FASB issued ASU 2024-03, Disaggregation of Income Statement Expenses (DISE), requiring additional disclosure of the nature of expenses included in the statements of operations. The new standard requires disclosures about specific types of expenses included in the expense captions presented on the face of the statement of operations as well as disclosures about selling expenses. The standard is effective for annual reporting periods beginning after December 15, 2026 and interim reporting periods within annual reporting periods beginning after December 15, 2027.

 

In December 2023, the FASB issued ASU 2023-09, Income Taxes (Topic 740): Improvements to Income Tax Disclosures (“ASU 2023-09”), which requires disaggregated information about an entity’s effective tax rate reconciliation as well as information on income taxes paid. ASU 2023-09 is effective for public business entities for fiscal years beginning after December 15, 2024, and for entities other than public business entities (including emerging growth companies that have elected to use the extended transition period) for annual reporting periods beginning after December 15, 2025, with early adoption permitted, and may be applied on a prospective or retrospective basis. As a result of the Business Combination, the Company became subject to U.S. federal and state income taxes, ASU 2023-09 is effective for the Company, in accordance with the effective date applicable to it as an emerging growth company, for its annual reporting period beginning January 1, 2026. The Company will adopt ASU 2023-09 in its annual financial statements for the year ending December 31, 2026, and the amendments are not required in interim financial statements. Because ASU 2023-09 affects footnote disclosures only, its adoption will not have an impact on the Company’s financial position, results of operations, or cash flows. The Company is currently evaluating the impact of ASU 2023-09 on its annual income tax disclosures.

 

In December 2025, the FASB issued ASU 2025-11, Interim Reporting (Topic 270): Narrow-Scope Improvements (“ASU 2025-11”), which clarifies interim disclosure requirements and the applicability of Topic 270. ASU 2025-11 is effective for public business entities for interim reporting periods within annual reporting periods beginning after December 15, 2027, and for entities other than public business entities (including emerging growth companies that have elected to use the extended transition period) for interim reporting periods within annual reporting periods beginning after December 15, 2028, with early adoption permitted. ASU 2025-11 will be effective for the Company for interim reporting periods beginning January 1, 2029. The Company is currently evaluating the impact of ASU 2025-11 on its unaudited condensed consolidated financial statements.

 

In May 2025, the FASB issued ASU 2025-04, Clarifications to Share-Based Consideration Payable to a Customer (“ASU 2025-04”), which clarifies the guidance in ASC 606 and ASC 718 on the accounting for share-based payment awards granted as consideration payable to a customer, including revising the definition of a performance condition and eliminating the forfeiture policy election for service conditions associated with such awards. ASU 2025-04 is effective for fiscal years beginning after December 15, 2026, including interim periods within those fiscal years, with early adoption permitted. The Company has not generated revenue and has not granted share-based payment awards to customers and, accordingly, does not expect the adoption of ASU 2025-04 to have an impact on its unaudited condensed consolidated financial statements.

 

In September 2025, the FASB issued ASU 2025-06, Intangibles—Goodwill and Other—Internal-Use Software (Subtopic 350-40): Targeted Improvements to the Accounting for Internal-Use Software (“ASU 2025-06”), which removes all references to software development project stages, clarifies the threshold for beginning to capitalize software costs, and amends the related disclosure requirements. ASU 2025-06 is effective for annual reporting periods beginning after December 15, 2027, and interim reporting periods within those annual reporting periods, with early adoption permitted, and may be applied prospectively, retrospectively or on a modified prospective basis. The Company has not capitalized any internal-use software costs and does not currently expect the adoption of ASU 2025-06 to have a material impact on its unaudited condensed consolidated financial statements.

 

The Company’s management does not believe that any other recently issued, but not yet effective, accounting pronouncements, if currently adopted, would have a material effect on the Company’s unaudited condensed consolidated financial statements.

 

14

 

 

NOTE 4 – REVERSE RECAPITALIZATION

 

As discussed in Note 1, on September 23, 2026, the Company consummated the Business Combination, which was accounted for as a reverse recapitalization. In connection with the Business Combination:

 

(a) holders of 18,796,132 HVII Class A ordinary shares tendered their shares for redemption. After giving effect to 4,987,103 Class A ordinary shares purchased by New Circle Capital Solutions LP (the “FPA Seller”) under the Forward Purchase Agreement (see Note 10), 13,809,029 Class A ordinary shares were redeemed for approximately $10.61 per share, for an aggregate redemption payment of $146,508,923;

 

(b) each of the 6,333,333 HVII Class B ordinary shares converted into one Class A ordinary share, and, upon the Domestication, each HVII Class A ordinary share, including the 690,000 HVII Class A ordinary shares issued in the private placement, converted into one share of common stock of the Company, par value $0.0001 per share;

 

(c) the HVII public rights and private placement rights converted into 1,583,332 and 57,500 shares of common stock, respectively;

 

(d) the outstanding membership units of ONE Nuclear LLC were cancelled and 94,403,842 shares of common stock were issued in respect thereof, including 94,253,842 shares issued to ONE Nuclear LLC equity holders (including 2,827,615 shares issued to Brooks, McAuly & Winston Strategies, LLC in respect of its 300,000 membership units) and 150,000 shares newly issued to Cohen & Company Securities, LLC at the Closing, which were not issued from the Sponsor’s or HVII’s existing shares and are included in the share consideration and the Exchange Ratio; and

 

(e) the remaining funds in the HVII trust account (the “Trust Account”) were disbursed on September 24, 2026, including $53,185,757 to the FPA Seller, $81,547 of deferred underwriting commissions, $100,000 in repayment of the B. Riley promissory note (see Note 6) and $1,707,077 released to the Company. No private investment in public equity or other financing was completed in connection with the Business Combination.

 

The following table reconciles the elements of the Business Combination to the condensed consolidated statement of cash flows and the condensed consolidated statement of changes in stockholders’ deficit for the nine months ended September 30, 2026:

 

      
Cash – Trust Account prior to redemptions  $201,583,304 
Less: redemption of HVII Class A ordinary shares   (146,508,923)
Less: payment to the FPA Seller under the Forward Purchase Agreement   (53,185,757)
Less: HVII deferred underwriting commissions paid   (81,547)
Less: B. Riley note payable repaid from the Trust Account   (100,000)
Cash released from the Trust Account to the Company   1,707,077 
Add: HVII operating cash acquired   71 
Net cash proceeds from the Business Combination   1,707,148 
Add: B. Riley note payable repaid from the Trust Account   100,000 
Proceeds from reverse recapitalization (statement of cash flows)   1,807,148 
Less: HVII liabilities assumed   (4,153,625)
Add: HVII prepaid expenses and note receivable from ONE Nuclear LLC (eliminated) acquired   381,046 
Less: ONE Nuclear LLC transaction costs charged to additional paid-in capital   (731,126)
Add: accrued commitment fees payable to HVII eliminated in consolidation   93,871 
Other, net   10,002 
Reverse recapitalization, net of transaction costs (statement of changes in stockholders’ deficit)  $(2,592,684)

 

15

 

 

The number of shares of common stock issued and outstanding immediately following the consummation of the Business Combination was as follows:

 

      
HVII Class A ordinary shares held by public shareholders prior to the Business Combination   19,000,000 
Less: redemption of HVII Class A ordinary shares   (13,809,029)
Public shares (including 4,987,103 shares held by the FPA Seller)   5,190,971 
Shares issued in respect of HVII public rights   1,583,332 
HVII founder shares (converted Class B ordinary shares)   6,333,333 
HVII private placement shares and shares issued in respect of private placement rights   747,500 
Shares held by former HVII shareholders   13,855,136 
Shares issued to ONE Nuclear LLC equity holders   94,253,842 
Shares newly issued to Cohen & Company at the Closing   150,000 
Total shares of common stock outstanding immediately following the Business Combination   108,258,978 

 

In connection with the Business Combination, the Company recognized the Earnout Shares liability at its Closing Date fair value of $106,081,000 as an expense in the condensed consolidated statements of operations upon initial recognition. The Earnout Shares liability is subsequently remeasured to fair value at each reporting date, with changes in fair value recognized in the condensed consolidated statements of operations (see Notes 3 and 7). The Company also recognized the FPA embedded derivative liability at its Closing Date fair value of $14,107,525 as an expense in the condensed consolidated statements of operations upon initial recognition, and the Prepayment Amount paid to the FPA Seller was recorded as a reduction of equity in the reverse recapitalization (see Notes 3, 7 and 10). In addition, $93,871 of accrued commitment fees payable by ONE Nuclear LLC to HVII under the Promissory Note with Hennessy became an intercompany balance upon the consummation of the Business Combination and was eliminated in consolidation as part of the reverse recapitalization (see Note 6).

 

16

 

 

NOTE 5 – ACCOUNTS PAYABLE AND ACCRUED EXPENSES

 

Accounts payable and accrued expenses consist of:

 

   September 30, 2026   December 31, 2025 
Professional fees  $838,563   $191,652 
Officers’ compensation   1,224,692    117,851 
Legal expenses   385,930    305,150 
Other accrued liabilities   230,044    35,560 
Transaction costs - Business Combination   13,408,467    - 
Accounts payable and accrued expenses assumed from HCVII   399,752    - 
Accounts payable and accrued expenses  $16,487,448   $650,213 

 

Transaction costs - Business Combination at September 30, 2026 consist of the $12.0 million Sale Transaction Fee payable to B. Riley Securities, Inc. (see Note 10), $721,126 of ONE Nuclear LLC transaction costs charged to additional paid-in capital (excluding $10,000 of legal fees included in Legal expenses above, for total transaction costs charged to additional paid-in capital of $731,126; see Note 4), and $687,341 of accrued directors’ and officers’ liability insurance premiums for the policy bound in connection with the Business Combination, which were recorded as prepaid expenses (see Note 3). Other than the $100,000 repaid to B.Riley at closing to reduce the note payable, none of the transaction costs payable to B.Riley Securities, legal counsel or other service providers were paid as of September 30, 2026.

 

NOTE 6 – PROMISSORY NOTES

 

Promissory Note - Hennessy Capital Investment Corp.

 

On December 19, 2025, the Company entered into a Promissory Note with Hennessy Capital Investment Corp. VII (the “Hennessy”) providing for loan advances up to an aggregate principal amount of $300,000. The proceeds from these advances are restricted solely for the payment of third-party legal, accounting and audit services. Certain Company Members provided personal guarantees of the Company’s obligations under the Promissory Note.

 

In consideration for the advances, the Company was subject to a non-refundable monthly Commitment Fee of $10,000. This fee was paid in-kind in arrears on the last calendar day of each month. The Company was not required to make cash payments on these fees until the Maturity Date. The outstanding principal and accrued fees matured and became payable upon the earliest of: (i) March 31, 2026, (ii) the acceleration of the obligations due to an Event of Default, or (iii) the consummation of a business combination between the Company and the Lender or another specified capital-raising transaction.

 

On March 31, 2026, HVII, Merger Sub and ONE Nuclear entered into the Omnibus Amendment, amending the Promissory Note to extend the Maturity Date from March 31, 2026 to June 30, 2026.

 

On June 1, 2026, the Company entered into Omnibus Amendment 2. The amendment modified the Promissory Note by extending its Maturity Date from June 30, 2026, to August 15, 2026, and increasing the permitted aggregate principal amount of advances from $300,000 to $316,975.

 

On August 7, 2026, HVII, Merger Sub and the Company entered into Omnibus Amendment 3, which amended the Promissory Note by extending its Maturity Date from August 15, 2026 to September 30, 2026 and increasing the permitted aggregate principal amount of advances from $316,975 to $620,000.

 

17

 

 

Upon the consummation of the Business Combination on September 23, 2026, the outstanding principal of $300,000, together with $55,313 of professional fees paid by HVII on behalf of the Company and added to the Promissory Note balance, became an intercompany balance and was eliminated in the reverse recapitalization (see Note 4). As of September 30, 2026 and December 31, 2025, the principal amount outstanding under the Promissory Note was $0 and $300,000, respectively. Accrued commitment fees under the Promissory Note amounted to $3,871 as of December 31, 2025 and $93,871 as of the Closing Date. Although the commitment fees are paid in-kind and contractually added to the amount due under the Promissory Note, the accrued commitment fees were presented within accounts payable and accrued expenses rather than notes payable. Upon the consummation of the Business Combination, the $93,871 of accrued commitment fees payable to HVII also became an intercompany balance and was eliminated in consolidation as part of the reverse recapitalization (see Note 4). Accordingly, no commitment fees were payable under the Promissory Note as of September 30, 2026.

 

Promissory Note - B. Riley

 

On February 18, 2026, the Company entered into a Promissory Note with B. Riley Principal Capital, LLC (the “B. Riley Note”) providing for loan advances up to an aggregate principal amount of $150,000. The proceeds from these advances were restricted solely to pay reasonable expenses to advance the Company’s business, primarily including third-party consultants and expenses related to the contemplated business combination with Hennessy Capital Investment Corp. VII (such as accounting, audit, regulatory filings, and the like).

 

In consideration for the advances, the Company was subject to a non-refundable monthly Commitment Fee of $5,000. This fee was fully earned and paid in-kind in arrears on the last calendar day of each month (pro-rated for partial periods), and was contractually added to the aggregate amount due under the Promissory Note; however, the accrued commitment fees are presented within accounts payable and accrued expenses rather than notes payable in the condensed consolidated balance sheets. Cash payments for these fees are not required until the Maturity Date. The outstanding principal and accrued fees matured and became payable upon the earliest of: (i) March 31, 2026, (ii) acceleration of the obligations due to an Event of Default, (iii) the consummation of the business combination with Hennessy Capital Investment Corp. VII or another specified financing transaction, or (iv) the termination of the Hennessy business combination. On March 31, 2026, the Company and B. Riley amended the Promissory Note to extend the Maturity Date from March 31, 2026 to June 30, 2026.

 

On June 4, 2026, the Company entered into a second amendment to the note, which increased the maximum principal amount to $166,975, raised the monthly commitment fee to $5,566, and extended the maturity date to August 15, 2026.

 

On July 6, 2026, B. Riley and the Company entered into Amendment 3, which amended the Promissory Note by increasing the permitted aggregate principal amount of advances to $196,375 and increased the monthly commitment fee to $6,546.

 

Shortly thereafter, on July 9, 2026, the parties entered into a fourth amendment. This agreement further raised the maximum principal borrowing limit to $204,113 and adjusted the corresponding monthly commitment fee to $6,804.

 

18

 

 

The Company and B. Riley Capital also entered into Amendment No. 5, dated July 22, 2026, and Amendment No. 6, dated August 9, 2026, to the B. Riley Promissory Note. These agreements further adjusted the maximum principal borrowing limit to $227,363 and $327,363 respectively, as well as adjusted the corresponding monthly commitment fee to $7,579 and $10,912, respectively.

 

On September 23, 2026, ONE Nuclear and B. Riley Principal Capital, LLC entered into Amendment No. 7 (“Amendment No. 7”) to that certain Promissory Note, dated February 18, 2026, as previously amended (the “B. Riley Note”). Amendment No. 7 reflects a $100,000 partial repayment under the B. Riley Note and provides that advances under the B. Riley Note may be made up to an aggregate reduced principal amount of $276,749. Amendment No. 7 also resets the monthly commitment fee to $9,225, extends the maturity date of the B. Riley Note from September 30, 2026, to December 31, 2026, and removes the consummation of the Business Combination as a separate maturity event under the B. Riley Note.

 

During the nine months ended September 30, 2026, the Company received advances totaling $327,363 under the Promissory Note, including $160,388 received during the three months ended September 30, 2026. Upon the consummation of the Business Combination, $100,000 of the outstanding principal was repaid from the Trust Account. As of September 30, 2026, the outstanding principal balance under the Promissory Note was $227,363, classified as Notes Payable - B. Riley, and accrued commitment fees of $42,763 were recorded within accounts payable and accrued expenses and are due upon demand.

 

NOTE 7 – FAIR VALUE MEASUREMENTS, EARNOUT SHARES LIABILITY AND FPA EMBEDDED DERIVATIVE LIABILITY

 

The Earnout Shares liability and the FPA embedded derivative liability are measured at fair value on a recurring basis and are classified within Level 3 of the fair value hierarchy because their valuations rely on significant unobservable inputs. The Company had no assets or liabilities measured at fair value on a recurring basis as of December 31, 2025, and there were no transfers between levels of the fair value hierarchy during the three and nine months ended September 30, 2026.

 

The fair value of the Earnout Shares liability was estimated by an independent third-party valuation firm as of September 23, 2026 (the Closing Date) and September 30, 2026. The fair value per Earnout Share was $8.31, $8.17 and $7.99 at the Closing Date and $1.49, $1.41 and $1.35 at September 30, 2026 for Triggering Events I, II and III, respectively. The decrease in fair value from the Closing Date to September 30, 2026 primarily reflects the decline in the trading price of the Company’s common stock, which closed at $2.15 per share on September 30, 2026. Significant inputs to the valuation include the trading price of the Company’s common stock, the share price milestones of $12.50, $15.00 and $17.50, the remaining earnout period through September 23, 2029, expected volatility and the risk-free interest rate. Both the Closing Date and September 30, 2026 valuations used a Monte Carlo simulation methodology. The risk-free rate was assumed to be 4.76% as of the Closing Date and 4.94% as of September 30, 2026. The expected volatility was assumed to be 120% at both valuation dates.

 

19

 

 

The fair value of the Earnout Shares liability by tranche was as follows:

 

   Closing Date   September 30, 2026 
Triggering Event I – 4,333,334 shares ($12.50 share price)  $36,026,000   $6,452,031 
Triggering Event II – 4,333,333 shares ($15.00 share price)   35,420,000    6,122,913 
Triggering Event III – 4,333,333 shares ($17.50 share price)   34,635,000    5,858,059 
Earnout Shares liability  $106,081,000   $18,433,003 

 

The following table presents the changes in the fair value of the Level 3 Earnout Shares liability:

 

      
Fair value as of June 30, 2026  $- 
Initial recognition at the Closing Date   106,081,000 
Change in fair value   (87,647,997)
Fair value as of September 30, 2026  $18,433,003 

 

The fair value of the FPA embedded derivative liability (see Notes 3 and 10) was estimated by an independent third-party valuation firm as of the Closing Date and September 30, 2026 using a Black-Scholes option pricing model. The fair value per FPA Share was $2.83 at the Closing Date and $8.36 at September 30, 2026, resulting in a fair value of $14,107,525 and $41,707,547, respectively, for the 4,987,103 FPA Shares subject to the Forward Purchase Agreement. The increase in fair value from the Closing Date to September 30, 2026 primarily reflects the decline in the trading price of the Company’s common stock relative to the reset price of $10.6096 per FPA Share.

 

The weighted-average shares of common stock outstanding include the 4,987,103 shares (the ‘FPA Shares’) subject to the Forward Purchase Agreement described in Note10. The FPA Shares are legally issued and outstanding and are held by the FPA Seller. Before the Valuation Date, the FPA Seller may sell any or all of the FPA Shares, in which case it pays the Company the Reset Price for each share sold. Because the Forward Purchase Agreement does not specify a minimum number of shares that will be returned to the Company, the FPA Shares are included in the denominator for basic and diluted net loss per share until they are returned. FPA Shares returned at the Valuation Date will be excluded from weighted-average shares outstanding from the date of return. The Forward Purchase Agreement does not result in incremental dilutive shares. The change in fair value of the FPA embedded derivative liability is included in net loss.

 

The significant inputs used in the valuation of the FPA embedded derivative liability were as follows:

   Closing Date   September 30, 2026 
Stock price  $9.08   $2.15 
Reset price  $10.6096   $10.6096 
Expected volatility   106.5%   105.5%
Remaining term (years)   0.25    0.22 
Risk-free interest rate   4.07%   4.09%
Dividend yield   0.0%   0.0%
Fair value per FPA Share  $2.83   $8.36 

 

The following table presents the changes in the fair value of the Level 3 FPA embedded derivative liability:

 

      
Fair value as of June 30, 2026  $- 
Initial recognition at the Closing Date   14,107,525 
Change in fair value   27,600,022 
Fair value as of September 30, 2026  $41,707,547 

 

20

 

 

NOTE 8 – STOCKHOLDERS’ DEFICIT

 

Preferred Stock — The Company is authorized to issue 1,000,000 shares of preferred stock, par value $0.0001 per share. As of September 30, 2026, there were no shares of preferred stock issued or outstanding.

 

Class A Common Stock — The Company is authorized to issue 500,000,000 shares of Class A common stock, par value $0.0001 per share. As of September 30, 2026, there were 108,258,978 shares of Class A common stock issued and outstanding. As of December 31, 2025, 94,403,842 shares of Class A common stock were outstanding, as retroactively adjusted to reflect the Exchange Ratio (see Note 1).

 

Prior to the Business Combination, ONE Nuclear LLC was a limited liability company with 10,000,000 member units authorized, issued and outstanding, and all profits and losses were allocated to its members. In connection with the Business Combination, the 10,000,000 membership units were cancelled and converted into 94,403,842 shares of Class A common stock at the Exchange Ratio (see Note 4). The condensed consolidated balance sheet as of December 31, 2025 and the condensed consolidated statements of changes in stockholders’ deficit have been retroactively adjusted to present the membership units outstanding prior to the Business Combination as shares of Class A common stock at the Exchange Ratio.

 

Earnout Shares — The pre-Business Combination members of ONE Nuclear LLC are entitled to receive up to 13,000,000 Earnout Shares upon the achievement of certain share price milestones (see Notes 7 and 10). No Earnout Shares had been issued as of September 30, 2026.

 

NOTE 9 – EQUITY-BASED COMPENSATION

 

The Company accounts for equity-based compensation arrangements in accordance with ASC 718, Compensation - Stock Compensation. Equity-based compensation expense is recognized for equity awards issued to employees and non-employee service providers in exchange for services.

 

ONE Nuclear LLC previously issued membership units to certain service providers in exchange for services rendered. ONE Nuclear LLC did not grant additional membership unit awards during the nine months ended September 30, 2026 prior to the Closing. At the Closing, the Company granted equity awards to certain executives and consultants (see Note 10). The membership units are classified as equity-settled awards. Compensation cost is measured at the grant-date fair value of the membership units issued. In connection with the Business Combination, the membership units held by these service providers were exchanged for shares of common stock at the Exchange Ratio (see Note 4).

 

The fair value of the membership units was determined using an invested capital model, which incorporated assumptions including enterprise value, discount rates, expected volatility, lack of marketability, and other relevant factors.

 

21

 

 

For awards that were fully vested upon issuance, the Company recognized compensation expense immediately. For awards subject to service-based vesting conditions, the Company recognizes compensation expense on a straight-line basis over the requisite service period, which represents the period over which the related services are expected to be provided. The Company accounts for forfeitures as they occur.

 

Equity-based compensation expense was $8,539 and $25,340 for the three and nine months ended September 30, 2026, respectively, and $3,541 the period from February 10, 2025 (inception) through September 30, 2025, respectively, and is included in general and administrative expense in the accompanying unaudited condensed consolidated statements of operations.

 

As of September 30, 2026, 211,888 membership units granted to service providers, including 150,000 units granted to BCR-ABL LLC (see Note 10), remained unvested. These units remained unvested because the related service-based vesting conditions had not been satisfied as of September 30, 2026: the 150,000 units granted to BCR-ABL LLC vest 75,000 on the earlier of twelve months after the Business Combination or August 18, 2027, 37,500 eighteen months after the Business Combination and 37,500 twenty-four months after the Business Combination, and the units granted to the other service providers vest in quarterly installments through October 1, 2028, in each case subject to the recipient’s continued service. Upon vesting, the related shares of common stock are transferred to the award recipients from the shares received by the co-founders of ONE Nuclear LLC in the Business Combination, and the total number of shares outstanding does not change. As of September 30, 2026, total unrecognized compensation cost related to unvested awards was $50,678, which is expected to be recognized over a weighted-average period of 1.6 years.

 

In connection with the Business Combination, HVII’s shareholders approved the ONE Nuclear Equity Incentive Plan at the extraordinary general meeting held on August 24, 2026. See Note 10 for equity awards granted at the Closing under certain executive employment and consulting agreements.

 

NOTE 10 – COMMITMENTS AND CONTINGENCIES

 

Business Combination Agreement

 

On October 22, 2025, HVII, a Cayman Islands exempted company, with limited liability, the Merger Sub, and ONE Nuclear LLC entered into the Business Combination Agreement, which contemplated an all-stock business combination transaction. The Business Combination was consummated on September 23, 2026 (see Notes 1 and 4).

 

The Domestication

 

In connection with the Closing on the Closing Date, the following events occurred in connection with the Purchaser changing its jurisdiction of organization from the Cayman Islands to Delaware:

 

(a) each then issued and outstanding Class B ordinary share of the Purchaser, par value $0.0001 per share (each a “Class B Ordinary Share”), converted (the “Sponsor Share Conversion”) automatically, on a one-for-one basis, into one Class A ordinary share of the Purchaser, par value $0.0001 per share (each a “Class A Ordinary Share”);

 

22

 

 

(b) immediately after the Sponsor Share Conversion, the Purchaser transferred by way of continuation and deregistration to and domesticated as a Delaware corporation (such continuation and domestication, the “Domestication”); and

 

(c) in connection with, and after giving effect to, the Domestication, (i) each then issued and outstanding Class A Ordinary Share converted automatically, on a one-for-one basis, into one share of common stock of the Purchaser, par value $0.0001 per share (“Common Stock”), and (ii) each then issued and outstanding right of the Purchaser converted automatically into the right to receive one-twelfth (1/12) of one share of Common Stock at Closing.

 

Conversion of Securities

 

Pursuant to the terms of the Business Combination Agreement, the aggregate consideration paid to the existing equity holders of ONE Nuclear LLC (the “Company Members”) at Closing was in the form of newly issued shares of Common Stock, determined pursuant to the formula set forth in the Business Combination Agreement based on $1.00 billion (the “Base Purchase Price”) divided by the price per share at which Class A Ordinary Shares issued in the Purchaser’s initial public offering were redeemed in connection with the Closing (the “Redemption Price”). An aggregate of 94,403,842 shares of Common Stock were issued in respect of the ONE Nuclear LLC membership units at Closing, including 150,000 shares newly issued to Cohen & Company, which are included in the share consideration and the Exchange Ratio (see Note 4). In addition, the Company Members are entitled to receive up to an aggregate of 13.0 million additional shares of Common Stock in contingent consideration, subject to the achievement of certain share price milestones, as described below under the section titled “Company Earn-out.”

 

Company Earn-out

 

During the two-year period beginning on the first anniversary of the Closing Date (September 23, 2027) and ending on the third anniversary of the Closing Date (September 23, 2029), the Company will issue up to 13.0 million additional shares of Common Stock as contingent consideration (collectively, the “Earnout Shares”) to the Company Members, subject to the achievement of certain share price milestones as follows below:

 

(a) 4,333,334 Earnout Shares if the closing sale price of one share of Common Stock as reported on Nasdaq (or the exchange on which the shares of Common Stock are then listed) is greater than or equal to $12.50 per share for a period of at least twenty (20) days out of thirty (30) consecutive trading days ending on the trading day immediately prior to the date of determination;

 

(b) 4,333,333 Earnout Shares if the closing sale price of one share of Common Stock as reported on Nasdaq (or the exchange on which the shares of Common Stock are then listed) is greater than or equal to $15.00 per share for a period of at least twenty (20) days out of thirty (30) consecutive trading days ending on the trading day immediately prior to the date of determination; and

 

(c) 4,333,333 Earnout Shares if the closing sale price of one share of Common Stock as reported on Nasdaq (or the exchange on which the shares of Common Stock are then listed) is greater than or equal to $17.50 per share for a period of at least twenty (20) days out of thirty (30) consecutive trading days ending on the trading day immediately prior to the date of determination.

 

23

 

 

The Earnout Shares liability is remeasured to fair value at each reporting date (see Note 7). No Earnout Shares had been issued as of September 30, 2026.

 

Forward Purchase Agreement

 

On September 22, 2026, HVII and ONE Nuclear LLC entered into a forward purchase agreement (the “Forward Purchase Agreement”) with the FPA Seller for a prepaid share forward transaction. Pursuant to the Forward Purchase Agreement, the FPA Seller agreed to purchase from third parties up to 5,000,000 HVII Class A ordinary shares (the “FPA Shares”) and to be prepaid an aggregate cash amount (the “Prepayment Amount”) equal to the number of FPA Shares multiplied by the per-share redemption price at the closing of the Business Combination (the “Initial Price”). Following the closing, the FPA Seller may, in its sole discretion, terminate the transaction in whole or in part, in which case the Company is entitled to receive from the FPA Seller an amount equal to the Initial Price (which may be reduced by mutual agreement) multiplied by the number of terminated FPA Shares. The Forward Purchase Agreement matures 90 days after the closing of the Business Combination, or such later date as agreed in writing, at which time, in exchange for the return of the remaining FPA Shares, the FPA Seller retains an amount equal to the number of FPA Shares multiplied by the Initial Price. The Forward Purchase Agreement also provides the Company with a termination right following the effectiveness of a resale registration statement on Form S-1 relating to a committed equity line of credit or similar financing facility, and the FPA Seller agreed to waive redemption rights with respect to the FPA Shares.

 

In connection with the Closing, the FPA Seller purchased 4,987,103 FPA Shares, and on September 24, 2026, $53,185,757 was paid from the Trust Account to the FPA Seller, consisting of the Prepayment Amount of $52,911,402 and $274,355 of FPA-related expenses. The payment of the Prepayment Amount was recorded as a reduction of equity in the reverse recapitalization (see Note 4). The Company accounts for the embedded feature of the Forward Purchase Agreement, the value of which is based on the reset price of $10.6096 per FPA Share and the trading price of the Company’s common stock, as the FPA embedded derivative liability (see Note 3). The FPA embedded derivative liability was recognized at its Closing Date fair value of $14,107,525 and was remeasured to $41,707,547 at September 30, 2026, with the initial recognition and the subsequent $27,600,022 change in fair value recognized in the condensed consolidated statements of operations (see Note 7). As of September 30, 2026, no portion of the transaction had been terminated, and all 4,987,103 FPA Shares, which are included in the shares of common stock issued and outstanding, remained subject to the Forward Purchase Agreement, which matures on December 21, 2026, subject to extension under Amendment No. 1 to the Forward Purchase Agreement entered into on November 14, 2026 (see Note 12). Any future net proceeds received by ONE Nuclear from the Forward Purchase Agreement will be applied first to repay the remaining then-outstanding principal and accrued fees under the B. Riley Note.

 

Coen Weddepohl Consulting Agreement

 

On August 18, 2025, ONE Nuclear entered into a consulting agreement with BCR-ABL LLC, an affiliate of Coen Weddepohl. Under the agreement, Mr. Weddepohl agreed to act as Chief Investment Officer to ONE Nuclear. The consulting agreement was terminable by either party with six (6) months’ prior written notice to the other party, or terminable immediately upon material default of the consulting agreement by the other party that was not cured within ten (10) days. Until consummation of the Business Combination, Mr. Weddepohl was due a consulting fee equal to $200,004 annually, payable in 12 equal monthly payments. Effective January 1, 2026, this annual consulting fee was increased to $400,000. Until ONE Nuclear has received an initial capital investment or loan of at least $3,000,000, payments of the consulting fee accrue but are unpaid.

 

24

 

 

As of September 30, 2026 and December 31, 2025, ONE Nuclear had accrued $344,692 and $117,851, respectively, in such consulting fee payable to Mr. Weddepohl. During the three months ended September 30, 2026, the Company paid $163,159 of such accrued consulting fees. In addition, under the consulting agreement, Mr. Weddepohl is entitled to 150,000 membership rights in ONE Nuclear, which originally vested 75,000 after one year, 37,500 after two years, and 37,500 after three years, subject to his continued service through each vesting date. Under an amendment to the consulting agreement, the membership rights vest 75,000 on the earlier of twelve months after the Business Combination or August 18, 2027, 37,500 eighteen months after the Business Combination, and 37,500 twenty-four months after the Business Combination. None of the membership rights had vested as of September 30, 2026. The consulting agreement also provides that the membership rights granted to Mr. Weddepohl under the terms of the consulting agreement, will not be diluted by any amount of an initial capital investment by an outside investor equal to or less than $5,000,000 of a pre-public event capital investment into ONE Nuclear. ONE Nuclear will also reimburse Mr. Weddepohl for certain reasonable business expenses, and pay a monthly payment of $10,000 in lieu of healthcare related benefits. If the consulting agreement was terminated “without cause,” Mr. Weddepohl was entitled to all vested and unvested membership rights and a severance payment of $100,000. The consulting agreement included standard confidentiality provisions and an agreement not to compete in the nuclear energy sector for 12 months after separation.

 

Amended and Restated Engagement Letter

 

On February 18, 2026, the Company entered into an Amended and Restated Engagement Letter with B. Riley Securities, Inc. (“B. Riley”) to serve as the exclusive financial advisor in connection with a potential Sale Transaction (as defined therein) and as sole placement agent for any offerings of debt or equity. The term of the engagement began on March 13, 2025, and continues until terminated by either party upon ten days’ written notice. The agreement supersedes prior agreements and contains a 12-month tail period for fee entitlements following termination.

 

If the Company consummates a business combination with Hennessy Capital Investment Corp. VII, the Company is obligated to pay B. Riley a fixed Sale Transaction Fee of $12.0 million. For any other Sale Transaction, the Company must pay a cash fee equal to 2.0% of the Aggregate Transaction Value, subject to a minimum fee of $1.5 million. If the Company completes a private or public offering, B. Riley is entitled to a cash fee equal to 6.0% of the first $100 million of gross proceeds (plus 5.5% of proceeds above $100 million) for equity or equity-linked securities, and 3.0% of the first $100 million of gross proceeds (plus 2.0% above $100 million) for debt financings. If a Sale Transaction is not consummated and the Company receives a reverse termination or breakup fee, B. Riley is entitled to 50% of the fair market value of such fee. The Company is also obligated to reimburse B. Riley for all reasonable out-of-pocket, accountable expenses incurred in connection with its services, regardless of whether a transaction is consummated.

 

25

 

 

Second Amended and Restated B. Riley Engagement Letter

 

On September 23, 2026, ONE Nuclear entered into a Second Amended and Restated Engagement Letter (the “Second A&R Engagement Letter”) with B. Riley Securities, Inc. (“B. Riley”), which amended and restated the existing engagement letter between ONE Nuclear and B. Riley. Pursuant to the Second A&R Engagement Letter, B. Riley’s fee in connection with the Business Combination is $12.0 million, consisting of (i) $4.0 million payable in ONE Nuclear Common Stock (the “Equity Fee”) and (ii) $8.0 million payable in cash following the Closing (the “Cash Fee”). The Equity Fee is payable in shares of ONE Nuclear Common Stock (or other securities) at a price equal to the lowest price ascribed to shares of ONE Nuclear Common Stock or other securities of ONE Nuclear issued to any other service provider in connection with the Business Combination and such securities will not be subject to any contractual lock-up period. ONE Nuclear is also required to register for resale the ONE Nuclear Common Stock (or the ONE Nuclear Common Stock underlying any other securities) issued as the Equity Fee on the registration statement on Form S-1 to be filed in connection with the committed equity facility described below.

 

Pursuant to the Second A&R Engagement Letter, ONE Nuclear is obligated to enter into a committed equity facility (the “CEF”) with B. Riley or an affiliate of B. Riley following the Closing and to execute a power of attorney granting B. Riley certain authority relating to the CEF. Subject to the terms of the Second A&R Engagement Letter, ONE Nuclear is required to pay B. Riley 65% of the net proceeds received under the CEF until the Cash Fee has been paid in full. Notwithstanding the foregoing, if the B. Riley Note remains outstanding when the resale registration statement on Form S-1 relating to the CEF is declared effective by the SEC, 100% of the net proceeds received under the CEF will first be applied to the outstanding principal and accrued fees under the B. Riley Note until the B. Riley Note has been repaid in full. In addition, 100% of the net proceeds received from any forward purchase agreement (including the Forward Purchase Agreement) entered into by ONE Nuclear and an investor or counterparty will be applied to the B. Riley Note until it has been repaid in full. As of September 30, 2026, the Company had not filed Form S-1 nor entered into the CEF.

 

Upon the consummation of the Business Combination on September 23, 2026, the $12.0 million Sale Transaction Fee was earned by B. Riley and was recognized in general and administrative expenses during the three months ended September 30, 2026. As of September 30, 2026, the fee remained unpaid and is included in accounts payable and accrued expenses.

 

Consulting Agreements

 

In February 2026, the Company entered into consulting agreements with each of Mark Taylor and Al Vickers that contain payment obligations contingent upon the successful closing of a Special Purpose Acquisition Company (“SPAC”) transaction. The aggregate cash obligations under these agreements are $170,000 in cash payments, payable within five business days of the SPAC closing. Additionally, the Company was committed to granting equity awards upon the initial public trading day, in the aggregate valued at $160,000. These equity awards are subject to Board approval and standard vesting terms, with no lock-up period. As of September 30, 2026, $250,000 related to these agreements was included in accounts payable and accrued expenses.

 

Independent Contractor Agreements and Executive Employment Agreements

 

On August 11, 2026, the Company entered into an Independent Contractor Agreement to engage a new Chief Financial Officer. Under the terms of this interim agreement, the Company agreed to pay a flat consulting fee of $35,417 per month, prorated for the actual days served, through the closing of the Business Combination. Fees under the interim arrangement were deferred and became payable within five business days following the closing of the Business Combination, and the Company paid $42,500 under the arrangement on September 28, 2026.

 

26

 

 

Concurrently, the Company executed an Executive Employment Agreement with the new Chief Financial Officer, which superseded the interim agreement and became effective upon the completion of the Business Combination on September 23, 2026. Under the employment agreement, the executive’s compensation transitioned to an annualized base salary of $425,000, alongside eligibility for an annual performance bonus of up to 100% of the base salary, payable in a combination of cash and Restricted Stock Units. The employment agreement also commits the Company to issue additional equity compensation, including a one-time grant upon the commencement of public trading on Nasdaq equivalent to 1% of ONE Nuclear LLC’s pre-merger Membership Units. These equity awards will be subject to various time-based vesting schedules and performance-based milestones, including future project financing, commercial operation dates, and specific stock price targets.

 

In August 2026, the Company entered into an Independent Contractor Agreement to engage a new Chief Development Officer. Under the terms of this interim agreement, the Company agreed to pay a flat fee of $37,500 per month for business development services through the closing of the Business Combination. Fees under the interim arrangement were deferred and became payable within five business days following the closing of the Business Combination, and the Company paid $62,500 under the arrangement on September 28, 2026.

 

Concurrently, the Company executed an Executive Employment Agreement with the Chief Development Officer, dated August 6, 2026. Under this agreement, which became effective upon the completion of the Business Combination, the executive transitioned to an annualized base salary of $450,000 and became eligible for an annual performance bonus of up to 100% of the base salary, payable in a combination of cash and restricted stock units. The executive is also eligible for an annual long-term incentive grant of up to 50% of the base salary and will receive an initial one-time equity grant upon the commencement of public trading on Nasdaq equivalent to 2% of ONE Nuclear LLC’s pre-merger Membership Units. These equity awards are subject to a combination of time-based vesting schedules and performance-based milestones, including securing project financing, achieving commercial operation dates, and meeting specific stock price targets.

 

As a condition of the employment agreement, the executive agreed to transfer ownership of all assets of a business known as the “Amino” Sustainable Group to the Company. The agreement stipulates that if the executive is terminated without cause within three years of employment commencement, the Company must transfer ownership of all “Amino” assets back to the executive. Furthermore, in the event of a termination without cause, the executive is entitled to a severance payment equal to six months of base salary and up to twelve months of company-paid COBRA insurance.

 

The equity awards committed to the Chief Financial Officer, the Chief Development Officer and consultants under the agreements described above were granted at the Closing, with vesting based on the terms established in the respective agreements at the date of hire or agreement.

 

27

 

 

NOTE 11 – SEGMENT REPORTING

 

ASC Topic 280, Segment Reporting, establishes standards for companies to report in their financial statement information about operating segments, products, services, geographic areas, and major customers. Operating segments are defined as components of an enterprise that engage in business activities from which it may recognize revenues and incur expenses, and for which separate financial information is available that is regularly evaluated by the Company’s chief operating decision maker, or group, in deciding how to allocate resources and assess performance.

 

The Company’s chief operating decision maker (“CODM”) has been identified as the Chief Executive Officer in accordance with ASC 280-10-50-5, who reviews the assets, operating results, and financial metrics for the Company as a whole to make decisions about allocating resources and assessing financial performance. Accordingly, management has determined that there is only one reportable segment.

 

The CODM assesses performance for the single segment and decides how to allocate resources based on net income or loss that also is reported on the statement of operations as net income or loss. The measure of segment assets is reported on the balance sheet as total assets.

 

As the Company has not earned revenues yet, the key measures of segment profit or loss reviewed by the Company’s CODM are general and administrative expenses and net loss to monitor, manage and forecast cash to ensure enough capital is available for working capital needs. The CODM also reviews general and administrative costs to manage, maintain and enforce all contractual agreements to ensure costs are aligned with all agreements and budget.

 

   2026   2025   2026   2025 
  

For the Three Months Ended

September 30,

  

For the Nine Months Ended

September 30,

  

For the Period from February 10, 2025 (inception) through September 30,

 
   2026   2025   2026   2025 
Operating expenses                    
General and administrative  $12,782,281   $472,795   $14,502,713   $472,805 
Loss from operations   (12,782,281)   (472,795)   (14,502,713)   (472,805)
Commitment fees   50,673    -    133,164    - 
Initial recognition of Earnout Shares liability   106,081,000    -    106,081,000    - 
Change in fair value of Earnout Shares liability   (87,647,997)   -    (87,647,997)   - 
Initial recognition of FPA embedded derivative liability   14,107,525    -    14,107,525    - 
Change in fair value of FPA embedded derivative liability   27,600,022    -    27,600,022    - 
Net loss  $(72,973,504)  $(472,795)  $(74,776,427)  $(472,805)

 

28

 

 

NOTE 12 – SUBSEQUENT EVENTS

 

Management evaluated subsequent events through November 16, 2026, the date the unaudited condensed consolidated financial statements were issued. Based upon this review, other than as described below, management did not identify any subsequent events that would have required adjustment or disclosure in the unaudited condensed consolidated financial statements.

 

Letter of Intent with SOO Green HVDC Link

 

On November 5, 2026, the Company and SOO Green HVDC Link (“SOO Green”) announced the signing of a letter of intent (the “LOI”) to work together to explore the potential for sourcing nuclear energy and capacity into the PJM Interconnection via SOO Green’s planned 2,100-megawatt underground high-voltage direct current transmission line, including from the Company’s planned Iowa project, which has a development target of up to 1,000 megawatts. The LOI establishes a framework for the parties to collaborate on potential nuclear generation and transmission opportunities and includes certain exclusivity provisions relating to nuclear generation development. Any future commercial arrangements are subject to the negotiation and execution of definitive agreements and applicable development, regulatory and financing requirements, and there can be no assurance that definitive agreements will be entered into. The Company and SOO Green remain separate and independent projects. The LOI was entered into after September 30, 2026 and, accordingly, had no effect on the unaudited condensed consolidated financial statements as of and for the three and nine months ended September 30, 2026.

 

Forward Purchase Agreement Amendment with New Circle Capital Solutions LP

 

On November 14, 2026, the Company executed Amendment #1 to the Forward Purchase Agreement (FPA) with New Circle Capital Solutions LP (the “FPA Seller”). Under the terms of the amendment, the Company requested a one-time advance of $1.0 million. The FPA Seller will sell shares equivalent to 1.3 times the amount of the advance. If the FPA Seller has not sold enough shares to cover the advance amount by the time of the natural expiration of the FPA, the agreement will be extended to ensure the FPA Seller can sell any remaining shares. The Company also has the option to repay any advanced amounts for a premium of 1.3x. The Company has not modified the Reset Price with this Amendment. At expiration, the FPA Seller will return any remaining shares to the Company.

 

Settlement of Accounts Payable with Common Equity in Lieu of Cash

 

On November 15, 2026, the Company executed a Global Compensation Settlement Agreement (the “Settlement Agreement”) with Mark Taylor (the “Consultant”) to compensate the Consultant for services previously provided to the Company. The original agreement dated on or about February 23, 2026 had contemplated that the Consultant would be paid $90,000 in cash and $60,000 worth of shares on the first day of trading after the merger at the opening trading price. The Settlement Agreement states that the Consultant will accept the following in exchange for full and final settlement of the amounts due:

 

●64,286 shares instead of the cash component, based on the closing market price of $1.40 on the last trading day prior to the execution of the agreement;
●16,902 shares for the equity component of the agreement, based on the opening trading price of $3.55 per share on the first day of trading, September 24, 2026;
●And 14,090 shares as consideration for late payment.

 

The consultant will receive an aggregate amount of 95,278 shares and has agreed to sell these shares over a 10-week period, with no more that 10% of the shares being sold per week. These shares will be registered in the Company’s next S-1 filing with Securities and Exchange Commission.

 

29

 

 

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

 

The following discussion and analysis of our financial condition and results of operations should be read together with our unaudited condensed consolidated financial statements and the related notes included elsewhere in this Quarterly Report on Form 10-Q, and with the audited financial statements of ONE Nuclear LLC as of December 31, 2025 and for the period from February 10, 2025 (inception) through December 31, 2025 and the related notes included in the Form S-4/A filed with the SEC on April 3, 2026. This discussion contains forward-looking statements that involve risks and uncertainties. Our actual results could differ materially from those discussed in or implied by these forward-looking statements as a result of various factors, including those discussed below in Part II, Item 1A “Risk Factors” of this Quarterly Report and “Risk Factors” in our Registration Statement on Form S-4, as amended, and in our other filings with the Securities and Exchange Commission.

 

Unless the context otherwise requires, references in this section to “ONE Nuclear,” the “Company,” “we,” “us” and “our” refer to ONE Nuclear Energy Inc. and its consolidated subsidiaries following the completion of the Business Combination.

 

Overview

 

The Company is structured to develop, own, and operate a portfolio of behind-the-meter (BTM) microgrids and energy parks that bypass the congested centralized energy transmission infrastructure of the United States. ONE Nuclear’s objective is to cultivate a diverse and sector-agnostic client base of energy-intensive end-users, including not just hyperscale AI and cloud data centers, but also industrial manufacturers, refineries, desalination plants and critical-infrastructure customers.

 

Recent Developments

 

The Business Combination

 

On October 22, 2025, Hennessy Capital Investment Corp. VII, a Cayman Islands exempted company, with limited liability (the “Purchaser” or “HVII”), Solis Merger Sub LLC, a Delaware limited liability company and a direct wholly-owned subsidiary of the Purchaser (“Merger Sub”), and ONE Nuclear Energy LLC entered into a business combination agreement (the “Business Combination Agreement”) that contemplated an all-stock business combination transaction and aggregate share consideration payable to the ONE Nuclear Members based on a formula equal to $1.0 billion divided by the Redemption Price. On August 24, 2026, HVII’s shareholders approved the Business Combination at an extraordinary general meeting, and on September 23, 2026, the Business Combination was consummated, ONE Nuclear Energy LLC became a wholly-owned subsidiary of HVII, and HVII was renamed ONE Nuclear Energy Inc. The Company’s common stock commenced trading on Nasdaq under the ticker symbol “ONEN” on September 24, 2026. The Business Combination was accounted for as a reverse recapitalization, with ONE Nuclear Energy LLC as the accounting acquirer. The Company is a development stage company, with nominal assets, no operating history or revenue to date and no project developments currently under construction.

 

In connection with the consummation of the Business Combination, four independent directors were appointed to the Company’s Board of Directors effective upon the Closing.

 

30

 

 

The Business Combination was funded with HVII cash held in trust. In connection with the Closing, holders of 13,809,029 HVII Class A ordinary shares redeemed their shares for an aggregate of $146,508,923 (approximately $10.61 per share). After payments of $53,185,757 to the FPA Seller under the Forward Purchase Agreement, $81,547 of deferred underwriting commissions and $100,000 in repayment of the B. Riley promissory note, $1,707,077 of remaining Trust Account funds was released to the Company on September 24, 2026. No private investment in public equity or other financing was completed in connection with the Business Combination. In connection with the Business Combination, the Company recognized an Earnout Shares liability for up to 13,000,000 Earnout Shares issuable to the pre-Business Combination members of ONE Nuclear Energy LLC upon the achievement of certain share price milestones. The Company also recognized an embedded derivative liability related to the Forward Purchase Agreement (the “FPA embedded derivative liability”). See Note 4 to the unaudited condensed consolidated financial statements included in Item 1 of this Quarterly Report for a reconciliation of the elements of the Business Combination to the condensed consolidated statements of cash flows and changes in stockholders’ deficit and for the number of shares of common stock outstanding immediately following the Business Combination.

 

Forward Purchase Agreement

 

On September 22, 2026, HVII and ONE Nuclear Energy LLC entered into a forward purchase agreement (the “Forward Purchase Agreement”) with New Circle Capital Solutions LP (the “FPA Seller”) for a prepaid share forward transaction covering up to 5,000,000 HVII Class A ordinary shares. In connection with the Closing, the FPA Seller purchased 4,987,103 shares, and $53,185,757, consisting of a prepayment of $52,911,402 and $274,355 of related expenses, was paid to the FPA Seller from the Trust Account. The FPA Seller may terminate the transaction in whole or in part following the closing, in which case the Company is entitled to receive the Initial Price multiplied by the number of terminated shares. The Forward Purchase Agreement matures 90 days after the closing of the Business Combination, unless extended by agreement. As of September 30, 2026, all 4,987,103 shares remained subject to the Forward Purchase Agreement, which matures on December 21, 2026, subject to extension under Amendment No. 1 to the Forward Purchase Agreement entered into on November 14, 2026 (see Note 12 to the unaudited condensed consolidated financial statements included in Item 1 of this Quarterly Report). The Company accounts for the embedded feature of the Forward Purchase Agreement, the value of which is based on the reset price of $10.6096 per share and the trading price of the Company’s common stock, as a derivative liability measured at fair value, which was $14,107,525 at the Closing Date and $41,707,547 at September 30, 2026 (see Notes 7 and 10 to the unaudited condensed consolidated financial statements).

 

On November 14, 2026 the Company executed Amendment #1 to the Forward Purchase Agreement (FPA) with New Circle Capital Solutions LP (the “FPA Seller”). Under the terms of the amendment, the Company requested a one-time advance of $1.0 million. The FPA Seller will sell shares equivalent to 1.3 times the amount of the advance. If the FPA Seller has not sold enough shares to cover the advance amount by the time of the natural expiration of the FPA, the agreement will be extended to ensure the FPA Seller can sell any remaining shares. The Company also has the option to repay any advanced amounts for a premium of 1.3x. The Company has not modified the Reset Price with this Amendment. At expiration, the FPA Seller will return any remaining shares to the Company.

 

Promissory Notes

 

On December 19, 2025, the Company entered into a Promissory Note with Hennessy Capital Investment Corp. VII (the “Hennessy”) providing for loan advances up to an aggregate principal amount of $300,000. The proceeds from these advances are restricted solely for the payment of third-party legal, accounting, and audit services.

 

In consideration for the advances, the Company is subject to a non-refundable monthly Commitment Fee of $10,000. This fee is paid in-kind in arrears on the last calendar day of each month and is contractually added to the amount due under the Promissory Note; however, the accrued commitment fees are presented within accounts payable and accrued expenses rather than notes payable. The Company is not required to make cash payments on these fees until the Maturity Date. The outstanding principal and accrued fees mature and become payable upon the earliest of: (i) March 31, 2026, (ii) the acceleration of the obligations due to an Event of Default, or (iii) the consummation of a business combination between the Company and the Lender or another specified capital-raising transaction.

 

On February 18, 2026, the Company entered into a Promissory Note with B. Riley Principal Capital, LLC providing for loan advances up to an aggregate principal amount of $150,000. The proceeds from these advances are restricted solely to pay reasonable expenses to advance the Company’s business, primarily including third-party consultants and expenses related to the contemplated business combination with Hennessy Capital Investment Corp. VII (such as accounting, audit, regulatory filings, and travel). During the nine months ended September 30, 2026, the Company received advances totaling $327,363 under the Promissory Note with B. Riley.

 

In consideration for the advances, the Company is subject to a non-refundable monthly Commitment Fee of $5,000. This fee is fully earned and paid in-kind in arrears on the last calendar day of each month (pro-rated for partial periods), and is contractually added to the aggregate amount due under the Promissory Note; however, the accrued commitment fees are presented within accounts payable and accrued expenses rather than notes payable in the condensed consolidated balance sheets. Cash payments for these fees are not required until the Maturity Date. The outstanding principal and accrued fees mature and become payable upon the earliest of: (i) March 31, 2026, (ii) acceleration of the obligations due to an Event of Default, (iii) the consummation of the business combination with Hennessy Capital Investment Corp. VII or another specified financing transaction, or (iv) the termination of the Hennessy business combination. On March 31, 2026, the Company and B. Riley amended the Promissory Note to extend the Maturity Date from March 31, 2026 to June 30, 2026.

 

31

 

 

On June 4, 2026, the Company entered into a second amendment to the note, which increased the maximum principal amount to $166,975, raised the monthly commitment fee to $5,566, and extended the maturity date to August 15, 2026.

 

On July 6, 2026, the Company and B. Riley executed a third amendment to the promissory note. This modification expanded the maximum principal amount available for advances to $196,375 and increased the monthly commitment fee to $6,546.

 

Shortly thereafter, on July 9, 2026, the parties entered into a fourth amendment. This agreement further raised the maximum principal borrowing limit to $204,113 and adjusted the corresponding monthly commitment fee to $6,804.

 

The Company and B. Riley Capital also entered into Amendment No. 5, dated July 22, 2026, and Amendment No. 6, dated August 9, 2026, to the B. Riley Promissory Note. These agreements further adjusted the maximum principal borrowing limit to $227,363 and $327,363 respectively, as well as adjusted the corresponding monthly commitment fee to $7,579 and $10,912 , respectively.

 

On September 23, 2026, ONE Nuclear and B. Riley Principal Capital, LLC entered into Amendment No. 7 (“Amendment No. 7”) to that certain Promissory Note, dated February 18, 2026, as previously amended (the “B. Riley Note”). Amendment No. 7 reflects a $100,000 partial repayment under the B. Riley Note and provides that advances under the B. Riley Note may be made up to an aggregate reduced principal amount of $276,749. Amendment No. 7 also resets the monthly commitment fee to $9,225, extends the maturity date of the B. Riley Note from September 30, 2026, to December 31, 2026, and removes the consummation of the Business Combination as a separate maturity event under the B. Riley Note.

 

During the nine months ended September 30, 2026, the Company received advances totaling $327,363 under the Promissory Note, including $160,388 received during the three months ended September 30, 2026. Upon the consummation of the Business Combination, $100,000 of the outstanding principal was repaid from the Trust Account.

 

In connection with the Closing, the Promissory Note with Hennessy, including $55,313 of professional fees paid by HVII on behalf of the Company, and the related $93,871 of accrued commitment fees were eliminated in the reverse recapitalization, and $100,000 of the B. Riley promissory note was repaid from the Trust Account. As of September 30, 2026, the outstanding principal balance under the Promissory Note was $227,363, classified as Notes Payable - B. Riley, and accrued commitment fees of $42,763 were recorded within accounts payable and accrued expenses and are due upon demand.

 

Omnibus Amendments

 

On March 31, 2026, HVII, Merger Sub and ONE Nuclear entered into the Omnibus Amendment 1, amending (1) the Business Combination Agreement to extend the Outside Date from April 30, 2026 to June 30, 2026 and (2) the Promissory Note to extend the Maturity Date from March 31, 2026 to June 30, 2026.

 

On June 1, 2026, HVII, Merger Sub and ONE Nuclear entered into the Omnibus Amendment 2, amending (1) the Business Combination Agreement to extend the Outside Date from June 30 2026, to August 15, 2026 and (2) the Promissory Note to extend the Maturity Date from June 30, 2026 to August 15, 2026, and increasing the permitted aggregate principal amount of advances from $300,000 to $316,975.

 

On August 7, 2026, HVII, Merger Sub and the Company entered into Omnibus Amendment 3. The amendment modified the Promissory Note by extending its Maturity Date from August 15, 2026 to September 30, 2026, and increasing the permitted aggregate principal amount of advances from $316,975 to $620,000.

 

Coen Weddepohl Consulting Agreement

 

On August 18, 2025, ONE Nuclear entered into a consulting agreement with BCR-ABL LLC, an affiliate of Coen Weddepohl. Under the agreement, Mr. Weddepohl agreed to act as Chief Investment Officer to ONE Nuclear. The consulting agreement was terminable by either party with six (6) months’ prior written notice to the other party, or terminable immediately upon material default of the consulting agreement by the other party that was not cured within ten (10) days. Until consummation of the Business Combination, Mr. Weddepohl was due a consulting fee equal to $200,004 annually, payable in 12 equal monthly payments. Effective January 1, 2026, this annual consulting fee was increased to $400,000. Until ONE Nuclear has received an initial capital investment or loan of at least $3,000,000, payments of the consulting fee accrue but are unpaid.

 

Consulting Agreements

 

In February 2026, the Company entered into consulting agreements with each of Mark Taylor and Al Vickers that contain payment obligations contingent upon the successful closing of a Special Purpose Acquisition Company (“SPAC”) transaction. The aggregate cash obligations under these agreements are $170,000, payable within five business days of the SPAC closing. Additionally, the Company was committed to granting equity awards upon the initial public trading day, in the aggregate valued at $160,000. These equity awards are subject to Board approval and standard vesting terms, with no lock-up period.

 

On November 15, the Company executed a Global Compensation Settlement Agreement (the “Settlement Agreement”) with Mark Taylor (the “Consultant”) to compensate the Consultant for services previously provided to the Company. The original agreement dated on or about February 23, 2026 had contemplated that the Consultant would be paid $90,000 in cash and $60,000 worth of shares on the first day of trading after the merger at the opening trading price. The Settlement Agreement states that the Consultant will accept the following in exchange for full and final settlement of the amounts due:

 

●64,286 shares instead of the cash component, based on the closing market price of $1.40 on the last trading day prior to the execution of the agreement;
●16,902 shares for the equity component of the agreement, based on the opening trading price of $3.55 per share on the first day of trading, September 24, 2026;
●And 14,090 shares as consideration for late payment.

 

The consultant will receive an aggregate amount of 95,278 shares and has agreed to sell these shares over a 10-week period, with no more that 10% of the shares being sold per week. These shares will be registered in the Company’s next S-1 filing with Securities and Exchange Commission.

 

32

 

 

Energy Projects

 

The Company develops behind-the-meter power generation projects for industrial customers. With a multi-gigawatt pipeline, our active development projects include:

 

Platform / Project   Location   Target Generation   Battery Storage   Primary Off-Take / Milestone
Louisiana Platform (Cayman, Barracuda, Amberjack)   Baton Rouge, LA   1,800 MW Gas + 1,000 MW SMR   450 MW / 900 MWh  

1,000 MW IT Data Center Campus (Site control established)

Project Nexus   Texas (ERCOT)  

400 MW Gas

(+ SMR option)

  129 MW / 257 MWh   Co-located data center; targeting 2029 COD
Project Sunshine   San Juan County, NM   1,000 MW Gas   250 MW / 1,000 MWh   Hyperscale data center; targeting JDA/binding LOI Dec 2026
Northern Pike   Cerro Gordo County, IA   1,000 MW SMR   TBD   PJM market access via SOO Green HVDC LOI
Hatchery Platform (Walleye, Lahontan, Sturgeon)   Washington State   35 MW Gas + 800 MW Solar + 1,000 MW SMR   1,000 MW / 4,000 MWh  

Industrial & data center power hub

 

Louisiana Platform (Projects Cayman, Barracuda and Amberjack)

 

ONE Nuclear’s proposed Baton Rouge Platform in Louisiana brings together natural gas generation, battery storage, data center development and advanced nuclear technology within a coordinated, phased development strategy. Its three projects—Cayman, Barracuda and Amberjack—are intended to connect large-scale computing demand with dedicated energy infrastructure and a pathway toward increasingly low-carbon power. The platform combines technologies with different development timelines, allowing investment in generation and customer facilities to progress as commercial requirements, infrastructure and project approvals develop.

 

●Cayman is the platform’s gas-and-storage project, targeting approximately 1,800 MW of natural gas generation paired with a 450 MW/900 MWh battery energy storage system. The proposed generation configuration combines reciprocating gas engines with simple-cycle gas turbines, providing a mix of modular capacity and larger generating units. Battery storage would complement these resources through rapid response and short-duration power support. Cayman is intended to support Barracuda’s electricity requirements, with final equipment selection, operating arrangements and delivered capacity established through engineering and customer agreements.
●Barracuda is the platform’s proposed data center campus, targeting 1,000 MW of information technology load at Jumonville North. The campus is intended to accommodate large-scale computing demand through phased development coordinated with power availability and supporting infrastructure. ONE Nuclear’s development role centers on suitable land, prepared sites and power, with tenant facilities and computing systems defined through customer agreements. Total campus electricity requirements would include cooling and other supporting loads in addition to the stated IT capacity.
●Amberjack is the platform’s advanced nuclear component, targeting 1,000 MW of generation using small modular reactor technology, with associated battery storage capacity to be determined. The project is intended to provide a long-term source of dependable, low-carbon electricity that could complement Cayman’s gas generation and support the region’s growing industrial and computing demand. Its final reactor configuration, cooling strategy and delivery arrangements will be developed through engineering and commercial evaluation, with deployment subject to site control, regulatory approvals, interconnection and financing.

 

Project Nexus (Texas)

 

Project Nexus is a planned project in Texas, within the Electric Reliability Council of Texas (“ERCOT”) market, designed to provide approximately 400 MW of fast-ramping natural-gas generation (utilizing modular gas engines) and 129 MW / 257 MWh of battery energy storage located behind the meter of a planned co-located data center campus, with a potential future nuclear option. The site is controlled by a third-party data center developer.

 

We are exploring a possible exclusive power development agreement with the data center developer for the Texas site. We have not entered into a memorandum of understanding or any other written agreement with the developer for this project, and there can be no assurance that we will do so. If we enter into definitive agreements, we expect to target first commercial operation in 2029.

 

Project Sunshine (New Mexico)

 

Project Sunshine is designed to serve hyperscale data center customers and is located on an initial site of approximately 600 acres, with the potential to expand to a substantially larger area, at the Four Corners energy hub in San Juan County, New Mexico (Western Electricity Coordinating Council (“WECC”) region). The project is planned as a behind-the-meter campus featuring approximately 1,000MW (gross) of natural-gas engine generation and 250 MW / 1,000 MWh of battery storage to serve adjacent hyperscale data-center loads under a targeted 15-20-year tolling agreement. The site is located within 1.5 miles of major 345/500 kV transmission hubs and high-pressure gas pipelines. The proposed project and commercial arrangements remain subject to definitive documentation, diligence and other conditions.

 

33

 

 

Northern Pike (Iowa)

 

ONE Nuclear’s proposed Northern Pike project in Cerro Gordo County, Iowa, targets 1,000 MW of generation using small modular reactor technology, with associated battery storage capacity to be determined. The project is intended to provide a long-term source of dependable, low-carbon electricity to support growing industrial and computing demand. Northern Pike combines advanced nuclear generation with a transmission-oriented development strategy, seeking to connect new electricity supply with markets requiring reliable power and additional capacity.

 

The project’s development strategy includes evaluating delivery through the proposed SOO Green high-voltage direct-current transmission link, providing a potential pathway for nuclear energy and capacity to reach the PJM electricity market. A hybrid cooling concept is also being evaluated to balance water use and operating performance. Final reactor configuration, storage sizing, cooling arrangements and commercial delivery terms will be established through engineering and customer discussions, with deployment subject to site control, water availability, regulatory approvals, transmission access and financing.

 

Hatchery Platform (Washington State)

 

ONE Nuclear’s proposed Hatchery Platform in Washington brings together natural gas generation, solar energy, advanced nuclear technology and battery storage within a coordinated, phased development strategy. Its three projects—Walleye, Lahontan and Sturgeon—are intended to address growing industrial electricity demand while establishing a pathway toward reliable, increasingly low-carbon power. The platform combines technologies with different development timelines, allowing investment and capacity additions to progress as customer requirements, infrastructure and project approvals develop.

 

●Walleye is the platform’s initial gas-and-storage project, with a planned 35 MW of natural gas generation paired with a 200 MW/800 MWh battery energy storage system.
●Lahontan Solar is the platform’s renewable generation component, targeting 800 MW of solar photovoltaic capacity paired with an 800 MW/3,200 MWh battery energy storage system.
●Sturgeon is the platform’s advanced nuclear component, targeting 1,000 MW of generation using small modular reactor technology, with associated battery storage capacity to be determined.

 

Key Components of Statements of Operations

 

General and Administrative expenses

 

General and administrative expenses primarily consist of personnel expenses, professional fees, equity-based compensation expenses, and other general and administrative expenses.

 

Other (Income) Expense

 

Other (income) expense consists of commitment fees incurred under the Company’s promissory notes, the initial recognition of the Earnout Shares liability and the FPA embedded derivative liability at the Closing Date and subsequent changes in the fair value of the Earnout Shares liability and the FPA embedded derivative liability.

 

34

 

 

Results of Operations

 

The following tables summarize the Company’s results of operations for the the nine months ended September 30, 2026, and the period from February 10, 2025 (inception) through September 30, 2025. This discussion should be read in conjunction with the accompanying financial statements, related notes, and the section below entitled “Key Components of Statements of Operations”. Historical results are not necessarily indicative of future performance.

 

Nine Months Ended September 30, 2026 and the Period from February 10, 2025 (inception) through September 30, 2025

 

The following tables set forth the Company’s unaudited condensed consolidated statement of operations data for the nine months ended September 30, 2026, and the period from February 10, 2025 (inception) through September 30, 2025:

 

  

For the Nine Months Ended

September 30, 2026

  

For the Period from

February 10, 2025

(inception) through

September 30, 2025

   Change 
Operating expenses               
General and administrative  $14,502,713   $472,805   $14,029,908 
Loss from operations   (14,502,713)   (472,805)   (14,029,908)
                
Other (income) expense               
Commitment fees   133,164    -    133,164 
Initial recognition of Earnout Shares liability   106,081,000    -    106,081,000 
Change in fair value of Earnout Shares liability   (87,647,997)   -    (87,647,997)
Initial recognition of FPA embedded derivative liability   14,107,525    -    14,107,525 
Change in fair value of FPA embedded derivative liability   27,600,022    -    27,600,022 
Total   60,273,714    -    60,273,714 
                
Net loss  $(74,776,427)  $(472,805)  $(74,303,622)

 

Operating Expenses

 

General and administrative expenses

 

General and administrative expenses for the nine months ended September 30, 2026 were $14,502,713 as compared to $472,805 for the period from February 10, 2025 (inception) through September 30, 2025. The $14,029,908 increase in general and administrative expenses is mainly due to the $12.0 million Sale Transaction Fee earned by B. Riley upon the consummation of the Business Combination, as well as increases in personnel expenses, professional fees and equity-based compensation expenses.

 

Other Income (Expense)

 

Commitment fees

 

The Company recognized $133,164 of commitment fees for the nine months ended September 30, 2026, consisting of $132,763 accrued in accordance with the terms of the Promissory Notes ($90,000 under the Promissory Note with Hennessy and $42,763 under the Promissory Note with B. Riley) and $401 of other expenses recorded in commitment fees.

 

Initial recognition of Earnout Shares liability

 

The Company recognized a loss of $106,081,000 for the nine months ended September 30, 2026, representing the Closing Date fair value of the Earnout Shares liability recognized in connection with the Business Combination.

 

Change in fair value of Earnout Shares liability

 

The Company recognized a gain of $87,647,997 for the nine months ended September 30, 2026 from the remeasurement of the Earnout Shares liability from $106,081,000 at the Closing Date to $18,433,003 at September 30, 2026, primarily reflecting the decline in the trading price of the Company’s common stock following the Closing.

 

Initial recognition of FPA embedded derivative liability

 

The Company recognized a loss of $14,107,525 for the nine months ended September 30, 2026, representing the Closing Date fair value of the FPA embedded derivative liability recognized in connection with the Forward Purchase Agreement.

 

Change in fair value of FPA embedded derivative liability

 

The Company recognized a loss of $27,600,022 for the nine months ended September 30, 2026 from the remeasurement of the FPA embedded derivative liability from $14,107,525 at the Closing Date to $41,707,547 at September 30, 2026, primarily reflecting the decline in the trading price of the Company’s common stock relative to the reset price of $10.6096 per share.

 

35

 

 

Liquidity and Capital Resources

 

The Company’s only sources of liquidity have been cash from financing activities, including the net proceeds received in connection with the Business Combination. For the nine months ended September 30, 2026, the Company incurred a net loss of $74,776,427. As of September 30, 2026, the Company had an accumulated deficit of $78,304,680, a cash balance of $1,495,641, and a working capital deficit of $62,677,882, which represents a $61,727,799 increase in the deficit compared to a working capital deficit of $950,083 at December 31, 2025. Current liabilities at September 30, 2026 include the $12.0 million B. Riley Sale Transaction Fee. In addition, we have $3.6 million of deferred legal and other professional fees, all of which remained unpaid.

 

Based on our current cash balance of $1,495,641 as of September 30, 2026, we do not have sufficient cash on hand to satisfy our existing current liabilities or fund our planned development activities over the next twelve months without raising additional capital. In addition to our existing current liabilities, we expect to require approximately $1.9 million in January 2027 to fund initial option payments for our Louisiana project sites if definitive option agreements are executed prior to December 31, 2026.

 

As discussed in Note 10 – Commitments and Contingencies, ONE Nuclear is obligated to enter into a committed equity facility (the “CEF”) with B. Riley or an affiliate of B. Riley following the Closing and to execute a power of attorney granting B. Riley certain authority relating to the CEF. Subject to the terms of the Second A&R Engagement Letter, ONE Nuclear is required to pay B. Riley 100% until the then-outstanding amounts under the B. Riley Note is repaid and then 65% of the net proceeds received under the CEF over time, until the $8.0 million Cash Fee has been paid in full. As of September 30, 2026, the Company had not entered into the CEF or filed a Registration Statement on Form S-1.

 

The Company’s future capital requirements will depend on many factors, including the timing and extent of spending. In order to finance these opportunities, the Company will need to raise additional financing. While there can be no assurances, the Company intends to raise such capital through issuances of additional equity, as well as project finance debt. If additional financing is required from outside sources, the Company may not be able to raise it on terms acceptable to the Company or at all. If the Company is unable to raise additional capital when desired, the Company’s business, results of operations and financial condition would be materially and adversely affected.

 

As a result of the above, in connection with the Company’s assessment of going concern considerations in accordance with Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) Subtopic 205-40, “Going Concern,” management has determined that the Company’s liquidity condition raises substantial doubt about the Company’s ability to continue as a going concern through twelve months from the date these unaudited condensed consolidated financial statements are issued. These condensed consolidated financial statements do not include any adjustments relating to the recovery of the recorded assets or the classification of the liabilities that might be necessary should the Company be unable to continue as a going concern.

 

Cash flows for the nine months ended September 30, 2026 and the Period from February 10, 2025 (inception) through September 30, 2025

 

The following table summarizes the Company’s cash flows from operating and financing activities for the nine months ended September 30, 2026 and the period from February 10, 2025 (inception) through September 30, 2025:

 

  

For the Nine Months Ended

September 30, 2026

   For the Period from February 10, 2025 (inception) through September 30, 2025 
CASH USED IN OPERATING ACTIVITIES  $(539,000)  $     (40)
CASH PROVIDED BY FINANCING ACTIVITIES  $2,034,511   $100 

 

Cash flows used in operating activities

 

Net cash used in operating activities for the nine months ended September 30, 2026, was $539,000 and $40 for the period from February 10, 2025 (inception) through September 30, 2025. This was primarily driven by the Company’s net loss, adjusted for the non-cash initial recognition of and change in fair value of the Earnout Shares liability and the FPA embedded derivative liability, partially offset by increases in accounts payable and accrued expenses, including the $12.0 million B. Riley Sale Transaction Fee, which remained unpaid at September 30, 2026, and the recognition of non-cash equity-based compensation.

 

36

 

 

Cash flows provided by financing activities

 

Cash provided by financing activities for the period from February 10, 2025 (inception) through September 30, 2025 was $100 from the sale of membership units.

 

Cash provided by financing activities for the nine months ended September 30, 2026 was $2,034,511. This primarily consisted of $1,807,148 of proceeds from the reverse recapitalization and $327,363 of proceeds from the promissory notes, partially offset by the $100,000 repayment of the B. Riley promissory note from the Trust Account.

 

Credit Risk

 

Financial instruments that potentially subject the Company to concentrations of credit risk consist primarily of cash and cash equivalents. The Company maintains its cash balances with financial institutions that management believes to be creditworthy. At times, these balances may exceed federally insured limits. The Company has not experienced any losses related to these deposits and believes its exposure to credit risk is minimal.

 

Material Accounting Policies and Estimates

 

ONE Nuclear management’s discussion and analysis of financial condition and results of operations is based on our financial statements which have been prepared in accordance with US GAAP standards. In preparing our financial statements, we make estimates, assumptions, and judgments that can have a significant impact on our results of operations and net loss, as well as on the value of certain assets and liabilities on our balance sheet during and as of the reporting periods. These estimates, assumptions, and judgments are necessary because future events and their effects on our results and the value of our assets cannot be determined with certainty and are based on our historical experience and on other assumptions that we believe to be reasonable under the circumstances. These estimates may change as new events occur or additional information is obtained, and we may periodically be faced with uncertainties, the outcomes of which are not within our control and may not be known for a prolonged period. Because the use of estimates is inherent in the financial reporting process, actual results could differ from those estimates.

 

Critical Accounting Estimates

 

Our unaudited condensed consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States of America (“U.S. GAAP”). The preparation of these financial statements requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues, expenses and related disclosures.

 

Significant estimates and judgments may include, but are not limited to, accounting for the Business Combination; the classification and measurement of transaction costs; the valuation of equity instruments and share-based compensation; income taxes and related valuation allowances; accrued expenses and related-party balances; and the recognition, measurement, classification and recoverability of project development costs, property and equipment and other long-lived assets, as applicable.

 

Management evaluates its estimates and assumptions on an ongoing basis based on historical experience and other factors believed to be reasonable under the circumstances. Actual results could differ from those estimates, and such differences could be material.

 

Our critical accounting estimates are those that involve a significant level of estimation uncertainty and have had or are reasonably likely to have a material impact on our financial condition or results of operations. As of September 30, 2026, our critical accounting estimates were the following:

 

37

 

 

Earnout Shares Liability

 

The Earnout Shares liability is measured at fair value at the Closing Date and at each reporting date, with the initial fair value and subsequent changes in fair value recognized in our condensed consolidated statements of operations. The fair value is estimated by an independent third-party valuation firm and depends on significant unobservable inputs, including the trading price of our common stock, expected volatility, the risk-free interest rate and the remaining earnout period through September 23, 2029, relative to the share price milestones of $12.50, $15.00 and $17.50 per share. The fair value of the Earnout Shares liability was $106,081,000 at the Closing Date, which was recognized as an expense upon initial recognition, and decreased to $18,433,003 at September 30, 2026, resulting in a gain from the change in fair value of $87,647,997 for the three and nine months ended September 30, 2026. Changes in these inputs, particularly the trading price of our common stock, could result in material changes in the fair value of the Earnout Shares liability and in our results of operations in future periods.

 

FPA Embedded Derivative Liability

 

The embedded derivative in the Forward Purchase Agreement is measured at fair value at the Closing Date and at each reporting date using a Black-Scholes option pricing model, with the initial fair value and subsequent changes in fair value recognized in our condensed consolidated statements of operations. Significant inputs include the underlying stock price ($9.08 at the Closing Date and $2.15 at September 30, 2026), the reset price of $10.6096 per share, expected volatility (106.5% and 105.5%, respectively), the remaining term to the December 21, 2026 maturity date and the risk-free interest rate. The fair value of the FPA embedded derivative liability was $14,107,525 at the Closing Date, which was recognized as a loss upon initial recognition, and increased to $41,707,547 at September 30, 2026, resulting in a loss from the change in fair value of $27,600,022 for the three and nine months ended September 30, 2026. Because the fair value of the FPA embedded derivative liability increases as the trading price of our common stock declines relative to the reset price, changes in our stock price could result in material changes in the liability and in our results of operations.

 

Emerging Growth Company Status

 

We are an emerging growth company, as defined in the Jumpstart Our Business Startups Act of 2012. As an emerging growth company, we may take advantage of certain exemptions from reporting requirements that are otherwise applicable to public companies, including reduced disclosure obligations regarding executive compensation and exemptions from certain auditor attestation requirements.

 

We have elected to use the extended transition period for complying with new or revised accounting standards. As a result, our financial statements may not be comparable to those of companies that comply with public company effective dates for new or revised accounting standards.

 

Off-Balance Sheet Arrangements

 

As of September 30, 2026, we did not have any off-balance sheet arrangements that have or are reasonably likely to have a material current or future effect on our financial condition, results of operations, liquidity, capital expenditures, or capital resources.

 

Item 3. Quantitative and Qualitative Disclosures About Market Risk

 

As a smaller reporting company, we are not required to provide the information required by this Item.

 

Item 4. Controls and Procedures

 

Evaluation of Disclosure Controls and Procedures

 

Our management, with the participation of our Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures as of September 30, 2026. The term “disclosure controls and procedures,” as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act, means controls and other procedures designed to ensure that information required to be disclosed by us in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures also include controls and procedures designed to ensure that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

 

38

 

 

Based upon such evaluation, our Chief Executive Officer and our Chief Financial Officer have concluded that, as of September 30, 2026, our disclosure controls and procedures were, and continue to be, ineffective because of material weakness in internal control over financial reporting due to the Company’s lack of a fully formalized and documented internal control framework, including formal documentation of key controls and review evidence. This reflects the Company’s transition to operating as a public company following the Business Combination. Management is commencing actions to address the lack of formal documentation of our control environment and expects any weakness to be remediated in subsequent reporting periods. We can give no assurance that additional material weaknesses will not be identified in the future. While we remain an emerging growth company, we are not required to provide an attestation report on internal control over financial reporting from our independent registered public accounting firm.

 

In light of the material weakness described above, we continue to perform additional analysis and other post-closing procedures to ensure our financial statements are prepared in accordance with GAAP. Accordingly, we believe that the financial statements included in this report fairly present, in all material respects, our financial condition, results of operations and cash flows for the periods presented. We do not believe there are any material misstatements in our financial reporting.

 

Changes in Internal Control over Financial Reporting

 

Other than as described above, there have been no changes during our most recent calendar quarter that have materially affected our internal controls over financial reporting.

 

Inherent Limitations on the Effectiveness of Controls

 

The effectiveness of any system of internal control over financial reporting, including ours, is subject to inherent limitations, including the exercise of judgment in designing, implementing, operating, and evaluating the controls and procedures, and the inability to eliminate misconduct completely. Accordingly, in designing and evaluating the disclosure controls and procedures, management recognizes that any system of internal control over financial reporting, including ours, no matter how well designed and operated, can only provide reasonable, not absolute assurance of achieving the desired control objectives. In addition, the design of disclosure controls and procedures must reflect the fact that there are resource constraints, and that management is required to apply its judgment in evaluating the benefits of possible controls and procedures relative to their costs. Projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate. We intend to continue to monitor and upgrade our internal controls as necessary or appropriate for our business but cannot assure you that such improvements will be sufficient to provide us with effective internal control over financial reporting.

 

39

 

 

PART II - OTHER INFORMATION

 

ITEM 1. LEGAL PROCEEDINGS

 

We are not currently a party to any material legal proceedings. From time to time, we may be subject to claims, legal proceedings, regulatory inquiries or other matters arising in the ordinary course of business. We are not aware of any pending or threatened legal proceedings that, individually or in the aggregate, would reasonably be expected to have a material adverse effect on our business, financial condition, results of operations or cash flows.

 

ITEM 1A. RISK FACTORS

 

ONE Nuclear is a development-stage company with no operating history or historical revenue, and ONE Nuclear faces execution risk across all major components of its business.

 

The ONE Nuclear project began in 2022, formally incorporated in the first quarter of 2025 and is currently in the early stages of developing its first power projects. ONE Nuclear has not generated any revenue to date and does not expect to do so until its first power project becomes operational, which ONE Nuclear expects will not occur until 2028. Given ONE Nuclear’s early stage of development, it is difficult to predict what results ONE Nuclear might ultimately achieve. ONE Nuclear’s ability to achieve its expected returns and business strategy depends on, among other things, its ability to construct, permit, finance, and operate large-scale infrastructure nuclear and natural gas power projects. If ONE Nuclear fails to timely deliver and make operational its power projects on budget, on time or at all, its business may prove unsuccessful.

 

ONE Nuclear has not yet constructed any power projects. Many of the necessary contracts with landowners, equipment providers or other partners have yet to be executed, and there is no guarantee that ONE Nuclear will be able to do so in the future. ONE Nuclear’s limited commercial operating history makes it difficult to evaluate its prospects, and the risks and challenges ONE Nuclear may encounter. Any delays or setbacks ONE Nuclear may experience could have a material adverse effect on its business, financial condition and results of operations, and could harm its reputation.

 

ONE Nuclear’s business plan to develop, construct, own and operate power projects depends on, among other things, its ability to negotiate and enter into binding agreements with landowners, equipment providers, customers and power offtakers. If ONE Nuclear is unable to enter into binding agreements on attractive terms or at all, its planned development, construction and operation of its power projects could be significantly delayed. Such delays would result in delays in revenue and could hinder ONE Nuclear’s ability to enter into other partnerships or relationships for other projects.

 

As a result of ONE Nuclear’s limited commercial operating history and ongoing changes in its new and evolving industry, including evolving demand for the types of products and services ONE Nuclear offers and the potential development of technologies that may prove more efficient or effective, its ability to forecast future results of operations and plan for and model future growth is limited and subject to a number of uncertainties, which could adversely affect its business, results of operations and prospects.

 

There can be no assurance that ONE Nuclear will not experience operational or process failures and other problems during the development, construction or operation of its power projects. Any failures or setbacks, particularly in the initial phases of development, could harm its reputation, its ability to gain financing and enter into strategic partnerships and relationships, and have a material adverse effect on its business and financial condition.

 

40

 

 

ONE Nuclear has not yet entered into binding definitive agreements with many of its key business relationships and several of its current commercial agreements are non-binding.

 

ONE Nuclear’s business plan relies on key strategic relationships with certain important business partners. ONE Nuclear has not yet entered into definitive agreements regarding many such business relationships, and therefore such relationships are subject to change, and there can be no assurance that definitive agreements will be executed or, if executed, that the terms of such definitive agreements will not vary materially from ONE Nuclear’s expectations. If ONE Nuclear is unable to enter into such definitive agreements, such definitive agreements are on materially different terms than expected or, once entered, such definitive agreements are terminated by the counterparty, ONE Nuclear will not benefit from such relationship and its business and results of operations will be affected.

 

Specifically, unless and until definitive agreements are entered into directly with landowners, ONE Nuclear has no rights to its physical locations. If ONE Nuclear is unable to enter into a definitive agreement with respect to its sites, including its priority sites, ONE Nuclear will need to explore alternative locations and arrangements for the deployment of its business plan, though no assurances can be made that such efforts will be successful.

 

ONE Nuclear is a development stage company with a history of financial losses (e.g., negative cash flows), and ONE Nuclear expects to incur significant expenses and continuing financial losses at least until its first power project becomes commercially viable, which may never occur. ONE Nuclear will require substantial additional future funding to support its operations and implementation of its growth plans.

 

ONE Nuclear expects its operating expenses to increase over the next several years and expects to continue to incur operating losses for the foreseeable future as ONE Nuclear expands and develops, and ONE Nuclear will need substantial additional capital from external sources over an extended period to fund such development. See “ONE Nuclear Management’s Discussion and Analysis of Financial Condition and Results of Operation — Liquidity and Capital Resources.” If ONE Nuclear is unable to raise additional capital, ONE Nuclear may need to make significant adjustments to its business plan or significantly delay or scale back its power projects, any of which could have a material adverse effect on its results of operations, financial condition and cash available for distribution. If ONE Nuclear is unable to raise additional funding, ONE Nuclear may be forced to liquidate its assets and the value ONE Nuclear receives for its assets in liquidation or dissolution could be significantly lower than the values reflected in its financial statements.

 

ONE Nuclear does not expect to generate meaningful revenue unless and until ONE Nuclear is able to finalize development of and commercialize its first power project, and ONE Nuclear may not be able to do so on its anticipated timetable, if at all. ONE Nuclear expects that its expenses and capital expenditures will increase in connection with its ongoing activities, including developing and advancing its initial power projects. In addition, ONE Nuclear expects to incur additional costs associated with operating as a public company. Certain costs are not reasonably estimable at this time, and ONE Nuclear will require additional funding beyond the proceeds received in connection with the Business Combination, which was consummated on September 23, 2026.

 

Adequate additional funding may not be available to ONE Nuclear on acceptable terms or at all. ONE Nuclear’s failure to raise capital as and when needed could have a negative impact on its financial condition and ability to pursue its business strategies. If ONE Nuclear raises additional funds by issuing equity securities, its shareholders will experience dilution. Any issuances of additional equity securities could result in substantial dilution to our shareholders, and the resale of any such additional equity securities issued could negatively impact the market price of ONE Nuclear’s common stock. If ONE Nuclear raises additional capital through debt financing, ONE Nuclear may be subject to covenants that restrict its operations including limitations on its ability to incur liens or additional debt, pay dividends, repurchase securities, make certain investments, and engage in certain merger, consolidation, or asset sale transactions. Any debt financing or additional equity that ONE Nuclear raises may contain terms that are not favorable to ONE Nuclear or its shareholders. If the needed financing is not available, or if the terms of financing are less desirable than ONE Nuclear expects, ONE Nuclear may be required to delay, scale back or terminate some or all of its projects and ONE Nuclear can provide no assurance that ONE Nuclear will be able to raise the necessary capital or obtain financing on favorable terms, if at all.

 

41

 

 

There is substantial doubt about our ability to continue as a going concern, and our inability to obtain additional financing could materially adversely affect our business, financial condition and results of operations.

 

Our financial statements have been prepared assuming that we will continue as a going concern. However, our history of operating losses, negative cash flows from operations and current liquidity position raise substantial doubt about our ability to continue as a going concern. We have not generated revenue from operations and expect to continue incurring significant expenses as we pursue the development of our planned power projects and satisfy our obligations as a publicly traded company.

 

Our ability to continue as a going concern will depend on our ability to obtain additional financing sufficient to fund our ongoing operations and meet our financial obligations as they become due. There can be no assurance that additional financing will be available when needed, on commercially reasonable terms or at all. If we are unable to obtain sufficient financing, we may be required to significantly reduce or delay our planned development activities, curtail operations or pursue other strategic alternatives. Any such developments could materially adversely affect our business, financial condition, results of operations and the value of our common stock.

 

ONE Nuclear will require significant additional capital to construct and complete its power projects, and ONE Nuclear may not be able to secure such financing on time with acceptable terms, or at all, which could cause delays in construction, lead to inadequate liquidity and increase overall costs.

 

The capital expenditures ONE Nuclear expects to incur as ONE Nuclear completes the development of its power projects will be significant. Additional capital may not be available in the amounts required, or on favorable terms. Furthermore, any adverse changes in power demand that affect the competitiveness of the power projects or any failure on ONE Nuclear’s part to obtain or comply with necessary permits or approvals may also hinder its ability to obtain necessary additional capital or financing.

 

Delays in the construction of ONE Nuclear’s power projects beyond the estimated development period could increase the cost of completion beyond the amounts that ONE Nuclear estimates, which could require ONE Nuclear to obtain additional sources of financing to fund its operations until its power projects are fully completed and generating revenue (which could cause further delays). Moreover, many factors (including factors beyond ONE Nuclear’s control) could result in a disparity between liquidity sources and cash needs, including factors such as construction delays and breaches of agreements.

 

ONE Nuclear’s ability to obtain financing that may be needed will depend, in part, on factors beyond its control and there can be no assurances that funding will be available to ONE Nuclear on commercial terms or at all. For example, capital providers or their applicable regulators may elect to cease funding nuclear projects or certain related businesses. Accordingly, ONE Nuclear may not be able to obtain financing on terms that are acceptable to ONE Nuclear, or at all. Even if ONE Nuclear is able to obtain financing, ONE Nuclear may have to accept terms that are disadvantageous to ONE Nuclear or that may have an adverse impact on its business plan and the viability of the relevant project. The failure to obtain any necessary additional funding could cause any or all of ONE Nuclear’s projects to be delayed or not be completed. Any delays in construction could prevent ONE Nuclear from commencing operations when ONE Nuclear anticipates and could prevent ONE Nuclear from realizing anticipated cash flows, all of which could have a material adverse effect on its business, contracts, financial condition, operating results, cash flow, financing requirements, liquidity, prospects and the price of its common stock.

 

ONE Nuclear will be dependent on third-party manufacturing and supply chain relationships to build and operate its facilities. ONE Nuclear’s reliance on third parties and suppliers involves certain risks that may result in increased costs, delays, and loss of revenue.

 

ONE Nuclear does not possess the physical materials and labor resources necessary to construct its own facilities, and ONE Nuclear will extensively rely on third parties for materials and labor for its business. As a result, ONE Nuclear is subject to risks associated with these third parties, including:

 

● insufficient capacity available to meet its demand on time;

● inability of its suppliers to obtain the equipment or replacement parts necessary to fully operate its facilities or expand capacity;

● inadequate manufacturing yields and excessive costs;

● inability of third parties to obtain an adequate supply of raw materials;

● extended lead times on supplies used in the building and operation of its facilities;

● limited warranties on products supplied to ONE Nuclear; and

● potential increases in prices (including the cost of freight and potential or increased tariffs).

 

ONE Nuclear’s industry has experienced the effects of manufacturing capacity constraints. The ongoing war in Ukraine and the Middle East, and related international tariffs, sanctions and restrictions have impacted supply chains for manufacturers. To mitigate this, the U.S. government has taken steps to create tariff exemptions for various energy projects, from which ONE Nuclear expects to benefit. Notwithstanding these mitigating steps, these supply challenges have impacted, and may continue to impact, ONE Nuclear’s ability to fully satisfy the necessary supplies, resources and products required by its business. In addition, the rapid growth in demand for natural gas-fired combustion turbine generators caused by the development of new data centers has produced a backlog in orders for new combustion turbines from manufacturers, which could adversely impact ONE Nuclear’s plans to purchase and procure additional gas-fired combustion turbines for timely delivery to its power projects.

 

42

 

 

ONE Nuclear cannot provide any assurance that its external partners will devote the necessary resources to its business and when requested by ONE Nuclear. Each of these events could increase ONE Nuclear’s costs, lower its gross margin, delay the construction and delivery of its projects, and cause ONE Nuclear to hold more inventories, or materially impact its ability to complete its projects and deliver power on time.

 

ONE Nuclear will need to hire additional skilled employees as ONE Nuclear grows and develops its power projects, and there is no assurance ONE Nuclear will be successful in recruiting, hiring, and training the personnel it needs.

 

ONE Nuclear expects that its business will require a number of skilled nuclear and power professionals, and there is no assurance that ONE Nuclear will be successful in recruiting, hiring, training, and retaining the personnel ONE Nuclear needs. If ONE Nuclear is unable to hire the personnel ONE Nuclear needs, its ability to achieve its aggressive growth and development milestones could be adversely affected.

 

The energy markets are highly competitive and rapidly evolving.

 

ONE Nuclear will compete with a variety of power production companies. These competitors may have greater access to capital, deeper vendor relationships, access to cheaper materials and inputs, and fewer regulatory hurdles. In addition, advances in power production technologies could put ONE Nuclear at a competitive disadvantage or require ONE Nuclear to make significant capital investment and continuous innovation. ONE Nuclear may be unable to meet these evolving demands, resulting in lost business or underutilized capacity.

 

ONE Nuclear will depend on third-party vendors, contractors, and consultants to support its business.

 

From licensing and permitting to design, procurement, construction, and operations, ONE Nuclear will depend on a complex ecosystem of third-party providers to execute its construction, development and operation. These parties include, among others, nuclear and gas equipment firms, construction managers, legal advisors, power off-takers, and control system integrators. If any such party experiences delays, disputes, or insolvency, or ONE Nuclear loses its license or use rights to critical third-party technology, it could materially adversely impact the timing of delivery, cost, or quality of its infrastructure solution its ability to produce power on attractive terms.

 

Terrorist attacks, cyberattacks and threats may compromise the integrity of ONE Nuclear’s power projects and could have a material adverse effect on its business, financial condition, and results of operations.

 

ONE Nuclear’s energy infrastructure will rely on highly integrated operational technology and industrial control systems, many of which will be internet-connected or exposed to remote access for diagnostics, supervisory control, data acquisition, and maintenance. These systems are increasingly targeted by nation-state and criminal actors, and even advanced cybersecurity protocols cannot fully eliminate risk. In addition, ONE Nuclear will rely on third-party cloud infrastructure providers and Software-as-a-Service platforms to operate and manage core elements of its data, diagnostics, and control environments. Any compromise or service disruption affecting these external providers could impair ONE Nuclear’s visibility into asset performance or interrupt critical operations.

 

A successful attack on ONE Nuclear’s physical power generation facilities, including nuclear, gas, or infrastructure facilities could result in physical damage, loss of service, ransom demands, data exposure, or regulatory fines. Moreover, nuclear assets are subject to elevated U.S. Nuclear Regulatory Commission (“NRC”) physical security requirements and cybersecurity standards, which impose specific requirements on digital system integrity. For ONE Nuclear’s nuclear and gas assets, a cyber breach could also raise safety, environmental, or emergency preparedness concerns, potentially triggering regulatory shutdowns, incident investigations, or long-term reputational harm beyond the direct operational impacts. Power and energy infrastructure have been identified as strategic targets for future attacks, and, as such, may face greater risk of disruption or exploitation than other asset classes. In addition, such an incident at any nuclear power facility, globally, may lead to heightened regulatory standards and scrutiny across the entire industry, leading to increased regulatory compliance burdens, loss of revenue, and incidental costs related to the alteration of infrastructure, assets, or systems.

 

43

 

 

Regarding nuclear assets, ONE Nuclear will be subject to the NRC’s regulations in this area, and for all of its electric generation and related electric infrastructure, ONE Nuclear will be subject to regulation by governmental and regulatory agencies and bodies such as the U.S. Federal Energy Regulatory Commission (“FERC”), the Southwest Power Pool (the “SPP”), the Public Utility Commission of Texas (the “PUCT”), the North American Electric Reliability Corporation (“NERC”), and the Midwest Reliability Organization (“MRO”), the violation of which could carry regulatory enforcement action.

 

While ONE Nuclear expects to implement a comprehensive set of security measures, its operational technology and industrial control systems, and those of its contractors and consultants, may be vulnerable to breakdown or other damage or interruption from service interruptions, system malfunction, natural disasters, terrorism, war and telecommunication and electrical failures, as well as security breaches from inadvertent or intentional actions by its employees, contractors, consultants, business partners, and/or other third parties, or from cyber-attacks by malicious third parties (including the deployment of harmful malware, ransomware, denial-of-service attacks, social engineering and other means to affect service reliability and threaten the confidentiality, integrity and availability of information), which may compromise ONE Nuclear’s system infrastructure or lead to data leakage. In particular, ransomware attacks could result in prolonged operational outages across ONE Nuclear’s energy infrastructure, delay site commissioning, or trigger fail-safe shutdowns of critical systems. More sophisticated attack vectors, such as spear phishing, credential stuffing, and deepfake-based social engineering, may further undermine ONE Nuclear’s ability to detect and prevent compromise. These disruptions could materially affect its ability to fulfill off-taker and customer obligations and meet development milestones. ONE Nuclear will not be able to anticipate, detect, or prevent all cyberattacks, particularly as attackers adapt methods to evade detection and exploit zero-day vulnerabilities. Additionally, some cyber incidents, including surveillance, data exfiltration, or deepfake impersonation, may go undetected for extended periods.

 

As a public company, ONE Nuclear is also subject to the cybersecurity disclosure and incident reporting requirements adopted by the SEC, which may increase the cost and complexity of its compliance efforts and expose ONE Nuclear to additional scrutiny in the event of a cyber incident.

 

Additionally, ONE Nuclear’s board of directors are responsible for overseeing the adequacy of management’s conduct of threat environment and vulnerability assessments, management of cyber incidents, pursuit of projects to strengthen internal cyber security and the cyber security of ONE Nuclear’s operations teams to evaluate the cyber security implications of its products and offerings, and coordination of efforts to monitor, detect, and prevent future cyber threats. In addition, the board of directors, or a duly authorized committee thereof, will annually review ONE Nuclear’s risk profile with respect to cybersecurity matters. To the extent that any disruption or security breach were to result in a loss of, or damage to, ONE Nuclear’s data or applications, or inappropriate disclosure of confidential or proprietary information, ONE Nuclear could incur liability and reputational damage and the further development and commercialization of its projects could be delayed. ONE Nuclear may also be required to expend significant additional capital or operating costs to investigate and remediate vulnerabilities, strengthen controls, or comply with evolving cybersecurity regulations.

 

ONE Nuclear will be required to continuously upgrade cybersecurity controls, test defenses, and maintain redundancy and isolation protocols. Any failure could materially impair its operations or partner relationships. ONE Nuclear expects to maintain cybersecurity insurance, but such coverage may not be adequate to cover all losses. Certain consequential or reputational damages may not be insurable, and ONE Nuclear may be required to self-fund recovery efforts, litigation costs, and regulatory penalties. As cyberattacks increase globally in frequency and severity, the cost of such insurance may increase and availability of such insurance may also decline. Any failure to prevent, detect, or respond to cybersecurity incidents could materially impair ONE Nuclear’s operations, delay its operational timeline, damage its relationships with off-takers, customers or regulators, and result in significant legal or financial exposure.

 

ONE Nuclear’s power projects will require extensive permitting, interconnection, and third-party coordination.

 

ONE Nuclear’s power generation projects will be complicated, spanning substations, cooling corridors, high-pressure gas delivery, nuclear construction, other electric generating and storage facilities, and data center capacity, and necessitate cooperation with dozens of agencies, regulators, vendors, and contractors. A delay or dispute with any one of these counterparties or regulators could cause delays, outages, unforeseen costs and other adverse effects to ONE Nuclear’s business and results of operations. Coordinating these layers in parallel, with differing regulatory timelines, creates risk for budget overruns or missed commercial operation dates for ONE Nuclear.

 

44

 

 

ONE Nuclear may face significant construction delays and global supply chain disruptions that could materially impact project timelines and costs.

 

ONE Nuclear’s power projects will require timely procurement of gas turbines, reciprocating engines, transformers, power electronics, and nuclear reactor components (including uranium), among others—many of which originate from international vendors. Geopolitical conflict, trade restrictions and tariffs, maritime shipping delays, or semiconductor shortages may delay site readiness, reduce operational capacity, or force reprioritization of development phases. In addition, recent global supply chain disruptions have increasingly affected both the availability and cost of raw materials (including uranium), component manufacturing and deliveries. These disruptions may result in delays in equipment deliveries and cost escalations that could adversely affect ONE Nuclear’s business. Prolonged disruptions in the supply of any key materials or components, difficulty finding qualifying new sources of supply, implementing the use of replacement materials or new sources of supply or any volatility in prices could have a material adverse effect on ONE Nuclear’s ability to develop and operate in a cost-efficient, timely manner. Such prolonged disruptions could also cause ONE Nuclear to experience cancellations or delays of scheduled launches, or reductions in its prices and margins, any of which could harm its business, financial condition, results of operations and cash flows.

 

The ongoing military conflict in Ukraine has escalated tensions between the United States and its North Atlantic Treaty Organization (“NATO”) allies, on one hand, and Russia, on the other hand. The United States and other NATO member states, as well as some non-member states, have imposed sanctions against Russia and certain Russian banks, enterprises, and individuals. These actions include sanctions on Russian companies that supply low-enriched uranium (“LEU”) to fuel nuclear reactors, representing a potential and material supply chain risk to companies that develop and operate nuclear reactors in the United States. These sanctions have impacted the commercial availability of LEU and increased the cost of uranium enrichment services and could potentially increase the cost and timing of receipt of LEU, which could have a material adverse effect on ONE Nuclear’s ability to deploy nuclear reactors.

 

In addition, the availability of critical path equipment such as heat exchangers, reactor modules, turbines, reciprocating engines, switchgear, and gas infrastructure is subject to global supply chain variability and vendor capacity. Many components required for nuclear construction, including pressure vessels, reactor coolant pumps and steam generating equipment, are manufactured by a limited number of qualified suppliers and may require long-lead orders with multi-year production timelines.

 

ONE Nuclear does not have manufacturing assets and will rely on third-party manufacturers and construction firms to build its facilities. Moreover, ONE Nuclear is dependent on future supplier capability to meet production demands attendant to its forecasts. If ONE Nuclear’s supply chain cannot meet the schedule demands of the market, its projected timelines and revenues could be materially impacted.

 

Additionally, shortages in skilled labor, construction permitting delays, inclement weather, or force majeure events could delay or halt construction of major systems. Each delay can cause cascading impacts on power generation schedules, reducing its ability to generate revenue or meet timelines.

 

High demand for, constraints on the supply of, and increasing costs for industrial scale gas-fired turbines and/or reciprocating engines could lead to significant delays in ONE Nuclear’s ability to develop the natural gas fired power generation infrastructure it will need to achieve its power delivery goals.

 

Industrial scale gas fired turbines and reciprocating engines are in high demand in the U.S. and globally for grid power generation, new and expanded LNG facilities and AI hyperscalers, creating significant delays in delivery as well as increasing costs. This increase in demand for gas-fired combustion turbines and/or reciprocating engines, after years of little or no demand for new gas-fired combustion turbines and/or reciprocating engines, appears to have significantly outstripped available supply, resulting in reports of lead-times for delivery of new gas-fired combustion turbines and/or reciprocating engines. As a result, ONE Nuclear could experience significant delays and increased costs in obtaining the gas fired turbines and/or reciprocating engines needed to develop the natural gas-fired power generation infrastructure that ONE Nuclear needs, which could adversely affect its ability to deliver power on the expected schedule, and its operating results and financial condition.

 

45

 

 

Nuclear reactors and SMRs can be costly and time consuming to construct and commercialize. Delays and cost overruns arising from issues with procurement, regulatory approvals, construction and commercialization of nuclear reactors may materially adversely affect ONE Nuclear’s business.

 

The development, construction, and commercialization of nuclear reactors and SMR projects involve significant time and cost. The design, engineering, licensing, and construction of nuclear reactors, including the AP1000 and SMRs, are complex, highly regulated, and subject to lengthy timelines. SMRs, while designed to be more cost-effective and scalable than traditional nuclear reactors, are still in early stages of development and deployment globally, with limited operational history and a lack of commercially available, fully licensed designs. This increases the risk of unforeseen technical challenges, delays in regulatory approvals, and higher-than-anticipated costs.

 

The costs associated with developing and deploying these technologies are substantial, including expenses related to site preparation, specialized materials, and compliance with stringent nuclear safety and environmental regulations. Further, the limited number of nuclear power plants constructed in the U.S. over the last twenty years has reduced the number of skilled laborers, such as welders, necessary to construct new nuclear power plants. Any delays or cost overruns, or failure or delay in securing the services of qualified laborers, could strain ONE Nuclear’s financial resources, require additional capital, or result in project delays or cancellations.

 

ONE Nuclear’s management team has limited experience in the nuclear energy sector, which may hinder its ability to effectively navigate the complex technical, regulatory, and operational challenges associated with nuclear reactors and SMR projects. This lack of experience could lead to delays, misjudgments, or failure to anticipate critical risks, further increasing project costs and timelines.

 

Furthermore, the limited availability of commercially viable SMRs poses additional risks. The technology is still emerging, with few operational SMRs globally, and the supply chain for specialized components is underdeveloped. This could result in delays in securing necessary materials, higher costs, or reliance on unproven suppliers. If ONE Nuclear is unable to successfully develop, license, and deploy nuclear reactor or SMR projects on time and within budget, or if ONE Nuclear fails to mitigate the inherent risks of nuclear power, its business prospects, financial condition, and ability to achieve strategic objectives could be materially adversely affected.

 

ONE Nuclear may be subject to credit risks.

 

Credit risk includes the risk that ONE Nuclear’s customers will not pay their bills, which may lead to a reduction in liquidity and an increase in bad debt expense. Credit risk is comprised of numerous factors including the price of products and services provided, the overall economy and local economies in the geographic areas ONE Nuclear serves, including local unemployment rates.

 

Credit risk also includes the risk that various counterparties that owe ONE Nuclear money or products will breach their obligations. Should the counterparties to these arrangements fail to perform, ONE Nuclear may be forced to enter into alternative arrangements. In that event, ONE Nuclear’s financial results could be adversely affected and it could incur losses.

 

One alternative available to address counterparty credit risk is to transact on liquid commodity exchanges. The credit risk is then socialized through the exchange central clearinghouse function. While exchanges do remove counterparty credit risk, all participants are subject to margin requirements, which create an additional need for liquidity to post margin as exchange positions change value daily. The Dodd-Frank Wall Street Reform and Consumer Protection Act (the “Dodd-Frank Act”) requires broad clearing of financial swap transactions through a central counterparty, which could lead to additional margin requirements that would impact ONE Nuclear’s liquidity. However, ONE Nuclear may take advantage of an exception to mandatory clearing afforded to commercial end-users who are not classified as a major swap participant, thereby allowing such commercial end-users to enter into uncleared bilateral swaps to hedge their exposure to commercial risk.

 

46

 

 

ONE Nuclear may at times have direct credit exposure in its short-term wholesale and commodity trading activity to various financial institutions trading for their own accounts or issuing collateral support on behalf of other counterparties. ONE Nuclear may also have some indirect credit exposure due to participation in organized markets, such as SPP, PJM and the Midcontinent Independent System Operator (“MISO”), in which any credit losses are socialized to all market participants.

 

ONE Nuclear may have additional indirect credit exposures to various domestic and foreign financial institutions in the form of letters of credit provided as security by power suppliers under various long-term physical purchased power contracts. If any of the credit ratings of the letter of credit issuers were to drop below the designated investment grade rating stipulated in the underlying long-term purchased power contracts, the supplier would need to replace that security with an acceptable substitute. If the security were not replaced, the party could be in technical default under the contract, which would enable ONE Nuclear to exercise its contractual rights.

 

ONE Nuclear may face physical site risks, including severe weather events, environmental conditions, or other disasters which could result in an interruption of its operations, a delay in the completion of its power projects, higher construction costs and the deferral of the dates on which ONE Nuclear could receive revenue, all of which could adversely affect ONE Nuclear.

 

ONE Nuclear expects that many of its power projects will be located in areas that are subject to certain regional hazards. These risks could include occasional high-wind events, seismic activity, water access variability, and regional dust or environmental permitting restrictions. Severe weather, including winter storms, can be destructive, causing construction delays, outages and property damage that require incurring additional expenses. A major weather or geological event affecting ONE Nuclear’s future infrastructure, especially nuclear or gas, could impair the safety or reliability of its power projects.

 

Furthermore, ONE Nuclear’s operations could be adversely affected, and its physical facilities could be at risk of damage, should global climate conditions produce, among other conditions, unusual variations in temperature and weather patterns, resulting in more intense, frequent and severe weather events or abnormal levels of precipitation. ONE Nuclear’s physical facilities are expected to have certain safeguards against weather and geological events, but these may not be effective to protect against any or all of these events.

 

In addition, site access or operation could be affected by new environmental protections or public opposition.

 

Any failure of ONE Nuclear’s physical infrastructure, or acts of theft or vandalism to its physical infrastructure, could lead to significant costs and disruptions that could reduce revenue and harm its business reputation and financial results.

 

ONE Nuclear will need to safeguard its infrastructure, facilities and equipment located at its power projects. Its facilities could be subject to break-ins, sabotage and intentional acts of vandalism causing potential disruptions. Some of ONE Nuclear’s systems may not be fully redundant, and its disaster recovery planning cannot account for all eventualities. Any problems at ONE Nuclear’s facilities could result in lengthy interruptions in power generation and its business operations. There can be no assurance that any security or other operational measures that ONE Nuclear or its third-party service providers or vendors have implemented will be effective against any of the foregoing threats or issues.

 

ONE Nuclear’s power generation that it will provide at each of its power projects are subject to failure resulting from numerous factors, including:

 

● human error;
● equipment failure;
● physical, electronic and cybersecurity breaches;
● fire, earthquake, hurricane, flood, tornado and other natural disasters;

 

47

 

 

● extreme temperatures;
● water damage;
● fiber cuts;
● power loss;
● terrorist acts;
● theft, sabotage and vandalism; and
● failure of business partners who provide resale products.

 

Problems at one or more of ONE Nuclear’s power facilities, whether or not within its control, could result in power generation interruptions or significant equipment damage. Power production, service interruptions or significant equipment damage in ONE Nuclear’s facilities could also result in lost profits or other indirect or consequential damages to its customers. ONE Nuclear cannot guarantee that a court would enforce any contractual limitations on its liability in the event that one of its customers brings a lawsuit against ONE Nuclear as a result of a problem at one of its facilities.

 

In addition, any loss of service, equipment damage or inability to meet service level commitment obligations could reduce the confidence of ONE Nuclear’s customers and could consequently impair its ability to obtain and retain customers, which would adversely affect both its ability to generate revenues and its operating results.

 

ONE Nuclear’s construction and delivery timeline estimates for its power projects and other equipment may increase due to a number of factors, including the degree of pre-fabrication, standardization, on-site construction, long-lead procurement, contractor performance, facility pre-operational and startup testing, demand for repairs and other site-specific considerations.

 

The success of ONE Nuclear’s business will depend in large part on its ability to successfully construct its facilities and provide required levels of power. Its business will require on-time and on-budget services at guaranteed performance levels, which would tend to establish greater confidence in its subsequent customers. There is no guarantee that all necessary components will be commercially available and substantial development of new supply chains might be necessary. Additionally, ONE Nuclear cannot guarantee the level of quality of these third-party supplies or import and export requirements or limitations that might be stipulated by the NRC or the U.S. Department of Energy (“DOE”) for the procurement of these components. Some of ONE Nuclear’s equipment may require repair or replacement, which could further delay development at its planned projects. Only a limited number of large contracting and engineering firms have the skills or experience to design and construct nuclear reactors. The lack of recent nuclear reactor construction projects in the United States means that there are few organizations with substantial institutional and personal knowledge of such projects. In addition, certain craft labor, particularly welding, on a nuclear reactor construction project requires a very high degree of skills and experience on the part of the laborers, meaning few qualified candidates may be available. The resurgent interest in nuclear energy projects, along with strong demand for such labor on other energy or infrastructure projects of similar complexity, means that securing and retaining the properly qualified workforce may be difficult, time consuming, and/or require competitive bidding, representing significant cost and schedule risks to the project.

 

There is no guarantee that the planned construction, delivery, and performance of ONE Nuclear’s power projects or the equipment ONE Nuclear needs to generate electricity will be successful, timely, or on budget or that its third-party suppliers and contractors will deliver timely or on budget. There is no guarantee that ONE Nuclear’s facility pre-operational and startup testing, including tests mandated as license conditions by the NRC, will be successfully completed on-time. Furthermore, ONE Nuclear may experience delays, operational or process failures, repair down-times and other problems during its first commercial deployment or any planned deployment thereafter. In addition, there can be no assurance that the construction of ONE Nuclear’s power generation facilities will be completed at the cost and on the timeline ONE Nuclear expects. ONE Nuclear will depend on third-party contractors to perform many of the essential activities needed to complete and deploy its power projects. ONE Nuclear will not control the performance of these contractors and its contracts with them may not provide adequate remedies if they fail to perform. ONE Nuclear does not currently employ any risk sharing structures to mitigate the risks associated with the construction, delivery and performance of its facilities. Any delays or setbacks ONE Nuclear may experience for its first operational project, as well as any failure to obtain final investment decisions for future orders could have a material adverse effect on its business prospects, financial condition, results of operations and cash flows and could harm its reputation.

 

48

 

 

ONE Nuclear may not receive the full amount of tax abatements or other incentives expected from the jurisdictions in which its projects are located.

 

ONE Nuclear expects to apply for property tax abatement with many of the jurisdictions in which its power projects are or will be located, which abatement may not be approved on the terms requested, or at all. A denial or reduction of such incentives could impact projected project economics and delay or limit available capital for reinvestment in ONE Nuclear’s sites. Even if approved, abatement eligibility may be subject to ongoing compliance with construction timelines, workforce commitments, and property valuation methodologies.

 

State regulation of sales of power to co-located customers could prevent or limit our behind-the-meter business model.

 

Our strategy depends on selling power from generation facilities located behind the meter of, or co-located with, data center and industrial customers. In certain states, including Louisiana, the state utility commission may treat a sale of power by a co-located generator directly to a customer as a retail sale subject to state utility regulation. If a state regulator takes that position for one of our projects, we may be unable to sell power directly to the co-located customer, may be required to sell power through a utility or another licensed entity, or may become subject to rate, licensing or other regulation. Any of these outcomes could delay or prevent our projects, reduce their revenues or make them uneconomic, and could have a material adverse effect on our business, financial condition and results of operations.

 

We may lose our rights to our Louisiana sites if we do not enter into option agreements before our Letters of Intent (LOIs) expire on December 31, 2026, or if we are unable to fund the required option payments.

 

Our rights to the Project Cayman and Project Amberjack sites arise under binding LOIs that expire on December 31, 2026. To retain those sites, we must negotiate and enter into option to purchase agreements before the LOIs expire and pay non-refundable option consideration in four annual installments beginning January 1, 2027, with the first installments totaling approximately $1.9 million. If we do not enter into the option agreement for the Project Cayman site and pay the first installment by December 31, 2026, we must also pay a $50,000 fee. We will need additional financing to make these payments, and there can be no assurance that it will be available. If we cannot agree on option agreements, or cannot fund the option payments when due, we may lose our rights to these sites, which are central to our development pipeline, and any amounts we have paid will not be refunded.

 

Risks Related to Regulatory Environment and Energy Generation

 

Nuclear energy development is subject to extensive regulation and uncertainty, which could materially delay or impair ONE Nuclear’s business.

 

ONE Nuclear’s business depends heavily on the successful execution of a development plan that includes the identification, development, construction and operation over time of multiple power generation projects, including nuclear reactors and gas-fired generation assets. Each component and project introduces regulatory, financial, operational, and technological risks.

 

Over time, ONE Nuclear plans to develop multiple nuclear reactors, supplemented by gas-fired generation and battery storage. This timeline introduces significant long-term capital exposure, regulatory coordination, construction risk, and supply chain vulnerability. While construction of new nuclear power plants in other countries has progressed more efficiently than in the past, construction of nuclear power plants in the U.S. has slowed dramatically in the last twenty years.

 

49

 

 

Construction of the Southern Company’s recent Vogtle nuclear power plant, built in Georgia, took approximately fifteen years. In May 2025, the White House issued executive orders aimed at accelerating U.S. nuclear deployment—including Executive Order 14300 (discussed below) and a directive instructing the U.S. Department of Energy (“DOE”) to use its authority under the Atomic Energy Act (“AEA”) to authorize new test reactors with a target of achieving criticality by July 4, 2026. Although these initiatives are intended to streamline federal nuclear permitting, there can be no guarantee that they will shorten commercial reactor licensing timelines, that any resulting regulatory reforms will withstand legal challenges, or that current or future Presidential administrations will not modify or reverse these directives. Indeed, certain recent nuclear power plant projects have taken more than ten years from commencement to completion. Delays or disruptions in any phase could impair ONE Nuclear’s overall development timeline, reduce forecasted revenue, and increase financing costs.

 

Each reactor will, among other things, require:

 

● full compliance with NRC licensing, testing, and inspection frameworks;
● multi-year site preparation and nuclear-grade infrastructure installation; and
● ongoing adherence to evolving federal safety standards.

 

Failure to secure timely approvals, maintain regulatory compliance, or meet critical milestones may delay or prevent the commencement of construction and the operation of ONE Nuclear’s nuclear units.

 

All elements of nuclear infrastructure will remain subject to the oversight of the NRC and potentially other federal and state agencies. ONE Nuclear intends to submit various applications to the NRC under Part 52 of the NRC’s regulations (10 CFR Part 52) (“Part 52”). The NRC’s review of ONE Nuclear’s COL Application will involve environmental impact assessments, pre-application safety evaluations, analysis of ONE Nuclear’s proposed construction of each nuclear reactor, as well as ONE Nuclear’s proposed operation of each nuclear reactor, which will involve site-specific safety analysis reports, testing, inspection, and operating conditions. The NRC’s review process involves an analysis of the proposed site for the nuclear reactor, which is why some applicants seek an early site permit from the NRC prior to submitting the COL Application.

 

ONE Nuclear’s license application under Part 52 of the NRC’s regulations (10 CFR Part 52) (“Part 52”) will need to achieve specified milestones prior to final approval. The Part 52 license is a combined construction and operating license, with parallel licensing tracks related to safety and the environment converging on a mandatory hearing and an ultimate decision at the end of the process.

 

NRC performs a safety review of each reactor application to assess whether it provides reasonable assurance of adequate protection of public health and safety. This involves review of preliminary and Final Safety Analysis Reports. NRC can request additional information during this review, or the parties can agree on a regulatory audit. Prolongation of this process poses a significant cost and schedule risk to ONE Nuclear’s proposed nuclear power projects.

 

NRC concurrently performs an environmental review which incorporates compliance with the National Environmental Policy Act (“NEPA”). NEPA reviews typically require preparation of an Environmental Impact Statement (“EIS”), which is the most detailed level of review provided for under NEPA, though the NRC has recently attempted to perform less intensive Environmental Assessments (“EA”). It is noteworthy that the DOE has previously implemented a modification of its NEPA review regulations that includes several enumerated “categorical exclusions,” which are intended to safely reduce the time required to produce EA and EIS reviews for components of new nuclear power plants that will be subject to such “categorical exclusions,” thereby not requiring an environmental analysis of such components. However, there is no guarantee that ONE Nuclear will be able to qualify for any of these exceptions. Whether performing an EIS or an EA, the environmental review process may be time consuming, and changes or delays to the process present significant cost and schedule risks for ONE Nuclear’s proposed power projects.

 

50

 

 

The COL Application will incorporate by reference a chosen reactor design. Though the combined license will include the right to operate the reactor, it will be contingent on construction of the reactors conforming exactly to the design, with accuracy measured by a series of Inspections, Tests, Analyses, and Acceptance Criteria (“ITAAC”) derived from both the design certification and certain site specific characteristics, and evaluated by the NRC as part of a quality assurance regime, which involves thousands of hours of inspection during construction. Modifying ITAAC, which may be required due to shifts in the sequence of construction, requires submitting a modification request to the NRC. ITAAC must be successfully “closed” before operation can begin and, no later than 270 days prior to the date of initial fuel loading for the reactor, the NRC will publish a notice of intended operation in the Federal Register which allows any person whose interests may be affected by plant operation the opportunity to request a hearing within 60 days of the publication of the Federal Register notice on whether the facility as constructed complies, or on completion will comply, with the acceptance criteria in the combined license. The possibility of delay, rework, analysis, and other mitigation resulting from ITAAC nonconformances, along with the potential for ITAAC hearings, pose significant cost and schedule risks to reactor completion.

 

In addition to potential ITAAC hearings and opportunities for public engagement throughout the licensing process, there is a mandatory license hearing required by the AEA at which the NRC and the license applicant present detailed evidence. This process takes a significant amount of time, and the possibility of delay represents a significant cost and schedule risk to ONE Nuclear’s power projects. While the public cannot directly participate in the mandatory hearing, the public can challenge the NRC’s review of the reactor application through the contested hearing process. Should contested hearings occur, they also present a significant cost and schedule risk to ONE Nuclear’s proposed power projects.

 

On May 23, 2025, President Trump issued Executive Order 14300 “Ordering the Reform of the Nuclear Regulatory Commission” which directed, among other actions, the NRC to undertake a review and wholesale revision of its regulations and guidance documents, issue notice(s) of proposed rulemaking and establish fixed deadlines of no more than 18 months for a final decision on an application to construct and operate a new reactor of any type, commencing with the first required step in the regulatory process and 12 months for an application to renew an existing operating license. It is unclear how these ongoing rulemaking proceedings resulting from Executive Order 14300 will revise Part 52. Should the resulting revisions require new or revised information to be submitted, that submission may delay the project, representing a significant cost and schedule risk. Should the new rules issued be legally challenged, it may delay open applications, also representing a significant cost and schedule risk to ONE Nuclear’s proposed power projects.

 

The regulatory review and approval process for ONE Nuclear to obtain a license authorizing the construction and the operation of each nuclear reactor can take several years, and any delays, objections, or changes in NRC policy or staff interpretations could materially postpone the start of nuclear power generation at ONE Nuclear’s proposed power projects. If ONE Nuclear’s applications are denied or subject to material conditions, it could significantly impact ONE Nuclear’s ability to deliver nuclear generated electric energy.

 

ONE Nuclear’s development plan requires ongoing engagement with the NRC, the DOE, and other agencies. For example, if one or more of ONE Nuclear’s nuclear reactors are interconnected to the transmission grid, then (i) that nuclear power plant would become part of the bulk power system and would have to comply with NERC and MRO reliability requirements, and (ii) that nuclear power plant would be subject to the grid interconnection process with various regulatory bodies, and the resulting interconnection agreement may need to be filed with FERC.

 

Changes in regulatory guidance, inspection regimes, or political oversight of nuclear infrastructure could affect the scope, timing, or cost of reactor design, development, construction, interconnection to the grid (if applicable), and operation.

 

If the NRC declines to issue a combined construction and operation license for any of ONE Nuclear’s planned reactors, or if FERC, SPP, NERC, MRO or the interconnecting utility imposes unexpected conditions on construction, operation, or interconnection of any of ONE Nuclear’s planned reactors, its strategy could be materially impaired. In addition, evolving federal standards on advanced reactors, emissions, and environmental impact reporting could require redesign or re-licensing of systems already under development.

 

51

 

 

ONE Nuclear may not obtain timely or successful regulatory approvals for nuclear development, which would materially impair its business model.

 

ONE Nuclear’s nuclear generation strategy will depend on its ability to obtain one or more combined COLs from the NRC under NRC Regulations. Nuclear power plants are subject to extensive federal regulation and must meet highly specific siting, safety, environmental, and technical criteria under NRC’s regulations. Although ONE Nuclear expects to submit a combined COL Application, the NRC’s review process is extensive and can span multiple years. Delays or denial of license issuance, imposition of additional safety reviews or design modifications, or adverse public or political opposition could prevent or delay construction start or commercial operation dates.

 

Further, the issuance of a COL is contingent on regulatory findings that satisfy the NRC’s standards for construction and operation, as well as environmental, seismic, and emergency planning criteria, as set forth in a final safety analysis report that addresses the “site” requirements of the NRC regulations. Any change in regulatory posture, litigation, or adverse environmental assessments could substantially impair ONE Nuclear’s ability to bring nuclear units online. The duration of a combined license, if issued, is 40 years from the date the NRC makes its finding that acceptance criteria have been met. ONE Nuclear cannot guarantee that any license will be issued, or that issued licenses will remain valid over the life of its projects.

 

The Nuclear Waste Policy Act (“NWPA”) (42 U.S.C. §10101 et seq.) directed the selection and creation of a national deep geological repository for the long-term storage of spent nuclear fuel. Efforts to identify, license, and construct this site have failed, resulting in nearly all spent nuclear fuel being stored on-site at licensee facilities. A fee which the DOE was previously assessing on reactor operators has been suspended pending resolution of the storage issue. The storage of such spent fuel on-site, with the prospect that no geological repository will be available for many years, creates several potential risks to ONE Nuclear’s power projects. Recently, in Nuclear Regulatory Commission v. Texas, 605 U.S. 665 (2025), the Supreme Court of the United States rejected a challenge to the NRC’s ability to license temporary offsite storage of spent nuclear fuel. Such temporary storage onsite would represent an additional cost to ONE Nuclear. Several startups and organizations are exploring the economic potential of fuel recycling, which is a common practice in France, but ONE Nuclear can provide no assurance that ONE Nuclear could incorporate such fuel recycling.

 

ONE Nuclear may not be able to obtain sufficient water resources for its operations, which could materially impair its operations or impact its ability to expand its operations.

 

ONE Nuclear’s operations for advanced nuclear sites require significant quantities of water for cooling, steam generation and other processes. The availability of adequate water supplies will be essential to the operations and expansion of ONE Nuclear’s proposed nuclear power projects. Prolonged droughts, changes in precipitation patterns, increased competition for water resources or the implementation of a more stringent regulatory regime regarding water rights and water usage (or changes to such regulatory regime) could limit ONE Nuclear’s ability to obtain sufficient water for its proposed nuclear power projects. If ONE Nuclear is unable to secure the necessary water resources, ONE Nuclear could be forced to limit its operations or undergo a costly technical re-design or relocation. Additionally, increased cost of obtaining and treating water or compliance with other environmental regulations related to water could adversely affect ONE Nuclear’s financial conditions and results of operations.

 

ONE Nuclear’s costs to comply with federal, state and local environmental laws and regulations—both existing and new—may be material.

 

ONE Nuclear’s business is subject to extensive, evolving, and increasingly stringent federal, state, and local environmental laws and regulations. Such federal, state, and local environmental laws and regulations govern ONE Nuclear’s activities, including those laws and regulations with respect to air emissions, waste disposal, protection of environmentally sensitive areas or endangered, threatened or otherwise protected species, protection of archaeological or cultural resources, water use and discharges, and with respect to the treatment, storage, recycling, disposal, and transportation of hazardous and solid waste and low-level radioactive waste. These laws and regulations impose numerous requirements, including requiring permits to conduct hazardous and non-hazardous activities, incurring costs to limit or prevent pollution or releases of regulated materials to the environment, and imposing substantial civil, administrative and criminal penalties and liabilities for noncompliance. Noncompliance may also result in injunctive relief and potential third-party claims or citizen suits to enforce such laws and regulations. These laws and regulations may impose joint and several liability upon ONE Nuclear to address pollution or contamination on its projected power project sites, regardless of whether ONE Nuclear caused the pollution or contamination. ONE Nuclear may incur substantial costs to obtain and maintain compliance with environmental laws and regulations.

 

52

 

 

Changes in laws and regulations can occur and these changes can be difficult to predict. New laws or regulations, or more stringent enforcement of existing laws or regulations, could adversely affect ONE Nuclear’s business, financial condition and results of operations.

 

If ONE Nuclear cannot obtain required permits, licenses and regulatory clearance or approvals for its proposed power projects or its operations, or is unable to maintain such permits, licenses or approvals, ONE Nuclear may not be able to continue or expand its operations.

 

Under environmental laws and regulations ONE Nuclear will be required to obtain and maintain permits or licenses to conduct its activities and then to conduct those activities in compliance with such permits and licenses as well as with environmental laws and regulations. Issuance of permits for ONE Nuclear’s proposed projects and activities will be subject to the discretion of government authorities, and ONE Nuclear may be unable to obtain or maintain such permits. Permits required for future development may not be obtainable on reasonable terms or on a timely basis. There can be no assurance that ONE Nuclear will be able to obtain or maintain any of the permits required for the development of its proposed power projects (or any other properties that ONE Nuclear may subsequently acquire).

 

Failure to obtain and maintain the required permits or licenses or failure to comply with environmental laws and regulations would have a material adverse effect on ONE Nuclear’s operations and financial condition. If any of ONE Nuclear’s facilities are unable to maintain permits or licenses or obtain any additional permits or licenses which may be required to conduct its operations, ONE Nuclear may not be able to continue those operations at these facilities, which could have a material adverse effect on ONE Nuclear’s business and operations.

 

Decommissioning costs and unresolved spent nuclear fuel storage and disposal policy issues, as well as current U.S. policy related to storage and disposal of used fuel from ONE Nuclear’s power plant, and/or negative customer perception of risks relating to these policies could have a significant negative impact on ONE Nuclear’s business prospects, financial condition, results of operations, and cash flows.

 

During the licensing process, a nuclear power plant operator must indicate how it will decommission its power plant and must have a “standard agreement” with the DOE related to the storage of the fuel waste created during the plant’s operating life. The requirements for developing the facility for fuel disposal may create both timing and cost challenges.

 

Specifically, the Nuclear Waste Policy Act of 1982 requires the DOE to provide for the permanent disposal of spent nuclear fuel (“SNF”) and associated high-level nuclear waste (“HLW”). In 1987, Congress amended the Nuclear Waste Policy Act to identify Yucca Mountain, in Nevada, as the only site that the DOE could consider for a permanent repository. The DOE has since failed to pursue the licensing of Yucca Mountain. While operators are currently able to successfully sue the DOE for costs incurred as a result of its continued failure to provide for permanent disposal, there is a potential in the future that operators may have to bear the costs of developing and maintaining these spent fuel storage facilities.

 

As such, the establishment of a national repository for the storage and/or permanent disposal of SNF, such as the one previously considered at Yucca Mountain, Nevada, the timing of such a facility’s opening and the ability of such a facility to accept waste from ONE Nuclear’s nuclear facilities, and any related regulatory action, could impact the costs associated with its powerhouses’ storage and/or disposal of SNF/HLW. These issues could be material to ONE Nuclear’s operations if potential customers view waste disposal issues or the onsite storage of SNF as problematic, detrimental or a negative factor in considering purchasing power produced by its reactors.

 

53

 

 

ONE Nuclear will be subject to laws and regulations governing the use, transportation, and disposal of toxic, hazardous and/or radioactive materials. Failure to comply with these laws and regulations could result in substantial fines and/or enforcement actions.

 

ONE Nuclear’s operations will be subject to a variety of federal, state, local environmental, health and safety laws and regulations governing, among other things, air emissions, wastewater discharges, management and disposal of hazardous, non-hazardous, radioactive materials and waste and remediation of releases of hazardous materials. A release of such toxic, hazardous and/or radioactive materials could pose a health risk to humans or animals.

 

The severity of an accidental release often depends on the volume of the release and the speed of corrective action taken by emergency response personnel, as well as other factors beyond releasor’s control, such as weather and wind conditions. Actions taken in response to an actual or suspected release of these materials, including a precautionary evacuation, could result in significant costs for which ONE Nuclear could be legally responsible. In addition to health risks, a release of these materials may cause reputational damage to the project and could result in the loss of or damage to property and may adversely affect property values.

 

Additionally, ONE Nuclear will be responsible for the decommissioning of facilities where ONE Nuclear will conduct, conducts, or previously conducted, commercial, NRC-licensed, operations. Activities of ONE Nuclear’s contractors, suppliers or other counterparties similarly may involve toxic, hazardous, and radioactive materials and ONE Nuclear will be or may be liable, contractually or under applicable law, to contribute to the remediation of damage or other costs arising from such activities, including the decontamination and decommissioning of third-party facilities.

 

ONE Nuclear may be liable if ONE Nuclear fails to comply with federal, state, and local environmental, health and safety laws and regulations with respect to hazardous or radioactive materials. Failing to comply with such laws and regulations, including failing to obtain any necessary permits, could result in substantial fines or enforcement actions. These actions might require ONE Nuclear to stop or curtail operations or conduct or fund remedial or corrective measures, make additional investments into safety-related improvements or perform other actions. The enactment of more stringent laws, regulations or permit requirements or other unanticipated events may arise in the future and adversely impact ONE Nuclear’s ability to operate, which could materially and adversely affect ONE Nuclear’s business, financial condition, and results of operations. ONE Nuclear could incur substantial costs as a result of a violation of, or liabilities under, environmental laws.

 

Nuclear project execution depends on specialized vendors, whose failure or delay could materially impact ONE Nuclear’s business.

 

ONE Nuclear’s nuclear facilities will rely heavily on manufacturers of nuclear reactors and their partners for design compliance, engineering support, component manufacturing, and field commissioning. While ONE Nuclear is in active discussions with multiple reactor manufacturers regarding the procurement of reactors, ONE Nuclear does not have a binding agreement with any such manufacturer for such procurement and can provide no assurance regarding the timing or terms of such agreement. Nuclear reactors are highly sophisticated and integrated systems that depend on successful vendor coordination. Failure by any key subcontractor or vendor to meet quality, schedule, or cost obligations could delay commercial operation dates.

 

ONE Nuclear will be subject to execution risks with respect to its natural gas power sources.

 

While ONE Nuclear’s planned natural gas offerings will diversify power generation, it introduces risks related to:

 

● fuel pricing volatility and natural gas pipeline transportation issues;

● equipment procurement and construction timing for combined cycle combustion turbine gensets and reciprocating engines; and

● battery safety, longevity, and regulatory fire protection standards.

 

ONE Nuclear’s decision to deploy a large number of reciprocating engines on an accelerated schedule introduces execution risks related to equipment availability, procurement timelines, and construction labor. While this approach enhances system reliability and reduces reserve capacity requirements, it also increases the complexity of coordination across multiple vendors, EPC contractors, and commissioning phases. Delays in reciprocating engine delivery, civil works, or fuel routing may materially adversely impact the readiness of initial MW blocks or delay the commissioning of downstream combined cycle assets. In addition, fuel consumption may expose the project to sensitivity around long-term gas supply contracting and volume stability.

 

54

 

 

Furthermore, ONE Nuclear will be reliant on third-party OEMs and EPC contractors for project delivery, and disruptions or quality control issues could affect its energy availability and cost structure. Failure to become operational in full compliance with all applicable regulatory standards could materially impair ONE Nuclear’s operational timelines, future project timeline, and long-term value. ONE Nuclear continues to engage proactively with relevant agencies, advisors, and policymakers to mitigate these risks.

 

ONE Nuclear will be subject to complex, evolving, and potentially burdensome regulatory requirements.

 

ONE Nuclear’s business will be subject to regulation by various federal, state and local governmental agencies. In the United States, such regulation includes the radioactive material exposure and nuclear facilities regulatory activities of the NRC, the DOE, NERC, MRO, FERC, various state regulators, the anti-trust regulatory activities of the Federal Trade Commission and Department of Justice, the import/export regulatory activities of the Department of Commerce, the Department of State and the Department of Treasury, the regulatory activities of the Department of Labor (including the Occupational Safety and Health Administration), the regulations of the FDA, the environmental regulatory activities of the Environmental Protection Agency, the regulatory activities of the Equal Employment Opportunity Commission and tax and other regulations by a variety of regulatory authorities in each of the areas in which ONE Nuclear will conduct business. These include licensing of nuclear power plants, environmental reviews, safety assessments, emissions and discharge standards for environmental contaminants (including discharges to air and water, as well as waste disposal), and water use permitting. Regulatory approvals may impose restrictions, conditions, or delays that impact project economics or construction sequencing.

 

The NRC may modify, suspend, or revoke licenses, shut down a nuclear facility and impose civil penalties for failure to comply with the Atomic Energy Act, the NRC’s regulations thereunder, or the terms of the licenses for construction and operation of nuclear facilities.

 

Interested parties may also intervene and file protests against ONE Nuclear and its power projects, which could result in prolonged proceedings. A change in the Atomic Energy Act, other applicable statutes, or the applicable regulations or licenses, or the NRC’s interpretation thereof, may require a substantial increase in capital expenditures or may result in increased operating or decommissioning costs and could materially affect the results of operations, liquidity, or financial condition of ONE Nuclear. A change in the classification of a plant owned by one of these companies under the NRC’s reactor oversight process, which is the NRC’s program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response, also could cause the owner of the plant to incur material additional costs as a result of the increased oversight activity and potential response costs associated with the change in classification.

 

Changes in laws or regulations or shifts in political or public sentiment against nuclear or energy development, could materially increase compliance burdens or limit ONE Nuclear’s ability to operate.

 

Accidents involving nuclear power facilities, including but not limited to events similar to the Three Mile Island or Fukushima Daiichi nuclear accidents, or other high profile events involving radioactive materials, could materially and adversely affect the public perception of the safety of nuclear energy, ONE Nuclear’s customers and the markets in which ONE Nuclear operates and potentially decrease demand for nuclear energy or facilities, increase regulatory requirements and costs or result in liabilities or claims that could materially and adversely affect ONE Nuclear’s business.

 

Historical nuclear accidents and/or future incidents resulting in the uncontrolled release of radioactive material and fears of a new nuclear accident could hinder ONE Nuclear’s efforts to develop new nuclear facilities. Nuclear power faces strong opposition from certain individuals and organizations both in the United States and abroad. With respect to public perceptions, the accident that occurred at the Fukushima nuclear power plant in Japan in 2011 increased public opposition to nuclear power in some countries, resulting in a slowdown in, or, in some cases, a complete halt to new construction of nuclear power plants, an early shut down of existing power plants and a dampening of the favorable regulatory climate needed to introduce new nuclear technologies. As a result of the Fukushima accident, some countries that were considering launching new domestic nuclear power programs delayed or cancelled the preparatory activities they were planning to undertake as part of such programs. In the past, adverse public reaction, increased regulatory scrutiny and related litigation contributed to extended licensing and construction periods for new nuclear power plants, sometimes delaying construction schedules by decades, or even shutting down operations at already-constructed nuclear power facilities.

 

55

 

 

Additionally, such an accident could lead to a pause in regulatory approval by the NRC, a change in regulatory compliance requirements increasing the cost and/or delaying the schedule associated with procuring necessary licenses, the creation of new licenses or regulatory requirements, additional governmental oversight concerns and compliance costs, a change in binding international treaties or agreements altering the rules governing the operation of nuclear power facilities or a change in the liability exposure of the project, a change in rules applying to private ownership of nuclear power facilities, or a ban on nuclear power. Such an accident need not occur at one of ONE Nuclear’s power projects or within the United States to result in these public and governmental reactions and requirements.

 

Successful execution of ONE Nuclear’s business model will depend upon public and political support for nuclear power in the United States and other countries. The risks associated with uses of radioactive materials by ONE Nuclear’s customers, and the public perception of those risks, can affect ONE Nuclear’s business. Opposition by third parties can delay or prevent the licensing and construction of new nuclear power facilities and in some cases can limit the operation of nuclear reactors. Adverse public reaction to developments in the use of nuclear power could directly affect ONE Nuclear’s customers and indirectly affect its business. If a high-visibility or high-consequence nuclear incident, including the loss or mishandling of nuclear materials, or other event, such as a terrorist attack involving a nuclear facility, occurs, public opposition to nuclear power may increase dramatically, regulatory requirements and costs could become more onerous or prohibitive, and customer demand could suffer, which could materially and adversely affect ONE Nuclear’s business prospects, financial condition, results of operations and cash flows.

 

ONE Nuclear will be subject to federal environmental review processes, including NEPA, that may materially delay or restrict project development.

 

Portions of ONE Nuclear’s development may trigger federal environmental reviews under NEPA, depending on the use of federal funding, involvement of federal lands or water systems, or participation in programs such as the DOE Loan Programs Office. These processes require environmental assessments or environmental impact statements, which can introduce significant uncertainty and delay. In some cases, NEPA reviews can take multiple years to complete and are subject to litigation by environmental advocacy groups or local stakeholders. The DOE published the interim final rule on July 3, 2025, at 90 FR 29676, which amends much of 10 CFR 1021, the regulations for DOE’s procedures for implementing NEPA. It also proposes an exemption from certain NEPA requirements for emergency situations. Notably, President Trump declared a national energy emergency on January 20, 2025, and there is an ongoing national emergency concerning cyber-enabled activities. These declarations could provide opportunities for ONE Nuclear to seek exemptions to certain resource consuming permitting requirements associated with ONE Nuclear’s planned operations. Alternatively, a change to these policies could result in additional costs and delays in licensing.

 

Adverse findings or delays in NEPA review could prevent site preparation, construction, or interconnection activities any of which would materially adversely affect ONE Nuclear’s business, results of operations and financial condition. ONE Nuclear may also face indirect delays if third-party infrastructure (e.g., gas pipelines or transmission upgrades) triggers NEPA reviews beyond its control.

 

Additionally, recent action taken by the current presidential administration has resulted in changes to NEPA regulations. Although guidance released by the administration advises the implementation of NEPA in a way that expedites permitting and prioritizes energy production, the impact of these recent actions may result in delays as these changes are understood and then executed by applicable federal agencies.

 

56

 

 

Regulatory changes or political shifts could materially adversely affect nuclear licensing and financial feasibility.

 

Nuclear policy in the United States is evolving, including through the passage of the ADVANCE Act in 2024 and through the efforts of the Trump Administration. While recent years have seen bipartisan support for advanced reactor deployment and DOE funding programs (e.g., the Advanced Reactor Demonstration Program), the regulatory and political environment may change. Shifts in federal administration, state-level opposition, or judicial challenges to nuclear permitting frameworks could create uncertainty or add cost burdens. Similarly, changes in tax credit policy or low-carbon energy investment programs could materially reduce the financial attractiveness of nuclear energy at ONE Nuclear’s proposed power projects.

 

Commodity prices (particularly for natural gas) could impact the economic viability of ONE Nuclear’s businesses or impair its ability to commence operations if ONE Nuclear is not able to adequately pass through the cost of natural gas and other raw materials to its customers.

 

Natural gas will represent the primary fuel necessary to generate the initial power at ONE Nuclear’s power projects. Although ONE Nuclear expects to enter into contracts with its customers that will provide for contractual pass-through provisions relating to the cost of natural gas, there are no assurances that the costs of natural gas prices will be effectively passed through or that ONE Nuclear will be able to offset fully, or on a timely basis, the effects of higher natural gas costs. Commodity prices are inherently volatile and are subject to fluctuations in response to changes in supply and demand, market uncertainty and a variety of additional factors that are beyond ONE Nuclear’s control. ONE Nuclear’s business depends heavily on the successful execution of an energy development plan that includes the construction and operation of numerous gas-fired generation assets that will require an increase in baseline fuel consumption, which may expose the projects to higher sensitivity around long-term gas supply contracting and volume stability. While ONE Nuclear expects to secure strategic relationships with gas providers, ONE Nuclear will remain exposed to fluctuations in natural gas prices. If ONE Nuclear is not able to effectively pass through the cost of natural gas or other raw materials to its customers, fluctuations in commodity prices have the potential to negatively impact its ability to achieve its earnings or cash flow targets, which could have a material adverse effect on its business, results of operations and financial condition. In addition, actual power prices and fuel costs will differ from those assumed in financial projections used to value ONE Nuclear’s trading and marketing transactions, and those differences may be material. As a result, ONE Nuclear’s financial results may be diminished in the future as those transactions are marked to market.

 

Furthermore, worldwide political, economic, and military events have contributed to oil and natural gas price volatility and are likely to continue to do so in the future. The broader consequences of the Russian-Ukrainian conflict and unrest in the Middle East, which may include further sanctions, embargoes, supply chain disruptions, regional instability and geopolitical shifts, may have adverse effects on global macroeconomic conditions, increase volatility in the price and demand for oil and natural gas, increase exposure to cyberattacks, cause disruptions in global supply chains, increase foreign currency fluctuations, cause constraints or disruption in the capital markets and limit sources of liquidity. ONE Nuclear cannot predict the extent of the conflicts’ effects on its business and results of operations as well as on the global economy and energy markets.

 

ONE Nuclear’s natural gas supply will be subject to market volatility and pipeline transportation risk.

 

While ONE Nuclear expects to secure strategic relationships with natural gas providers and natural gas pipelines, and to negotiate a pass-through of gas prices entirely to the buyer of electricity within Power Purchase Agreements, ONE Nuclear may be exposed to the impact of fluctuations in natural gas prices. Price spikes, regional delivery bottlenecks, pipeline outages, weather-related interruptions to wellhead production and related impacts on available pipeline deliveries, or contractual disputes could increase ONE Nuclear’s levelized cost of energy (“LCOE”) and reduce margin on take-or-pay tenant contracts. Delivery of natural gas will depend on functional and contractual pipeline interconnects. In addition, the use of alternative forms of transportation such as trucks or rail transportation of LNG involve risks as well. For example, recent and well-publicized accidents involving trains delivering energy commodities could result in increased levels of regulation and transportation costs. ONE Nuclear’s gas providers are dependent on third-party pipeline infrastructure to deliver their natural gas production to ONE Nuclear. In addition to causing production curtailments, capacity constraints can also increase the price ONE Nuclear pays for natural gas.

 

57

 

 

Our energy generation strategy requires multi-year planning and access to specialized equipment.

 

Nuclear reactors, gas turbines, reciprocating engines, HRSGs, transformers, and utility-scale battery systems all require long lead-times and complex shipping, staging, and installation logistics. Certain assets, like turbines, may only be available on the secondary market or through refurbishment programs. Any failure to source or deploy these assets in a timely manner could affect ONE Nuclear’s development schedule and financial forecast.

 

In addition, ONE Nuclear may fail to meet requirements for energy-related federal incentives. ONE Nuclear expects to rely on potential eligibility for numerous federal energy programs and tax incentives, such as the:

 

● 45J Nuclear Production Tax Credit;
● 45Q Carbon Capture Tax Credit;
● 45V Clean Hydrogen Tax Credit; and
● 48C Advanced Manufacturing Credit.

 

Each of these programs has eligibility thresholds, domestic content rules, prevailing wage mandates, and reporting burdens. If ONE Nuclear is unable to structure its SPEs or operations to meet these requirements, ONE Nuclear may forfeit millions of dollars in expected benefits or financing backstops. In addition, changes to these credits currently under review by President Trump, the U.S. House of Representatives and the U.S. Senate, or under subsequent review in the future, due to tax reforms or political policy redirection initiatives, could materially adversely reduce the return profile of ONE Nuclear’s energy assets.

 

ONE Nuclear may be subject to opposition from environmental groups, litigation, or reputational campaigns, which could delay permitting or reduce site flexibility.

 

New nuclear projects as well as some other types of energy projects (and their associated infrastructure) in the United States frequently face opposition from non-governmental organizations, environmental advocacy coalitions, and some local stakeholders. In addition, there has been a growing, coordinated resistance to the development and operation of AI data centers and other data centers and hyperscalers. These groups may challenge NRC proceedings, file administrative appeals, or initiate litigation under NEPA, the Clean Water Act, or the Endangered Species Act (“ESA”) as well as challenge government activities to grant required environmental permits. Even unsuccessful litigation can delay project timelines, increase legal costs, and discourage investors or tenants.

 

Furthermore, reputational campaigns in media or political venues, particularly those focused on water usage, emissions from backup gas infrastructure, or perceived AI overreach, may generate public controversy that slows permitting or discourages tenant commitments.

 

In addition, future power projects will interact with environmental and public stakeholder processes, especially regarding land selection, nuclear permitting, air quality emissions, and water usage. Any local opposition or environmental group litigation could restrict ONE Nuclear’s ability to expand or require costly mitigation efforts.

 

Risks Related to ONE Nuclear’s Governance and Operating Model

 

ONE Nuclear will rely on a highly concentrated leadership team and may face succession or key personnel risks.

 

ONE Nuclear is led by a senior management team with extensive experience in the management and development of energy and infrastructure projects. ONE Nuclear’s team includes individuals with deep institutional knowledge of its operating model, site entitlement history, and financing structure. However, ONE Nuclear’s operations and the growth of its business are still dependent on a relatively small group of key personnel. If one or more of ONE Nuclear’s executive officers or senior advisors, including its CEO, CFO, CSO and COO were to become unavailable to ONE Nuclear, ONE Nuclear may not be able to replace their expertise in a timely manner or at all. The loss of their services, and the inability to recruit or retain key personnel, could delay business decisions, impact external relationships, disrupt execution of critical milestones and have a material adverse effect on ONE Nuclear’s business prospects, financial condition and results of operations.

 

58

 

 

In addition, the success of ONE Nuclear’s operations will depend, in part, on its ability to identify, attract, develop and retain experienced personnel. There is competition within ONE Nuclear’s industry for experienced technical personnel and certain other professionals, which could increase the costs associated with identifying, attracting and retaining such personnel. If ONE Nuclear cannot identify, attract, develop or retain key personnel, including technical and professional personnel, its ability to compete in its industry and implement its business plans could be materially harmed.

 

Some members of ONE Nuclear’s management team have limited experience in operating a public company.

 

Some members of ONE Nuclear’s management team, including its executive officers, have limited experience in the management of a publicly-traded company. Their limited experience in dealing with the increasingly complex laws pertaining to public companies could be a significant disadvantage in that it is likely that an increasing amount of their time may be devoted to these activities, which will result in less time being devoted to ONE Nuclear’s business’ management and growth. ONE Nuclear may need to add additional personnel with the appropriate level of knowledge, experience, and training in the accounting policies, practices or internal controls over financial reporting to maintain what is required of public companies in the United States. The development and implementation of the standards and controls necessary for ONE Nuclear to maintain the level of accounting standards required of a public company in the United States may require greater costs than expected. ONE Nuclear could be required to expand its employee base and hire additional employees and advisors to support its operations as a public company, which will increase its operating costs in future periods.

 

ONE Nuclear may enter into related-party transactions that could pose conflicts of interest or governance scrutiny.

 

Certain of ONE Nuclear’s founders, executives, and strategic advisors may in the future be investors, vendors, or partners in Company-related development entities or energy SPEs. However, such dual roles may pose perceived or actual conflicts of interest, particularly in matters of pricing, revenue sharing, or site access. If these conflicts are not properly managed or disclosed, they could damage investor confidence or subject ONE Nuclear to regulatory investigation or litigation.

 

Risks Related to Market Conditions and Macroeconomic Factors

 

Adverse macroeconomic conditions could impair ONE Nuclear’s ability to raise capital or complete development phases.

 

The success of ONE Nuclear’s proposed power projects will depend on continued access to both equity and project-level debt to fund real estate, energy, and infrastructure development. In the event of economic downturns, financial market volatility, interest rate increases, or reduced investor risk appetite, particularly for real asset or infrastructure investments, ONE Nuclear may be unable to secure sufficient capital on acceptable terms or at all. This could result in construction delays, contract renegotiations, or asset impairments, any of which would have a material adverse effect on ONE Nuclear’s business, results of operations and cash flows.

 

Cost overruns and inflationary pressures could materially increase development and operating costs and impact ONE Nuclear’s capital budget and profitability.

 

Construction at the proposed power projects is expected to span multiple years and include capital-intensive civil, electrical, and mechanical engineering work. The prices of steel, concrete, turbine components, piping systems, data center racks, and high-voltage equipment and the associated labor have experienced material inflation in recent years. Similarly, prices for imported materials, equipment and supplies used in ONE Nuclear’s business may also be negatively impacted by tariff policy, which can be inflationary. If inflation or tariffs affect labor rates, raw materials (e.g., steel, concrete), or specialized equipment, ONE Nuclear’s project budgets may increase significantly. Historically, nuclear projects in the U.S. have experienced budget escalations due to engineering rework, licensing scope changes, and schedule slippage. Similarly, labor costs for skilled construction workers, electricians, and qualified engineers continue to rise.

 

59

 

 

If inflation persists or accelerates, the cost to complete ONE Nuclear’s power projects may exceed estimates, reducing return on investment and increasing reliance on additional capital raises. While ONE Nuclear has incorporated contingency planning into its baseline financial models, these provisions may not be sufficient to cover real-time market variability. Unexpected inflation or commodity price shocks may necessitate budget revisions or additional capital raising.

 

Changes in U.S. trade policy, including the imposition of tariffs and the resulting consequences, may have a material adverse impact on ONE Nuclear’s business and results of operations.

 

The United States government has indicated its intent to adopt a new approach to trade policy and in some cases to renegotiate, or potentially terminate, certain existing bilateral or multi-lateral trade agreements. It has also initiated or is considering the imposition of tariffs on certain foreign goods and products. Changes in United States trade policy have resulted in many United States trading partners adopting responsive trade policies, and additional responsive trade policies could be adopted in the future. These measures could materially increase the costs ONE Nuclear incurs in developing, deploying and maintaining its reactors, gas turbines and other long-lead time components.

 

ONE Nuclear will depend on a limited number of suppliers, including suppliers of reactors, gas turbines and other long-lead time system components that may be manufactured overseas, to provide ONE Nuclear, directly or through other suppliers, with items such as equipment for the construction and development of reactors, other components and raw materials. Tariffs on such components would increase ONE Nuclear’s costs to the extent those components are imported into the United States. While a certain portion of the increased costs may be absorbed by certain suppliers, some suppliers may struggle to absorb the increased costs, especially over the long term, potentially leading to supply disruptions or cost pass-throughs to ONE Nuclear, which may lead to an increase in expenditures. Any shortage, delay or component price change from these suppliers, including as a result of changes in exchange rates, taxes or tariffs, could result in sales and installation delays, cancellations and loss of market share. If there are substantial tariffs imposed by the United States on countries from which ONE Nuclear imports certain key products, ONE Nuclear may not be able to pass the cost through to its customers.

 

ONE Nuclear cannot predict future trade policy or the terms of any renegotiated trade agreements and their impact on its business. The adoption and expansion of trade restrictions, the occurrence of a trade war, or other governmental action related to tariffs or trade agreements or policies has the potential to adversely impact demand for ONE Nuclear’s products, costs, customers, suppliers, and the United States economy, which in turn could adversely impact its business, financial condition and results of operations. ONE Nuclear’s attempts to mitigate potential disruptions to its supply chain and offset procurement and operational cost pressures, such as through alternative sourcing and/or increases in the selling prices of ONE Nuclear’s products, may not be successful. To the extent that cost increases result in significant increases in expenditures, or if price increases are not sufficient to offset these increased costs adequately or in a timely manner, and/or if revenues decrease, ONE Nuclear’s business, financial condition or operating results may be adversely affected.

 

Interest rate fluctuations may increase cost of capital and reduce profitability.

 

ONE Nuclear’s proposed power projects will utilize a mix of fixed and variable rate financing instruments across SPEs. Increases in benchmark interest rates, lender spreads, or risk premiums for long-duration infrastructure projects may increase debt service costs, reduce debt availability, or constrain financial flexibility. Rising rates may also reduce the relative attractiveness of ONE Nuclear’s common equity to yield-seeking investors, limiting its ability to raise additional equity capital through future financings.

 

Shifts in federal, state, or local policy may affect permitting, taxation, or infrastructure incentives.

 

ONE Nuclear’s development strategy is currently supported by a policy environment that encourages energy innovation, U.S.-based manufacturing, and advanced infrastructure deployment. However, changes in political leadership or budget priorities at the federal or state level could result in the rollback of tax credits (such as 45Q, 45J, 45V, or 48C), delays in DOE funding programs, or new environmental permitting requirements. At the state level, changes in law or interpretation regarding water rights, transmission access, or land use could materially adversely impact ONE Nuclear’s projects’ ability to expand or conduct core business any of which could materially adversely affect ONE Nuclear’s business.

 

60

 

 

Global supply chain disruptions may delay delivery of critical infrastructure components.

 

ONE Nuclear’s projects will require timely procurement of reciprocating engines, gas turbines, transformers, power electronics, nuclear reactor components, and HVAC systems, among others—many of which originate from international vendors. Acts of God, geopolitical conflict, war, terrorism, social unrest, global health crises, trade restrictions, maritime shipping delays, or semiconductor shortages may result in global supply chain disruptions that could delay site readiness, reduce operational capacity, or force reprioritization of development phases.

 

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

 

In connection with the consummation of the Business Combination on September 23, 2026, the Company issued 150,000 shares of common stock to Cohen & Company Securities, LLC as consideration for services rendered, in a private transaction exempt from registration under the Securities Act pursuant to Section 4(a)(2) thereof. This issuance, together with the other securities issuances associated with the Business Combination, was previously disclosed in the Company’s Current Report on Form 8-K filed with the Securities and Exchange Commission on September 29, 2026.

 

ITEM 3. DEFAULTS UPON SENIOR SECURITIES

 

None.

 

ITEM 4. MINE SAFETY DISCLOSURES

 

Not applicable.

 

ITEM 5. OTHER INFORMATION

 

During the quarter ended September 30, 2026, none of the Company’s directors or officers adopted, modified or terminated a “Rule 10b5-1 trading arrangement” or a “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408(a) of Regulation S-K.

 

Except as disclosed elsewhere in this Quarterly Report on Form 10-Q, there was no information required to be disclosed in a report on Form 8-K during the quarter ended September 30, 2026 that was not previously reported.

 

61

 

 

ITEM 6. EXHIBITS

 

The following exhibits are filed as part of, or incorporated by reference into, this Quarterly Report on Form 10-Q.

 

Exhibit No.   Description
10.1*   Amendment No. 1 to the Forward Purchase Agreement, dated November 14, 2026, by and between ONE Nuclear Energy Inc. and New Circle Capital Solutions LP.
     
10.2*   Global Compensation Settlement Agreement, dated November 15, 2026, by and between ONE Nuclear Energy Inc. and Mark Taylor.
     
31.1*   Certification of Principal Executive Officer Pursuant to Securities Exchange Act Rules 13a-14(a) and 15(d)-14(a), as adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
     
31.2*   Certification of Principal Financial Officer Pursuant to Securities Exchange Act Rules 13a-14(a) and 15(d)-14(a), as adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
     
32.1**   Certification of Principal Executive Officer Pursuant to 18 U.S.C. Section 1350, as adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
     
32.2**   Certification of Principal Financial Officer Pursuant to 18 U.S.C. Section 1350, as adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
     
101.INS*   Inline XBRL Instance Document
101.CAL*   Inline XBRL Taxonomy Extension Calculation Linkbase Document
101.SCH*   Inline XBRL Taxonomy Extension Schema Document
101.DEF*   Inline XBRL Taxonomy Extension Definition Linkbase Document
101.LAB*   Inline XBRL Taxonomy Extension Labels Linkbase Document
101.PRE*   Inline XBRL Taxonomy Extension Presentation Linkbase Document
104*   Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101).

 

* Filed herewith.
** Furnished.

 

62

 

 

SIGNATURES

 

In accordance with the requirements of the Exchange Act, the registrant caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

  ONE NUCLEAR ENERGY INC.
     
Date: November 16, 2026 By: /s/ Richard Taylor
  Name: Richard Taylor
  Title: Chief Executive Officer
    (Principal Executive Officer)

 

  By: /s/ Ann Anthony
  Name: Ann Anthony
  Title: Chief Financial Officer
    (Principal Financial Officer)

 

63

 

Keep reading