Exhibit 99.1

FOR
IMMEDIATE RELEASE
ONE
Nuclear Energy Inc. Reports Third Quarter and Year-to-Date 2026 Financial Results and Highlights Inaugural Public Listing Milestone
| ● | Successfully
closed business combination with Hennessy Capital Investment Corp. VII; commenced trading
on Nasdaq under ticker symbol “ONEN” on September 24, 2026. |
| | |
| ● | Differentiated infrastructure strategy pairing high-efficiency
natural gas generation with advanced Small Modular Reactors (SMRs) for behind-the-meter (BTM)
industrial and heavy use applications. |
| | |
| ● | Multi-Gigawatt development pipeline: Advancing over 7.0 GW of total
generation capacity and 1.8GW of battery storage across the top five strategic U.S. energy platforms. |
| | |
| ● | Management will release a pre-recorded video presentation and project
pipeline walkthrough on November 30, 2026 at 8:30 a.m. ET via the Company’s Investor Relations
website. |
West
Palm Beach, FL — November 16, 2026 — ONE Nuclear Energy Inc. (Nasdaq: ONEN) (“ONE Nuclear” or the “Company”),
an independent power producer focused on developing behind-the-meter islanded energy parks, today announced its unaudited financial and
operating results for the third quarter and nine months ended September 30, 2026.
“Closing
our business combination with Hennessy Capital Investment Corp. VII and listing on Nasdaq marks a foundational milestone for ONE Nuclear,”
said Richard Taylor, ONE Nuclear’s Chief Executive Officer. “The rapid expansion of energy-intensive industrial manufacturing,
next generation computing infrastructure and overall higher power demand has placed an unprecedented strain on congested, centralized
electrical grids across the United States. Utility interconnection queues now stretch for years, while large-scale customers urgently
require reliable, around-the-clock baseload power.”
“Our
behind-the-meter approach provides a solution to this challenge without burdening local rate payers. By deploying high-efficiency natural
gas generation and battery storage on-site first, we deliver rapid speed-to-power and near-term cash flow potential. This creates a non-disruptive
pathway toward zero-carbon baseload energy through Small Modular Reactors (SMRs). With our public corporate structure now established,
we are intensely focused on securing anchor off-take agreements, progressing site development, and structuring corporate and project-level
financing to drive execution.”

Third
Quarter 2026 & Recent Corporate Highlights
| ● | Nasdaq
Public Listing: On September 23, 2026, ONE Nuclear Energy LLC completed its business
combination with Hennessy Capital Investment Corp. VII. The combined entity’s Class
A common stock commenced trading on the Nasdaq Stock Market LLC under the symbol “ONEN”
on September 24, 2026. |
| ● | New
Circle Forward Purchase Agreement (FPA): The Company amended the FPA with New Circle
to receive an advance of $1.0 million. The advance will be repaid by New Circle selling shares
into the market equivalent to $1.3 million. In the event that the FPA expires on December
21, 2026 before New Circle has recovered the full amount owed, the FPA will be extended.
The amendment also permits ONE Nuclear to repay any remaining amounts owed. The amendment
does not modify the reset price at this time. |
| ● | Commercial
Announcements: Introduced our Louisiana portfolio with site control for Projects
Cayman, Barracuda and Amberjack as well as our Letter of Intent with SOO Green to explore
bringing nuclear power to their HVDC project. The Company’s planned developments remain
subject to definitive agreements, applicable approvals and financing. |
| ● | Board
and Key Executive Hires: Appointed four experienced independent board directors and formalized
executive agreements for key operational roles, including the Chief Financial Officer, solidifying
our corporate governance and execution capabilities. |
| ● | Strategic
Acquisition: Integrated the Amino Sustainable Group in conjunction with the appointment
of our Chief Development Officer to expand power project development opportunities. |
Energy
Projects
The
Company develops behind-the-meter power generation projects for industrial customers. With a multi-gigawatt pipeline, our active development
projects include:
| Platform
/ Project |
|
Location |
|
Target
Generation |
|
Battery
Storage |
|
Primary
Off-Take / Milestone |
| |
|
|
|
|
|
|
|
|
| Louisiana
Platform (Cayman, Barracuda, Amberjack) |
|
Baton
Rouge, LA |
|
1,800
MW Gas + 1,000 MW SMR |
|
450
MW / 900 MWh |
|
1,000
MW IT Data Center Campus (Site control established)
|
| |
|
|
|
|
|
|
|
|
| Project
Nexus |
|
Texas
(ERCOT) |
|
400
MW Gas
(+
SMR option) |
|
129
MW / 257 MWh |
|
Co-located
data center; targeting 2029 COD |
| |
|
|
|
|
|
|
|
|
| Project
Sunshine |
|
San
Juan County, NM |
|
1,000
MW Gas |
|
250
MW / 1,000 MWh |
|
Hyperscale
data center; targeting JDA/binding LOI Dec 2026 |
| |
|
|
|
|
|
|
|
|
| Northern
Pike |
|
Cerro
Gordo County, IA |
|
1,000
MW SMR |
|
TBD |
|
PJM
market access via SOO Green HVDC LOI |
| |
|
|
|
|
|
|
|
|
| Hatchery
Platform (Walleye, Lahontan, Sturgeon) |
|
Washington
State |
|
35 MW
Gas + 800 MW Solar + 1,000 MW SMR |
|
1,000
MW / 4,000 MWh |
|
Industrial
& data center power hub |

Louisiana
Platform (Projects Cayman, Barracuda and Amberjack)
ONE
Nuclear’s proposed Baton Rouge Platform in Louisiana brings together natural gas generation, battery storage, data center
development and advanced nuclear technology within a coordinated, phased development strategy. Its three projects—Cayman, Barracuda
and Amberjack—are intended to connect large-scale computing demand with dedicated energy infrastructure and a pathway toward increasingly
low-carbon power. The platform combines technologies with different development timelines, allowing investment in generation and customer
facilities to progress as commercial requirements, infrastructure and project approvals develop.
| ● | Cayman
is the platform’s gas-and-storage project, targeting approximately 1,800 MW of natural
gas generation paired with a 450 MW/900 MWh battery energy storage system. The proposed generation
configuration combines reciprocating gas engines with simple-cycle gas turbines, providing
a mix of modular capacity and larger generating units. Battery storage would complement these
resources through rapid response and short-duration power support. Cayman is intended to
support Barracuda’s electricity requirements, with final equipment selection, operating
arrangements and delivered capacity established through engineering and customer agreements. |
| ● | Barracuda
is the platform’s proposed data center campus, targeting 1,000 MW of information technology
load at Jumonville North. The campus is intended to accommodate large-scale computing demand
through phased development coordinated with power availability and supporting infrastructure.
ONE Nuclear’s development role centers on suitable land, prepared sites and power,
with tenant facilities and computing systems defined through customer agreements. Total campus
electricity requirements would include cooling and other supporting loads in addition to
the stated IT capacity. |
| ● | Amberjack
is the platform’s advanced nuclear component, targeting 1,000 MW of generation using
small modular reactor technology, with associated battery storage capacity to be determined.
The project is intended to provide a long-term source of dependable, low-carbon electricity
that could complement Cayman’s gas generation and support the region’s growing
industrial and computing demand. Its final reactor configuration, cooling strategy and delivery
arrangements will be developed through engineering and commercial evaluation, with deployment
subject to site control, regulatory approvals, interconnection and financing. |
Project
Nexus (Texas)
Project
Nexus is a planned project in Texas, within the Electric Reliability Council of Texas (“ERCOT”) market, designed to provide
approximately 400 MW of fast-ramping natural-gas generation (utilizing modular gas engines) and 129 MW / 257 MWh of battery energy storage
located behind the meter of a planned co-located data center campus, with a potential future nuclear option. The site is controlled by
a third-party data center developer.
We
are exploring a possible exclusive power development agreement with the data center developer for the Texas site. We have not entered
into a memorandum of understanding or any other written agreement with the developer for this project, and there can be no assurance
that we will do so. If we enter into definitive agreements, we expect to target first commercial operation in 2029.

Project
Sunshine (New Mexico)
Project
Sunshine is designed to serve hyperscale data center customers and is located on an initial site of approximately 600 acres, with the
potential to expand to a substantially larger area, at the Four Corners energy hub in San Juan County, New Mexico (Western Electricity
Coordinating Council (“WECC”) region). The project is planned as a behind-the-meter campus featuring approximately 1,000MW
(gross) of natural-gas engine generation and 250 MW / 1,000 MWh of battery storage to serve adjacent hyperscale data-center loads under
a targeted 15-20-year tolling agreement. The site is located within 1.5 miles of major 345/500 kV transmission hubs and high-pressure
gas pipelines. The proposed project and commercial arrangements remain subject to definitive documentation, diligence and other conditions.
Northern
Pike (Iowa)
ONE
Nuclear’s proposed Northern Pike project in Cerro Gordo County, Iowa, targets 1,000 MW of generation using small modular
reactor technology, with associated battery storage capacity to be determined. The project is intended to provide a long-term source
of dependable, low-carbon electricity to support growing industrial and computing demand. Northern Pike combines advanced nuclear generation
with a transmission-oriented development strategy, seeking to connect new electricity supply with markets requiring reliable power and
additional capacity.
The
project’s development strategy includes evaluating delivery through the proposed SOO Green high-voltage direct-current transmission
link, providing a potential pathway for nuclear energy and capacity to reach the PJM electricity market. A hybrid cooling concept
is also being evaluated to balance water use and operating performance. Final reactor configuration, storage sizing, cooling arrangements
and commercial delivery terms will be established through engineering and customer discussions, with deployment subject to site control,
water availability, regulatory approvals, transmission access and financing.
Hatchery
Platform (Washington State)
ONE
Nuclear’s proposed Hatchery Platform in Washington brings together natural gas generation, solar energy, advanced nuclear
technology and battery storage within a coordinated, phased development strategy. Its three projects—Walleye, Lahontan and Sturgeon—are
intended to address growing industrial electricity demand while establishing a pathway toward reliable, increasingly low-carbon power.
The platform combines technologies with different development timelines, allowing investment and capacity additions to progress as customer
requirements, infrastructure and project approvals develop.
| ● | Walleye
is the platform’s initial gas-and-storage project, with a planned 35 MW of natural
gas generation paired with a 200 MW/800 MWh battery energy storage system. |
| ● | Lahontan
Solar is the platform’s renewable generation component, targeting 800 MW of solar
photovoltaic capacity paired with an 800 MW/3,200 MWh battery energy storage system. |
| ● | Sturgeon
is the platform’s advanced nuclear component, targeting 1,000 MW of generation using small modular reactor technology, with associated
battery storage capacity to be determined. |

Financial
Results Summary (Unaudited)
ONE
Nuclear is a pre-revenue, independent power developer. As such, our financial results primarily reflect overhead and development costs,
in addition to one-time transaction costs, as we continue to advance our portfolio of power development projects.
| ● | General
& Administrative Expenses: G&A expenses for the three months ended September
30, 2026 were $12.8 million, compared to $472.8 thousand for third quarter of 2025. This
increase was primarily driven by a one-time $12.0 million success fee earned by B. Riley
Securities, Inc. upon the consummation of the business combination, alongside increases in
people costs, corporate insurance, and professional fees. For the nine months ended September
30, 2026, G&A expenses totaled $14.5 million driven primarily by the one-time success
fee referenced above, compared with $472.8 thousand in the prior year. Excluding the one-time
transaction fees and net non-cash adjustments, core operating expenses for the third quarter
were approximately $0.8 million, and $2.5 million for the first nine months of 2026, reflecting
disciplined corporate overhead as we advance project-level development. |
| ● | Earnout
Shares and Forward Purchase Agreement Fair Value Adjustments: In accordance with U.S.
GAAP, the Company recognized the contingent Earnout Shares liability at its Closing Date
fair value of $106.1 million as Other Expense. Subsequently, the liability was marked to
fair value of $18.4 million reflecting the post-closing market price of ONEN common stock
of $2.15 per share on September 30, 2026, generating an $87.6 million non-cash gain
that partially offset the initial charge. The fair value of the liability associated with
the Forward Purchase Agreement (FPA) was initially recognized as $14.1 million of Other Expense
based on the closing market share price as of the FPA execution date of September 22, 2026
with a subsequent increase in the expense due to the decline in the share price over the
next 7 days. The fair value of the FPA liability was $41.7 million as of September
30, 2026. |
| ● | Net
Loss: Net loss for the three months ended September 30, 2026 was $(73.0) million, or
$(0.76) per basic and diluted share compared with a loss of $(472.8) thousand or $(0.01)
per basic and diluted share for the prior year quarter. For the nine months ended September
30, 2026, net loss was $(74.8) million, or $(0.79) per basic and diluted share compared with
a loss of $(472.8) thousand or $(0.01) per basic and diluted share for the period of February
10, 2025 (inception) through September 30, 2025. 2026 financial results primarily reflect
the impact of the one-time transaction fees associated with the reverse merger that were
not eligible for capitalization as well as the mark-to-market impacts of the Earnout Shares
liability and the Forward Purchase Agreement embedded derivative liability. |
| ● | Cash
& Liquidity: As of September 30, 2026, cash on hand was $1.5 million. The $1.0 million
New Circle FPA advance occurred subsequent to September 30 and is incremental to the
$1.5M cash on hand. The $0.8 million quarterly core burn rate provides multi-quarter operating
runway with the combined $2.5 million liquidity while additional financing is finalized.
Net financing cash inflows for the nine months ended September 30, 2026 totaled $2.0 million,
driven by $1.8 million of proceeds from the reverse recapitalization and $327.4 thousand
in notes payable advances, partially offset by a $100.0 thousand note repayment. To support
ongoing operational overhead and fund capital requirements for future energy project development,
the Company intends to secure additional financing through the issuance of equity, project
finance debt, and customer co-investment structures. As our behind-the-meter assets are structured
around long-term off-take and tolling agreements, we intend to fund construction primarily
through project-level debt, infrastructure partners, and customer co-investment—minimizing
parent-level equity dilution. |

Management
Presentation and Recorded Webinar
| ● | ONE
Nuclear Energy’s management team will host a pre-recorded video presentation and Q&A
walkthrough on Monday, November 30, 2026, at 8:30 a.m. ET. The presentation will include
an overview of Q3 2026 financial results, and project-level development milestones across
the Company’s project pipeline. |
| ● | Investors
and analysts may submit questions in advance until 12:00p.m. ET on Sunday, November 22, 2026,
by emailing IR@onenuclearenergy.com. The recorded webinar will be available in the
Investors section of the Company’s website at onenuclearenergy.com and
will remain archived for replay. |
Consolidated
Statements of Operations (Unaudited)
| (In USD, except share data) | |
Three Months Ended
Sep 30, 2026 | | |
Three Months Ended
Sep 30, 2025 | | |
Nine Months Ended
Sep 30, 2026 | | |
Inception (Feb 10, 2025) to
Sep 30, 2025 | |
| Operating expenses: | |
| | | |
| | | |
| | | |
| | |
| General and administrative | |
$ | 12,782,281 | | |
$ | 472,795 | | |
$ | 14,502,713 | | |
$ | 472,805 | |
| Loss from operations | |
$ | (12,782,281 | ) | |
$ | (472,795 | ) | |
$ | (14,502,713 | ) | |
$ | (472,805 | ) |
| Other (income) expenses: | |
| | | |
| | | |
| | | |
| | |
| Commitment fees | |
| 50,673 | | |
| — | | |
| 133,164 | | |
| — | |
| Initial recognition of Earnout Shares liability | |
| 106,081,000 | | |
| — | | |
| 106,081,000 | | |
| — | |
| Change in fair value of Earnout Shares liability | |
| (87,647,997 | ) | |
| — | | |
| (87,647,997 | ) | |
| — | |
| Initial recognition of FPA liability | |
| 14,107,525 | | |
| — | | |
| 14,107,525 | | |
| — | |
| Change in fair value of the FPA liability | |
| 27,600,022 | | |
| — | | |
| 27,600,022 | | |
| — | |
| Total other (income) expense | |
| 60,191,223 | | |
| — | | |
| 60,273,714 | | |
| — | |
| Net loss | |
$ | (72,973,504 | ) | |
$ | (472,795 | ) | |
$ | (74,776,427 | ) | |
$ | (472,805 | ) |
| Weighted average shares outstanding (basic & diluted) | |
| 95,458,037 | | |
| 94,403,842 | | |
| 94,759,102 | | |
| 94,403,842 | |
| Basic and diluted net loss per share | |
$ | (0.76 | ) | |
$ | (0.01 | ) | |
$ | (0.79 | ) | |
$ | (0.01 | ) |

Condensed
Consolidated Balance Sheets (Unaudited)
| (In USD) | |
September 30, 2026 | | |
December 31, 2025 | |
| ASSETS | |
| | |
| |
| Current Assets: | |
| | | |
| | |
| Cash | |
$ | 1,495,641 | | |
$ | 130 | |
| Prepaid expenses | |
| 725,866 | | |
| — | |
| Total current assets | |
$ | 2,221,507 | | |
$ | 130 | |
| TOTAL ASSETS | |
$ | 2,221,507 | | |
$ | 130 | |
| LIABILITIES AND STOCKHOLDERS’ DEFICIT | |
| | | |
| | |
| Current Liabilities: | |
| | | |
| | |
| Accounts payable and accrued expenses | |
$ | 16,487,448 | | |
$ | 650,213 | |
| Accrued Offering Costs | |
| 25,000 | | |
| — | |
| Notes payable - B. Riley | |
| 227,363 | | |
| — | |
| Notes payable - Hennessy Capital | |
| — | | |
| 300,000 | |
| Earnout Shares liability – current portion | |
| 6,452,031 | | |
| — | |
| FPA Embedded Derivative Liability | |
| 41,707,547 | | |
| — | |
| Total current liabilities | |
$ | 64,899,389 | | |
$ | 950,213 | |
| Deferred legal fees | |
| 3,635,000 | | |
| — | |
| Earnout Shares liability | |
| 11,980,972 | | |
| — | |
| TOTAL LIABILITIES | |
$ | 80,515,361 | | |
$ | 950,213 | |
| STOCKHOLDERS’ DEFICIT | |
| | | |
| | |
| Preferred stock ($0.0001 par value) | |
| — | | |
| — | |
| Class A common stock ($0.0001 par value) | |
| 10,826 | | |
| 9,440 | |
| Additional paid-in capital | |
| — | | |
| 16,379 | |
| Accumulated deficit | |
| (78,304,680 | ) | |
| (975,902 | ) |
| Total stockholders’ deficit | |
$ | (78,293,854 | ) | |
$ | (950,083 | ) |
| TOTAL LIABILITIES AND STOCKHOLDERS’ DEFICIT | |
$ | 2,221,507 | | |
$ | 130 | |

About
ONE Nuclear Energy Inc.
ONE
Nuclear Energy Inc. (Nasdaq: ONEN) is a pre-revenue development-stage independent power producer (IPP) organized to develop, own, and
operate advanced nuclear and large-scale energy infrastructure to deliver reliable power, strengthen energy security and enable American
industrial growth. By combining the rapid deployment capabilities of high-efficiency natural gas generation with the long-term decarbonization
and baseload power potential of advanced Small Modular Reactors (SMRs), ONE Nuclear will deliver high-uptime, resilient power directly
to energy-intensive off-takers—including hyperscale artificial intelligence and cloud data centers, industrial manufacturers, refineries,
and critical infrastructure—bypassing congested, aging, centralized energy transmission grids.
Forward-Looking
Statements
This
press release contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section
21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements include, but are not limited to, statements regarding
the Company’s commercial pipeline, development strategy, deployment of microgrids and SMRs, anticipated capital requirements, liquidity
position, and ability to secure future debt or equity project financing. Words such as “anticipate,” “believe,”
“continue,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,”
“project,” “target,” “will,” and similar expressions identify forward-looking statements. These statements
are based on management’s current expectations, assumptions, and beliefs and are subject to significant risks, uncertainties, and
changes in circumstances that may cause actual results or events to differ materially from those expressed or implied. Factors that could
cause differences include, among others: the Company’s limited operating history as a development-stage enterprise; substantial
doubt regarding the Company’s ability to continue as a going concern ; the critical requirement to raise substantial additional
capital to fund operations and project development; the risk that financing may not be available on favorable terms or at all; the ability
to execute binding commercial power purchase agreements; regulatory, licensing, and environmental approval timelines relating to advanced
nuclear and microgrid technologies; supply chain lead times; and stock price volatility. ONE Nuclear Energy Inc. undertakes no obligation
to publicly update or revise any forward-looking statement, whether as a result of new information, future events, or otherwise, except
as required by law. Further information is available in our Form 10-Q on file with the SEC for the period ended September 30, 2026.
Investor
& Media Contacts
ONE
Nuclear Energy Inc. Investor Relations & Corporate Communications
Email: IR@onenuclearenergy.com
Website: www.onenuclearenergy.com